Rubber discharging pipe fixing tool
By designing a fixture to fix the glue discharge pipe, the problem of glue splashing caused by the glue discharge pipe not being fixed was solved, achieving stable glue collection and cleanliness of the production site, and reducing production costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-13
- Publication Date
- 2026-03-24
AI Technical Summary
The existing glue discharge pipes are not secured during the glue discharge process, causing glue to splatter everywhere and making it difficult to clean and maintain the production site.
A glue discharge tube fixing fixture was designed, including a fixture frame, a first fixing component and a second fixing component, for fixing the glue discharge tube and making its discharge port face the collection space to collect the discharged glue.
This avoids the shaking of the glue discharge pipe and glue splashing, ensuring a clean production site, reducing maintenance work, improving production efficiency, and saving production costs.
Smart Images

Figure CN224025528U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to gluing technical field, specifically, relate to a kind of glue discharge pipe fixing tool. BACKGROUND
[0002] In the process of gluing operation, the front end of the robot device needs to continuously receive glue supply from the rear-end glue supply device. The glue supply device has a glue discharge pipe and a glue bucket. The glue in the glue bucket may mix with air after the packaging bag is opened. Therefore, the air in the glue bucket must be discharged through the glue discharge pipe until the discharged glue flow is continuous and stable, indicating that the air in the bucket has been completely removed. At this time, the glue discharge valve should be closed to ensure that the glue supply device can normally deliver glue to the robot device, thereby supporting its standard gluing operation.
[0003] However, the existing glue discharge pipe is not fixed during glue discharge. After adding glue, the staff often temporarily finds on-site items to catch the excess glue during the glue discharge process. Because there may be too much air left in the glue bucket, this can cause the glue mixed with air to be suddenly injected due to pressure changes during the glue discharge process, thereby causing the glue to splash everywhere, making it difficult to clean and maintain the production site. SUMMARY
[0004] The utility model aims to provide a kind of glue discharge pipe fixing tool, it can be fixed to glue discharge pipe, and glue after discharge can be collected, avoid the problem that glue discharge pipe shakes and glue splashes everywhere during glue discharge process, guarantee the cleanness of production site, save production cost.
[0005] The embodiment of the utility model is implemented as follows:
[0006] The embodiment of the utility model provides a kind of glue discharge pipe fixing tool, comprising:
[0007] tool holder, the tool holder has collection space, the collection space is used to install glue collection container;
[0008] first fixing assembly, the first fixing assembly is arranged in the tool holder;And
[0009] second fixing assembly, the second fixing assembly is arranged in the tool holder, and the first fixing assembly, the second fixing assembly and the collection space are sequentially spaced apart;
[0010] Among them, the first fixing assembly and the second fixing assembly are used to sequentially fix glue discharge pipe, and make the glue discharge port of the glue discharge pipe towards the collection space.
[0011] In an optional embodiment, the first fixing assembly comprises a first lifting eye bolt and a nut, the first lifting eye bolt is arranged in the tooling frame and is threadedly connected with the nut.
[0012] The first lifting eye bolt has a first fixing hole for fixing the glue discharging pipe.
[0013] In an optional embodiment, the second fixing assembly comprises a second lifting eye bolt and a fixing member, the fixing member is arranged in the tooling frame, and the second lifting eye bolt is connected with the fixing member.
[0014] The second lifting eye bolt has a second fixing hole for fixing the glue discharging pipe.
[0015] In an optional embodiment, the second fixing assembly further comprises a spacer, the spacer is arranged between the second lifting eye bolt and the fixing member and is connected with the second lifting eye bolt and the fixing member.
[0016] In an optional embodiment, the tooling frame comprises a bottom plate, a mounting plate, four supporting rods and four connecting rods, the four supporting rods are arranged along the circumference of the bottom plate, the four connecting rods are arranged away from the bottom plate, and the four connecting rods are arranged along the circumferential direction of the bottom plate, one connecting rod is arranged between two adjacent supporting rods and is connected with the two adjacent supporting rods, and the mounting plate is connected with two adjacent supporting rods and is located on the side of the four connecting rods away from the bottom plate.
[0017] The bottom plate, the four supporting rods and the four connecting rods form the collecting space, the first fixing assembly is arranged at one end of the supporting rod away from the bottom plate, and the second fixing assembly is arranged on the mounting plate.
[0018] In an optional embodiment, the mounting plate is provided with a strip-shaped hole, and the second fixing assembly is movably connected with the strip-shaped hole.
[0019] In an optional embodiment, the tooling frame further comprises at least one baffle, the baffle is connected with the connecting rod, the bottom plate and two adjacent supporting rods.
[0020] In an optional embodiment, the tooling frame further comprises four protective sleeves, the four protective sleeves are respectively arranged at one end of the four supporting rods away from the bottom plate.
[0021] In an optional embodiment, the glue discharging pipe fixing tool further comprises a plurality of hooks, the plurality of hooks are arranged on the tooling frame and are used for fixing the glue collecting container.
[0022] In an optional embodiment, the number of the first fixing assemblies and the second fixing assemblies is multiple, the multiple first fixing assemblies are arranged at intervals, the multiple second fixing assemblies are arranged at intervals and correspond to the multiple first fixing assemblies one by one.
[0023] The beneficial effects of the embodiments of the present application include:
[0024] The glue discharging pipe fixing tool comprises a tool frame, a first fixing assembly and a second fixing assembly, the tool frame has a collection space, the collection space is used for installing a glue collection container, the first fixing assembly is arranged on the tool frame, the second fixing assembly is arranged on the tool frame, and the first fixing assembly, the second fixing assembly and the collection space are arranged at intervals in sequence, wherein the first fixing assembly and the second fixing assembly are used for fixing the glue discharging pipes in sequence and making the glue discharging ports of the glue discharging pipes face the collection space.
[0025] During the glue discharging operation, the glue collection container is first installed in the collection space, and then the glue discharging pipes of the glue supply device are fixed through the first fixing assembly and the second fixing assembly in sequence, so as to ensure the installation stability and make the glue discharging ports of the glue discharging pipes face the collection space, thereby facilitating the glue collection container to collect the discharged glue. It is easy to understand that through such a setting, the problems of shaking of the glue discharging pipes and splashing of the glue everywhere during the glue discharging process can be avoided, the cleanliness of the production site is ensured, the maintenance work is reduced, the production efficiency is improved, and the excess glue can be collected as much as possible, thereby saving the production cost. BRIEF DESCRIPTION OF DRAWINGS
[0026] In order to more clearly illustrate the technical scheme of the embodiments of the present application, the following will briefly introduce the drawings needed to be used in the embodiments. It should be understood that the following drawings only show some embodiments of the present application, and therefore should not be regarded as a limitation on the scope, and for those skilled in the art, other related drawings can also be obtained without creative labor on the basis of these drawings.
[0027] Figure 1 The assembly diagram of the glue discharging pipe fixing tool and the glue supply device provided by the embodiments of the present application is shown in the figure.
[0028] Figure 2 The structure diagram of the glue discharging pipe fixing tool provided by the embodiments of the present application is shown in the figure.
[0029] Figure 3 The structure diagram of the first fixing assembly provided by the embodiments of the present application is shown in the figure.
[0030] Figure 4 The structure diagram of the second fixing assembly provided by the embodiments of the present application is shown in the figure.
[0031] Icon: 100 - Rubber hose fixing tool; 10 - Tool frame; 11 - Collection space; 12 - Bottom plate; 121 - Mounting hole; 13 - Mounting plate; 131 - Strip hole; 14 - Support rod; 15 - Connecting rod; 16 - Baffle; 17 - Protective sleeve; 20 - First fixing assembly; 21 - First lifting ring bolt; 211 - First fixing hole; 22 - Nut; 30 - Second fixing assembly; 31 - Second lifting ring bolt; 311 - Second fixing hole; 32 - Fixing piece; 33 - Pad; 40 - Hook; 200 - Rubber supply device; 201 - Rubber bucket; 202 - Rubber hose; 2021 - Rubber outlet. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme of the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings herein can be arranged and designed in various different configurations.
[0033] Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the claimed present application, but only represents selected embodiments of the present application. All other embodiments obtained by those of ordinary skill in the art based on the embodiments in the present application without creative labor are within the scope of protection of the present application.
[0034] It should be noted that: similar reference numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings.
[0035] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship commonly placed when the product of the present application is used, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third" and the like are only used for differentiation in description, and cannot be understood as indicating or implying relative importance.
[0036] In addition, the terms "horizontal", "vertical" and the like do not mean that the components must be absolutely horizontal or vertical, but can be slightly inclined. For example, "horizontal" only means that it is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly inclined.
[0037] In the description of the utility model, it should be explained that, unless otherwise specified and limited, the terms "set", "install", "connect", "connect" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected, it can be mechanically connected, or it can be electrically connected, it can be directly connected, or it can be indirectly connected through an intermediate medium, it can be the communication inside two elements. For ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to specific circumstances.
[0038] As described in the background, the glue supply device has a glue discharge pipe and a glue bucket, and the glue in the glue bucket may mix with air after the packaging bag is opened. Therefore, the air in the glue bucket must be discharged through the glue discharge pipe until the discharged glue flow is continuous and stable, indicating that the air in the bucket has been completely removed. However, the existing glue discharge pipe is not fixed during glue discharge, and after adding glue, the staff often temporarily finds on-site items to catch the excess glue during the glue discharge process. Because there may be too much air remaining in the glue bucket, this will cause the glue mixed with air to be suddenly injected due to pressure changes during the glue discharge process, thereby causing the glue to splash everywhere, making the cleaning and maintenance work of the production site difficult.
[0039] Based on this, please refer to Figures 1-4 The embodiment of the utility model provides a glue discharge pipe fixing tool 100, which can effectively improve the above-mentioned technical problems, that is, it can fix the glue discharge pipe 202, and can collect the discharged glue, avoid the problem of shaking of the glue discharge pipe 202 and splashing of the glue during the glue discharge process, ensure the cleanliness of the production site, and save the production cost. The glue discharge pipe fixing tool 100 will be described in detail below.
[0040] Please refer to Figure 1 , Figure 1 The glue discharge pipe fixing tool 100 provided by the embodiment and the assembly schematic view of the glue supply device 200 are combined Figure 1 The glue supply device 200 includes a glue bucket 201 and a glue discharge pipe 202, and the glue bucket 201 is communicated with the glue discharge pipe 202. Before actual gluing operation, the air in the glue bucket 201 needs to be discharged through the glue discharge pipe 202 until the glue flow discharged from the glue discharge pipe 202 is continuous and stable, indicating that the air in the bucket has been completely removed and normal operation can be carried out. The glue discharge pipe fixing tool 100 is used for installing and fixing the glue discharge pipe 202 to avoid shaking and other conditions during the glue discharge process.
[0041] For details, please refer to Figure 2 , Figure 2 This is a structural schematic diagram of the glue discharge tube fixing fixture 100 provided in this embodiment, combined with... Figure 1 and Figure 2 The glue discharge tube fixing fixture 100 includes a fixture frame 10, a first fixing component 20, and a second fixing component 30. The fixture frame 10 has a collection space 11 for installing a glue collection container. The first fixing component 20 is disposed on the fixture frame 10, and the second fixing component 30 is disposed on the fixture frame 10. The first fixing component 20, the second fixing component 30, and the collection space 11 are arranged in sequence at intervals. The first fixing component 20 and the second fixing component 30 are used to fix the glue discharge tube 202 in sequence, and make the glue discharge port 2021 of the glue discharge tube 202 face the collection space 11.
[0042] During the glue discharge operation, the glue collection container is first installed in the collection space 11. Then, the glue discharge pipe 202 of the glue supply device 200 is fixed sequentially by the first fixing component 20 and the second fixing component 30 to ensure installation stability. The discharge port 2021 of the glue discharge pipe 202 is positioned facing the collection space 11, facilitating the collection of the discharged glue in the glue collection container. This setup easily avoids the problems of the glue discharge pipe 202 shaking and glue splashing during the discharge process, ensuring a clean production site, reducing maintenance, improving production efficiency, and collecting excess glue as much as possible, thus saving production costs.
[0043] In order to fix the glue discharge pipes 202 of multiple glue supply devices 200 and collect the discharged glue, the number of first fixing components 20 and second fixing components 30 can be set to multiple, with multiple first fixing components 20 spaced apart and multiple second fixing components 30 spaced apart, and each corresponding to one of the multiple first fixing components 20.
[0044] Specifically, in this embodiment, there are two glue supply devices 200. That is, during the actual glue application operation, the two glue supply devices 200 can provide two different types of glue or the same type of glue. For example, in this embodiment, the two glue supply devices 200 provide glue A and glue B respectively. During the actual glue application, glue A and glue B need to be mixed before subsequent production operations. Correspondingly, in this embodiment, there are also two first fixing components 20 and two fixing components 30, which are used to fix the two glue discharge tubes 202 respectively. Of course, in other embodiments, the number of glue supply devices 200, first fixing components 20 and second fixing components 30 can also be three, four or five, etc., and all can be collected by the same glue collection container.
[0045] It should be noted that the glue collection container can be a glue collection bag, a glue collection barrel or a glue collection box or other collection structures, as long as it can be installed in the collection space 11 of the tool rack 10 and collect the glue discharged by the glue discharge pipe 202.
[0046] Further, please refer to Figure 3 , Figure 3 The structure diagram of the first fixing assembly 20 provided in the embodiment is shown in FIG. 2, in combination with Figure 2 and Figure 3 , the first fixing assembly 20 includes a first lifting eye bolt 21 and a nut 22, the first lifting eye bolt 21 is arranged in the tool rack 10 and is threadedly connected with the nut 22. The first lifting eye bolt 21 has a first fixing hole 211 for fixing the glue discharge pipe 202.
[0047] That is, the first lifting eye bolt 21 is threadedly connected with the nut 22, thereby being fixed on the first fixing assembly 20, and the glue discharge pipe 202 passes through the first fixing hole 211 of the first lifting eye bolt 21, thereby achieving glue discharge fixation. In actual fixing of the glue discharge pipe 202, the position and direction of the glue discharge pipe 202 can be adjusted by rotating the first lifting eye bolt 21, so as to better cooperate with the second fixing assembly 30, improve the installation stability of the glue discharge pipe 202, better collect the glue and prevent the glue from splashing.
[0048] Further, please refer to Figure 4 , Figure 4 The structure diagram of the second fixing assembly 30 provided in the embodiment is shown in FIG. 3, in combination with Figure 2 and Figure 4 , the second fixing assembly 30 includes a second lifting eye bolt 31 and a fixing piece 32, the fixing piece 32 is arranged in the tool rack 10, and the second lifting eye bolt 31 is connected with the fixing piece 32. The second lifting eye bolt 31 has a second fixing hole 311 for fixing the glue discharge pipe 202. Similarly, the glue discharge pipe 202 passes through the second fixing hole 311 of the second lifting eye bolt 31, thereby achieving glue discharge fixation.
[0049] In order to enable the second fixing hole 311 to be located in the middle region of the collection space 11, improve the glue collection effect and further avoid the glue splashing problem in the glue discharge process, in the embodiment, the second fixing assembly 30 further includes a pad 33 arranged between the second lifting eye bolt 31 and the fixing piece 32 and connected with the second lifting eye bolt 31 and the fixing piece 32.
[0050] It should be noted that in the embodiment, the fixing member 32 is a hexagonal bolt, which can be threadedly connected with the pad 33 to fix the pad 33. Similarly, the second lifting ring bolt 31 is also threadedly connected with the pad 33, so that when the glue discharge pipe 202 is actually fixed, the position and direction of the glue discharge pipe 202 can be adjusted by rotating the second lifting ring bolt 31 to better cooperate with the first fixing assembly 20, thereby improving the installation stability of the glue discharge pipe 202. At the same time, by arranging the pad 33, the second fixing hole 311 of the second lifting ring bolt 31 can be arranged as much as possible in the middle region of the collection space 11, so that the glue collection container can collect glue better and avoid glue splashing.
[0051] In addition, it should be noted that the number of the fixing member 32 in the embodiment is two, and the two fixing members 32 are connected with the pad 33, thereby improving the installation stability of the pad 33 and further ensuring the stable installation of the second lifting ring bolt 31 on the glue discharge pipe 202. Of course, in other embodiments, the number of the fixing member 32 can be one, three, four or the like, and the specific number needs to be determined according to actual design requirements.
[0052] Please continue to combine Figure 2 Specifically, the tooling frame 10 includes a bottom plate 12, a mounting plate 13, four support rods 14 and four connecting rods 15. The four support rods 14 are arranged on the bottom plate 12 in a circumferential direction of the bottom plate 12, and the four connecting rods 15 are arranged on the bottom plate 12 in a circumferential direction of the bottom plate 12. There is one connecting rod 15 between adjacent two support rods 14, and the connecting rod 15 is connected with the two support rods 14. The mounting plate 13 is connected with the adjacent two support rods 14, and is located on a side of the four connecting rods 15 away from the bottom plate 12. The collection space 11 is formed between the bottom plate 12, the four support rods 14 and the four connecting rods 15. The first fixing assembly 20 is arranged at one end of the support rod 14 away from the bottom plate 12, and the second fixing assembly 30 is arranged on the mounting plate 13.
[0053] It should be noted that in the embodiment, the two first fixing assemblies 20 are arranged on the adjacent two support rods 14, and the two second fixing assemblies 30 are arranged on the mounting plate 13.
[0054] Combined with Figure 2 and Figure 4 In order to further facilitate the position adjustment of the glue discharge pipe 202, the mounting plate 13 is provided with a strip-shaped hole 131, and the second fixing assembly 30 is movably connected with the strip-shaped hole 131.
[0055] Specifically in the embodiment, the fixing member 32 passes through the strip-shaped hole 131 and is connected with the pad 33, and the fixing member 32 can be slid and fixed in the strip-shaped hole 131 by screwing or unscrewing the thread connection with the pad 33. In this way, the second lifting ring bolt 31 and the glue discharging pipe 202 can be moved, so that different specifications of the glue discharging pipe 202 and different specifications of the glue collecting container can be adapted, and the glue discharged from the glue discharging pipe 202 can be better collected by the glue collecting container, thereby further saving the production cost.
[0056] Please continue to combine Figure 2 In order to improve the installation stability of the glue collecting container, the tool frame 10 further comprises at least one baffle 16, which is connected with the connecting rod 15, the bottom plate 12 and the adjacent two supporting rods 14. It is easy to understand that the baffle 16 can provide support for the glue collecting container, thereby improving the effect of glue collection.
[0057] It should be noted that in the embodiment, the number of baffles 16 is two, and the two baffles 16 are oppositely arranged to support the glue collecting container in the left-right direction or the front-rear direction, thereby improving the installation stability; and when the glue discharging operation is completed, the operator can conveniently take out the glue collecting container from the space where the baffle 16 is not arranged, thereby improving the work efficiency.
[0058] Of course, in other embodiments, the number of baffles 16 can also be one, three or four, and the specific number needs to be determined according to the actual design requirements.
[0059] In order to further improve the installation stability of the glue collecting container, the glue pipe fixing tool 100 further comprises a plurality of hooks 40, which are arranged at intervals on the tool frame 10 and are used for fixing the glue collecting container. For example, if the glue collecting container is a glue collecting bag, the opening end of the collecting bag can be hung on the hook 40 for fixation, and then the collecting main body part of the collecting bag is placed in the collecting space 11 of the tool frame 10.
[0060] It should be noted that in the embodiment, the number of hooks 40 is specifically four, and the four hooks 40 are arranged on the four connecting rods 15, thereby realizing fixation of the glue collecting container in four directions, with high stability. Of course, in other embodiments, the number of hooks 40 can also be two, three or five, and the specific number and arrangement position also need to be determined according to the actual design requirements.
[0061] Optionally, the tooling frame 10 further comprises four protective sleeves 17, which are respectively sleeved on the ends of the four supporting rods 14 away from the bottom plate 12. By arranging the protective sleeves 17, the glue discharge pipe 202 can be protected, and the risk of the staff being scratched by the supporting rods 14 during operation can be avoided, thereby protecting the operator.
[0062] In addition, in the embodiment, mounting holes 121 are arranged at both ends of the bottom plate 12, so that the tooling frame 10 can be fixed as a whole with other equipment, thereby further improving the stability during glue discharging.
[0063] In summary, the embodiment of the utility model provides a glue discharge pipe fixing tool 100, which comprises a tooling frame 10, a first fixing assembly 20 and a second fixing assembly 30. The tooling frame 10 has a collection space 11 for mounting a glue collection container. The first fixing assembly 20 is arranged on the tooling frame 10, and the second fixing assembly 30 is arranged on the tooling frame 10. The first fixing assembly 20, the second fixing assembly 30 and the collection space 11 are arranged in sequence and are spaced apart. The first fixing assembly 20 and the second fixing assembly 30 are used for fixing the glue discharge pipe 202 in sequence and making the glue discharge port 2021 of the glue discharge pipe 202 face the collection space 11. During glue discharging, the glue collection container is first mounted in the collection space 11, and then the glue discharge pipe 202 of the glue supply device 200 is fixed in sequence by the first fixing assembly 20 and the second fixing assembly 30, so as to ensure the mounting stability and make the glue discharge port 2021 of the glue discharge pipe 202 face the collection space 11, thereby facilitating the glue collection container to collect the discharged glue.
[0064] It is easy to understand that, by arranging the glue discharge pipe fixing tool 100, the problem of shaking of the glue discharge pipe 202 and splashing of glue during glue discharging can be avoided, the production site can be kept clean, the maintenance work can be reduced, the production efficiency can be improved, and the excess glue can be collected as much as possible, thereby saving the production cost.
[0065] The above merely describes specific embodiments of the utility model and is not used to limit the utility model. For those skilled in the art, the utility model can be changed and varied in various ways. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A fixture for fixing a glue discharge hose, characterized in that, include: Tooling rack (10), the tooling rack (10) having a collection space (11) for mounting a glue collection container; A first fixing component (20) is disposed on the tooling frame (10); and The second fixing component (30) is disposed on the tooling frame (10), and the first fixing component (20), the second fixing component (30) and the collection space (11) are arranged at intervals in sequence; The first fixing component (20) and the second fixing component (30) are used to fix the glue discharge tube (202) in sequence, and to make the glue discharge port (2021) of the glue discharge tube (202) face the collection space (11).
2. The adhesive discharge hose fixing fixture according to claim 1, characterized in that, The first fixing component (20) includes a first eye bolt (21) and a nut (22). The first eye bolt (21) passes through the tooling frame (10) and is threadedly engaged with the nut (22). The first eye bolt (21) has a first fixing hole (211) for fixing the rubber discharge tube (202).
3. The adhesive discharge hose fixing fixture according to claim 1, characterized in that, The second fixing component (30) includes a second eye bolt (31) and a fixing member (32), the fixing member (32) being disposed on the tooling frame (10), and the second eye bolt (31) being connected to the fixing member (32); The second eye bolt (31) has a second fixing hole (311) for fixing the rubber discharge tube (202).
4. The adhesive discharge hose fixing fixture according to claim 3, characterized in that, The second fixing component (30) further includes a pad (33) which is disposed between the second eye bolt (31) and the fixing member (32) and is connected to both the second eye bolt (31) and the fixing member (32).
5. The adhesive discharge hose fixing fixture according to claim 1, characterized in that, The tooling frame (10) includes a base plate (12), a mounting plate (13), four support rods (14), and four connecting rods (15). The four support rods (14) are spaced apart on the base plate (12) around its circumference. The four connecting rods (15) are spaced apart from the base plate (12) and are arranged in a ring around the base plate (12). A connecting rod (15) is provided between two adjacent support rods (14), and all support rods (14) are connected to the connecting rod (15). The mounting plate (13) is connected to two adjacent support rods (14) and is located on the side of the four connecting rods (15) away from the base plate (12). The collection space (11) is formed between the base plate (12), the four support rods (14) and the four connecting rods (15), the first fixing component (20) is disposed at the end of the support rod (14) away from the base plate (12), and the second fixing component (30) is disposed on the mounting plate (13).
6. The adhesive discharge hose fixing fixture according to claim 5, characterized in that, The mounting plate (13) has a strip hole (131), and the second fixing component (30) is movably engaged with the strip hole (131).
7. The adhesive discharge hose fixing fixture according to claim 5, characterized in that, The tooling frame (10) also includes at least one baffle (16), which is connected to the connecting rod (15), the base plate (12) and the two adjacent support rods (14).
8. The adhesive discharge hose fixing fixture according to claim 5, characterized in that, The tooling frame (10) also includes four protective sleeves (17), which are respectively fitted onto the ends of the four support rods (14) away from the base plate (12).
9. The adhesive discharge hose fixing fixture according to claim 1, characterized in that, The glue discharge tube fixing fixture (100) also includes a plurality of hooks (40), which are spaced apart on the fixture frame (10) and are used to fix the glue collection container.
10. The adhesive discharge hose fixing fixture according to claim 1, characterized in that, The number of the first fixing component (20) and the second fixing component (30) are both multiple. The multiple first fixing components (20) are spaced apart, and the multiple second fixing components (30) are spaced apart, and each corresponds to one of the multiple first fixing components (20).