Connecting structure of artificial stone plate ground pavement

The seamless splicing method using tapered pins and tapered holes solves the problems of gaps and complex installation in the process of artificial stone slab flooring, thus improving both aesthetics and construction efficiency.

CN224048580UActive Publication Date: 2026-03-27SHANDONG TIANXU NEW MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-14
Publication Date
2026-03-27

AI Technical Summary

Technical Problem

Existing artificial stone slab flooring is prone to gaps during installation, affecting aesthetics and stability. At the same time, the installation is complex, increasing construction difficulty and time costs.

Method used

It adopts a tapered pin and tapered hole structure design, and achieves seamless splicing by tightly fitting the tapered pin and tapered hole and applying glue, which simplifies the installation process.

Benefits of technology

It achieves seamless splicing of artificial stone slabs, improving aesthetics and construction efficiency, reducing installation difficulty, and making it suitable for quick installation by non-professionals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224048580U_ABST
    Figure CN224048580U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building decoration, and discloses an artificial stone plate ground paving connecting structure which comprises a first connecting plate, the front side of the outer portion of the first connecting plate is fixedly connected with a first taper pin, and the front side of the outer portion of the first taper pin is slidably connected with a first taper hole. And a second connecting plate is fixedly connected to the front side of the exterior of the first taper hole, a second taper pin is fixedly connected to the front side of the exterior of the second connecting plate, a second taper hole is slidably connected to the front side of the exterior of the second taper pin, and a third connecting plate is fixedly connected to the exterior of the second taper hole. According to the utility model, the first taper pin is tightly attached to the first taper hole, and the second taper pin is tightly attached to the second taper hole, so that seamless splicing between the artificial stone plates can be realized, the problems of gaps and dislocation in a traditional splicing mode are avoided, the overall paving attractiveness is obviously improved, and the floor paving effect is more tidy; and delicate visual perception is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field technology field of building decoration especially relates to a connecting structure of artificial stone floor paving. BACKGROUND

[0002] Artificial stone floor paving is a kind of floor paving plate made of non-natural mixture, which has good decorative effect and practicability. It is usually made of resin, cement, glass beads, aluminum stone powder and other materials and stone adhesive, has the characteristics of wear resistance, pollution resistance, environmental protection, etc., and is widely used in indoor floor, outdoor floor, landscape and municipal engineering and other places. The gap between the stone plates can be bonded by glue, and the design can effectively splice and facilitate use. Therefore, the connecting structure of the gap between the artificial stone floor paving is also very important.

[0003] A connecting structure of artificial stone floor paving is usually composed of connecting mechanism and glue, so when in use, the connecting mechanism is used for installation during two-end connection, and the glue plays a role in enhancing the stability of connection during connection, so that the connecting mechanism is connected with each other.

[0004] However, some devices in the prior art are prone to gaps during installation, which not only affects the overall aesthetics, but also causes insufficient stability of the connection part, thereby affecting the service life. In addition, the installation process of some connecting structures is relatively complex, which requires professional tools and skills, increasing the difficulty and time cost of construction and reducing the construction efficiency. Therefore, a connecting structure of artificial stone floor paving is proposed to solve the above problems. UTILITY MODEL CONTENT

[0005] In order to make up for the above shortcomings, the utility model provides a connecting structure of artificial stone floor paving, which aims to improve the problem that some devices in the prior art produce gaps during installation.

[0006] In order to achieve the above purpose, the utility model adopts the following technical scheme:

[0007] A connecting structure of artificial stone floor paving, comprising a first connecting plate, the outer front side of the first connecting plate is fixedly connected with a first taper pin, the outer front side of the first taper pin is slidably connected with a first taper hole, the outer front side of the first taper hole is fixedly connected with a second connecting plate, the outer front side of the second connecting plate is fixedly connected with a second taper pin, the outer front side of the second taper pin is slidably connected with a second taper hole, and the outer side of the second taper hole is fixedly connected with a third connecting plate.

[0008] As a further description of the above technical scheme:

[0009] The first conical hole is arranged on the outer back side of the second connecting plate, and the second conical hole is arranged on the outer back side of the third connecting plate.

[0010] As a further description of the above technical solution:

[0011] The first conical pin and the second conical pin are both conical, and the first connecting plate is connected to the first conical hole through the first conical pin, so that the first connecting plate and the second connecting plate are connected.

[0012] As a further description of the above technical solution:

[0013] The second conical pin and the second conical hole are matched with each other, and the first conical pin can be matched with the second conical hole.

[0014] As a further description of the above technical solution:

[0015] When the first conical pin is matched with the first conical hole and the second conical hole, the first conical pin is connected through glue.

[0016] As a further description of the above technical solution:

[0017] When the second conical pin is matched with the second conical hole, the second conical pin is connected through glue.

[0018] As a further description of the above technical solution:

[0019] The second connecting plate is arranged between the first conical pin and the second conical hole, so that the first connecting plate, the second connecting plate and the third connecting plate are connected.

[0020] The utility model has the advantages of the following:

[0021] 1. In the utility model, the first conical pin and the first conical hole and the second conical pin and the second conical hole are closely matched, so that the artificial stone plates can be seamlessly spliced, the gap and misalignment problems in the traditional splicing mode are avoided, the overall appearance is significantly improved, the ground laying effect is more neat, and the visual sense is delicate.

[0022] 3. The utility model discloses, through the connecting effect of second connecting plate, first connecting plate and third connecting plate can realize mutual connection and prolong the connecting length quickly, this design significantly simplifies the connecting step, reduces the installation time, makes whole paving process more efficient, and installation personnel need not complicated operation skill, only need to aim at each connecting plate and slide in can complete the connection, greatly improves the construction efficiency, especially suitable for large -area laying project. BRIEF DESCRIPTION OF DRAWINGS

[0023] Figure 1 A three-dimensional schematic view of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0024] Figure 2 The structure diagram of the second taper hole of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0025] Figure 3 The structure diagram of the second taper pin of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0026] Figure 4 The structure diagram of the first taper pin of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0027] Figure 5 The structure diagram of the first connecting plate of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0028] Figure 6 The structure diagram of the first taper hole of the connecting structure of the artificial stone slab ground paving is provided for the utility model;

[0029] Figure 7 The structure diagram of the third connecting plate of the connecting structure of the artificial stone slab ground paving is provided for the utility model.

[0030] LEGEND:

[0031] 1, first connecting plate, 2, second connecting plate, 3, third connecting plate, 4, first taper pin, 5, first taper hole, 6, second taper pin, 7, second taper hole. DETAILED DESCRIPTION

[0032] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model, and obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without creative labor belong to the scope of protection of the utility model.

[0033] REFERENCEFigures 1 to 4 The utility model provides a kind of connecting structure of artificial stone slab ground paving of an embodiment: a kind of first connecting plate 1, its design can provide good supporting ability, first connecting plate 1 is fixedly connected with first taper pin 4 in the outside front side, its design can provide good connecting ability, simultaneously connect the both sides of the stone slab to be connected, first taper pin 4 is slidably connected with first taper hole 5 in the outside front side, its design can be connected by first taper pin 4 with first taper hole 5, first taper hole 5 is fixedly connected with second connecting plate 2 in the outside front side, its design can provide good supporting ability, second connecting plate 2 is fixedly connected with second taper pin 6 in the outside front side, the design of second taper pin 6 can provide good connecting ability, second taper pin 6 is slidably connected with second taper hole 7 in the outside front side, second taper hole 7 makes design can make first taper pin 4 or second taper pin 6 connect, second taper hole 7 is fixedly connected with third connecting plate 3 in the outside, its design can provide good supporting ability, simultaneously when being able to be connected in the other side of stone slab, first connecting plate 1 can be spliced, first taper hole 5 is arranged in the outside rear side of second connecting plate 2, second taper hole 7 is arranged in the outside rear side of third connecting plate 3, the appearance of first taper pin 4 and second taper pin 6 is all taper, simultaneously first connecting plate 1 can be connected by first taper pin 4 with first taper hole 5, so that first connecting plate 1 and second connecting plate 2 are connected, by second taper pin 6 with second taper hole 7 can make second connecting plate 2 with third connecting plate 3 connect, so that the extension connection between first connecting plate 1 and third connecting plate 3 can be achieved, as described above, realize seamless splicing of quartz stone plate, improve overall aesthetic degree, simultaneously can be connected quickly.

[0034] Refer to Figures 2 to 4 Second taper pin 6 and second taper hole 7 mutually adhere to, simultaneously first taper pin 4 can mutually adhere to second taper hole 7, when first taper pin 4 and first taper hole 5 and second taper hole 7 mutually slide and adhere, connect by glue, when second taper pin 6 and second taper hole 7 mutually slide and adhere, connect by glue, as described above, its design can provide convenient installation, need not professional skill, can be completed installation in alignment position, simple and efficient, simultaneously on the basis of guaranteeing firm connection, reduce the amount of glue, more environmentally friendly and healthy.

[0035] Refer to Figure 1 , Figure 5 , Figure 6 And Figure 7 The outside of second connecting plate 2 is between first taper pin 4 and second taper hole 7, so that first connecting plate 1, second connecting plate 2 and third connecting plate 3 are connected with each other, as described above, the connecting length of first connecting plate 1 and third connecting plate 3 can be quickly and effectively extended by second connecting plate 2, so that the docking can be facilitated and quickened.

[0036] Working principle: in use, first, the first connecting plate 1 is placed in the appropriate position. Then, the second connecting plate 2 is close to the first connecting plate 1, so that the first taper pin 4 is aligned with the first taper hole 5 on the rear side of the second connecting plate 2. Because the first taper pin 4 and the first taper hole 5 are both tapered design, the first taper pin 4 can be smoothly into the first taper hole 5, realize the close connection of the first connecting plate 1 and the second connecting plate 2. Then, the third connecting plate 3 is close to the second connecting plate 2, so that the second taper pin 6 is aligned with the second taper hole 7 on the rear side of the third connecting plate 3. Similarly, by virtue of the tapered design, the second taper pin 6 can be smoothly into the second taper hole 7, complete the connection of the second connecting plate 2 and the third connecting plate 3. Through this way of connection, the seamless splicing of artificial stone plate is realized.

[0037] In the installation, first, the first connecting plate 1 is placed in the predetermined position. Then, the second connecting plate 2 is close to the first connecting plate 1, so that the first taper pin 4 on the first connecting plate 1 is aligned with the first taper hole 5 on the second connecting plate 2. In the process of mutual sliding fit of the first taper pin 4 and the first taper hole 5, appropriate amount of glue is applied to enhance the stability of the connection. Then, the third connecting plate 3 is close to the second connecting plate 2, so that the second taper pin 6 on the second connecting plate 2 is aligned with the second taper hole 7 on the third connecting plate 3. In the process of mutual sliding fit of the second taper pin 6 and the second taper hole 7, appropriate amount of glue is also applied for connection. In addition, the first taper pin 4 can also be mutually fitted with the second taper hole 7, and connected through the glue. In this way, the first connecting plate 1, the second connecting plate 2 and the third connecting plate 3 can realize convenient installation, without complex operation skills, only need to align the position to complete the installation process.

[0038] In the connection, the first connecting plate 1 is placed in the laying position, and then the second connecting plate 2 is close to the first connecting plate 1, so that the first taper pin 4 on the first connecting plate 1 is aligned with the first taper hole 5 on the second connecting plate 2 and is slid into it, realizing the connection of the first connecting plate 1 and the second connecting plate 2. Then, the third connecting plate 3 is close to the second connecting plate 2, so that the second taper pin 6 on the second connecting plate 2 is aligned with the second taper hole 7 on the third connecting plate 3 and is slid into it, completing the connection of the second connecting plate 2 and the third connecting plate 3. Through the connection of the second connecting plate 2, the first connecting plate 1 and the third connecting plate 3 are connected with each other and the connection length is extended, so as to realize the rapid butt joint of artificial stone plate.

[0039] Finally, it should be pointed out that: the above only for the preferred embodiments of the present application, and not for limiting the present application, although the present application has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can modify the technical scheme recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application, shall be included in the protection scope of the present application.

Claims

1. A connecting structure for artificial stone sheet flooring, comprising a first connecting plate (1), characterized in that: The outer front side of the first connecting plate (1) is fixedly connected with a first taper pin (4), the outer front side of the first taper pin (4) is slidably connected with a first taper hole (5), the outer front side of the first taper hole (5) is fixedly connected with a second connecting plate (2), the outer front side of the second connecting plate (2) is fixedly connected with a second taper pin (6), the outer front side of the second taper pin (6) is slidably connected with a second taper hole (7), and the outer side of the second taper hole (7) is fixedly connected with a third connecting plate (3).

2. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: The outer side of the first taper hole (5) is arranged on the outer rear side of the second connecting plate (2), and the outer side of the second taper hole (7) is arranged on the outer rear side of the third connecting plate (3).

3. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: The first taper pin (4) and the second taper pin (6) are both in the shape of a cone, and the first connecting plate (1) can be connected with the first taper hole (5) through the first taper pin (4), so that the first connecting plate (1) and the second connecting plate (2) are connected.

4. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: The second taper pin (6) and the second taper hole (7) are mutually attached, and the first taper pin (4) can be mutually attached with the second taper hole (7).

5. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: When the first taper pin (4) is slidably attached with the first taper hole (5) and the second taper hole (7), the first taper pin (4) is connected through glue.

6. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: When the second taper pin (6) is slidably attached with the second taper hole (7), the second taper pin (6) is connected through glue.

7. The connection structure of the artificial stone sheet flooring according to claim 1, wherein: The outer side of the second connecting plate (2) is between the first taper pin (4) and the second taper hole (7), so that the first connecting plate (1), the second connecting plate (2) and the third connecting plate (3) are mutually connected.