Concrete pouring, pumping and warehousing construction structure for multi-hole spillway gate pier
By setting up reserved channels at the bottom of the gate piers and using horizontal and vertical pump pipes to connect concrete pump trucks, the problem of interference between gate pier construction was solved, and efficient concrete pouring of multi-hole spillway gate piers was achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SINOHYRDO ENG BUREAU 3 CO LTD
- Filing Date
- 2025-05-06
- Publication Date
- 2026-05-12
AI Technical Summary
在水电站闸墩混凝土施工中,由于各个闸墩的阻挡导致施工之间相互干扰,影响施工速度且成本高。
A reserved passage is set up at the bottom of the gate pier, and a concrete pump truck is connected by horizontal and vertical pump pipes. A temporary operating platform is provided through a horizontal walkway to enable simultaneous concrete pouring for multiple gate piers.
This avoided mutual interference between the concrete construction of the gate piers, and improved construction efficiency and progress.
Smart Images

Figure CN224227748U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of hydropower station technology, and specifically relates to a construction structure for pumping concrete into a multi-hole spillway gate pier. Background Technology
[0002] A spillway section is typically located in the middle of a hydroelectric dam for flood discharge. This spillway section has multiple gate piers, with gates installed between them to control the discharge flow. During the concrete construction of the gate piers, concrete is usually pumped into the placement area. However, due to the obstruction of the gate piers, the pump pipe for the concrete entering the placement area of the middle gate pier must cross over adjacent gate piers that are under construction simultaneously. This causes mutual interference between the concrete construction work of the gate piers. The installation of the pump pipe across the gate piers is difficult, requires repeated installation and removal, resulting in high construction costs and limiting the speed of the gate pier concrete construction. Utility Model Content
[0003] The main purpose of this utility model is to provide a construction structure for pumping concrete into the dam for a multi-hole spillway gate pier, which solves the problem that the concrete pouring of the gate piers interferes with each other and affects the construction speed during the construction of the gate piers of the hydropower station dam.
[0004] To achieve the above objectives, the technical solution adopted by this utility model is as follows: a construction structure for concrete pouring and pumping into a multi-hole spillway gate pier, comprising a gate pier, the gate pier being located on the overflow section of the dam body, a reserved channel being provided at the lower end of the gate pier, a concrete pump truck being provided on the non-overflow section of the dam body, the concrete pump truck being connected to a horizontal pump pipe, the horizontal pump pipe passing through the reserved channel, a vertical pump pipe being connected to the horizontal pump pipe, and the vertical pump pipe being arranged parallel to the gate pier.
[0005] Furthermore, a horizontal walkway is also provided, which is set on the overflow surface slope between the gate piers.
[0006] Furthermore, a pad is provided at the bottom of the horizontal pump pipe.
[0007] Furthermore, a fixing clamp is connected to the vertical pump pipe.
[0008] Furthermore, the horizontal walkway is constructed using steel pipes.
[0009] Compared with the prior art, the present invention has the following beneficial effects: By setting a reserved channel at the bottom of the gate pier and by setting horizontal and vertical pump pipes, the present invention can simultaneously pour concrete for multiple gate piers, avoiding mutual interference between the concrete construction of each gate pier, accelerating the construction progress and improving construction efficiency. Attached Figure Description
[0010] Figure 1This is a schematic diagram of the overall structure of a multi-hole spillway gate pier concrete pouring and pumping construction structure according to the present invention.
[0011] In the picture: 1. Gate pier; 2. Concrete pump truck; 3. Horizontal pump pipe; 4. Vertical pump pipe; 5. Fixing clamp; 6. Pad block; 7. Horizontal walkway. Detailed Implementation
[0012] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0013] See Figure 1 This utility model discloses a construction structure for pumping concrete into a multi-hole spillway gate pier, including a gate pier 1 located on the overflow section of the dam body. A reserved channel is provided at the lower end of the gate pier 1. Furthermore, the device is also equipped with a concrete pump truck 2, which is set on the non-overflow section of the dam body. The concrete pump truck 2 is connected to a horizontal pump pipe 3, which passes through the reserved channel. Furthermore, a pad 6 is provided under the horizontal pump pipe 3 to support the horizontal pump pipe 3. Furthermore, a vertical pump pipe 4 is connected to the horizontal pump pipe 3 and is arranged parallel to the gate pier 1. Furthermore, a fixing clamp 5 is connected to the vertical pump pipe 4 to fix the vertical pump pipe 4 to the outer wall of the gate pier 1, which can stabilize the vertical pump pipe 4.
[0014] Furthermore, the structure is also provided with a horizontal walkway 7, which is set on the overflow surface slope between the gate piers 1. Preferably, the horizontal walkway 7 is constructed of steel pipes, and the horizontal walkway 7 can provide a temporary operating platform for the erection of the horizontal pump pipe 3.
[0015] The working principle of this utility model is as follows: By setting a reserved channel at the bottom of the gate pier 1 and setting a horizontal pump pipe 3 and a vertical pump pipe 4, multiple gate piers 1 can be poured with concrete at the same time, avoiding mutual interference between the concrete construction of each gate pier 1 and speeding up the construction progress. After the concrete pouring is completed, only the reserved channel needs to be poured with concrete.
[0016] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0017] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A concrete pouring and pumping construction structure for a porous spillway gate pier, characterized in that: Includes a gate pier (1), which is located on the overflow section of the dam body. A reserved passage is provided at the lower end of the gate pier (1). A concrete pump truck (2) is provided on the non-overflow section of the dam body. The concrete pump truck (2) is connected to a horizontal pump pipe (3). The horizontal pump pipe (3) passes through the reserved passage. A vertical pump pipe (4) is connected to the horizontal pump pipe (3). The vertical pump pipe (4) is set parallel to the gate pier (1).
2. The construction structure for pumping concrete into the formwork of a porous spillway gate pier according to claim 1, characterized in that: A horizontal walkway (7) is also provided, which is set on the overflow surface slope between the gate piers (1).
3. The construction structure for pumping concrete into the formwork of a porous spillway gate pier according to claim 1, characterized in that: A pad (6) is provided at the bottom of the horizontal pump pipe (3).
4. The construction structure for pumping concrete into the formwork of a porous spillway gate pier according to claim 1, characterized in that: A fixing clamp (5) is connected to the vertical pump pipe (4).
5. The construction structure for pumping concrete into the formwork of a porous spillway gate pier according to claim 2, characterized in that: The horizontal walkway (7) is constructed using steel pipes.