Wall building assistor for house building

By designing a bricklaying aid suitable for different heights and locations, the problem of increased labor intensity for workers using hand-held plumb bobs for measurement was solved, achieving convenient and efficient measurement during the bricklaying process.

CN224228284UActive Publication Date: 2026-05-12SINOCHEM COMMUNICATIONS CONSTRUCTION (SHANGHAI) ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SINOCHEM COMMUNICATIONS CONSTRUCTION (SHANGHAI) ENGINEERING CO LTD
Filing Date
2025-06-06
Publication Date
2026-05-12

AI Technical Summary

Technical Problem

In the current bricklaying process, workers need to use a plumb bob to take multiple measurements, which increases labor intensity and bricklaying time.

Method used

设计了一种房建砌墙辅助器,包含支撑底板、收纳杆、延长杆、定位螺栓、安装组件、吊绳和铅锤,通过螺纹连接和滑动连接实现装置的高度和位置适应性,简化吊绳的操作。

Benefits of technology

提高了砌墙过程的便捷度,减少了工人劳动强度,缩短了测量时间,适用于不同高度和位置的建筑测量。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224228284U_ABST
    Figure CN224228284U_ABST
Patent Text Reader

Abstract

The utility model discloses a house building wall building assistor, and relates to the technical field of house building assistors, the house building wall building assistor comprises a support bottom plate, the top of the support bottom plate is provided with a storage rod, the top of the storage rod is provided with an extension rod and a positioning bolt, the top of the extension rod is provided with a mounting assembly, and the mounting assembly comprises an adapter seat; a threaded connecting rod and a threaded connecting seat are arranged at the top of the adapter, a mounting plate and an L-shaped mounting frame are arranged at the top of the threaded connecting seat, a connecting threaded rod and a limiting ring are arranged on the side face of the L-shaped mounting frame, and a mounting seat and a positioning side plate are arranged outside the limiting ring. The mounting frame and the lifting rope are mounted through the mounting assembly, the extension rod is slidably connected with the storage rod, so that the device is suitable for different heights, workers do not need to manually stretch the lifting rope, and the threaded connection seat is in threaded connection with the threaded connection rod, so that the lifting rope can be conveniently detached. Therefore, the mounting frame and the lifting rope can be conveniently detached.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction aids, and in particular to a building construction bricklaying aid. Background Technology

[0002] Building construction refers to the construction of houses or other buildings on land where infrastructure has been completed. Building a wall is the process of laying bricks one by one to form a wall. The most solid way to build a wall is to lay bricks one by one. Auxiliary tools for building a wall include triangular trowels, square trowels, bricklaying hammers, chisels, folding rulers, tape measures, string lines, measuring hammers, and spirit levels.

[0003] Plumb bobs are extremely useful in fields such as construction, civil engineering, and geography, especially in the construction of high-rise buildings, bridges, and other structures that require precise verticality. When building walls, workers use plumb bobs to check the verticality of the cavity. However, some existing plumb bobs are used by hand for checking, which not only increases the labor of workers but also requires workers to take multiple measurements during the wall construction process, increasing the time spent building the wall. Therefore, there is a need to provide a building construction wall-building aid to solve the above problems. Utility Model Content

[0004] The main purpose of this utility model is to provide a building construction wall-building auxiliary device that can effectively solve the problems in the background art.

[0005] To achieve the above objectives, the technical solution adopted by this utility model is as follows:

[0006] A building construction bricklaying aid includes a supporting base plate, a storage rod is provided on the top of the supporting base plate, and an extension rod and a positioning bolt are provided on the top of the storage rod. An installation component is provided at the top of the extension rod, and an installation frame, a hanging rope, a plumb bob, a driving component and a counterweight are provided on the top of the installation component.

[0007] The mounting assembly includes an adapter, the top of which is provided with a threaded connecting rod and a threaded connecting seat, and the top of the threaded connecting seat is provided with a mounting plate and an L-shaped mounting bracket. The side of the L-shaped mounting bracket is provided with a connecting threaded rod and a limiting ring, and the outside of the limiting ring is provided with a mounting seat and a positioning side plate.

[0008] Preferably, the top end of the extension rod is fixedly connected to an adapter seat, and the top center of the adapter seat is fixedly connected to a threaded connecting rod. The threaded connecting rod is fitted with a threaded connecting seat, and the bottom center of the threaded connecting seat is provided with an anti-slip groove. The threaded connecting rod is threadedly connected to the inside of the anti-slip groove.

[0009] Preferably, the outer wall of the threaded connector is provided with an anti-slip groove, and the top of the threaded connector is mounted with a mounting plate by bolts. An L-shaped mounting bracket is fixedly connected to the side of the mounting plate, and there are two L-shaped mounting brackets, which are symmetrically distributed on both sides of the mounting plate. A connecting threaded rod is threadedly connected to the middle of the L-shaped mounting bracket, and there are two connecting threaded rods, which are symmetrically distributed on both sides of the middle of the L-shaped mounting bracket.

[0010] Preferably, one end of the connecting threaded rod passes through the L-shaped mounting bracket, and a limiting ring is fixedly connected to the end of the connecting threaded rod near the mounting plate. A mounting seat is sleeved on the outside of the limiting ring, and a limiting groove is opened in the middle of the mounting seat near the limiting ring. The limiting ring is slidably connected inside the limiting groove. A positioning side plate is bolted to the side of the mounting seat away from the limiting ring, and the positioning side plate is located below one side of the threaded connecting seat.

[0011] Preferably, a mounting frame is bolted to one side of the top of the mounting plate, and a counterweight is bolted to the other side of the top of the mounting plate. The counterweight is arranged adjacent to the mounting frame. A lifting rope is installed on the side of the mounting frame away from the counterweight. A driving component is installed on the side of the mounting frame, and a plumb bob is connected to the bottom end of the lifting rope.

[0012] Preferably, a storage rod is bolted to the top of the support base plate, and an extension rod is slidably connected to the middle of the storage rod. A positioning bolt is threaded onto the outer wall of the top of the storage rod, and the positioning bolt passes through the storage rod and connects to the extension rod.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] In this invention, the installation frame and the hoisting rope are installed through the provided installation components. The extension rod and the storage rod are slidably connected, making the device suitable for different heights without requiring manual stretching of the hoisting rope. The threaded connection between the threaded connecting seat and the threaded connecting rod facilitates the disassembly of the installation frame and the hoisting rope. The installation plate, L-shaped mounting bracket, and positioning side plate enable the installation of the device, making it suitable for different positions and further improving the ease of use of the device. Attached Figure Description

[0015] Figure 1 This is a first-view structural schematic diagram of the entire device of this utility model;

[0016] Figure 2 This is a second-view structural schematic diagram of the overall device of this utility model;

[0017] Figure 3 This is a schematic diagram of the installation component of this utility model;

[0018] Figure 4 This is a structural schematic diagram of the side of the L-shaped mounting bracket of this utility model.

[0019] In the diagram: 1. Support base plate; 2. Storage rod; 3. Extension rod; 4. Positioning bolt; 5. Mounting assembly; 6. Adapter; 7. Threaded connecting rod; 8. Threaded connecting seat; 9. Anti-slip groove; 10. Mounting plate; 11. L-shaped mounting bracket; 12. Connecting threaded rod; 13. Limiting ring; 14. Mounting seat; 15. Limiting groove; 16. Positioning side plate; 17. Mounting frame; 18. Lifting rope; 19. Plumb bob; 20. Drive component; 21. Counterweight. Detailed Implementation

[0020] To make the technical means, creative features, objectives and effects of this utility model easier to understand, the present utility model will be further described below in conjunction with specific embodiments.

[0021] Please see Figure 1 , Figure 2 , Figure 3 As shown, a building construction wall-building auxiliary device includes a supporting base plate 1. A storage rod 2 is provided on the top of the supporting base plate 1, and an extension rod 3 and a positioning bolt 4 are provided on the top of the storage rod 2. An installation assembly 5 is provided at the top of the extension rod 3, and an installation frame 17, a lifting rope 18, a plumb bob 19, a driving component 20, and a counterweight 21 are provided on the top of the installation plate 10. The installation frame 17 is bolted to one side of the top of the installation plate 10, and the positioning bolt 4 is bolted to the other side of the top of the installation plate 10. The heavy component 21 and the counterweight 21 are arranged adjacent to the mounting frame 17. A lifting rope 18 is installed on the side of the mounting frame 17 away from the counterweight 21, and a driving component 20 is installed on the side of the mounting frame 17. A plumb bob 19 is connected to the bottom end of the lifting rope 18. A storage rod 2 is installed on the top of the support base plate 1 by bolts, and an extension rod 3 is slidably connected in the middle of the storage rod 2. A positioning bolt 4 is threadedly connected to the top outer wall of the storage rod 2, and the positioning bolt 4 passes through the storage rod 2 and connects to the extension rod 3.

[0022] Please see Figure 1 , Figure 2 , Figure 3 , Figure 4As shown, the mounting assembly 5 includes an adapter 6. The top of the adapter 6 is provided with a threaded connecting rod 7 and a threaded connecting seat 8. The top of the threaded connecting seat 8 is provided with a mounting plate 10 and an L-shaped mounting bracket 11. The side of the L-shaped mounting bracket 11 is provided with a connecting threaded rod 12 and a limiting ring 13. The outside of the limiting ring 13 is provided with a mounting seat 14 and a positioning side plate 16. The top of the extension rod 3 is fixedly connected to the adapter 6. The top middle of the adapter 6 is fixedly connected to the threaded connecting rod 7. The threaded connecting rod 7 is sleeved on the outside of the threaded connecting seat 8. The bottom middle of the threaded connecting seat 8 is provided with an anti-slip groove 9. The threaded connecting rod 7 is threadedly connected to the inside of the anti-slip groove 9. The outer wall of the threaded connecting seat 8 is provided with an anti-slip groove 9. The top of the threaded connecting seat 8 is installed with a mounting plate 10 by bolts.

[0023] An L-shaped mounting bracket 11 is fixedly connected to the side of the mounting plate 10. There are two L-shaped mounting brackets 11, symmetrically distributed on both sides of the mounting plate 10. A connecting threaded rod 12 is threadedly connected to the middle of the L-shaped mounting bracket 11. There are two connecting threaded rods 12, symmetrically distributed on both sides of the middle of the L-shaped mounting bracket 11. One end of the connecting threaded rod 12 passes through the L-shaped mounting bracket 11, and a limit ring 13 is fixedly connected to the end of the connecting threaded rod 12 near the mounting plate 10. A mounting seat 14 is sleeved on the outside of the limit ring 13, and a limit groove 15 is formed in the middle of the mounting seat 14 near the limit ring 13. The limit ring 13 is slidably connected inside the limit groove 15. The mounting seat 14 is away from the limit ring 13. A positioning side plate 16 is bolted to one side of the positioning ring 13, and the positioning side plate 16 is located below the threaded connection seat 8. The mounting frame 17 and the lifting rope 18 are installed through the mounting assembly 5. The extension rod 3 and the storage rod 2 are slidably connected, so that the device can be used at different heights without the need for manual stretching of the lifting rope 18. The threaded connection seat 8 and the threaded connection rod 7 are connected by threads, so that the mounting frame 17 and the lifting rope 18 can be disassembled. The mounting plate 10, the L-shaped mounting bracket 11 and the positioning side plate 16 are used to install the device, so that the device can be used in different positions and further improve the ease of use of the device.

[0024] It should be noted that this utility model is a building construction wall-building auxiliary device. In use, the anti-slip groove 9 at the bottom of the threaded connecting seat 8 is aligned with the threaded connecting rod 7. The threaded connecting seat 8 is rotated, thereby connecting the threaded connecting seat 8 and the threaded connecting rod 7 via threads. A rope winding roller is installed in the middle of the end of the mounting frame 17 away from the counterweight 21. A rope 18 is fitted onto the rope winding roller. Simultaneously, the rope winding roller is connected to the output end of the drive component 20. The drive component 20 drives the rope winding roller to rotate, thereby realizing the winding and unwinding of the rope 18. Adjust the lengths of the storage rod 2 and the extension rod 3 to measure the verticality of shorter buildings. When the building is too tall, rotate the threaded connecting seat 8 to separate the threaded connecting seat 8 from the threaded connecting rod 7, and snap the mounting plate 10 and the L-shaped mounting bracket 11 onto the building wall. Rotate the connecting threaded rod 12 to drive the limiting ring 13 to push out the mounting seat 14 and the positioning side plate 16, thereby positioning and clamping the positioning side plate 16 on the wall, thus enabling the detection of taller buildings and further improving the ease of use of the device.

[0025] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A building construction wall-building auxiliary device, comprising a supporting base plate (1), characterized in that: The top of the support base plate (1) is provided with a storage rod (2), and the top of the storage rod (2) is provided with an extension rod (3) and a positioning bolt (4). The top of the extension rod (3) is provided with an installation component (5), and the top of the installation component (5) is provided with an installation frame (17), a hanging rope (18), a plumb bob (19), a driving component (20), and a counterweight (21). The mounting assembly (5) includes an adapter (6), the top of which is provided with a threaded connecting rod (7) and a threaded connecting seat (8), and the top of the threaded connecting seat (8) is provided with a mounting plate (10) and an L-shaped mounting bracket (11). The side of the L-shaped mounting bracket (11) is provided with a connecting threaded rod (12) and a limiting ring (13), and the outside of the limiting ring (13) is provided with a mounting seat (14) and a positioning side plate (16).

2. The bricklaying aid for building construction according to claim 1, characterized in that: The top end of the extension rod (3) is fixedly connected to an adapter (6), and the top middle of the adapter (6) is fixedly connected to a threaded connecting rod (7). The threaded connecting rod (7) is fitted with a threaded connecting seat (8), and the bottom middle of the threaded connecting seat (8) is provided with an anti-slip groove (9). The threaded connecting rod (7) is threadedly connected to the inside of the anti-slip groove (9).

3. The bricklaying aid for building construction according to claim 2, characterized in that: The threaded connector (8) has an anti-slip groove (9) on its outer wall, and a mounting plate (10) is bolted to the top of the threaded connector (8). An L-shaped mounting bracket (11) is fixedly connected to the side of the mounting plate (10), and there are two L-shaped mounting brackets (11), which are symmetrically distributed on both sides of the mounting plate (10). A connecting threaded rod (12) is threaded to the middle of the L-shaped mounting bracket (11), and there are two connecting threaded rods (12), which are symmetrically distributed on both sides of the middle of the L-shaped mounting bracket (11).

4. The bricklaying aid for building construction according to claim 3, characterized in that: One end of the connecting threaded rod (12) passes through the L-shaped mounting bracket (11), and the end of the connecting threaded rod (12) near the mounting plate (10) is fixedly connected to a limiting ring (13). The limiting ring (13) is fitted with a mounting seat (14), and a limiting groove (15) is opened in the middle of the mounting seat (14) near the limiting ring (13). The limiting ring (13) is slidably connected inside the limiting groove (15). A positioning side plate (16) is installed on the side of the mounting seat (14) away from the limiting ring (13) by bolts, and the positioning side plate (16) is located below one side of the threaded connecting seat (8).

5. A building construction bricklaying aid according to claim 1, characterized in that: The mounting plate (10) has a mounting frame (17) bolted to one side of its top, and a counterweight (21) bolted to the other side of its top. The counterweight (21) is arranged adjacent to the mounting frame (17). A lifting rope (18) is installed on the side of the mounting frame (17) away from the counterweight (21). A drive unit (20) is installed on the side of the mounting frame (17), and a plumb bob (19) is connected to the bottom end of the lifting rope (18).

6. The bricklaying aid for building construction according to claim 1, characterized in that: The top of the support base plate (1) is bolted with a storage rod (2), and an extension rod (3) is slidably connected in the middle of the storage rod (2). A positioning bolt (4) is threadedly connected to the outer wall of the top of the storage rod (2), and the positioning bolt (4) passes through the storage rod (2) and connects to the extension rod (3).