Pipeline supporting frame for fresh air conditioning engineering

By designing a sliding connection structure for the movable plate and connecting rod, the problem of the support frame being unable to be adjusted after it is fixed is solved, and the position of the support frame can be flexibly adjusted. This is suitable for duct support frames in fresh air conditioning projects.

CN224245596UActive Publication Date: 2026-05-15JINAN QIER ENERGY SAVING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
JINAN QIER ENERGY SAVING TECH CO LTD
Filing Date
2025-07-09
Publication Date
2026-05-15

AI Technical Summary

Technical Problem

The existing support frame cannot be adjusted after it is fixed, making it difficult to adjust the position.

Method used

A duct support frame for fresh air conditioning engineering was designed, which adopts a movable plate and connecting rod structure. The connecting rod is slidably connected in the movable groove. Combined with multiple nuts and ball bearings, the position of the support frame can be adjusted.

Benefits of technology

It enables flexible adjustment of the support frame position, facilitating pipe installation and repositioning while avoiding damage to the wall surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224245596U_ABST
    Figure CN224245596U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline installation, in particular to a pipeline supporting frame for fresh air conditioning engineering, which comprises a fixed part, a connecting rod is arranged on the fixed part, a bearing frame is arranged at the bottom end of the connecting rod, the fixed part comprises a movable plate, a movable groove is arranged in the movable plate, and the bearing frame is arranged in the movable plate. The upper end of the connecting rod penetrates through the movable groove and is provided with a second nut, the two sides of the movable plate are each provided with a fixing plate, the fixing plates and the movable plate are integrally formed, and the fixing plates are installed on the wall face through screws. The connecting rods are connected in the movable grooves in a sliding mode, the connecting rods can be moved on the movable grooves when position adjustment is needed subsequently, and therefore the position of the whole supporting frame can be adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pipeline installation technology, and in particular to a pipeline support frame for fresh air conditioning projects. Background Technology

[0002] Central air conditioning is commonly used in large shopping malls or office buildings. The air conditioning ducts used for this purpose usually run through the basement, and support frames are installed on the ducts and fixed to the basement walls.

[0003] The current support frame is fixed to the wall directly with fixing screws. Since the fixing is done at the cost of damaging the wall, it is impossible to adjust the position of the support frame later. Utility Model Content

[0004] The purpose of this utility model is to solve the following shortcomings in the prior art: once the support frame is fixed, there is no way to adjust it, and to propose a duct support frame for fresh air conditioning engineering.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] A duct support frame for a fresh air conditioning project includes a fixing component, a connecting rod installed on the fixing component, a bearing frame installed at the bottom end of the connecting rod, a movable plate including a movable groove, a second nut installed at the upper end of the connecting rod passing through the movable groove, and a fixing plate integrally formed on both sides of the movable plate, the fixing plate being mounted on the wall by screws.

[0007] Preferably, the support frame is arranged in a "mountain" shape, and the support frame is divided into a main support area and an auxiliary support area.

[0008] Preferably, the number of the second nuts is at least two, and the two nuts have opposite thread directions.

[0009] Preferably, the bottom end of the connecting rod is provided with two first nuts, and the support frame is located between the two first nuts.

[0010] Preferably, two assembly slots are symmetrically arranged on the support frame, and each assembly slot is detachably connected to a movable shaft, on which a plurality of rolling balls located in the assembly slot are rotatably connected.

[0011] Preferably, a support block is provided in the bearing area of ​​the auxiliary pipe, and the support block is located directly below the assembly groove.

[0012] Compared with the prior art, the beneficial effects of this utility model are:

[0013] The connecting rod slides within the movable slot. When subsequent position adjustments are needed, the connecting rod can be moved along the movable slot to adjust the position of the entire support frame. Attached Figure Description

[0014] Figure 1 This is a three-dimensional structural diagram of a pipe support frame for a fresh air conditioning project proposed in this utility model;

[0015] Figure 2 This is a front structural diagram of a pipe support frame for a fresh air conditioning project proposed in this utility model;

[0016] Figure 3 This is a schematic diagram of the structure after the pipeline is installed.

[0017] In the diagram: 1. Bearing frame, 2. Movable shaft, 3. Ball bearing, 4. First nut, 5. Connecting rod, 6. Fixed plate, 7. Second nut, 8. Movable groove, 9. Movable plate, 10. Main pipe bearing area, 11. Auxiliary pipe bearing area, 12. Support block, 13. Assembly groove. Detailed Implementation

[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0019] The terms used in this utility model, such as "upper", "lower", "left", "right", "middle" and "one", are only for clarity of description and are not intended to limit the scope of implementation of this utility model. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered as within the scope of implementation of this utility model.

[0020] Reference Figures 1-3 A duct support frame for a fresh air conditioning project includes a fixing component, which is installed on the top of the basement with screws. A connecting rod 5 is installed on the fixing component, and a bearing frame 1 is installed at the bottom of the connecting rod 5. The fixing component includes a movable plate 9, which has a movable groove 8. The upper end of the connecting rod 5 passes through the movable groove 8 and is fitted with a second nut 7. Fixed plates 6 are integrally formed on both sides of the movable plate 9. The fixed plates 6 are installed on the wall with screws. The fixed plates 6 have fixing holes, and standard parts such as fixing screws or expansion screws are used to pass through the fixing holes and install them in the wall. After the entire support frame is installed, the connecting rod 5 slides in the movable groove 8. When the position needs to be adjusted later, the connecting rod 5 can be moved on the movable groove 8, thereby adjusting the position of the entire support frame.

[0021] The support frame 1 is set in a "mountain" shape. The "mountain" shape facilitates the installation of pipes. If the pipes are already connected, they can be slowly lifted from the side and moved into the main pipe support area 10. The support frame 1 is divided into the main pipe support area 10 and the auxiliary pipe support area 11. The main pipe is placed in the main pipe support area 10, and the auxiliary pipe support area 11 can place auxiliary hoses or other types of pipes to facilitate the layout of pipes.

[0022] The number of second nuts 7 is at least two, and the two threads are opposite. The two second nuts 7 have opposite threads and the same rotation direction. One is pre-tightened and the other is loosened. That is, when vibration occurs, when the thread at the bottom rotates and loosens and moves upward, the thread at the top will rotate and move downward. This method can keep the two second nuts 7 stably fixed on the connecting rod 5.

[0023] Two first nuts 4 are provided at the bottom of the connecting rod 5. The bearing frame 1 is located between the two first nuts 4. The two first nuts 4 move closer to each other and rotate to clamp the bearing frame 1 to complete the installation.

[0024] Two symmetrical assembly slots 13 are arranged on the support frame 1. Each assembly slot 13 is detachably connected to a movable shaft 2. Multiple ball bearings 3 located in the assembly slot 13 are rotatably connected to the movable shaft 2. One end of the movable shaft 2 passes through the ball bearings 3 and is rotatably connected to the support frame 1. When the pipe needs to be moved during installation, the pipe comes into contact with the ball bearings 3, and the ball bearings 3 roll, making it easier to move the pipe. When the pipe installation is finished, the movable shaft 2 is pulled outward so that one end is detached from the side wall of the assembly slot 13. Under the action of the pipe's gravity, one end of the movable shaft 2 tilts downward. Then, by grasping the lower end and pulling outward, some of the ball bearings 3 will detach from the movable shaft 2 and fall out of the assembly slot 13. After collection, the next one can be installed and used.

[0025] A support block 12 is provided in the auxiliary pipe bearing area 11. The support block 12 is located directly below the assembly groove 13. When the installation is completed, the support block 12 is inserted into the auxiliary pipe bearing area 11 to provide support and prevent the support frame from deforming.

[0026] Before installation, extend the movable shaft 2 into the assembly groove 13, then thread the ball bearing 3 onto it, and rotatably connect one end of the movable shaft 2 to the side wall of the assembly groove 13. The ball bearing 3 is rotating. After the pipe is installed, remove the movable shaft 2, and the ball bearing 3 falls and is collected for reuse. Then insert the support block 12 into the auxiliary pipe bearing area 11 to provide support and prevent deformation.

[0027] In this utility model, unless otherwise explicitly specified and limited, the terms "installation", "connection", "linking", "fixing", etc., should be interpreted broadly.

[0028] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A duct support frame for a fresh air conditioning project, comprising a fixing component, wherein a connecting rod (5) is mounted on the fixing component, and a bearing frame (1) is mounted on the bottom end of the connecting rod (5), characterized in that... The fixing component includes a movable plate (9), which has a movable groove (8) inside. The upper end of the connecting rod (5) passes through the movable groove (8) and is fitted with a second nut (7). Both sides of the movable plate (9) are provided with a fixing plate (6) integrally formed therewith. The fixing plate (6) is installed on the wall by screws.

2. The pipe support frame for a fresh air conditioning project according to claim 1, characterized in that, The support frame (1) is arranged in a "mountain" shape, and the support frame (1) is divided into a main support area (10) and an auxiliary support area (11).

3. The pipe support frame for a fresh air conditioning project according to claim 2, characterized in that, The number of the second nut (7) is at least two, and the two have opposite thread directions.

4. The pipe support frame for a fresh air conditioning project according to claim 3, characterized in that, The bottom end of the connecting rod (5) is provided with two first nuts (4), and the bearing frame (1) is located between the two first nuts (4).

5. A duct support frame for a fresh air conditioning project according to claim 4, characterized in that, Two assembly slots (13) are symmetrically arranged on the support frame (1). Each assembly slot (13) is detachably connected to a movable shaft (2). Multiple balls (3) located in the assembly slot (13) are rotatably connected to the movable shaft (2).

6. A duct support frame for a fresh air conditioning project according to claim 5, characterized in that, A support block (12) is provided in the auxiliary pipe bearing area (11), and the support block (12) is located directly below the assembly groove (13).