A space division nitrogen water pre-cooling system

By connecting the chilled water and cooling water delivery units in the nitrogen precooling system, a dual-system redundant design and intelligent fault switching are achieved, which solves the extreme failure risk caused by the independent design of the cooling water and chilled water systems, improves system reliability and fault response speed, and reduces operation and maintenance costs.

CN224365187UActive Publication Date: 2026-06-16XINXING DUCTILE IRON PIPES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520862585.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-30
Publication Date
2026-06-16
Estimated Expiration
2035-04-30

AI Technical Summary

Technical Problem

In existing nitrogen-water precooling systems, the independent design of cooling water and chilled water systems leads to extreme failure risks. When the main and backup water pumps fail simultaneously, the system is interrupted, affecting the heat exchange efficiency of the air-cooled tower.

Method used

The chilled water delivery unit and the cooling water delivery unit are connected by a dispensing pipe to achieve a dual-system redundancy design. It is equipped with a main and a backup delivery mechanism and intelligent fault switching. The PLC control module monitors in real time and automatically switches the backup pump to ensure system connectivity.

Benefits of technology

It improves system reliability and fault response speed, avoids system paralysis caused by the failure of a single device, reduces unplanned downtime losses, and lowers operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224365187U_ABST
    Figure CN224365187U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of air separation nitrogen water precooling system, belong to air separation equipment technical field, including air cooling tower, and cooling water conveying unit and refrigerated water conveying unit, cooling water conveying unit, it is connected with first inlet pipe, and cooling water conveying unit still is connected with first water supply pipe on it, first water supply pipe is connected with air cooling tower intercommunication;Refrigerated water conveying unit, it is connected with second inlet pipe, and refrigerated water conveying unit still is connected with second water supply pipe on it, second water supply pipe is connected with air cooling tower intercommunication;Batching pipe, its both ends are mutually connected with first water supply pipe and second water supply pipe respectively, and control valve is equipped on it;The utility model can be mutually connected by batching pipe between refrigerated water conveying unit and cooling water conveying unit, so that when one of conveying unit cannot normally send water, another conveying unit can send water source to air cooling tower by batching pipe as emergency treatment, so that conveying unit can still make system normal work when being maintained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of air separation equipment technology, specifically to an air separation nitrogen-water precooling system. Background Technology

[0002] In the production process of air separation equipment, the nitrogen-water precooling system is a key pretreatment step, playing a crucial role in the initial cooling of compressed air. Its working principle is as follows: high-temperature compressed air (typically exceeding 100°C) output from the air compressor enters from the bottom of the nitrogen-water precooling air-cooling tower. It then undergoes counter-current heat exchange with the cooling medium (cooling water, chilled water) flowing downwards through the mass transfer unit within the tower, reducing the air temperature to the suitable range (typically 4–15°C) required for subsequent molecular sieve adsorption or cryogenic separation processes.

[0003] The existing nitrogen precooling system uses an independent design for its cooling water and chilled water systems:

[0004] Independent water circulation system: Cooling water is driven by a circulating water pump, and after heat exchange in the air-cooled tower, it returns to the cooling tower for further cooling; chilled water is cooled by the chiller unit and then pumped to the top of the air-cooled tower for spraying. The two systems are not physically connected by piping and are equipped with one main and one backup water pump to improve reliability.

[0005] Fault response mechanism: When the main operating water pump fails, it can quickly switch to the standby water pump. However, the following prominent problems still exist in practical applications:

[0006] Extreme failure risk: If the main and backup water pumps fail to operate simultaneously due to electrical faults, mechanical damage, or control system failure, the corresponding water system will be completely interrupted. For example, if the cooling water is interrupted, the heat exchange at the bottom of the air-cooled tower will fail, and the temperature of the air entering the tower will rise sharply; if the chilled water is interrupted, the top spray will fail, and the air cooling gradient will be disrupted. Utility Model Content

[0007] In view of this, the present invention provides an air separation nitrogen-water precooling system. The present invention can connect the chilled water conveying unit and the cooling water conveying unit through the dispensing pipe, so that when one of the conveying units fails to deliver water normally, the other conveying unit can deliver water to the air-cooled tower through the dispensing pipe as an emergency treatment. In this way, the system can still work normally when the conveying units are being maintained and repaired.

[0008] To solve the above-mentioned technical problems, this utility model provides an air separation nitrogen water precooling system, including an air-cooled tower, and a cooling water conveying unit and a chilled water conveying unit for supplying water to the air-cooled tower. The cooling water conveying unit is connected to a first water inlet pipe for supplying cooling water to the cooling water conveying unit, and the cooling water conveying unit is also connected to a first water delivery pipe. The first water delivery pipe is connected to the air-cooled tower, and the cooling water can enter the air-cooled tower through the first water delivery pipe.

[0009] The chilled water delivery unit is connected to a second inlet pipe for supplying chilled water to the cooling water delivery unit. The chilled water delivery unit is also connected to a second delivery pipe, which is connected to the air-cooled tower. Chilled water can enter the air-cooled tower through the second delivery pipe.

[0010] The feed pipe is connected to the first water supply pipe and the second water supply pipe at both ends, and is equipped with a control valve to control the opening and closing of the pipe.

[0011] The cooling water delivery unit includes two sets of cooling water delivery mechanisms, both of which are connected to the first water supply pipe and the first water inlet pipe. That is, the cooling water delivery unit is designed as a main unit and a secondary unit, and can provide sufficient water source when it needs to supply water to the second water supply pipe.

[0012] The chilled water delivery unit includes two sets of chilled water delivery mechanisms, both of which are connected to the second water supply pipe and the second water inlet pipe. That is, the chilled water delivery unit is designed as one main and one auxiliary unit, and can provide sufficient water source when it needs to supply water to the first water supply pipe.

[0013] A chiller is also connected to the second water supply pipe to cool the liquid inside the pipe.

[0014] The control valve is detachably fixed to the feed pipe, making it easy to disassemble and maintain.

[0015] The feed pipe consists of two connecting pipes, and the control valve is fixed between the two connecting pipes by flanges at both ends.

[0016] In summary, compared with the prior art, this application includes at least one of the following beneficial technical effects:

[0017] 1. Dual-system redundancy design, revolutionizing reliability:

[0018] Dual conveying mechanism: Both cooling water and chilled water units adopt a "one main and one backup" dual conveying mechanism design. When the main operating equipment fails, the backup equipment can seamlessly take over, completely avoiding the risk of system paralysis caused by the failure of a single traditional equipment.

[0019] Emergency water supply capability: The cooling water and chilled water systems are physically connected via a distribution pipe. Combined with a control valve that can be quickly opened and closed, the other system can provide emergency water supply across the pipeline when one system completely fails. For example, if both pumps in the cooling water system fail, the chilled water system can replenish water to the bottom of the air-cooled tower via the distribution pipe to maintain basic cooling function.

[0020] 1. Intelligent fault switching: The system can integrate a PLC control module to monitor the operating status of the two pumps in real time. When the main pump is detected to be abnormal, the standby pump start command is automatically triggered and the control valve opening is adjusted synchronously, so that the fault response speed is improved from minutes to seconds.

[0021] 2. Extreme operating conditions response: When external power is interrupted due to extreme weather such as rainstorms and lightning, the dual-system mutual power supply design can ensure the air separation unit can operate continuously for 4-6 hours, buying valuable time for emergency power supply access.

[0022] 3. Reduced operation and maintenance costs: Dual system redundancy reduces unplanned downtime losses. Based on an annual production capacity of 100,000 tons of air separation unit, it can reduce downtime losses by approximately RMB 8-12 million per year. Attached Figure Description

[0023] Figure 1 This is a schematic diagram of the structure of an air separation nitrogen-water precooling system according to the present invention;

[0024] Figure 2 This is a schematic diagram of the control valve of this utility model.

[0025] Explanation of reference numerals in the attached figures:

[0026] 100. Air cooling tower;

[0027] 200. Cooling water delivery unit; 201. Cooling water delivery mechanism; 202. First water delivery pipe; 203. First water inlet pipe;

[0028] 300. Chilled water delivery unit; 301. Chilled water delivery mechanism; 302. Second water supply pipe; 303. Second water inlet pipe; 304. Chiller;

[0029] 400, Feeding pipe; 401, Connecting pipe; 402, Control valve. Detailed Implementation

[0030] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the following will be described in conjunction with the accompanying drawings of the embodiments of this utility model. Figure 1-2The technical solutions of the embodiments of this utility model are clearly and completely described herein. Obviously, the described embodiments are only some, not all, of the embodiments of this utility model. All other embodiments obtained by those skilled in the art based on the described embodiments of this utility model are within the protection scope of this utility model.

[0031] This embodiment provides an air separation nitrogen-water precooling system, such as Figure 1 The system includes an air-cooled tower 100, a cooling water delivery unit 200, and a chilled water delivery unit 300 for supplying water to the air-cooled tower 100. The cooling water delivery unit 200 is connected to an external water supply structure via a first inlet pipe 203, allowing cooling water to be delivered to the cooling water delivery unit 200. A first water delivery pipe 202 is also connected to the cooling water delivery unit 200 and is connected to the middle of the air-cooled tower 100, allowing cooling water to flow through the first water delivery pipe 202. The chilled water enters the air-cooled tower 100 to pre-cool the nitrogen-water. The chilled water delivery unit 300 is also connected to an external water supply structure via a second inlet pipe 303. The water supply structure can send chilled water into the chilled water delivery unit 300 through the second inlet pipe 303. The chilled water delivery unit 300 is also equipped with a second water delivery pipe 302. The end of the second water delivery pipe 302 is connected to the top of the air-cooled tower 100, so the chilled water can enter the air-cooled tower 100 through the second water delivery pipe 302 to pre-cool the nitrogen-water.

[0032] A feed pipe 400 is also connected between the first water supply pipe 202 and the second water supply pipe 302. That is, chilled water can enter the first water supply pipe 202 through the feed pipe 400, and cooling water can also enter the second water supply pipe 302 through the feed pipe 400. A control valve 402 is also provided on the feed pipe 400, which can control the opening and closing of the feed pipe 400.

[0033] Specifically, a chiller 304 is connected to the second water supply pipe 302. The chiller 304 can further cool the chilled water in the second water supply pipe 302, meaning the temperature of the chilled water must be 9 degrees lower than that of the cooling water. This means that after the chilled water enters the second water supply pipe 302 and is cooled by the chiller 304, it can be used to pre-cool the nitrogen water in the air-cooled tower 100. Thus, when the cooling water delivery unit 200 cannot deliver water normally, the uncooled chilled water can be fed into the first water supply pipe 202 through the dispensing pipe 400. When the chilled water delivery unit 300 cannot supply water normally, the cooling water can enter the second water supply pipe 302 through the dispensing pipe 400, and after being cooled by the chiller 304, it can be used as chilled water. During the use of the dispensing pipe 400, maintenance can be performed on the chilled water delivery unit 300 or the cooling water delivery unit 200, thereby avoiding a decrease in work efficiency caused by downtime.

[0034] Furthermore, the cooling water delivery unit 200 includes two sets of cooling water delivery mechanisms 201. Both sets of cooling water delivery mechanisms 201 are connected to the first water delivery pipe 202 and the first water inlet pipe 203. The two sets of cooling water delivery mechanisms 201 can form a main and backup design. That is, when one set of cooling water delivery mechanisms 201 cannot deliver water normally, the other set of cooling water delivery mechanisms 201 can continue to deliver water as a backup. When the chilled water delivery unit 300 cannot deliver water normally, the control valve 402 on the dispensing pipe 400 is opened, and the two sets of chilled water delivery mechanisms 301 work simultaneously, which can deliver additional water to the second water delivery pipe 302 while ensuring that the chilled water delivery volume meets the standard.

[0035] The chilled water delivery unit 300 includes two sets of chilled water delivery mechanisms 301, both of which are connected to the second water supply pipe 302 and the second water inlet pipe 303. The two sets of chilled water delivery mechanisms 301 can form a main and backup design, that is, when one set of chilled water delivery mechanisms 301 cannot deliver water normally, the other set of chilled water delivery mechanisms 301 can continue to deliver water as a backup. Furthermore, when the chilled water shortage delivery unit cannot deliver water normally, the control valve 402 on the dispensing pipe 400 is opened, and the two sets of chilled water delivery mechanisms 301 work simultaneously, which can provide additional water to the first water supply pipe 202 while ensuring that the chilled water delivery volume meets the standard.

[0036] It is worth mentioning that the control valve 402 is detachably fixed to the dispensing pipe 400, such as... Figure 2 As shown: The dispensing pipe 400 consists of two connecting pipes 401. The two ends of the control valve 402 are fixed between the two connecting pipes 401 through flanges. This allows the control valve 402 to be quickly disassembled for maintenance or replacement through the flanges.

[0037] Furthermore, it should be noted that, in the description of this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0038] The above description is the preferred embodiment of this utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of this utility model, and these improvements and modifications should also be considered within the protection scope of this utility model.

Claims

1. An air separation nitrogen-water precooling system, comprising an air-cooled tower (100), and a cooling water conveying unit (200) and a chilled water conveying unit (300) for supplying water to the air-cooled tower (100), characterized in that: A cooling water delivery unit (200) is connected to a first inlet pipe (203) for supplying cooling water to the cooling water delivery unit (200), and a first water delivery pipe (202) is also connected to the cooling water delivery unit (200), which is connected to the air-cooled tower (100). A chilled water delivery unit (300) is connected to a second inlet pipe (303) for supplying chilled water to a cooling water delivery unit (200), and the chilled water delivery unit (300) is also connected to a second water supply pipe (302), which is connected to an air-cooled tower (100). The feed pipe (400) is connected at both ends to the first water supply pipe (202) and the second water supply pipe (302) respectively, and is equipped with a control valve (402) to control the opening and closing of the pipe.

2. The air separation nitrogen-water precooling system as described in claim 1, characterized in that: The cooling water delivery unit (200) includes two sets of cooling water delivery mechanisms (201), both of which are connected to the first water delivery pipe (202) and the first water inlet pipe (203).

3. The air separation nitrogen-water precooling system as described in claim 1 or 2, characterized in that: The chilled water delivery unit (300) includes two sets of chilled water delivery mechanisms (301), both of which are connected to the second water delivery pipe (302) and the second water inlet pipe (303).

4. The air separation nitrogen-water precooling system as described in claim 1, characterized in that: A chiller (304) is also connected to the second water supply pipe (302) for cooling the liquid in the second water supply pipe (302).

5. The air separation nitrogen-water precooling system as described in claim 1, characterized in that: The control valve (402) is detachably fixed to the dispensing pipe (400).

6. The air separation nitrogen-water precooling system as described in claim 5, characterized in that: The dispensing pipe (400) consists of two connecting pipes (401), and the control valve (402) is fixed at both ends between the two connecting pipes (401) by flanges.