A long balcony building combined flow vertical pipe reconstruction structure
By improving the combined riser structure of long balcony buildings and adopting components such as lower risers, upper horizontal pipes, and hangers, the problems of high renovation difficulty and water pollution were solved, achieving simple and efficient rainwater and sewage separation and stable water quality assurance.
Patent Information
- Application Number
- CN202521586611.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-29
- Publication Date
- 2026-06-23
- Estimated Expiration
- 2035-07-29
AI Technical Summary
The existing combined riser pipe of the long balcony building is difficult to renovate, which will affect the normal use of the water by residents. Moreover, the water quality will be polluted after the renovation, resulting in black and smelly water.
The system employs components such as a downpipe, an upper horizontal pipe, a reducing tee, a new rainwater well, and a hanger. The rainwater hopper is connected to the upper horizontal pipe via a reducing tee and a 90° elbow. A 45° elbow is installed between the downpipe and the rainwater well. The hanger is fixed to the roof beam with angle steel and expansion bolts, and the support frame is fixed to the roof with steel plates and expansion bolts to ensure stable separation of rainwater and sewage.
It has achieved a simple and efficient rainwater and sewage separation transformation, reduced construction difficulty, avoided water pollution, ensured the normal life of residents, and simplified the maintenance process.
Smart Images

Figure CN224395927U_ABST
