Desert ecological construction road rapid construction device

By using the bottom barrier unit, separation component, fixing component, slope protection component and surface pressing component of the desert ecological construction device, the problem of difficult construction of roads in the desert was solved, and the construction effect of high speed, high quality and low cost was achieved, thus protecting the desert ecological environment.

CN224412226UActive Publication Date: 2026-06-26中国葛洲坝集团第三工程有限公司

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
中国葛洲坝集团第三工程有限公司
Filing Date
2025-07-29
Publication Date
2026-06-26

AI Technical Summary

Technical Problem

Construction in desert areas presents challenges in road construction, making the transportation of construction materials difficult and costly. Furthermore, existing construction methods can damage the native desert ecosystem and fail to meet the rapid construction needs of photovoltaic projects.

Method used

A desert ecological construction device is adopted, which includes a bottom barrier unit, separation component, fixing component, slope protection component and pressing surface component. Flexible and biodegradable materials are used, combined with grass grid and pressing surface material to form a stable construction structure.

Benefits of technology

It has achieved high-speed, high-quality, low-cost, and low-maintenance construction of desert ecological roads, protecting the desert ecological environment, meeting the requirements for construction speed and quality, and reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224412226U_ABST
    Figure CN224412226U_ABST
Patent Text Reader

Abstract

The utility model discloses a desert ecological construction road quick construction device, including bottom layer barrier unit, the surface of bottom layer barrier unit is equipped with separation subassembly, and separation subassembly is filled with fixed component, still including revetment component, and the edge of revetment component is close to fixed component setting, and revetment component is filled with press surface subassembly. The utility model has realized desert ecological construction road high speed, high quality, low cost, less maintenance construction, avoided using the destruction desert original ecological material, and guaranteed construction road construction speed and construction quality, satisfied material and equipment transportation condition, protected desert ecological environment, effectively reduced construction cost, can promote the application.
Need to check novelty before this filing date? Find Prior Art