A precast pipe pile splicing connection structure for pile foundation support

By introducing disassembly and sealing components into the precast pipe pile splicing structure, the problems of cumbersome disassembly and unstable welding quality in the existing technology are solved, achieving rapid disassembly and good sealing, thus improving construction efficiency and safety.

CN224451601UActive Publication Date: 2026-07-03ANHUI ZHONGCHUNWEI CONSTRUCTION ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ANHUI ZHONGCHUNWEI CONSTRUCTION ENGINEERING CO LTD
Filing Date
2025-08-13
Publication Date
2026-07-03

AI Technical Summary

Technical Problem

The existing precast pipe pile splicing structure is cumbersome to disassemble and assemble, the welding quality is easily affected by environmental factors, and dismantling is difficult, which affects the construction progress and safety.

Method used

It employs disassembly and sealing components, including L-shaped inserts, fixing blocks, arc-shaped clamps, arc plates, and sealing covers, to achieve quick disassembly and sealing. The arc-shaped clamps and rubber gaskets enhance the clamping tightness, while the sealing gaskets improve the sealing performance.

Benefits of technology

It enables rapid assembly and disassembly of precast pipe piles and ensures good sealing, thereby improving construction efficiency and safety and reducing dependence on environmental factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224451601U_ABST
    Figure CN224451601U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of precast pipe pile construction technology and discloses a precast pipe pile splicing connection structure for pile foundation support, comprising: a first precast pipe pile, arranged longitudinally; and a second precast pipe pile, also arranged longitudinally, with the top surface of the second precast pipe pile in contact with the bottom surface of the first precast pipe pile. The second precast pipe pile is connected to the first precast pipe pile via a disassembly and assembly assembly, and a sealing assembly is provided between the interiors of the second and first precast pipe piles. The disassembly and assembly assembly includes: an L-shaped insert rod, the upper end of which is fixedly installed to the outer wall of the first precast pipe pile; and a fixing block, fixedly installed to the outer wall of the second precast pipe pile, with an insertion port on the top surface of the fixing block for insertion. This precast pipe pile splicing connection structure for pile foundation support allows for quick disassembly of the first and second precast pipe piles via the disassembly and assembly assembly, eliminating the need for cumbersome operations and tools, making it extremely convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of precast pipe pile construction technology, specifically a precast pipe pile splicing connection structure for pile foundation support. Background Technology

[0002] In modern construction engineering, pile foundation support is a crucial foundation component ensuring the stability of buildings, and its construction quality and efficiency are of paramount importance. Precast pipe piles, with their numerous advantages such as stable quality from factory production, relatively fast construction speed, and controllable costs, have been widely used in pile foundation support projects. However, in actual construction, due to factors such as site conditions and building design requirements, it is often necessary to splice precast pipe piles to meet different pile length requirements.

[0003] Currently, existing precast pipe pile splicing structures have significant limitations, including the inability to quickly assemble and disassemble them. Traditional welding connections, while ensuring a certain level of strength, are cumbersome. During construction, specialized welders must spend considerable time performing on-site welding, requiring not only high skill levels but also making the weld quality susceptible to environmental factors (such as humidity and wind). Poor welding quality can lead to safety hazards during subsequent use. Furthermore, separating the welded joints is extremely difficult when the pipe piles need to be removed or adjusted, typically requiring significant manpower and resources for cutting and other operations, severely impacting construction progress.

[0004] To address this issue, we propose a precast pipe pile splicing connection structure for pile foundation support. Utility Model Content

[0005] The purpose of this utility model is to provide a precast pipe pile splicing connection structure for pile foundation support, which solves the problems in the background art mentioned above.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a precast pipe pile splicing connection structure for pile foundation support, comprising:

[0007] The first precast pipe pile is installed longitudinally;

[0008] The second precast pipe pile is arranged longitudinally, with its top surface in contact with the bottom surface of the first precast pipe pile. The second precast pipe pile is connected to the first precast pipe pile via a disassembly and assembly assembly, and a sealing assembly is provided between the interior of the second precast pipe pile and the first precast pipe pile.

[0009] Preferably, the disassembly / assembly assembly includes:

[0010] The upper end of the L-shaped insertion rod is fixedly installed to the outer wall of the first precast pipe pile.

[0011] A fixing block is fixedly installed on the outer wall of the second precast pipe pile, and the fixing block has a socket on its top surface for insertion.

[0012] The arc-shaped locking rod is engaged with the L-shaped insert rod and the first and second arc-shaped openings on the surface of the fixing block;

[0013] The curved plate has a curved guide groove on its top surface, which slides with the curved locking rod.

[0014] Preferably, a first arc-shaped rubber pad and a second arc-shaped rubber pad are fixedly installed on both sides of the arc-shaped clamping rod, and the first arc-shaped rubber pad and the second arc-shaped rubber pad are both fixedly installed to the inner wall of the first arc-shaped opening and the second arc-shaped opening. The clamping tightness can be enhanced by setting the first arc-shaped rubber pad and the second arc-shaped rubber pad.

[0015] Preferably, the arc length of the arc-shaped lever is less than the arc length of the arc-shaped plate, which facilitates the sliding out of the arc-shaped lever.

[0016] Preferably, the ends of the first and second arc-shaped rubber pads are rounded to facilitate the smooth insertion of the arc-shaped locking rod.

[0017] Preferably, the sealing assembly includes:

[0018] The outer wall of the circular plate is fixedly installed to the inner wall of the first precast pipe pile;

[0019] Hollow columns are fixedly installed on the bottom surface of a circular plate;

[0020] The sealing cover is fixedly installed on the outer wall of the second precast pipe pile, and the inner wall of the sealing cover is snapped into the lower end of the hollow column.

[0021] Preferably, a sealing gasket is fixedly installed on the inner wall of the sealing cover, and the sealing gasket is snapped into the hollow column. The sealing performance can be enhanced by the sealing gasket.

[0022] This utility model provides a precast pipe pile splicing connection structure for pile foundation support. This precast pipe pile splicing connection structure for pile foundation support has the following beneficial effects:

[0023] (1) The precast pipe pile splicing connection structure used for pile foundation support can quickly disassemble the first precast pipe pile and the second precast pipe pile through the set disassembly and assembly components, without cumbersome operation and tools, which is extremely convenient.

[0024] (2) The precast pipe pile splicing structure used for pile foundation support can ensure the sealing between the first precast pipe pile and the second precast pipe pile through the set sealing components, making it easy and convenient to use. Attached Figure Description

[0025] Figure 1 This is a schematic diagram of the overall three-dimensional structure of a precast pipe pile splicing connection structure for pile foundation support according to the present invention.

[0026] Figure 2 This is a schematic diagram of the disassembly and assembly components in a precast pipe pile splicing connection structure for pile foundation support according to the present invention.

[0027] Figure 3 This utility model relates to a precast pipe pile splicing connection structure for pile foundation support. Figure 2 A schematic diagram of the decomposed structure;

[0028] Figure 4 This is a schematic diagram of the first and second arc-shaped rubber pads in a precast pipe pile splicing connection structure for pile foundation support according to this utility model.

[0029] Figure 5 This is a schematic diagram of the arc-shaped plate structure in a precast pipe pile splicing connection structure for pile foundation support according to this utility model.

[0030] Figure 6 This is a cross-sectional view of the first and second precast pipe piles in a precast pipe pile splicing connection structure for pile foundation support according to this utility model.

[0031] Figure 7 This is a cross-sectional view of the sealing component in a precast pipe pile splicing connection structure for pile foundation support according to this utility model.

[0032] In the diagram: 1. First precast pipe pile; 2. Second precast pipe pile; 3. Assembly / disassembly assembly; 31. L-shaped insert rod; 32. Fixing block; 33. Arc-shaped clamp rod; 34. Arc-shaped plate; 35. First arc-shaped rubber pad; 36. Second arc-shaped rubber pad; 4. Sealing assembly; 41. Circular plate; 42. Hollow column; 43. Sealing gasket; 44. Sealing cover; 5. Insert; 6. First arc-shaped opening; 7. Second arc-shaped opening. Detailed Implementation

[0033] To provide a clearer understanding of the technical features, objectives, and effects of this utility model, the specific embodiments of this utility model are now described with reference to the accompanying drawings.

[0034] A preferred embodiment of the precast pipe pile splicing connection structure for pile foundation support provided by this utility model is, for example... Figures 1 to 7 As shown: A precast pipe pile splicing connection structure for pile foundation support, comprising:

[0035] The first precast pipe pile 1 is set longitudinally;

[0036] The second precast pipe pile 2 is arranged longitudinally, and the top surface of the second precast pipe pile 2 is in contact with the bottom surface of the first precast pipe pile 1.

[0037] Example 1: Figure 1 , Figure 2 and Figure 3 The second precast pipe pile 2 is connected to the first precast pipe pile 1 through the disassembly and assembly component 3.

[0038] Specifically, the disassembly / assembly component 3 includes:

[0039] The upper end of the L-shaped insertion rod 31 is fixedly installed to the outer wall of the first precast pipe pile 1;

[0040] The fixing block 32 is fixedly installed on the outer wall of the second precast pipe pile 2, and the socket 5 opened on the top surface of the fixing block 32 is inserted.

[0041] The arc-shaped locking rod 33 is engaged with the first arc-shaped opening 6 and the second arc-shaped opening 7 on the surface of the L-shaped insert rod 31 and the fixing block 32;

[0042] The arc-shaped plate 34 has an arc-shaped guide groove on its top surface, which slides with the arc-shaped locking rod 33.

[0043] In this embodiment, it should be noted that a first arc-shaped rubber pad 35 and a second arc-shaped rubber pad 36 are fixedly installed on both sides of the arc-shaped locking rod 33. The first arc-shaped rubber pad 35 and the second arc-shaped rubber pad 36 are both fixedly installed to the inner walls of the first arc-shaped opening 6 and the second arc-shaped opening 7. The clamping force can be enhanced by the first arc-shaped rubber pad 35 and the second arc-shaped rubber pad 36. The ends of the first arc-shaped rubber pad 35 and the second arc-shaped rubber pad 36 are rounded to facilitate the smooth insertion of the arc-shaped locking rod 33.

[0044] Furthermore, the arc length of the arc-shaped lever 33 is less than the arc length of the arc-shaped plate 34, which facilitates the sliding of the arc-shaped lever 33.

[0045] Example 2: Reference Figure 6 and Figure 7 A sealing assembly 4 is provided between the interior of the second precast pipe pile 2 and the first precast pipe pile 1.

[0046] Specifically, the sealing component 4 includes:

[0047] The outer wall of the circular plate 41 is fixedly installed to the inner wall of the first precast pipe pile 1;

[0048] Hollow column 42 is fixedly installed on the bottom surface of circular plate 41;

[0049] The outer wall of the sealing cover 44 is fixedly installed with the inner wall of the second precast pipe pile 2, and the inner wall of the sealing cover 44 is snapped into the lower end of the hollow column 42.

[0050] In this embodiment, it should be noted that a sealing gasket 43 is fixedly installed on the inner wall of the sealing cover 44. The sealing gasket 43 is snapped into the hollow column 42. The sealing performance can be enhanced by the sealing gasket 43.

[0051] Working principle: When it is necessary to disassemble the first precast pipe pile 1 and the second precast pipe pile 2, the worker can first pull the arc-shaped clamp 33 to slide the arc-shaped clamp 33 along the arc-shaped groove in the arc plate 34 until the arc-shaped clamp 33 disengages from the first arc-shaped opening 6 and the second arc-shaped opening 7. Then, the first precast pipe pile 1 is pulled upward to completely disengage the L-shaped insert 31 from the insertion port 5 in the fixing block 32, thus completing the disassembly of the first precast pipe pile 1 and the second precast pipe pile 2, which is extremely convenient.

[0052] The above description is merely an illustrative embodiment of this utility model and is not intended to limit the scope of this utility model. Any equivalent changes and modifications made by those skilled in the art without departing from the concept and principles of this utility model should fall within the protection scope of this utility model. Furthermore, it should be noted that the components of this utility model are not limited to the overall application described above. Each technical feature described in the specification of this utility model can be used individually or in combination as needed. Therefore, this utility model naturally covers other combinations and specific applications related to the points of this utility model.

Claims

1. A precast pipe pile splicing connection structure for pile foundation support, characterized in that: include: The first precast pipe pile (1) is set longitudinally; The second precast pipe pile (2) is arranged longitudinally. The top surface of the second precast pipe pile (2) is in contact with the bottom surface of the first precast pipe pile (1). The second precast pipe pile (2) is connected to the first precast pipe pile (1) through the disassembly and assembly assembly (3). A sealing assembly (4) is provided between the interior of the second precast pipe pile (2) and the first precast pipe pile (1).

2. The pile connection structure of claim 1, wherein: The disassembly / assembly assembly (3) includes: The upper end of the L-shaped insertion rod (31) is fixedly installed to the outer wall of the first precast pipe pile (1); A fixing block (32) is fixedly installed on the outer wall of the second precast pipe pile (2), and the socket (5) opened on the top surface of the fixing block (32) is inserted into it; The arc-shaped locking rod (33) is engaged with the first arc-shaped opening (6) and the second arc-shaped opening (7) on the surface of the L-shaped insert rod (31) and the fixing block (32); The arc plate (34) has an arc-shaped guide groove on its top surface, which slides with the arc-shaped clamp (33).

3. The pile connection structure of claim 2, wherein: The two sides of the arc-shaped clamp (33) are respectively fixedly installed with a first arc-shaped rubber pad (35) and a second arc-shaped rubber pad (36), and the first arc-shaped rubber pad (35) and the second arc-shaped rubber pad (36) are both fixedly installed with the inner walls of the first arc-shaped opening (6) and the second arc-shaped opening (7).

4. The pile connection structure of claim 2, wherein: The arc length of the arc-shaped lever (33) is less than the arc length of the arc-shaped plate (34).

5. The connecting structure of the prefabricated pipe pile for pile foundation support according to claim 3, characterized in that: The ends of the first arc-shaped rubber pad (35) and the second arc-shaped rubber pad (36) are rounded.

6. The precast pipe pile splicing structure for pile foundation support according to claim 1, characterized in that: The sealing assembly (4) includes: The outer wall of the circular plate (41) is fixedly installed to the inner wall of the first precast pipe pile (1); Hollow column (42) is fixedly installed on the bottom surface of circular plate (41); The outer wall of the sealing cover (44) is fixedly installed with the inner wall of the second precast pipe pile (2), and the inner wall of the sealing cover (44) is snapped into the lower end of the hollow column (42).

7. The pile connection structure of claim 6, wherein: A sealing gasket (43) is fixedly installed on the inner wall of the sealing cover (44), and the sealing gasket (43) is snapped into the hollow column (42).