An oil-proof fence cloth for offshore operation
Patent Information
- Application Number
- CN202522145724.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-11
- Publication Date
- 2026-09-11
- Estimated Expiration
- 2035-10-11
AI Technical Summary
[0003]公告号为CN211773455U的一种用于海上溢油处理的阻隔收集平台装置,围栏能够根据浮油的污染范围进行首尾连接形成封锁,从而方便对浮油进行阻隔隔离,避免浮油造成更大范围的污染,有利于限制浮油的污染范围,方便后期进行收集处理;该技术方案虽然设有配重块,但是海面上的漂浮物过矮,很容易在风浪的作用下,海水很容易的越过漂浮物,出现油料泄漏,并且该技术方案设有隔离膜,但是隔离膜置于水下,无法作用在水面上,疏油效果一般
[0012]本实用新型的一种海上作业防油隔栏布,与现有技术相比,有益效果为:该海上作业防油隔栏布,本装置通过布支撑底座和布支撑立板形成串联的漂浮装置,并且在配重结构的作用下,让漂浮装置一部分置于水下,一部分漂于水上;隔栏布固定在漂浮装置外部,让隔栏布也是一部分置于水下,一部分漂于水上,即使出现风浪,也能够避免出现油料泄漏的情况,具有更高的安全性。
Smart Images

Figure CN224741541U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the technical field of barrier fabric, specifically relating to an oil-proof barrier fabric for marine operations. Background Technology
[0002] Barrier fabric is a flexible barrier material used for physical isolation, area demarcation, or security protection. It is usually made of polymer or glass fiber as the base material and is produced through weaving, coating, or composite processes. It has properties such as UV resistance, weather resistance, flame retardancy, water resistance, and tear resistance. It is widely used in construction site fencing, temporary road isolation, forest firebreaks, event site demarcation, and medical environment isolation, etc., to achieve the purpose of space management, security protection, or environmental protection by forming physical barriers.
[0003] The announcement number CN211773455U describes a barrier and collection platform device for marine oil spill treatment. The barrier can be connected end-to-end to form a blockade based on the extent of oil spill pollution, thus facilitating the isolation of the oil spill and preventing it from causing further pollution. This helps limit the scope of oil spill pollution and facilitates subsequent collection and treatment. Although this technical solution includes counterweights, the floating objects on the sea surface are too low, making it easy for seawater to overflow them under the influence of wind and waves, leading to oil leaks. Furthermore, while the solution includes a barrier membrane, this membrane is underwater and cannot function on the water surface, resulting in only a moderate oil-repellent effect. Utility Model Content
[0004] To address the potential oil spillage issue in existing technologies, this invention provides an oil-proof barrier for offshore operations. By fixing the barrier to the outside of a floating device, part of the barrier is submerged underwater and part floats on the surface. Even in rough seas, oil spillage can be prevented, resulting in enhanced safety. The specific technical solution is as follows: An oil-proof barrier for offshore operations includes: a barrier body; a fabric support structure is installed inside the barrier body; a connecting structure is installed on the side wall of the fabric support structure; and two sets of center-of-gravity lowering devices are installed on the lower wall of the fabric support structure. The structure includes: a fabric support base, a fabric support upright, two support nuts, two support screws, and a support clamp; the fabric support upright is installed on the upper wall of the fabric support base, the two support nuts are respectively embedded in the lower wall of the fabric support base, the two support screws are respectively threadedly installed inside the support nuts, the support clamp is fixedly installed on the lower wall of the fabric support base by the two support screws, the partition fabric body is wrapped around the fabric support base and the fabric support upright, and the two ends of the partition fabric body are clamped between the fabric support base and the support clamp.
[0005] Preferably, the connecting structure includes: a connecting female buckle, a connecting seat, a connecting rope, and a connecting male buckle; the connecting female buckle is installed on the side wall of the fabric support upright, the connecting seat is installed on the other side wall of the fabric support upright, one end of the connecting rope is installed on the side wall of the connecting seat, and the connecting male buckle is installed on the other end of the connecting rope.
[0006] Preferably, the two sets of the center of gravity lowering structure include: a center of gravity fixing nut, a center of gravity fixing screw, a center of gravity connecting cable, and a center of gravity hammer; the center of gravity fixing nut is embedded in the support clamp, the center of gravity fixing screw is movably installed in the center of gravity fixing nut by means of a thread, one end of the center of gravity connecting cable is installed on the lower wall surface of the center of gravity fixing screw, and the center of gravity hammer is fixedly installed on the other end of the center of gravity connecting cable.
[0007] Preferably, sealing zippers are installed on the two side walls of the partition fabric body.
[0008] Preferably, the exterior of the partition fabric body is provided with an oleophobic coating.
[0009] Preferably, two anti-slip rubber strips are installed on the lower wall surface of the fabric support base.
[0010] Preferably, the upper wall surface of the support plate is provided with two anti-slip rubber strips.
[0011] Preferably, two buoyancy columns are installed inside the fabric support base.
[0012] The oil spill containment barrier of this utility model has the following advantages compared with the prior art: This oil spill containment barrier forms a floating device in series through a cloth support base and a cloth support upright plate. Under the action of the counterweight structure, part of the floating device is placed underwater and part is floating on the water. The barrier cloth is fixed to the outside of the floating device, so that part of the barrier cloth is also placed underwater and part is floating on the water. Even in the event of wind and waves, oil leakage can be avoided, which has higher safety. Attached Figure Description
[0013] Figure 1 A schematic diagram of the first integral structure of the marine oil-proof barrier fabric provided by this utility model; Figure 2 A schematic diagram of the second integral structure of the marine oil-proof barrier fabric provided by this utility model; Figure 3 An exploded view of a first partial structure of the oil-proof barrier fabric for marine operations provided by this utility model; Figure 4 An exploded view of the second partial structure of the marine oil-proof barrier fabric provided by this utility model; in, Figures 1 to 4The attached diagrams and components for offshore oil spill containment barriers are as follows: 1. Barrier barrier body; 2. Barrier support base; 3. Barrier support upright; 4. Support nut; 5. Support screw; 6. Support clamp; 7. Connecting nut; 8. Connecting seat; 9. Connecting rope; 10. Connecting buckle; 11. Center of gravity fixing nut; 12. Center of gravity fixing screw; 13. Center of gravity connecting cable; 14. Center of gravity hammer; 15. Sealing zipper; 16. Anti-slip rubber strip; 17. Buoyancy column. Detailed Implementation
[0014] The following are specific implementation cases and appendices. Figures 1-4 This utility model will be further described, but it is not limited to these embodiments. This utility model provides a technical solution: an oil-proof barrier fabric for marine operations, comprising: a barrier fabric body 1, a fabric support structure installed inside the barrier fabric body 1, a connecting structure installed on the side wall of the fabric support structure, and two sets of center-of-gravity shifting structures installed on the lower wall of the fabric support structure; the fabric support structure includes: a fabric support base 2, a fabric support upright plate 3, two support nuts 4, two support screws 5, and a support clamping plate 6; the fabric support upright plate 3 is installed on the upper wall of the fabric support base 2, and the two support nuts 4 are respectively embedded in the lower wall of the fabric support base 2. Each support screw 5 is movably installed inside the support nut 4 via a thread. The support clamp 6 is fixedly installed on the lower wall of the fabric support base 2 via two support screws 5. The partition fabric body 1 is wrapped around the fabric support base 2 and the fabric support upright 3, and both ends of the partition fabric body 1 are clamped between the fabric support base 2 and the support clamp 6. Sealing zippers 15 are installed on the two side walls of the partition fabric body 1. The exterior of the partition fabric body 1 is coated with an oil-repellent coating. Two anti-slip rubber strips 16 are installed on the lower wall of the fabric support base 2 and two anti-slip rubber strips 16 are installed on the upper wall of the support clamp 6. Two buoyancy columns 17 are installed inside the fabric support base 2.
[0015] As a preferred embodiment, the connection structure further includes: a connecting female buckle 7, a connecting seat 8, a connecting rope 9, and a connecting male buckle 10; the connecting female buckle 7 is installed on the side wall of the fabric support plate 3, the connecting seat 8 is installed on the other side wall of the fabric support plate 3, one end of the connecting rope 9 is installed on the side wall of the connecting seat 8, and the connecting male buckle 10 is installed on the other end of the connecting rope 9.
[0016] As a preferred embodiment, the two sets of center-of-gravity lowering structures further include: a center-of-gravity fixing nut 11, a center-of-gravity fixing screw 12, a center-of-gravity connecting cable 13, and a center-of-gravity hammer 14; the center-of-gravity fixing nut 11 is embedded inside the support clamp 6, the center-of-gravity fixing screw 12 is movably installed in the center-of-gravity fixing nut 11 by means of threads, one end of the center-of-gravity connecting cable 13 is installed on the lower wall surface of the center-of-gravity fixing screw 12, and the center-of-gravity hammer 14 is fixedly installed on the other end of the center-of-gravity connecting cable 13.
[0017] Working principle: This device cannot be used alone. Several devices need to be connected to form a chain and placed on the sea surface to enclose the area where the operation is being carried out at sea. If an oil spill occurs during the operation at sea, it can ensure that the oil is confined to the area and does not spread, thus providing preventive protection for the marine environment.
[0018] The operator first covers the partition fabric body 1 over the fabric support base 2 and the fabric support upright plate 3. Then, the support clamp 6 is fixed to the lower wall of the fabric support base 2 by two support screws 5, so that both ends of the partition fabric body 1 are fixed between the fabric support base 2 and the support clamp 6. Anti-slip rubber strips 16 are provided between the partition fabric body 1 and the fabric support base 2, and between the partition fabric body 1 and the support clamp 6. The anti-slip rubber strips 16 can increase the friction and thus ensure the stability of the partition fabric body 1.
[0019] When connecting multiple devices, the operator first inserts the connecting buckle 10 into the connecting nut 7, allowing several fabric support uprights 3 to be connected in series via the connecting rope 9, thus forming a series of partition fabric chains with multiple fabric support bases 2 and fabric support uprights 3. Next, the operator connects the partition fabric body 1 via the sealing zipper 15, thereby forming a single, elongated partition fabric body 1.
[0020] Operators use a transport ship to lower the assembled barrier fabric bodies 1 into the sea. Both the fabric support base 2 and the fabric support uprights 3 are made of polyethylene and have a hollow structure, allowing for stronger buoyancy. To achieve stable buoyancy, buoyancy columns 17 are installed inside the fabric support base 2. The fabric support base 2 and fabric support uprights 3 will float on the sea with the barrier fabric bodies 1. Then, driven by the center of gravity hammer 14 through the center of gravity connecting cable 13, a portion of the fabric support base 2 sinks into the seawater, and a portion of the barrier fabric bodies 1 sinks into the seawater, thus creating a situation where part of the barrier fabric bodies 1 is submerged and part is exposed above the seawater.
[0021] Under the gravitational pull of the center of gravity 14 and the buoyancy of the cloth support base 2, cloth support plate 3 and buoyancy column 17, part of the partition cloth body 1 can be submerged in the seawater and part of it can be exposed above the seawater. If waves hit the device, the partition cloth body 1 can still maintain this position, thus preventing oil leakage in the area.
[0022] In the description of this utility model, the term "multiple" refers to two or more. Unless otherwise explicitly defined, the terms "upper," "lower," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. The terms "connection," "installation," "fixing," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. For those skilled in the art, the specific meaning of the above terms in this utility model can be understood according to the specific circumstances.
[0023] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. An oil spill containment barrier for offshore operations, comprising: The partition fabric body (1) is characterized in that a fabric support structure is installed inside the partition fabric body (1), a connecting structure is installed on the side wall of the fabric support structure, and two sets of center-of-gravity shifting structures are installed on the lower wall of the fabric support structure; the fabric support structure includes: a fabric support base (2), a fabric support upright plate (3), two support nuts (4), two support screws (5), and a support clamping plate (6); the fabric support upright plate (3) is installed on the upper wall of the fabric support base (2), the two support nuts (4) are respectively embedded in the lower wall of the fabric support base (2), the two support screws (5) are respectively installed inside the support nuts (4) by thread, and the support clamping plate (6) is fixedly installed on the lower wall of the fabric support base (2) by the two support screws (5); the partition fabric body (1) is wrapped around the outside of the fabric support base (2) and the fabric support upright plate (3), and the two ends of the partition fabric body (1) are clamped between the fabric support base (2) and the support clamping plate (6).
2. The marine oil-proof barrier fabric according to claim 1, characterized in that, The connection structure includes: a female connector (7), a connecting seat (8), a connecting rope (9), and a male connector (10); the female connector (7) is installed on the side wall of the fabric support plate (3), the connecting seat (8) is installed on the other side wall of the fabric support plate (3), one end of the connecting rope (9) is installed on the side wall of the connecting seat (8), and the male connector (10) is installed on the other end of the connecting rope (9).
3. The marine oil-proof barrier fabric according to claim 1, characterized in that, The two sets of center-of-gravity lowering structures include: a center-of-gravity fixing nut (11), a center-of-gravity fixing screw (12), a center-of-gravity connecting cable (13), and a center-of-gravity hammer (14); the center-of-gravity fixing nut (11) is embedded in the support clamp (6), the center-of-gravity fixing screw (12) is movably installed in the center-of-gravity fixing nut (11) by a thread, one end of the center-of-gravity connecting cable (13) is installed on the lower wall of the center-of-gravity fixing screw (12), and the center-of-gravity hammer (14) is fixedly installed on the other end of the center-of-gravity connecting cable (13).
4. The marine oil-proof barrier fabric according to claim 1, characterized in that, The two side walls of the partition fabric body (1) are respectively equipped with sealing zippers (15).
5. The marine oil-proof barrier fabric according to claim 1, characterized in that, The exterior of the partition cloth body (1) is provided with an oleophobic coating.
6. The marine oil-proof barrier fabric according to claim 1, characterized in that, Two anti-slip rubber strips (16) are installed on the lower wall of the cloth support base (2).
7. The marine oil-proof barrier fabric according to claim 1, characterized in that, The upper wall of the support plate (6) is provided with two anti-slip rubber strips (16).
8. The marine oil-proof barrier fabric according to claim 1, characterized in that, The cloth support base (2) has two buoyancy columns (17) installed inside.
Citation Information
Patent Citations
Blocking and collecting platform device for offshore oil spill treatment
CN211773455U