A cable stabilizing and guiding device for overhead line stringing

CN224908910UActive Publication Date: 2026-10-27THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522384488.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-11
Publication Date
2026-10-27
Estimated Expiration
2035-11-11

AI Technical Summary

Technical Problem

然而,值得注意的是,部分线缆架的安装位置距离地面有一定的高度,这样的设计虽然有利于线缆的布局和维护,但在实际操作中,特别是在安装一些直径较粗、重量较大的电缆时,却会带来一定的不便

Benefits of technology

1.本申请转动第一螺杆运作后,可促使第一连接座与第二连接座相互趋近,进而使上支臂与下支臂实现合拢。上支臂与下支臂合拢后,定位座将向上位移,从而把线缆提升至安装位置,便于开展线缆的安装作业。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224908910U_ABST
    Figure CN224908910U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of power collection line stringing construction cable stable guiding device, it is related to cable installation technical field, including comprehensive pipe gallery, cable frame is fixedly installed on comprehensive pipe gallery side wall, equipment rack body is equipped in comprehensive pipe gallery, lifting mechanism is installed on equipment rack body, lifting mechanism includes two positioning shafts fixedly installed on equipment rack body, rotatingly installed with lower branch arm on two positioning shafts, first connecting seat and second connecting seat are rotatably connected with lower branch arm terminal respectively, first screw rod is connected between first connecting seat and second connecting seat, upper branch arm is rotatably installed with first connecting seat and second connecting seat terminal, upper branch arm terminal is rotatably installed with positioning seat, guiding mechanism is installed on positioning seat, the power collection line stringing construction cable stable guiding device, lifting mechanism can lift cable to one end height, guiding mechanism can push cable to cable frame after cable is lifted to one end height, the quick installation of cable is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of cable installation technology, specifically a cable stabilization and guiding device for power line overhead construction. Background Technology

[0002] Integrated utility tunnels are underground tunnel structures built in cities to centrally lay municipal pipelines such as electricity, communications, water supply, heating, and gas, and are hailed as the "main artery of the city's lifeline." Through unified planning, construction, and management, they systematically accommodate various pipelines that were originally buried or overhead, completely solving the problems of repeated road excavation, wasted space resources, and frequent pipeline accidents caused by traditional pipeline laying methods, and greatly improving the carrying capacity of urban infrastructure.

[0003] On the inner walls of the integrated utility tunnel, cable racks are specially installed for fixing and supporting cables. These cable racks are designed to ensure that cables can be installed orderly and safely within the tunnel's interior space. However, it is worth noting that some cable racks are installed at a certain height above the ground. While this design facilitates cable layout and maintenance, it can cause inconvenience in actual operation, especially when installing larger diameter and heavier cables. Therefore, a cable stabilization and guiding device for power line overhead line construction is proposed. Utility Model Content

[0004] The purpose of this utility model is to provide a stable guiding device for cables during power line construction to solve the problems in the prior art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a cable stabilization and guiding device for power line overhead line construction, comprising a comprehensive utility tunnel, a cable rack fixedly installed on the side wall of the comprehensive utility tunnel, an equipment frame provided inside the comprehensive utility tunnel, a lifting mechanism installed on the equipment frame, the lifting mechanism comprising two positioning shafts fixedly installed on the equipment frame, a lower support arm rotatably installed on each of the two positioning shafts, a first connecting seat and a second connecting seat rotatably connected to the end of the lower support arm respectively, a first screw connecting the first connecting seat and the second connecting seat, an upper support arm rotatably installed at the end of each of the first and second connecting seats, a positioning seat rotatably installed at the end of the upper support arm, and a guiding mechanism installed on the positioning seat.

[0006] Preferably, the lifting mechanism further includes a lifting frame slidably mounted on the positioning seat and a second screw threadedly mounted on the bottom of the positioning seat. A guide roller is rotatably mounted inside the lifting frame, and the upper end of the second screw is rotatably mounted on the lifting frame.

[0007] Preferably, the positioning seat is provided with a rotating shaft, and the upper support arm is rotatably mounted on the positioning seat via the rotating shaft.

[0008] Preferably, the lower support arm is rotatably mounted on the equipment frame via a positioning shaft, one end of the first screw is rotatably mounted on the first connecting seat, the second connecting seat has a screw hole, and the first screw is threadedly connected to the second connecting seat.

[0009] Preferably, the guiding mechanism includes a mounting bracket and a housing fixedly mounted on the positioning seat. A threaded conveying roller is rotatably mounted on the mounting bracket. A planetary reducer is fixedly mounted inside the housing. A movable shaft is rotatably mounted on the housing. A pinion is fixedly mounted at one end of the movable shaft, and a sprocket is fixedly mounted at the other end of the movable shaft. A chain is connected to the sprocket.

[0010] Preferably, the output end of the planetary reducer is fixedly mounted on one end of the threaded conveyor roller, and a large gear is fixedly mounted on the input end of the planetary reducer.

[0011] Preferably, bearings are installed on both the mounting frame and the housing, the threaded conveying roller is rotatably mounted on the mounting frame via the bearings, and the movable shaft is rotatably mounted on the housing via the bearings.

[0012] Preferably, the pinion is rotatably mounted inside the housing via a movable shaft and meshes with the large gear.

[0013] Compared with the prior art, the beneficial effects of this utility model are: 1. After the first screw is rotated, the first connecting seat and the second connecting seat will approach each other, thereby causing the upper support arm and the lower support arm to close together. After the upper support arm and the lower support arm close together, the positioning seat will move upward, thereby lifting the cable to the installation position, which facilitates the installation of the cable. 2. In this application, after the cable falls onto the threaded conveyor roller, it can be pulled by a chain. The chain, under traction, drives the sprocket to rotate; the sprocket's rotation, in turn, drives the movable shaft to rotate; the movable shaft's rotation causes the pinion to rotate; the pinion's rotation drives the large gear to rotate; the large gear's rotation drives the threaded conveyor roller to rotate. When the threaded conveyor roller rotates, its threaded mechanism pushes the cable forward, thereby transferring the cable to the cable rack, achieving rapid cable installation. Attached Figure Description Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a partial structural schematic diagram of the present invention; Figure 3 This is a schematic diagram of the lifting mechanism of this utility model; Figure 4 This is a partial schematic diagram of the lifting mechanism of this utility model; Figure 5 This is a schematic diagram of the guiding mechanism of this utility model.

[0014] The markings in the diagram are: 1. Integrated utility tunnel; 2. Cable rack; 3. Equipment frame; 4. Lifting mechanism; 401. Positioning shaft; 402. Lower support arm; 403. First connecting seat; 404. Upper support arm; 405. Guide roller; 406. Lifting frame; 407. Positioning seat; 408. First screw; 409. Second connecting seat; 410. Second screw; 5. Guiding mechanism; 501. Mounting frame; 502. Threaded conveyor roller; 503. Planetary reducer; 504. Housing; 505. Sprocket; 506. Movable shaft; 507. Pinion; 508. Gear; 509. Chain. Detailed Implementation

[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0016] like Figure 1 and Figure 2 As shown, this utility model provides a technical solution for a stable cable guiding device for power line overhead line construction. It includes a utility tunnel 1, a cable rack 2 fixedly installed on the side wall of the utility tunnel 1, an equipment frame 3 inside the utility tunnel 1, a lifting mechanism 4 installed on the equipment frame 3, and a guiding mechanism 5 installed on the positioning seat 407. The lifting mechanism 4 can lift the cable to one end height, and after the cable is lifted to one end height, the guiding mechanism 5 can push the cable onto the cable rack 2, achieving rapid cable installation.

[0017] Example 1: As Figure 2 , Figure 3 and Figure 4 As shown, the lifting mechanism 4 includes two positioning shafts 401 fixedly installed on the equipment frame 3. A lower support arm 402 is rotatably installed on each of the two positioning shafts 401. A first connecting seat 403 and a second connecting seat 409 are rotatably connected to the ends of the lower support arms 402, respectively. A first screw 408 is connected between the first connecting seat 403 and the second connecting seat 409. An upper support arm 404 is rotatably installed at the ends of the first connecting seat 403 and the second connecting seat 409. A positioning seat 407 is rotatably installed at the end of the upper support arm 404. The lifting mechanism 4 also includes a lifting frame 406 slidably installed on the positioning seat 407 and a second screw 410 threadedly installed at the bottom of the positioning seat 407. A guide roller 405 is rotatably installed inside the lifting frame 406, and the upper end of the second screw 410 is rotatably installed on the lifting frame 406. A rotating shaft is provided on the positioning seat 407, and the upper support arm 404 is rotatably installed on the positioning seat 407 through the rotating shaft.

[0018] Specifically, rotating the first screw 408 brings the first connecting seat 403 and the second connecting seat 409 closer together, thereby causing the upper support arm 404 and the lower support arm 402 to close. When the upper support arm 404 and the lower support arm 402 close, the positioning seat 407 moves upward, thereby lifting the cable to the installation position. After the cable is lifted to the installation position, rotating the second screw 410 causes the guide roller 405 on the lifting frame 406 to retract into the positioning seat 407.

[0019] Example 2: Figure 2 and Figure 5 As shown, the guide mechanism 5 includes a mounting frame 501 and a housing 504 fixedly mounted on the positioning seat 407. A threaded conveying roller 502 is rotatably mounted on the mounting frame 501. A planetary reducer 503 is fixedly mounted inside the housing 504. A movable shaft 506 is rotatably mounted on the housing 504. A pinion 507 is fixedly mounted at one end of the movable shaft 506, and a sprocket 505 is fixedly mounted at the other end of the movable shaft 506. A chain 509 is connected to the sprocket 505. The output end of the planetary reducer 503 is fixedly mounted on one end of the threaded conveying roller 502. A large gear 508 is fixedly mounted on the input end of the planetary reducer 503. Bearings are mounted on both the mounting frame 501 and the housing 504. The threaded conveying roller 502 is rotatably mounted on the mounting frame 501 via the bearings, and the movable shaft 506 is rotatably mounted on the housing 504 via the bearings.

[0020] Specifically, after the cable falls onto the threaded conveyor roller 502, it pulls the chain 509. The chain 509, when pulled, drives the sprocket 505 to rotate. The rotation of the sprocket 505, in turn, drives the movable shaft 506 to rotate. The rotation of the movable shaft 506 drives the pinion 507 to rotate. The rotation of the pinion 507, in turn, drives the large gear 508 to rotate. The rotation of the large gear 508 ultimately drives the threaded conveyor roller 502 to rotate. During the rotation of the threaded conveyor roller 502, its threaded mechanism pushes the cable forward, thus smoothly transferring the cable to the cable holder 2, achieving rapid cable installation.

[0021] Working principle: In operation, the entire equipment is first set up within the integrated utility tunnel 1. Then, the cable is pulled along the guide roller 405 to slide, thus placing the cable within the integrated utility tunnel 1. After the cable is placed, the first screw 408 is rotated. Rotating the first screw 408 brings the first connecting seat 403 and the second connecting seat 409 closer together, causing the upper support arm 404 and the lower support arm 402 to close. Once the upper and lower support arms 404 and 402 are closed, the positioning seat 407 moves upward, lifting the cable to the installation position. After the cable is lifted to the installation position, the second screw 410 is rotated. Rotating the second screw 410 causes the guide roller 405 on the lifting frame 406 to retract into the positioning seat 407. The cable falls onto the threaded conveyor roller 502. Once the cable is on the threaded conveyor roller 502, the chain 509 can be pulled. Pulling the chain 509 will drive the sprocket 505 to rotate. The rotation of the sprocket 505 will drive the movable shaft 506 to rotate. The rotation of the movable shaft 506 will drive the pinion 507 to rotate. The rotation of the pinion 507 will drive the large gear 508 to rotate. The rotation of the large gear 508 will drive the threaded conveyor roller 502 to rotate. When the threaded conveyor roller 502 rotates, the threaded mechanism on it will push the cable forward, thereby pushing the cable onto the cable rack 2, realizing the rapid installation of the cable.

[0022] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

Claims

1. A cable stabilization and guiding device for overhead power line construction, comprising a utility tunnel (1), wherein a cable rack (2) is fixedly installed on the side wall of the utility tunnel (1), characterized in that: The integrated utility tunnel (1) is equipped with an equipment frame (3), and a lifting mechanism (4) is installed on the equipment frame (3). The lifting mechanism (4) includes two positioning shafts (401) fixedly installed on the equipment frame (3). A lower support arm (402) is rotatably installed on each of the two positioning shafts (401). A first connecting seat (403) and a second connecting seat (409) are rotatably connected to the ends of the lower support arm (402). A first screw (408) is connected between the first connecting seat (403) and the second connecting seat (409). An upper support arm (404) is rotatably installed at the ends of the first connecting seat (403) and the second connecting seat (409). A positioning seat (407) is rotatably installed at the end of the upper support arm (404). A guide mechanism (5) is installed on the positioning seat (407).

2. The cable stabilization and guiding device for overhead power line construction according to claim 1, characterized in that: The lifting mechanism (4) further includes a lifting frame (406) slidably mounted on the positioning seat (407) and a second screw (410) threadedly mounted on the bottom of the positioning seat (407). A guide roller (405) is rotatably mounted inside the lifting frame (406), and the upper end of the second screw (410) is rotatably mounted on the lifting frame (406).

3. The cable stabilization and guiding device for overhead power line construction according to claim 2, characterized in that: The positioning seat (407) is provided with a rotating shaft, and the upper support arm (404) is rotatably mounted on the positioning seat (407) via the rotating shaft.

4. The cable stabilization and guiding device for overhead power line construction according to claim 3, characterized in that: The lower support arm (402) is rotatably mounted on the equipment frame (3) via the positioning shaft (401). One end of the first screw (408) is rotatably mounted on the first connecting seat (403). The second connecting seat (409) has a screw hole. The first screw (408) is threadedly connected to the second connecting seat (409).

5. The cable stabilization and guiding device for overhead power line construction according to claim 4, characterized in that: The guiding mechanism (5) includes a mounting bracket (501) and a housing (504) fixedly mounted on the positioning seat (407). A threaded conveying roller (502) is rotatably mounted on the mounting bracket (501). A planetary reducer (503) is fixedly mounted inside the housing (504). A movable shaft (506) is rotatably mounted on the housing (504). A pinion (507) is fixedly mounted at one end of the movable shaft (506). A sprocket (505) is fixedly mounted at the other end of the movable shaft (506). A chain (509) is connected to the sprocket (505).

6. The cable stabilization and guiding device for overhead power line construction according to claim 5, characterized in that: The output end of the planetary reducer (503) is fixedly installed on one end of the threaded conveyor roller (502), and a large gear (508) is fixedly installed on the input end of the planetary reducer (503).

7. A cable stabilization and guiding device for overhead power line construction according to claim 6, characterized in that: Bearings are installed on both the mounting bracket (501) and the outer shell (504). The threaded conveying roller (502) is rotatably mounted on the mounting bracket (501) via the bearings, and the movable shaft (506) is rotatably mounted on the outer shell (504) via the bearings.

8. The cable stabilization and guiding device for overhead power line construction according to claim 7, characterized in that: The pinion (507) is rotatably mounted inside the housing (504) via a movable shaft (506), and the pinion (507) meshes with the large gear (508).