A new bridge deck connection structure
By setting a high-performance concrete layer and a high-toughness cement-based composite layer at the connection between the new and old bridges, and by setting steel bars in the leveling layer, the problem of insufficient transmission of bending moment and shear force at the connection between the new and old bridges was solved, the stress coordination at the connection and the toughness of the bridge deck pavement were improved, and the occurrence of cracks was avoided.
Patent Information
- Application Number
- CN202522558322.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-02
AI Technical Summary
At present, the connection between the old and new bridges has limited capacity to transmit bending moment and shear force, and cracks are prone to occur under long-term rolling and differential settlement.
A high-performance concrete layer and a high-toughness cement-based composite layer are installed at the connection between the new and old bridges. Reinforcing bars are also installed in the leveling layers of the new and old bridges to enhance the shear force and bending moment transmission capacity at the connection and suppress uneven settlement.
It improved the ability to transfer bending moment and shear force at the connection between the old and new bridges, reduced cracks caused by settlement differences, enhanced the toughness of the bridge deck pavement, and prevented the occurrence of large cracks.
Smart Images

Figure CN224954956U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge engineering technology, and in particular to a connection structure for the decks of new and old bridges. Background Technology
[0002] With urbanization, traffic volume is increasing, and existing bridges in some areas can no longer meet the needs of continued development. Widening and upgrading existing bridges has become an urgent problem. One inevitable issue in widening existing bridges is how to connect the old and new bridges.
[0003] Currently, most bridge connections between new and old bridges use a method where the superstructure is butted together while the substructure remains separate. This technique effectively transfers shear force and some bending moment, and also helps reduce the adverse effects of concrete shrinkage, creep, and uneven settlement. However, the superstructure connection in this method is usually relatively thin, limiting the amount of bending moment and shear force it can transfer. Under long-term compaction and the significant settlement of the new bridge, a large difference in deflection and settlement still exists between the new and old bridges, making cracks at the connection unavoidable.
[0004] Therefore, how to solve the problem that the connection between new and old bridges has limited capacity to transmit bending moment and shear force, and that cracks are prone to appear at the connection between new and old bridges under long-term rolling and differential settlement, remains a technical challenge that urgently needs to be addressed. Utility Model Content
[0005] This utility model aims to solve at least one of the aforementioned technical problems existing in the prior art. To this end, this application proposes a connection structure for new and old bridge decks, which can improve the ability to transmit bending moment and shear force at the connection point, and reduce cracks caused by settlement at the connection point.
[0006] The new and old bridge deck connection structure according to the embodiments of this application includes: The new bridge structure includes a new bridge leveling layer and a new bridge pavement layer, wherein the new bridge pavement layer is laid on top of the new bridge leveling layer; The old bridge structure includes an old bridge leveling layer and an old bridge pavement layer, wherein the old bridge pavement layer is laid on top of the old bridge leveling layer; The connecting structure includes a high-performance concrete layer and a high-toughness cement-based composite layer, wherein the high-toughness cement-based composite layer is disposed in the high-performance concrete layer, and the two sides of the high-performance concrete layer are respectively connected to the new bridge structure and the old bridge structure. The reinforcement structure includes new bridge reinforcement, old bridge reinforcement and composite reinforcement. The two ends of the new bridge reinforcement are respectively inserted into the new bridge leveling layer and the high-performance concrete layer. The two ends of the old bridge reinforcement are respectively inserted into the old bridge leveling layer and the high-performance concrete layer. The composite reinforcement passes through the high-performance concrete layer and the high-toughness cement-based composite layer.
[0007] The bridge deck connection structure of the new and old bridges according to the embodiments of this application has at least the following beneficial effects: By setting steel bars in the leveling layers of the new and old bridges, the effect of transmitting shear force and bending moment at the connection can be improved, enabling the new and old bridges to share the load collaboratively, while also suppressing uneven settlement between the new and old bridges. Moreover, the laying of a high-performance concrete layer and a high-toughness cement-based composite layer at the connection between the new and old bridges improves the toughness of the bridge deck pavement at the connection, preventing large cracks from appearing on the bridge deck.
[0008] According to some embodiments of this application, the top of the connecting structure is flush with the top of the new bridge pavement layer and the old bridge pavement layer.
[0009] According to some embodiments of this application, the high-toughness cement-based composite layer is located on top of the high-performance concrete layer, and the top of the high-toughness cement-based composite layer is level with the top of the new bridge pavement layer and the old bridge pavement layer.
[0010] According to some embodiments of this application, the top of the high-performance concrete layer is provided with a groove to accommodate the high-toughness cement-based composite layer.
[0011] According to some embodiments of this application, the new bridge reinforcement bars are welded to the old bridge reinforcement bars.
[0012] According to some embodiments of this application, the two ends of the composite reinforcement are respectively welded to the new bridge reinforcement and the old bridge reinforcement, and the middle part of the composite reinforcement passes through the high-toughness cement-based composite layer.
[0013] According to some embodiments of this application, the composite reinforcement includes a connecting section and a reinforcing section. The reinforcing section is C-shaped and embedded in the high-performance concrete layer and the high-toughness cement-based composite layer. There are two connecting sections, which are respectively connected to the two ends of the reinforcing section. One of the connecting sections is welded to the new bridge reinforcement, and the other connecting section is welded to the old bridge reinforcement.
[0014] According to some embodiments of this application, the composite reinforcement is an FRP-steel composite reinforcement.
[0015] According to some embodiments of this application, the new and old bridge deck connection structure further includes a new bridge main beam and an old bridge main beam, which together support the new bridge structure, the old bridge structure and the connection structure.
[0016] According to some embodiments of this application, the connecting structure is located at the junction of the new bridge main beam and the old bridge main beam.
[0017] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description
[0018] The accompanying drawings are used to provide a further understanding of the technical solutions disclosed in this application and form part of the specification. They are used together with the embodiments disclosed in this application to explain the technical solutions of this application and do not constitute a limitation on the technical solutions disclosed in this application.
[0019] Figure 1 This is a cross-sectional view of the connection structure between the old and new bridge decks in an embodiment of this application; Figure 2 This is a top view of the connection structure between the old and new bridge decks in an embodiment of this application.
[0020] Reference numerals: 100-New bridge structure, 110-New bridge leveling layer, 120-New bridge pavement layer, 200-Old bridge structure, 210-Old bridge leveling layer, 220-Old bridge pavement layer, 300-Connecting structure, 310-High-performance concrete layer, 320-High-toughness cement-based composite layer, 410-New bridge reinforcement, 420-Old bridge reinforcement, 430-Composite reinforcement, 431-Connecting section, 432-Reinforcement section, 500-New bridge main beam, 600-Old bridge main beam. Detailed Implementation
[0021] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.
[0022] In the description of this application, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0023] In the description of this application, "several" means one or more, "multiple" means two or more, "greater than," "less than," and "exceeding" are understood to exclude the stated number, while "above," "below," and "within" are understood to include the stated number. The use of "first" and "second" in the description is merely for distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the number of indicated technical features, or implicitly indicating the order of the indicated technical features.
[0024] In the description of this application, unless otherwise expressly defined, terms such as "setup," "installation," and "connection" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this application in conjunction with the specific content of the technical solution.
[0025] In the description of this application, the terms "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0026] With urbanization, traffic volume is increasing, and existing bridges in some areas can no longer meet the needs of continued development. Widening and upgrading existing bridges has become an urgent problem. One inevitable issue in widening existing bridges is how to connect the old and new bridges.
[0027] Currently, most bridge connections between new and old bridges use a method where the superstructure is butted together while the substructure remains separate. This technique effectively transfers shear force and some bending moment, and also helps reduce the adverse effects of concrete shrinkage, creep, and uneven settlement. However, the superstructure connection in this method is usually relatively thin, limiting the amount of bending moment and shear force it can transfer. Under long-term compaction and the significant settlement of the new bridge, a large difference in deflection and settlement still exists between the new and old bridges, making cracks at the connection unavoidable.
[0028] Therefore, how to solve the problem that the connection between new and old bridges has limited capacity to transmit bending moment and shear force, and that cracks are prone to appear at the connection between new and old bridges under long-term rolling and differential settlement, remains a technical challenge that urgently needs to be addressed.
[0029] To address this issue, this application proposes a bridge deck connection structure between new and old bridges. By incorporating reinforcing steel bars in both the new and old bridge leveling layers, the connection's ability to transfer shear force and bending moment is improved, enabling coordinated stress distribution between the new and old bridges and suppressing uneven settlement between them. Furthermore, the application of a high-performance concrete layer and a high-toughness cement-based composite layer at the connection point enhances the toughness of the bridge deck pavement, preventing significant cracking of the bridge deck.
[0030] Reference Figure 1 and Figure 2 The bridge deck connection structure of the new and old bridges in this embodiment includes a new bridge structure 100, an old bridge structure 200, a connecting structure 300, and a reinforcement structure. Both the new bridge structure 100 and the old bridge structure 200 are existing bridge deck structures, which are joined together by the connecting structure 300. The connecting structure 300 not only serves as a connector between the new bridge structure 100 and the old bridge structure 200, but also constitutes part of the bridge deck pavement layer, with its top surface allowing vehicles to drive over or pedestrians to walk on. The reinforcement structure is used to improve the connection stability between the new bridge structure 100, the old bridge structure 200, and the connecting structure 300, and to suppress deformation of the connecting structure 300 caused by settlement differences between the new and old bridges.
[0031] Specifically, the new bridge structure 100 includes a new bridge leveling layer 110 and a new bridge pavement layer 120, with the new bridge pavement layer 120 laid on top of the new bridge leveling layer 110. The new bridge leveling layer 110 mainly serves to adjust the road surface smoothness and transfer vehicle loads to the underlying structure, while the new bridge pavement layer 120, as the top layer of the new bridge structure 100, is for vehicles to drive over or pedestrians to walk on.
[0032] The old bridge structure 200 includes an old bridge leveling layer 210 and an old bridge pavement layer 220, with the old bridge pavement layer 220 laid on top of the old bridge leveling layer 210. The old bridge leveling layer 210 mainly serves to adjust the road surface smoothness and transfer vehicle loads to the underlying structure, while the old bridge pavement layer 220, as the top layer of the old bridge structure 200, is for vehicles to drive over or pedestrians to walk over.
[0033] The connecting structure 300 includes a high-performance concrete layer 310 and a high-toughness cement-based composite layer 320. The high-toughness cement-based composite layer 320 is disposed within the high-performance concrete layer 310. The high-performance concrete layer 310 has higher structural strength to cope with the stress generated by the settlement difference between the new bridge and the old bridge, while the high-toughness cement-based composite layer 320 has higher toughness to reduce the risk of structural tearing under large stress. The two sides of the high-performance concrete layer 310 are respectively connected to the new bridge structure 100 and the old bridge structure 200. During construction, the high-performance concrete layer 310 is poured between the new bridge structure 100 and the old bridge structure 200. After setting, the high-performance concrete layer 310, the new bridge structure 100, and the old bridge structure 200 form a whole.
[0034] The reinforcement structure includes new bridge reinforcement 410, old bridge reinforcement 420, and composite reinforcement 430. The two ends of the new bridge reinforcement 410 are inserted into the new bridge leveling layer 110 and the high-performance concrete layer 310, respectively. The two ends of the old bridge reinforcement 420 are inserted into the old bridge leveling layer 210 and the high-performance concrete layer 310, respectively. Thus, the connection strength between the new bridge leveling layer 110, the old bridge leveling layer 210, and the high-performance concrete layer 310 is strengthened through the new bridge reinforcement 410 and the old bridge reinforcement 420. The composite reinforcement 430 penetrates the high-performance concrete layer 310 and the high-toughness cement-based composite layer 320, thereby giving the high-performance concrete layer 310 and the high-toughness cement-based composite layer 320 even higher connection strength.
[0035] The new bridge reinforcement 410, the old bridge reinforcement 420, and the composite reinforcement 430 all form an integrated structure with the high-performance concrete layer 310 and the high-toughness cement-based composite layer 320 during the pouring process, thus forming a stable connection.
[0036] Furthermore, the top of the connecting structure 300 is level with the top of the new bridge pavement layer 120 and the old bridge pavement layer 220, thereby reducing the bumps when vehicles drive over this new and old bridge deck connecting structure and improving the driver's driving experience.
[0037] Furthermore, the high-toughness cement-based composite layer 320 is located on top of the high-performance concrete layer 310. It has higher toughness so that it can recover its original shape before and after being compressed, avoiding cracking under high pressure or high impact. The top of the high-toughness cement-based composite layer 320 is flush with the top of the new bridge pavement layer 120 and the old bridge pavement layer 220, reducing the bumps when vehicles drive over it.
[0038] Furthermore, a groove is provided on the top of the high-performance concrete layer 310 to accommodate the high-toughness cement-based composite layer 320, thereby limiting the high-toughness cement-based composite layer 320 through the high-performance concrete layer 310 and improving the connection stability between the two. At the same time, the groove on the top of the high-performance concrete layer 310 also facilitates the casting and molding of the high-toughness cement-based composite layer 320.
[0039] Furthermore, the new bridge steel bars 410 and the old bridge steel bars 420 are welded together to form a whole bearing structure, thereby improving the connection strength between the new bridge structure 100 and the old bridge structure 200.
[0040] Furthermore, the two ends of the composite reinforcement 430 are welded to the new bridge reinforcement 410 and the old bridge reinforcement 420, respectively. The three types of reinforcement together form a load-bearing whole, improving the connection strength between the new bridge structure 100, the old bridge structure 200, and the connecting structure 300. The middle part of the composite reinforcement 430 passes through the high-toughness cement-based composite layer 320, playing an auxiliary role in fixing the high-toughness cement-based composite layer 320.
[0041] Specifically, the composite reinforcement 430 includes a connecting section 431 and a reinforcing section 432. The reinforcing section 432 is C-shaped and embedded in the high-performance concrete layer 310 and the high-toughness cement-based composite layer 320. There are two connecting sections 431, which are respectively connected to the two ends of the reinforcing section 432. One connecting section 431 is welded to the new bridge reinforcement 410, and the other connecting section 431 is welded to the old bridge reinforcement 420.
[0042] Specifically, the composite reinforcement is an FRP-steel composite reinforcement, which is a composite material reinforcement composed of high-performance fibers (such as carbon fiber, aramid fiber, glass fiber, basalt fiber) and organic matrix (such as vinyl ester, epoxy resin). It is mainly used in reinforced concrete structures and has the characteristics of lightweight, corrosion resistance and excellent mechanical properties.
[0043] Furthermore, the bridge deck connection structure of this new and old bridge also includes a new bridge main girder 500 and an old bridge main girder 600, which together support the new bridge structure 100, the old bridge structure 200, and the connection structure 300. In some embodiments, the new bridge main girder 500 and the old bridge main girder 600 are interconnected to achieve higher connection strength; in other embodiments, the new bridge main girder 500 and the old bridge main girder 600 are not connected, so that no internal stress is generated between them during settlement. It is worth noting that the connection structure 300 is located at the junction of the new bridge main girder 500 and the old bridge main girder 600, and mainly bears the stress generated by the difference in settlement between the new and old bridges.
[0044] The embodiments of this application have been described in detail above with reference to the accompanying drawings. However, this application is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of this application. Furthermore, unless otherwise specified, the embodiments and features described in the embodiments of this application can be combined with each other.
Claims
1. A bridge deck connection structure between new and old bridges, characterized in that, include: The new bridge structure includes a new bridge leveling layer and a new bridge pavement layer, wherein the new bridge pavement layer is laid on top of the new bridge leveling layer; The old bridge structure includes an old bridge leveling layer and an old bridge pavement layer, wherein the old bridge pavement layer is laid on top of the old bridge leveling layer; The connecting structure includes a high-performance concrete layer and a high-toughness cement-based composite layer, wherein the high-toughness cement-based composite layer is disposed in the high-performance concrete layer, and the two sides of the high-performance concrete layer are respectively connected to the new bridge structure and the old bridge structure. The reinforcement structure includes new bridge reinforcement, old bridge reinforcement and composite reinforcement. The two ends of the new bridge reinforcement are respectively inserted into the new bridge leveling layer and the high-performance concrete layer. The two ends of the old bridge reinforcement are respectively inserted into the old bridge leveling layer and the high-performance concrete layer. The composite reinforcement passes through the high-performance concrete layer and the high-toughness cement-based composite layer.
2. The bridge deck connection structure according to claim 1, characterized in that: The top of the connecting structure is level with the top of both the new bridge pavement and the old bridge pavement.
3. The bridge deck connection structure according to claim 2, characterized in that: The high-toughness cement-based composite layer is located on top of the high-performance concrete layer, and the top of the high-toughness cement-based composite layer is level with the top of the new bridge pavement layer and the old bridge pavement layer.
4. The bridge deck connection structure according to claim 3, characterized in that: The top of the high-performance concrete layer is provided with a groove to accommodate the high-toughness cement-based composite layer.
5. The bridge deck connection structure according to claim 1, characterized in that: The steel bars of the new bridge are welded together with the steel bars of the old bridge.
6. The bridge deck connection structure according to claim 1, characterized in that: The two ends of the composite reinforcement are welded to the new bridge reinforcement and the old bridge reinforcement, respectively, and the middle part of the composite reinforcement passes through the high-toughness cement-based composite layer.
7. The bridge deck connection structure according to claim 6, characterized in that: The composite reinforcement includes a connecting section and a reinforcing section. The reinforcing section is C-shaped and embedded in the high-performance concrete layer and the high-toughness cement-based composite layer. There are two connecting sections, which are respectively connected to the two ends of the reinforcing section. One of the connecting sections is welded to the new bridge reinforcement, and the other connecting section is welded to the old bridge reinforcement.
8. The bridge deck connection structure according to claim 1, characterized in that: The composite reinforcement is an FRP-steel composite reinforcement.
9. The bridge deck connection structure according to claim 1, characterized in that: The bridge deck connection structure between the new and old bridges also includes the main beams of the new bridge and the main beams of the old bridge, which together support the new bridge structure, the old bridge structure and the connection structure.
10. The bridge deck connection structure according to claim 9, characterized in that: The connecting structure is located at the junction of the new bridge main beam and the old bridge main beam.