A T-beam prestressing tensioning device
By adding a sleeve to the T-beam prestressing tensioning device, the synchronous tensioning of the two steel strand groups was achieved, solving the pressure difference problem caused by the limited tensioning space and improving construction quality and efficiency.
Patent Information
- Application Number
- CN202521975723.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-15
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-09-15
AI Technical Summary
During the prestressing tensioning of T-beams, the limited tensioning space prevents the two strands of steel in the horizontal direction from being tensioned simultaneously, resulting in a pressure difference that causes the beam to bend laterally and affects the construction quality.
A sleeve is added between the second working anchor and the second jack, with its outer diameter smaller than that of the second jack, to avoid direct conflict with the first jack, thereby achieving synchronous tensioning of the two bundles of steel strands and eliminating pressure difference.
By using the synchronous tensioning method, the problem of beam lateral bending was reduced, the quality of prestressed construction was improved, and the tensioning operation time was significantly shortened.
Smart Images

Figure CN224954969U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge engineering technology, and in particular to a T-beam prestressing tensioning device. Background Technology
[0002] The quality requirements for prestressing tensioning in bridge engineering are becoming increasingly stringent. Currently, box girders can achieve symmetrical synchronous tensioning on both sides, meaning the two horizontal strands can be tensioned simultaneously, resulting in good prestressing quality. However, for T-beams, due to the limited web thickness at the beam ends (only 60cm) and the larger diameter of the jacks, and the limited tensioning space, two jacks cannot be simultaneously placed on one side of the beam. In practice, staged tensioning is commonly used. This involves partially tensioning one strand first, then partially tensioning the other, repeating this alternating tensioning until the design tension stress is reached. This process leads to different tension forces on the two horizontal prestressing strands in the T-beam. Before reaching the design tension stress, a pressure difference exists, causing lateral bending of the beam and affecting the construction quality. Utility Model Content
[0003] The purpose of this invention is to provide a T-beam prestressing tensioning device to solve the problems existing in the prior art, reduce the lateral bending of the T-beam, and improve the construction quality of prestressing.
[0004] To achieve the above objectives, this utility model provides the following solution: This utility model provides a T-beam prestressing tensioning device, including a T-beam with a first bundle of steel strands and a second bundle of steel strands on the T-beam. The first bundle of steel strands includes multiple first steel strands; the second bundle of steel strands includes multiple second steel strands; it also includes a first stress tensioner and a second stress tensioner located on the same side of the T-beam; the first stress tensioner includes a first working anchor, a first jack, and a first tool anchor sequentially sleeved on each of the first steel strands, with the first working anchor located on the side closer to the T-beam; the second stress tensioner includes a second working anchor, a sleeve, a second jack, and a second tool anchor sequentially sleeved on each of the second steel strands; the outer diameter of the sleeve is smaller than the outer diameter of the second jack, and the end of the sleeve can make abutment contact with both the T-beam and the second jack; in the length direction of the second steel strands, the length of the sleeve is not less than the working length of the first jack.
[0005] Preferably, the first working anchor includes a first anchor plate, on which a plurality of through first conical anchoring holes are formed. Each of the first conical anchoring holes corresponds to one of the first steel strands. A first conical working clamp is provided in each of the first conical anchoring holes, and the first steel strand passes through the first conical working clamp within the first conical anchoring hole. The larger end of the first conical working clamp is located on the same side as the larger end of the first conical anchoring hole, and both are close to the first jack. The end of the first jack near the T-beam can abut against the first anchor plate.
[0006] Preferably, a first limiting plate is further provided between the first working anchor and the first jack; the first limiting plate has a plurality of first through holes, each of which corresponds to a first steel strand, and the first steel strand passes through the first conical anchor hole and the first through hole in sequence before connecting to the first jack; the end of the first limiting plate near the first anchor plate has a first groove with an opening facing the first anchor plate; the first groove communicates with each of the first through holes; and the end of the first conical working clamp near the first jack is located in the first groove.
[0007] Preferably, the second working anchor includes a second anchor plate, on which a plurality of through-holes are formed, each of the second conical anchor holes corresponding to one of the second steel strands. A second conical working clamp is provided inside the second conical anchor hole, and the second steel strand passes through the second conical working clamp inside the second conical anchor hole. The larger end of the second conical working clamp is on the same side as the larger end of the second conical anchor hole, and both are close to the second jack. The end of the second jack near the T-beam can abut against the second anchor plate.
[0008] Preferably, a second limiting plate is further provided between the second working anchor and the sleeve; the second limiting plate has a plurality of second through holes, each of which corresponds to a second steel strand, and the second steel strand passes through the second conical anchor hole, the second through hole and the sleeve in sequence before connecting to the second jack; the end of the second limiting plate near the second anchor plate has a second groove with an opening facing the second anchor plate; the second groove communicates with each of the second through holes; and the end of the second conical working clamp near the sleeve is located in the second groove.
[0009] Preferably, the first working anchor and the second working anchor have the same structure, the first jack and the second jack have the same structure, and the first tool anchor and the second tool anchor have the same structure.
[0010] Preferably, both the first jack and the second jack are equipped with displacement sensors.
[0011] The present invention achieves the following technical advantages over the prior art: The T-beam prestressing tensioning device provided by this utility model adds a sleeve between the second working anchor and the second jack. By designing the outer diameter of the sleeve to be smaller than that of the second jack, the second jack avoids direct conflict with the first jack in the horizontal space. This arrangement enables simultaneous tensioning of both ends of the first and second bundles of steel strands, eliminating the pressure difference caused by staged tensioning, reducing beam lateral bending caused by pressure difference, and significantly improving the quality of prestressed construction. At the same time, the synchronous tensioning mode also greatly shortens the tensioning operation time, balancing the improvement of quality and efficiency. Attached Figure Description
[0012] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0013] Figure 1 A schematic diagram of the overall structure of the T-beam prestressing tensioning device provided by this utility model; Figure 2 This is a front view of the T-beam prestressing tensioning device provided by this utility model; Figure 3 This is a side view of the T-beam prestressing tensioning device provided by this utility model; Figure 4 This is a top view of the T-beam prestressing tensioning device provided by this utility model.
[0014] In the picture: 10-T-beam; 11-First bundle of steel strands; 12-Second bundle of steel strands; 20-First stress tensioner; 21-First working anchor; 22-First limiting plate; 23-First jack; 24-First tool anchor; 30-Second stress tensioner; 31-Second working anchor; 32-Second limiting plate; 33-Sleeve; 34-Second jack; 35-Second tool anchor. Detailed Implementation
[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0016] The purpose of this invention is to provide a prestressed tensioning device for T-beams to solve the problems existing in the prior art, reduce the lateral bending of T-beams, and improve the construction quality of prestressing.
[0017] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0018] Example 1 This embodiment provides a T-beam prestressing tensioning device, such as... Figures 1-4 As shown, the device includes a T-beam 10, on which a first bundle of steel strands 11 and a second bundle of steel strands 12 are mounted. The first bundle of steel strands 11 includes multiple first steel strands; the second bundle of steel strands 12 includes multiple second steel strands. It also includes a first stress tensioner 20 and a second stress tensioner 30 located on the same side of the T-beam 10. The first stress tensioner 20 includes a first working anchor 21, a first jack 23, and a first tool anchor 24 sequentially mounted on each of the first steel strands. The first working anchor 21 is located on the side closest to the T-beam 10. The second stress tensioner 30 includes a second working anchor 31, a sleeve 33, a second jack 34, and a second tool anchor 35 sequentially mounted on each of the second steel strands. The outer diameter of the sleeve 33 is smaller than the outer diameter of the second jack 34, and the end of the sleeve 33 can make contact with both the T-beam 10 and the second jack 34. In the length direction of the second steel strands, the length of the sleeve 33 is not less than the working length of the first jack 23.
[0019] By adding a sleeve 33 between the second working anchor 31 and the second jack 34, and by designing the outer diameter of the sleeve 33 to be smaller than the outer diameter of the second jack 34, the second jack 34 and the first jack 23 are staggered, allowing the second jack 34 to avoid direct conflict with the first jack 23 in the horizontal space. This solves the problem of not being able to achieve symmetrical synchronous tensioning of prestressed beams on both sides due to limited tensioning space. Moreover, this arrangement can simultaneously tension both ends of the first strand group 11 and the second strand group 12, eliminating the pressure difference generated by staged tensioning, reducing the beam and slab lateral bending problem caused by the pressure difference, and significantly improving the quality of prestressed construction. Compared with staged tensioning, the simultaneous synchronous tensioning mode also greatly shortens the tensioning operation time, taking into account both quality and efficiency improvement.
[0020] In the optional scheme of this embodiment, the first working anchor 21 includes a first anchor plate with a plurality of through first conical anchor holes. Each first conical anchor hole corresponds to a first steel strand. A first conical working clip is provided in the first conical anchor hole, and the first steel strand passes through the first conical working clip in the first conical anchor hole. The large end of the first conical working clip and the large end of the first conical anchor hole are located on the same side and are both close to the first jack 23. The end of the first jack 23 near the T beam 10 can abut against the first anchor plate.
[0021] Among the optional solutions in this embodiment, the more preferred one is as follows: Figures 1-4 As shown, a first limiting plate 22 is also provided between the first working anchor 21 and the first jack 23; the first limiting plate 22 is provided with a plurality of first through holes, each of which corresponds to a first steel strand, and the first steel strand passes through the first conical anchor hole and the first through hole in sequence and then connects to the first jack 23; the end of the first limiting plate 22 near the first anchor plate is provided with a first groove with an opening facing the first anchor plate; the first groove communicates with each of the first through holes; and the end of the first conical working clamp near the first jack 23 is located in the first groove.
[0022] In the optional scheme of this embodiment, more preferably, the second working anchor 31 includes a second anchor plate, the second anchor plate has a plurality of through second conical anchor holes, the second conical anchor holes correspond one-to-one with the second steel strands, the second conical working clips are provided in the second conical anchor holes, and the second steel strands pass through the second conical working clips in the second conical anchor holes; the large end of the second conical working clips and the large end of the second conical anchor holes are located on the same side and are both close to the second jack 34; the end of the second jack 34 near the T beam 10 can abut against the second anchor plate.
[0023] Among the optional solutions in this embodiment, the more preferred one is as follows: Figures 1-4 As shown, a second limiting plate 32 is also provided between the second working anchor 31 and the sleeve 33; the second limiting plate 32 has multiple second through holes, each corresponding to a second steel strand, and the second steel strand passes through the second conical anchor hole, the second through hole and the sleeve 33 in sequence before connecting to the second jack 34; the end of the second limiting plate 32 near the second anchor plate has a second groove with an opening facing the second anchor plate; the second groove communicates with each of the second through holes; and the end of the second conical working clamp near the sleeve 33 is located in the second groove.
[0024] In the optional schemes of this embodiment, it is more preferred that the first working anchor 21 and the second working anchor 31 have the same structure, the first jack 23 and the second jack 34 have the same structure, and the first tool anchor 24 and the second tool anchor 35 have the same structure.
[0025] In the optional schemes of this embodiment, it is more preferred that both the first jack 23 and the second jack 34 are equipped with displacement sensors.
[0026] Specifically, the first jack 23, the second jack 34, the first working anchor 21, the second working anchor 31, the first tool anchor 24, and the second tool anchor 35 are all commonly used prestressed tensioning equipment in bridge engineering. Their specific structures are consistent with those of the existing ones. The related structures mentioned above are only one type, including but not limited to the above structures, and will not be elaborated further here.
[0027] Specifically, the first jack 23 and the second jack 34 are used to tension the corresponding prestressed steel strands; the first working anchor 21 and the second working anchor 31 are used to anchor the prestressed steel strands; the grooves on the first limiting plate 22 and the second limiting plate 32 are used to limit the outward leakage of the corresponding first conical working clamp and the second conical working clamp; the sleeve 33 is a hollow cylindrical structure used for force transmission between the jack and the limiting plate; the first tool anchor 24 and the second tool anchor 35 are used to temporarily fix the prestressed steel strands in conjunction with the jacks during the prestressing tensioning process.
[0028] Specifically, the construction method is as follows: The first step is to simultaneously install the first working anchor 21 of the first stress tensioner 20 and the second working anchor 31 of the second stress tensioner 30 on both sides of the beam and slab, and insert them into the corresponding steel strands. The second step is to install the corresponding first limiting plate 22 and second limiting plate 32; The third step is to install the first jack 23 on the first bundle of steel strands 11, and install the sleeve 33 on the second bundle of steel strands 12 on the same side, with the other side arranged symmetrically. The fourth step is to install the second jack 34 on the outside of the sleeve 33, symmetrically arranged on both sides of the beam and plate; Fifth step, set the corresponding first tool anchor 24 and second tool anchor 35 (including corresponding anchor plates and working clamps) on the outside of the jacks on the first bundle of steel strands 11 and the second bundle of steel strands 12 respectively. Step 6: Simultaneously apply prestressing tension to the design tension stress using four jacks on both sides of T-beam 10.
[0029] This utility model uses specific examples to illustrate its principles and implementation methods. The above description of the embodiments is only for the purpose of helping to understand the method and core idea of this utility model. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the idea of this utility model. In summary, the content of this specification should not be construed as a limitation of this utility model.
Claims
1. A T-beam prestressing tensioning device, comprising a T-beam, wherein the T-beam has a first bundle of steel strands and a second bundle of steel strands, the first bundle of steel strands comprising a plurality of first steel strands; the second bundle of steel strands comprising a plurality of second steel strands; characterized in that: It also includes a first stress tensioner and a second stress tensioner located on the same side of the T-beam; The first stress tensioner includes a first working anchor, a first jack, and a first tool anchor sequentially sleeved on each of the first steel strands, with the first working anchor located on the side close to the T-beam; The second stress tensioner includes a second working anchor, a sleeve, a second jack, and a second tool anchor sequentially sleeved on each of the second steel strands; the outer diameter of the sleeve is smaller than the outer diameter of the second jack, and the end of the sleeve can make abutment contact with both the T-beam and the second jack; in the length direction of the second steel strand, the length of the sleeve is not less than the working length of the first jack.
2. The T-beam prestressing tensioning device according to claim 1, characterized in that: The first working anchor includes a first anchor plate, on which a plurality of through first conical anchor holes are formed. Each first conical anchor hole corresponds to a first steel strand. A first conical working clamp is provided in each first conical anchor hole, and the first steel strand passes through the first conical working clamp within the first conical anchor hole. The larger end of the first conical working clamp is on the same side as the larger end of the first conical anchor hole, and both are close to the first jack. The end of the first jack near the T-beam can abut against the first anchor plate.
3. The T-beam prestressing tensioning device according to claim 2, characterized in that: A first limiting plate is also provided between the first working anchor and the first jack; The first limiting plate is provided with multiple first through holes, each of which corresponds to one of the first steel strands. The first steel strands pass through the first conical anchor hole and the first through hole in sequence and are then connected to the first jack. The first limiting plate has a first groove with an opening facing the first anchor plate at one end; the first groove communicates with each of the first through holes; and the first conical working clamp is located in the first groove at one end near the first jack.
4. The T-beam prestressing tensioning device according to claim 1, characterized in that: The second working anchor includes a second anchor plate with multiple through-holes in the second conical anchorage hole. Each conical anchorage hole corresponds to a second steel strand. A second conical working clamp is installed inside the second conical anchorage hole, and the second steel strand passes through the second conical working clamp inside the second conical anchorage hole. The larger end of the second conical working clamp is on the same side as the larger end of the second conical anchorage hole, and both are close to the second jack. The end of the second jack near the T-beam can abut against the second anchor plate.
5. The T-beam prestressing tensioning device according to claim 4, characterized in that: A second limiting plate is also provided between the second working anchor and the sleeve; The second limiting plate has multiple second through holes, each corresponding to a second steel strand. The second steel strand passes through the second conical anchor hole, the second through hole, and the sleeve in sequence before connecting to the second jack. The second limiting plate has a second groove with an opening facing the second anchor plate at one end; the second groove communicates with each of the second through holes; and the second conical working clamp is located in the second groove at one end near the sleeve.
6. The T-beam prestressing tensioning device according to claim 1, characterized in that: The first working anchor and the second working anchor have the same structure, the first jack and the second jack have the same structure, and the first tool anchor and the second tool anchor have the same structure.
7. The T-beam prestressing tensioning device according to claim 1, characterized in that: Displacement sensors are installed on both the first jack and the second jack.