A prefabricated bottom formwork structure for pylon diaphragms and solid sections.
By adopting precast bottom formwork structures in bridge engineering, the problems of low construction efficiency and poor safety of pylon diaphragms and solid sections have been solved, achieving efficient and safe construction results.
Patent Information
- Application Number
- CN202522557164.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-02
AI Technical Summary
In existing bridge engineering projects, the construction efficiency of diaphragms or solid sections in the pylon structure is low and the safety is poor. Traditional construction techniques are complex, consume a lot of materials, and pose safety risks for high-altitude operations.
The precast bottom formwork structure, including the lower chamfer structure, support structure and precast slab, is used to form a stable casting base surface by fixing it to the tower wall, reducing the formwork installation operation, and the overall integrity and stability of the structure are enhanced by the cast-in-place connection.
It improved construction efficiency, reduced construction difficulty and safety risks, shortened construction time, reduced material consumption, and enhanced construction safety and efficiency.
Smart Images

Figure CN224954980U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge engineering technology, and in particular to a prefabricated bottom formwork structure for cable tower diaphragms and solid sections. Background Technology
[0002] In the field of bridge engineering technology, pylons, as key load-bearing components of bridge structures, are often designed as box-shaped structures. To ensure sufficient load-bearing safety, diaphragms (distributed inside and between the pylon columns) or solid sections are usually installed in the pylon structure.
[0003] Currently, the traditional construction process for diaphragms or solid sections mainly involves pre-embedding steel horizontal and vertical main beams or pre-installing welded steel brackets. Based on this, distribution beams are laid above the main beams or steel brackets, followed by the erection of disc-lock scaffolding and formwork installation, then reinforcement binding, and finally, cast-in-place concrete pouring.
[0004] However, this traditional construction method has many drawbacks after the concrete pouring is completed. The removal of the bottom formwork and supports can only be carried out after the steel ladder inside the tower has been installed to that position. Furthermore, the dismantled materials can only be hoisted out through pre-existing manholes, a process involving extensive high-altitude work and extremely high construction difficulty. Due to the limited operating space and complex construction process, the construction time is significantly extended, and a large amount of construction materials are also consumed. More importantly, the entire demolition process is accompanied by significant safety risks, posing a potential threat of major safety accidents. Utility Model Content
[0005] The purpose of this utility model is to provide a prefabricated bottom formwork structure for cable tower diaphragms and solid sections, so as to solve the technical problems of low efficiency and poor safety in setting diaphragms or solid sections in cable tower structures in the prior art.
[0006] To achieve this objective, the present invention adopts the following technical solution:
[0007] A prefabricated bottom formwork structure for cable tower diaphragms and solid sections, comprising:
[0008] The lower chamfered structure is fixedly installed on the tower wall.
[0009] A support structure is fixedly connected to the lower chamfer structure, the support structure having a horizontal support surface that is lower than the upper surface of the lower chamfer structure;
[0010] A precast slab is erected on the supporting surface. The top of the precast slab forms a bearing surface, which constitutes a bottom mold for supporting concrete. The bearing surface and the upper surface of the lower chamfered structure together form a continuous casting base surface.
[0011] The cast-in-place connection is formed at the joint between the periphery of the precast slab and the supporting structure.
[0012] Preferably, the height difference between the supporting surface and the upper surface of the lower chamfered structure is equal to the thickness of the precast slab.
[0013] Preferably, the support surface has upwardly extending limiting surfaces on both sides, and the side end of the precast slab abuts against the limiting surfaces.
[0014] Preferably, the precast slab has embedded hoisting components.
[0015] Preferably, the lifting component is a U-shaped round steel bar, which is symmetrically embedded in the precast slab.
[0016] Preferably, the cast-in-place connection is cast-in-place concrete that fills the joint, bonding the precast slab and the supporting structure into a whole.
[0017] Preferably, the support structure includes at least one pair of corbel structures symmetrically arranged on the tower wall, with the support surface formed on the corbel structures.
[0018] Preferably, the corbel structure is a concrete structure integrally cast with the tower wall.
[0019] Preferably, the corbel structure is provided with outer stirrups and inner stirrups.
[0020] Preferably, the precast slab is equipped with a reinforcing structure.
[0021] The beneficial effects of this utility model are:
[0022] This invention proposes a precast bottom formwork structure for cable tower diaphragms and solid sections. The bottom formwork is fixed to the tower wall via a chamfered structure, providing a foundational support point for the entire bottom formwork structure. The supporting structure is fixedly connected to the chamfered structure, with the horizontal support surface of the supporting structure lower than the upper surface of the chamfered structure, providing a stable platform for the precast slab. The precast slab is erected on the supporting surface, with the top bearing surface of the precast slab serving as the bottom formwork supporting the concrete. Together with the upper surface of the chamfered structure, they form a continuous pouring base, ensuring the flatness and continuity of the concrete pouring. This eliminates the need for complex formwork installation and other operations required by traditional methods, improving construction efficiency. The cast-in-place connection is formed at the joint between the perimeter of the precast slab and the supporting structure, enhancing the overall integrity and stability of the structure. Compared to traditional methods, this structure eliminates the need to wait for the steel ladder to be constructed to a specific location before dismantling the bottom formwork and supports in mid-air, and also eliminates the need to hoist materials through pre-reserved manholes. This reduces the amount of work at height, lowers the difficulty of construction and safety risks, while also shortening construction time, reducing material consumption, and improving the efficiency and safety of the construction of the pylon diaphragm and solid sections. Attached Figure Description
[0023] Figure 1 This is a cross-sectional view of the prefabricated bottom mold structure for the pylon diaphragm and solid section provided in this embodiment of the utility model;
[0024] Figure 2 This is a top view of the prefabricated bottom mold structure for the pylon diaphragm and solid section provided in this embodiment of the utility model.
[0025] In the picture:
[0026] 100. Tower wall; 1. Lower chamfered structure; 2. Support structure; 20. Corbel structure; 21. Support surface; 22. Limiting surface; 3. Precast slab; 31. Bearing surface; 4. Cast-in-place connection; 5. Diaphragm or solid section; 6. Manhole; 7. Upper chamfered structure. Detailed Implementation
[0027] The embodiments of this utility model are described in detail below. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar parts or parts having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this utility model, and should not be construed as limiting this utility model.
[0028] In the description of this utility model, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection or a detachable connection; a mechanical connection or an electrical connection; a direct connection or an indirect connection through an intermediate medium; or the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0029] In the description of this utility model, unless otherwise expressly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0030] The technical solution of this utility model will be further described below with reference to the accompanying drawings and specific embodiments.
[0031] See Figure 1 and Figure 2 The precast bottom formwork structure for cable tower diaphragms and solid sections provided in this embodiment includes a lower chamfer structure 1, a support structure 2, a precast slab 3, and a cast-in-place connection part 4. The lower chamfer structure 1 is fixedly mounted on the cable tower wall 100. The support structure 2 is fixedly connected to the lower chamfer structure 1, and the support structure 2 forms a horizontal support surface 21, which is lower than the upper surface of the lower chamfer structure 1. The precast slab 3 is erected on the support surface 21, and the top of the precast slab 3 forms a bearing surface 31, which constitutes the bottom formwork for supporting concrete. The bearing surface 31 and the upper surface of the lower chamfer structure 1 together form a continuous casting base surface. The cast-in-place connection part 4 is formed at the joint between the periphery of the precast slab 3 and the support structure 2.
[0032] The precast bottom formwork structure for cable tower diaphragms and solid sections proposed in this utility model is fixed to the cable tower wall 100 via a lower chamfered structure 1, providing a basic support point for the entire bottom formwork structure. A support structure 2 is fixedly connected to the lower chamfered structure 1, and the horizontal support surface 21 of the support structure 2 is lower than the upper surface of the lower chamfered structure 1, providing a stable erection platform for the precast slab 3. The precast slab 3 is erected on the support surface 21, and the bearing surface 31 at the top of the precast slab 3 serves as the bottom formwork supporting the concrete, forming a continuous pouring base surface together with the upper surface of the lower chamfered structure 1. This ensures the flatness and continuity of the concrete pouring, eliminating the need for complex formwork installation and other operations required by traditional processes, thus improving construction efficiency. The cast-in-place connection 4 is formed at the joint between the periphery of the precast slab 3 and the support structure 2, enhancing the overall integrity and stability of the structure. Compared to traditional methods, this structure eliminates the need to wait for the steel ladder to be constructed to a specific position before dismantling the bottom formwork and supports in mid-air, and also eliminates the need to hoist materials through the reserved manhole 6. This reduces the amount of work at height, lowers the construction difficulty and safety risks, and also shortens the construction time, reduces material consumption, and improves the efficiency and safety of the construction of the pylon diaphragm and solid sections.
[0033] The working principle and specific structure of the prefabricated bottom formwork structure (hereinafter referred to as the bottom formwork structure) used for the pylon diaphragm and solid section are explained in detail below.
[0034] Specifically, the support structure 2 includes at least one pair of corbel structures 20 symmetrically arranged on the tower wall 100, with a support surface 21 formed on the corbel structure 20. The corbel structure 20 is preferably a concrete structure integrally cast with the tower wall 100 to ensure the strength and integrity of the connection.
[0035] During construction, the reinforcement of the lower chamfer structure 1 and the corbel structure 20 is tied first. The corbel structure 20 is equipped with outer and inner stirrups to provide the necessary structural strength. After the reinforcement is installed, the corbel formwork is erected, and then concrete is poured simultaneously with the lower chamfer structure 1. During the pouring process, the pouring elevation must be controlled so that the supporting surface 21 formed by the corbel structure 20 is lower than the upper surface of the lower chamfer structure 1.
[0036] Preferably, upwardly extending limiting surfaces 22 are formed on both sides of the supporting surface 21. When the precast slab 3 is hoisted and erected on the supporting surface 21, the side ends of the precast slab 3 can abut against the limiting surfaces 22. This design can effectively limit the horizontal displacement of the precast slab 3, ensure its accurate installation position, and enhance the stability of the entire bottom formwork structure under construction loads.
[0037] Preferably, the height difference between the upper surface of the lower chamfer structure 1 and the supporting surface 21 of the corbel structure 20 is equal to the thickness of the subsequently installed precast slab 3. The corbel formwork can only be removed after the concrete has reached a certain strength (e.g., 80% of the standard strength).
[0038] Next, the precast slab 3 is installed. The precast slab 3 is prefabricated in the factory, and to facilitate hoisting and transportation, hoisting components are pre-embedded within it. Specifically, the hoisting components are U-shaped round steel bars. Preferably, the U-shaped round steel bars are symmetrically embedded in the precast slab 3; for example, four U-shaped round steel bars can be symmetrically embedded in each precast slab 3. This symmetrical arrangement ensures balanced force during hoisting, preventing cracks or damage to the precast slab 3 due to uneven force, thus ensuring the safety of the hoisting process and the integrity of the component. During hoisting, simply connect the hook to these pre-embedded U-shaped round steel bars to safely and efficiently hoist the precast slab 3 to the designated location for installation.
[0039] The precast slab 3 is hoisted and erected on the support surface 21 of the corbel structure 20. By adjusting it, the bearing surface 31 at its top is flush with the upper surface of the lower chamfer structure 1, together forming a continuous and flat casting base.
[0040] Preferably, the precast slab 3 is equipped with a reinforcing structure. The reinforcing structure is preferably a steel reinforcement cage installed inside the precast slab 3. Specifically, based on the construction load of the diaphragm or solid section 5 concrete pouring, the precast slab 3 is designed with reinforcement to form a two-way steel mesh, ensuring sufficient load-bearing capacity and structural rigidity. The steel reinforcement cage is cast into the concrete body of the precast slab 3 and is within an appropriate concrete cover thickness. By setting up the reinforcing structure, the bending and shear resistance of the precast slab 3 is effectively improved under various working conditions such as hoisting, installation, and use as a load-bearing formwork, preventing cracking or excessive deformation, thereby ensuring construction quality and safety.
[0041] After the precast slab 3 is erected and positioned, a cast-in-place connection 4 is formed at the joint between the perimeter of the precast slab 3 and the corbel structure 20, i.e., wet joint construction is carried out. This step allows for easy fine-tuning of the planar position of the precast slab 3, ensuring a tight fit between the precast slab 3 and the surrounding cast-in-place tower wall, preventing concrete leakage. On the other hand, it also avoids interference from the complex chamfered reinforcement inside the tower wall on the installation of the precast slab 3.
[0042] Specifically, during construction, after the precast slab 3 is installed and positioned, a formwork is erected at the joint, and then micro-expansion concrete is poured to fill it densely. After the concrete hardens, the cast-in-place connection 4 firmly bonds the precast slab 3 to the supporting structure 2 as a whole.
[0043] Finally, using the bearing surface 31 of the precast slab 3 as the bottom formwork, the steel reinforcement of the transverse diaphragm or solid section 5 and the upper chamfered structure 7 are tied and the formwork is installed. Concrete is then poured in one go to complete the construction of the entire cable tower diaphragm or solid section.
[0044] Furthermore, a manhole 6 is provided in the middle of the diaphragm or solid section 5. The manhole 6 is formed by a pre-set template during the concrete pouring of the diaphragm or solid section 5, and is a passage that runs through the thickness of its structure. The manhole 6 provides construction personnel with access to the internal chamber space of the cable tower, which greatly facilitates subsequent quality inspection, maintenance, and installation of related ancillary facilities of the cable tower's internal structure.
[0045] Obviously, the above embodiments of this utility model are merely examples for clearly illustrating the present utility model, and are not intended to limit the implementation of the present utility model. Those skilled in the art can make other variations or modifications based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this utility model should be included within the protection scope of the claims of this utility model.
Claims
1. A prefabricated bottom formwork structure for cable tower diaphragms and solid sections, characterized in that, include: The lower chamfer structure (1) is fixedly installed on the tower wall (100). A support structure (2) is fixedly connected to the lower chamfer structure (1). The support structure (2) has a horizontal support surface (21), which is lower than the upper surface of the lower chamfer structure (1). A precast slab (3) is erected on the support surface (21). The top of the precast slab (3) forms a bearing surface (31). The bearing surface (31) constitutes a bottom mold for supporting concrete. The bearing surface (31) and the upper surface of the lower chamfer structure (1) together form a continuous casting base surface. The cast-in-place connection (4) is formed at the joint between the periphery of the precast slab (3) and the supporting structure (2).
2. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 1, characterized in that, The height difference between the support surface (21) and the upper surface of the lower chamfer structure (1) is equal to the thickness of the precast slab (3).
3. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 2, characterized in that, The support surface (21) has upwardly extending limiting surfaces (22) on both sides, and the side end of the precast slab (3) abuts against the limiting surfaces (22).
4. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 1, characterized in that, The precast slab (3) has pre-embedded hoisting components.
5. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 4, characterized in that, The lifting component is a U-shaped round steel bar, which is symmetrically embedded in the precast slab (3).
6. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 1, characterized in that, The cast-in-place connection part (4) is cast-in-place concrete that fills the joint, and the precast slab (3) and the supporting structure (2) are bonded together as a whole.
7. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 1, characterized in that, The support structure (2) includes at least one pair of corbel structures (20) symmetrically arranged on the tower wall (100), and the support surface (21) is formed on the corbel structure (20).
8. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 7, characterized in that, The corbel structure (20) is a concrete structure integrally cast with the tower wall (100).
9. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 7, characterized in that, The corbel structure (20) is equipped with outer stirrups and inner stirrups.
10. The prefabricated bottom formwork structure for cable tower diaphragms and solid sections according to claim 1, characterized in that, The precast slab (3) is equipped with a reinforcing structure.