A hydraulically jacking cantilever bridge approach slab with grouting structure

By pre-reserving grouting holes in the bridge abutment approach slab and filling the voids with grout, combined with the arc design and steel reinforcement, the problems of voids and fracture risks in the approach slab were solved, improving the structural safety and long-term service reliability of the bridge approach slab.

CN224982035UActive Publication Date: 2026-11-17SHANDONG HI SPEED CONSTRUCTION MANAGEMENT GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522654607.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-15
Publication Date
2026-11-17
Estimated Expiration
2035-12-15

AI Technical Summary

Technical Problem

The existing bridge approach slabs are prone to becoming detached or suspended after being raised, and there is a risk of breakage under traffic loads, which affects the structural safety and long-term service reliability.

Method used

The design incorporates a hydraulically jacked cantilever bridge abutment slab with grouting structure. By pre-drilling grouting holes in the abutment slab and filling the voids with grout, combined with an arc design and steel reinforcement, the load distribution is optimized to reduce stress concentration.

Benefits of technology

It effectively reduces stress concentration in the void area at the bottom of the slab, reduces the risk of cracks and fractures, and improves the safety and long-term service reliability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982035U_ABST
    Figure CN224982035U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of bridge engineering technology and discloses a hydraulic lifting cantilever bridge abutment slab with grouting structure. It includes a bridge abutment, with one end of the abutment slab resting on the back wall of the abutment and the remainder laid on the roadbed. Multiple hydraulic lifting devices are embedded in the roadbed at the far end of the abutment slab. Multiple sets of grouting holes are pre-drilled on the abutment slab. The thickness of the slab near the abutment end is greater than that at the far end, and the bottom surface of the abutment slab exhibits an arc-shaped change from the near end to the far end, with rounded chamfers. This utility model, by pre-drilling grouting holes on the abutment slab and designing the thickness of the slab near the abutment end to be greater than that at the far end, can fill the void area at the bottom of the abutment slab after repositioning. It can also effectively reduce stress concentration in the root area of ​​the abutment slab, reducing the risk of cracks and fractures caused by stress concentration, and improving the structural safety and long-term service reliability of the abutment slab.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of bridge engineering technology, specifically relating to a hydraulically jacking cantilever bridge approach slab with grouting structure. Background Technology

[0002] The statements in this section are merely background information related to this utility model and do not necessarily constitute prior art.

[0003] Under the long-term repeated action of vehicle loads, flexible roadbeds are prone to compressive settlement, while rigid bridge abutments remain largely undeformed. Without a transition structure, this can lead to vehicle bouncing at the bridge approach, accelerating the formation of road surface cracks and potholes, affecting driving comfort, and creating safety hazards. Bridge approach slabs are reinforced concrete slabs located at the transition section between the road and bridge, used to mitigate the stiffness difference between the rigid bridge abutments and the flexible roadbed, and to control uneven settlement.

[0004] However, as the flexible subgrade settles, the end of the approach slab furthest from the abutment will also settle. To solve this technical problem, existing technology discloses a bridge approach slab anti-settlement lifting device, including an abutment, a subgrade, and an approach slab on the top surface of the abutment and subgrade. A pressure tank is pre-embedded at the bottom of the subgrade, and a lifting cylinder is installed on the bottom surface of the approach slab. The lifting cylinder is connected to the pressure tank, and the pressure tank is connected to a pressure plate through a piston. When the subgrade settles, the subgrade on the pressure plate presses against the pressure plate, supplying oil to the lifting cylinder, which then lifts the approach slab.

[0005] Although the above solution uses a passive hydraulic device to lift the slab, it still has the following drawbacks: After the approach slab is raised, the bottom of the approach slab may become detached or suspended. During the long-term use of the road, the approach slab may break under traffic loads. In addition, the approach slab in the above scheme is a flat slab. However, when the far end of the approach slab settles with the roadbed, the near end of the approach slab is subjected to a large bending moment and shear force, which may also cause the approach slab to break during the settlement process with the roadbed. Utility Model Content

[0006] In view of this, the purpose of this utility model is to provide a hydraulic lifting cantilever bridge approach slab with grouting structure, which can solve the technical problem that after the approach slab is lifted, the bottom of the approach slab will become empty or suspended, and the approach slab is at risk of breaking under traffic load during long-term road use.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: A hydraulic lifting cantilever bridge approach slab with grouting structure is provided, including a bridge abutment, one end of the bridge approach slab is erected and fixedly connected to the back wall of the bridge abutment, and the rest is laid on the roadbed; Multiple hydraulic jacking devices are embedded in the roadbed at the far end of the bridge abutment approach slab. Multiple sets of grouting holes are reserved on the bridge abutment slab to fill the voids on the bottom surface of the bridge abutment slab with grout. The thickness of the bridge abutment approach slab near the abutment end is greater than that at the far abutment end. The bottom surface of the bridge abutment approach slab changes in an arc shape from the near abutment end to the far abutment end and has rounded corners.

[0008] Preferably, the end of the bridge abutment approach slab near the abutment is reinforced with bending-resistant steel bars, and the cantilever extension area of ​​the bridge abutment approach slab is reinforced with steel bars that resist negative bending moments.

[0009] Preferably, a grouting pipe is inserted into the grouting hole, and several grout outlet holes are opened on the outer wall of the grouting pipe along the axial and circumferential directions of the grouting pipe.

[0010] Preferably, the bottom end of the grouting pipe is fixedly connected to an inverted triangular conical bracket.

[0011] Preferably, the hydraulic lifting device has a hydraulic oil pipe connected to its main body, and the top of the main body is a piston output end, with a steel support plate fixedly connected to the top surface of the piston output end.

[0012] Preferably, multiple stiffening ribs are uniformly welded along the circumference of the bottom surface of the steel pallet.

[0013] Preferably, the bottom surface of the hydraulic jacking device rests on a foundation, and the area of ​​the foundation is larger than the area of ​​the device body.

[0014] Preferably, the foundation is a concrete structure, in the shape of a square or a circle.

[0015] Preferably, the grouting holes are designed in multiple sets, with one set of grouting holes designed on the outside of the hydraulic jacking device.

[0016] Preferably, elevation positioning devices are installed at both the near end and the far end of the bridge abutment approach plate.

[0017] Compared with the prior art, the advantages and positive effects of this utility model are: This invention, by pre-reserving grouting holes in the bridge abutment approach plate and designing the plate thickness near the abutment end to be greater than that far from the abutment end, can fill the void area formed at the bottom after the bridge abutment approach plate is lifted and reset by the hydraulic jacking device. It can also effectively reduce stress concentration in the root area of ​​the bridge abutment approach plate, reduce the risk of cracks and fractures caused by stress concentration, and improve the structural safety and long-term service reliability of the bridge abutment approach plate in the road-bridge transition section. Attached Figure Description

[0018] The accompanying drawings, which form part of this specification, are used to provide a further understanding of this utility model. The illustrative embodiments of this utility model and their descriptions are used to explain this utility model and do not constitute an improper limitation of this utility model.

[0019] Figure 1 This is a perspective view of a hydraulically jacking cantilever bridge approach slab with a grouting structure according to an embodiment of this utility model; Figure 2 This is an axial cross-sectional view of a hydraulically jacking cantilever bridge approach slab with grouting structure according to an embodiment of this utility model; Figure 3 This is a top view of a hydraulically jacking cantilever bridge approach slab with grouting structure according to an embodiment of this utility model; Figure 4 This is a front view of the grouting pipe according to an embodiment of the present utility model; Figure 5 This is a front view of the hydraulic lifting device according to an embodiment of the present utility model; In the picture: 1. Bridge abutment; 2. Bridge abutment approach slab; 3. Hydraulic jacking device; 31. Steel support plate; 32. Piston output end; 33. Device body; 34. Foundation; 35. Hydraulic oil pipe; 4. Grouting pipe; 41. Grout outlet hole; 42. Conical bracket; 5. Elevation locator. Detailed Implementation

[0020] It should be noted that the following detailed description is illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.

[0021] The present invention will now be described in detail with reference to the accompanying drawings. This embodiment discloses a hydraulically lifted cantilever bridge approach slab with a grouting structure, such as... Figure 1 , Figure 2 As shown, the bridge includes an abutment 1, with a back wall on the side of the abutment 1 facing the roadbed, and an abutment approach slab 2 installed on the abutment 1 and the roadbed. Specifically, one end of the abutment approach slab 2 is erected and fixedly connected to the back wall, and the rest is laid on the roadbed.

[0022] It is understandable that the bridge abutment slab 2 bears the vehicle load of the road and transfers the vehicle load to the roadbed. During long-term use, the roadbed settles, which in turn causes the end of the bridge abutment slab 2 away from the bridge abutment 1 to settle, resulting in the "vehicle jumping" phenomenon.

[0023] like Figure 1 , Figure 2As shown in the figure, in this embodiment, multiple hydraulic jacking devices 3 are embedded in the roadbed at the bottom of the abutment end of the bridge abutment slab 2, which is far from the abutment 1. It is understood that when the far abutment end of the bridge abutment slab 2 settles along with the roadbed under long-term vehicle loads, the hydraulic jacking devices 3 can lift the bridge abutment slab 2 to the design elevation, solving the settlement problem at the far abutment end. However, after jacking, a void area easily forms between the bottom of the bridge abutment slab 2 and the roadbed. Under repeated traffic loads, this void area causes uneven stress on the bridge abutment slab 2, resulting in localized stress concentration, leading to crack formation and propagation, thereby increasing the risk of bridge abutment slab 2 fracture and affecting the overall structural stability and driving safety.

[0024] In this embodiment, as Figure 1 , Figure 3 As shown, multiple sets of grouting holes are reserved on the bridge abutment slab 2. After the bridge abutment slab 2 is lifted and reset by the hydraulic lifting device 3 at the far end of the bridge abutment, grout is injected into the void area on the bottom surface of the bridge abutment slab 2 through the grouting holes to support the bridge abutment slab 2 and prevent the bridge abutment slab 2 from breaking under the repeated action of long-term traffic load.

[0025] In this embodiment, the grouting hole can be achieved by pre-embedding a sleeve during the pouring of the bridge abutment slab 2. The pre-embedded sleeve has a pre-set thread. When grouting is not performed, the grouting hole can be sealed with a threaded plug. When grouting is performed, the grouting hole is opened for grouting.

[0026] In this embodiment, as Figure 1 As shown, the thickness of the bridge abutment slab 2 near the abutment 1 at its near end is greater than that at its far end. The purpose of this design is that the near end of the bridge abutment slab 2 will bear a larger bending moment and shear force in actual applications. Increasing the thickness of the slab near the abutment end ensures that the bending resistance of the section near the abutment end of the bridge abutment slab 2 matches the actual bending moment distribution, thereby effectively dispersing high-stress areas and improving the overall load-bearing capacity of the structure.

[0027] Understandably, when the area at the root of the bridge abutment slab 2 is subjected to the maximum negative bending moment as a fixed end under cantilever stress, the large plate thickness design significantly enhances the flexural stiffness and bearing capacity of the section in this area, effectively dispersing high stress concentration.

[0028] In this embodiment, as Figure 2As shown, the top surface of the bridge abutment slab 2 is flat and at the same elevation as the top surface of the bridge abutment 1. The bottom surface of the bridge abutment slab 2 exhibits an arc-shaped change from the near end to the far end of the bridge abutment, with a rounded chamfered structural design. The arc-shaped change of the bottom surface of the bridge abutment slab 2 with the thickness variation means that the bottom surface of the bridge abutment slab 2 forms a continuous curved transition according to the thickness distribution. This is because in the cantilever extension region of the bridge abutment slab 2 from the near end to the far end of the bridge abutment, the closer to the far end of the bridge abutment, the smaller the bending moment. The bridge abutment slab 2 can reduce its self-weight and avoid material waste while maintaining structural safety, forming an overall optimized mechanical performance that is coordinated with the load distribution. It can avoid stress concentration points caused by right-angle transitions, make the load transfer more uniform, eliminate stress peaks at sharp corners, and inhibit the initiation and propagation of cracks.

[0029] It is understandable that, by pre-reserving grouting holes on the abutment slab 2 and designing the abutment slab 2 with a thickness greater near the abutment end than far from the abutment end, this embodiment can fill the void area at the bottom after the hydraulic jacking device 3 lifts and resets the abutment slab 2. It can also effectively reduce stress concentration in the root area of ​​the abutment slab 2 (i.e., near the abutment end), reduce the risk of cracks and fractures caused by stress concentration, and improve the structural safety and long-term service reliability of the abutment slab 2 in the road-bridge transition section.

[0030] In this embodiment, after a void appears at the bottom of the bridge abutment slab 2, the root area near the abutment end bears a positive bending moment while the cantilever extension area bears a negative bending moment, which can easily cause the bridge abutment slab 2 to crack at the root or break at the cantilever end. To address this, bending-resistant steel bars are used in the root area near the abutment end of the bridge abutment slab 2 during construction, and steel bars that resist negative bending moments are used in the cantilever extension area during construction.

[0031] It should be noted that flexural reinforcement refers to steel bars used to enhance the ability of concrete members to resist bending deformation. They can be achieved using hot-rolled ribbed steel bars or prestressed steel bars, with the aim of improving the compressive and bending resistance of the members under positive bending moment. Reinforcing bars that resist negative bending moment can be understood as steel bars specifically designed to withstand tensile stress under negative bending moment. They can be achieved using double-layer steel mesh or by increasing the density of steel bars, with the aim of effectively bearing the tensile load on the upper part of the cantilever extension area.

[0032] This embodiment enhances the structural strength of the bridge abutment approach slab 2 under positive bending moment by configuring anti-bending reinforcement in the root region near the abutment end. At the same time, it configures reinforcement to resist negative bending moment in the cantilever extension region to effectively disperse the tensile stress generated by negative bending moment. This ensures the bearing capacity of the root region near the abutment end and the cantilever extension region when a void appears at the bottom of the bridge abutment approach slab 2, avoids local stress concentration that could lead to cracks in the bridge abutment approach slab 2, and guarantees the structural integrity and long-term service reliability of the bridge abutment approach slab 2.

[0033] In this embodiment, injecting grout into the bottom of the abutment slab 2 through the grouting hole can only fill the voided area. Therefore, as follows: Figure 1 , Figure 2 As shown, in this embodiment, a grouting pipe 4 is inserted into the grouting hole during grouting. Several grout outlet holes 41 are opened on the outer wall of the grouting pipe 4 along the axial and circumferential directions.

[0034] Understandably, the grouting pipe 4 is a pipeline structure used to guide the directional transport of grout. It can be made of metal or plastic and is inserted downwards into the roadbed from the grouting hole. Figure 4 As shown, the several grout outlet holes 41 opened on the outer wall of the grouting pipe 4 can not only fill the void area with grout, but also reinforce the roadbed with grout, forming a uniformly distributed grouting network in the roadbed, increasing the bearing capacity of the roadbed while slowing down the re-settlement of the roadbed.

[0035] like Figure 4 As shown, in this embodiment, the bottom end of the grouting pipe 4 is fixedly connected (e.g., welded) to an inverted triangular conical bracket 42. When the grouting pipe 4 is driven downward into the roadbed, the conical bracket 42 can easily penetrate the roadbed, allowing the grouting pipe 4 to be smoothly inserted into the roadbed, facilitating subsequent grouting operations.

[0036] It should be noted that the hydraulic jacking device 3 refers to a device used to provide jacking force; in this embodiment, a hydraulic cylinder jack can be used. Figure 5 As shown, the hydraulic lifting device 3 has a hydraulic oil pipe 35 connected to its main body 33. The top of the main body 33 is the piston output end 32. The piston output end 32 is driven to move by changing the hydraulic oil pressure of the hydraulic oil pipe 35.

[0037] In this embodiment, in order to avoid stress concentration on the bottom surface of the bridge abutment plate 2 caused by the piston output end 32 pushing upward, a steel support plate 31 is fixedly connected (e.g., welded) to the top surface of the piston output end 32 to increase the contact area with the bottom surface of the bridge abutment plate 2.

[0038] In this embodiment, multiple stiffening ribs are uniformly welded along the circumference of the bottom surface of the steel support plate 31 to ensure the overall strength of the steel support plate 31, and at the same time to ensure that the lifting force of the piston output end 32 can be transferred from a concentrated point to a uniformly distributed surface.

[0039] like Figure 5As shown, the bottom surface of the hydraulic jacking device 3 rests on the foundation 34, and the area of ​​the foundation 34 is larger than the area of ​​the device body 33. Due to the flexible characteristics of the roadbed, during the jacking operation, the hydraulic jacking device 3 will also generate a counterforce on the roadbed, which may cause local deformation or further settlement of the roadbed, resulting in the hydraulic jacking device 3 being unable to jack effectively. Therefore, in this embodiment, the foundation 34 is poured on the bottom surface of the hydraulic jacking device 3, and the area of ​​the foundation 34 is larger than the area of ​​the device body 33, increasing the contact area with the roadbed, dispersing the downward pressure generated during jacking to a larger area of ​​the roadbed, thereby reducing the pressure per unit area, preventing local deformation of the roadbed, and ensuring the stable support function of the hydraulic jacking device 3 during the jacking process.

[0040] In this embodiment, the foundation 34 is square or circular and is made of concrete.

[0041] like Figure 1 , Figure 2 , Figure 3 As shown, in this embodiment, three sets of grouting holes are designed: two sets near the abutment end and one set far from the abutment end. Specifically, one set of grouting holes is designed 0.5m away from the back wall of abutment 1 to address potential voids near abutment 1. At the far abutment end, a set of grouting holes is designed on the outside of the hydraulic jacking device 3 (30cm from the free end of the abutment approach slab 2) to suppress roadbed settlement at the far abutment end. The middle set of grouting holes is used to address voids that occur at the bottom of the abutment approach slab 2 after jacking and restoration. After the abutment approach slab 2 is jacked and restored, the grouting sequence proceeds from the near abutment end to the far abutment end.

[0042] In this embodiment, the center-to-center distance between grouting holes in the same row is 1.5m, the hole diameter is 100mm, and the drilling depth is not less than 1.0m.

[0043] In some implementations, a circumferentially integrally cast guide wall is constructed on the foundation 34 to block water and protect the hydraulic jacking device 3, while also preventing it from being buried in the grout body after grouting and thus unrecoverable; wherein holes are drilled in the guide wall and rubber plugs are installed for the hydraulic oil pipe 35 to extend out, the hydraulic oil pipe 35 extending laterally from the roadbed and connecting to an external high-pressure oil pump.

[0044] In this embodiment, as Figure 1 , Figure 2 As shown, after the abutment slab 2 settles, elevation locators 5 are installed at both the near and far ends of the abutment slab 2 to detect the elevation difference between the two ends. Based on this elevation difference data, the hydraulic jacking device 3 is controlled to lift the abutment slab 2, that is, the lifting stroke of the hydraulic jacking device 3 is controlled to ensure that the far end of the abutment slab 2 can be reset to the same elevation as the near end, thus ensuring the levelness of the abutment slab 2.

[0045] In some implementations, the elevation locator 5 can be replaced with a level, and the elevation difference can be calculated by observing the leveling rod.

[0046] Although the specific embodiments of the present utility model have been described above in conjunction with the accompanying drawings, this is not intended to limit the scope of protection of the present utility model. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art without creative effort based on the technical solution of the present utility model are still within the scope of protection of the present utility model.

Claims

1. A hydraulically jacking cantilever bridge approach slab with a grouting structure, characterized in that, Includes bridge abutments, with one end of the bridge abutment approach slab erected and fixedly connected to the back wall of the bridge abutment, and the remaining part laid on the roadbed; Multiple hydraulic jacking devices are embedded in the roadbed at the bottom of the far abutment end of the bridge abutment approach slab. The bridge abutment approach plate has multiple sets of grouting holes for grouting and filling the voids on the bottom surface of the bridge abutment approach plate; The thickness of the bridge abutment approach plate near the bridge abutment end is greater than that of the bridge abutment end. The bottom surface of the bridge abutment approach plate changes in an arc shape from the bridge abutment end to the bridge abutment end and has rounded corners.

2. The hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 1, characterized in that, The bridge abutment approach slab near the abutment end uses bending-resistant steel bars, and the cantilever extension area of ​​the bridge abutment approach slab uses steel bars that resist negative bending moments.

3. The hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 1, characterized in that, A grouting pipe is inserted into the grouting hole, and several grout outlet holes are opened on the outer wall of the grouting pipe along the axial and circumferential directions.

4. The hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 3, characterized in that, The bottom end of the grouting pipe is fixedly connected to an inverted triangular conical bracket.

5. The hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 1, characterized in that, The hydraulic lifting device is connected to a hydraulic oil pipe on its main body, and the top of the main body is the piston output end, with a steel support plate fixedly connected to the top surface of the piston output end.

6. The hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 5, characterized in that, Multiple stiffening ribs are uniformly welded along the circumference of the bottom surface of the steel support plate.

7. A hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 5, characterized in that, The bottom surface of the hydraulic lifting device rests on a foundation, the area of ​​which is larger than the area of ​​the device body.

8. A hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 7, characterized in that, The foundation is a concrete structure, and is square or circular in shape.

9. A hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 1, characterized in that, The grouting holes are designed in multiple sets, with one set of grouting holes designed on the outside of the hydraulic jacking device.

10. A hydraulically lifted cantilever bridge approach slab with grouting structure as described in claim 1, characterized in that, Elevation locators are installed at both the near and far ends of the abutment approach plate.