Electronic devices with a graphical user interface for scheduling and orchestration designer

CN309114525SActive Publication Date: 2025-02-14MERIT DATA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430041657.7
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2025-02-14
Estimated Expiration
2039-01-22

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the product of this design: electronic device with a scheduling designer graphical user interface. 2. Purpose of this design product: This design product is used in electronic equipment. 3. The design highlights of this appearance design product are the graphical user interface content on the screen. 4. The picture or photo that best illustrates the key points of the design: main view. 5.Purpose of graphical user interface: Display interface used for software scheduling and arrangement. 6. Human-computer interaction mode of the graphical user interface: Click the three dots on the right side of the data type conversion business flow menu on the main view, and more business flow operation buttons will appear, presenting the interface change state diagram 1; click Add Task on the interface change state diagram 1, and the scheduling task list will appear, presenting the interface change state diagram 2; select three task nodes on the interface change state diagram 2, click the OK button, and present the interface change state diagram 3; click Data Integration in the right dialog box on the interface change state diagram 3, and then click Scheduling Configuration on the right side of the dialog box, and present the interface change state diagram 4; click Add Dependent Task on the interface change state diagram 4, and then click Save, and present the interface change state diagram 5; click Type Conversion in the right dialog box on the interface change state diagram 5, and then click Scheduling Configuration on the right side of the dialog box, and present the interface change state diagram 6; click Add Dependent Task on the interface change state diagram 6, and then click Save, and present the interface change state diagram 7; click Result Output in the right dialog box on the interface change state diagram 7, and then click Scheduling Configuration on the right side of the dialog box, and present the interface change state diagram 8; click Add Dependent Task on the interface change state diagram 8, and then click Save, and present the interface change state diagram State diagram 9; click any blank space in the dialog box on the interface change state diagram 9, and the publish button will be highlighted in the upper left corner of the dialog box, and the interface change state diagram 10 will be presented; in the interface change state diagram 10, place the mouse on the yellow exclamation mark of the publish button, and a reminder "Tip: There are updated contents that have not been published" will appear, and the interface change state diagram 11 will be presented; click the publish button on the interface change state diagram 11 to save and publish all the contents of the dialog box on the right, and the interface change state diagram 12 will be presented; click execute immediately on the interface change state diagram 12, and the dialog box will execute all the actions in the dialog box from the start node There are process nodes, and execution results are generated. A pop-up box prompts whether to view it, and the interface change status diagram 13 is presented; click the View button on the interface change status diagram 13, and the status of all immediate executions of the business process and the execution status of the sub-nodes will appear, and the interface change status diagram 14 will be presented; click any blue number in the list on the interface change status diagram 14, and the detailed operation status of the sub-nodes in the business process will appear, and the interface change status diagram 15 will be presented; click View Log on any list in the interface change status diagram 15, and a pop-up window of the operation log of the sub-node will appear, and the interface change status diagram 16 will be presented.
Need to check novelty before this filing date? Find Prior Art