Graphical User Interface for Travel Setting of Electronic Device

CN309410656SActive Publication Date: 2025-07-29CTRIP COMP TECH SHANGHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430625263.6
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2025-07-29
Estimated Expiration
2039-09-30

Smart Images

  • Figure 000003_ABST
    Figure 000003_ABST
Patent Text Reader

Abstract

1. Name of the Design Product: Graphical User Interface for Trip Settings of Electronic Devices. 2. Use of the Design Product: An electronic device. 3. Design Key Points of the Design Product: Lies in the graphical user interface. 4. Picture or Photograph Most Indicating the Design Key Points: Design 1 - State Change Diagram 3 of the Interface. 5. Design 1 is designated as the basic design. 6. Use of the Graphical User Interface: The graphical user interfaces corresponding to each design are all used for trip settings; Design 1 is used to import text to read the trip, Design 2 is used to import links to read the trip, Design 3 is used to import pictures to read the trip, Design 4 is used to add flights to the trip, and Design 5 is used to add train numbers to the trip. 7. Human - Machine Interaction Method of the Graphical User Interface: On the main view of Design 1, click the "Import Link / Text / Picture" button at the bottom to switch to Design 1 - State Change Diagram 1 of the Interface; enter text in the text box above Design 1 - State Change Diagram 1 to change to Design 1 - State Change Diagram 2 of the Interface; click the "Start" button at the bottom on Design 1 - State Change Diagram 2 to switch to Design 1 - State Change Diagram 3 of the Interface; click the "Deselect All" button on the upper - middle right on Design 1 - State Change Diagram 3 to change to Design 1 - State Change Diagram 4 of the Interface. On the main view of Design 2, click the "Import Link / Text / Picture" button at the bottom to switch to Design 2 - State Change Diagram 1 of the Interface; click the "Link" button above on Design 2 - State Change Diagram 1 to change to Design 2 - State Change Diagram 2 of the Interface; enter the link in the text box above Design 2 - State Change Diagram 2 to switch to Design 2 - State Change Diagram 3 of the Interface; click the "Start" button at the bottom on Design 2 - State Change Diagram 3 to switch to Design 2 - State Change Diagram 4 of the Interface; click the "Deselect All" button on the upper - middle right on Design 2 - State Change Diagram 4 to change to Design 2 - State Change Diagram 5 of the Interface. On the main view of Design 3, click the "Import Link / Text / Picture" button at the bottom to switch to Design 3 - State Change Diagram 1 of the Interface; click the "Picture" button above on Design 3 - State Change Diagram 1 to change to Design 3 - State Change Diagram 2 of the Interface; click the "Upload Picture" button above on Design 3 - State Change Diagram 2 to switch to Design 3 - State Change Diagram 3 of the Interface; click on the picture frame on Design 3 - State Change Diagram 3 to change to Design 3 - State Change Diagram 4 of the Interface; click the "Add" button in the upper - right corner on Design 3 - State Change Diagram 4 to switch to Design 3 - State Change Diagram 5 of the Interface; click the "Start" button at the bottom on Design 3 - State Change Diagram 5 to switch to Design 3 - State Change Diagram 6 of the Interface; click the "Deselect All" button on the upper - middle right on Design 3 - State Change Diagram 6 to change to Design 3 - State Change Diagram 7 of the Interface. Click the "Add Transportation" button at the bottom on the front view of Design 4 to switch to the state change diagram 1 of the Design 4 interface; click the "By Departure and Arrival Locations" button at the top on the state change diagram 1 of the Design 4 interface to change to the state change diagram 2 of the Design 4 interface; enter text in the "Departure Location" and "Destination" fields at the top of the state change diagram 2 of the Design 4 interface to change to the state change diagram 3 of the Design 4 interface, and then automatically change to the state change diagram 4 of the Design 4 interface; click the date option on the state change diagram 4 of the Design 4 interface to change to the state change diagram 5 of the Design 4 interface; click the "OK" button at the bottom on the state change diagram 5 of the Design 4 interface to change to the state change diagram 6 of the Design 4 interface; slide up on the state change diagram 6 of the Design 4 interface to change to the state change diagram 7 of the Design 4 interface; click the check box on the right on the state change diagram 7 of the Design 4 interface to change to the state change diagram 8 of the Design 4 interface. Click the "Add Transportation" button at the bottom on the front view of Design 5 to switch to the state change diagram 1 of the Design 5 interface; click the "Train" button at the top on the state change diagram 1 of the Design 5 interface to change to the state change diagram 2 of the Design 5 interface; enter text in the "Departure Location" and "Destination" fields at the top of the state change diagram 2 of the Design 5 interface to change to the state change diagram 3 of the Design 5 interface, and then automatically change to the state change diagram 4 of the Design 5 interface; click the date option on the state change diagram 4 of the Design 5 interface to change to the state change diagram 5 of the Design 5 interface; click the "OK" button at the bottom on the state change diagram 5 of the Design 5 interface to change to the state change diagram 6 of the Design 5 interface; slide up on the state change diagram 6 of the Design 5 interface to change to the state change diagram 7 of the Design 5 interface; click the check box on the right on the state change diagram 7 of the Design 5 interface to change to the state change diagram 8 of the Design 5 interface. 8. Other situations that need to be explained Other explanations: The single rectangular color block areas at the top of the front views of Design 1, state change diagram 3 of Design 1, state change diagram 4 of Design 1, front view of Design 2, state change diagram 4 of Design 2, state change diagram 5 of Design 2, front view of Design 3, state change diagram 6 of Design 3, state change diagram 7 of Design 3, front view of Design 4, and front view of Design 5 are all maps.
Need to check novelty before this filing date? Find Prior Art