Solar air conditioning system graphical user interface for electronic devices
CN309659694SActive Publication Date: 2025-12-09GD MIDEA AIR CONDITIONING EQUIP CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430644995.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-12-09
- Estimated Expiration
- 2039-10-14
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: solar air conditioning system graphical user interface for electronic equipment. 2. The use of the design product: for an electronic device. 3. The design features of the design product: the interface content of the graphical user interface. 4. The picture or photo that best shows the design features: design 1 front view. 5. The electronic device is a conventional design, and designs 1, 2, 3, 4 rear view, left view, right view, top view and bottom view are omitted. 6. Design 1 is designated as the basic design. 7. The use of the graphical user interface: the interface of the design product is used for the function implementation and switching of the solar air conditioning system. 8. The human-computer interaction mode of the graphical user interface: design 1 front view is the initial interface with the solar air conditioning system graphical user interface, which enters after starting / waking up the software / applet; clicking the "Energy Monitor" icon on the right side of design 1 front view enters design 1 interface change state diagram 1; clicking the "Week" icon of design 1 interface change state diagram 1 enters design 1 interface change state diagram 2; design 2 front view is the initial interface with the solar air conditioning system graphical user interface, which enters after starting / waking up the software / applet; clicking the "Energy Monitor" icon on the right side of design 2 front view enters design 2 interface change state diagram 1; clicking the "Year" icon of design 2 interface change state diagram 1 enters design 2 interface change state diagram 2; design 3 front view is the initial interface with the solar air conditioning system graphical user interface, which enters after starting / waking up the software / applet; clicking the "Energy Monitor" icon on the right side of design 3 front view enters design 3 interface change state diagram; design 4 front view is the initial interface with the solar air conditioning system graphical user interface, which enters after starting / waking up the software / applet; clicking the "Energy Monitor" icon on the right side of design 4 front view enters design 4 interface change state diagram.
Need to check novelty before this filing date? Find Prior Art