METHOD AND SYSTEM FOR OPTIMIZING BATCH PROCESS PLANNING

DE602018074904T2Active Publication Date: 2024-10-02BULL SA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE602018074904
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2017-12-30
Filing Date
2018-12-28
Publication Date
2024-10-02
Estimated Expiration
2038-12-28

AI Technical Summary

Technical Problem

Existing batch processing scheduling mechanisms fail to adapt automatically to fluctuations in data volumes, leading to potential resource saturation, increased processing times, and errors, which can disrupt production.

Method used

A self-adaptive scheduling method that measures business activity parameters, defines temporal profiles, and designs scheduling plans to optimize resource usage, allowing for real-time adjustments to ensure efficient processing without saturating resources.

Benefits of technology

This approach reduces execution time, maximizes resource utilization, and prevents resource saturation, ensuring batch processes are completed within deadlines and maintaining production efficiency.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The present invention relates to the field of batch processing and more particularly to the optimization of their scheduling. The invention relates in particular to a method for self-adaptive planning of the scheduling of batch processing and a device capable of implementing this method. [Prior art]

[0002] Batch processes are used to automate non-interactive tasks that must be executed reliably within certain deadlines. For example, a batch process can be used to update information at the end of the day, transform data, generate reports, print documents, or perform other non-interactive tasks. A batch process can also be used to perform various operations with files, including digital images, such as resizing or converting. Batch processes are typically queued or accumulated during peak hours when computing resources are unavailable or limited by real-time activities. They are then run during off-peak hours when computing resources are available.It is therefore very common that, for technical reasons, these treatments are planned at night, on weekends or during periods of low business activity.

[0003] In general, batch processing is performed regularly (e.g. daily or weekly) and the order of priority for executing batch processing (i.e. scheduling) is managed by a batch processing scheduler. This scheduling of batch processing makes it possible to avoid problems of concurrent access to data, to respect precedence rules (the output of one batch is used as input for another) or to smooth the application load so that processing is completed within the allocated time window. However, although the evolution of data volumes is significantly increasing, the significant fluctuation of these volumes over time leads to very volatile resource consumption and processing times.For example, the same schedule on the same infrastructure may one day lead to resource overload and processing interruption, while another day, a few days apart, no malfunction will be detected. Thus, although some batch processing is similar from day to day, depending on the day, the data volumes that some batch processes have to process can vary greatly. In addition, we can also see trends in the evolution of these quantities of data to be processed. All these changes have an impact not only on the processing execution time, but also on the level of resources used. In addition, up to several thousand batches may need to be processed each day in order to integrate the day's data or transactions into a company's business process.

[0004] The interrelationship between the different batches (e.g. some batches will require data generated by other batches before being executed), the fluctuation of the resources to be processed as well as the constraint in terms of time and available resources lead to the need to plan optimally and dynamically the sequence of these batches. In addition, in the case of errors or unforeseeable delays, it is necessary to have processes to resolve these issues so that all batches are finalized within the allotted time. It is also necessary to implement planning aimed at optimizing the execution of these batch processes so that they are completed within the allotted time and do not lead to saturation of available resources. Indeed, in some cases, production may be stopped if the treatments could not be completed in time.

[0005] Batch processing schedulers already exist, including a mechanism described in document EP3113022 that uses resource consumption levels in the scheduling rules for batch processing. More specifically, this mechanism is based on the execution constraints of the batch processing operations, the resources they consume, and the resources available on the infrastructure. However, these scheduling mechanisms are not able to automatically adapt to fluctuations in the volume of data to be processed in order to avoid waiting times and maximize the use of available resources while not causing saturation of these resources, which would lead to an increase in processing times or an error in the execution of the processing operations.

[0006] Thus, there is a need for new methods or devices for batch processing scheduling planning capable of providing self-adaptive planning of batch processing scheduling.

[0007] European patent number EP 3 113 022 concerns the optimization of batch processing scheduling.

[0008] The paper "Evaluation of Hybridization of GA and TS Algorithms for Independent Batch Scheduling in Computational Grids" concerns the evaluation of the hybridization of two algorithms GA (Genetic Algorithm) and TS (Taboo Search) for independent scheduling plans in computational grids. [Technical problem]

[0009] The invention therefore aims to remedy the drawbacks of the prior art. In particular, the invention aims to propose a method for planning the scheduling of batch processing operations which is capable of automatically adapting to the load (e.g. the volume of data to be processed) so as to propose a scheduling which is always optimized despite the variation in the quantities of data to be processed or the available resources, whether or not these variations are initially anticipated during the implementation of the method. The invention also aims to optimize the execution time of batch processing operations while preventing an increase in processing times.

[0010] The invention further aims to propose a planning device capable of implementing a batch processing scheduling planning method capable of adapting in particular to the upstream activity having generated the data to be processed. [Brief description of the invention]

[0011] To this end, the invention relates to a method for self-adaptive planning of the scheduling of batch processing operations, said batch processing operations being configured to process data generated during business activities on a production IT infrastructure, said method being implemented by a device associated with a resource repository capable of storing the resources available for batch processing operations on a processing IT infrastructure and with a regulatory repository capable of storing rules for executing batch processing operations, said method comprising: a measurement step, by probes, of parameters, preferably significant, of business activities on the production IT infrastructure, a definition step, by an impact calculation module, of a time profile for each of the batch processing operations based on the values ​​of parameters, preferably significant, of measured business activities and a batch processing behavior model, and a design step, by a scheduling plan design module, of a scheduling plan optimizing the resources from the time profiles of the batch processing operations and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository.

[0012] The method according to the invention makes it possible to optimize the scheduling of batch processing operations by taking into account the activity on the production IT infrastructure of the business applications, sources of the data to be processed, but also according to the behavior of previous batch processing operations. Indeed, the design module makes it possible, in association with the impact calculation module, to design the scheduling plan most suited to the situation, in particular by taking into account a behavior model of the batch processing operations. This makes it possible to reduce the execution time because the scheduling is particularly adapted to the volumes of data that need to be processed, while respecting the resource consumption limits defined beforehand. More particularly, the method allows for optimization of the scheduling by taking into account the business activity and the behavior of the batch processing operations that have been observed during their previous executions.The present invention can therefore be presented as a mechanism allowing the batch processing scheduling plan to be modified on the fly (self-adaptive functionality) in order to optimize execution time, while respecting the resource consumption limits (without saturating them) defined beforehand.

[0013] According to other optional process features: The step of defining a time profile also includes taking into account maximum resource utilization thresholds stored in the resource repository. Indeed, if the time profile shows an exceedance of a maximum resource utilization threshold then it will be necessary to provide for an extension in time of the different phases of the batch processing concerned. The saturation of at least one resource leading to a longer execution time. The step of designing the scheduling plan includes a modeling of the use of each resource during a processing period in order to be able to determine the quantity of resources available for the other processing operations during said period. This is a way of parallelizing the other processing operations to best arrange batch processing operations in parallel without causing saturation of the available resources.it comprises a preliminary step of definition by a modeling module, of a behavior model comprising the following sub-steps: i) loading of values ​​of business activity parameters, preferably measured on the production IT infrastructure during the generation of the data to be processed, ii) loading of values ​​of behavior parameters of a batch processing, preferably measured on the processing IT infrastructure during the processing of the data generated by business applications, and iii) generation by a modeling module, of a behavior model of the batch processing from the values ​​of business activity parameters and values ​​of behavior parameters. The model advantageously comprises at least one correlation between a value of business activity parameters and a value of behavior parameter of a batch processing. it includes a preliminary step of defining a self-adaptation model comprising the sub-steps of: ∘ loading behavior parameter values ​​of a first batch processing during the processing of data generated by business applications, ∘ loading behavior parameter values ​​of at least one other batch processing during the processing of data generated by business applications, ∘ generation, by a modeling module, of a self-adaptation model from the loaded behavior parameter values.

[0014] Thus, the self-adaptation model then comprises at least one correlation between a behavior parameter value of a batch process and a behavior parameter value of another batch process. Furthermore, a self-adaptation model according to the invention can make it possible to determine or correct the time profile of a batch process as a function of the parameter values ​​of another batch process. It includes a step of recording the scheduling plans optimizing the resources in a catalog of scheduling plans and a step of selecting a suitable scheduling plan. The generation of several schedules makes it possible to avoid having to calculate new schedules optimizing the use of resources every day, which would be resource-consuming and time-consuming. In the context of the method according to the invention, it is only necessary to select the most suitable plan from a catalog of plans. It includes a step of implementing the optimized scheduling plan. It includes a step of measuring the behavior parameters of the batch processes. It includes a step of generating a processing report when all the batch processes are completed and a step of using the report to modify the behavior model of the batch processes.This allows, over time, to refine the behavior models. It includes a step of detecting a deviation in the execution of batch processing. This step can make it possible to identify, for example, an extension of the processing time or a change in the time profile of resource consumption compared to the generated time profiles. Thus, following such a deviation detection, it is possible to modify the scheduling so as to make the best use of all the available resources and to avoid exceeding the processing time limit. Thus, the present invention makes it possible, in addition to defining mechanisms for predicting the behavior of batch processing from the upstream activity, to be able to adapt the scheduling plan according to the results of analyses of the batch processing currently being executed.the step of detecting a deviation, comprises a measurement of a behavior parameter of a batch processing at a time t, and a comparison of the value of the measured behavior parameter with an expected value of the behavior parameter, the presence of a deviation being indicative of a deviation. in the event of detection of a deviation for one or more batch processings, said method further comprises a step of generating a refined behavior model, a refined time profile, and / or a refined scheduling plan. Indeed, once a deviation has been observed, the method according to the invention can use the measured batch processing behavior parameter values ​​to modify a behavior model, a time profile and finally the scheduling plan. This is advantageously done while verifying that all of the execution rules are respected and that the resource consumption is at the expected level.The design of an optimized scheduling plan concerns only a part of the batch processes to be executed over a period to process the data generated during business activities. It includes a step of designing a subsequent scheduling plan, for a new period, based on a self-adaptation model and from the time profiles of the batch processes, measured values ​​of batch processing behavior during a previous period and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository. The subsequent scheduling plan concerns the batch processes to be executed over the new period. It also includes a step of storing the measured values ​​of batch processing behavior parameters and updating the batch processing behavior models and the self-adaptation models.These steps allow, for example, the implementation of learning processes to improve models over time.

[0015] The invention further relates to a device for self-adaptive planning of the scheduling of batch processing of data generated by business activities on a production IT infrastructure, said device being associated with a resource repository capable of storing data on resources available for the batch processing, with a regulatory repository capable of storing rules for executing the batch processing, and with probes, configured to measure a parameter value of business activities on the production IT infrastructure by the business applications, said device comprising: an impact calculation module, capable of defining a time profile for each of the batch processing operations based on the measured values ​​of business activity parameters and a batch processing behavior model, and a scheduling plan design module, capable of designing a scheduling plan optimizing the use of resources based on the time profiles of each of the batch processing operations and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository.

[0016] Other advantages and characteristics of the invention will appear on reading the following description given by way of illustrative and non-limiting example, with reference to the appended Figures which represent: Figures 1A and 1B, respectively a schedule of resource consumption of two batch processes over the months of January (J) and February (F) and a time profile of a batch process showing resource consumption over time; Figure 2 , a schematic representation of a self-adaptive scheduling method for batch processing according to the invention. The steps framed by dotted lines are optional; Figure 3 , a schematic representation of a step of generating a behavior model of a batch processing according to the invention. Figure 4 , a schematic representation of a step of generating a self-adaptation model according to the invention. Figure 5 , a schematic representation of the construction of scheduling plans optimizing the use of resources according to the invention; Figure 6, a schematic representation of a method for designing and executing a scheduling plan optimizing the use of resources according to an embodiment of the invention; Figure 7 , a schematic representation of a method for self-adapting in real time a scheduling plan optimizing the use of resources according to an embodiment of the invention; Figures 8A, 8B and 8C , three schematic representations of two batch processes running in parallel, with a representation corresponding to a scheduling plan optimizing the use of resources (4A), a representation corresponding to an observed scheduling plan (4B) and a representation corresponding to a refined scheduling plan (4C); Figure 9 , a schematic representation of an embodiment of the step of acquiring a footprint of each batch processing for each machine impacted by the batch processing; Figure 10, a schematic view of the self-adaptive scheduling device for batch processing according to an embodiment of the invention. [Description of the invention]

[0017] In the remainder of the description, a "business activity" corresponds to business applications running on a production IT infrastructure. This includes in particular all upstream processing intended to provide the data that will then be processed by batch processing (transactional activity, file or message submission, etc.). Thus, the expression "business activity parameter" corresponds to measurable parameters allowing these activities to be quantified. This may include values ​​of use of the resources of the production IT infrastructure by business applications or values ​​of parameters concerning the data generated by the business applications and which will have to be used by batch processing. A significant business activity parameter is a parameter correlated with the behavior parameters of a batch processing, in particular with regard to the behavior model.

[0018] For the purposes of the invention, a "batch processing" is an automatic sequence of several phases via a series of commands (processes) on a computer without operator intervention. Once a process is completed, the computer processes the next batch; however, at a given time, there are generally several batch processes running in parallel. Batch processing ends once all the batches in the stack (queue) have been executed. Batch processes are mainly used for automated tasks, in particular for the automatic sending of postal or electronic mail. A batch process is generally stored in a command file which is executed by the computer system.Running the batch file can produce a number of actions as diverse as updating databases, sending emails to users, or producing one or more output files for use by another batch process.

[0019] The “scheduling” or “execution plan” within the meaning of the invention corresponds to the order of execution of the different batch processes to be carried out during a given period of time. This scheduling is generally calculated according to rules and / or prerequisites in order to satisfy resource availability requirements.

[0020] The expression "behavior parameter of an IoT processing" within the meaning of the invention corresponds to parameters for implementing a batch processing or to consequences of this implementation. The parameters for implementing a batch processing may, for example, include parameters selected from: the use of resources by the batch processing over time, the execution time of the batch processing, or its division into periods with information on these periods (order, duration and associated resource consumption). Advantageously, the behavior of a batch processing is analyzed for each of the phases of a batch processing. The consequences of implementing a batch processing may, for example, include a volume of data generated or an occupation of memory space after the end of the batch processing. These values ​​may, for example, be measured by probes.

[0021] The term "footprint" within the meaning of the invention corresponds to a set of information on the resource consumption of a batch process or the resource availability of a machine (for the idle footprint) during its execution period.

[0022] A "resource" refers to the parameters, capabilities, or functions of computing devices that enable the operation of a batch process or application. A single computing device is generally associated with several resources. Similarly, a single resource may be shared between several batch processes. A resource is generally associated with a unique identifier that allows it to be identified within an IT infrastructure. For example, the term "resource" may include: network disks characterized, for example, by their inputs / outputs, reading / writing on disks, the memory utilization rate, a network characterized by its bandwidth, a processor characterized, for example, by its utilization (in percent) or the occupancy rate of its caches, a RAM characterized by the amount allocated.Resource usage refers to the consumption of a resource by a batch process or a business application.

[0023] For the purposes of the invention, the term "IT infrastructure" means a set of IT structures (i.e. IT devices), or machines, capable of operating one or more business applications or application chains. The IT structure may be a server or comprise a plurality of machines. It is used to implement (execute) the scheduling of batch processing. In this invention, the production IT infrastructure designates the IT infrastructure used to generate the data to be processed while the processing IT infrastructure designates the IT infrastructure used to execute the batch processing.

[0024] For the purposes of the invention, the term "probe" or "computer probe" or "consumption probe" means software associated with equipment which makes it possible to carry out, manage and send back to computer equipment measurements intended to provide information, among other things, on the operating status of resources or the consumption of resources.

[0025] By "predetermined maximum usage threshold", we mean, within the meaning of the invention, a maximum value of a parameter associated with each resource allowing proper functioning of said resource. For example, this corresponds to the maximum acceptable limits of resource consumption for an IT structure hosting one or more batch processes. These limits may be real or hypothetical and generally correspond to a level of usage beyond which malfunctions may occur and result in saturation of the resource which leads to an increase in processing times or even an error in the execution of these processes.

[0026] The term “malfunction” within the meaning of the invention corresponds to the occurrence of saturation of one or more resources on the IT structure hosting batch processing.

[0027] The expression "human-machine interface" within the meaning of the invention corresponds to any element allowing a human being to communicate with a computer in particular and without this list being exhaustive, a keyboard and means allowing in response to orders entered on the keyboard to carry out displays and possibly to select using the mouse or a touchpad elements displayed on the screen. Another example of embodiment is a touch screen allowing to directly select on the screen the elements touched by the finger or an object and possibly with the possibility of displaying a virtual keyboard.

[0028] In the remainder of the description, the same references are used to designate the same elements.

[0029] There Figure 1Aillustrates the resource consumption, here the CPU occupancy rate, as a function of time (calendar days), by batch processing processes hosted by an IT infrastructure. The consumption of two batch processes is represented. It is possible to observe a variation in resource consumption by these two batch processes as a function of time. The first batch process represented by a solid line could correspond to a batch processing of data relating to pay slips. The resource consumption for this batch process is higher during the end and beginning of the month periods with a certain stability during the month. The second batch process represented by a dotted line could correspond to a batch processing of data relating to time management for which the instructions recommend processing at the end of the week with consolidation at the end of the month.Thus, resource consumption is higher at the end of the week with high consumption in the middle of January after returning from vacation (J).

[0030] This figure illustrates the variations faced by batch processing scheduling management tools. Other scenarios exist where, for example, a certain drop in activity may be observed on Wednesdays, or an increase in activity following the end of quarters and semesters. A single execution plan spread over the year taking these variations into account would be very static and could not take into account changes in the volume of data to be processed. However, such changes can be frequent and it is necessary to be able to offer self-adaptive planning, preferably in real time, for the scheduling of batch processing.

[0031] So the inventors developed a new self-adaptive planning process for batch processing schedulingcan be implemented on an IT infrastructure comprising one or more machines. This process advantageously makes it possible to adapt the scheduling of batch processing over time.

[0032] This method according to the invention can be implemented by a self-adaptive planning device comprising or being associated with a resource repository 11. As will be presented later, this resource repository 11 is capable of storing the resources available for batch processing. That is to say the available resources of the processing IT infrastructure 4 implementing the batch processing. Similarly, the self-adaptive planning device implementing the method according to the invention comprises or is associated with a regulatory repository 12 capable of storing rules for executing batch processing.

[0033] There figure 2schematically illustrates a self-adaptive scheduling planning method according to the invention.

[0034] As presented in la figure 2 , the planning method according to the invention comprises a step 200 of generating a behavior model. This step can be carried out partially or completely by a 20 modeling module which is represented on the figure 10 .

[0035] This advantageous step notably concerns the monitoring and analysis of the behavior of batch processes during their execution in order to determine, for example, the consumption profile over time of the resources of each batch process and to determine the possible correlations between the behavior of the different processes and the values ​​of business activity parameters participating in the generation of the data to be processed. It thus makes it possible to establish a correlation between measured business activity parameters (such as resources consumed or data produced) and the subsequent behavior of the batch processes, in particular during the processing of data generated by the business applications.Thus, the behavior of batch processing, particularly in terms of resource consumption during the different phases of the different processing operations and / or processing duration, is linked to business activities and more particularly to the flow of data to be processed coming from the business activities.

[0036] The behavior of a batch process may correspond to parameters for implementing a batch process or to consequences of this implementation. Behavior parameters of a batch process may, for example, include the use of resources by the batch processes, their execution times, the end time, the size of the file(s) generated or the volume of data processed. The objective of this sub-step of acquiring values ​​of a parameter for implementing a batch process is, more specifically, to be able to have a resource usage reference for each process during its execution as illustrated in Figure 1B .

[0037] The behavior model refers to the behavior of a batch process. Thus, the behavior model is advantageously derived from a correlation between business activity parameter values ​​and batch process behavior parameter values. The step 200 of defining a behavior model of the batch processes more particularly allows the generation of a correlation reference between the different phases of the different processes making it possible to extrapolate the time and the level of resources from the results of the monitoring carried out during the day or in real time.

[0038] As presented in the figure 3 and preferably, the step 200 of defining a behavior model comprises the following sub-steps: The loading 220, i.e. the loading into memory, by the modeling module 20, of values ​​of business activity parameters. These values ​​can for example be measured by probes and in this case, the step can also comprise the measurement 210, by probes, of the values ​​of business activity parameters on the production IT infrastructure 5 ( figure 10), for example during the generation of the data to be processed. The loading 240, by the modeling module 20, of values ​​of behavior parameters of a batch processing. These values ​​can for example be measured by probes and in this case, the step can also comprise the measurement 230, by probes, of values ​​of behavior parameters of a batch processing during the processing of the data generated by business applications. It should be understood here that the data processed by the batch processing during the measurement step 230 are the data generated by during the step 210. The generation 250, by the modeling module 20, of a behavior model of the batch processing, said model comprising at least one association between a business activity parameter value and a behavior parameter value of a batch processing.Thus, it can advantageously include several of these associations in order to better model the behavior of a batch process.

[0039] The step 200 of defining a behavior model may also include a sub-step 260 of recording the batch processing behavior model.

[0040] Many business activity parameters can be measured during step 210. These are, for example, business activity parameters relating to processed data (e.g., number of files opened by the application, volume of data modified by the application), generated data (e.g., number of files generated by the application, number of messages sent, volume of data generated by the application) or resource use (computing power consumed by the application, data transfer flow dedicated to the application). Preferably, the business activity parameters include parameters selected from: volumes of network exchanges between the business applications, the number of files transferred to a server, the average CPU usage on one or more of the business application chains.

[0041] Similarly, many behavior parameters of a batch process can be taken into account within the scope of the invention. These are, for example, behavior parameters relating to the different phases of execution of the processing: level of resource consumption, duration of the phase or to the total execution of the batch process. Preferably, the behavior parameters of a batch process comprise parameters selected from: a resource consumption as a function of time and a duration for each of the phases of the batch process.

[0042] In addition, the step 200 of defining a behavior model may include, prior to the generation 250 of a behavior model of the batch processes, a sub-step of loading significant resources or key resources which will have a strong impact on the behavior of each batch process. These significant resources may, for example, have been recorded in a repository.

[0043] Thus, this step makes it possible to generate a behavior model making it possible to link business activity parameters such as the use of resources of the production IT infrastructure 5 by the business applications during the generation of the data to be processed and behavior parameters of the batch processing, for example in terms of resource consumption, between the different phases of the different processing operations. Preferably, this step can be repeated several times per month, more preferably several times per week, even more preferably each day when data to be processed is generated. This daily or almost daily monitoring will make it possible to refine the behavior models so as to better determine the time profile of each batch processing operation.In addition, the behavior model can generate predictions about the behavior of a batch process based on the values ​​of business activity parameters impacting this batch process. Thus, the behavior model can generate predictions about many parameters of the batch process such as resource consumption (CPU, I / O, memory, etc.) or the estimated completion time for this batch process.

[0044] The behavior model for batch processes can include a behavior model for each batch process or it can consist of a single behavior model for all batch processes. In addition, the behavior model can predict the behavior of a batch process based on the values ​​of business activity parameters, including the values ​​of business activity parameters of the business applications impacting this batch process.

[0045] Preferably, the preliminary step of defining a behavior model also includes a sub-step of recording the generated model(s) on a memory so as to create a behavior model catalog.

[0046] Advantageously, as will be detailed later, monitoring these values ​​daily, for example, will make it possible to refine this or these behavioral models.

[0047] As discussed, the behavior model allows predicting the behavior of a batch process based on the values ​​of business activity parameters that generated the data to be processed. However, in the execution of a scheduling plan, it is possible that factors influence the behavior of batch processes without this being exclusively related to the data to be processed. Thus, the inventors propose a self-adaptation model that can be used in addition to this behavior model,

[0048] The self-adaptation model refers to the determination of a behavior of a batch process but on the basis of a correlation between behavior parameter values ​​of a first batch process and behavior parameter values ​​of at least one other batch process. Thus, this model can be used during the execution of a scheduling plan and allow rapid adaptation to behaviors observed during the execution of a previous period of the execution plan.

[0049] The step 300 of defining a self-adaptation model makes it possible more specifically to extrapolate the time and the level of resources from the results of the monitoring carried out over a period preceding the execution of the scheduling plan.

[0050] As presented in the figure 4 and preferably, the definition step 300 of a self-adaptation model includes the following sub-steps: The loading 320, i.e. the loading into memory, by the modeling module 20, of values ​​of behavior parameters of a first batch processing. These values ​​can for example be measured by probes and in this case, the step can also comprise the measurement 310, by probes, of the values ​​of behavior parameters of a first batch processing on the processing IT infrastructure 4 ( figure 10). The loading 340, by the modeling module 20, of behavior parameter values ​​of at least one other batch processing. These values ​​can for example be measured by probes and in this case, the step can also comprise the measurement 330, by probes, of behavior parameter values ​​of at least one batch processing on the processing IT infrastructure 4 (during the processing of data generated by business applications). The generation 350, by the modeling module 20, of a self-adaptation model between the different phases of the different batch processing, said model comprising at least one association between a parameter value of a first batch processing and a behavior parameter value of another batch processing. Thus, it can advantageously comprise several of these associations so as to better model the behavior of a batch processing.

[0051] The step 300 of defining a behavior model may also include a sub-step 360 of recording the batch processing behavior model.

[0052] As presented in la figure 2 , the management method according to the invention comprises a step 400 of measuring business activity parameter values ​​on the production IT infrastructure 5 ( figure 10 ). This step can be carried out by one or more probes which will be presented later.

[0053] Indeed, in order to allow self-adaptive scheduling, it is advantageous to measure the values ​​of one or more business activity parameters on the production IT infrastructure 5, in particular for the business activities (implemented by business applications) which will be the source of the input data for the batch processing operations to be scheduled. Thus, preferably, the business applications for which the business activity parameter(s) (e.g. resource utilization) are measured are the business applications which will generate data subsequently used by the batch processing operations.

[0054] As when defining the behavior model, the numerous business activity parameters can be measured during step 400. These are, for example, business activity parameters relating to processed data (e.g., number of files opened by the application, volume of data modified by the application), generated data (e.g., number of files generated by the application, number of messages sent, volume of data generated by the application) or resource use (computing power consumed by the application, data transfer flow dedicated to the application). Preferably, the business activity parameters include parameters selected from: transactional activity volume, file or message deposit volume.

[0055] More preferably, the business activity parameters whose measured value has a correlation with: the quantity of data generated for a batch process and / or the behavior of at least one batch process. In other words, during this step 400, the business activity parameters whose value is measured advantageously include at least the parameters whose value is taken into account in the behavior model.

[0056] For example, the batch processing behavior model allows, for example, to calculate, from a number of files generated by a business application, values ​​of utilization of the resources of the processing IT infrastructure 4 such as the CPU and memory as a function of time. Thus, the behavior model allows to generate a temporal profile.

[0057] In addition, the measured values ​​can be recorded in a business activity repository 13.

[0058] As presented in la figure 2 , the management method according to the invention comprises a step 500 of definition of a time profile for each of the treatments by IoT. The time profile is advantageously defined based on the measured values ​​of business activity parameters and a batch processing behavior model. This step can be carried out by the impact calculation module 50 which will be presented later.

[0059] This step of defining a time profile allows the use of the previously defined "behavior model" to predict the behavior of each batch process. The time profile of a batch process therefore consists of a prediction of the behavior of the batch process as a function of time and in particular as a function of its different phases. A typical time profile may resemble the Figure 1B .

[0060] Timing profiles can be very diverse depending on the batch processes. For example, some batch processes will involve the execution of learning tasks which often tend to be more CPU intensive while others will incorporate tasks containing data aggregation queries which tend to be more I / O intensive. Prior knowledge of the dominant resource of a batch process can be used to schedule a job with other tasks for better resource utilization and less interference between tasks.

[0061] Preferably, the time profiles thus generated are recorded.

[0062] The planning method according to the invention also comprises a step 600 of designing a scheduling plan optimizing the use of resources based on the time profiles of IoT processing. This step can be done by a scheduling plan design module 60 ( figure 10) which will be presented later. Advantageously, this design is done in compliance with the execution rules stored in the regulatory reference 12 and the resource data stored in the resource reference 13.

[0063] Such a step advantageously makes it possible to optimize the positioning in time of batch processing independently of a frequency, but taking into account their execution constraints, the resources they consume and the resources available on the infrastructure they use.

[0064] Preferably, step 600 of design of a scheduling plan optimizing the use of resources , is carried out: from the time profiles and data recorded on the resource 11 and regulatory 12 repositories, by determining the optimum execution plan aimed at reducing the overall execution time while maximizing the use of available resources, and by determining, from the time profiles, the level of resources theoretically used during the execution of the entire execution plan.

[0065] Advantageously, step 600 of designing a scheduling plan optimizing the use of resources is implemented so as to design a scheduling plan relating only to a portion of the batch processing operations to be executed. Thus, the scheduling plan only concerns, for example, urgent batch processing operations that must be carried out first.

[0066] An embodiment of this design step is notably illustrated in Figure 5. In this example of building batch processing schedules (execution plans), a plan building module 60 launches, on a computer infrastructure, matrix calculations between the stored batch processing time profiles and data from the stored resource repository 11.

[0067] In a step 601, the batch processes to be considered (in the case of a partial scheduling plan) are selected. In a step 602, all possible matrix definitions for all the processes considered are constructed. These represent the batch processes spread over all the time slots.

[0068] In step 603 the definitions are compared with the regulatory reference and the plan construction module eliminates, in step 604, the incompatible definitions.

[0069] In step 605, the plan construction module 60 selects a first processing. Among the remaining matrix definitions for this processing, a definition is randomly chosen in a step 606. The plan construction module then calculates the resource consumption over time in step 607.

[0070] During a step 608, the resource consumption over time is compared with the data in the resource repository 11 in order to measure their compatibility with the processing IT infrastructure 4 and more particularly the available resources. If this is the case, that is to say that the resources are sufficient for said definition, the chosen definition is stored during a step 609. Otherwise, another definition is preselected randomly from among the remaining definitions and the plan construction module repeats steps 606, 607 and 608.

[0071] Once the compatible definition of a treatment has been stored, step 610 determines whether all treatments have been planned. If not, the plan construction module performs steps 605, 606, 607, 608 and 609 until all treatments have been planned.

[0072] At the end of step 610, the plan construction module, in a step 611, generates the execution plan, or scheduling, and saves it in the execution plan catalog. This execution plan is the result of matrix calculations between the stored definitions of the treatments and the reference data.

[0073] Each execution plan, or schedule, can typically include for each batch processing component information on the duration of the batch processing, the consumption made by the processing on each machine, the order of execution of the processing, the start time of the processing, and the maximum end time of the processing.

[0074] When an execution plan is first implemented, if the consumption of some resources has exceeded the expected resource consumption or if some rules have not been respected, then the execution plan can be deleted and a new execution plan can be recalculated with the measured footprints. This ensures that, during the execution step, the execution rules will be respected and that resource consumption will be at the expected consumption level.

[0075] Alternatively, if the consumption of certain resources has exceeded the expected resource consumption or if certain rules have not been respected, but the overruns remain low (for example, less than 10% overrun), then the plan may not be deleted. Thus, there is an acceptability rate. A batch process that is expected to last 3 hours and lasts 3 hours 15 minutes will not result in the deletion of the execution plan if the other parameters are valid.

[0076] Calculating an optimized execution plan is time-consuming, as is adapting existing execution plans. Thus, the scheduling plans optimizing the use of resources designed during step 600 can be recorded in a memory, for example a memory of the device according to the invention. This makes it possible to generate a catalog 61 of scheduling plans comprising a plurality of batch processing scheduling plans.

[0077] Preferably, the execution plan catalog 61 contains between 5 and 50 batch processing schedules, more preferably between 10 and 40 and even more preferably 10 and 20. Furthermore, these scheduling plans are preferably recorded in association with the measured business activity parameter values ​​and advantageously with the execution rule values ​​and the resource repository data.

[0078] In this context, each recorded scheduling plan may include information relating to the values ​​of business activity parameters used to calculate the time profiles at the origin of the scheduling plan.

[0079] Thus, the process also involves a step of selecting, from said catalog of execution plans 61, a suitable scheduling of batch processing. This step can be performed by a selection module 62.

[0080] During this selection step, the method according to the invention can compare values ​​of business activity parameters measured in step 400 with values ​​of business activity parameters recorded in the execution plan catalog 61 so as to identify a scheduling plan capable of meeting the needs associated with said measured business activity parameter values.

[0081] Once the suitable scheduling of batch processing has been selected, the method according to the invention may comprise a step 652 of transmitting the scheduling plan optimizing the use of resources to the processing IT infrastructure 4 for its execution 655 by software.

[0082] Batch processing may be implemented on a plurality of machines of a processing IT infrastructure 4, the processing IT infrastructure 4 being able to be the production IT infrastructure 5 or not.

[0083] Furthermore, the self-adaptive planning method according to the invention may comprise a step 660 of monitoring and measuring the execution parameters of the batch processing schedule. This step makes it possible to verify that, during execution, the execution rules have been respected, that the resource consumption has been at the expected consumption level and / or that the volumes of data processed correspond to the expected volumes. This step 660 may also include monitoring and recording of the behavior parameters of the batch processing.

[0084] Advantageously, the monitoring and measurement step 660 is carried out by comparing a measured level of resources used with a previously calculated level of resources used to take into account the impact of the execution of batch processing in parallel. Indeed, it is possible that, occasionally, there are parasitic activities on the IT infrastructure leading to lower availability of resources with, for example, consumption of bandwidth or memory resources on servers.

[0085] The method can thus comprise a step of storing the values ​​of behavior parameters of the batch processing and in particular the resource consumption during the execution of the scheduling of the batch processing.

[0086] There figure 6presents an embodiment according to the invention. According to this embodiment, the method conventionally comprises a step 400 of measuring business activity parameter values ​​on the production IT infrastructure and a step 510 of loading a previously generated batch processing behavior model. Following this, the method comprises a step 500 of defining a time profile for each of the batch processes based on the measured business activity parameter values ​​and the loaded behavior model. Following the step 520 of loading data from the resource repository 11 and the step 530 of loading data from the regulatory repository 12 and once the time profiles have been generated, the method may comprise a step 550 of searching in a scheduling plan catalog 61 for a scheduling plan generated from identical or similar time profiles.If this is the case (OK), the method determines 560 whether the scheduling plan registered in the catalog meets the requirements of the data loaded with execution rules and regulatory resources and if this is the case (OK), the existing scheduling plan is loaded 651 and transmitted 652 to a processing IT infrastructure for its execution 655.

[0087] If no plan is identified (NOK) or the identified plan does not meet the requirements of the data loaded with execution rules and regulatory resources, then the method comprises a step 600 of designing a scheduling plan optimizing the use of resources from the time profiles of the batch processing and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository.

[0088] The scheduling plan optimizing the use of resources thus designed is transmitted 652 to a processing IT infrastructure for its execution 655.

[0089] There figure 7 presents another embodiment according to the invention corresponding to the steps of the method taking place during the execution of batch processing. Thus, this embodiment begins with a step 650 of implementing the scheduling plan optimizing the use of resources.

[0090] Advantageously, the method according to the invention comprises a step 660 of measuring, for example by probes 40, the values ​​of behavior parameters of the batch processes. Preferably, this measurement is carried out in real time and is accompanied by rapid processing of the results. Indeed, the detailed analysis of the behavior parameters of the batch processes, for example of their resource use, in real time makes it possible to further optimize the execution of the batches. In this context, the method can comprise a recording of the values ​​of behavior parameters of the batch processes. As already mentioned previously, the measured behavior parameters can be very diverse and include, for example, the resource consumption values ​​of the batch process.

[0091] In particular, the measured value of behavioral parameters relates to one or more critical behavioral parameters. A critical behavioral parameter may be a critical resource, namely a resource playing an important role in the implementation of batch processing. For example, a critical resource may be a resource whose utilization rate reaches percentages greater than 80% during the implementation of batch processing or it may be a resource for which the IT infrastructure does not have redundancy.

[0092] Critical behavior parameters may vary depending on IT infrastructure and time. Thus, preferably, within the scope of the invention, a repository of critical behavior parameters is generated. This repository of critical behavior parameters makes it possible in particular to categorize the behavior parameters and associate them with a criticality level.Thus, the method may comprise a step of evaluating the severity of a deviation during which the behavior parameters whose values ​​exhibit a deviation are compared to the critical behavior parameters, for example listed in the critical behavior parameters reference system, so as to identify a high severity level when the behavior parameters whose deviation is identified are also critical behavior parameters or a low severity level when the behavior parameters exhibiting a deviation are not critical behavior parameters.

[0093] In addition to such monitoring, the method according to the invention may include, as presented in figure 7 , a step 700 of detecting a deviation in the execution of batch processing.

[0094] Preferably, the step of detecting a deviation in the execution of the batch processing operations comprises a measurement of a behavior parameter of a batch processing operation at a time t, and a comparison of the value of the measured behavior parameter with an expected value of the behavior parameter, the presence of a deviation being indicative of a deviation.

[0095] The expected value of the behavior parameter can, for example, be selected from the set of stored execution rules, the stored available resource values, or the defined time profiles.

[0096] Preferably, the behavioral parameters measured in the context of the detection of a deviation comprise parameters selected from: the duration of a phase of the batch processing, the end time of a phase of the batch processing, the size of a generated file, the consumption of resources during the batch processing, the volume of data to be processed (for example via monitoring of the file repositories to be processed or the volume of network communication measured upstream).

[0097] In particular, the measurement of a behavior parameter of a batch processing operation may concern the overall resource consumption on the machines comprising the IT infrastructure. Alternatively, the method comprises a step of evaluating the severity of a deviation during which the resources whose consumption is increasing are compared to the critical resources so as to identify a high severity level when the resources whose consumption is increasing are also critical resources. This then makes it possible to best judge the severity of the deviation. The list of critical resources may for example be recorded in a critical resource repository.

[0098] As we have seen, the method according to the invention is capable of taking into account the user's performance constraints in terms of execution targets and automatically scheduling batch processing with regard to the resources to achieve these targets. This is facilitated after having modeled, via time profiles, the expected behavior of a batch process based on previous executions.

[0099] However, as we will see, the method according to the invention can also be used to dynamically adapt the distribution of batch processing. Indeed, it may be desirable to generate a partial scheduling plan comprising only a part of the batch processing to be executed over the time period and then, depending on the behavior of the first batch processing executed, initiate a scheduling plan design step for the batch processing remaining to be scheduled.

[0100] As presented at the figure 7 , if during step 700 a deviation is detected (OK), then the method according to the invention can comprise a loading step 810 of a self-adaptation model then a generation step 820 of a refined scheduling plan.

[0101] This step 820 may for example comprise the design of a new refined scheduling plan for the scheduled batch processing operations remaining to be executed. This new design will advantageously be based on the measured values ​​of the behavior parameters of the batch processing operations having been executed during the implementation step 650 in association with the previously loaded self-adaptation model.

[0102] For example, the Figures 8A, 8B, 8C present schematic illustrations of a batch processing scheduling plan (A & B) each comprising several phases (A1, A2, A3, B1...). The dotted phases are estimates while the phases framed in solid lines are the results of the measurements carried out. Figure 8Apresents a scheduling plan optimizing the use of resources as proposed during step 600 of the method according to the invention. The Figure 8B presents the observed progress of the scheduling plan. Thus, by monitoring the behavior parameter values ​​during the execution of batch processing, it is possible to quickly identify a slowdown impacting phase A2 in particular and causing a shift and / or an extension of phases B3, A3, A4 and A5. Thus, it is possible to see that the end of phase B3 will exceed the limit 123 imposed in the execution rules recorded in the execution reference 12.

[0103] Thanks to a step 820 of generating a refined scheduling plan, the method according to the invention is capable of modifying the scheduling of already scheduled phases. In this case, phases A3, A4 and A5 are shifted in time so as to allow phase B3 to use all the resources of the processing IT infrastructure 4 and thus allows it to finish before the deadline 123.

[0104] Furthermore, the method according to the invention may comprise a modification of the behavior model, the self-adaptation model or the time profiles. However, preferably, the models are not modified during the execution of a batch processing because a direct modification of the models would require intensive modeling calculations at a time when it is important not to monopolize resources. Thus, preferably, the method according to the invention comprises, during the execution of the batch processing, a step of modifying the scheduling plan so as to generate a refined scheduling plan.

[0105] Furthermore, as presented in the figure 7, the method according to the invention may comprise a step 830 of analyzing the scheduling plan so as to determine whether it is complete. That is to say whether the scheduling plan currently being executed takes into account all the batch processes to be executed. Indeed, it is possible during step 600 to generate a partial scheduling plan so as to gain speed in execution and initiation of the batch processes. If all the batch processes have been taken into consideration and their execution is finished (OK), then the method comprises a step 690 of generating a report on the execution of the batch processes and a step 695 of generating an alert on the end of execution. Then, it comprises a step 900 of storing the measured values ​​of behavior parameters of the batch processes and updating the batch process behavior models and the self-adaptation models.

[0106] If this is not the case (NOK), then the method comprises a step 810 of loading a self-adaptation model. Then, it comprises a step 840 of loading the temporal profiles generated during step 500.

[0107] The method then comprises a step 850 of designing a subsequent scheduling plan, based on the self-adaptation model and from the time profiles of the batch processes and the measured values ​​of batch process behavior, preferably during the period directly preceding and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository. This scheduling plan concerns a new period. It can integrate all the batch processes remaining to be scheduled or only a part.

[0108] This step 850 can then comprise the design of a new scheduling plan for the batch processing operations remaining to be executed. This new design will advantageously be based on the measured values ​​of the behavior parameters of the batch processing operations having been executed during the implementation step 650.

[0109] Thus, the method allows dynamic modification via a self-adaptation mechanism of the scheduling plan either following a change in the behavior of the batch processing or because the initially generated scheduling plan only concerns part of the batch processing to be executed (partial scheduling plan).

[0110] Furthermore, the planning method according to the invention may further comprise beforehand: a step of memorizing, by the resource repository, a footprint of each batch processing for each machine impacted by the batch processing, and a step of memorizing, by the regulatory repository, rules for executing batch processing.

[0111] The planning method according to the invention may also include a step of modifying this information.

[0112] The method according to the invention may also include a step 150 of acquiring a fingerprint of each batch processing for each machine impacted by the batch processing. This step can be carried out by a resource repository 11 which will be presented later.

[0113] In this step, the idle footprint is measured for each batch process. This measurement is performed when no user action is taking place in order to best identify the resource consumption induced by each batch process and / or all available resources. Thus, the footprint is advantageously measured for each batch process, one by one.

[0114] An embodiment of this step is notably illustrated in Figure 9 In this embodiment, step 150 of acquiring a fingerprint of each batch processing for each machine impacted by the batch processing, comprises the following sub-steps: a step 151 of measuring the idle footprint of all the machines impacted by the batch processing, a step 152 of measuring the footprint of each batch processing on all the machines that the batch processing impacts by subtracting from the measured consumption those of the first measurement step, and a step 153 of recording in a resource repository 11 the footprint of each batch processing for each machine impacted by the batch processing.

[0115] The footprint of each processing is thus measured in a manner identical to the measurement of the idle footprint, and by executing the processings one by one, sequentially. Such resource consumption can be stored in at least one stored matrix table corresponding to each processing Ti applied to one or more resources of a machine MJ, the number of resources of which defines a dimension of the matrix table, the number of allocated time slots defining another dimension of the matrix table, and the percentages of use of the resource constituting the coefficient of an additional row or column. This information can, preferably, be transcribed in the form of a machine Mj matrix stored in a memory, each row of the machine matrix Mj representing a resource of the machine (CPU, RAM, etc.), each column of the matrix a time range and each value present in a box of the row of a resource representing the consumption of this resource for the time period defined for the column.

[0116] The method may also include a step of storing execution rules and expected consumption levels. This step consists in particular of recording execution rules applicable during the execution of the batch processing schedule. Thus, a user will have the possibility during this step of recording in a memory execution rules that the created schedule must respect. It can be carried out by a regulatory reference 12 which will be presented later.

[0117] The rules can, for example, relate to sequence orders to be respected (e.g., processing A must be executed before processing B), schedules to be respected (e.g., processing C must start before 11 p.m. or processing D must be completed before 2 a.m.), resource consumption thresholds to be respected (e.g., the consumption of resource 1.1.1 cannot exceed 80%), etc.

[0118] Such rules can be stored in at least one stored matrix table corresponding to each processing Ti. For example, in order to avoid the simultaneous execution, or overlap, of two batch processings, a row can be added to each processing matrix, said row no longer containing the consumption of a resource for the time slots but an identical value (for example 99) in the first column for the two or more processings concerned. This makes it possible to indicate to the plan construction module that, for example, the overlapping of processings T1 and T2 is prohibited.

[0119] According to this example, the execution plan construction module will deduce that the two processes cannot be executed simultaneously because they have a third identical row within their respective processing matrices. The same would apply if several matrices Ti,... Ti+n were constructed with the same additional row. Thus, it is possible, by choosing the values ​​entered in the rows of the matrices, to shift the execution of one process after another, to start it at a specific time slot, or to finish it before another time slot. All the matrices Ti thus constituted form the regulatory unit 30.

[0120] Thus the process can be based on as many matrices as there are Ti processes and Mj machines belonging to the IT infrastructure on which the processes will be executed according to the rules thus defined. By using the Ti process matrices and the Mj machine matrices on which the processes will be executed, the program will be able to construct an execution plan.

[0121] This step also advantageously includes a storage of the expected consumption levels. Such storage can also be carried out by means of matrix tables comprising for each machine Mj a predetermined maximum usage threshold defining the maximum consumption expected during the execution of batch processing for each of the resources of each machine making up the IT infrastructure.

[0122] The method according to the invention may use a probe 40 or a plurality of probes 40, in particular to measure the idle footprint of each machine. The probe(s) make it possible to collect data on the consumption of the resources of the IT infrastructure and more particularly of each machine comprising it. Several resources may be measured in parallel.

[0123] These measurements can be performed using a probe, for example a "Nigel's Monitor" (Nmon) or "Performance Monitor" (Perfmon) type probe. Nmon probes allow, for example, the display of CPU, memory, swap, network data, information on users, groups, storage media, kernel usage, or the most consuming processes. Perfmon probes allow the performance of an IT infrastructure to be measured. The information collected can, for example, correspond to percentages of resource usage, response times, processing times, but also the status of ports, the number of JDBC or JMS message queues, the file system occupancy rate, the operating rate of the garbage collector for J2EE (Java Enterprise Edition) applications.

[0124] These probes can be associated with each parameter (e.g. resource) to report measurement or metric information, representing for example the operating status of the resources and the associated consumption. For each parameter, the probe(s) define a parameter identifier and a parameter value. The parameter values ​​can be monitored continuously or at configurable intervals so as to obtain information for each parameter as a function of time. This information can be stored in a memory. In certain embodiments, the device comprises a human-machine interface making it possible to define the probes on each machine which report the metrics originating from the use of the machine's resources.

[0125] There figure 10schematically illustrates a non-limiting functional representation of an embodiment of a device 1 for self-adaptive planning of the scheduling of batch processing. The device may in particular comprise software for implementing the self-adaptive planning method according to the invention.

[0126] On the figure 10 a user terminal 2 is displayed via which a user can interact, via a communication network 3, with the device 1 for self-adaptive planning of the scheduling of batch processing according to the invention.

[0127] The user terminal 2 is a computer, a digital tablet, a mobile phone, or more generally any device allowing a user to send requests, via a communication network 3 (for example LAN, WLAN, or PAN, database log, email), to the self-adaptive planning device 1. In this regard, the user terminal 2 may be provided with a client application making it possible to send requests or instructions to the self-adaptive planning device 1 and to interpret the responses. This client application is, for example, a web browser (Firefox ®< , Fennec ®< , Opera ®< , Opera Mobile ®< , Internet Explorer ®< , Google Chrome ®< for example), or an ftp browser (such as FileZilla ®< ).

[0128] The production IT infrastructure 5 may comprise a plurality of machines. Each machine may comprise a microprocessor, storage means (such as a hard disk, whether local or remote), and a communication interface (for example, a network interface of the Ethernet, FiberChannel, InfiniBand, etc. type). The microprocessor, the storage means, and the communication interface are advantageously interconnected by a bus. When an action is assigned to a device, this is in fact carried out by a microprocessor of the device controlled by instruction codes recorded in a memory of the device. If an action is assigned to an application, this is in fact carried out by a microprocessor of the device in a memory in which the instruction codes corresponding to the application are recorded. When a device sends or receives a message, this message is sent or received by a communication interface of the device.

[0129] The processing IT infrastructure 4 may also comprise a plurality of machines and may advantageously correspond to the production IT infrastructure 5.

[0130] As already mentioned, the device according to the invention makes it possible to automatically adapt the scheduling of batch processing according to the business activity that produced the data to be processed. Thus, more particularly, the invention relates to a self-adaptive planning device for scheduling batch processing of data generated by business applications on a production IT infrastructure 5.

[0131] The device 1 according to the invention comprises an impact calculation module 50, capable of defining a time profile for each of the batch processing operations as a function of the measured use of the resources of the production IT infrastructure 5 by the business applications and a behavior model of each batch during its processing.

[0132] The device 1 according to the invention comprises a scheduling plan design module 60, capable of designing an optimized scheduling plan from the time profiles of each of the batch processing operations and in compliance with the execution rules stored in the regulatory repository and the resource data stored in the resource repository.

[0133] The device 1 according to the invention also comprises a resource repository 11 capable of storing the resources available for batch processing, for example for each machine impacted by the batch processing. According to another feature of the invention, the resource repository 11 comprises a hardware and software arrangement allowing the measurement, by probes, of the idle footprint of all the machines impacted by the batch processing(s) and a hardware and software arrangement allowing the measurement, by probes, of the footprint of each batch processing on each machine in terms of measured resource consumption. The measurement of the resource consumption of each batch processing can for example be carried out by subtracting the idle footprints over the same period from the measured consumption.The resource repository 11 may also be able to calculate the total footprint across all machines and for each batch process, then store this total footprint in a memory.

[0134] The device 1 according to the invention also comprises a regulatory reference 12 capable of storing rules for executing batch processing.

[0135] The device 1 according to the invention also comprises a module 60 for designing execution plans, capable of constructing an optimized scheduling plan from the time profiles and information from the resource repository 11 and the regulatory repository 12.

[0136] The device 1 according to the invention also comprises a catalog 61 of optimized execution plans, capable of storing a plurality of execution plans, said execution plans comprising optimized scheduling information for a given period of time. The device 1 according to the invention also comprises a module 62 for selecting the optimized execution plan to be executed.

[0137] The device 1 according to the invention may further comprise a human-machine interface module 70 (HMI), capable of intervening for example in: The definition of usage percentages of each resource of a machine for each batch processing and their recording in memory in the resource repository 11; The definition of execution rules applicable for each batch processing Ti and their recording in the regulatory repository 12. The rules may, for example, correspond to time restrictions on processing, maximum acceptable limits of resource consumption, inter-process scheduling rules; The definition and recording of metrics monitored by probes 40 on each machine as well as the acceptability thresholds associated with each probe.

[0138] The device 1 according to the invention may further comprise a communication module 75 capable in particular of transmitting the ordering to the infrastructure 4 and of receiving data.

[0139] The device 1 according to the invention may further comprise a verification module capable, once an execution plan has been executed, of verifying that all the rules are respected for all the machines involved in the batch processing and that the resource consumption is at the expected level for each resource. This module may also be capable of detecting a deviation of at least one batch processing.

[0140] These different units or modules are distinct on the figure 7 but the invention can provide various types of arrangement such as for example a single module combining all the functions described here. Similarly, these means can be divided into several electronic cards or else gathered on a single electronic card.

[0141] So, referring again to the figure 6, the device 1, independent or installed within an IT infrastructure 4, is configured to dynamically manage the scheduling of batch processing for a given IT infrastructure. A device and a method according to the invention make it possible to implement more efficient and more suitable scheduling than those that can be achieved up to now.

[0142] Indeed, the self-adaptive planning method according to the invention is simple to implement. It makes it possible to take into account the seasonality of business activities while reducing the risk of malfunction that could result from its implementation on IT structures in production.

[0143] All these advantages therefore contribute to improving the performance of batch processing management and reducing the risks and costs of managing a company's IT infrastructure.

Claims

1. Method of self-adaptive planning for the scheduling of batch processing, said batch processes being configured to process data generated during business activities on a production computing infrastructure (5), said method being implemented by a device (1) which is associated with a resource repository (11) which is capable of storing the resources available for the batch processes on a processing computing infrastructure (4) and with a regulatory repository (12) which is capable of storing rules for executing batch processes, said method comprising: - a step (400) of measuring, by means of probes (40), business activity parameters on the production computing infrastructure (5), - a step (500) of defining, by an impact calculation module (50), a time profile for each of the batch processes according to the measured business activity parameter values and a batch processing behavior model, and - a step (600) of designing, by means of a scheduling plan design module (60), a scheduling plan optimizing the resources on the basis of time profiles of the batch processes and in compliance with execution rules which are stored in the regulatory repository (12) and resource data which are stored in the resource repository (11), - a step (650) of implementing the optimized scheduling plan, - a step (660) of measuring batch processing behavior parameters, - a step (700) of detecting a deviation in the execution of the batch processes, and - if a deviation is detected for one or more batch processes, said method further comprises a step (800) of generating a refined scheduling plan from a self-adaptive model and measured values of behavior parameters of the implemented batch processes.

2. Planning method according to claim 1, characterized in that the definition step (500) further comprises taking into account maximum resource usage thresholds which are stored in the resource repository (11).

3. Planning method according to one of claims 1 or 2, characterized in that the step (600) of designing the scheduling plan comprises a modeling of the use of each resource during a processing period in order to be able to determine the amount of resources available for the other processes during the period.

4. Planning method according to any one of claims 1 to 3, characterized in that it comprises a preliminary step (200) of defining a model of batch processing behavior, comprising the sub-steps of: - loading (220) of business activity parameter values, preferably measured on the production computing infrastructure (5) when generating the data to be processed, - loading (240) of batch processing behavior parameter values, preferably measured on the processing computing infrastructure (4) when processing data generated by business applications, and - generating (250), by means of a modeling module (20), a behavior model of the batch processes from business activity parameter values and behavior parameter values.

5. Planning method according to any one of claims 1 to 4, characterized in that it comprises a preliminary step (300) of defining a self-adaptation model, comprising the sub-steps of: - loading (320) of behavior parameter values from a first batch process when processing data generated by business applications, - loading (340) of behavior parameter values from at least one other batch process when processing data generated by business applications, - generating (350), by means of a modeling module (20), a self-adaptation model from the loaded behavior parameter values.

6. Planning method according to any one of claims 1 to 5, characterized in that it comprises a step of registering resource-optimizing scheduling plans in a scheduling plan catalog (61) and a step (550) of selecting a suitable scheduling plan.

7. Planning method according to one of claims 1 to 6, characterized in that the deviation detection step (700) comprises measuring a behavior parameter of a batch process at a time t, and comparing the measured behavior parameter value with an expected behavior parameter value, the presence of a difference being indicative of a deviation.

8. Planning method according to one of claims 1 to 7, characterized in that the generation step (800) further comprises the generation of a refined time profile.

9. Planning method according to one of claims 1 to 8, characterized in that the generation step (800) further comprises the generation of a refined behavior model and / or the modification of the self-adaptive model.

10. Planning method according to any one of claims 1 to 9, characterized in that the optimized scheduling plan design (600, 850) relates only to a portion of the batch processes to be executed over a period of time to process the data generated during business activities.

11. Planning method according to claim 10, characterized in that it comprises a step (850) of designing a subsequent scheduling plan, for a new period, according to a self-adaptation model and on the basis of time profiles of the batch processes, measured values of batch processing behavior during a previous period and in compliance with execution rules which are stored in the regulatory repository and resource data which are stored in the resource repository.

12. Planning method according to any one of claims 1 to 11, characterized in that it further comprises a step (900) of storing the measured behavior parameter values of the batch processes and updating batch processing behavior models and self-adaptation models.

13. Device (1) for self-adaptive planning of the scheduling of batch processing of data generated by business activities on a production computing infrastructure (5), said device being associated with a resource repository (11) capable of storing data on resources available for the batch processes, with a regulatory repository (12) capable of storing rules for executing the batch processes, and with probes (40) which are configured to measure a parameter value of business activities on the production computing infrastructure (5) by the business applications, said device comprising an impact calculation module (50) which is capable of defining a time profile for each of the batch processes according to the measured business activity parameter values and a batch processing behavior model, and a scheduling plan design module (60) which is capable of designing a scheduling plan optimizing resource usage on the basis of the time profiles of each of the batch processes and in compliance with the execution rules stored in the regulatory repository (12) and the resource data stored in the resource repository (11), the device (1) being further configured to implement the optimized scheduling plan, to measure behavior parameters of the batch processes, to detect a deviation in the execution of the batch processes and to generate a refined scheduling plan from a self-adaptation model and the measured values of behavior parameters of the implemented batch processes, in the event of a deviation being detected for one or more batch processes.