Turbine blade

The perforated and curved intermediate wall in the turbine blade design addresses thermomechanical stress-induced fatigue by providing elasticity and improved heat transfer, enhancing the service life and cooling efficiency of the blade.

EP2828484B2Active Publication Date: 2024-10-09ANSALDO ENERGIA IP UK LTD
View PDF 22 Cites 0 Cited by

Patent Information

Application Number
EP2013714573
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2012-03-22
Filing Date
2013-03-21
Publication Date
2024-10-09
Estimated Expiration
2033-03-21

AI Technical Summary

Technical Problem

Turbine blades in gas turbines experience fatigue and crack formation due to thermomechanical stresses caused by high temperature differences between the hot gas-exposed leading edge and the cooling air-exposed inner walls, leading to reduced service life.

Method used

The turbine blade design incorporates a perforated intermediate wall with a curved or 'V' or 'U' shaped cross-section, allowing for elasticity and flexibility to accommodate thermal expansion and shrinkage, reducing mechanical stresses and improving heat transfer.

Benefits of technology

The design effectively reduces fatigue-related crack formation by allowing the intermediate wall to yield to thermal changes, maintaining the known cooling measures' effectiveness while enhancing the blade's durability and heat transfer capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
  • Figure IMGF0002
    Figure IMGF0002
  • Figure IMGF0003
    Figure IMGF0003
Patent Text Reader

Abstract

A turbine vane for a rotary turbomachine is described having a turbine blade (4) which is delimited by a concave pressure-side wall (6) and a convex suction-side wall (7) which are connected in the region of a vane front edge (5) which can be assigned to the turbine blade (4) and enclose a cavity (9) which extends in the longitudinal extent of the vane front edge (5) and is delimited on the inner wall by the pressure-side wall (6) and the suction-side wall (7) in the region of the vane front edge (5) and by an intermediate wall (8) which extends in the longitudinal direction to the vane front edge (5) and connects the suction-side wall (7) and the pressure-side wall (6) on the inner wall. The disclosed vane is distinguished by the fact that the intermediate wall (8) has a perforation (16) at least in sections in the connecting region to the suction-side wall (7) and / or pressure-side wall (6), in order to increase the elasticity of the intermediate wall (8).
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The disclosure relates to a turbine blade for a turborotational machine with a blade bounded by a concave pressure side wall and a convex suction side wall enclosing a cavity bounded by the pressure and suction side walls and by an intermediate wall extending longitudinally and connecting the suction and pressure side walls in a wall-like manner. State of the art

[0002] Turbine blades of the aforementioned type are heat-resistant components that are used particularly within turbine stages of gas turbine arrangements and are exposed to the hot gases exiting directly from the combustion chamber in the form of guide or rotor blades.

[0003] The heat resistance of such turbine blades stems on the one hand from the use of heat-resistant materials and on the other hand from highly efficient cooling of the turbine blades, which are directly exposed to the hot gases. For the purpose of continuous flow and supply with a coolant, preferably cooling air, these blades have corresponding cavities that are connected to a coolant feed system of the gas turbine assembly, which provides cooling air to all heat-exposed gas turbine components during gas turbine operation, in particular the turbine blades.

[0004] Conventional turbine blades have a blade root to which the blade itself is attached radially, either directly or indirectly. The blade has a concave pressure sidewall and a convex suction sidewall, which are joined integrally at the blade's leading edge. A gap exists between these surfaces, which is supplied with cooling air from the blade root. The term "radially" refers to the turbine blade's orientation in its assembled state within the gas turbine assembly, which is radial to the rotor unit's axis of rotation.To optimize cooling of the turbine blade by supplying and distributing cooling air within the space enclosed between the suction and pressure side walls, the space is provided with radially extending partitions. These partitions separate radially oriented cavities within the blade, some of which have fluidic connections. At suitable locations along the cavities, openings are provided in the suction or pressure side wall, in the region of the turbine blade leading and / or trailing edge, or at the turbine blade tip, allowing the cooling air to escape to the outside into the hot gas channel of the turbine stage.

[0005] A gas turbine blade optimized for cooling purposes is described in EP 1 319 803 A2. This design incorporates numerous radially oriented cooling channel cavities within the turbine blade. These cavities are fluidically interconnected in a meandering pattern, and the flow of cooling air through them varies depending on the heat-stressed areas of the blade. The primary objective is to cool the leading edge of the blade, which experiences the greatest flow and heat exposure from the hot gases, with maximum efficiency. To achieve this, an inner cavity extends lengthwise along the leading edge of the blade. This cavity is bounded by the suction and pressure sidewalls, which converge at the leading edge, and by an intermediate wall that connects the suction and pressure sides internally. Cooling air is supplied to this cavity from the blade root. Typically, the cooling air flowing through the cavity exits the blade near the tip.In addition, structures that swirl the cooling air flow are provided along the wall areas enclosing the cavity to improve heat transfer between the blade wall and the cooling air flow.

[0006] Another preferred cooling method for the leading edge region of a turbine blade is described in US 5,688,104. A cavity runs along the leading edge of the blade, bounded on one side by the suction and pressure sidewalls, which meet at the leading edge, and on the other by an intermediate wall that rigidly connects the suction and pressure sidewalls within the blade. The cavity running along the leading edge of the blade is supplied with cooling air, which enters the cavity exclusively through cooling channel openings provided within the intermediate wall. The straight intermediate wall is provided with a plurality of individual passages along its radial length, through which cooling air from an adjacent radially extending cooling channel along the blade enters the cavity in the form of impingement cooling towards the leading edge of the blade.To discharge the cooling air introduced into the cavity, film cooling openings are provided along the leading edge of the blade towards the suction and pressure side outer walls, through which the cooling air introduced within the cavity is discharged onto the pressure and suction side outer walls, forming a film cooling effect.

[0007] To improve the cooling effect, especially of the leading edge of a turbine blade, it is advisable to increase the supply of cooling air and to optimize the cooling mechanisms of the impact cooling using known cooling techniques.

[0008] Turbine blades that incorporate the cooling measures described above for optimized heat resistance, particularly in the leading edge area, frequently exhibit fatigue phenomena along the pressure and suction sidewalls in the leading edge region, which ultimately manifest as cracking. The cause of such cracking lies in the occurrence of thermomechanical stresses within the suction and pressure sidewalls in the leading edge region. These stresses arise from significant temperature differences between the hot gas-exposed leading edge and the cooling air-exposed inner wall areas of the blade.Particularly in the case of transient operating conditions of the gas turbine assembly, such as those occurring during start-up or load changes in the turbine stage, temperature differences of approximately 1000°C can occur between the hot gas-exposed blade leading edge and the intermediate and inner wall sections exposed to cooling air. It is obvious that such large temperature differences result in considerable thermomechanical stresses within the suction and discharge walls along the blade leading edge, leading to significant material stresses, as mentioned above.

[0009] From EP 0 447 320 A1 a blade with suction and pressure sidewalls is known, in which an intermediate wall is inserted which connects the suction and pressure sidewalls in a wall-like manner and which has holes for impact cooling of the sidewall.

[0010] From EP 2107215 A1, US 3191908 and JP 2002 242607 A, blades are known with an intermediate wall connecting the suction and pressure sidewalls within the wall, which has holes for impact cooling of the sidewall.

[0011] EP 0 806 546 A1 discloses a turbine blade with a ceramic leading-edge insert that is mounted on the leading edge of the blade profile and is air-cooled.

[0012] From EP 2258 925 A2 and US 5246340, blades are known with an intermediate wall connecting the suction and pressure side walls, which has holes for introducing a flow of a cooling medium into the front cooling channel. Presentation of the Revelation

[0013] The disclosure is based on the objective of further developing a turbine blade according to claim 1 for a turborotational machine with a blade that is bounded by a concave pressure side wall and a convex suction side wall, which are connected in the region of a blade leading edge attributable to the blade and enclose a cavity extending longitudinally along the blade leading edge, which is bounded internally by the pressure and suction side walls in the region of the blade leading edge and by an intermediate wall extending longitudinally to the blade leading edge and connecting the suction and pressure side walls internally, in such a way as to reduce or completely avoid fatigue phenomena in the region of the blade leading edge caused by temperature differences in order to improve the service life of turbine blades exposed to high temperatures.The measures required for this should, if possible, not impair existing cooling methods, but rather improve and support them. Furthermore, these measures should not require either costly or manufacturing-related complexities.

[0014] A turbine blade according to the solution for a turborotational machine has a blade bounded by a concave pressure side wall and a convex suction side wall. These walls are connected in the region of a leading edge associated with the blade and enclose a cavity extending longitudinally along the leading edge. This cavity is bounded internally by the pressure and suction side walls in the region of the leading edge and by an intermediate wall extending longitudinally to the leading edge, which connects the suction and pressure side walls internally. This intermediate wall and the suction and / or pressure side walls form a single, continuous part. This is typically manufactured as a casting. The disclosed turbine blade is characterized in that the intermediate wall has perforations, at least in sections, in the area connecting to the suction and / or pressure side walls to increase elasticity.Perforation refers to a multitude of holes, typically arranged along a line. This line is usually straight, at least in sections. For example, three or more holes may be arranged along a straight line. This perforation primarily increases the elasticity of the intermediate wall. Due to the elastic connection area, the intermediate wall exerts less stiffening on the entire blade, thus reducing stress between the pressure and suction sidewalls. The connection area of ​​the intermediate wall to the suction and / or pressure sidewall is defined here as the area of ​​the intermediate wall adjacent to the suction and / or pressure sidewall. This connection area can extend up to one-quarter of the distance between the suction and pressure sidewalls. Typically, the connection area extends over a distance that is less than the thickness of the intermediate wall or less than one to two times the thickness of the intermediate wall.In one embodiment, the connection area is limited to a curve or groove at the transition from the partition wall to the suction and / or pressure side wall. In another embodiment, the connection area is limited to an area extending from the side wall that corresponds to twice the radius of the curve or groove at the transition from the partition wall to the suction and / or pressure side wall.

[0015] The revelation is based on the understanding that fatigue cracking in the leading edge region of turbine blades exposed to hot gases is primarily due to the fact that the thermally induced expansion and contraction of the pressure and suction sidewall areas in the leading edge region is mechanically counteracted by the rigid intermediate wall, which is constantly surrounded by cooling air and is located directly behind the leading edge within the blade and firmly connects the suction and pressure sidewalls. This results in increased internal mechanical stress in the highly heated, heat-exposed suction and pressure sidewall areas, which in turn leads to high material stress and ultimately to fatigue phenomena that reduce service life.To counteract the mechanical stress that causes fatigue and acts on the pressure and suction sidewall areas along the blade leading edge, the intermediate wall immediately downstream of the blade leading edge, which together with the inner walls of the pressure and suction sidewalls defines the cavity running along the blade leading edge, is modified according to the solution. This modification imparts elasticity to the intermediate wall and its connection area, thereby at least partially accommodating the thermally induced expansion and contraction of the suction and pressure sidewall areas along the blade leading edge. To achieve this, the intermediate wall, unlike the conventionally rigid wall connection between the intermediate wall and the suction and pressure sidewalls, features perforations at least at one connection area to the sidewall, enabling the elasticity described above.In one embodiment, the perforation comprises a series of cylindrical holes. In another embodiment, the perforation comprises a series of elongated holes or slots, the longer side of which extends parallel to the respective adjacent suction or pressure sidewall.

[0016] The connection of the intermediate wall to the side wall creates relatively thick material accumulations whose surface area to volume ratio is much smaller than in a free wall section. Furthermore, the connection on the inside obstructs the airflow between the walls, causing the temperature of the blade material in the connection area to change more slowly during transient changes in hot gas or cooling air temperatures than the material temperature in a free wall section. This leads to additional thermal stresses, which are reduced by perforation.

[0017] Typically, the connection area between the intermediate wall and the suction and / or pressure side wall is even formed with a rounded edge or groove. This groove is a manufacturing characteristic of cast blades. On the one hand, it reduces stress concentration at the wall connection; on the other hand, the groove further increases material accumulation in the connection area between the intermediate wall and the suction and / or pressure side wall. The perforation in the connection area improves heat transfer on the inside of the walls, thus allowing for better adaptation to transient temperature changes. To further counteract the effect of material accumulation and improve heat transfer in the connection area, one embodiment extends the perforation at least partially through the groove.

[0018] The partition wall has at least one curved section extending from the suction to the pressure side wall, or vice versa. This curvature increases elasticity, resulting in a flexible partition wall, particularly in combination with the perforated connection area.

[0019] In a preferred embodiment, the intermediate wall directly adjacent to the leading edge of the blade, which connects the suction and pressure side walls, has a V- or U-shaped cross-section that preferably extends over the entire radial length of the intermediate wall. Such a curvature of the intermediate wall, extending from the suction to the pressure side wall and vice versa, and allowing curvature-induced wall elasticity in this spatial direction, enables the curved intermediate wall to accommodate the tendency of the suction and pressure side walls to move further apart from each other in the case of thermally induced expansion of the suction and pressure side walls in the leading edge region by elastically stretching them.In the reverse case of thermally induced material shrinkage, which leads to a reduction in the mutual distance between the pressure and suction side walls in the blade leading edge area, the curved intermediate wall is able to follow the decreasing wall distance by increasing the wall curvature.

[0020] According to a further embodiment, the turbine blade has at least partial perforations at the base of the "v-" or "u-shaped" cross-section of the intermediate wall, which run parallel to the perforations of the connection area in order to increase elasticity. Overall, this results in a hinge-like structure for the intermediate wall between the two legs of the "v-" or "u-shaped" cross-section, which allows rotational movement of the legs around the perforations and thus compensates for changes in the distance between the pressure and suction side walls.

[0021] Due to the flexibility of the intermediate wall explained above, the mutual distance between the pressure and suction side walls in the blade leading edge area can adjust itself depending on the temperature level without harmful mechanical stresses occurring within the pressure and suction side walls, especially in the connection area to the inner intermediate wall.

[0022] It is of course conceivable to design the partition wall in question with curved wall contours that deviate from the "V" or "U" wall cross-sectional shape. However, all such wall sections designed according to the proposed solution have in common that they possess curvature-induced wall elasticity and are flexibly connected to the exterior walls by means of perforation.

[0023] To further improve wall elasticity, a preferred embodiment provides for the intermediate wall to be designed, at least in certain areas, with the same or preferably a smaller thickness compared to the wall thicknesses of the suction and pressure sidewalls in the blade leading edge region. It is not necessary for the intermediate wall to have a constant thickness along its entire cross-section. In this way, the intermediate wall thickness, the elasticity of the perforated connection area, and the curvature behavior of the intermediate wall can be optimally coordinated to achieve particularly suitable wall elasticity. If particularly high wall elasticities are required, highly curved and / or suitably thin wall sections along the intermediate wall are particularly suitable.

[0024] Furthermore, the proposed solution of an intermediate wall with a perforated connection area is not necessarily limited to the intermediate wall directly adjacent to the blade leading edge. It is, of course, also possible to design other intermediate walls within the blade profile with perforations or with curved perforations in accordance with the proposed solution, in order to accommodate thermally induced shrinkage or expansion effects affecting the pressure and suction sidewalls without stress. It has proven particularly advantageous that the "V"- or "U"-shaped wall curvature of the intermediate wall directly adjacent to the blade leading edge is designed and arranged such that the convex side of the "V"- or "U"-shaped wall section faces the area of ​​the blade leading edge.

[0025] Furthermore, it is advantageous to design the curvature contour of the intermediate wall, extending from the suction to the pressure sidewall or vice versa, such that the convex wall side of the intermediate wall facing the blade leading edge is largely parallel to the suction and pressure sidewalls bounding the cavity and connected at the blade leading edge. Such a design is particularly advantageous when implementing so-called impingement cooling, as will be shown in the following explanations with reference to a corresponding embodiment. Here, it is possible to direct impingement cooling airflows through passage channels incorporated within the intermediate wall onto specific inner wall areas in the blade leading edge region. In this way, temperature-induced material stresses can be effectively countered by optimized cooling of the blade leading edge region.

[0026] To achieve sufficient flexibility, one embodiment considers a row of holes as perforation in which, in the perforation direction, the proportion of hole lengths is at least 30% of the total length of the perforated area. For high flexibility, another embodiment specifies that the proportion of hole lengths is at least 50% of the total length of the perforated area. This is achieved, for example, by a series of cylindrical bores spaced twice their diameter apart. Particularly in designs with elongated holes or slots, the proportion of hole lengths can exceed 70% of the total length of the perforated area.

[0027] The connection area of ​​the partition wall to the pressure or suction side wall comprises, for example, up to 20% of the wall distance between the two side walls. Typically, the connection area extends one or two wall thicknesses of the partition wall in the direction of the connection. Short description of the characters

[0028] Preferred embodiments of the disclosure are described below with reference to the drawings, which serve only for illustration and are not to be interpreted restrictively. The drawings show: Fig. 1 Illustration of the schematic arrangement of turbine guide vanes and turbine rotor blades within a turbine stage, Fig. 2 Representative profile through a turbine blade and Fig. 3a, b, alternative variants for forming a perforation in an intermediate wall in the area of ​​the blade leading edge, Fig. 4a - alternative variants for forming an intermediate wall in the area of ​​the blade leading edge. Detailed description

[0029] In Fig. 1 The schematic representation shows a guide vane 2 and a rotor blade 3 as they are arranged along a guide vane and rotor blade row in a turbine stage 1 (not illustrated further). It is assumed that the guide vane 2 and the rotor blade 3 come into contact with a hot gas flow H, which, in the representation, flows from left to right over the respective blades 4 of the guide vane 2 and the rotor blade 3. The blades 4 of the guide vanes 2 and 3 project into the hot gas channel of turbine stage 1 of a gas turbine assembly, which is bounded by radially inner shrouds 2i, 3i and by the radially outer shrouds 2a of the guide vanes 2 and radially outer heat storage segments 3a. The rotor blade 3 is mounted on a rotor unit R (not shown) which is rotatably mounted about an axis of rotation A.

[0030] In Fig. 2 is a cross-sectional representation through a guide or running vane that extends along a Fig. 1 The removable section plane AA is obtained. The typical blade profile of a turbine guide vane or turbine rotor blade is characterized by an aerodynamically profiled blade 4, which is bounded on both sides by a convex suction sidewall 7 and a concave pressure sidewall 6. The convex suction sidewall 7 and the concave pressure sidewall 6 merge seamlessly in the area of ​​the blade leading edge 5, which, as already explained, is directly exposed to the hot gas flow passing through the turbine stage of a gas turbine assembly. It is obvious that the turbine blade area along the blade leading edge 5 experiences a particularly high thermal load.

[0031] To cool the turbine blade exposed to the hot gases, four radially oriented cavities 9, 10, 11, etc. are provided within the blade, which are purged with cooling air. The individual cavities 9, 10, 11, etc. are separated from each other by partitions 8, 12, 13, etc. Depending on the design and shape of the turbine blade, the individual cooling channels 9, 10, 11, etc. communicate with each other.

[0032] To solve the problem of fatigue-induced cracking in the suction and pressure sidewalls 6, 7 near the leading edge of the blade 5, as described above, the foremost intermediate wall 8 in the connection area to the suction 7 and / or pressure sidewall 6 is provided with a perforation 16, at least in sections. Exemplary embodiments of perforations 16 are described in the Fig. 3a, b and c shown.

[0033] A first embodiment is described in the Fig. 3aAs shown, a perforation 16 is provided in the connection area of ​​the partition wall 8 to the suction and pressure side walls 6, 7. The perforations in the example shown are a series of cylindrical holes 18 arranged parallel to the suction and pressure side walls 6, 7. In this example, the perforation 16 on the pressure side wall 6 extends only over a section of the partition wall 8.

[0034] A second embodiment is described in the Fig. 3b As shown, a perforation 16 is provided in the connection area of ​​the intermediate wall 8 to the suction and pressure side walls 6, 7. The perforations in this example are a series of elongated holes 19, which are arranged parallel to the suction and pressure side walls 6, 7 and whose longer side extends parallel to the adjacent suction 7 or pressure side wall 6, respectively.

[0035] In the third embodiment of the Fig. 3c In addition to the perforations, 16 of the Fig. 3bIn the example shown, a central perforation 20 is also provided, which runs parallel to the suction and pressure side walls 6, 7 in the middle of the partition wall 8. Together with the perforations 16 in the connection area to the suction and pressure side walls 6, 7, a two-part partition wall 8 is thus formed, which can be flexibly folded together.

[0036] To better illustrate the partition wall construction, refer to the in Fig. 4a Reference is made to an illustrated, detailed embodiment showing the blade profile in the blade leading edge area. Fig. 4a Figure 1 shows a perforation 16 in the connection area of ​​the suction side wall 7 and in the connection area of ​​the pressure side wall 6. The main direction of the material expansion or contraction tendency 21 of the side walls 6, 7 runs in this example essentially parallel to the extension of the intermediate wall 8.

[0037] Unlike a linear education, as is the case in Fig. 1 ,2 , 3 and 4a This is the case with the partition walls 8, 12, 13, in Fig. 4b An embodiment with a curved partition wall 8 is shown. The partition wall 8 has a U-shaped wall cross-section, which is integrally connected on both sides to the suction side wall 6 and the pressure side wall 7. The U-shaped wall design of the partition wall 8 gives the blade profile area additional elastic deformability, such that the thermally induced material expansion and contraction of the suction and pressure side walls can be accommodated by making the wall distance w variable within certain limits, which are determined by the shape and curvature elasticity of the partition wall 8 as well as the elasticity of the perforation 16.

[0038] In Fig. 4cAn exemplary embodiment with an additional central perforation 20 is shown in detail. This divides the intermediate wall 8 into two legs which, starting from the connection area to the side walls 6, 7, converge at an angle, whereby the angle can be flexibly changed by the central perforation 20 and thus expansion-related changes in the distance between the pressure and suction side walls can be easily compensated.

[0039] Furthermore, in Fig. 4cAn example of a possible film cooling arrangement is shown. Cooling air from the cavity 9 passes through the film cooling holes 14 to the outside and forms a cooling air film on the surface of the suction 6 and pressure side walls 7. The U-shaped intermediate wall 8, which is integrally connected on both sides to the inner wall of both the suction 7 and pressure side walls 6, preferably has a convex wall profile facing the leading edge 5 of the blade and is largely parallel to the suction 7 and pressure side walls 6, which are integrally connected at the leading edge 5 of the blade and define the cavity 9. In this example, the cooling air enters the front cavity 9 at least partially through the perforations 16 and the central perforation 20.

[0040] Another embodiment with details on cooling is shown in Fig. 4dThe intermediate wall is shown in the figure. Here, the intermediate wall has perforations 16 at the connection points to the suction side wall 7 and the pressure side wall 6. In addition to the perforations, it also has cooling air passage channels 15a, b, c, which serve for impingement air cooling of the inner wall side of the blade wall leading edge. The passage channels 15a, b, c can be advantageously subdivided into at least three groups with respect to their longitudinal extent and the resulting flow direction. A first group of passage channels 15a is characterized by a flow direction directed towards the suction side wall 7, a second group of passage channels 15b is characterized by a flow direction directed towards the blade leading edge, and a third group of passage channels 15c is characterized by a flow direction directed towards the pressure side wall 6.The passage channels 15a, 15b, and 15c are distributed along the entire radial extent of the partition wall 8, thus ensuring effective and individual cooling of the leading edge area of ​​the turbine blade. Of course, additional passage channels can be installed on the partition wall 8 for optimized impact cooling.

[0041] Furthermore, impact air cooling can be combined with central perforation. Typically, impact air cooling air holes have a larger diameter, e.g., twice the diameter of perforation holes. Reference symbol list

[0042] 1 Turbine stage 2 Guide vane 2i Inner guide vane cover 2a Outer guide vane cover 3 Rotor blade 3i Inner rotor blade cover 3a Heat storage segment 4 Blade blade 5 Blade leading edge 6 Concave pressure sidewall 7 Convex suction sidewall 8 Partition 9 Cavity 10, 11 Cavities 12, 13 Partitions 14 Film cooling holes 15 Passage channels 16 Perforation 17 Fillet 18 Hole 19 Oblong hole 20 Center perforation 21 Main direction of material expansion or contraction R Rotor unit A Axis of rotation E Degree of elasticity W Wall spacing

Claims

1. Turbine vane for a rotary turbomachine, the turbine vane comprising a turbine blade (4) which is delimited by a concave pressure-side wall (6) and a convex suction-side wall (7) which are connected in the region of a vane leading edge (5) assigned to the turbine blade (4), and enclose a cavity (9) which extends in the longitudinal extent of the vane leading edge (5) and is delimited on the inner wall by the pressure-side wall (6) and the suction-side wall (7) in the region of the vane leading edge (5) and by an intermediate wall (8) which extends in the longitudinal direction to the vane leading edge (5) and connects the suction-side wall (7) and the pressure-side wall (6) on their inner walls, wherein the turbine vane has a rounding or hollow groove (17) at the transition from the intermediate wall (8) to the suction-side wall (7) and / or pressure-side wall (6), characterised in that the intermediate wall (8) has a perforation (16) at least in portions in a connecting region to the suction-side wall (7) and / or pressure-side wall (6) in order to increase the elasticity of the intermediate wall in the connecting region, wherein the connecting region is restricted to a region from the suction-side wall (7) and / or pressure-side wall (6) which corresponds to twice the radius of the rounding or hollow groove (17); wherein in its extent from the suction-side wall (7) to the pressure-side wall (6) or vice versa, the intermediate wall (8) has at least one curved wall portion deviating from a rectilinear wall contour, and the at least one curved wall portion is configured such that the wall portion has a curve-induced elasticity in the direction of the extent of the intermediate wall (8) from the suction-side wall (7) to the pressure-side wall (6) or vice versa; in that passage channels (15) are provided in the intermediate wall (8) for impingement cooling of the suction-side wall (7) and pressure-side wall (6) connected to the vane leading edge (5).

2. Turbine vane according to claim 1, characterised in that the perforation (16) comprises a row of cylindrical holes (18).

3. Turbine vane according to claim 1, characterised in that the perforation comprises a row of slots (19) or slits, the longer side of which extends parallel to the adjacent suction-side wall (7) and / or pressure-side wall (6).

4. Turbine vane according to any of claims 1 to 3, characterised in that the connecting region from the intermediate wall (8) to the suction-side wall (7) and / or pressure-side wall (6) comprises a hollow groove (17), and the perforation (16) runs at least partially through the hollow groove (17).

5. Turbine vane according to any of claims 1 to 4, characterised in that the intermediate wall (8) has a wall side facing away from the cavity (9) which, together with the suction-side wall (7) and pressure-side wall (6), delimits at least one further cavity (10), and that the cavities (9, 10) are cooling channels into which a coolant can be conducted.

6. Turbine vane according to claim 5, characterised in that openings of the perforation (16) are formed parallel to the surface of the suction-side wall (7) or pressure-side wall (6) in the connecting region of the intermediate wall (8), and during operation cooling air flows through these openings from the one cavity (10) into the further cavity (9), and an output jet of the respective opening runs tangentially to the inner wall of the respective suction-side wall (7) or pressure-side wall (6).

7. Turbine vane according to any one of claims 1 to 6, characterised in that the at least one curved wall portion is configured with a V or U shape in a cross-section intersecting the vane leading edge (5).

8. Turbine vane according to claim 7, characterised in that at the base of the V- or U-shaped cross-section of the intermediate wall (8), the turbine vane comprises at least in portions a perforation (16) which runs parallel to the perforation of the connecting region in order to increase the elasticity.

9. Turbine vane according to any one of claims 1 to 8, characterised in that the convex wall side of the V- or U-shaped wall portion is formed and arranged largely parallel to the suction-side wall (7) and pressure-side wall (6) delimiting the cavity (9) and connected to the vane leading edge (5).

10. Turbine vane according to any of claims 1 to 9, characterised in that, with regard to their flow direction predefined by a longitudinal extent which can be assigned to the passage channels, the passage channels arranged inside the intermediate wall (8) can be divided into at least three groups: a first group of passage channels (15a) with a flow direction oriented onto the suction-side wall (7), a second group of passage channels (15b) with a flow direction oriented onto the vane leading edge (5), and a third group of passage channels (15c) with a flow direction oriented onto the pressure-side wall (6).

11. Turbine vane according to any of claims 1 to 10, characterised in that the turbine vane is guide vane or a rotor vane of a turbine stage of a gas turbine arrangement.

Citation Information

Patent Citations

  • Coolable rotor blade for an industrial gas turbine engine

    EP1319803A2

  • Airfoil having expanded wall portions to accommodate film cooling holes

    US5688104A

  • Coolable blade structure for a gas turbine

    DE69718673T2

  • Internal cooling circuit for the stator vane of a turbine

    EP0447320A1

  • Thermally stressed turbomachine vane with a ceramic insert in the leading edge

    EP0806546A1