Method for controlling a buffer conveyor of a thermal container treatment device, and filling line
Patent Information
- Application Number
- EP2022821394
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-22
- Filing Date
- 2022-11-21
- Publication Date
- 2024-10-02
AI Technical Summary
Existing thermal container treatment systems require significant space for buffers to manage malfunctions, and current methods are inflexible in adjusting buffer times based on specific device faults, leading to inefficiencies and increased space requirements.
A method for controlling a buffer belt that adjusts its filling level based on fault data from upstream and downstream devices, allowing flexible operation and reduced space usage by dynamically managing buffer times during normal and fault conditions.
This approach enables flexible operation of the buffer belt, reducing space requirements and effectively managing buffer times to accommodate various fault scenarios, ensuring continuous production without stopping the entire line, while maintaining line efficiency.
Smart Images

Figure 1.1
Abstract
Description
[0001] Method for controlling a buffer belt of a thermal container treatment device and filling line
[0002] The present invention relates to a method for controlling a buffer belt of a thermal container treatment device according to claim 1 and a filling line according to claim 15.
[0003] State of the art
[0004] It is known from the field of filling technology that product filled into containers in a plant with a filler, for example, must be pasteurized in a pasteurizer. The pasteurization process can be followed by further processes such as inspection of the containers in an inspection machine and drying of the containers in a drying section. To accommodate any malfunctions that may occur in these machines – filler, pasteurizer, inspection machine, drying section – a buffer can be provided between the filler and pasteurizer, between the pasteurizer and inspection machine, and between the inspection machine and drying section. Each buffer can be designed to buffer the containers for a period of up to 60 seconds. Using these multiple buffers, possible malfunctions in the individual machines can be rectified without having to stop the entire production line.
[0005] The nominal line capacity in such a plant can correspond to the nominal capacity of the pasteurizer. The filler upstream of the pasteurizer can be oversized by 10% to 20%, for example, to allow the buffer between the filler and the pasteurizer to be refilled after a malfunction in the filler. The machines downstream of the pasteurizer can be oversized by 20%, for example, to maintain high line efficiency and to be able to reduce the number of containers accumulated in the respective buffer after a malfunction.
[0006] Implementing the buffers in bulk transport requires a lot of space. Furthermore, the buffer between the filler and the pasteurizer, for example, is used solely to buffer containers in the event of filler malfunctions. It is not intended to be used between the filler and the pasteurizer to buffer in the event of malfunctions in the pasteurizer and / or the inspection machine and / or the dry section.
[0007] DE 44 34 176 A1 discloses a method for a performance-based supply of machines in container processing systems, so that otherwise unavoidable machine downtimes within such a container processing system can be avoided or reduced. The method provides that, depending on the throughput or fill level of the conveyors and / or machines upstream and downstream of the cleaning machine, the fill level of the cleaning machine can be adjusted by changing the number of containers to be cleaned. If there is a shortage of containers in the system, the downstream machines can continue operating without any problems due to the reserve in the cleaning machine, without the need for premature stopping.
[0008] Task
[0009] Based on the known prior art, the technical problem to be solved is to provide a method for controlling a buffer belt of a thermal container treatment device and a filling line with such a thermal container treatment device, with which a flexible operation of the buffer belt and a space reduction of the filling line can be achieved.
[0010] Solution
[0011] This object is achieved according to the invention by the method according to claim 1 and the filling line according to claim 15. Further embodiments and developments are covered in the subclaims.
[0012] The method according to the invention for controlling a buffer belt for buffering containers, which is comprised by a thermal container treatment device in a filling line as a buffer device, wherein the filling line comprises at least one further device for treating the containers, which is arranged upstream or downstream of the thermal container treatment device, comprises: detecting fault data of the at least one further device, analyzing the fault data and obtaining control data and controlling a filling level of the buffer belt during normal operation of the filling line based on the control data.
[0013] In order to flexibly accommodate potentially occurring malfunctions in the at least one additional device caused by buffering containers on the buffer belt, the malfunction data and / or control data of the at least one additional device are recorded. By analyzing the malfunction data, control data is obtained, which is subsequently used to control the fill level of the buffer belt during normal operation. During a malfunction, the fill level of the buffer belt may differ from the fill level during normal operation.
[0014] If a device upstream of the thermal container treatment machine malfunctions, the buffer belt may gradually become empty during the malfunction. If a device downstream of the thermal container treatment machine malfunctions, the buffer belt may gradually fill during the malfunction.
[0015] Therefore, by controlling the buffer belt fill level during normal operation, the available buffer time can be adjusted in the event of disruptions. For example, if it is considered that disruptions are more likely to occur upstream of the thermal container treatment device, a higher buffer belt fill level during normal operation can provide a longer buffer time than a lower fill level. For example, if it is considered that disruptions are more likely to occur downstream of the thermal container treatment device, a lower buffer belt fill level during normal operation can provide a longer buffer time than a higher fill level.
[0016] Another device that can be arranged upstream of the thermal container treatment machine, i.e., the buffer belt, can be a filler. The filler can also include an inspection device, a discharge device, and / or a can turner next to the filler. A closer can also be provided. A washing device can be provided for glass containers, and a neck sterilizer can be provided for PET containers.
[0017] Another device that can be arranged downstream of the buffer belt can be an inspection machine or a drying section. Both an inspection machine and a drying section can also be provided.
[0018] The buffer belt for buffering containers can be included in the thermal container treatment device in the filling line as the only buffer device.
[0019] The thermal container treatment device, such as a pasteurizer, cooler, or warmer, can comprise a main conveyor belt for transporting containers in the thermal container treatment device, wherein the main conveyor belt can be designed to be driven at a first speed in a first direction. Furthermore, the thermal container treatment device comprises the buffer belt for buffering containers in the thermal container treatment device. The buffer belt can be designed to be driven at a second, variably adjustable speed in the first direction, and the buffer belt can be arranged directly adjacent to the main conveyor belt, viewed in the first direction. For example, the buffer belt can be designed to be driven further in a second direction.The main conveyor belt can be driven at a constant speed during normal operation and during buffer operation of the thermal container treatment device. The speed and direction in which the buffer belt is driven can be varied during normal operation and during buffer operation of the thermal container treatment device.
[0020] When controlled to a filling level of 30%, also called the first filling level, a fault in another device arranged upstream of the thermal container treatment device can be buffered by the buffer belt for at least 20, 30, 40, 50 or 60 seconds and a fault in another device arranged downstream of the thermal container treatment device can be buffered by the buffer belt for at least 20, 30, 40, 50, 60, 70, 80, 90, 100, 110 or 120 seconds.
[0021] The method may further comprise that, when controlled to a second filling level which is smaller than the first filling level, a disturbance of a further device arranged upstream of the thermal container treatment device can be buffered by the buffer belt for less than 60 seconds and a disturbance of a further device arranged downstream of the thermal container treatment device can be buffered by the buffer belt for more than 120 seconds.
[0022] By providing a smaller filling level, for example, it is possible to take into account the fact that it has been observed that there is an increase in malfunctions downstream of the thermal container treatment device.
[0023] The method may further comprise that, when controlled to a third filling level which is greater than the first filling level, a disturbance of a further device which is arranged upstream of the thermal container treatment device can be buffered by the buffer belt for more than 60 seconds and a disturbance of a further device which is arranged downstream of the thermal container treatment device can be buffered by the buffer belt for less than 120 seconds.
[0024] By providing a higher filling level, for example, it is possible to take into account the fact that it has been observed that there is an increase in malfunctions upstream of the thermal container treatment device.
[0025] The designations “first”, “second” and “third” filling levels serve only to distinguish between the different filling levels mentioned.
[0026] The controller can control the filling level of the buffer belt to 30%.
[0027] A buffer time for a malfunction of another device arranged upstream of the thermal container treatment device can be at least 60 seconds.
[0028] It can be provided that a buffer time for a malfunction of another device arranged downstream of the thermal container treatment device can be at least 120 seconds.
[0029] Alternatively, it can be provided that a first buffer time for a first fault of a first further device arranged upstream of the thermal container treatment device can be at least 60 seconds and that a second buffer time for a second fault of a second further device arranged downstream of the thermal container treatment device can be at least 60 seconds.
[0030] The fault data can comprise: information that a fault has occurred in the at least one further device for treating the containers, which is arranged upstream or downstream of the thermal container treatment device and / or information on downtimes, comprising for example frequencies of faults, duration of faults and / or reduced performance and / or information on time dependencies of faults during production and / or information on ambient pressure and / or ambient temperature and / or time of day during faults and / or a number of faults before and / or after the buffer belt and / or a number of faults before and / or after the buffer belt that caused the buffer belt to run completely empty or completely full and / or accumulated fault durations and / or classified fault data.
[0031] Treating the containers may include thermal treatment, inspection and / or packaging.
[0032] For example, a classification can consider why a fault occurred and whether it could occur again within a given timeframe. If the fault could occur again within the given timeframe, this can be taken into account for controlling the buffer device within the given timeframe. If the fault could not occur again within the given timeframe, the fault does not need to be taken into account for controlling the buffer device.
[0033] For example, a malfunction can occur in the drying section if film is not replenished in time. The drying section then stops because there is no more film. Once the film supply is replenished, the malfunction is resolved and will not occur again within a given timeframe, for example, one hour, because the film supply has been replenished.
[0034] The control data can be obtained by means of automatic analysis, for example by means of an analysis program and / or by machine learning.
[0035] A setpoint of the buffer belt filling level can be increased or decreased based on the disturbance data and the increased or decreased setpoint can be used to control the filling level.
[0036] The method may further comprise that the acquisition of the fault data of the at least one further device, the analysis of the fault data and the obtaining of the control data and the control of the filling level of the buffer belt during normal operation of the filling line can take place at regular intervals, for example every 10 seconds to 20 seconds, every 5 minutes to 45 minutes, once per hour, once per day or once per week.
[0037] It can also be provided that only the fault data of the at least one additional device are recorded at regular intervals, for example, every 10 seconds to 20 seconds, every 5 minutes to 45 minutes, once per hour, once per day, or once per week. Analyzing the fault data, obtaining the control data, and controlling the fill level of the buffer belt during normal operation of the filling line based on the control data are not directly linked to the regular recording of the fault data of the at least one additional device.
[0038] Alternatively, it can be provided that the acquisition of the fault data of the at least one further device, the analysis of the fault data, and the receipt of the control data can take place at regular intervals, for example, every 10 seconds to 20 seconds, every 5 minutes to 45 minutes, once per hour, once per day, or once per week. Controlling the fill level of the buffer belt during normal operation of the filling line based on the control data, for example, is not directly linked to the regular acquisition of the fault data of the at least one further device, the analysis of the fault data, and the receipt of the control data.
[0039] Controlling the filling level of the buffer belt during normal operation of the filling line based on the control data after detecting the fault data of the at least one further device and analyzing the fault data and obtaining the control data.
[0040] The process can further include the buffer being able to actively intervene in the power control of other machines. This involves not only reducing / rebuilding the buffer, but also "stretching" buffer times so that the entire line does not come to a standstill. This means that by analyzing the messages, the buffer can also build up the buffer with reduced power. This allows the buffer time to be increased without bringing the entire line to a standstill. This will not affect the line's efficiency / OEE.
[0041] The method may further comprise controlling the filling level of the buffer belt during normal operation of the filling line based on the control data: after exceeding a first given maximum number of disturbances before and / or after the buffer belt and / or after exceeding a second given maximum number of disturbances before and / or after the buffer belt which have caused the buffer belt to run completely empty or completely full.
[0042] The method may further comprise that the filling level of the buffer belt can be controlled during normal operation of the filling line based on the control data after a given maximum number of accumulated disturbance durations of disturbances before and / or after the buffer belt have been exceeded.
[0043] The buffer device may comprise two, three or more buffer belts running parallel to one another and adjoining one another.
[0044] A filling line according to the invention comprises a thermal container treatment device comprising a buffer belt for buffering containers, wherein the buffer belt is included in the filling line as a buffer device. The filling line further comprises at least one further device for treating the containers, which is arranged upstream or downstream of the thermal container treatment device. The buffer belt is controlled by the method as described above or further below.
[0045] Short character description
[0046] The attached figures illustrate aspects and embodiments of the invention by way of example for better understanding and illustration. It shows:
[0047] Figure 1 is a schematic view of the space required for a prior art filling line;
[0048] Figure 2 is a schematic view of the space required for a filling line according to an embodiment;
[0049] Figure 3 shows a diagram for normal operation without disturbance;
[0050] Figure 4 is a diagram showing operation in the event of a fault upstream of the thermal treatment device;
[0051] Figure 5 is a diagram showing operation in the event of a fault after the thermal treatment device;
[0052] Figure 6 is a diagram showing operation with time-shifted disturbances before and after the thermal treatment device;
[0053] Figure 7 is a diagram showing operation with temporally overlapping disturbances before and after the thermal treatment device;
[0054] Figure 8 is a diagram showing a first ratio of disturbances over a period of time;
[0055] Figure 9 is a diagram showing a second ratio of disturbances over a period of time;
[0056] Figure 10 is a diagram for a third ratio of disturbances over a period of time; and
[0057] Figure 11 shows a diagram for an exemplary dynamic buffer control with adjustment of the buffer times.
[0058] Detailed description
[0059] Figure 1 shows a schematic view of the space required for a prior art filling line. The filler area 1, which in addition to the filler can also include the inspection, discharge and / or can turner, is followed by a first buffer area 2 with a first buffer in the mass transport, which is provided to buffer containers in the event of malfunctions in the filler area 1. The first buffer area 2 is followed by a pasteurizer area 3. If, for example, a double-decker pasteurizer is used, a division and / or merging to the two decks or after the two decks can be provided. The division and / or merging can be provided in the mass transport. The division and / or merging can also be used for buffering in a double-decker pasteurizer.Downstream of the pasteurization area 3, a second buffer area 4 is arranged with a second buffer in the bulk transport, which is intended to buffer containers in the event of malfunctions in the pasteurization area 3, whereby the buffer duration can be up to 60 seconds. The second buffer area 4 is followed by the single-track inspection area 5. Downstream of the inspection area 5, a third buffer area 6 is arranged with a third buffer in the bulk transport, which is intended to buffer containers in the event of malfunctions in the inspection area 5, whereby the buffer duration can be up to 60 seconds. Downstream of the third buffer area 6 is the dry part area 7 of the filling line.
[0060] Implementing buffers in bulk transport requires a lot of space. Furthermore, the individual buffers in the buffer areas are only used to buffer containers in the event of disruptions in the immediately preceding area.
[0061] Figure 2 shows a schematic view of the space required for a filling line 8 according to one exemplary embodiment. Adjacent to the filler area 9, which may include the filler as well as the inspection, discharge, and / or can turning device, is an area 10 of a thermal container treatment device, which may, for example, include a division and / or merger in a double-decker design of the thermal container treatment device, wherein the area 10 includes a buffer area 11 with a buffer belt. The division and / or merger can take place in single-track transport. Thus, buffering is not provided in the division and / or merge. Following the area 10 of the thermal container treatment device with the buffer area 11, there is an inspection area 12, followed by a drying section 13.Buffer area 11 with the buffer belt is intended to buffer containers in the event of malfunctions in the filler area 9 (i.e., malfunctions upstream of buffer area 11, i.e., upstream of the thermal container treatment device), to buffer containers in the event of malfunctions in the inspection area 12 (i.e., malfunctions downstream of buffer area 11, i.e., downstream of the thermal container treatment device), and to buffer containers in the event of malfunctions in the dry section area 13 (i.e., malfunctions downstream of buffer area 11, i.e., downstream of the thermal container treatment device). The buffer duration can be up to 60 seconds for malfunctions upstream of buffer area 11, i.e., upstream of the thermal container treatment device, and up to 120 seconds for malfunctions downstream of buffer area 11.By integrating the buffer area 11 with the buffer belt into the area 10 of the thermal treatment device and by using the buffer area 11 with the buffer belt to buffer containers in the event of malfunctions before and / or after the buffer area 11, i.e. the thermal container treatment device, the space requirement can be significantly reduced compared to that of the prior art.
[0062] Figure 3 shows a diagram for normal operation of filling line 8 without disruption, where the thermal treatment device was assumed to be a pasteurizer. The buffer occupancy in % (solid line), the filler output or pasteurizer belt speed in % (dashed line), and the dry section output in % (dash-dotted line) are plotted as a function of time in seconds. Buffer occupancy remains at 50% throughout. The filler output or pasteurizer belt speed and the dry section output are each at 100% (they are shown slightly offset in the diagram).
[0063] The buffer occupancy, also known as the buffer belt fill level, determines the buffer times available for faults upstream and downstream of the buffer belt. The higher the buffer belt fill level during normal operation, the more time is available for buffering in the event of faults upstream of the thermal treatment device, but the less time is available for faults downstream of the thermal treatment device. The lower the buffer belt fill level during normal operation, the more time is available for buffering in the event of faults downstream of the thermal treatment device, but the less time is available for faults upstream of the thermal treatment device.
[0064] The ratio of buffer times for buffering before and after the thermal treatment device can be adjusted based on the fill level during normal operation. For example, the adjustment can be made during operation of the filling line, taking into account disturbances before and / or after the thermal treatment device, their frequency, their duration, and / or their correlation with ambient and / or production conditions.
[0065] Figure 4 shows a diagram for operation during a fault upstream of the thermal treatment device, where the thermal treatment device was assumed to be a pasteurizer. The buffer occupancy in % (solid line), the filler output or pasteurizer belt speed in % (dashed line), and the treatment in the pasteurizer or pasteurizer output in % (dash-dotted line) are shown as a function of time in seconds. At time tb Füllera fault in the filler begins and at time t e Füllerthe filler malfunction ends. When the malfunction begins, the pasteurizer's main belt is stopped, although the existing containers in the pasteurizer continue to be treated. The buffer belt continues to transport the containers out of the pasteurizer at 100% of its rated capacity, so that the buffer occupancy gradually decreases during the malfunction. As soon as the malfunction ends, the filler runs at 120% of its rated capacity and the buffer belt transports the containers out of the pasteurizer at 120% of its rated capacity. When the buffer belt is back to the buffer belt fill level of normal operation, the filler runs at 100% of its rated capacity, the pasteurizer's main belt then transports the containers at 100% of its rated capacity, and the buffer belt continues to transport the containers out of the pasteurizer at 100% of its rated capacity. Instead of 120% of the rated capacity (filler and / or pasteurizer's main belt), 105% or 110% of the rated capacity can also be specified.
[0066] Figure 5 shows a diagram for operation during a failure downstream of the thermal treatment device, where the thermal treatment device was assumed to be a pasteurizer. The buffer occupancy in % (solid line), the pasteurizer belt speed in % (dashed line), and the dry section performance in % (dash-dotted line) are plotted as a function of time in seconds. At time t b Dry part a fault of the dry part begins and at time t eDry section ends the dry section malfunction. When the malfunction begins, no more containers are transferred from the buffer belt to the downstream components, and an outlet connected to the buffer belt stops. The buffer belt begins to buffer containers transferred to it, increasing buffer utilization. The buffer time is 60 seconds, for example. After the dry section malfunction ends, the outlet, inspection, and dry sections begin operating at 120% of their rated capacity. When the buffer belt returns to the fill level of the buffer belt during normal operation, the outlet, inspection, and dry sections run again at 100% of their rated capacity. The pasteurizer operates continuously at 100% of its rated capacity.
[0067] Figure 6 shows a diagram for operation with temporally staggered disturbances before and after the thermal treatment device, where the thermal treatment device was assumed to be a pasteurizer. The buffer occupancy in % (solid line), the filler performance or pasteurizer belt speed in % (dashed line), and the dry section performance in % (dash-dotted line) are shown as a function of time in seconds. At time tb Füller , about 15 seconds, a malfunction of the filler begins and at time t e Füller, approximately 35 seconds, the filler malfunction ends. With the onset of this malfunction, the pasteurizer's main conveyor is stopped, but the existing containers continue to be processed in the pasteurizer. The buffer conveyor continues to transport the containers out of the pasteurizer at 100% of its rated capacity, so that the buffer conveyor occupancy gradually decreases during the malfunction. As soon as the malfunction ends, the filler runs at 120% of its rated capacity, and the pasteurizer's main conveyor transports the containers at 120% of its rated capacity, while the buffer conveyor transports the containers out of the pasteurizer at 100% of its rated capacity. If the buffer conveyor is stopped at time t e komplett ' Füller, about 120 seconds, is filled again to the filling level of the buffer belt in normal operation (here, for example, 50%), the filler runs at 100% of the nominal power, the main belt of the pasteurizer then transports the containers at 100% of the nominal power and the buffer belt transports the containers out of the pasteurizer at 100% of the nominal power.
[0068] At time t b Dry part, about 175 seconds a disturbance of the dry part begins and at time t eAfter approximately 195 seconds of the dry section, the disruption in the dry section ends. When the disruption begins, no more containers are transferred from the buffer belt to the downstream components, and an outlet connected to the buffer belt stops. The buffer belt begins to buffer containers transferred to it, thereby increasing the occupancy of the buffer belt. The buffer time is, for example, 60 seconds. After the disruption in the dry section ends, the outlet, inspection, and dry sections begin operating at 120% of their rated capacity. If the buffer belt is at time t e kom P |ett Troeckenteil Once the buffer belt fill level has been reduced to the normal operating level (approximately 295 seconds), the outlet, inspection, and dry section will run at 100% of rated capacity again. The pasteurizer will operate continuously at 100% of rated capacity.
[0069] The buffer time is 60 seconds for the fault before the thermal treatment device and 60 seconds for the fault after the thermal treatment device, resulting in a total buffer time of 120 seconds.
[0070] Figure 7 shows a diagram for operation with temporally overlapping disturbances before and after the thermal treatment device. At time tb Füller A filler malfunction occurs, and with the onset of the filler malfunction, the pasteurizer's main conveyor is stopped, but the existing containers continue to be processed in the pasteurizer. The buffer conveyor continues to transport the containers out of the pasteurizer at 100% of its rated capacity, so that the buffer conveyor's occupancy gradually decreases during the filler malfunction. At time t bA malfunction in the dry section begins. When the malfunction in the dry section begins, no more containers are transferred from the buffer belt to the downstream components, and an outlet connected to the buffer belt stops. The buffer belt begins to buffer containers transferred to it. Since the malfunction in the filler and the dry section overlap in time, the occupancy of the buffer belt remains constant during the time both malfunctions are present.
[0071] At time t e Füller The filler malfunction ends. As soon as the malfunction ends, the filler runs at 120% of its rated capacity. The pasteurizer's main conveyor belt transports the containers at 120% of its rated capacity. The buffer belt gradually fills because no containers are being released from the buffer belt due to the ongoing malfunction in the dry section.
[0072] At time t eDry section ends the dry section malfunction. After the dry section malfunction has ended, the outlet, inspection, and dry sections begin operating at 120% of their rated capacity. The buffer belt fill level is still a few percent, for example, 3%, above the fill level during normal operation. At time t e komplett ' Füller , approximately 135 seconds, the filler is brought back to 100% of its rated power. At time t e komplettAfter approximately 148 seconds of the dry section, the outlet, inspection, and dry sections are brought back to 100% of their rated capacity. The buffer belt fill level has been reduced to the extent that it corresponds to the fill level during normal operation. The pasteurizer's main belt operates continuously at 100% of its rated capacity. The different times at which the filler capacity is brought back to 100% of its rated capacity or the dry section capacity is brought back to 100% of its rated capacity can result from the design and dimensioning of the buffer belt and the filling line.
[0073] Figure 8 shows a diagram for a first ratio of disturbances over a period of time. The first ratio of disturbances is 1:1 for disturbances before the thermal treatment device to disturbances after the thermal treatment device. For example, a disturbance in the filler (dashed line) and a disturbance in the dry section (dash-dotted line) each occur for the same duration. In the "disturbance ratio" shown, negative values are assigned to the filler and positive values to the dry section.
[0074] Figure 9 shows a diagram for a second ratio of disturbances over a period of time. The second ratio of disturbances is 2:1 for disturbances upstream of the thermal treatment device to disturbances downstream of the thermal treatment device. As an example, three disturbances occur in the filler (dashed line) and two disturbances in the dry section (dash-dotted line), with the time durations resulting in a ratio of 67%:33%. In the “disturbance ratio” shown, negative values are assigned to the filler and positive values to the dry section. Since many disturbances occur upstream of the buffer, it may be useful to select the fill level of the buffer belt during normal operation such that a large part of the buffer time can be used for disturbances upstream of the thermal treatment device.
[0075] Figure 10 shows a diagram for a third ratio of disturbances over a period of time. The third ratio of disturbances is 1:4 for disturbances upstream of the thermal treatment device to disturbances downstream of the thermal treatment device. As an example, one disturbance in the filler (dashed line) and three disturbances in the dry section (dash-dotted line) occur, with the time durations resulting in a ratio of 20%:80%. In the “disturbance ratio” shown, negative values are assigned to the filler and positive values to the dry section. Since many disturbances occur downstream of the thermal treatment device, it can be useful to select the fill level of the buffer belt during normal operation such that a large part of the buffer time can be used for disturbances downstream of the thermal treatment device. Figure 11 shows a diagram for an exemplary dynamic buffer control with adjustment of the buffer times.In various time periods 14 - 19, the susceptibility to failure, in this case of the filler and the dry section, is determined. In the first period 14, the maximum susceptibility to failure of the filler, i.e., the number of faults occurring in the filler, is four, and the maximum susceptibility to failure of the dry section, i.e., the number of faults occurring in the dry section, is one.
[0076] In the second section 15, there is also a maximum susceptibility to errors of the filler, i.e. a number of occurring faults of the filler, of four and a maximum susceptibility to errors of the dry part, i.e. a number of occurring faults of the dry part, of one, whereby the duration of the faults of the filler, however, is different from that of the first section 14.
[0077] In the third section 16, the maximum error susceptibility of the filler and the dry part is one each.
[0078] There are no disturbances in the fourth section 17.
[0079] In the fifth section 18, the maximum error susceptibility of the filler is one and the maximum error susceptibility of the dry part is two.
[0080] In the sixth section 19, the maximum susceptibility to errors of the filler, i.e. occurring faults of the filler, is two and the maximum susceptibility to errors of the dry part is four.
[0081] At times t1, t2, and t3, the buffer times are adjusted based on the determined error susceptibility by adjusting the buffer fill level during normal operation. Since in the first section 14, faults predominate upstream of the thermal treatment device, the buffer fill level is increased during normal operation. Since in the third section 16, faults before and after the thermal treatment device are equally frequent, the buffer fill level is reduced during normal operation. Since in the fifth section 18, faults predominate downstream of the thermal treatment device, the buffer fill level is further reduced during normal operation.
Claims
Claims 1. Method for controlling a buffer belt for buffering containers, which is comprised as a buffer device by a thermal container treatment device in a filling line (8), wherein the filling line (8) comprises at least one further device for treating the containers, which is upstream or downstream of the thermal container treatment device, wherein the method comprises: Acquiring fault data from at least one other device, analyzing the fault data and obtaining control data, and Controlling the fill level of the buffer belt during normal operation of the filling line (8) using the control data.
2. The method according to claim 1, wherein, when controlled to a fill level of 30%, also called first fill level, a disturbance of a further device, which is arranged upstream of the thermal container treatment device, can be buffered by the buffer belt for at least 20, 30, 40, 50 or 60 seconds and a disturbance of a further device, which is arranged downstream of the thermal container treatment device, can be buffered by the buffer belt for at least 20, 30, 40, 50, 60, 70, 80, 90, 100, 110 or 120 seconds.
3. The method according to claim 2, wherein, in the case of control to a second filling level which is less than the first filling level, a disturbance of a further device which is arranged upstream of the thermal container treatment device can be buffered by the buffer belt for less than 60 seconds and a disturbance of a further device which is arranged downstream of the thermal container treatment device can be buffered by the buffer belt for more than 120 seconds.
4. The method according to claim 2 or 3, wherein, in the case of control to a third filling level greater than the first filling level, a disturbance of a further device which is arranged upstream of the thermal container treatment device can be buffered by the buffer belt for more than 60 seconds and a disturbance of a further device which is arranged downstream of the thermal container treatment device can be buffered by the buffer belt for less than 120 seconds.
5. The method according to claim 1, wherein the control controls the fill level of the buffer belt to 30%.
6. The method according to claim 5, wherein a buffer time for a malfunction of a further device which is arranged upstream of the thermal container treatment device is at least 60 seconds.
7. The method according to claim 6, wherein a buffer time for a malfunction of a further device downstream of the thermal container treatment device is at least 120 seconds.
8. The method according to claim 6, wherein a first buffer time for a first fault of a first further device which is arranged upstream of the thermal container treatment device is at least 60 seconds and wherein a second buffer time for a second fault of a second further device which is arranged downstream of the thermal container treatment device is at least 60 seconds.
9. The method according to any one of claims 1 to 8, wherein the fault data comprises: information that a fault has occurred in the at least one further device for treating the containers, which is upstream or downstream of the thermal container treatment device, and / or Information on downtime, including, for example, frequency of malfunctions, duration of malfunctions and / or reduced performance and / or Information on the time dependencies of disturbances during production and / or information on ambient pressure and / or ambient temperature and / or time of day during disturbances and / or a number of disturbances before and / or after the buffer belt and / or a number of disturbances before and / or after the buffer belt that caused the buffer belt to run completely empty or completely full and / or accumulated disturbance durations and / or classified disturbance data.
10. The method according to any one of claims 1 to 9, wherein the control data are obtained by means of automatic analysis, for example by means of an analysis program and / or by machine learning.
11. The method according to any one of claims 1 to 10, wherein a target value of the fill level of the buffer belt is increased or decreased based on the disturbance data and the increased or decreased target value is used for controlling the fill level.
12. The method according to any one of claims 1 to 11, wherein the acquisition of the fault data of the at least one further device, the analysis of the fault data and the receipt of the control data and the control of the fill level of the buffer belt during the normal operation of the filling line (8) is carried out at regular intervals, for example every 10 seconds to 20 seconds, every 5 minutes to 45 minutes, once per hour, once per day or once per week.
13. The method according to any one of claims 1 to 11, wherein the control of the fill level of the buffer belt during normal operation of the filling line (8) is carried out on the basis of the control data: after exceeding a first given maximum number of disturbances before and / or after the buffer band and / or after exceeding a second given maximum number of disturbances before and / or after the buffer band, which have caused the buffer band to run completely empty or completely full.
14. The method according to any one of claims 1 to 11, wherein the control of the fill level of the buffer belt during normal operation of the filling line (8) is based on the control data according to Exceeding a given maximum number of accumulated fault durations occurs before and / or after the buffer band.
15. Filling line (8) comprising a thermal container treatment device which includes a buffer belt for buffering containers, wherein the buffer belt in the filling line (8) is included as a buffer device, wherein the filling line (8) further comprises at least one further device for treating the containers which is upstream or downstream of the thermal container treatment device, wherein the buffer belt is controlled by means of the method according to one of claims 1 to 14. 16