Method for checking the maximum power available to different members of a propulsion chain of an aircraft

EP4444620A1Pending Publication Date: 2024-10-16SAFRAN HELICOPTER ENGINES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2022817289
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-07
Filing Date
2022-12-06
Publication Date
2024-10-16

AI Technical Summary

Technical Problem

Current methods for verifying the maximum power availability of aircraft propulsion systems, particularly in hybrid and electric propulsion systems, are inadequate as they cannot test engines at the high power levels required for safe operation, leading to uncertainties and complex maintenance challenges.

Method used

A method that sets each component of the propulsion system to a maximum power regime, adjusting power contributions to ensure delivery of necessary power during flight, and determines the maximum available power by monitoring and comparing power levels to predetermined thresholds, with automatic interruption in case of failure or threshold exceedance.

Benefits of technology

This method ensures that each component can deliver maximum power under worst-case conditions, reducing maintenance risks and uncertainties, and allows for predictive maintenance analysis, thereby enhancing safety and operational reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a method for checking the maximum power available to members of a propulsion system of an aircraft (1) comprising first members (M1.1, M2.1, D10, TG, BAT1) that are sized to compensate for the failure of second members of the propulsion system (M1.2, M2.2, D20, TG, BAT2) by delivering a maximum power to keep the aircraft in a safe operating range, the method comprising the following steps for each of the first members: - placing the first member in a state that is substantially equal to a maximum power state (PM); - adjusting the power delivered by the second member working in synergy with the first member so that the first member and the second member contribute to delivering the power required for the aircraft in the flight phase; - determining the power delivered by the first member placed in the maximum power state; - from the determined power, deducing information relating to the maximum power available to the first member.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] METHOD FOR VERIFYING THE MAXIMUM AVAILABLE POWER OF DIFFERENT COMPONENTS OF AN AIRCRAFT PROPULSION LINE

[0002] The present invention relates to the propulsion system of aircraft and more particularly to a method for verifying the maximum power available from components of a propulsion chain of an aircraft.

[0003] BACKGROUND OF THE INVENTION

[0004] For example, a helicopter is an aircraft conventionally equipped with a main rotor driving a rotary wing to provide its lift and propulsion. In order to rotate the main rotor, it is known to equip the helicopter with a redundant propulsion system comprising two turbomachines operating in parallel. Each is designed to be oversized so as to be able to provide, in the event of failure of the other turbomachine, sufficient power to allow the helicopter to continue its flight and land in safe conditions.

[0005] However, it is not possible to test the aircraft at such an operating regime called CEI ("One Engine Inoperative" or with one engine inoperative), since the valid turbomachine delivers a power well above its nominal power and is consequently damaged, so that it can no longer be used without heavy maintenance action.

[0006] It was therefore necessary to develop strategies to ensure the availability of maximum power at OEI speed for each of the turbomachines.

[0007] It was envisaged to carry out during a commercial flight, for example every 25 hours, a series of temperature and rotation speed measurements for each of the turbomachines in order to determine whether, from a thermodynamic point of view, each of the turbomachines would have the capacity to provide maximum power at the OEI regime. This check, called EPC ("Engine Power Check"), is supplemented by specific maintenance operations aimed at detecting possible latent failures of certain components of the turbomachines.

[0008] However, this strategy is not entirely satisfactory. Indeed, the EPC check is carried out at a power level significantly lower than the power required for takeoff, which increases the uncertainty regarding the turbomachinery's ability to deliver maximum power at IEC speed. Moreover, maintenance operations are particularly delicate and complicated to implement, and require specific tools and qualified personnel without which the risks of maintenance errors are high.

[0009] Although document FR-A-1752849 describes a method for overcoming the problems described above, it only concerns the case where the aircraft propulsion system comprises two thermal engines (such as turbomachines) operating in parallel.

[0010] However, among aircraft, we find, for example, so-called hybrid helicopters which are equipped with a propulsion system comprising a single thermal engine assisted during certain phases of flight by a brushless electric motor. The energy required to operate the electric motor is provided by an auxiliary power unit (also called an "Auxiliary Power Unit" or "APU") or by an electric generator, which can also fail.

[0011] There are also aircraft equipped with an exclusively electric propulsion system which includes one or more electric motors powered by at least one battery.

[0012] It appears that the teaching of document FR-A- 1752849 cannot be applied directly to aircraft equipped with a propulsion system having multiple redundancies of components (active or passive and on standby), as may be the case with aircraft with hybrid propulsion (thermal and electric engines) or with exclusively electric propulsion.

[0013] SUBJECT OF THE INVENTION

[0014] The aim of the invention is to propose a solution which at least partially overcomes the aforementioned drawbacks.

[0015] SUMMARY OF THE INVENTION

[0016] To this end, a method is proposed for verifying a maximum available power of components of a propulsion system of an aircraft comprising first components dimensioned to compensate for a failure of second components of the propulsion system by providing a maximum power to maintain the aircraft in a safe operating range, the first components comprising an electrical power source, a component for distributing the electrical power supplied by the electrical power source and a component for transforming the power supplied by the distribution component.

[0017] According to the invention, the method comprises the following steps for each of the first organs:

[0018] - put the first organ at a speed substantially equal to a maximum power speed;

[0019] - adjusting a power supplied by the second member operating in synergy with the first member so that the first member and the second member contribute to supplying the power necessary for the aircraft during the flight phase;

[0020] - determine a power supplied by the first organ put at maximum power speed;

[0021] - deduce from the determined power information relating to the maximum power available from the first component. Maximum power means the maximum power for particular operating conditions. There are thus several maximum powers and for example the maximum power at takeoff for different temperatures and pressures, the maximum power in hovering flight out of ground effect... Thus, such a method has the advantage of using the maximum power regime to ensure that each of the first components can deliver the maximum power at each regime or worst-case operating condition, in particular at regimes corresponding to particularly high powers such as takeoff, OEI regime, hovering regime out of ground effect... Indeed, at the maximum power regime, the power level is high enough to limit uncertainties as to the capacity of the component to reach the expected power level.This ensures that aging, degradation, limitations, failures or latent errors in the primary organs do not prevent full power from being obtained if necessary.

[0022] According to a particular characteristic, the method further comprises the following steps:

[0023] - determine a threshold power corresponding to a minimum power to be reached by the first organ put into maximum power mode, and

[0024] - compare the power supplied by the first organ to the threshold power.

[0025] In particular, the process is automatically interrupted when at least one of the following conditions is met:

[0026] - the power supplied by the first organ put into maximum power mode is less than or equal to a threshold power;

[0027] - a parameter of the first organ put at maximum power is lower or higher than a predetermined threshold;

[0028] - a fault is detected on the first component put at maximum take-off power.

[0029] In particular, the method further comprises the step of collecting data from the first organs during the other steps, and of enriching a model allowing a predictive analysis of maintenance action needs for each of said first organs.

[0030] The invention also relates to a computer program product comprising instructions for executing such a method when this program is executed by a processor.

[0031] The invention also relates to a control device comprising a computer configured to implement such a method.

[0032] The invention further relates to an assembly comprising at least two chains of members configured to operate in synergy and together provide power necessary for an aircraft during a flight phase, the assembly being characterized in that it comprises such a control device.

[0033] The invention also relates to an aircraft comprising at least two chains of components configured to operate in synergy and together provide the power required by an aircraft during a flight phase, the aircraft being characterized in that it comprises a computer configured to implement such a method.

[0034] BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The invention will be better understood in light of the following description, which is purely illustrative and non-limiting, and must be read in conjunction with the appended figures, among which:

[0036] Figure 1 is a schematic view of an aircraft with hybrid electric propulsion; Figure 2 is a view partially and schematically representing the architecture of the hybrid electric propulsion of the aircraft illustrated in Figure 1;

[0037] Figure 3 illustrates a method for verifying the maximum power available from different components of an aircraft according to one embodiment of the invention.

[0038] DETAILED DESCRIPTION OF THE INVENTION

[0039] With reference to Figure 1, a vertical take-off and landing aircraft 1 (also called “Vertical Take-Off and Landing aircraft” or “VTOL”), here of the drone type, comprises a propulsion system comprising four propellers H1, H2, H3, H4 serving both for the propulsion and the lift of the aircraft 1. Each of the propellers H1, H2, H3, H4 is driven in rotation by a first electric motor M1.1, M2.1, M3.1, M4.1 and a second electric motor M1.2, M2.2, M3.2, M4.2. The first motor M1.1, M2.1, M3.1, M4.1 is sized to provide the minimum power necessary for the propulsion and the lift of the aircraft 1 in the event of failure of the second motor M1.2, M2.2, M3.2, M4.2, and vice versa. Under normal operating conditions, half of the power required by the propeller Hl, H2, H3, H4 is supplied by the first engine Ml.l, M2.1, M3.1, M4.1, the other half being supplied by the second engine Ml.2, M2.2, M3.2, M4.2 in order to minimize wear of the electrical and mechanical components of said first and second motors Ml.1, Ml.2, M2.1, M2.2, M3.1, M3.2, M4.1, M4.2.

[0040] The propulsion system also comprises a turbogenerator TG connected to a first electric power distributor D10 supplying the first engines M1.1, M2.1, M3.1, M4.1, and to a second electric power distributor D20 supplying the second engines M1.2, M2.2, M3.2, M4.2. A first battery BATI is also connected to the first distributor D10 and is sized to supplement the power supplied by the turbogenerator TG and compensate for a failure of the latter. Similarly, a second battery BAT2 is connected to the second distributor D20 and is sized to supplement the power supplied by the turbogenerator TG and compensate for a failure of the latter.

[0041] Thus, the first engines Ml.1, M2.1, M3.1, M4.1 and the second engines Ml.2, M2.2, M3.2, M4.2 operate in synergy two by two to drive the propellers Hl, H2, H3, H4 in rotation. The first and second distributors DIO, D20 operate in synergy to power the first engines Ml.1, M2.1, M3.1, M4.1 and the second engines Ml. 2, M2.2, M3.2, M4.2. The turbogenerator TG and the first battery BATI operate in synergy to power the first distributor D10. The turbogenerator TG and the second battery BAT2 operate in synergy to power the second distributor D20.

[0042] Four failure situations can be envisaged on the propulsion system of aircraft 1:

[0043] - the first engine Ml.1, M2.1, M3.1, M4.1 or the second engine Ml.2, M2.2, M3.2, M4.2 of a propeller Hl, H2, H3, H4 fails: the engine remaining active is then used at a power level well above its nominal power in order to compensate for the loss of the other engine (the use of the first and second distributors D10, D20, of the turbogenerator TG and of the first and second batteries BATI, BAT2 is modified to a lesser extent);

[0044] - the first battery BATI or the second battery BAT2 fails: one solution consists in the turbogenerator TG compensating for the failure of the battery BATI, BAT2 so as to provide all of the electrical power required by the first and second engines Ml.1, M2.1, M3.1, M4.1, Ml.2, M2.2, M3.2, M4.2 to satisfy the safety minima of the aircraft 1 (the load on the first and second distributors DIO, D20 then remains balanced and the turbogenerator TG is used at a power level significantly higher than its normal operating power), another solution consists in unbalancing the load on the first and second distributors DIO, D20 in order to distribute the required power over the turbogenerator TG and over one of the first and second batteries BATI, BAT2;

[0045] - the turbogenerator TG fails: the first and second batteries BATI, BAT2 must then provide all the electrical power required by the first and second engines Ml.1, M2.1, M3.1, M4.1, Ml.2, M2.2, M3.2, M4.2 to meet the safety minima of the aircraft 1, which requires them to operate at a power level generally close to their maximum operating power;

[0046] - the first distributor D10 or the second distributor D20 fails (for example due to a short circuit or a broken electrical cable): all the engines Ml.l, Ml.2, M2.1, M2.2, M3.1, M3.2, M4.1, M4.2 supplied by the remaining distribution chain DIO, D20 will then operate at a power level well above their nominal power, as will the turbogenerator TG and the corresponding battery BATI, BAT2.

[0047] Figure 2 schematically represents the architecture of the propulsion system of aircraft 1. For clarity, only propellers H1, H2 are shown.

[0048] The turbogenerator TG delivers electrical power WelO to the first distributor D10 and electrical power We20 to the second distributor D20. Similarly, the first battery BATI delivers electrical power Well to the first distributor DIO and the second battery BAT2 delivers electrical power We21 to the second distributor D20.

[0049] The first distributor D10 in turn delivers electrical power Wel.l to the first motor Ml.1 of propeller H1 and electrical power We2.1 to the first motor M2.1 of propeller H2. Similarly, the second distributor D20 delivers electrical power Wel.2 to the second motor Ml.2 of propeller H1 and electrical power We2.2 to the second motor M2.2 of propeller H2.

[0050] The first motor Ml.1 and the second motor Ml.2 respectively deliver a mechanical power Wml.1 and a mechanical power Wml.2, both of which are used to rotate the propeller H1. Similarly, the first motor M2.1 and the second motor M2.2 respectively deliver a mechanical power Wm2.1 and a mechanical power Wm2.2, both of which are used to rotate the propeller H2. In normal operation, the mechanical power required to rotate the propellers Hl, H2 is distributed equally between the corresponding first motor Ml.1, M2.1 and the second motor Ml.2, M2.2.

[0051] The propeller H1, the first engine M1.1, the second engine M1.2, the first and second distributors D10, D20, the first and second batteries BATI, BAT2 and the turbogenerator TG each form a component of a first propulsion chain of the aircraft 1. It is understood that these “components” or “power components” have a direct role in the production and exploitation of the power necessary for the flight of the aircraft 1. Similarly, the propeller H2, the first engine M2.1, the second engine M2.2, the first and second distributors D10, D20, the first and second batteries BATI, BAT2 and the turbogenerator TG each form a component of a second propulsion chain of the aircraft 1. Thus, the first and second distributors D10, D20, the first and second batteries BATI, BAT2 and the turbogenerator TG are components common to the first and second propulsion chains of the aircraft 1.

[0052] Aircraft 1 is further equipped with a control device comprising a CAL computer configured to act:

[0053] - on the first and second motors Ml.l, Ml.2, M2.1, M2.2 via control instructions Cl.l, Cl.2, C2.1, C2.2;

[0054] - on the first and second distributors DIO, D20 via control instructions CIO, C20; and

[0055] - on the turbogenerator TG via control instructions Cl.

[0056] It will be noted that the first and second distributors DIO, D20 may comprise active electrical converters allowing the computer CAL to vary, via the instruction commands CIO, C20, the power delivered by the first and second batteries BATI, BAT2 and / or the turbogenerator TG.

[0057] The CAL computer thus makes it possible to act on each of the components of the first and second propulsion chains of the aircraft 1 so as, in particular in the event of a failure of one of the components, to put the component, which operates in synergy with the faulty component, at a maximum power regime and to adjust the power supplied by the other components so as to satisfy the safety minima of the aircraft 1.

[0058] The CAL computer is also configured to acquire measurements of different operating parameters for each of the components of the first and second propulsion chains. In particular, the CAL computer can acquire: - mechanical and thermal measurements MMI.I, MMI.2, MM2.I, MM2.2 for each of the first and second engines Ml.1, Ml.2, M2.1, M2.2 including the effective rotation speed, the transmitted torque and the operating temperature (taken for example at the level of windings or power transistors of the first and second engines Ml.1, Ml.2, M2.1, M2.2);

[0059] - electrical measurements MEI.I, MEI.2, M E 2.I, M E2.2 for each of the first and second motors Ml.l, Ml.2, M2.1, M2.2 including the electric current flowing in the winding of the first and second motors Ml.l, Ml.2, M2.1, M2.2, the voltage and / or the supply current of said first and second motors Ml.l, Ml.2, M2.1, M2.2;

[0060] - electrical measurements Mio, M20 for each of the two distributors DIO, D20 including the current IDIO, ID2O and the voltage VDIO, V D 2O crossing said distributors DIO, D20;

[0061] - mechanical and thermal measurements MMI and electrical MEI of the TG turbogenerator including the temperature and rotation speed of the turbine of the TG turbogenerator, the torque supplied by said turbine to drive the electricity generator of the TG turbogenerator, the current flowing in the winding of said generator...

[0062] According to the invention, the CAL computer is further configured to implement a method for verifying the maximum available power of the components of the propulsion system of the aircraft 1, the verification method comprising the following steps (figure 3): • for each of the first engines Ml.l, M2.1: put, via the command Cl.l, C2.1, the first engine Ml.l, M2.1 at a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10), preferably under a low electrical voltage so as to precipitate the latent failures that the first engine Ml.l, M2.1 could present by strongly stressing the electrical components constituting said first engine Ml.l, M2.1; adjust, via the command Cl.2, C2.2, the power Wml.2, Wm2.2 supplied by the second motor Ml.2, M2.2 operating in synergy with the first motor Ml.l, M2.1 so that the first motor Ml.l, M2.1 and the second motor Ml.2, M2.2 continue to provide the power required by the aircraft 1 during the flight phase (step 20); determine the power Wml.l, Wm2.1 provided by the first engine Ml.l, M2.1 set to maximum power PM (step 30); and deduce from the power Wml.l, Wm2.1 information relating to the maximum power available from the first engine Ml.l, M2.1 (step 50);.

[0063] • for each of the second engines Ml.2, M2.2: put, via the control Cl.2, C2.2, the second engine Ml.2, M2.2 at a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10), preferably under a low electrical voltage so as to precipitate the latent failures that the second engine Ml.2, M2.2 could present by strongly stressing the electrical components constituting said second engine Ml.2, M2.2; adjust, via the control Cl.1, C2.1, the power Wml.1, Wm2.1 supplied by the first engine Ml.1, M2.1 operating in synergy with the second engine Ml.2, M2.2 so that the first engine Ml.1, M2.1 and the second engine Ml.2, M2.2 continue to supply the power necessary for the aircraft 1 during the flight phase (step 20); determine the power Wml.2, Wm2.2 supplied by the second motor Ml.2, M2.2 set to the maximum power regime to be checked (step 30); and deduce from the power Wml.2, Wm2.2 information relating to the maximum power available from the second engine Ml.2, M2.2 (step 50);.

[0064] • for the first BATI battery: put, via the CIO command, the first BATI battery at a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10); adjust, via the C1 command, the WelO power supplied by the turbogenerator TG so that the first BATI battery and the turbogenerator TG continue to supply the power necessary for the aircraft 1 during the flight phase (step 20); determine the Well power supplied by the first BATI battery put at the maximum power speed PM (step 30); and deduce from the Well power information relating to the maximum power available from the first BATI battery (step 50);

[0065] • for the second battery BAT2: put, via the command C20, the second battery BAT2 at a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10); adjust, via the command Cl, the power We20 supplied by the turbogenerator TG so that the second battery BAT2 and the turbogenerator TG continue to supply the power necessary for the aircraft 1 during the flight phase (step 20); determine the power We21 supplied by the second battery BAT2 put at the maximum power speed PM (step 30); deduce from the power We21 information relating to the maximum power available from the second battery BAT2 (step 50);

[0066] • for the turbogenerator TG: set, via the command C1, the turbogenerator TG to a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10); adjust, via the command CIO, the power Well supplied by the first battery BATI (or, via the command C20, the power We21 supplied by the second battery BAT2) so that the turbogenerator TG and the first battery BATI (or the second battery BAT2) continue to supply the power necessary for the aircraft 1 during the flight phase (step 20); determine the power WelO (or the power We20) supplied by the turbogenerator TG set to the maximum power speed PM (step 30); deduce from the power WelO (or the power We20) information relating to the maximum power available from the turbogenerator TG (step 50);

[0067] • for each of the two distributors D10, D20: set, via the controls CIO, C20, one of the distributors D10, D20 to a speed substantially equal to a maximum power speed PM making it possible to satisfy the safety minima of the aircraft 1 (step 10); adjust, via the control CIO, C20, the power Wel.2, We2.2, Wel.l, We2.1 supplied by the other of the distributors D10, D20 so that the distributors D10, D20 continue to supply the power necessary for the aircraft 1 during the flight phase (step 20); determine the power Wel.l, We2.1, Wel.2, We2.2, supplied by the distributor D10, D20 set to the maximum power speed PM (step 30); and deduce from the power Wel.l, We2.1, Wel.2, We2.2 information relating to the maximum power available from the distributor DIO, D20 set to maximum power mode PM (step 50).

[0068] It should be noted that "speed" here refers to the operating conditions of the component in question. This refers to the "rotation speed / torque" pair for the Ml.l, M2.1, M3.1, M4.1, Ml.2, M2.2, M3.2, M4.2 engines, the "battery voltage / current" pair for the BATI, BAT2 batteries and the "turbogenerator voltage / current" pair for the TG... turbogenerator.

[0069] It will be understood that each of the components of the propulsion system is tested at a predetermined maximum power regime in order to ensure that all of the components have no latent failure, said components being tested one after the other or in batches when the maximum power regime is identical.

[0070] Propulsive power P prOp required by the aircraft 1 during the flight phase is for example provided to the control device, in particular to the CAL computer, via a user interface connected to the control device. The user interface may further be configured to display status information of the aircraft 1 for the attention of a pilot or an operator.

[0071] The control device further comprises a memory in which is recorded, for each of the components of the two propulsion chains, a threshold power P s predetermined corresponding to a minimum power to be reached by the organ put at maximum power mode PM in the event of failure of the one operating in synergy.

[0072] The CAL calculator then compares the power Wml.l, Wml.2, Wm2.1, Wm2.2, Wel.l, We2.1, Wel.2, We2.2, Well, WelO, We20, We21 supplied by the component set to maximum power PM with the threshold power P sso as to ensure that the power supplied is greater than or equal to the threshold power P s (step 40).

[0073] More precisely, if the power Wml.l, Wml.2, Wm2.1, Wm2.2, Wel.l, We2.1, Wel.2, We2.2, Well, WelO, We20, We21 supplied by the organ put at maximum power mode PM is greater than or equal to the threshold power P s , the CAL calculator is configured to command the user interface to inform the pilot or operator that the component set to maximum power regime PM can provide the threshold power P s . The threshold power P s then corresponds to the minimum power guaranteed in the event of failure of the component whose power is adjusted. Otherwise, if the power supplied is lower than the threshold power P s, the CAL calculator is configured to command the user interface to inform the pilot or operator that the component set to maximum power PM cannot provide the guaranteed minimum power and that it is necessary to program a maintenance action on said component.

[0074] The CAL calculator can determine the power Wml.l, Wml.2, Wm2.1, Wm2.2 supplied by each of the first and second motors Ml.l, Ml.2, M2.1, M2.2 from the mechanical measurements MMI.I, MMI.2, MM2.I, MM2.2 and / or from the electrical measurements MEI.I, M E I.2, M E 2.I, M E 2.2 acquired by the CAL calculator.

[0075] The CAL calculator can determine the power Wel.l, Wel.2, We2.1, We2.2 supplied by each of the distributors D10, D20 from the electrical measurements Mio, M20 acquired by the CAL calculator.

[0076] The CAL calculator can determine the power WelO, We20 supplied by the turbogenerator TG from the electrical measurements M E I acquired by the CAL calculator.

[0077] The CAL calculator can also be configured to compare the measured temperature T of the engine Ml.l, Ml.2, M2.1, M2.2 put at maximum power speed PM to a threshold temperature T s predetermined temperature recorded in the memory of the control device, so as to ensure that the measured temperature is lower than the threshold temperature T s (step 60).

[0078] More precisely, if the temperature T of the engine Ml.l, Ml.2, M2.1, M2.2 put at maximum power speed PM is lower than the threshold temperature T s, the CAL calculator is configured to command the user interface to inform the pilot or operator that the temperature of the engine Ml.l, Ml.2, M2.1, M2.2 at maximum power speed PM does not exceed the threshold temperature T s , that is to say that there is no overheating of said engine Ml.1, Ml.2, M2.1, M2.2 when the latter is at a maximum rotation speed corresponding to the maximum power regime PM.

[0079] Otherwise, that is to say if the measured temperature T of the engine Ml.l, Ml.2, M2.1, M2.2 put at the maximum power speed PM is greater than or equal to the threshold temperature T s , the CAL calculator is configured to command the user interface to inform the pilot or operator that the engine Ml.l, Ml.2, M2.1, M2.2 set to maximum power PM is overheating and that it is necessary to program a maintenance action on said engine Ml.l, Ml.2, M2.1, M2.2.

[0080] The CAL calculator can also be configured to compare the rotation speed V measured on the engine Ml.l, Ml.2, M2.1, M2.2 set to maximum power speed PM with a threshold rotation speed V s recorded in the memory of the control device, so as to ensure that the measured rotation speed V is greater than or equal to the threshold rotation speed V s (step 60).

[0081] More precisely, if the rotation speed V of the engine Ml.l, Ml.2, M2.1, M2.2 set to maximum power speed PM is greater than or equal to the threshold rotation speed V s , the CAL calculator is configured to command the user interface to inform the pilot or operator that the engine Ml.l, Ml.2, M2.1, M2.2 put at the maximum power speed PM can reach the threshold rotation speed V s when the latter is at the maximum temperature corresponding to the maximum power regime PM.

[0082] Otherwise, that is to say if the rotation speed V of the motor Ml.l, Ml.2, M2.1, M2.2 set to maximum power speed PM is lower than the threshold rotation speed V s , the CAL calculator is configured to command the user interface to inform the pilot or operator that the rotation speed of the engine Ml.l, Ml.2, M2.1, M2.2 set to the maximum power regime PM is limited by the maximum temperature corresponding to the maximum power regime PM and that it is necessary to have a maintenance action programmed on said engine Ml.l, Ml.2, M2.1, M2.2.

[0083] The CAL calculator can also be configured to compare the temperature Tg measured on the turbogenerator TG set to maximum power PM with a threshold temperature Tg s predetermined temperature recorded in the memory of the control device, so as to ensure that the measured temperature Tg is lower than the threshold temperature Tg s(step 60).

[0084] More precisely, if the temperature Tg of the turbogenerator TG put at maximum power regime PM is lower than the threshold temperature Tg s , the CAL calculator is configured to command the user interface to inform the pilot or operator that the temperature of the turbogenerator TG set to maximum power regime PM does not exceed the threshold temperature Tg s , that is to say that there is no overheating of said turbogenerator TG when the turbine of the latter is at the maximum rotation speed corresponding to the maximum power regime PM.

[0085] Otherwise, that is to say if the measured temperature Tg of the turbogenerator TG put at maximum power regime PM is greater than or equal to the threshold temperature Tg s, the CAL calculator is configured to command the user interface to inform the pilot or operator that the temperature of the TG turbogenerator set to maximum power regime PM is overheating and that it is necessary to program a maintenance action on said TG turbogenerator.

[0086] To minimize the risk that the propulsion system's behavior is impacted by the potential limitation or loss of one of the tested components, and leads to a significant impact on the crew's workload, the verification process is automatically interrupted when at least one of the following conditions is met:

[0087] - the power supplied by the organ put at maximum power mode PM is less than or equal to the threshold power Ps;

[0088] - a parameter of the organ set to the maximum take-off power regime PMD is lower or higher than a predetermined threshold (for example, the rotation speed of one of the engines Ml.l, Ml.2, M2.1, M2.2 is lower than the threshold rotation speed V s , the temperature of one of the motors Ml.l, Ml.2, M2.1, M2.2 is higher than the temperature T s , the temperature of the turbogenerator is higher than the threshold temperature Tg s ...) ;

[0089] - a fault is detected on the component set to maximum power PM.

[0090] Preferably, the verification process is carried out during each flight for each of the components of the propulsion system. In other words, the maximum power that each of the components of the propulsion system can provide is preferably checked during each flight.

[0091] Furthermore, the verification method is preferably carried out during a flight phase during which the effect of a failure of one of the components would be minimal, for example during a cruise phase, near a diversion surface.

[0092] The verification process ensures that all the components of the propulsion system can deliver maximum power at each speed, particularly at speeds corresponding to particularly high power levels such as take-off (PMD speed) or OEI speed.

[0093] In particular, using the maximum power regime PM to check the maximum power available from each of the components is particularly advantageous since at this regime, the power level provided by the component is not likely to damage it significantly if it does not have a latent failure.

[0094] Using the maximum power regime PM to check the maximum power available from each of the components also has the advantages of:

[0095] - precipitate dormant or latent organ failures;

[0096] - reduce the duration of exposure to dormant failures, particularly when the verification process is carried out on each flight for each of the components;

[0097] - cause a possible failure of the component set to maximum take-off power PMD in flight conditions, particularly in the cruise phase, in conditions where the consequences of such a failure are minimized (in the event of failure of one of the components, the other component operating in synergy will be less stressed in the cruise phase than in another flight phase, which limits the risks of cascading effects, i.e. the loss of the component, then of the other component);

[0098] - limit or even avoid maintenance operations and therefore human interventions on the components which can themselves generate new risks and immobilize the aircraft;

[0099] - can be completed by an EPC check; and

[0100] - allow the application of the verification process on any type of flight, and in particular a commercial flight.

[0101] The operating parameters of the various components collected during the verification process can also be stored in the memory of the control device for analysis on the ground to determine whether or not the components can continue to be used. The results of these analyses make it possible, for example, to better guarantee the availability of maximum power of each component at each speed for future flights.

[0102] Furthermore, the verification process also has the advantage of being able to be carried out on any type of flight (commercial or technical) and of not disrupting it in terms of speed, altitude, etc.

[0103] It can be checked beforehand that the electrical power consumed by the aircraft 1 is sufficient to bring the propulsion system components to their maximum power regime or close to it. To do this, the following steps are carried out:

[0104] - measure operating parameters of the propulsion system making it possible to evaluate the power delivered by each of the components whose maximum available power is to be determined (the parameters measured are, for example, the rotation speed of the engines Ml.l, Ml.2, M2.1, M2.2, the electric current flowing in the windings of said engines Ml.l, Ml.2, M2.1, M2.2, the electric current delivered by the batteries BATI, BAT2 or by the turbogenerator TG), the measurement period having to be sufficiently long (several seconds, or even tens of seconds) to allow an estimate of the average power consumed and to reject brief transient variations;

[0105] - determine the power consumed by each group of components from the measured parameters (the groups of components can for example be the engines Ml.l, Ml.2, M2.1, M2.2 of the same propeller Hl, H2, the battery and the turbogenerator supplying the same propulsion chain, etc.);

[0106] - compare the power consumed by each group of organs with a predetermined threshold power guaranteeing the capacity of the group to carry out the verification of availability of maximum power in satisfactory operating and safety conditions;

[0107] - authorize the verification of availability of maximum power when the power consumed by each group of organs is greater than the threshold power defined for each of them.

[0108] The verification method may also include an additional step of collecting data from the components of the propulsion system and enriching a model allowing a predictive analysis of maintenance action needs for each of said components of the propulsion system. This analysis may, for example, be carried out by monitoring the level and trend of the parameters measured over time. Maintenance personnel may thus be informed of an upcoming maintenance operation on one or more of the components, in particular when the level of one of the parameters deteriorates more quickly than the others, while remaining within an acceptable range.

[0109] Of course, the invention is not limited to the embodiment described but encompasses any variant falling within the scope of the invention as defined by the claims. The architecture of the propulsion system of the aircraft may include both electric motors and thermal engines which may correspond to various fuels (kerosene, dihydrogen, etc.). In other words, one or more of the engines M1.1, M1.2, M2.1, M2.2 of the aircraft 1 may, for example, be replaced by thermal engines.

[0110] The aircraft propulsion system architecture may include both batteries and fuel cells or other sources of electrical energy. In other words, the turbine generator and / or one of the batteries may, for example, be replaced by a fuel cell.

[0111] The process applies to any architecture combining different sources of energy, distribution and power transformation.

[0112] The process applies to any type of aircraft: VTOL (“Vertical Take-Off and Landing aircraft”), STOL (“Short Take-Off and Landing aircraft”), or conventional aircraft...

[0113] The organs of the propulsion system can be tested individually or in groups.

[0114] The maximum power regime PM can, for example, correspond to the maximum power regime at takeoff.

[0115] The aircraft can be fixed or rotary wing, manned or unmanned, vertical takeoff, short or long...

Claims

DEMANDS 1. A method for verifying the maximum available power of components of an aircraft propulsion system (1) comprising first components (Ml.1, M2.1, D10, TG, BATI) sized to compensate for a failure of second components of the propulsion system (Ml.2, M2.2, D20, TG, BAT2) by providing maximum power to maintain the aircraft within a safe operating range, the first components comprising an electrical power source (TG, BATI, BAT2), a distribution component (DIO, D20) for the electrical power supplied by the electrical power source and a transformation component (Ml.1, Ml.2, M2.1, M2.2) for the power supplied by the distribution component, the method comprising the following steps for each of the first components: - put the first organ at a regime substantially equal to a maximum power (MP) regime; - adjust the power supplied by the second organ operating in synergy with the first organ so that the first organ and the second organ contribute to providing the necessary power to the aircraft during the flight phase; - determine the power supplied by the first component brought to its maximum power setting; - deduce from the determined power information relating to the maximum available power of the first component.

2. A method according to claim 1, comprising the following additional steps: - determine a threshold power (P s ) corresponding to a minimum power to be reached by the first component brought to its maximum power (MP) setting, and - compare the power supplied by the first component to the threshold power (P s ).

3. A method according to any one of the preceding claims, automatically interrupted when at least one of the following conditions is met: - the power supplied by the first component (Ml.1, Ml.2, M2.1, M2.2, DIO, D20, TG, BATI, BAT2) operating at maximum power (PM) is less than or equal to a threshold power (P s ), - a parameter of the first component brought to maximum power (PM) is below or above a predetermined threshold (V s , T s , Tg s ), - a fault is detected on the first component brought to maximum takeoff power (PMD).

4. A method according to any one of the preceding claims, further comprising the step of collecting data from the first components (Ml.l, M2.1, D10, TG, BATI) during the other steps, and enriching a model enabling predictive analysis of maintenance action needs for each of said first components.

5. Product computer program comprising instructions for carrying out the process according to any one of claims 1 to 4 when this program is executed by a processor.

6. Control device comprising a computer (CAL) configured to implement the method according to any one of claims 1 to 4.

7. Assembly comprising at least two chains of components configured to operate in synergy and together provide the power required by an aircraft (1) during a phase of flight, the aircraft being characterized in that it comprises a control device according to claim 6.

8. Aircraft (1) comprising at least two sets of components configured to operate in synergy and together provide the power necessary to an aircraft during a phase of flight, the aircraft being characterized in that it includes a computer (CAL) configured to implement the method according to claim 1.