AI Technical Summary

Technical Problem

Modern semiconductor miniature circuit breakers (SCCBs) quickly switch off short circuits, limiting damage but make it difficult to localize the short-circuit point due to lack of visible signs like smoke or odor, complicating troubleshooting, especially in buried or wall-laid lines.

Method used

An electronic circuit breaker with a processing unit that uses voltage and current measuring means to calculate line impedance and distance to the short-circuit point, enabling localization without expensive line inspections or special diagnostic devices, utilizing existing components like electronic and mechanical switching elements.

Benefits of technology

Enables accurate localization of short-circuit points without extensive line inspection, supporting diagnosis through existing circuit breaker components and potentially higher-level devices, reducing diagnostic complexity and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a method for operating a circuit breaker (100) which protects an electric circuit (200). The circuit breaker (100) has a mechanical switch element (110) and an electronic switch element (120) connected in series thereto. In one step, the circuit (200) is reactivated by means of the electronic switch element (120) after being deactivated by the electronic switch element (120) due to a short-circuit in the protected circuit (200), said short-circuit being detected by the circuit breaker (100). At least two current measurement values (i1, i 2) separated by a time interval are then ascertained for the current (i) flowing through the circuit breaker (100), and at least two voltage values (u31, u32) separated by a time interval are ascertained for load-side terminals (103, 104) of the electronic circuit breaker (100). The circuit (200) is deactivated again by the electronic switch element (120) in the event of one or more criteria. Finally, the impedance (L) of the line between the circuit breaker (100) and the short-circuit location (K) is calculated from the voltage values (u31, u32) and the current measurement values (i1, i2) and the time interval (Δt) thereof.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Description Method for operating an electronic circuit breaker, electronic circuit breaker and electrical system with an electronic circuit breaker The invention relates to a method for operating an electronic circuit breaker, an electronic circuit breaker and electrical system with an electronic circuit breaker. Modern semiconductor circuit breakers (SCCBs for short, sometimes also solid state circuit breakers, SSCBs for short; the abbreviation SCCB is used below) are able to switch off electrical circuits much more quickly in the event of a short circuit than conventional miniature circuit breakers (MCBs for short). This advantageously means that no further damage occurs to the electrical circuit and in particular to the point of the short circuit beyond that which triggered the short circuit.In particular, the short-circuit currents are quickly limited to a much lower value, which means less energy is supplied to the short-circuit point. Accordingly, in circuits protected by SCCBs, the typical short-circuit characteristics caused by the conversion of short-circuit energy into thermal energy, such as smoke or odor development, discoloration, or other visible damage, usually do not occur, which makes troubleshooting after a short-circuit event considerably more difficult. EP 3770 936 A1 discloses a method for protecting an electrical circuit against faults and overloads. In this method, a load current flowing in the load circuit is determined and compared with the maximum permissible current. If the determined load current exceeds the maximum permissible current, the load is electrically isolated by switching off a semiconductor switch arranged in the load circuit.An (electro-)mechanical switching element is then switched off to physically isolate the load.

[0002] An object of the present invention is to provide an improved electronic circuit breaker and a method for operating an electronic circuit breaker, by which the localization of the short-circuit point is facilitated.

[0003] This object is achieved by a method having the features of independent patent claim 1, by an electronic circuit breaker having a processing unit which is programmed to carry out the method according to the invention, and by an electrical system having such a circuit breaker.

[0004] Advantageous further developments of the present invention are specified in the subclaims.

[0005] One advantage of the invention is that a circuit breaker according to the invention, in particular a semiconductor circuit breaker (SCCB), enables or at least supports the localization of a short-circuit point without the need for a complex inspection of the line itself. This is a significant advantage, particularly for lines laid in walls or underground, for example. Furthermore, no special diagnostic device needs to be connected to the short-circuited circuit – the diagnosis is performed by the circuit breaker according to the invention, or the circuit breaker according to the invention supports a higher-level device that can be coupled to the circuit breaker on a case-by-case or permanent basis in the diagnosis.

[0006] In this case, components that are already present in modern circuit breakers, particularly in SCCBs, such as the electronic switching element, which switches quickly compared to the mechanical switching element, the voltage measuring device(s) and the current measuring device(s) of the SCCB are advantageously used, ie apart from the control means, which can be implemented, for example, in software or firmware, preferably no adjustments need to be made to the SCCB.

[0007] In the following, embodiments of the present invention are explained in more detail with reference to drawings.

[0008] Showing:

[0009] Fig. 1 is a schematic diagram of a circuit breaker according to an embodiment of the present invention;

[0010] Fig. 2 is an equivalent circuit diagram for a short-circuited circuit with a circuit breaker according to an embodiment of the present invention;

[0011] Fig. 3 is a simplified equivalent circuit diagram of the circuit according to Fig. 2;

[0012] Fig. 4 is a simplified flow diagram of an embodiment of the method according to the invention; and

[0013] Fig. 5 shows an exemplary curve of current and voltage of a circuit breaker when carrying out an embodiment of the method according to the invention.

[0014] Fig. 1 shows a schematic diagram of a circuit breaker 100, in particular a semiconductor miniature circuit breaker (SCCB), according to an embodiment of the present invention. The SCCB 100 has line-side terminals 101 and 102 and load-side terminals 103 and 104. Without limiting the generality, the neutral conductor of the exemplary AC system extends between terminals 102 and 104, and the neutral conductor extends between terminals 101 and 103.

[0015] The SCCB 100 has at least one mechanical switching contact. In the example shown, the SCCB 100 has two mechanical switching contacts 111, 112, which can galvanically isolate the input terminals 101, 102 from the output terminals 103, 104 for both conductor paths L and N. In the example shown, the two switching contacts 111, 112 are coupled and combined to form a two-pole mechanical disconnect switch 110.

[0016] In addition to the (electro-)mechanical switching element 110, the SCCB 100 has an electronic switching element or a power semiconductor element 120, which is preferably arranged in the L-conductor path and has a mains-side pole 121, a load-side pole 122 and a control input 123.

[0017] The electronic switching element 120 is controlled by a control element 130 via a signal line 134 via the control input 123, in particular switched on and off depending on an operating state predetermined by the control element 130. The control element 130 can be, for example, a microcontroller. In embodiments of the invention, it can also be provided that the microcontroller 130 also controls the mechanical switching element 110 (not shown). In other embodiments, it can be provided that the mechanical switching element 110 is controlled by a separate, electronic or electromechanical control element (not shown), which in turn can be coupled to the control element 130.

[0018] The control element 130 receives signals or measured values ​​from sensors or measuring devices of the SCCB 100, which is indicated in the illustration in Fig. 1 by arrows 131, 132, 133. For the sake of clarity, the illustration of any necessary signal conversions has been omitted, since the corresponding mechanisms are well-known to the responsible specialist.

[0019] In the illustrated embodiment, the SCCB 100 has means 140 for determining the (alternating) voltage ul applied to the mains-side terminals 101, 102, from which a value representing the time-dependent voltage ul is supplied to the control element 130 via the relationship 131. The SCCB 100 also has means 150 for determining the voltage u2 dropped across the electronic switching element 120. From this, a value representing the time-dependent voltage u2 is supplied to the control element 130 via the relationship 132. In the preferred embodiment, the control element 130 can determine a time-dependent voltage u3 at the output terminals 103, 104 by simple sign-true addition or subtraction from the values ​​for ul and u2. Expressed in the form of an equation, the following applies to the illustrated embodiment: u3 = ul - u2.

[0020] In other embodiments, the voltage u3 can be determined directly by corresponding measuring means arranged at the output terminals (not shown), in which case the means 140 or 150 can be dispensed with in some cases.

[0021] Finally, the exemplary SCCB 100 has means 160 for determining the current i flowing through the SCCB 100, which are preferably arranged in the conductor L connected by the power semiconductor 120. The means 160 supply a value representing the time-dependent current i to the control element 130 via the relationship 133.

[0022] The remaining functionality of the controller 130 is explained in more detail below in connection with Fig. 4 and Fig. 5.

[0023] Fig. 2 shows a highly simplified equivalent circuit of a load circuit 200 protected by an SCCB 100. The representation of the SCCB 100 has also been greatly simplified and reduced to the representation of the line-side terminals 101, 102, the load-side terminals 103, 104, and the switching devices 120, 111 in the L path. The previously mentioned voltages ul, u2, and u3, as well as the current i, are also shown for clarity.

[0024] The load circuit 200 has a short circuit at a short-circuit point K in the line between the load-side terminals 103, 104 of the SCCB 100 and the actual load (not shown). The distance, or more precisely the line length, between the load-side terminals 103, 104 of the SCCB 100 and the short circuit is designated X and indicated by a double arrow. In the illustrated simplified equivalent circuit diagram of the consumer circuit 200, the line starting from the load-side L terminal 103 of the SCCB 100 has the following elements: a first resistive line component 211 with the value Rl / 2, a first inductive line component 221 with the value L / 2, an resistive short-circuit component 230 with the value R2, a second inductive line component 222 with the value L / 2 and a second resistive line component 212 with the value Rl / 2.

[0025] With a view to further simplification (cf. Fig. 3), it has already been assumed for the sake of simplicity that the ohmic components 211, 212 and the inductive components 221, 222 for the forward and return lines are each approximately the same and therefore each correspond to approximately half of the total line resistance RI and the total line inductance L between the load-side terminals 103, 104 of the SCCB 100 and the short-circuit point K.

[0026] Fig. 3 shows a further simplified equivalent circuit diagram of the load circuit 200 between the load-side terminals 103, 104 of the SCCB 100 and the short-circuit point K. The ohmic and inductive line components 211, 212, 221, 222 shown in Fig. 2 were combined to form an ohmic line component 210 with value RI and an inductive line component 220 with value L. Thus, for the purposes of further consideration, the ohmic line component RI, the inductive line component L, and the ohmic resistance R2 at the short-circuit point K form the simplified load circuit 200 through which the current i flows. The voltage u3 is present at the load-side terminals 103, 104 of the SCCB 100. This voltage is also the time-dependent supply voltage of the load circuit 200 and is divided into time-dependent voltage drops u4, u5, and u6 across the components R1, L, and R2. Expressed in the form of an equation: u3 = u4 + u5 + u6.

[0027] An advantageous embodiment of the method according to the invention is explained below with reference to Fig. 4. The method starts in step 410, for example, in response to a request generated by an operator, if the following conditions are met: the electronic switching element 120 of the SCCB 100 was switched off (or is in a high-resistance state) due to a detected short-circuit event, and the mechanical switching element 110 is (or has been) closed again.

[0028] In step 420, the system waits until the input AC voltage ul at the input terminals 101, 102 of the SCCB 100 reaches a defined value, for example, at least 80% of the positive or negative peak value of the input AC voltage, preferably approximately the positive or negative peak value of the input AC voltage. In alternative embodiments, in step 420, the system waits until the magnitude of the input AC voltage ul at the input terminals 101, 102 of the SCCB 100 falls below a defined value, for example, a value less than or equal to a safety voltage at which accidental contact with live parts is safe for humans, for example, 50 volts or less, 60 volts or less, or 24 volts or less.

[0029] Subsequently, in step 430, the electronic switching element 120 of the SCCB is switched on, whereupon the short-circuited load circuit 200 is supplied with electrical energy and current i begins to flow. With reference to Fig. 5, this is time t0.

[0030] In step 440 (at time t1 in Fig. 5), a current value il of the current i flowing in the load circuit 200 is determined and, preferably approximately at the same time, a voltage value u31 of the voltage u3 applied to the input side of the load circuit 200 is determined. These values ​​u31 and il are stored in a memory (not shown). For the SCCB 100 shown in the example in Fig. 1, the respective instantaneous values ​​for ul and u2 are determined at time t1 and u31 is calculated therefrom. i is determined by means of the current measuring means 160 at time t1. In embodiments of the present invention, the detection of u3 and i can also take place at different times. In this case, it may be necessary to determine pairs of values ​​for u3 and i by interpolation.This is useful, for example, if the SCCB 100 has a (single) voltage measuring device that is first connected to the lines L and N to determine an instantaneous value for ul or u3, and then to the terminals of a measuring resistor or shunt (not shown) integrated in the path L to determine the voltage drop across this measuring resistor, from which the controller 130 then calculates an instantaneous value for the current i, for example.

[0031] In step 450, a check is made to determine whether the instantaneous value il of the current i exceeds a maximum value of the current i that can be specified for the method. If yes, the method continues with step 470 for safety reasons. If no, the method continues with step 460. In preferred embodiments of the invention, the maximum value of the current i that can be specified for the method is five times the amplitude value of the rated current of the circuit breaker 100. Alternatively, the check to determine whether the current exceeds the predeterminable maximum value can be performed in parallel to the steps described here, for example with a higher query frequency and / or by dedicated hardware, in order to reliably and quickly prevent the maximum value for the current i from being exceeded by then initiating shutdown of the electronic switching element 120.

[0032] Analogously, in step 450, it can additionally or alternatively be checked whether the magnitude of voltage u3 exceeds a predeterminable maximum value, for example, the aforementioned protective voltage. If yes, the method continues with step 470 for safety reasons. If no, the method continues with step 460.

[0033] In step 460, a check is made to determine whether a predeterminable number of values ​​for u3 and i have been determined. In preferred embodiments, the minimum number of value pairs is 2. In further embodiments, for example, 3, 4, 5, 6, 7, or 8 value pairs can be used. In general, the higher the processing speed of the control unit, the more value pairs can be acquired, which subsequently enables a plausibility check of the value pairs and / or filtering such as smoothing and / or interpolation at specific times and / or the suppression of transient processes in calculation step 470.

[0034] In embodiments of the invention, in addition or as an alternative, parallel to the steps described here or arranged at a suitable point in the sequence described here, it can be checked whether the time already elapsed since the electronic switching element 120 of the SCCB 100 was switched on in step 430 has reached a predeterminable maximum value.

[0035] If the predeterminable number of value pairs has not yet been reached and / or the maximum time for switching on the electronic switching element 120 has not yet been reached, the system returns to step 440 and performs a new determination of instantaneous values ​​for u3 and i. This is indicated by way of example in Fig. 5: at time t2, the values ​​u32 and i2 are determined as described above for u31 and i11.

[0036] If the predeterminable number of value pairs is reached and / or the maximum time for switching on the electronic switching element 120 is reached, the repetition is terminated and the process continues with step 470.

[0037] In step 470, the electronic switching element 120 of the SCCB 100 is switched off if this has not already occurred through parallel processes (for example, through one of the previously described checks for exceeding a maximum current value or maximum voltage magnitude or maximum duty cycle). Referring to Fig. 5, the electronic switching element 120 is switched off at time t3.

[0038] Subsequently, in step 470, the line impedance L of the line between the circuit breaker 100 and the short-circuit point K is calculated at least approximately from the voltage values ​​u31, u32 and the current measured values ​​il, i2 as well as their time interval Δt = t2 - tl. In preferred embodiments, Ai = i2 - il and Au3 = u32 - u31 are first calculated for this purpose. Subsequently, the value of the total ohmic resistance between terminals 103 and 104 is estimated as an auxiliary variable using the following relationship: RI + R2 = Au3 / Ai. Using this auxiliary variable, u5 is then estimated at one of the times tl or t2 (hereinafter referred to as tl): u51 = u31 - u41 - u61 = u31 - ((RI + R2) * il). Then an approximate value for di / dt is determined using the relationship di / dt = Ai / At and finally the desired approximate value for L is determined using the relationship L = u51 / (di / dt).

[0039] Using the values ​​u31, u32, il, i2 determined by multiple, here double, execution of step 440, the following equation results for the preferred embodiment:

[0040] L = (u31 - (u32-u31) / (i2-il) * il) / ((i2-il) / (t2-tl))

[0041] From the inductance per unit length of the cable used for the load circuit 200, which is known, for example, from data sheets and preferably stored for the respective load circuit 200 in a memory of the controller 130, the distance X between the load-side terminals 103, 104 of the SCCB 100 and the short-circuit point K can now be calculated as the value calculated for L and the inductance per unit length of the cable by dividing L by the inductance per unit length specified, for example, in pH / m:

[0042] X = L / inductance per unit length

[0043] The inductance per unit length depends in particular on the cable and / or conductor material and / or the conductor cross-section and / or the arrangement of the conductors in the cable.

[0044] The value for X determined in this way is then saved and displayed to an operator or forwarded to a higher-level device (not shown) for display. The calculations described above can be carried out entirely by the SCCB controller 130. Alternatively, individual or all calculation steps can be performed by a higher-level device, so that, for example, the required computing power only needs to be implemented once per control box and / or is provided by a portable device as needed. The higher-level and / or portable device can be connected to the SCCB 100 (not shown) permanently or as needed, either wired or wirelessly, and can, in particular, feature a convenient display of the determined value for X and, optionally, other parameters.

[0045] In exemplary embodiments, instead of the value X, the value L is output to the operator or made available for output to the operator, and it is up to the operator to determine the inductance per unit length for the load circuit 200 and then calculate X from L and the inductance per unit length. This has the advantage that the SCCB 100 or the higher-level device can be used universally and no individual parameterization of the inductance per unit length is necessary, which reduces the installation effort for SCCBs and other devices that typically do not have a user interface. In exemplary embodiments of the invention, the line resistance RI of the line between the circuit breaker 100 and the short-circuit point K is calculated from the voltage values ​​u31, u32 and the current measured values ​​il, i2 and is optionally output to the operator or made available for output to the operator.In certain embodiments, the simplifying assumption can be made that the electrical resistance R2 at the short-circuit point is zero, i.e. R2 = 0. Then, with the value of the total ohmic resistance between the terminals 103 and 104 referred to above as an auxiliary quantity, an estimate for RI is already available, namely RI = Δu3 / Ai.

[0046] In other embodiments, this simplifying assumption is not made, but RI is first calculated from the determined cable length X and a resistance per unit length of the cable known, for example, from data sheets, by multiplying X by a resistance per unit length (specified, for example, in mΩ / m):

[0047] RI = X * resistance coating

[0048] The resistance also depends in particular on the cable and / or conductor material and / or the conductor cross-section and / or the arrangement of the conductors in the cable.

[0049] From this value RI and the value RI + R2 of the total ohmic resistance between terminals 103 and 104 determined as an auxiliary value, the electrical resistance R2 at the short-circuit point K can then optionally be calculated by subtracting RI from this auxiliary value. The relationship R2 = (RI + R2) - RI = Au3 / Ai - RI then applies to R2. The value for R2 can be output to the operator, made available for output to the operator, or used for further calculations.

[0050] If, for example, due to an excessive current or an excessive magnitude of the SCCB output voltage or reaching the maximum time, the method was directed to step 470 without sufficient values ​​being available for the calculations described above, an error code may optionally be generated and transmitted to an operator or made available for transmission, indicating that the automatic determination of the parameter(s) L and / or X was not possible.

[0051] After calculating and outputting or providing the parameters X and / or L and / or RI and / or R2, the method ends with step 480. Of course, it is possible to restart the method upon appropriate operator input. In exemplary embodiments, it is possible to run the method automatically several times in succession and to calculate an average before outputting the parameters in order to obtain a better estimate.

[0052] Furthermore, it is of course possible to improve the reliability of the estimate by using additional pairs of values. The estimate is based, among other things, on the assumption that, over the very short time intervals considered, the processes described are linear (and quasi-stationary with respect to the AC system to which the SCCB 100 and the load circuit 200 are connected). The evaluation of more than two pairs of values ​​then allows value pairs to be excluded from consideration for which the aforementioned assumptions prove to be incorrect through comparison with the other pairs of values ​​or interpolation, for example, in the case of transient processes or interference coupled into the line.

[0053] As already mentioned, it is possible to have the method described above carried out entirely by a controller 130, for example a microcontroller, of a modern SCCB 100 and to transmit the results to a display device of the operator via a wireless or wired interface. The display device can be, for example, a mobile device such as a smartphone that can be coupled to the SCCB 100 via Bluetooth or another short-range radio technology. The software running on this mobile device can be designed such that the operator initiates the method through a user input, which is then transmitted to the SCCB 100. Alternatively, it can be provided that the SCCB 100 merely transmits the measured values ​​and the mobile device performs the calculations.

Claims

Patent claims 1. Method for operating a circuit breaker (100) protecting an electrical circuit (200), the circuit breaker (100) comprising a mechanical switching element (110) and an electronic switching element (120) connected in series therewith, comprising the following steps: a) re-energizing the circuit (200) by means of the electronic switching element (120) after the circuit (200) has been switched off by the electronic switching element (120) due to a short circuit in the protected circuit (200) detected by the circuit breaker (100); b) determining at least two time-separated current measurements (il, i2) for a current (i) flowing through the circuit breaker (100); c) determining at least two time-separated voltage measurements (u31, u32) at load-side terminals (103, 104) of the electronic circuit breaker (100);d) re-switching off of the circuit (200) by the electronic switching element (120) when one or more of the following criteria occur:; • Reaching a predefinable maximum value for the current (i) flowing through the circuit breaker (100); • Reaching a predetermined time period (t3) from the time point (tO) of the re-switching on of the circuit (200); • Determining a specified number of current and / or voltage measurements; e) Calculating a line impedance (L) of the line between circuit breaker (100) and a short circuit point (K) from the voltage values ​​(u31, u32) and the current measurements (il, i2) and their time interval (At).

2. Method according to claim 1, wherein f) is calculated from the calculated line impedance (L) and an inductance per unit length of the line material used for the line- as a length (X) of the line between the circuit breaker (100) and the short circuit point (K).

3. Method according to one of the preceding claims, wherein g) an ohmic resistance of the circuit (200) is calculated from the voltage values ​​(u31, u32) and the current measurements (il, i2).

4. Method according to claim 3 insofar as it relates back to claim 2, wherein h) from a resistance per unit length of the conductor material used for the conductor and the length (X) of the conductor between circuit breaker (100) and short-circuit point (K) a resistance (RI) of the conductor between circuit breaker (100) and short-circuit point (K) is first calculated and subsequently the electrical resistance (R2) at the short-circuit point (K) is calculated from the ohmic resistance of the circuit (200) and the resistance (RI) of the conductor between circuit breaker (100) and short-circuit point (K).

5. Method according to one of the preceding claims, wherein steps b) and c) are performed simultaneously or almost simultaneously and pairs of current measurement values ​​(il, i2) and voltage values ​​(u31, u32) are determined.

6. Method according to any of the preceding claims, wherein some or all of the calculation steps e), f), g) and / or h) are performed by the electronic circuit breaker (100).

7. Method according to any one of claims 1 to 5 insofar as it relates back to them, wherein some or all of the calculation steps e), f), g) and / or h) are carried out by a superior device, wherein the current measurement values ​​(il, i2) and / or voltage values ​​(u31, u32) required for the respective calculation are transmitted wirelessly or via wired connections from the protective switch (100) to the superior device.

8. Method according to one of the preceding claims, wherein the predefinable maximum value for the current (i) flowing through the circuit breaker (100) is equal to or less than five times the amplitude value of a rated current of the circuit breaker (100).

9. Method according to one of the preceding claims, wherein the predefinable time duration (t3) is 1 millisecond or shorter, in particular 100 microseconds or shorter.

10. Method according to one of the preceding claims, wherein the re-switching takes place when an alternating voltage (ul) applied to the input side of the protective switch (100) corresponds at least approximately to its peak value.

11. Method according to any one of claims 1 to 9, wherein the switching on again takes place when the magnitude of an alternating voltage (ul) applied to the input side of the protective switch (100) is at least less than or equal to a safety voltage at which accidental contact with live parts of the circuit (200) is without danger to humans.

12. Method according to claim 11, wherein the circuit (200) is switched off by the electronic switching element (120) when the magnitude of the AC voltage (ul) applied to the input side of the circuit breaker (100) exceeds the safety voltage.

13. Electronic circuit breaker (100) comprising voltage measuring means (140, 150) and current measuring means (160) and a processing unit (130) programmed to execute the procedure according to one of the preceding claims.

14. Electrical installation with one or more protective switches (100) according to claim 13 and a device connectable wirelessly or wired to the protective switch(es) (100) for calculating and / or displaying the length (X) of the conductor- tung between circuit breaker (100) and short circuit point (K) of a short-circuited circuit (200).