Electrolyser and method for operating an electrolyser

EP4469624A2Pending Publication Date: 2024-12-04SIEMENS ENERGY GLOBAL GMBH & CO KG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2023705328
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2022-03-31
Filing Date
2023-01-09
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing electrolyzers face challenges in preventing dry running during standstill operations, particularly in emergency shutdowns, due to gas diffusion through thinner membranes, which increases the risk of explosion, and require complex and inflexible solutions to maintain moisture levels across varying operating pressures.

Method used

An electrolyzer system with a gas separator and bypass line that utilizes hydrostatic pressure to automatically flood the electrolysis module with water, ensuring rapid and reliable moisture maintenance independent of external supplies or redundant systems, suitable for both atmospheric and pressure electrolyzers.

Benefits of technology

The system effectively prevents dry running and explosion risks by ensuring rapid and automatic flooding of electrolysis modules, maintaining membrane and component moisture, and is flexible across different operating pressures without the need for complex external systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to an electrolyser (1) for generating hydrogen (H2) and oxygen (O2) as product gases, said electrolyser comprising an electrolysis module (3) and a gas separator (5) which is designed for phase separation of the product gas from water, the electrolysis module (3) being connected to the gas separator (5) via a product flow line (7) for the product gas, and a return line (9), which fluidically connects the gas separator (5) to the electrolysis module (3), being provided for the separated water, a circulation pump (13) being connected in the return line (9). The electrolyser (1) has a bypass line (15) comprising a valve (17) which connects the gas separator (5) to the electrolysis module (3), at least part of the return line (9) being fluidically bypassed by the bypass line (15) so that, in the event of a standstill, water can be supplied from the gas separator (5) to the electrolysis module (3) via the bypass line (15). The invention also relates to a method for operating an electrolyser (1) comprising an electrolysis module (3), wherein, in a standstill mode, the electrolysis current is stopped and a safety deactivation is initiated. This involves water being automatically driven into the electrolysis module (3) solely due to a hydrostatic differential pressure (∆p) associated with a predefined height difference (∆h), and flooding the electrolysis module (3) with water.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Description

[0002] Electrolyzer and process and operation of an electrolyzer

[0003] The invention relates to an electrolyzer and a method for operating an electrolyzer.

[0004] An electrolyzer is a technical system that uses electrical current to effect an electrochemical conversion of substances, known as electrolysis. In keeping with the variety of different electrolysis processes, there are also a variety of electrolyzers, such as an electrolyzer for water electrolysis, i.e., the decomposition of water as a reactant into the product gases oxygen and hydrogen.

[0005] For some time now, there has been increasing interest in using surplus energy from renewable energy sources during periods of abundant sun and wind, i.e., when solar or wind power generation is above average, to generate valuable materials. One such valuable material could be hydrogen, which is produced using water electrolyzers. This hydrogen can be used, for example, to produce so-called renewable energy gas (RE-gas).

[0006] An electrolyzer typically has a large number of electrolysis cells arranged adjacent to one another and stacked. By means of water electrolysis, water is split into hydrogen and oxygen in the electrolysis cells. In a PEM electrolyzer, distilled water is typically fed in as a reactant on the anode side and split into hydrogen and oxygen at a proton-permeable membrane (PEM). The water is oxidized to oxygen at the anode. The protons pass through the proton-permeable membrane. Hydrogen is produced on the cathode side. The water is usually pumped from the bottom into the anode compartment and / or cathode compartment. In an electrolyzer, the individual electrolysis cells are typically stacked in an axial direction to form a module comprising a large number of individual cells and installed to form the module or electrolysis module.An electrolyzer usually has a plurality of modules which together form a so-called electrolysis stack or simply "stack". For example, 50 electrolysis cells can be stacked axially to form a module and in turn, for example, 5 modules can be stacked in the axial direction to form a stack, so that such an electrolysis stack can therefore comprise, for example, 250 cells in an overall axial assembly.

[0007] As soon as the electrolysis modules of a PEM electrolyzer, or the electrolysis cells or the electrolysis stack, have been filled with water for the first time (e.g. after production), it must be ensured that water (reactant water) or, during operation of the electrolyzer, a water-gas mixture always remains in the modules. Dry running or drying out must be prevented in every phase of operation, as this would lead to irreversible damage to the electrolyzer. Above all, the membrane must always be kept in a moist environment, but other functional parts and components, such as the catalyst or the electrodes, must not dry out either.

[0008] During an operating phase with planned and imminent maintenance or repair of the electrolyzer from a normal operating state, for example for service purposes, downtime management of the electrolyzer can generally be planned well and in advance, and appropriate precautions and shutdown procedures can be initiated routinely and safely, in particular to ensure that water remains in the modules even after shutdown and, if necessary, is also circulated.

[0009] On the other hand, unforeseen and, in particular, safety-related rapid shutdowns within a very short period of time or even instantaneous emergency shutdowns in the event of a malfunction can cause considerable problems. These are very difficult to control and require a great deal of technical effort, particularly with regard to preventing the modules from running dry during standstill operation. This is all the more true as there are various types of electrolyzers, each with a different design and different operating parameters, which must be taken into account to determine specific operating risks and causes for a safety shutdown or emergency shutdown. For example, atmospheric electrolyzers are known, which operate at atmospheric or low operating pressure, and pressure electrolyzers, which operate at a high operating pressure of 35 bar and far higher.

[0010] The object of the invention is therefore to provide an electrolyzer in which standstill operation can be implemented in a technically simple and safe manner, thus preventing dry running with high reliability. A further object is to provide a method for operating an electrolyzer in standstill operation with low susceptibility to failure and high flexibility.

[0011] According to the invention, the object directed to an electrolyzer is achieved by an electrolyzer for producing hydrogen and oxygen as product gases, comprising an electrolysis module and a gas separator which is designed for the phase separation of the product gas from water, in which the electrolysis module is connected to the gas separator via a product flow line for the product gas, and in which a return line for the separated water is provided, which fluidically connects the gas separator to the electrolysis module, wherein a circulation pump is connected to the return line, and in which a bypass line with a fitting is provided, which connects the gas separator to the electrolysis module, wherein the return line is at least partially fluidically bypassed by the bypass line, and wherein the bypass line with the fitting is designed in such a way,that during standstill operation, water from the gas separator can be supplied to the electrolysis module independently via the bypass line, ensuring rapid flooding of the electrolysis module with water and preventing the electrolysis module from running dry.

[0012] The invention is based on an understanding of the problem from a risk assessment and evaluation of different causes, such that in electrolysis modules that are at least partially filled with gas, with hydrogen on the cathode side and oxygen on the anode side, a very rapid diffusion of the gases through the thin, proton-permeable membrane takes place. The small hydrogen molecule in particular then diffuses back to the oxygen side. The effect is more pronounced at higher operating pressures in the electrolyzer, since a partial pressure difference is the driving force behind the diffusion. The diffusion can lead to dangerous gas concentrations within a matter of minutes, i.e. to an increase in the hydrogen concentration on the oxygen side well beyond the lower explosion limit of 4. Since an ignition source cannot be ruled out, for example a dry catalyst, an explosion is possible in the worst case scenario.

[0013] In this situation, dry running of the electrolysis modules must be prevented at all costs.

[0014] During normal operation, a mixed phase is created in the modules, i.e. a phase mixture of water and product gas, i.e. on the hydrogen side a water / hydrogen mixture and on the oxygen side a water / oxygen mixture. As soon as the power supply to the electrolysis is stopped and no further measures are taken, the mixture would immediately separate and a gas phase would form, at least in the upper area of ​​the electrolysis modules. A rapid supply of water and the displacement of the gas is therefore essential in all conceivable malfunctions in order to prevent drying out. Safety measures must therefore be implemented immediately. To make matters worse, one of the development goals for PEM electrolysis is to use increasingly thinner membranes, which reduces the electrical resistance across the membrane and increases the efficiency of the electrolyzer.However, thinner membranes disadvantageously lead to even higher diffusion and thus to an increased risk of explosion.

[0015] It is therefore increasingly important to ensure particularly rapid flooding of the electrolysis modules with water during standstill operation. Current solutions are inadequate or very complex and lack flexibility with regard to the electrolyzer's operating pressure.

[0016] To this end, the invention proposes a completely self-sufficient water flooding concept for the electrolysis modules in the electrolyzer, which proves to be highly reliable and robust within the system. It is particularly independent of additional and complex external supplies and redundant systems or backup solutions for conveying or flooding using pump units. The present system concept for the electrolyzer can also be used advantageously, regardless of the electrolyzer's working pressure, i.e., it can be flexibly applied to both atmospheric and pressure electrolyzers.In particular, critical operating conditions such as those resulting from the risk of explosion can be avoided and dry running prevented at the same time, as rapid emptying of the gas separator through the specially provided bypass line and level compensation due to the height difference and thus the corresponding pressure difference maintained as a result of the water column are automatically carried out and driven. In particular, there is no need for external or specially provided pump units or complex electrical emergency power supply systems to bring about safe and very rapid flooding of the electrolysis modules. This means that the electrolysis cells and in particular the membrane are reliably protected from drying out, as these components are quickly flooded and kept moist by the water driven back through the bypass line.

[0017] A bypass line with a valve is specifically provided for bleeding, particularly in the event of an emergency shutdown. The bypass line is essentially parallel to the return line in terms of flow and connects the gas separator and its water reservoir with the electrolysis module. During normal operation, the valve is closed. Separated water can then be returned to the electrolysis module via the return line using the circulation pump. Depending on its design, the return line with the circulation pump is partially or completely bypassed by the bypass line.

[0018] This system concept for an electrolyzer therefore enables safe, particularly rapid, and automatic flooding of an electrolysis module with water through the bypass line and the water reservoir in the gas separator when the valve is opened, advantageously achieved solely due to the height difference. Compared to known solutions for electrolyzers, the present safety concept is superior because it requires no redundancies and supplies can be implemented independently of the electrolyzer's working pressure.

[0019] In a particularly preferred embodiment, the gas separator is designed and arranged at a predetermined height difference above the electrolysis module in such a way that, when the electrolysis module is at a standstill, it can be automatically flooded with water via the bypass line, driven solely by a hydrostatic differential pressure.

[0020] By designing and arranging the gas separator at a predetermined height above the electrolysis module, a sufficient minimum fill level or water level is constantly maintained in the gas separator during operation and a hydrostatic delivery pressure is already inherently provided in the system. This implements safe shutdown or standstill operation, particularly in the event of a safety-related emergency shutdown, which is provided via the bypass line with the valve. Of course, the flooding concept can also be advantageously used for regular and scheduled shutdown of the electrolyzer, for example for servicing purposes. In conjunction with the bypass line, the elevated position of the gas separator ensures sufficient hydrostatic delivery pressure and a sufficient volume flow of water for flooding in a short time.

[0021] For example, pressure electrolyzers are operated at a pressure of 35 bar. At this high working pressure, the volumetric gas content in the electrolysis module is low, i.e., after shutdown, only a small amount of gas can separate in volumetric terms. The pipes from the electrolysis module generally lead uphill to the gas separators, so that after shutdown, some of the water in the pipes is also separated and can flow back into the electrolysis module. However, in the event of an emergency shutdown, for example in the event of an explosion hazard, this does not happen quickly enough and also requires active components to actively and quickly pump the water into the electrolysis modules. The gas separator must also be kept at an appropriate fill level for this situation.Due to the pressure operation, the diffusion of hydrogen from the cathode side through the membrane to the anode side of the electrolysis cell is increased, a safety-relevant problem which becomes more pronounced with increasing design towards thinner membranes.

[0022] In comparison to a pressure electrolyzer, a larger volumetric amount of gas is present in the electrolysis module in atmospheric operation under operating conditions. The electrolysis modules are directly connected to the gas separators above via both the inlet and outlet. The installation of a pump is generally not necessary due to the natural circulation process. As long as there is a sufficient amount of sufficiently dispersed gas in the electrolysis modules, this natural circulation does not come to a standstill due to the resulting density difference. Once the natural circulation has stopped, the water level in the electrolysis modules is significantly lower than that of the gas separators and there are no internals in between that are subject to significant pressure losses, so that water can flow freely from the gas separators into the modules and maintain the water level in the modules.

[0023] A classic way to safeguard against failures in forced circulation using pumps is to use redundant pumps. In the event of a pump failure, the remaining pump capacity can be used to quickly fill the modules with water. To counteract a power outage, an uninterruptible power supply is necessary. Furthermore, pumps should be controlled completely separately to bridge control system errors. This makes such solutions very complex and expensive.

[0024] With the concept of the invention, however, both pressure electrolyzers and atmospheric electrolyzers can be very effectively protected against dry running, and particularly rapid, automatic, and self-sufficient flooding via the bypass line is possible without the need for redundancy. The concept proves particularly advantageous for atmospheric electrolyzers, but, as explained, it is not limited to them.

[0025] The system concept of the invention for an electrolyzer therefore enables particularly safe and rapid flooding of an electrolysis module with water through the bypass line and the water reservoir in the gas separator, which provides sufficient hydrostatic delivery pressure and a correspondingly large water reservoir due to a correspondingly elevated position of the gas separators. Preferably, the height difference is adjusted such that at least 0.05 bar to 0.5 bar, in particular 0.1 bar to 0.3 bar, is provided as the driving pressure difference for flooding.

[0026] Design engineering has shown that at this differential pressure, typical electrolyzers generally provide sufficient pressure to initiate the fastest possible flooding by opening the valve in the bypass line, if necessary. The sufficient differential pressure level and thus the higher positioning of the gas separator relative to the electrolysis module can be advantageously adapted to the respective situation. By providing the bypass line with only one valve, adverse effects from line cross-sections, parts, and components that influence the flow resistance and the entire electrolysis module to be flooded on the flow path to the electrolysis module are not to be feared in the bypass line.These pressure loss coefficients can lead to altered and increased differential pressures in lines with numerous flow elements, such as pumps and heat exchangers, which would be necessary for rapid flooding. The bypass line advantageously bypasses the return line with the circulation pump, thus advantageously avoiding the disadvantages of increased pressure loss coefficients.

[0027] In a further preferred embodiment of the electrolyzer, the gas separator is designed as a horizontal container, so that a large surface is provided as a phase interface between the liquid and gaseous phases.

[0028] This design of the electrolyzer allows a comparatively low overall height of the gas separator, which is very advantageous given the intended positioning with a sufficient height difference above the electrolysis module. The gas separator designed as a container therefore has a container base with a length and a width that are each significantly greater than the height of the container. This advantageously saves installation space despite the necessary height difference for the hydrostatic pressure build-up. In addition, the horizontal design creates a correspondingly large phase boundary in the gas separator between the water at the container base and the product gas - oxygen or hydrogen - in the gas phase above the phase boundary, which promotes more effective phase separation between water and product gas in the phase mixture during normal operation. Effective phase separation is also advantageous during standstill operation.

[0029] In a particularly preferred embodiment, the bypass line opens directly into a lower region of the electrolysis module or into the return line, bypassing the circulation pump on its pressure side.

[0030] This type of bypass line connection creates the highest possible hydrostatic pressure difference and therefore a corresponding filling pressure due to the height difference between the gas separator and the electrolysis module in the electrolyzer. A higher differential pressure ensures faster backflow of water and complete flooding of the electrolysis module via the bypass line in the event of a safety shutdown. The theoretically achievable maximum differential pressure (filling pressure) is simply the hydrostatic pressure of the water column that is generated when there is a height difference between the normal fill level in the gas separator and the level at the bypass line connection to the electrolysis module. In practice, however, the electrolysis module itself already has a fill level, so the differential pressure actually available for flooding is the result of the height difference or the level difference between the fill levels.The driving force for flooding is the higher water level in the gas separator compared to the water level in the electrolysis module, so that automatic level compensation can be achieved. Preferably, the fitting in the bypass line is designed as a valve, particularly a solenoid valve, which opens automatically when de-energized.

[0031] A relatively robust and simple valve with a short opening time and a large opening is sufficient here, allowing the flow path in the bypass line to be cleared for flooding without any significant pressure loss through the valve. A solenoid valve is advantageous here, which is closed during normal operation when activated by a current. If the electrolyzer is shut down, possibly accompanied by a power failure, the solenoid valve opens automatically when de-energized.

[0032] Preferably, the valve is designed as a check valve that opens automatically due to the hydrostatic differential pressure when the system is at a standstill. This is a particularly simple and robust mechanical solution that requires no power supply and only minimal maintenance.

[0033] Preferably, at least two valves are provided in the bypass line which are connected in parallel in terms of flow in the bypass line. This creates redundancy in a very simple way in the event that a valve fails during standstill operation and does not open for standstill or shutdown operation. This increases the operational reliability for initiating flooding of the electrolysis module. Valves connected in parallel considerably increase the reliability in the event of necessary opening. It is possible for two or more valves to be connected in parallel in the bypass line. When choosing the type of valve, combinations of solenoid valve and check valve or other designs are also advantageous.

[0034] In a preferred embodiment, the return line opens into a lower region of the electrolysis module. This is particularly advantageous if the bypass line itself does not open directly into a lower region of the electrolysis module, but rather opens into the return line in a line section on the pressure side, advantageously bypassing the circulation pump and any other flow elements. Only one connection is required. This means that the one connection to the electrolysis module can be used both for normal operation with regular return of water to the electrolysis process and during standstill operation for flooding via the bypass line, bypassing the circulation pump and any other flow elements in the return line.

[0035] With this type of connection of the bypass line in combination with the return line via just one connection to the electrolyzer, the highest possible hydrostatic pressure difference is created as a result of the height difference between the gas separator and the electrolysis module in the electrolyzer. A higher differential pressure ensures faster backflow of the water and complete flooding of the electrolysis module in the event of a safety shutdown. The differential pressure results simply from the hydrostatic pressure of the water column, which is generated when there is a height difference between the normal fill level in the gas separator and the lowest possible connection level of the common connection of the bypass line and partly finally via the return flow line into the electrolysis module.In this case, the driving force for flooding is also the higher water level in the gas separator compared to the electrolysis module, so that an automatic level compensation can be brought about.

[0036] By partially or completely bypassing the return line with the bypass line, there are no restrictions on the flow rate at standstill for the bypassed fluidic components in the return line. There is no specific design of the flow path in the return line with regard to the pressure loss coefficient, and there is a great deal of freedom in selecting and combining available components, such as the circulation pump, heat exchanger, measuring devices, or other components that increase the resistance coefficient.

[0037] Nevertheless, in certain applications, it may be advantageous for the circulation pump in the return line to be designed such that it has a low pressure loss coefficient when not in operation. This would generally be advantageous because it would provide an additional flow path for rapid backflow or flooding via the return line if required, thus achieving simple redundancy. This may then eliminate the need for additional redundancy through multiple, parallel-connected valves in the bypass line.

[0038] The pressure loss coefficient, pressure loss coef fi cient or resistance coefficient (usual formula symbol In fluid mechanics, pressure loss (Zeta) is a dimensionless measure of pressure loss in a component through which flow occurs, such as a pipe or valve. This means that the pressure loss coefficient indicates the pressure difference that must exist between the inflow and outflow to maintain a certain flow rate through the component. The pressure loss coefficient always applies to a specific geometric shape and is generally dependent on the Reynolds number and, if applicable, the surface roughness of the component carrying the flow.

[0039] During normal operation of the electrolyzer, it is very advantageous to actively return the water separated in the gas separator to the electrolysis process, which is why a circulation pump is provided in the return line to continuously pump the water back. However, the circulation pump represents a flow element subject to resistance, which would counteract a rapid backflow of water during flooding, for example during shutdown. It can therefore be advantageous to provide the lowest possible pressure loss coefficient for the circulation pump during standstill. Especially in combination with the bypass line, this increases the reliability of standstill operation and optionally allows rapid flooding via several lines, creating simple redundancy.

[0040] It has been shown that a pressure loss coefficient / of the circulating pump of less than / = 5, in particular less than / = 3, is preferred. This ensures that a sufficient volume flow of water can flow through or back through the circulating pump, if required, even when the pump is at a standstill. The driving force, however, remains the differential pressure due to the height difference between the gas separator and the electrolysis module. However, an appropriately adapted and designed circulating pump is now advantageously integrated into the electrolysis system; this circulation pump passively supports flooding through the low pressure loss coefficient, in combination with the bypass line. The leading component or flow path for flooding is preferably the bypass line.

[0041] In a preferred embodiment, several electrolysis modules are provided which are connected to the gas separator via a common product flow line.

[0042] The performance of the electrolyzer or electrolysis system can thus be easily and flexibly scaled by adding additional electrolysis modules. The electrolysis modules can be operated in parallel or in series as a so-called module series or combinations thereof. In this context, a parallel connection can refer to the purely electrical connection with regard to the electrolysis current or the electrolysis voltage and / or with regard to the material flows, such as the routing and conduction of the process water as a reactant stream through the electrolysis modules.

[0043] In a particularly preferred embodiment, when there are multiple electrolysis modules, the electrolysis modules are connected to the return line via a respective connecting line, with a control valve arranged in at least one of the connecting lines. A preferred embodiment is one in which a respective control valve is provided in each of the connecting lines, as this allows for particularly high operational flexibility, such as flooding only one or only individual electrolysis modules as needed for servicing purposes or in a safety shutdown.

[0044] If, for example, several electrolysis modules or module rows connected in parallel are supplied by a pump or pump station, respective control valves are preferably provided in order to enable an individually controllable flow to each electrolysis module or module row.

[0045] When using several pumps in parallel, for example to provide redundancy, it is preferable that the flow through a pump is also sufficiently dimensioned, i.e. the pressure loss coefficient. This advantageously allows, for example, the so-called shut-off and replacement of pumps and continued operation with at least one pump that can flow freely. A gate valve - also known as a gas or water gate valve - is a fitting that is usually used to completely open or close the entire flow cross-section of a pipe or line. Unlike valves, gate valves are not primarily used to regulate the flow rate and not at very high pressure. Gate valves are often used for pre-shutoff, i.e. to enable maintenance work on downstream valves that take over the shut-off or regulation during normal operation.

[0046] Even if the bypass line is preferably provided as the leading component or the decisive flow path for flooding the electrolysis module in the design concept of the invention, it can generally be advantageous to provide the lowest possible permissible pressure loss coefficient at the component level for an electrolysis system. Therefore, if additional fluidic components or elements are used in a flow path, e.g., heat exchangers, valves, filters, particularly in the return flow line, consideration of the pressure loss coefficient may be preferable. Then, at least within certain limits, an otherwise necessary adjustment of the height difference can be partially compensated, i.e., a correspondingly higher differential pressure can be used as the driving force for flooding. In particular, the return flow line is thus also upgraded for flooding as needed, either alternatively or additionally as a redundant flow path to the bypass line.

[0047] Preferably, the control valve is mechanically designed for a minimum flow rate that cannot be undercut during control. The minimum opening can be achieved by a corresponding mechanical locking device. A corresponding design of the control valve is also preferably provided for multiple control valves, each of which is connected to a connecting line.

[0048] This minimum opening of the valve position for a minimum flow through the control valve is advantageously set and designed together with the pressure loss coefficient of the circulation pump and / or the pressure loss coefficient of a pump station comprising a plurality of pumps in the electrolyzer in such a way that a sufficiently rapid, automatic backflow of water from the gas separator to the electrolysis module to be flooded is ensured solely due to the differential pressure or the height difference. Even if the leading component or the decisive flow path for flooding the electrolysis module, preferably the bypass line, is provided in the design concept of the invention, it can be advantageous to provide the lowest possible permissible pressure loss coefficient when at a standstill for other flow paths as well, for example a corresponding minimum flow through the existing control valves.

[0049] In a preferred embodiment, a control valve is connected to the return line on the pressure side of the circulation pump. This allows the return flow of water from the gas separator to be controlled during normal operation, and the volume flow can be adapted to the operation of the electrolyzer. The bypass line is routed parallel to the return flow line in terms of flow technology or fluid technology and, in this preferred embodiment, bypasses both the circulation pump and the control valve. The bypass line preferably opens into the return line downstream of the control valve or, alternatively, is preferably connected to the electrolysis module via a separate connection.

[0050] Preferably, a heat exchanger is installed in the return line between the circulation pump and the control valve. This allows process heat to be extracted from the returned water from the gas separator and dissipated via a heat exchanger. The water is cooled to a temperature level and can be used not only for the electrolysis process but also for cooling the electrolysis module.

[0051] The object directed to a method for operating an electrolyzer is achieved according to the invention by a method to which an electrolysis current is fed to an electrolysis module during normal operation, such that water is converted to hydrogen and oxygen as product gases in the electrolysis module, wherein product gas is fed to a gas separator in a phase mixture of water and product gas, wherein water is separated from product gas in the gas separator, and wherein during standstill operation the electrolysis current is stopped and a safety shutdown is initiated. In this case, water from the gas separator is automatically driven into the electrolysis module due to a hydrostatic differential pressure associated with a predetermined height difference, wherein the electrolysis module is flooded with water, ensuring rapid flooding of the electrolysis module and preventing the electrolysis module from running dry.Preferably, during the safety shutdown, a valve is opened automatically and the water is driven into the electrolysis module via a bypass line.

[0052] Preferably, the electrolysis module is automatically flooded with water until the water level in the gas separator and the level in the electrolysis module are equal.

[0053] In the event of a sudden stoppage in operation, e.g. as a result of a safety shutdown or an emergency shutdown of the electrolysis, product gas and water separate in the electrolysis module. A certain water level or fill level is established in the electrolysis module. Because the gas separator is positioned higher and designed accordingly, water is immediately and quickly driven into the electrolysis module by means of the intended differential pressure and any flow elements present in the lines can also be flowed through sufficiently quickly. This brings about level compensation very quickly and automatically and rapid flooding of the electrolysis module. The electrolysis cells in the electrolysis module and in particular the sensitive membranes are completely soaked with water and cannot dry out. Dry running is reliably prevented.

[0054] Further advantages of the process arise from the advantages of the electrolyzer described above.

[0055] The invention is explained in more detail below with reference to the accompanying drawings. It should be noted that the exemplary embodiments shown in the drawings primarily serve to explain the invention. However, they are not intended to limit the invention.

[0056] Here we show schematically and very simplified:

[0057] FIG 1 shows an electrolyzer with an electrolysis module; FIG 2 shows a diagram showing the time course of the fill level during a safety shutdown.

[0058] The same reference symbols have the same meaning in the figures.

[0059] FIG. 1 shows an electrolysis system 1 for the electrolysis of water. The electrolyzer 1 has - simplified in the illustration - a circuit on the hydrogen side. A corresponding circuit is also possible on the oxygen side in an analogous manner. A simple exemplary embodiment of an electrolyzer 1 is shown in order to carry out the invention and explain the principle. The electrolyzer 1 has an electrolysis module 3 and a gas separator 5. The gas separator 5 is connected to the electrolysis module 3 via a product stream line 7. The electrolysis module 3 typically comprises an electrolysis cell stack (not shown in detail in FIG. 1) with a large number of electrolysis cells stacked in an axial direction. An anodic half-cell and the cathodic half-cell of an electrolysis cell are separated by a proton-permeable membrane.As shown, it is also possible for a plurality of electrolysis modules 3, 3a, 3b to be connected together to form a module arrangement 27. The electrolyzer 1 is designed to produce hydrogen H2 and oxygen O2 as product gases in a PEM electrolysis process, for example under atmospheric pressure conditions. The electrolysis module 3 is connected to the gas separator 5 via the product flow line 7 for the product gas. The gas separator 3 is designed for phase separation of the product gas from water, in this case the separation of gaseous hydrogen H2 from the phase mixture with water in the gas separator 3. A return line 9 for the separated water fluidically connects the gas separator 3 to the electrolysis module 3.The return line 9 opens into the electrolysis module 3 at a connection point that is as geodetically low as possible, so that the highest possible hydrostatic pressure is generated by the water column in the gas separator 5 in relation to the filling level L. sin the gas separator and rests on it. A circulation pump 13 is connected to the return line 9, which, during normal operation of the electrolyzer, actively conveys water separated from the phase mixture from the gas separator 3 into the electrolysis module 3 or circulates it in the hydrogen-soap circuit. The circulation pump 13 is supplied with electrical current. A bypass line 15 with a fitting 17 connects the gas separator 5 to the electrolysis module 3. The bypass line 15 opens into the return line 9 downstream of the circulation pump 13 or is connected to it. It is also possible for the bypass line 15 to be connected directly to the electrolysis module 3 without opening into the return line 9. In both connection variants, the return line 9 with the circulation pump 13 is fluidically bypassed at least partially by the bypass line 15 in a separate and parallel flow path for the water.A heat exchanger 25 and a control valve 23 are connected to the return line 9, so that during normal operation of the electrolyzer 1, a controlled return of water and cooling of the water via the heat exchanger 25 can be carried out. Thus, in the event of a scheduled or unscheduled shutdown of the electrolyzer 1, water from the gas separator 5 can be quickly supplied to the electrolysis module 3 via the bypass line 15 provided for this purpose, and the electrolysis module 3 can be flooded very effectively in the shortest possible time, so that the membrane in particular is reliably protected from drying out.

[0060] With this simple circuit of FIG 1, during normal operation of the electrolysis module 3 is supplied with water for the electrolysis reaction, whereby the water also serves to cool the cells. Hydrogen H2 produced as the product gas of the electrolysis is fed together with excess water in a phase mixture into the gas separator 3 for hydrogen. In the gas separator 3, phase separation takes place and the gaseous hydrogen H2 is separated from the liquid water and withdrawn from the circuit via the gas line 19 for the hydrogen H2 and fed for further use. In order to maintain the water circulation in the circuit, the circulation pump 4 is provided in the circuit. Used water is also compensated for by adding demineralized water (DI water) to the gas separator 3 via a supply line 21 with a control valve 23.

[0061] The gas separator 5 is designed and arranged at a height difference Ah above the electrolysis module 3 such that, in the event of a standstill, the electrolysis module 3 or, if necessary, further electrolysis modules 3b, 3c in the module arrangement 27 can be automatically flooded with water via the bypass line 15 solely by a hydrostatic pressure difference Ap driven by the height difference Ah. In this case, the height difference Ah is set such that the available effective and driving pressure difference between the fill level L M in the electrolysis module 3 and the fill level L s in the gas separator 3 at least 0.05 bar to 0.5 bar, in particular 0.1 bar to 0.3 bar, is provided, see also FIG 2 in which the principle of level compensation is explained in more detail.

[0062] The flooding concept for the electrolysis module 3 is completely self-sufficient and intrinsically very reliable. It is independent of additional and complex external supplies and redundant systems or backup solutions for conveying or flooding by means of pumps. By designing and arranging the gas separator 5 at a sufficient height above the electrolysis module 3, a filling level L s or a Level L s of the water in the gas separator 5, and a hydrostatic discharge pressure is already intrinsically provided in the system for a potentially necessary shutdown, particularly in the case of a safety-related emergency shutdown. Of course, the flooding concept can also be advantageously used for regular and scheduled shutdowns, for example, for service purposes.

[0063] The gas separator 5 is designed as a horizontal container with the largest possible surface 11 as a phase boundary surface, whereby a particularly effective phase separation as well as a reduced installation space, especially in terms of height, is possible, despite the raised arrangement of the gas separator 5 compared to the electrolysis module 3 on the height difference Ah.

[0064] The circulation pump 13 in the return line 9 is optionally designed in such a way that it has a low pressure loss coefficient when at a standstill, so that in joint cooperation with the gas separator 3 which is emptied via the return line 9, a rapid flooding is ensured. Typically, the pressure loss coefficient for the circulation pump of less than = 5 , in particular smaller than = 3 . This is an advantageous optional precautionary measure and creates a redundancy in a simple manner, which, in addition to the primary flooding via the bypass line 15, creates an additional flow path via the return line 9 . In general, however, no special measures, restrictions or precautions with regard to the pressure loss coefficients of the components need to be observed for the return line 9 .

[0065] During normal or regulated operation of the electrolyzer 1, an electrolysis current is fed to the electrolysis module 3, so that water is converted to hydrogen H2 and oxygen are produced as product gases in the electrolysis module 3. Hydrogen H2 is fed to the gas separator 3 in a phase mixture with water as product gas, wherein the water is separated from hydrogen H2 in the gas separator 3. During standstill operation, the electrolysis current is stopped instantly and a safety shutdown is initiated without delay. In this case, the valve 17 in the bypass line 15 opens automatically. By designing the valve 17, for example, as a normally closed solenoid valve, the valve opens automatically in the de-energized state via a released spring.A further embodiment of the valve 17 is possible as a simple check valve, which is closed during normal operation due to a pressure difference across the check valve and, during standstill operation, the pressure difference across the check valve is reduced or eliminated, so that the flow path for flooding is quickly opened via the bypass line 15. Thus, water from the gas separator 3 is automatically driven into the electrolysis module 3 due to the height difference Ah, so that the electrolysis module 3 is completely flooded with water. The electrolysis module is automatically flooded with water until the fill level L. s of the water in the gas separator 3 and the filling level L Min the electrolysis module. This achieves a steady and safe state, and the electrolysis module 5 with its critical components such as the membrane and electrodes are completely immersed in water. Dry running is inherently prevented, especially without having to resort to active electrical supply systems or redundant backup solutions.

[0066] The flooding concept of the invention can be flexibly applied to more complex electrolyzers 1 with regard to safety-related design and configuration. For example, a plurality of electrolysis modules 3, 3a, 3b can be provided, which are interconnected to form a module arrangement 27. In FIG. 1, three electrolysis modules 3, 3b, 3c are provided as an example, which are connected to the gas separator 3 via a common product flow line 7. For this purpose, on the output side of the electrolysis modules 3a, 3b, 3c, a respective line - not shown in more detail in the module arrangement 27 - opens into the common product flow line 7. It is also possible for the electrolysis modules 3a, 3b, 3c to be connected to the return line 9 via a respective connecting line - not shown in more detail in the module arrangement 27.A control valve is then provided in each of the respective connecting lines so that individual control and controlled return of water to an electrolysis module 3, 3a, 3b is achieved during normal operation. If required or optionally, these control valves can also be mechanically designed for a minimum flow rate which cannot be undershot during control, so that rapid and largely unhindered return flow through the return flow line 9 to flood one or more of the electrolysis modules 3, 3b, 3c can be achieved redundantly or as an alternative to the preferred flooding via the bypass line 15. With this embodiment too, in an emergency, water from the gas separator 3 is automatically driven into one or more of the electrolysis modules 3, 3a, 3b due to the height difference Ah, so that the deactivated electrolysis module 3, 3a, 3b is completely flooded with water in a short time.

[0067] A diagram showing the time course of the fill level L during a safety shutdown is shown in simplified form in FIG. 2 to explain the principle. The time t is plotted on the abscissa and the level L as a function of time t on the ordinate, which characterizes the time course of the fill level of the corresponding component with water. From a time t, a standstill operation of the electrolyzer 1 is initiated from normal operation, for example by switching off the electrolysis current. At this time, a level L s in the gas separator 5 and a level L M in the electrolysis module 3 . At this time, L s > L M, so that initially in the electrolysis plant 1 a correspondingly high differential pressure Ap is available as a driving force due to the predetermined height difference Ah for a rapid flooding by level compensation. With the height difference Ah there is a difference L s > L M of the filling levels (level difference) and provides the predetermined driving differential pressure Ap due to a hydrostatic pressure difference for flooding.

[0068] In standstill operation at time t0, the electrolysis current is stopped and a safety shutdown is initiated. Water is automatically forced from the gas separator 3 into the electrolysis module 3 due to the height difference Ah, and the electrolysis module 3 is quickly flooded with water. The flooding occurs automatically with water due to the hydrostatic pressure difference Ap until the fill level L sof water in the gas separator 5 and the fill level or level L M in the electrolysis module 3 are adjusted and the differential pressure Ap = 0. The fill level or level L s of water in the gas separator 5 decreases with time t, whereas the filling level or level L M in the electrolysis module 3 increases accordingly over time until both filling levels L M and L s are equal and are on a level L A Here lies a balanced level L A or level and the flooding process is completed. In a very short time, a level equalization is achieved, so that a relatively short time t A is determined at which the flooding process via the bypass line 15 is completed. This time period t Afor level compensation is only about 60 - 300 seconds up to a few minutes, depending on the design of the electrolyzer 1. For larger systems and volume flows of water or for several electrolysis modules 3, 3a, 3b to be flooded simultaneously, the time period t A for level compensation up to level L A It can also be longer, about 10 to 30 minutes, especially about 15 to 20 minutes. This is sufficiently fast to prevent dry running safely using the simple means described here.

[0069] If the power supply and thus the electrolysis process are suddenly stopped, gas and water separate in the electrolysis module 3 . A certain water level L Min the electrolysis module 3. Due to the fact that the gas separator 3 in the electrolysis system is arranged at a corresponding height difference Ah significantly above the electrolysis module 3 and the bypass line 15 with the automatically and instantly opening valve 17 with a low pressure loss coefficient are affected, the line can be flowed through very quickly through the bypass line, bypassing the return line 9, and a very rapid level equalization takes place automatically. The height difference Ah is accordingly based on the effective pressure loss coefficient ^ e ff of the entire flow path of the bypass line, whereby due to the simple line path, no particular restrictions due to pressure loss are to be feared and a moderate height difference Ah is sufficient by appropriate positioning of the gas separator 3 above the electrolysis module.

[0070] The flow path via the return line 9 is not particularly restricted with regard to the installation of active components such as the circulation pump 13, the heat exchanger 25 and the control valve 23, which reduces the influence of the pressure loss coefficient ^ e ff concerns. Optionally, however, it is possible and advantageous to adapt the return line 9, including any flow elements present such as pumps or valves, accordingly and to take this into account when designing an electrolyzer 1. Thus, if necessary, an additional flow path can optionally be provided in addition to the bypass line 15 for rapid flooding.

[0071] The invention provides a self-regulating flooding concept for an electrolyzer 1 with the highest reliability. Failure of active components is not possible because active components are not used. A high level of system reliability for an electrolyzer 1 and very effective protection of an electrolysis module 3 or several electrolysis modules 3, 3a, 3b in a module arrangement 27 against dry running are maintained, especially in possible fault situations. Such fault situations may occur, for example, in the event of a power failure, failure of the pump control, failure of the control valve control, incorrect operation, or pump damage.Furthermore, this provides a very simple and cost-effective solution, since apart from the bypass line 15 with the valve 17, no complex additional equipment is required, merely the targeted and intelligent use of the existing equipment and the design of the electrolyzer 1. The application of the concept is particularly possible and very advantageous for any electrolyzer - atmospheric or pressurized - with a pump arrangement in the circuit.

Claims

Patent claims 1. Electrolyzer (1) for producing hydrogen (H2) and oxygen (O2) as product gases, comprising an electrolysis module (3) and a gas separator (5) designed for phase separation of the product gas from water, wherein the electrolysis module (3) is connected to the gas separator (5) via a product flow line (7) for the product gas, and wherein a return line (9) for the separated water is provided, which fluidically connects the gas separator (5) to the electrolysis module (3), wherein a circulation pump (13) is connected in the return line (9), characterized in that a bypass line (15) with a fitting (17) is provided, which connects the gas separator (5) to the electrolysis module (3), wherein the return line (9) is at least partially bypassed fluidically by the bypass line (15), and wherein the bypass line (15) is designed with the fitting (17) such that, in standstill operation, water from the gas separator (5) can be supplied autonomously to the electrolysis module (3) via the bypass line (15), ensuring rapid flooding of the electrolysis module (3) and preventing the electrolysis module from running dry.

2. Electrolyzer (1) according to claim 1, wherein the gas separator (5) is designed and arranged at a predetermined height difference (Ah) above the electrolysis module (3) such that when the electrolysis module is at a standstill (3) can be automatically flooded with water via the bypass line (15) solely by means of a hydrostatic differential pressure (Ap).

3. Electrolyzer (1) according to one of the preceding claims, wherein the height difference (Ah) is set such that at least 0.05 bar to 0.5 bar, in particular 0.1 bar to 0.3 bar, is provided as the driving differential pressure (Ap) for flooding.

4. Electrolyzer (1) according to one of the preceding claims, wherein the gas separator (3) is designed as a horizontal container, such that a large surface area (11) is provided as a phase interface between the liquid and gaseous phases.

5. Electrolyzer (1) according to one of the preceding claims, wherein the bypass line (15) opens directly into a lower area of ​​the electrolysis module (3) or bypasses the circulation pump (13) and opens into the return line (9) on its pressure side.

6. Electrolyzer (1) according to one of the preceding claims, wherein the fitting (17) in the bypass line (15) is designed as a valve, in particular as a solenoid valve which opens automatically in the de-energized state.

7. Electrolyzer (1) according to one of claims 1 to 5, wherein the fitting (17) is designed as a check valve which opens automatically when the unit is at rest due to the hydrostatic differential pressure (Ap).

8. Electrolyzer (1) according to one of the preceding claims, in which at least two fittings (17) are provided which are connected in parallel in the bypass line (15) in terms of flow technology.

9. Electrolyzer (1) according to one of the preceding claims, in which several electrolysis modules (3a, 3b, 3c) are provided which are connected to the gas separator (3) via a common product flow line (7).

10. Electrolyzer (1) according to one of the preceding claims, in which a control valve (23) is connected in the return line (9) on the pressure side of the circulation pump (13).

11. Electrolyzer (1) according to claim 10, in which a heat exchanger (25) is connected in the return line (9) between the circulation pump (13) and the control valve (23).

12. Method for operating an electrolyzer (1) in which, during normal operation, an electrolysis current is supplied to an electrolysis module (3) so that water is produced as hydrogen (H2) and oxygen as product gases in the electrolysis module (3), wherein product gas in a phase mixture of water and product gas is supplied to a gas separator (5), wherein water is separated from product gas in the gas separator (5), and wherein, during standstill operation, the electrolysis current is stopped and a safety shutdown is initiated, characterized in that Water from the gas separator (3) is automatically driven into the electrolysis module (3) due to a hydrostatic differential pressure (Ap) associated with a predetermined height difference (Ah), whereby the electrolysis module (3) is flooded with water, ensuring rapid flooding of the electrolysis module (3) and preventing the electrolysis module from running dry.

13. Method according to claim 12, wherein in the event of a safety shutdown a fitting (17) is automatically opened and the water is driven into the electrolysis module via a bypass line (15).

14. Method according to claim 12, wherein flooding with water occurs automatically until the fill level (L s ) of water in the gas separator (3) and the fill level (L M ) are aligned with the electrolysis module (3).