Leak detection system and leak testing procedure

The leak detection installation with a buffer volume and controlled valves addresses inefficiencies in detecting small and large leaks by achieving rapid, cost-effective leak detection in small test chambers.

FR3136551B1Active Publication Date: 2024-11-15PFEIFFER VACUUM SAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
FR2022005627
Authority / Receiving Office
FR · FR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-06-10
Publication Date
2024-11-15
Estimated Expiration
2042-06-10

AI Technical Summary

Technical Problem

Existing leak detection methods for small internal volumes in test chambers are inefficient in detecting both small and large leaks due to long pressure decay times, which are incompatible with production rates and result in incomplete tracer gas detection.

Method used

A leak detection installation with a test chamber and preemptying line using a buffer volume and controlled valves to rapidly lower pressure, allowing simultaneous detection of both small and large leaks in under two seconds.

Benefits of technology

The method enables rapid detection of both small and large leaks in a single cycle, improving production efficiency and reducing installation costs by minimizing valve usage and pressure drop times.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000016_0000
    Figure 00000016_0000
  • Figure 00000016_0001
    Figure 00000016_0001
Patent Text Reader

Abstract

Leak detection installation (1) for checking the tightness of at least one object (3) having an internal cavity with a volume less than or equal to 50 cm³ and containing a tracer gas, comprising a control unit (19) configured to control pre-drain valves (8, 9) and a test valve (12) based on measurements from a first and a second pressure sensor (6, 11), in order to implement: - a first step (102a) of a pre-drain step (102) during which the test chamber (2) is connected to the buffer volume (VT) and a large leak test is performed on the test chamber (2) by monitoring the increase in the pressure measurement in the test chamber (2) by means of the first pressure sensor (6), - and, in the absence of detection of a large leak,a second step (102b) following the first step (102a) in which the pressure in the test chamber (2) is lowered until the pressure measured by the second pressure sensor (11) reaches a low-pressure threshold, for example less than or equal to 100 Pa, to allow a low-pressure test step (103) to be carried out by measuring the tracer gas concentration using the leak detector (13), the duration of the pre-emption step (102) being less than or equal to two seconds. Abbreviated figure: Figure 1,
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: Leak detection installation and leak testing method Technical field of the invention

[0001] The present invention relates to a leak detection installation for checking the leaktightness of at least one object having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas, the at least one object being placed in a test chamber whose internal volume is at least five times greater than or equal to the volume of the internal cavity of the object. The invention also relates to a method for checking the leaktightness at very high speed of said at least one object. Technical background

[0002] To ensure the tightness of reclosable hollow objects, in particular to check the tightness of the closure of these objects, a known method consists of carrying out a leak test using a tracer gas such as helium.

[0003] To do this, tracer gas is introduced into the cavity of the object, which is then closed and placed in a sealed test chamber that is then evacuated. Once the appropriate vacuum has been reached in the test chamber, the possible presence of tracer gas in the internal atmosphere of the test chamber is checked using a leak detector.

[0004] One problem is that, for certain uses, the volume of the chamber is oversized compared to that of the object to be tested, for example to accommodate bulky objects due to their complex shapes.

[0005] Currently, when the part to be tested has a small internal volume compared to that of the chamber containing this part (ratio of 1 / 5 minimum), a relatively large volume surrounding the object to be tested must be placed under vacuum, which takes a significant amount of time. In the case of large leaks from the object, typically for leak dimensions greater than or equal to 0.2 mm, and in the case of objects with a small volume internal cavity, typically when the internal volume of the object to be tested is less than 50 cm3, this excessively long pressure reduction phase allows time for the cavity of the object to empty completely and it may happen that by the time the analyzer can be put into communication with the test chamber, all the tracer gas has disappeared. It is therefore not possible to detect large leaks by tracer gas using this method.Another problem with detecting smaller leaks from these objects in larger volume test chambers is that the pressure drop time of these large volumes is too long to be compatible with production rates.

[0006] Another method not using tracer gas allows large leaks to be detected of the object to be tested. This method consists of putting the test chamber at atmospheric pressure into communication for a few moments, of the order of four seconds, with a buffer volume previously placed under vacuum. The pressure equilibrates between the test chamber and the buffer volume and the test chamber is isolated. Monitoring the evolution of the pressure measurement in the test chamber makes it possible to detect large leaks (of dimensions greater than or equal to 0.2 mm) over test durations of the order of two seconds. However, the cumulative duration, of the order of six seconds, is too long. In addition, this detection time increases further when one seeks to increase the sensitivity of the test, that is to say when one seeks to detect smaller leaks, to reach four to six seconds of detection time for leaks of the order of a few tenths of a millimeter.Beyond this, this method does not allow the detection of small leaks from the object because these become difficult to detect in the background noise of the degassing of the walls of the test chamber. It is then necessary to wait until the end of the degassing, i.e. up to fifteen seconds, to obtain a correct estimate of the leak rate. Summary of the invention

[0007] One of the aims of the present invention is to at least partially overcome these drawbacks by proposing a method for checking the leaktightness of at least one object having an internal cavity volume containing a tracer gas less than or equal to 50cm3, less than that of the test chamber (at least five times less), this method being able to detect both small and large leaks, and moreover in very short detection times.

[0008] To this end, the invention relates to a leak detection installation for checking the tightness of at least one object having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas, the leak detection installation comprising: - a test chamber whose internal volume is at least five times greater than or equal to the volume of the internal cavity of said at least one object, the test chamber being intended to receive the at least one object, - a first pressure sensor configured to measure the pressure of the internal volume of the test chamber surrounding the at least one object, - a test line fluidly connected to the test chamber, comprising a test valve and a leak detector configured to measure a concentration of tracer gas in the internal volume of the test chamber, - a pre-emptying line fluidly connected to the test chamber comprising a first pumping device, a first and a second pre-emptying valves, a buffer volume interposed between the first and the second pre-emptying valves, the first pre-emptying valve being interposed between the test chamber and the second pre-emptying valve, the second pre-emptying valve being interposed between the first pre-emptying valve and the first pumping device, the ratio of the internal volume of the test chamber to the buffer volume being less than one and greater than 0.2, the pre-emptying line comprising a second pressure sensor configured to measure the pressure in the buffer volume, and - a control unit configured to control the pre-emptying valves and the test valve according to the measurements of the first and second pressure sensors, in order to implement: - a first stage of a pre-emptying stage during which the test chamber is put into communication with the buffer volume and a large leak test of the test chamber is carried out by monitoring the increase in the pressure measurement in the test chamber by means of the first pressure sensor, - and, in the absence of detection of a large leak, a second step following the first step in which the pressure in the test chamber is lowered until the pressure measured by the second pressure sensor reaches a low pressure threshold, for example less than or equal to 100Pa, to allow a low pressure test step to be carried out by measuring the concentration of tracer gas using the leak detector, - the duration of the pre-emptying step being less than or equal to two seconds.

[0009] A single test thus makes it possible to detect both a small leak by detecting tracer gas or a large leak from the object by monitoring the pressure variation and therefore to check the leaktightness of the object over the entire range of leaks in the same detection cycle.

[0010] The pre-emptying time is reduced compared to the prior art method for detecting large leaks. This time saving makes it possible to avoid emptying the internal cavity of the object of all the tracer gas it contains and thus allows any small leaks from the object to be detected in the more sensitive low-pressure test step. This time saving also makes it possible to improve the production rate.

[0011] The leak testing process can furthermore be fully or partially automated.

[0012] This embodiment has the advantage of requiring a limited number of valves, which makes it possible not to increase the volume of the test chamber and therefore not to increase the pressure reduction times of the first and second stages of the pre-emptying stage. In addition, this makes it possible to limit the costs of the installation.

[0013] Another advantage is that pre-emptying the test chamber by means of a buffer volume, i.e. isolated from any pumping device, makes it possible to make the leak-tightness control process reproducible from one object to another, since it is relatively in depending on the pumping capacities of said pumping device.

[0014] The ratios of the internal volumes of the test chamber to the buffer volume make it possible to lower the pressure in the test chamber from atmospheric pressure to an equilibrium pressure, for example less than or equal to 40000Pa (400mbars) in a time less than one second, such as 500 milliseconds. It also allows the second step to have a duration less than or equal to one second. The pre-emptying duration combining the two steps is therefore less than or equal to two seconds, on the one hand, by reducing the duration of the first step and on the other hand, by reducing the duration of the second step.

[0015] The leak detection installation may further comprise one or more of the features described below, taken alone or in combination.

[0016] The volume of the test chamber is for example greater than or equal to 40cm3.

[0017] The first pressure sensor may be configured to measure pressures between 20000Pa and 60000Pa, for example with an accuracy of + / - 50Pa, in particular with a response (or stabilization) time of less than 50 milliseconds.

[0018] The first pressure sensor is for example a piezoelectric sensor.

[0019] The second pressure sensor is for example configured to measure pressures between IPa and 1000Pa for example with an accuracy of + / - IPa.

[0020] The invention also relates to a method for checking the tightness of at least one object having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas, the method for checking the tightness comprising a loading step during which the at least one object is placed in a test chamber whose internal volume is at least five times greater than or equal to the volume of the internal cavity of said at least one object, the method for checking the tightness comprising a pre-emptying step preceding a low-pressure test step, characterized in that the pre-emptying step has a pre-emptying duration of less than or equal to two seconds, and comprises: - a first step during which the test chamber is placed in communication with a buffer volume interposed between a first and a second pre-emptying valve, by closing a second pre-emptying valve placing the buffer volume in communication with the first pumping device and by opening a first pre-emptying valve, the ratio of the internal volume of the test chamber to the buffer volume being less than one and greater than 0.2, the first pre-emptying valve being interposed between the test chamber and the second pre-emptying valve, the second pre-emptying valve being interposed between the first pre-emptying valve and the first pumping device, and a large leak test of the test chamber is carried out by monitoring the increase in the pressure measurement in the test chamber by means of a first pressure sensor, - and, in the absence of detection of a large leak, a second step following the first step in which the pressure in the test chamber is lowered by opening the second pre-emptying valve to lower the pressure in the test chamber by means of the first pumping device through the buffer volume until the pressure measured by a second pressure sensor reaches a low pressure threshold, for example less than or equal to 100Pa, to allow a low pressure test step to be carried out by measuring the concentration of tracer gas by means of a leak detector.

[0021] Before the first step, the buffer volume can be evacuated by the first pumping device to a pressure advantageously less than 1000Pa, such as less than or equal to 200Pa, such as for example 1000Pa.

[0022] It is also possible to compare beforehand the increase in the pressure measurement in the test chamber with a control threshold to confirm the presence of the object in the test chamber before carrying out the large leak test itself. Brief description of the figures

[0023] Other advantages and characteristics will appear on reading the following description of a particular embodiment of the invention, but in no way limiting, as well as the appended drawings in which:

[0024] [Fig-1] [Fig.l] is a schematic view of an example of an installation of leak detection.

[0025] [Fig.2] [Fig.2] shows a flowchart of a method for checking the leaktightness of at least one object that can be implemented in the leak detection installation of [Fig.l].

[0026] In these figures, identical elements have the same reference numbers. Detailed description

[0027] The following embodiments are examples. Although the description refers to one or more embodiments, this does not necessarily mean that each reference relates to the same embodiment, or that the features apply only to a single embodiment. Single features of different embodiments may also be combined or interchanged to provide other embodiments.

[0028] [Fig.l] represents an example of a leak detection installation 1 for checking the leaktightness of at least one object 3 having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas. The object 3 to be tested is for example resealable.

[0029] Helium or hydrogen are generally used as tracer gases because these gases pass through small leaks more easily than other gases, due to the small size of their atom or molecule.

[0030] The leak detection installation 1 comprises a test chamber 2 intended to receive the at least one object 3 whose leaktightness is to be verified, a test line 4, a pre-emptying line 5, the test lines 4 and pre-emptying lines 5 being fluidically connected to the test chamber 2, and a first pressure sensor 6 configured to measure the pressure of the internal volume of the test chamber 2 surrounding said at least one object 3 to be tested.

[0031] The pre-emptying line 5 comprises a first pumping device 7, a first and a second pre-emptying valve 8, 9, and a buffer volume VT interposed between the first and the second pre-emptying valve 8, 9. The pre-emptying valves 8, 9 are arranged in series on a first pipe 10 of the pre-emptying line 5 interposed between the test chamber 2 and the first pumping device 7.

[0032] More precisely, the first pre-emptying valve 8 is interposed between the test chamber 2 and the second pre-emptying valve 9. The second pre-emptying valve 9 is interposed between the first pre-emptying valve 8 and the first pumping device 7. The buffer volume VT is the internal volume of the first pipe 10 interposed between the first and second pre-emptying valves 8, 9. The volume between the second pre-emptying valve 9 and the first pumping device 7 is advantageously minimized to reduce the time for evacuating the buffer volume VT, then the buffer volume VT and the test chamber 2 as will be seen later.

[0033] The first pumping device 7 comprises, for example, a primary vacuum pump, such as a vane pump.

[0034] The pre-emptying line 5 also comprises a second pressure sensor 11 configured to measure the pressure in the buffer volume VT.

[0035] This second pressure sensor 11 is for example a standard vacuum sensor with a response time of the order of 200 milliseconds. It is for example configured to measure pressures between 1000 Pa and 1000 Pa.

[0036] The first pressure sensor 6 is, on the other hand, a precise and fast sensor, in particular configured to measure pressures between 200 mbars (20000 Pa) and 60000 Pa with, for example, a response time of less than 50 milliseconds, such as, for example, of the order of a millisecond. It is, for example, a piezoelectric sensor.

[0037] The test line 4 comprises a test valve 12 and a leak detector 13 configured to measure a concentration of tracer gas in the internal volume of the test chamber 2.

[0038] The leak detector 13 comprises a second pumping device 14, 15 and a gas analysis device 16 for measuring the concentration of at least one species gaseous used as a tracer gas.

[0039] The second pumping device 14, 15 comprises, for example, a secondary vacuum pump 14, such as a turbomolecular pump, and a primary vacuum pump 15 connected in series, the secondary vacuum pump 14 being arranged upstream of the primary vacuum pump 15 in the direction of gas flow. The primary vacuum pump 15 is, for example, a vane pump or a small dry primary vacuum pump.

[0040] The gas analysis device 16 is for example connected to the suction of the secondary vacuum pump 14. The measuring cell of the gas analysis device 16 can thus be placed under a low pressure of the order of 104 mbars. The gas analysis device 16 comprises for example a mass spectrometer.

[0041] The test valve 12 is fluidically connected to the second pumping device 14, 15, for example at an intermediate compression stage of the secondary vacuum pump 14 and / or at the suction of the secondary vacuum pump 14 (depending on the level of leaks sought).

[0042] The test line 4 and the pre-emptying line 5 are for example arranged in parallel.

[0043] A vent line 17 may also be fluidically connected to the test chamber 2, for example in parallel with the other two lines 4, 5 to allow air to enter test chamber 2 and return to atmospheric pressure.

[0044] The vent line 17 comprises, for example, an air inlet valve 18 placing the test chamber 2 in fluid communication with the external atmosphere or with a neutral gas.

[0045] The atmosphere contained in the test chamber 2 can be put into communication with the test line 4 or with the pre-emptying line 5 or even here with the venting line 17.

[0046] The test chamber 2 has an internal volume at least five times greater than or equal to the volume of the internal cavity of the at least one object 3. We seek to minimize this volume as much as possible while allowing the reception of the at least one object 3 to be tested.

[0047] This internal volume of the test chamber 2 is the volume of the test chamber from which the external volume of the at least one object 3 is subtracted (therefore of all the objects 3 when there are several) and to which the volume of the pipes between the test chamber 2 and the first pre-emptying valve 8, the test valve 12 and the air inlet valve 18 if applicable (valves closed) is added. It is this internal volume that the first pressure sensor 6 is configured to measure the pressure of, for example by being fluidly connected to the test chamber 2 or between the outlet of the test chamber 2, the first pre-emptying valve 8, the test valve 12 and the air inlet valve 18.

[0048] The volume of the test chamber 2 is for example greater than or equal to 40cm3.

[0049] The ratio of the internal volume of the test chamber 2 to the buffer volume VT is less than one.

[0050] The ratio of the internal volume of the test chamber 2 to the buffer volume VT is greater than 0.2.

[0051] These volume ratios make it possible to lower the pressure in the test chamber 2 from atmospheric pressure to an equilibrium pressure, for example less than or equal to 40000Pa (400mbars) in a time of less than one second, such as 500 milliseconds.

[0052] The pre-emptying valves 8, 9, the test valve 12 and the air inlet valve 18 may be solenoid valves, such as electromagnetic valves, or may be pneumatic valves. These valves advantageously have fast opening / closing times (time < 50 ms) and high conductances.

[0053] These pre-emptying valves 8, 9, the test valve 12 and the air inlet valve 18 if applicable, can be controlled by a control unit 19 of the leak detection installation 1, such as a computer or a controller, as a function of the measurements of the first and second pressure sensors 6, 11 in order to implement, in a cyclical and automatic manner, a very high-speed leak-proofing control method 100 of said at least one object 3 as we will describe with reference to FIGS. 1 and 2.

[0054] It is considered that the first pumping device 7, the second pumping device 14, 15 and the gas analysis device 16 are operational and operate without interruption.

[0055] At the start of a cycle, the second pre-emptying valve 9 is open and all the other valves are closed.

[0056] The buffer volume VT is therefore placed under vacuum by the first pumping device 7 at a pressure advantageously lower than 1000Pa (or 10mbar), such as lower than or equal to 200Pa (or 2mbar) such as for example 1000Pa (or 1mbar).

[0057] This pressure is controlled by the second pressure sensor 11. This ensures the pressure prevailing in the buffer volume VT, making it possible both to ensure the expected pressure balance between the test chamber 2 and the buffer volume VT around the equilibrium pressure to which the first pressure sensor 6 is sensitive for the large leak test, and that this equilibrium pressure is reached within the short time required.

[0058] During a loading step 101, at least one object 3 containing tracer gas is placed in the test chamber 2, the internal volume of which is at least five times greater than the volume of the internal cavity of the object 3. The pressure in the test chamber 2 is the pressure of the atmosphere prevailing outside the test chamber 2, i.e. atmospheric pressure. Then, the test chamber 2 is sealed.

[0059] Then, during a first step 102a of a pre-emptying step 102 following In the loading step 101, the test chamber 2 is put into communication with the buffer volume VT of the pre-emptying line 5.

[0060] To do this, the second pre-emptying valve 9 is closed, putting the buffer volume VT in communication with the first pumping device 7, and the first pre-emptying valve 8 is opened.

[0061] The internal volume of the test chamber 2 is then fluidically placed in communication with the buffer volume VT. This buffer volume VT at subatmospheric pressure allows the rapid expansion of the gas in the test chamber 2. The pressure is balanced in these communicating volumes and can be measured by the first pressure sensor 6. The volume ratio between the internal volume of the test chamber 2 containing the at least one object 3 and the buffer volume VT makes it possible to lower the pressure from atmospheric pressure to an equilibrium pressure, for example less than or equal to 40000Pa (400mbar). Consequently, if at least one object 3 is defective, tracer gas will escape through the leak and spread into the test chamber 2 and the buffer volume VT without being evacuated by the first pumping device 7.

[0062] This first sequence has a duration less than or equal to 500 milliseconds.

[0063] A large leak test of the test chamber 2 is then carried out by monitoring the increase in the pressure measurement in the test chamber 2 using the first pressure sensor 6.

[0064] For this, the increase in the pressure measurement over time in the test chamber 2 in communication with the buffer volume VT is measured and it is compared with a threshold, to check whether this increase is as expected or whether the pressure measurement increases faster than expected, which would mean that tracer gas is escaping from a leak in the object 3 in the test chamber 2 and therefore that the object 3 has a large leak.

[0065] This measurement is carried out by the first pressure sensor 6 which is adapted to detect small pressure variations and with a very short response time in the equilibrium pressure range.

[0066] It should be noted that an advantage of carrying out the large leak test while the first pre-emptying valve 8 is open allows time to be saved because closing this valve would involve a displacement of the volumes and it would then be necessary to wait for a new pressure equilibrium before being able to carry out a measurement, at least 200 milliseconds.

[0067] It is also possible to compare beforehand the increase in the pressure measurement in the test chamber 2 with a control threshold to confirm the presence of the object 3 in the test chamber 2 before carrying out the large leak test itself. If the pressure increase is lower than the control threshold, it is that the object is present in the test chamber and the large leak test can be carried out. The control threshold value can also be used to determine that the object has the expected dimensions.

[0068] This pre-emptying step 102 allows the detection of large leaks of said at least one object 3, in particular with a hole size equal to or greater than 0.2 mm.

[0069] If a large leak is detected, the object 3 is identified as defective, which completes the cycle of the leak testing method 100.

[0070] In the absence of detection of large leaks, the leak testing method 100 comprises a second step 102b following the first step 102a of the pre-emptying step 102, during which the pressure in the test chamber 2 is lowered to a low pressure threshold, for example less than or equal to 100 mbar (100 Pa). This pressure is monitored by the second pressure sensor 11 adapted to measure this low pressure.

[0071] For this purpose, the second pre-emptying valve 9 is opened to lower the pressure in the test chamber 2 by means of the first pumping device 7 through the buffer volume VT. The two pre-emptying valves 8, 9 are open.

[0072] The volume ratio between the internal volume of the test chamber 2 containing the at least one object 3 and the buffer volume VT allows this second step 102b to have a duration less than or equal to one second.

[0073] The pre-emptying duration combining the two steps is consequently less than or equal to two seconds, on the one hand, by reducing the duration of the first step 102a and on the other hand, by reducing the duration of the second step 102b, these reductions in duration being notably possible due to the ratio of the volumes between the internal volume of the test chamber 2 containing the at least one object 3 and the buffer volume VT.

[0074] This time saving in the pre-emptying step 102 makes it possible to avoid emptying the internal cavity of the object 3 of all the tracer gas that it contains and thus allows any small leaks from the object 3 to be detected in the more sensitive low-pressure test step 103.

[0075] This time saving also makes it possible to improve the production rate.

[0076] When the pressure becomes lower than the low pressure threshold, for example lower than or equal to 100Pa, such as between 10 2mbar and 10 3mbar, the pressure in the test chamber 2 is then sufficiently low to allow the opening of the test valve 12 allowing the test line 4 to be put into communication with the test chamber 2 (low pressure test step 103). The first pre-emptying valve 8 is therefore closed and the test valve 12 is opened to switch the test chamber 2 onto the test line 4 and thus put the test chamber 2 into fluid communication with the leak detector 13.

[0077] Simultaneously, the closing of the first pre-emptying valve 8 makes it possible to lower the pressure of the buffer volume VT by the first pumping device 7 through the pre-emptying valve 9 which has remained open, and therefore in masked time of the low pressure test. Since the evacuation of the buffer volume VT is carried out in masked time, this can be of longer duration in order to reduce degassing and improve the sensitivity of the large leak test.

[0078] In this low pressure test step 103, the test chamber 2 is in communication with the test line 4 to determine a concentration of tracer gas so as to detect a leak of said at least one object 3 by means of the leak detector 13.

[0079] A portion of the gas sampled by the second pumping device 14, 15 rises through the secondary vacuum pump 14. The gas analyzer 16 detects whether this gas sample contains tracer gas indicating a leak. The tracer gas possibly present in the test chamber 2 in the event of a defective object 3 can then be detected by the leak detector 13.

[0080] The low pressure test step 103 allows the detection of small leaks of said at least one object 3, in particular with a hole size less than 0.5 mm.

[0081] The leak detection installation 1 can therefore detect leaks having a hole size between 0.5 mm and 0.2 mm both with the large leak test in primary vacuum and with the low pressure test in secondary vacuum. This range of leak size overlap is relatively large.

[0082] Then, during a step 104 of returning to atmospheric pressure, the test valve 12 is closed and the air inlet valve 18 is opened. The pressure in the test chamber 2 thus returns to atmospheric pressure. The test chamber 2 can then be opened to remove the tested object 3 (unloading step 105) and at least one new object 3 to be tested can be loaded (loading step 101).

[0083] A single test thus makes it possible to detect both a small leak by detecting tracer gas or a large leak from the object 3 by monitoring the pressure variation and therefore to check the leaktightness of the object over the entire range of leaks in the same detection cycle.

[0084] The leaktightness control method 100 may furthermore be fully or partially automated. In particular, provision is made for all the valves, in particular allowing the test chamber 2 to be put into communication with the pre-emptying line 5 or the test line 4 or the venting line 17 to be controlled automatically.

[0085] This embodiment has the advantage of requiring a limited number of valves, which makes it possible not to increase the volume of the test chamber 2 and therefore not to increase the pressure reduction times of the first and second steps 102a, 102b of the pre-emptying step 102. In addition, this makes it possible to limit the costs of installation 1.

[0086] Another advantage is that the pre-emptying of the test chamber 2 by means of a buffer volume VT, i.e. isolated from any pumping device, makes it possible to make the leak-tightness control method 100 reproducible from one object 3 to another, since it is relatively independent of the pumping capacities of said pumping device.

Claims

Claims

1. Leak detection installation (1) for checking the tightness of at least one object (3) having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas, the leak detection installation (1) comprising: - a test chamber (2) whose internal volume is at least five times greater than or equal to the volume of the internal cavity of said at least one object (3), the test chamber (2) being intended to receive the at least one object (3), - a first pressure sensor (6) configured to measure the pressure of the internal volume of the test chamber (2) surrounding the at least one object (3), - a test line (4) fluidically connected to the test chamber (2), comprising a test valve (12) and a leak detector (13) configured to measure a concentration of tracer gas in the internal volume of the test chamber (2), - a pre-emptying line (5) fluidically connected to the test chamber (2) comprising a first pumping device (7), a first and a second pre-emptying valves (8, 9), a buffer volume (VT) interposed between the first and the second pre-emptying valves (8, 9), the first pre-emptying valve (8) being interposed between the test chamber (2) and the second pre-emptying valve (9), the second pre-emptying valve (9) being interposed between the first pre-emptying valve (8) and the first pumping device (7), the ratio of the internal volume of the test chamber (2) to the buffer volume (VT) being less than one and greater than 0.2, the pre-emptying line comprising a second pressure sensor (11) configured to measure the pressure in the buffer volume (VT), and - a control unit (19) configured to control the pre-emptying valves (8, 9) and the test valve (12) as a function of the measurements of the first and second pressure sensors (6, 11), in order to implement: - a first step (102a) of a pre-emptying step (102) during which the test chamber (2) is placed in communication with the buffer volume (VT) and a large leak test of the test chamber (2) is carried out by monitoring the increase in the pressure measurement in the test chamber (2) by means of the first pressure sensor (6), - and, in the absence of detection of a large leak, a second step (102b) following the first step (102a) in which the pressure in the test chamber (2) is lowered until the pressure measured by the second pressure sensor (11) reaches a low pressure threshold, for example less than or equal to 100Pa, to allow a low pressure test step (103) to be carried out by measuring the concentration of tracer gas using the leak detector (13), the duration of the pre-emptying step (102) being less than or equal to two seconds.

2. Leak detection installation (1) according to the preceding claim, characterized in that the volume of the test chamber (2) is greater than or equal to 40cm3.

3. Leak detection installation (1) according to one of the preceding claims, characterized in that the first pressure sensor (6) is configured to measure pressures between 20000Pa and 6000Pa with a response time of less than 50 milliseconds.

4. Leak detection installation (1) according to one of the preceding claims, characterized in that the first pressure sensor (6) is a piezoelectric sensor.

5. Leak detection installation (1) according to one of the preceding claims, characterized in that the second pressure sensor (11) is configured to measure pressures between IPa and 1000Pa.

6. Method for checking the leaktightness (100) of at least one object (3) having an internal cavity whose volume is less than or equal to 50cm3 and contains a tracer gas, the method for checking the leaktightness (100) comprising a loading step (101) during which the at least one object (3) is placed in a test chamber (2) whose internal volume is at least five times greater than or equal to the volume of the internal cavity of said at least one object (3), the method for checking the leaktightness (100) comprising a pre-emptying step (102) preceding a low-pressure test step (103), characterized in that the pre-emptying step (102) has a pre-emptying duration of less than or equal to two seconds, and comprises: - a first step (102a) during which the test chamber (2) is placed in communication with a buffer volume (VT) interposed between a first and a second pre-emptying valve (8,9),by closing a second pre-emptying valve (9) putting the buffer volume (VT) in communication with the first pumping device (7) and,

7. opening a first pre-emptying valve (8), the ratio of the internal volume of the test chamber (2) to the buffer volume (VT) being less than one and greater than 0.2, the first pre-emptying valve (8) being interposed between the test chamber (2) and the second pre-emptying valve (9), the second pre-emptying valve (9) being interposed between the first pre-emptying valve (8) and the first pumping device (7), and a large leak test of the test chamber (2) is carried out by monitoring the increase in the pressure measurement in the test chamber (2) by means of a first pressure sensor (6), - and, in the absence of detection of a large leak,a second step (102b) following the first step (102a) in which the pressure in the test chamber (2) is lowered by opening the second pre-emptying valve (9) to lower the pressure in the test chamber (2) by means of the first pumping device (7) through the buffer volume (VT) until the pressure measured by a second pressure sensor (11) reaches a low pressure threshold, for example less than or equal to 100Pa, to allow a low pressure test step (103) to be carried out by measuring the concentration of tracer gas by means of a leak detector (13)., Method for checking the leaktightness (100) according to the preceding claim, characterized in that, before the first step (102a), the buffer volume (VT) is placed under vacuum by the first pumping device (7) at a pressure advantageously less than 1000Pa, such as less than or equal to 200Pa, such as for example 1000Pa.