AI Technical Summary
Existing mechanisms for time synchronization in 5G networks, such as Precision Time Protocol (PTP) and Timing Advance (TA) mechanisms, fail to accurately compensate for propagation delays due to changing network conditions and user equipment locations, leading to persistent synchronization errors.
A method for updating time counters in user equipment by scheduling propagation delay measurements relative to a reference point in a reference system frame, ensuring that the propagation delay estimation is performed as close as possible to the reference time, using a combination of PTP and TA mechanisms.
This approach improves the accuracy of time synchronization by reducing errors in time counters, ensuring precise timestamping for time-sensitive applications by compensating for propagation delays more effectively.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical field
[0001] The present disclosure relates to methods and devices for synchronizing equipment in a wireless network, such as a wireless communication network. [Background technology]
[0002] The use of the Internet of Things (IoT) is increasing with each use having certain limitations.
[0003] One application of IoT is industry, for example, production plants that use critical machinery and multiple sensors and actuators. IoT makes it possible to accurately track production lines, for example by implementing the following functions (non-exhaustive list): Predictive maintenance (early warning signs of failure to proactively schedule maintenance interventions) avoid production interruptions (by identifying operating data and repair history through sensors), intelligent diagnostics (by recording operating data and repair history through sensors), production line optimization, production machine optimization, etc.
[0004] With the development of 5G technology, a new generation of IoT is being developed. However, it is still necessary to ensure that 5G networks are compatible with time-sensitive applications implemented by IoT elements.
[0005] To do this, precise time synchronization is required within the 5G network.
[0006] A mechanism of traditional reference system frame was proposed. The base station provides information to the user equipment for time synchronization, such as a reference time linked to the occurrence of a reference system frame provided by the base station. The user equipment then sets a local time counter to the reference time upon receiving the reference frame signaling the reference time within the reference system frame.
[0007] Synchronization based on reference system framing may be improved by compensating for propagation delay, ie, the time it takes for the reference frame to reach the user equipment.
[0008] To do this, several methods have been developed, including one that utilizes a precision time protocol (IEEE1588) adapted for 5G systems to measure the propagation delay between the user equipment and the base station during position triangulation estimation. A solution exists.
[0009] The Precision Time Protocol mechanism consists in exchanging uplink and downlink frames between user equipment and base station. The user equipment and the base station then store the transmission and reception times of the exchanged frames to estimate the round trip time (RTT). The propagation delay is then calculated by the user equipment based on the estimated RTT (more precisely on half of it) and used to update its local time counter.
[0010] Another known solution for measuring propagation delay is called the timing advance (TA) mechanism, as described in TS 38.211, clause 4.3. This mechanism aims to control the timing of uplink frames of user equipment. It provides a correction of the timing value in the Timing Advance (TA) command for each user equipment, taking into account the estimated propagation delay for the user equipment.
[0011] To do this, the base station schedules the transmission time of an uplink frame by the user equipment, knows its transmission time, and can detect its reception time, so it can calculate the propagation delay of this scheduled uplink frame. Monitor regularly. The base station then uses subsequent messages, which may be subsequent TA commands, to calculate the propagation delay before sharing it with the user equipment (or modifying it).
[0012] However, these known mechanisms have limitations. In fact, network conditions and user equipment locations may change significantly during the time synchronization process. In this case, the estimated propagation delay does not adequately reflect the actual propagation delay of the reference frame in which the local time counter is initially set. As a result, substantial asynchrony of the time counters may persist over time.
[0013] Therefore, a more accurate synchronization mechanism is needed. [Summary of the invention]
[0014] The present invention has been devised to address one or more of the aforementioned problems. The present invention relates to a mechanism for updating time counters in user equipment (UE), in which the reference time of the reference system frame is determined so that the measurement of propagation delay (or measurement of RTT) is as close as possible to the reference time, and therefore , used to schedule or trigger as close to the reference frame as possible.
[0015] In other words, it defines a dedicated method for measuring propagation delay that allows to trigger measurements close to the reference SFN.
[0016] A method for updating a time counter of a user equipment in a wireless network comprising a base station and a plurality of user equipments comprises: receiving a reference time and instructions for determining a reference point in time associated with the reference time; scheduling determination of propagation delay relative to a reference point in time; determining a propagation delay with a base station according to scheduling; updating a time counter using the reference time and the determined propagation delay; including.
[0017] According to some embodiments, the reference point in time may be the end of the reference system frame and the indication may include the sequence number of the reference system frame.
[0018] According to some embodiments, the reference point in time may be the start of a reference system frame, and the indication may include a sequence number of a system frame preceding the reference system frame.
[0019] According to a first aspect of the invention, there is provided a method for updating a time counter of a user equipment in a wireless network comprising at least one base station and a plurality of user equipment, the method comprising: in the user equipment; receiving a reference frame for signaling a reference point in time associated with a reference time within a reference system frame; determining the propagation delay with the base station; updating a time counter using the reference time and the determined propagation delay; including; The propagation delay determination is scheduled relative to a reference point in time in a reference system frame.
[0020] In this way, the closer in time the propagation delay estimate is to the reference instant and reference frame, the closer the estimated propagation delay is as close as possible to the actual propagation delay between the UE and gNB when the reference instant occurs.
[0021] As a result, the updating of the time counter with the determined propagation delay becomes more accurate and the compensation of errors for the propagation delay of the reference frame is improved.
[0022] Optional features of the invention are defined in the appended claims. Although some of these features are explained below with reference to the method, they can be converted into system features dedicated to user equipment of a wireless network according to the invention.
[0023] According to some embodiments, scheduling the propagation delay determination further comprises: The method may include scheduling transmission of the first measurement frame relative to a reference point in time.
[0024] According to some embodiments, the first measurement frame is in a reference system frame, preferably in a reference system subframe that includes the reference time point or in a reference system subframe that precedes the reference subframe that includes the reference time point. may be scheduled to be sent during
[0025] According to some embodiments, the first measurement frame may be scheduled to be transmitted during a predetermined system frame preceding the reference system frame, preferably immediately before the reference system frame.
[0026] According to some embodiments, scheduling the propagation delay determination further comprises: The method may include determining a time to begin determining the propagation delay based on a system frame number of a current system frame, a current value of a time counter, and a system frame number of a reference system frame.
[0027] According to some embodiments, scheduling the propagation delay determination further comprises: setting a decrement timer to the determined start time; and initiating the propagation delay determination when the decrement timer expires.
[0028] According to some embodiments, scheduling the propagation delay determination may include retrieving a transmission time from a message received from the base station that sets a time for transmission of the first measurement frame. Often, determining the propagation delay may include receiving a timing advance command from the base station that includes information regarding the propagation delay estimated by the base station.
[0029] According to some embodiments, determining the propagation delay with the base station includes: transmitting a first measurement frame to a base station; storing the transmission time of the first measurement frame; receiving a second measurement frame from the base station; The method may include storing a reception time of the second measurement frame.
[0030] According to some embodiments, the second measurement frame may be transmitted during the reference system frame, and preferably the second measurement frame may be a reference frame signaling a reference point in time.
[0031] According to some embodiments, the second measurement frame may be transmitted during a system frame immediately following the reference system frame.
[0032] According to some embodiments, the method further comprises: The method may include receiving from a base station at least one parameter for determining a propagation delay to and from the base station.
[0033] According to some embodiments, the at least one parameter is the arrival time of the first measurement frame at the base station, the transmission time of the second measurement frame by the base station, and the arrival time of the first measurement frame and the second measurement frame. The measurement frame may include at least one of the differences between the transmission times of the two measurement frames.
[0034] According to some embodiments, at least one parameter may be received within the second measurement frame.
[0035] According to some embodiments, the at least one parameter may be received in a system frame immediately following the reference system frame and in an additional message in the second measurement frame.
[0036] According to some embodiments, the arrival time of the first measurement frame at the base station may be received within a second measurement frame, and the transmission time of the second measurement frame by the base station may be received within the second measurement frame. It may also be received in additional messages following the frame.
[0037] According to some embodiments, the propagation delay uses a stored transmission time of the first frame, a stored reception time of the second frame, and at least one parameter for determining the propagation delay. It may be determined by
[0038] According to another aspect of the invention, a method is provided for updating a time counter of a user equipment in a wireless network comprising at least one base station and a plurality of user equipment, the method comprising: at the base station; transmitting a reference frame to signal a reference point in time associated with a reference time within the reference system frame to configure a time counter of the user equipment; transmitting a measurement frame to user equipment; including; The transmission of measurement frames is scheduled with respect to reference times of reference system frames.
[0039] According to another aspect of the invention, a method is provided for updating a time counter of a user equipment in a wireless network comprising at least one base station and a plurality of user equipment, the method comprising: at the base station; transmitting a reference frame to signal a reference point in time associated with a reference time within a reference system frame to configure a time counter of the user equipment; The method further includes: selecting at least one resource in the system frame relative to a reference point in time in the reference system frame; selecting at least one resource allocation scheme for the selected resource, the resource allocation scheme defining an allocation of each symbol of the selected resource to downlink transmission and / or uplink transmission; selecting an allocation method; and performing a propagation delay measurement by exchanging at least one measurement frame using the selected resource.
[0040] Such a method ensures that the determination of the propagation delay between the UE and the gNB is performed as close as possible to the reference time in order to improve the accuracy of the update of the UE's time counter. In fact, based on the selected resource allocation scheme provided by the gNB, the UE (and optionally the gNB) uses the PTP method to enter resources with suitable uplink (and optionally downlink) characteristics. or the transmission of the first measurement frame of either the TA mechanism (and optionally the second measurement frame in the case of the PTP method).
[0041] Optional features of the invention are defined in the appended claims. Although some of these features are explained below with reference to the method, they can be converted into system features dedicated to base stations of a wireless network according to the invention.
[0042] According to some embodiments, the selected resource may be a time slot of a system frame, and the selecting step further includes: selecting at least one time slot within the system frame relative to a reference point in time of the reference system frame; For each selected time slot, selecting a slot assignment scheme from among predetermined slot assignment schemes that defines an assignment of each symbol making up the time slot for downlink transmissions and / or uplink transmissions; May include.
[0043] According to some embodiments, the selected resource may be included in the reference system frame or in a system frame adjacent to the reference system frame.
[0044] According to some embodiments, the selected resource may be directly adjacent to the reference point in time.
[0045] According to some embodiments, the selected resource allocation scheme for the first selected resource may include at least one uplink symbol, and the first measurement frame may include at least one uplink symbol. may be received from the user equipment.
[0046] According to some embodiments, the selected resource allocation scheme for the first selected resource may further include at least one downlink symbol, and the second measurement frame may include at least one downlink symbol. may be transmitted to the user equipment via.
[0047] According to some embodiments, uplink symbols and downlink symbols may be time division duplexed.
[0048] According to some embodiments, uplink symbols and downlink symbols may be frequency division duplexed.
[0049] According to some embodiments, the selected resource allocation scheme for the second selected resource may include at least one downlink symbol, and the at least one further measurement frame includes at least one downlink symbol. may be transmitted to the user equipment via.
[0050] According to some embodiments, the at least one additional measurement frame may include a second measurement frame.
[0051] According to some embodiments, the at least one further measurement frame may include a follow-up measurement frame that provides time information of the one or more exchanged measurement frames to the user equipment.
[0052] According to some embodiments, the first resource may be the last slot of the reference system frame.
[0053] According to some embodiments, the second resource may be the start slot of the system frame immediately after the reference system frame.
[0054] According to some embodiments, all slots of subframes in a system frame may be selected with a resource allocation scheme that provides only uplink symbols made of multiple subcarriers, and the first measurement frame may be received from the user equipment via slots of a subframe.
[0055] According to some embodiments, all slots of another subframe in the system frame may be selected with a resource allocation scheme that provides only downlink symbols made of multiple subcarriers, and the second measurement frame may be transmitted to the user equipment via a slot in this separate subframe.
[0056] According to some embodiments, the subframe and other subframes may be consecutive subframes in the same system frame.
[0057] According to some embodiments, the subframe and the other subframe may be the two last subframes of the same system frame According to some embodiments, the end of the same system frame may correspond to a reference point in time.
[0058] According to another aspect of the invention, a method is provided for updating a time counter of a user equipment in a wireless network comprising at least one base station and a plurality of user equipment, the method comprising: at the base station; transmitting a reference frame for signaling a reference point in time associated with a reference time in a reference system frame to configure a time counter of the user equipment; performing propagation delay measurements by exchanging at least one measurement frame using at least one resource of system frames; including; The reference time point is determined based on a resource allocation scheme for at least one resource.
[0059] Correspondingly, a device in a wireless network is provided, comprising at least one base station and a plurality of user equipment comprising a processor configured to perform the steps of the method described above.
[0060] This device has the same advantages as the method defined above.
[0061] According to another aspect of the invention, there is provided a computer readable storage medium storing instructions of a computer program for implementing the method described above when loaded onto and executed by the programmable device. be done.
[0062] According to another aspect of the invention, a computer program product is provided which, when executed, causes the method described above to be carried out.
[0063] At least part of the method according to the invention can be implemented on a computer. Accordingly, the present invention may be embodied in an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, microcode, etc.), or as generally referred to herein as a "circuit," "module," or " Embodiments may take the form of a combination of software and hardware aspects, which may be referred to as a "system." Additionally, the invention may take the form of a computer program product embodied in any tangible medium of representation having computer-usable program code embodied therein.
[0064] Since the invention can be implemented in software, the invention can be implemented as computer readable code for provision to a programmable device on any suitable carrier medium. A tangible, non-transitory carrier medium may comprise a storage medium such as a floppy disk, a CD-ROM, a hard disk drive, a magnetic tape device, or a solid state memory device. The transient carrier medium may include signals such as electrical, electronic, optical, acoustic, magnetic, or electromagnetic signals, such as microwave or RE signals. [Brief explanation of drawings]
[0065] Embodiments of the invention will now be described, by way of example only, with reference to the following drawings, in which: FIG.
Figure 1
Figure 2
[0066] The names of lists and elements (such as data elements) provided in the following description are merely exemplary. Embodiments are not limited thereto and other names may be used.
[0067] Embodiments of the invention are intended to be implemented in a 5G network used to interconnect connected objects or terminals, as shown in FIG.
[0068] The 5G network 100 comprises a plurality of user equipment (UE) 104a, 104b, also called mobile stations (indicated by dotted lines), wirelessly connected to at least one base station 102 (gNB or gNodeB). gNB 102 is connected to core network 101, for example, by wire (eg, using optical fiber) or wirelessly.
[0069] In this 5G network, a common time reference is provided by a Grand Master Clock (5G GM) 103 as defined in TS 23.501 clause 5.27.
[0070] The 5G GM clock may be connected to the core network 101 as shown in FIG. 1, but it may also be directly connected to the gNB or one of the UEs. Therefore, devices connected to a 5G GM clock will share a common time reference provided by the 5G GM clock with other devices in the network.
[0071] According to some embodiments, the common time reference provided by the 5G GM clock may be or be based on a universal time reference. For example, a universal time reference may be obtained by the gNB directly from the satellite system.
[0072] As explained above, 5G network 100 may be used to connect end devices 105a, 105b, and 105c, such as connected devices of an IoT network. End devices may for example be devices for industrial equipment such as sensors and actuators. As shown in FIG. 1, end devices 105a, 105b and 105c are connected to UEs 104a, 104b or network core 101 of 5G network 100. According to some embodiments, end devices 105a, 105b, and 105c are wired connected to UEs 104a, 104b or network core 101.
[0073] According to some embodiments, one end device and one UE may be integrated into a single device.
[0074] Thus, end devices 105a, 105b, and 105c share data using the 5G network.
[0075] When implementing time-sensitive applications in IoT networks, accurate time synchronization between UEs is essential, especially within 5G networks.
[0076] An exemplary and simplified internal architecture of gNB 102 is illustrated in FIG. 2.
[0077] The gNB 200 comprises a 5G NR interface 205 that allows it to communicate with the UEs 104a, 104b of the 5G network 100. The gNB may also be equipped with several different types of air interfaces, such as LTE (4G) or other types of air interfaces.
[0078] To communicate with the core network 101, the gNB also comprises a core network interface 204, as defined in clause 4.2 of TS 23.501.
[0079] Synchronization between gNB and 5G GM clock is handled by 5G time synchronization manager 203.
[0080] According to some embodiments, the 5G time synchronization manager 203 implements a time counter that is incremented by a local clock oscillator. The 5G time synchronization manager 203 continuously evaluates the time difference between the time counter and the 5G GM clock. The evaluation may be performed using the IEEE 1588 Precise Time Synchronization Protocol, which is implemented through the exchange of time synchronization packets with the 5G GM clock via the core network interface 204. Therefore, the evaluated difference allows the 5G time synchronization manager 203 to determine the value to adjust its time counter.
[0081] According to some embodiments, the 5G time synchronization manager 203 continuously evaluates the clock difference between the time counter and a reference time received from a satellite system, such as GPS.
[0082] Therefore, the 5G time synchronization manager 203 provides accurate current time to the UE synchronization manager 201 based on its local time counter.
[0083] The UE synchronization manager 201 is configured to handle the synchronization between the base stations and the UEs 104a, 104b of the network 100 with a view to ensuring that the time counters of all these devices are synchronized as accurately as possible.
[0084] To that end, the UE synchronization manager 201 may implement several mechanisms, as described below in connection with FIG. 5. The UE synchronization manager 201 is also configured to evaluate and record the propagation delay between the gNB and each UE 104a, 104b for synchronization.
[0085] The gNB further comprises a control manager 202 in which the gNB control protocol is implemented. The control protocols include at least the following protocols: RLC (TS 38.322 Radio Link Control), PDCP (TS 38.323 Packet Replication Control Protocol), RRC (TS 38.331 Radio Resource Control), and NAS (TS 24.501 Network Access Layer). Accordingly, the control manager 202 handles the generation of protocol packets exchanged with the core network 101 and the UE via the core network interface 204 and 5G NR interface 205, respectively.
[0086] An exemplary and simplified internal architecture of the UEs 104a, 104b is illustrated in FIG. 3.
[0087] The UE 300 is equipped with a 5G NR interface 305 that allows the UE 300 to communicate with the gNBs 200, 102 via this interface. UE 300 may be equipped with several different types of air interfaces, such as LTE (4G) or other types of air interfaces.
[0088] Synchronization between the UE and the 5G GM clock is handled by the 5G time synchronization manager 303.
[0089] According to some embodiments, the 5G time synchronization manager 303 implements a time counter that is incremented by a local clock oscillator. When the 5G time synchronization manager 303 receives the time counter correction value from the gNB synchronization manager 301, it can correct or change the time counter value.
[0090] In fact, the gNB synchronization manager 301 stores the parameters necessary for the synchronization provided by the gNB 102 and determined by the UE synchronization manager 201 of the gNB 102. Furthermore, gNB synchronization manager 301 is also configured to evaluate and record the propagation delay between UE 300 and gNB 102.
[0091] UE 300 further comprises a control manager 302 in which gNB control protocols are implemented. The control protocols include at least the following protocols: RLC (TS 38.322 Radio Link Control), PDCP (TS 38.323 Packet Replication Control Protocol), RRC (TS 38.331 Radio Resource Control), and NAS (TS 24.501 Network Access Layer). The control manager 302 handles the generation of protocol packets exchanged with the gNBs 200, 102 via the 5G NR interface 305.
[0092] The organization of data exchange between the 5G NR interfaces 205, 305 of the gNB and the UE is based on the system frames specified by the 3GPP(R) NR PHY and MAC protocols, defined in clauses 5 and 6 of TS 38.300, respectively. Comply with format.
[0093] The system frames constituting the data exchange are organized accordingly, have a structure as shown in Figure 4, and are periodically declared (or provided) by the gNB using appropriate signals, for example via SIB1 messages.
[0094] System frames follow one another in time. Each system frame has a duration of 10ms. A cyclic code / prefix may be sent periodically by the gNB to declare the start of each system frame.
[0095] System frames may be numbered with a system frame number (SFN), also referred to as a system frame index. As shown in FIG. 4, the first system frame numbered #0 is followed by system frames #1, #2, and #3. System frame numbering can be done in increments. In other words, every 10ms, the system frame number is incremented and can go from 0 to 1023, and when 1023 is reached, the numbering starts from 0 again.
[0096] Therefore, the gNB numbers system frames with SFN. The SFN is signaled to the UE using a system frame synchronization signal or synchronization signal block (SSB). The SSB consists of a Primary Synchronization Signal (PSS), a Secondary Synchronization Signal (SSS), and a Physical Broadcast Channel (PBCH), which communicate with the cell (including the gNB and associated UE) at the symbol level and slot level as well as the frequency Synchronization: Used by the UE to obtain time synchronization. These synchronization signals (PSS, SSS) transmitted by the gNB help the UE to detect frame and subframe boundaries. SSB is implemented by signaling the SFN (of one or several subframes) using the six most significant bits of the so-called MIB (Master Information Block) field and the four least significant bits of the so-called PBCH field. periodically sent by the gNB to the UE in predefined symbols in the system frame (at predefined moments on predefined resources).
[0097] Each system frame includes 10 subframes ranging from 0 to 9.
[0098] Each subframe comprises a flexible number of slots, eg up to 64 slots. Each slot comprises a number of orthogonal frequency division multiplexing (OFDM) symbols. Each slot consists of 14 OFDM symbols. A symbol may be declared as an uplink symbol (i.e. used by the UE for transmission) or a downlink symbol (i.e. used by the gNB for transmission) or flexible (i.e. uplink or downlink) . A resource allocation scheme that provides a type declaration for each symbol is declared by the gNB in the SIB1 message, for example. It defines the sequence of uplink, downlink and / or flexible symbols within a slot or subframe or an entire system frame.
[0099] The gNB may choose among multiple predefined slot allocation schemes, as detailed in Table 11.1.1-1: Slot format for normal cyclic prefixes in standard TS38.213.
[0100] A cyclic prefix may be transmitted periodically by an emitter to protect against interference. A cyclic prefix may also declare the beginning and / or end of each OFDM symbol.
[0101] Therefore, the system frame constitutes a common reference for the UE and gNB to organize frame exchanges. Therefore, system frames, especially their SFNs, are used for conventional adjustment of the UE's time counter.
[0102] Conventional UE time counter adjustment is shown in Figure 5.
[0103] Traditional time counter adjustment requires a reference time (T) to update the time counter. R )(reference time) to the UE. The value of the reference time corresponds to the time at the reference time point of the reference system frame. Hereinafter, this will be referred to as a reference system frame.
[0104] For example, the reference time corresponds to the expected time of the gNB's time counter when a particular reference point in time within the reference system frame occurs (eg, the end of the reference system frame). The specific reference point in time is the exact point in time that the UEs use to update their time counters. According to embodiments, the time counter may be updated at a reference time, or a time offset may be determined at a reference time and the time counter may be updated later using the determined time offset.
[0105] Therefore, after receiving from the UE a request for a reference time value to update its time counter, or on its own initiative, the gNB updates the UE's time counter with the reference time value provided by the gNB. Select a future reference system frame containing a reference point in time that you want to force to update.
[0106] The reference time point may be freely selected by the gNB, for example corresponding to the end boundary or the start boundary of the reference system frame. In a variant, it may include any predefined cyclic code / prefix (predefined symbol(s)) transmitted by the gNB during the reference system frame or to signal the start boundary of the next system frame. )) or a physical preamble or message (such as a reference frame or synchronization signal).
[0107] According to some embodiments, a reference point in time may be predefined to be the beginning or end of a reference system frame. In this particular case, the information regarding the reference time point only includes information regarding the reference system frame, such as the reference system frame number (referenceSFN).
[0108] The reference time value may therefore correspond to the time at the intended start or end time of the reference system frame, which is sent by the gNB to announce the start of the reference system frame or the start of the next system frame. , or can be directly inferred from any reference frame transmitted by the gNB during the reference system frame.
[0109] For ease of explanation, in the following it is assumed that the reference time point is the end of the reference system frame (identified by its system frame number referenceSFN). Therefore, from now on, the information regarding the reference time point is simply the number of referenceSFNs.
[0110] As shown in Figure 5, the reference time is equal to the sum of: - the current time of the gNB's time counter, which is continuously synchronized with the 5G GM clock thanks to the synchronization manager 203; - a duration T representing the delay (in time counters) that the gNB waits before reaching a reference point in time during the reference system frame (e.g. its end).
[0111] According to some embodiments, where the reference time corresponds to the end boundary of the reference system frame, the reference time may be determined, for example, by the gNB as the sum of: - the current time of the gNB's time counter, which is synchronized to the 5G grandmaster clock by the synchronization manager 203; - Time remaining until the start of the next system frame. Since a new system frame occurs every 10ms, the remaining time may be obtained by an alarm counter set to 10ms at the start of each system frame and then decremented. - 10ms*(referenceSFN-nextSFN+1), where reference is the SFN of the specified reference system frame and nextSFN is the SFN of the next system frame. If the reference time is calculated just before starting the reference system frame, referenceSFN can be nextSFN. In that case, the reference time is included in the reference system frame and SIB9 messages can be used. Typically, the reference SFN refers to the future reference system frame, i.e. referenceSFN-nextSFN>0.
[0112] Reference time T R and an indication of the reference system frame, eg, referenceSFN, are then provided to the UE. Both of these elements may be sent together or separately.
[0113] According to some embodiments, the gNB has a reference time T R Prepare an information element (referenceTimeInfo IE) that includes and referenceSFN. The referenceTimeInfo IE is then encapsulated into a System Information (SI) or Radio Resource Control (RRC) message, such as a SIB9 or DLInformationTransfer message.
[0114] The DLInformationTransfer message is sent before the reference system frame, as shown in Figure 5.
[0115] SIB9 messages are sent during reference system frames. Therefore, it is the reference time T with respect to the reference time included in the same reference system frame. R directly included. Therefore, no other messages related to the reference system frame are sent by the gNB before.
[0116] Therefore, as shown in FIG. 5, the gNB sends the message to the requesting UE or several UEs if the message is a broadcast.
[0117] If a DLInformationTransfer message is sent, later a reference frame is sent by the gNB to signal the reference time of the reference system frame when its time counter is equal to the reference time.
[0118] Again, in general, the reference frame is the cyclic code or physical preamble that starts the reference system frame, the cyclic code or physical preamble that starts the next system frame (e.g., the reference time is between the reference system frame and the next system frame). or any message sent during the reference system frame (eg, a synchronization signal).
[0119] Once the reference time of the reference system frame is detected by the UE thanks to the referenceSFN and the reference frame, the reference time T R The UE (its managers 301 and 302) that previously received (or retrieved the reference time from the SIB9 message) sets its time counter to the reference time.
[0120] In the specific case of SIB9, the reference time corresponds to the time at the end boundary of the reference system frame.
[0121] However, as shown in Figure 5, there is a delay between the moment the gNB transmits the reference frame and the moment the UE receives it. This delay, also called propagation delay, represents the propagation time of the radio signal between the UE and the gNB.
[0122] Therefore, the synchronization mechanism described above relies on the assumption that the propagation delay of the reference frame used as a trigger by the UE to set its local time counter using the reference time provided by the gNB is negligible.
[0123] It can be appreciated that when the UE uses the reference time provided by the gNB to set its time counter, a permanent synchronization error is introduced due to the propagation delay of the gNB message. This may be incompatible with some applications (eg, time-sensitive applications), especially those that require accurate timestamps of the arrival or departure times of some packets. Indeed, persistent synchronization errors due to propagation delays may lead to errors in the timestamps of those packets, which may be incompatible with the requirements of time-sensitive applications.
[0124] To overcome this drawback, for example, a precision time protocol (IEEE1588) has been adapted to 5G systems to periodically measure the propagation delay between the user equipment and the base station during the estimation of position triangulation. It may be possible to utilize.
[0125] The estimated propagation delay is then used to compensate for the identified error. For example, when a reference point is detected, the time counter is set to T. R When set to , the UE may add the last estimated propagation delay to the time counter.
[0126] A precision time protocol (PTP) adapted for 5G systems is shown in Figure 6a.
[0127] PTP relies on the exchange of uplink and downlink measurement frames between the UE and gNB to estimate the round trip time (RTT) by timestamping the times of transmission and reception at both the gNB and the UE. . By using their time counters, the UE and gNB register the reception and transmission times of the exchanged frames.
[0128] First, as shown in FIG. 6a, the UE transmits the first measurement frame, ie, uplink frame #i, and records the transmission time t1 of the frame #i in the UE's internal memory.
[0129] Next, upon receiving the first measurement frame #i, the gNB stores the reception time t3 in its internal memory.
[0130] Next, the gNB transmits the second measurement frame, ie, downlink frame #j, to the UE and records the transmission time t2 of frame #j in its internal memory. According to some embodiments, the transmission of the second measurement frame #j may occur before receiving the first measurement frame #i. According to some embodiments, the transmission order of measurement frames #i and #j may be reversed.
[0131] Upon receiving the second measurement frame #j, the UE stores the reception time t4 of the second measurement frame #j in its internal memory.
[0132] When both measurement frames #i and #j are received, the UE and gNB respectively perform the following calculations: UE Rx-Tx =t4-t1 and gNB Tx-Rx =t2-t3. Obtained quantity UE Rx-Tx and gNB Tx-Rx are similarly signed (either positive or negative) when the measurement frames do not intersect each other.
[0133] The gNB then uses the calculated value gNB to enable the UE to determine the propagation delay between the UE and the gNB. Tx-Rx as a parameter to the UE using a subsequent (or follow-up) downlink frame.
[0134] And the calculated gNB Tx-Rx If the terminal receives a subsequent downlink frame containing the UE Rx-Tx fromgNB Tx-Rx Determine the propagation delay by subtracting: Assuming that the propagation delay is the same for uplink and downlink transmissions, propagation delay = RTT / 2 = (UE Rx-Tx -gNB Tx-Rx ) / 2.
[0135] The estimated propagation delay then detects the next reference time and then changes the time counter to T. R may be added to the UE's time counter when configured. In a variant, it may be used directly after the estimation, correcting the time counter given the estimated propagation delay used when setting the time counter at the reference time.
[0136] Therefore, consideration of calculated propagation delays for updating user equipment time counters is an improvement for achieving strict end-to-end timing accuracy requirements of time-sensitive applications. In fact, the calculated propagation delay is used to compensate for the identified error, ie the propagation delay associated with the transmission of the reference system frame.
[0137] An alternative method for determining the propagation delay between the gNB and the UE may be used, known as the timing advance (TA) mechanism defined in the standard in clause 4.3 of TS 38.211. An example of the use of the TA mechanism to determine propagation delay is shown in Figure 6b. This mechanism provides a timing value in a timing advance (TA) command for each user equipment that takes into account the estimated propagation delay for the user equipment.
[0138] To do this, the base station schedules the transmission time of an uplink frame by the user equipment, knows its transmission time, and can detect its arrival time, so it can calculate the propagation delay of this scheduled uplink frame. Monitor regularly. In order to control the uplink timing of the UE, the gNB sends TA commands in control messages to the UEs of the network. The TA command is specific to a given UE as it reflects the propagation delay with this particular UE.
[0139] Upon receiving an uplink frame, the base station may compare to the previously estimated propagation delay to detect a significant increase in propagation delay compared to the previously estimated propagation delay.
[0140] When a significant increase is detected, the base station sends a subsequent TA command to the user equipment to provide the updated parameters, as shown in Figure 6b.
[0141] The user equipment registers the parameters of the command, calculates the updated propagation delay, and waits for the next reference system frame. Upon detecting the next reference time, the user equipment determines the updated time counter based on the last calculated propagation delay, i.e. the calculated propagation delay is T R is added to the time counter set in .
[0142] TA commands are provided by the gNB to the UE via the 5G NR interface. For transmission, TA commands are encapsulated into different types of protocol data units (PDUs), all defined in TS 38.321: - Random Access Response MAC Protocol Data Unit (PDU) as defined in clauses 6.1.5 and 6.2.3 of TS 38.321. RAR is a response frame to the random access preamble used by the UE within the random access procedure to associate with the gNB. In the RA procedure, the propagation delay measurement is triggered by the UE sending a random access preamble to the gNB. - MAC control element for absolute timing advance commands or MAC control element for timing advance commands as defined in clauses 6.1.3.4 and 6.1.4a of TS 38.321.
[0143] At least two pieces of information are provided within the TA command: parameters for determining the propagation delay with respect to the previously transmitted uplink frame (or the propagation delay itself).
[0144] Uplink frames may be of different types. If the TA command is a random access response, the uplink frame is a specific frame of the random access procedure. Otherwise, the uplink frame may be, for example, a Physical Uplink Shared Channel (PUSCH), a Physical Uplink Control Channel (PUCCH), or a Sounding Reference Signal (SRS) as defined in TS38.213.
[0145] Depending on the type of TA command, the provided parameters may be of different nature. For random access responses and absolute timing advance commands, the absolute value of the parameter TA is given. For timing advance commands, only the previously provided TA correction value is included in the TA command.
[0146] Therefore, according to some embodiments, the TA command may comprise the absolute value of TA in the TA command field, which then comprises the instantaneous T TA Used by the UE to determine: T TA =(N TA +N TA,offset )*T C Here, N TA =TA*16*64*2 μ , μ is the subcarrier interval (spacing) configuration, and as defined in Section 4.2 of TS 38.211, Table 4.2-1, Δf=2μ*15kHz, N TA,offset is the fixed offset used to calculate the timing advance and T C is the basic time unit for New Radio, as defined in TS 38.211, Section 4.1.
[0147] According to other embodiments, the TA command is TA correction The previously provided TA value, called TA previous may contain modified values. Previous T TA The adjustment value applied to (TA correction -31)*16*64 / 2 μ is equal to
[0148] Interestingly, member N TA It can be noticed that is proportional to the round-trip time between the gNB and the terminal. such a number N TA can be useful in determining the propagation delay, assuming that the propagation delay is symmetric. For example, the propagation delay between the UE and gNB is (N TA *Tc) / 2.
[0149] In this way, when receiving a TA command, the UE may be able to determine the propagation delay during the transmission of the TA command. The calculated propagation value is the reference time T R and the reference frame transmitted by the gNB may be used when adjusting the time counter as described above.
[0150] However, the propagation delay calculated using PTP or TA mechanisms may e.g. trigger the setting of a counter based on a reference frame (reference time), assuming that the UE is mobile relative to the base station. ) may be estimated using a different UE positioning than the UE's positioning when the UE is transmitted.
[0151] For example, if the UE leaves the gNB between the moment when the propagation delay is estimated and the moment when the reference frame signaling the reference time is received, the estimated propagation delay increases the time counter T R is not sufficient to compensate for the actual propagation delay when set to .
[0152] The triangulation estimation is performed by the PTP in a periodic manner that is triggered independently of the reference frame (or reference point in time), so the PTP calculates the propagation delay when the UE is moving relative to the gNB. is not adapted to accurately estimate .
[0153] Similarly, since the TA mechanism is triggered independently of the reference frame, the TA mechanism is not adapted to accurately estimate the propagation delay when the UE is moving relative to the gNB.
[0154] Therefore, there is a need to improve the correlation between propagation delay measurements and the reference frame used by the UE to synchronize its local time counter with the 5G system clock.
[0155] Therefore, in a first aspect, the invention proposes that the determination of the propagation delay in the UE is scheduled with respect to a reference time of a reference system frame.
[0156] Therefore, the reference time of the reference system frame is used to schedule or trigger propagation delay measurements (or RTT measurements) as close as possible to the reference time and therefore as close as possible to the reference frame.
[0157] In this way, the estimated propagation delay is scheduled closer in time to the reference time, so that the estimated propagation delay is as close as possible to the actual propagation delay occurring between the UE and the gNB at the reference time.
[0158] As a result, the updating of the time counter with the determined propagation delay becomes more accurate and the error shown in FIG. 5 is reduced. Determination of propagation delay is performed using an improved PTP method or an improved TA mechanism.
[0159] Several embodiments are proposed within this document and illustrated in FIGS. 7a-11.
[0160] Figure 7a illustrates the general principle of the invention based on an improved PTP method according to an embodiment of the invention. The diagram of FIG. 7a shows frames exchanged between a UE and a gNB according to an embodiment of the invention. Figure 7b shows another embodiment using a TA mechanism, where uplink frames are scheduled as described below.
[0161] According to the present invention, the determination of the propagation delay is performed at a reference time T for updating the time counter of the UE. R takes place near a reference point in time associated with.
[0162] First, similar to the procedure described in relation to FIG. 5, the gNB (in both FIG. 7a and FIG. 7b) sends a downlink frame to the UE. The downlink frame contains information about the reference time at which the UE updates its time counter, in particular it includes the SFN of the reference system frame as well as the associated reference time T. R including.
[0163] In this example, the reference point in time is, for example, but not limited to, the end of the reference system frame.
[0164] Downlink frames can be two different types: DLInformationTransfer messages or SIB9 messages. The description of the two embodiments described in connection with FIGS. 11 and 12 more precisely points out the details of using these types of messages.
[0165] Both of these types of messages can include additional information beyond that regarding the reference point in time.
[0166] Regardless of the type of downlink message, its reception by the UE triggers the scheduling of propagation delay measurements.
[0167] In order to update the UE's time counter as accurately as possible, the UE schedules propagation delay measurements close in time to a reference frame signaling a reference point in time. Such scheduled propagation delay measurements thus provide an accurate estimate of the propagation delay of the reference frame used by the UE to detect the reference instant. In fact, this propagation delay is the cause of possible desynchronization of time counters set only to a reference time.
[0168] Therefore, the UE schedules the propagation delay determination with respect to a reference point in time, as known from previously received downlink frames. In other words, the UE schedules the start of the propagation delay measurement based on the information contained in the previously received downlink frame regarding the reference system frame (i.e., the target frame for updating the time counter) and the current time. .
[0169] Scheduling the propagation delay measurements may include scheduling the transmission times of the first measurement frame and (optionally) the second measurement frame, as described above in connection with FIG. 6a or FIG. 6b. . The first measurement frame may be either the first measurement frame used in the PTP method or the uplink frame of the TA mechanism. In the TA mechanism, the gNB uses only one uplink frame to determine the propagation delay, so a second measurement frame is not required.
[0170] Advantageously, the scheduling time for the transmission of the first measurement frame is determined based on a resource allocation scheme previously provided to the gNB. Determining the resource allocation scheme is further described in connection with the second aspect of the invention.
[0171] According to some embodiments, scheduling propagation delay measurements includes determining a time to begin determining propagation delay, eg, a time of transmission of a first measurement frame. This is the case for example in the scenario of Figure 7a.
[0172] Therefore, the time to start measuring propagation delay is based on the SFN of the current system frame, the current value of the time counter, and the SFN of the reference system frame.
[0173] To do this, according to some embodiments, the timer counts down from a threshold to zero or, when counting up to a threshold, generates a time to begin determining the propagation delay (or RTT). can be used for The threshold uses the difference between the SFN of the current system frame (when receiving the DLinformation message) and the SFN of the reference system frame, and uses the periodicity of the system frame (typical value 10ms, as mentioned above). , may be determined by the UE to set its timer: value of timer (threshold) = current time + time to next system frame + 10ms*(referenceSFN - SFN of next system frame).
[0174] Thus, according to some embodiments, once the threshold is determined, a decrement timer is set to the determined threshold as the initialization time. Then, when the decrement timer expires, determination of propagation delay is started.
[0175] According to some TA command-based embodiments, uplink frame scheduling may be provided by the gNB. In other words, the gNB may provide the UE with information regarding the transmission time of the uplink frame (ie, the first measurement frame). In that case, the UE only sets its timer to expire at the provided scheduling time. According to the invention, the scheduling time thus provided is close to the reference time.
[0176] In the TA command-based mechanism, based on the determination of the reference time, the gNB may allocate resources to the UE for transmission of an uplink frame (ie, the first measurement frame) relatively close to the reference time. Therefore, the allocated resources are signaled in the resource allocation scheme sent by the gNB to the UE. Therefore, the UE infers the transmission time of the first measurement frame from the resource allocation scheme by retrieving the uplink resources allocated to it for the uplink frame. The transmission of the resource allocation scheme to the UE by the gNB is further described in connection with the second aspect of the invention, particularly in relation to step 1604 of FIG. 16.
[0177] Upon expiration of the timer, the UE sends a first measurement frame (ie, an uplink message) to the base station, as visible in both FIG. 7a and FIG. 7b. The UE also stores the transmission time t1 of the first measurement frame. The transmission time is the value of the time counter when the UE transmits the first measurement frame.
[0178] In the example shown, the first measurement frame is scheduled to be transmitted between the reference system frames and before the reference time. Of course, it may also be transmitted in other system frames, for example before the reference system frame, preferably the immediately previous system frame. Alternatively, it may be scheduled to be transmitted (immediately or not immediately) during a system frame after the reference system frame.
[0179] Next, the gNB receives the first measurement frame and stores the time t3 at which the gNB received the first measurement frame. The reception time is the value of the gNB's time counter when the first measurement frame is received by the gNB.
[0180] The gNB then transmits the reference frame in the reference system frame. The reference frame signals a reference point in time. It declares either the start of the reference system frame (in which case the reference time is 10ms later) or the start of the system frame immediately following the reference system frame (in which case the reference time is the start of this system frame). may be a cyclic code / prefix or a physical preamble or synchronization signal. It may also be a message issued at a reference point in time, eg ending a reference system frame.
[0181] As shown, upon detecting the reference time point of the reference system frame, the UE detects the reference time T provided by the gNB and associated with the system frame. R to update its local time counter.
[0182] Next, the gNB transmits an arbitrary second measurement frame to the UE and records the transmission time as t2 of the second measurement frame.
[0183] According to some embodiments, the second measurement frame is transmitted during a system frame that follows (immediately or otherwise) the reference system frame, as shown in FIG. 7a.
[0184] According to some embodiments, the second measurement frame is transmitted during a system frame immediately preceding the reference system frame. This advantageously allows the estimation of the delay propagation to be terminated before the reference time.
[0185] According to some embodiments, the second measurement frame is scheduled to be transmitted during the reference system frame. In particular, the second measurement frame may be a reference frame signaling a reference time for the UE.
[0186] According to some embodiments, the transmission time of the second measurement frame is scheduled with respect to a reference time. For example, the transmission time of the second measurement frame may be scheduled before or after the reference system frame. Similar to scheduling the transmission time of the first measurement frame, a timer may be used at the gNB to manage the transmission time of the second measurement frame. The timer threshold is set by the gNB using the SFN of the current system frame (when transmitting information about the reference time), the referenceSFN, and the system frame periodicity (typical value of 10ms, as mentioned above) to set that timer. This can be determined by setting .
[0187] Therefore, in parallel with the declaration of the reference system frame and reference time, the gNB also schedules the transmission of the second measurement frame and sets the timer accordingly. Therefore, upon expiration of the timer, the gNB transmits a second measurement frame. Using a timer has the advantage that it is a reliable solution if the gNB responds quickly to the reception of the first measurement frame to trigger the transmission of the second measurement frame.
[0188] When the UE receives the second measurement frame, the UE records the reception time as t4 of the second measurement frame.
[0189] The RTT or propagation delay can then be determined in the same manner as described above in relation to Figure 6a or 6b.
[0190] difference gNB Tx-Rx , or t3 and / or t2 may be sent to the UE in a follow-up message.
[0191] According to some embodiments, the gNB sends the value t2 to the UE directly in the second measurement frame. To that end, the transmission time t2 is scheduled with respect to a reference time, and t2 can be included directly in the second measurement frame, or the gNB can support timestamp insertion on the fly after the timestamp point. Therefore, it may be known in advance. In that case, no follow-up message is necessary.
[0192] Then, assuming that the propagation delay is the same for uplink and downlink transmissions, the UE calculates that RTT=UE Rx-Tx -gNB Tx-Rx or delay propagation = (UE Rx-Tx -gNB Tx-Rx ) / 2 to calculate the RTT or propagation delay between the UE and gNB.
[0193] In TA-based mechanisms, the second measurement frame is not sent. As shown in FIG. 7b, the gNB provides the UE with a transmission time to schedule the transmission of uplink measurement frames based on the reference time provided by the gNB. The gNB then estimates the propagation delay from the reception of this uplink measurement frame sent by the UE. Therefore, the gNB only uses follow-up messages (i.e., subsequent TA commands, etc.) to send information about the estimated propagation delay value. Therefore, the UE calculates the propagation delay based on the received information. According to some embodiments, the follow-up message is a general follow-up message that directly includes the estimated propagation delay value. Such messages allow for reduced computation at the UE.
[0194] The UE then updates its local time counter with the value of the calculated propagation delay. This allows the UE to compensate for errors introduced when it previously updated (or set) its time counter based on a reference time associated with a reference system frame. To do this, the calculated propagation delay is previously T R will be added to the time counter set to .
[0195] In the example shown in Figure 7a, the first and second measurement frames are sent before and after the reference system frame, respectively.
[0196] According to some embodiments, the order of transmission of the first and second measurement frames may be reversed, in which case the second measurement frame is scheduled relative to a reference time.
[0197] According to some embodiments, both the first and second measurement frames are transmitted and received before or after the reference system frame.
[0198] Further, according to some embodiments, the first measurement frame and / or the second measurement frame may be transmitted during the reference system frame.
[0199] For a better understanding, the method proceeding on the gNB side and the UE side will be further detailed in connection with FIG. 8, FIG. 8a, FIG. 8b, FIG. 9, FIG. 9a and FIG. 9b, respectively.
[0200] In the illustrated embodiment, the reference point in time is the end of the reference system frame. Therefore, in this embodiment, the information regarding the reference time is referenceSFN.
[0201] Figure 8 shows the reference time T at gNB. R Figures 8a and 8b show an alternative example of the corresponding method for compensating the propagation error introduced during the update of the UE's time counter using show. These methods are performed by the UE synchronization manager module 201 of the gNB.
[0202] The method for updating a time counter of a UE in a gNB comprises a first step 801 aimed at scheduling a reference system frame.
[0203] Next, in step 802, the gNB receives a reference time T, as described in relation to FIG. R Calculate.
[0204] Next, in step 803, the gNB prepares a message to provide information about the reference system frame to the UE. For example, the message includes an information element that includes, for example, a referenceSFN.
[0205] This message has two uses according to the invention: - Associated reference time T R In addition, the purpose is to notify the UE of the new reference time in advance. - triggering the scheduling of propagation delay measurements between the gNB and the UE, so that the UE schedules propagation delay measurements close to the reference time;
[0206] The message can be either a dedicated RRC message, a dedicated MAC CE, or a SIB or DLinformationTransfer message.
[0207] A prepared message containing information about the reference system frame is then sent by the gNB to the UE in step 804. Also, the reference time T R can also be included.
[0208] In step 805, the gNB uses its 5G NR interface 205 to transmit a reference frame to signal the reference time of the reference system frame. This may be a cyclic code or a physical preamble or synchronization signal that signals the start of the reference system frame or the start of the immediately following system frame.
[0209] At the UE side, Fig. 9 shows the corresponding method for updating the UE's time counter with the reference time, and Figs. 9a and 9b show the corresponding method for compensating the propagation error introduced during the updating of the UE's time counter. An alternative to the corresponding method is shown. These methods are performed by the gNB synchronization manager module 301 of the UE.
[0210] The method for updating a time counter of a UE in a gNB includes, in a first step 901, receiving a message sent by the gNB in step 804 via its 5G NR interface 305 and updating a time counter of a UE at a reference time: referenceSFN and T R including providing information about.
[0211] Next, in step 902, the UE extracts information about the reference time in order to schedule propagation delay determinations with respect to the reference time and the current time. Accordingly, the UE may schedule the propagation delay determination using the reference SFN provided in the received message, as described in FIGS. 7a and 7b.
[0212] Scheduling may include, for example, setting a timer that expires at the same time as a reference system frame begins. Of course, the timer for transmitting the first measurement frame may be set to another time close to the reference time. Therefore, it is initialized with the sum of: - Current time of the UE's time counter, - Time remaining until the start of the next system frame. If a new system frame occurs every 10ms, the remaining time can be obtained by an alarm counter set to 10ms at the start of each new system frame. - 10ms*(target SFN index - next SFN index), where targetSFN is the SFN of the system frame when propagation delay determination has to start, preferably the reference system frame, and nextSFN is the current This is the SFN of the system frame following the system frame.
[0213] In a variation, scheduling may include setting a timer to expire before the occurrence of the reference system frame. Therefore, it is initialized with the sum of: - Current time of the UE's time counter, - time remaining until the start of the next system frame, - 10ms*(target SFN index - next SFN index - 1), and - targetSubframes×1ms, where targetSubframes is the identifier (0-9) of one of the ten subframes forming the preceding system frame. Therefore, the first measurement frame is transmitted during this subframe.
[0214] Next, in step 903, the terminal determines the reference time T from the information received in step 901. R Take out.
[0215] According to some embodiments, the reference time T R is sent in advance in step 901 at the same time as the reference time indication. In this case, the message sent in step 901 is, for example, a DLInformationTransfer message with an IE called referenceTimeInfo that includes both a reference time and an instruction to the reference time (referenceSFN, etc.). This case is shown in FIG.
[0216] According to some embodiments, the reference time T R may be received during the reference system frame. In this case, the message to be sent is, for example, a SIB9 message, as shown in FIG.
[0217] Then, once a reference time point (e.g., one of the reference system frame boundaries estimated from the reference frame transmitted by the gNB in step 805) is detected, the UE detects the reference time T R to set that time counter and synchronize it with gNB's time counter. Unfortunately, as explained in connection with FIG. 5, this procedure introduces errors due to the propagation delay of the reference frame signaling the reference point in time to the UE.
[0218] The two propagation delay measurement methods at the UE side shown in FIGS. 9a and 9b aim to determine the value of the propagation delay in order to compensate for the identified error. This method is performed by the gNB synchronization manager module 301 of the UE.
[0219] Each alternative method corresponds to an alternative approach to determining propagation delay, PTP-based or TA-based approaches. According to the chosen approach, the corresponding method may be used in combination with the method for updating the time counter of the UE, as shown in FIG. 8 (gNB side) and FIG. 9 (UE side).
[0220] First, in step 910, the UE is triggered to start propagation delay measurements by expiration of the timer set in step 902.
[0221] The UE sends the first measurement frame to the gNB through its 5G NR interface 305 as scheduled in step 911 or 918. The transmission time t1 of the first measurement frame is stored (step 912).
[0222] In a PTP approach, according to some embodiments, the first measurement frame may be a message dedicated to RTT measurements and may include an indication of RTT measurement purpose.
[0223] In both approaches, according to some embodiments, the first measurement frame may be any uplink message sent as close as possible to the reference time (before, during, or after the reference system frame). . In this case, the gNB may switch to active measurement mode from step 804 to process each received uplink for propagation delay measurements.
[0224] Returning to gNB, the two alternatives shown in Figures 8a and 8b correspond to the alternatives in Figures 9a and 9b, respectively. On the gNB side, in step 810, the gNB receives a first measurement frame through its 5G NR interface 205.
[0225] In step 811, the gNB stores the reception time of the first measurement frame as t3.
[0226] At step 812, the gNB transmits a second measurement frame, the transmission of which may be scheduled relative to a reference time or triggered by reception of the first measurement frame.
[0227] According to some embodiments, the second measurement frame may be a message dedicated to RTT measurements and may include an indication of RTT measurement purpose.
[0228] According to some embodiments, the second measurement frame may be any downlink message sent as close as possible to the reference time (before, during, or after the reference system frame).
[0229] According to some embodiments, the second measurement frame may be transmitted during the reference system frame.
[0230] Next, in step 813, the gNB stores the transmission time t2 of the second measurement frame transmitted in step 812. As previously explained, the transmission time t2 may be, for example, a reference point in time or the start of a reference or next system frame.
[0231] Returning to the UE, in step 913, the UE receives the second measurement frame transmitted by the gNB in step 812. In step 914, the reception time t4 of the second measurement frame by the UE is stored.
[0232] In TA-based approaches, a second measurement frame is not required. Therefore, in step 815, the gNB stores the reception time of the first measurement frame. Therefore, the corresponding processing steps are not executed.
[0233] Returning to the gNB side, in step 814, the gNB sends a follow-up message to the UE including information about the reception time t3 of the first measurement frame and the transmission time t2 of the second measurement frame. The information is either the value of times t3 and t2 in separate fields or more efficiently the time difference gNB between times t2 and t3 Tx-Rx It may be either.
[0234] According to some embodiments, the follow-up message only includes information regarding the transmission time t2 of the second measurement frame. In this case, information regarding the reception time t3 of the first measurement frame may be transmitted to the UE in advance, for example, within the second measurement frame.
[0235] According to some embodiments, there are no follow-up messages. At this time, the second measurement frame is determined by the reception time t3 of the first measurement frame and the transmission time t2 of the second measurement frame (or simply the difference gNB Tx-Rx ) directly.
[0236] In a TA-based approach, the follow-up message sent in step 817 is simply a subsequent TA command containing information about the propagation delay estimated by the gNB in step 816 and the time of reception (from step 815). Compare with the sent time. For example, this information may include a delay propagation correction value that corrects the current delay propagation known by the UE and gNB. According to some embodiments, the follow-up message may be a generic follow-up message that directly includes the estimated propagation delay value.
[0237] Returning to the UE side, in step 915, the UE receives from gNB the reception time t3 of the first measurement frame by gNB and the transmission time t2 of the second measurement frame (or simply the difference gNB Tx-Rx ).
[0238] This information may be included in the follow-up message sent in step 814 or may be partially or completely included in the second measurement frame.
[0239] Next, in step 916, propagation delays are estimated, as described above.
[0240] In a TA-based approach, the estimated propagation delay can be retrieved directly from the follow-up message (TA command) received in step 919 (step 920).
[0241] Therefore, in step 917 or 921, the calculated value of the propagation delay is then added to it (the estimated propagation delay) to compensate for the error due to the propagation delay of the reference frame used to detect the reference time ) is used to correct the UE's time counter.
[0242] In this way, by considering the propagation delay of the reference system frame, the accuracy of updating the time counter is improved.
[0243] According to some embodiments, steps 810-814 and 910-917 of propagation delay measurements may be performed before or after the reference system frame. In other words, propagation delay measurements may be scheduled such that the transmission and reception of both measurement frames are performed before or after the reference system frame. In this case, according to some embodiments, steps 904 and 917 may be performed simultaneously such that the time counter is updated with the sum of the reference time and the measured propagation delay.
[0244] 10 and 11 show an alternative example of the previously presented method to improve the accuracy of the update of the UE's local time counter.
[0245] As mentioned above, the scheduling of propagation delay measurements is based on the reference time T for which the UE sets its local time counter. R Triggered when a message containing information about the event is received. This message may be of different types.
[0246] Figure 10 illustrates an embodiment in which the message is a DLInformationTransfer as defined in standard TS 38.331, item 5.7.1.
[0247] The DLInformationTransfer message is based on the reference time T R In order to enable the UE to determine when to set its time counter to the time counter, it may at least be provided with information regarding a reference point in time. Therefore, information regarding the reference time may be included in an information element (IE) called referenceTimeInfo within the DLInformationTransfer message.
[0248] According to some embodiments, this information may include a referenceSFN. According to some embodiments, this information may include information about the exact reference time of the reference system frame (e.g., the start or end of the reference system frame), where the UE R to update the time counter.
[0249] According to some embodiments, the DLInformationTransfer message includes a reference time T in an information element (IE) called referenceTimeInfo. R may further include information regarding. As explained earlier, the reference time is used by the UE to update its time counter. In this case, both information regarding the reference time and the reference time are included in referenceTimeInfo.
[0250] According to some embodiments, the reference time T R is sent in a frame different from the DLInformationTransfer message and separately from the reference time point (here, the value of referenceSFN).
[0251] Figure 11 shows the reference time T R 2 shows an embodiment in which the message containing information about is a new type of message defined for the present invention called RTTmeasurement TF (RTTmeasurement frame).
[0252] An RTTmeasurement Trigger Frame is sent by the gNB to trigger the scheduling of propagation delay measurements with respect to the reference time provided in the RTTmeasurement Trigger Frame. Therefore, at the reference point in time, i.e. when the UE has set its local time counter to T R The instant to be set to is provided in the RTTmeasurementTF.
[0253] Information regarding the reference time point can include the value of referenceSFN.
[0254] In a TA-based approach, the RTTmeasurementTF may directly include the time for the UE to transmit the first measurement frame.
[0255] Similar to the previous embodiments, measurement frames are then scheduled and transmitted temporally close to the reference system frame and reference point in time.
[0256] Reference time T relative to the reference time provided by RTTmeasurementTF R is transmitted during the reference system frame using, for example, a SIB9 message. In the specific case of SIB9, the reference time T provided R corresponds to the ending boundary of the reference system frame.
[0257] Therefore, the terminal has a reference time T R Upon receiving a SIB9 containing SIB9, set a time counter with the reference time at the end of the reference system frame.
[0258] In both embodiments, reception of the DLInformationTransfer or SIB9 message triggers the scheduling of propagation delay measurements close to the reference time of the reference system frame. Therefore, measurement frames #i and #j are then sent closer to the reference instant, so that the determined propagation delay more accurately reflects the propagation delay of the reference frame signaling the reference instant.
[0259] Therefore, the proposed method discloses a new usage of DLInformationTransfer or SIB9 messages to improve the accuracy of the UE's time counter update.
[0260] As detailed in Figures 7a-11, in a first aspect of the invention, the first and second measurement frames and follow-up messages are close in time to the reference time and are therefore subject to propagation delay errors. Scheduled near the reference frame.
[0261] Figure 12 shows an example of the temporality of measurement frames and follow-up messages. This figure shows that the gNB determines (1200) the new reference time trigger (1205), and the reference time T R shows the creation (1201) of a message containing information about the same, and its sending (1202).
[0262] The reference point in time is selected here as the end of reference system frame #3. As explained earlier, the message for measuring the propagation delay between the UE and gNB is based on the time reference T R A reference frame 1205 is transmitted in close temporal proximity to a reference frame 1205 that signals a reference point in time associated with the reference frame 1205 .
[0263] At a reference time 1205, the UE updates its time counter to the reference time T previously provided in 1202. R Then, update by gNB.
[0264] As shown in FIG. 12, first and second measurement frames 1203 and 1204 are transmitted during reference system frame #3. A follow-up message 1206 containing the arrival timing of the first measurement frame and / or the transmission time of the second measurement frame (or the difference between them) is sent to the gNB during system frame #4 immediately following reference system frame #3. sent to the UE by This scenario is, of course, only the exemplary scenario already mentioned above.
[0265] In the TA-based approach only one measurement frame, uplink frame 1203, is transmitted, so that only uplink resources close to the reference time are needed to estimate the propagation delay. Uplink frames may include, but are not limited to, uplink signals of the type Physical Uplink Shared Channel (PUSCH), Physical Uplink Control Channel (PUCCH), or Sounding Reference Signal (SRS) as defined in TS38.213. It can be. Furthermore, in this approach to provide information about the propagation delay to the UE, TA commands are sent. TA commands require downlink resources.
[0266] Both of these methods rely on the exchange of messages between the gNB and the UE.
[0267] Resource allocation for transmitting these messages, the first and optional second measurement frames, and follow-up messages (for PTP-based or TA-based approaches) is performed by the gNB. Resource allocation should be understood to determine the opportunity to transmit uplink or downlink frames within a system frame. Depending on the situation, the gNB may declare more or fewer opportunities to transmit uplink frames.
[0268] As described in connection with FIG. 4, the system frame is subdivided in the time and / or frequency domain such that each symbol establishes a minimum duration at a given frequency for transmitting data. Before the start of the reference system frame, the gNB determines which resources (time slots and / or OFDMA symbols) are allocated to uplink or downlink transmissions and their sequences within the system frame according to the resource allocation scheme. I can do it.
[0269] By efficiently selecting an appropriate resource allocation scheme, the gNB may allow these messages to be sent close in time to the reference time and thus close to the reference frame signaling the reference time. can. In other words, it is possible to secure an opportunity to transmit the first measurement frame (uplink frame) and any second measurement frame (downlink frame) close to the reference time.
[0270] Therefore, there is a need to ensure that the propagation delay measurements initiated by the UE are consistent and compatible with the resource allocation scheme selected by the gNB.
[0271] Therefore, according to the second aspect of the invention, in order to transmit and / or receive information for determining the propagation delay with the UE, the gNB at least Select one resource and select an appropriate resource allocation method for each selected resource. The gNB then performs propagation delay measurements by exchanging at least one measurement frame in the selected one or more resources. As shown in exemplary Figure 12, the gNB may provide uplink and downlink symbols in reference system frame #3, while downlink symbols (follow-up frame) should be provided.
[0272] Figure 16 shows the reference time T R FIG. 4 shows a first embodiment of a method according to the second aspect of the invention, determined by a gNB based on (and thus a reference point in time); FIG.
[0273] First, in step 1601, the gNB determines the requirements regarding synchronization required by the UE of the 5G network. According to the synchronization requirements of the UE, the accuracy of the propagation delay may vary. The gNB may determine these requirements upon receiving the information provided by the UE, for example in the RRC message defined in TS 38.331, in particular the UEAssistanceInformation message. The gNB may also infer these requirements based on information time bearing QoS, such as sensitive communication (TSC) assistance information.
[0274] Next, in step 1602, the gNB R and an associated reference point in time that is provided to the UE (eg, via a referenceSFN) to update its time counter. Both information may be provided to the UE together or separately as previously explained.
[0275] Although not shown in the diagram of Figure 16, this information is sent to the UE and then the gNB R It is recalled that a reference frame is transmitted to signal a reference point in time associated with the reference frame. This means that the UE sets its time counter to R Allows you to set
[0276] Based on the reference time and the associated reference time (ie, the frame signaling the reference time) and the requirements for synchronization, the gNB selects at least one resource for the reference time in step 1603. Resources may be defined in one or several slots, or one or several subframes, or time and / or frequency within a system frame near a reference point in time. The selected resources are for transmitting and receiving measurement frames close to the reference time to determine the propagation delay between the gNB and the UE.
[0277] Furthermore, in step 1603, the gNB then selects a resource allocation for the selected resource. The resource allocation may be a time-based or frequency-based resource allocation. Resource allocation defines the allocation of selected resource elements for uplink transmissions and / or downlink transmissions. Resource elements may be of different types, such as symbols or carriers, slots (if the selected resource is a subframe or system frame), subframes (if the selected resource is a system frame), etc.
[0278] Therefore, the gNB selects a resource allocation scheme that provides uplink and / or downlink elements of the selected resources for transmission and reception of measurement frames that comply with the synchronization requirements of the UE.
[0279] For example, in a PTP-based approach, the gNB chooses resource allocation as follows: - at least one uplink element close to the reference time is provided for the first measurement frame, - At least two downlink elements close to the reference time are provided for the second measurement frame and follow-up message.
[0280] For example, in a TA-based mechanism, the gNB can therefore ensure that one or more uplink elements of the resource are responsible for the transmission of at least one first measurement frame, regardless of whether some elements are allocated as downlink resources or not. Select the resource allocation scheme given for the purpose.
[0281] For example, the gNB selects one slot as a resource and therefore selects the associated slot allocation scheme as the resource allocation scheme, as shown in FIG. 13.
[0282] The selection of these resources is aimed at allowing the exchange of measurement frames to determine the propagation delay close to the reference time. In some embodiments, multiple resources (eg, slots) are selected to carry measurement frames.
[0283] To do this, first the gNB selects at least one resource for a reference time. In fact, the gNB can select resources close to the reference time and send measurement frames and follow-up messages during that time.
[0284] The gNB then selects a resource allocation method for the selected resource.
[0285] For example, there are several predefined slot allocation schemes, defined in table 11.1.1-1 of standard TS38.213. For each given slot assignment scheme, a sequence of uplink and / or downlink symbols within the slot is provided for each slot (see Figures 13, 14 below for given slot assignment schemes 0, 1, 55) .
[0286] According to some embodiments, the selected resource allocation scheme uses at least one uplink symbol, preferably multiple uplink symbols, to provide the UE with uplink resources for transmitting the first measurement frame. It may also include a symbol. Accordingly, such at least one uplink symbol may be used by the gNB to receive at least one measurement frame transmitted by the UE.
[0287] According to some embodiments, the selected resource allocation scheme provides at least one downlink symbol, preferably multiple downlink symbols, to enable the gNB to transmit a second and / or follow-up measurement frame. It may also include a symbol. Accordingly, such at least one downlink symbol may be used by the gNB to transmit at least one measurement frame to the UE. Two different resources allocated to the downlink (possibly in different system frames) may be used to carry the second measurement frame and the follow-up message, respectively.
[0288] In a TA-based mechanism, the selected resource allocation scheme may comprise at least one downlink symbol for transmission of a subsequent TA command (equivalent to a follow-up measurement message). The allocated downlink resources are TA-specific, except when the TA command is of MAC CE type.
[0289] Therefore, the gNB selects a resource allocation scheme to provide uplink and downlink resources (eg, symbols) for transmission and reception of measurement frames that comply with the UE's synchronization requirements. The higher the synchronization requirement for the UE, the closer to the reference time the measurement frames should be exchanged.
[0290] Next, in step 1604, the gNB declares the selected resource allocation scheme by transmitting the selected resource allocation scheme to the UE.
[0291] According to the chosen approach for determining propagation delay (TA-based approach or PTP approach), resource allocation may involve specific configuration.
[0292] For example, in a TA-based approach, the measurement frames may be PUSCH and PUCCH signals. The gNB may reserve PUSCH channel resources dedicated to data that the UE wants to share with the gNB, or PUCCH channel resources dedicated to control frames (eg, Acknowledgment frames).
[0293] The gNB can then use the parameters to configure both the PUSCH channel and the PUCCH channel, which are defined in TS38.331, PUSCH-config et PUCCH-config, respectively. There is an additional configuration parameter for the PUCCH channel, called PUCCH resource set, defined in la TS 38.213 Section 9.2.1, previously provided by the gNB, to refine the resource allocation of the PUCCH channel.
[0294] The declaration of the resource allocation scheme should be sent to the UE before the start of propagation delay measurements.
[0295] The configuration of resources (ie, the resource allocation scheme selected for resources such as slots, symbols, etc.) may be provided to the UE in several ways.
[0296] For example, it may be provided to the UE using the SIB1 message defined in section 6.2.2 of standard TS 38.331, sent periodically by the gNB, at least every 160 ms. For example, SIB1 messages may be used.
[0297] The configuration may also be provided to the UE in a physical downlink control channel (PDCCH) included at the beginning of each downlink subframe (ie, a subframe with only downlink symbols). The PDCCH, which can be considered a control message, comprises downlink control information (DCI), which can be in different formats. There are several DCI formats, as defined in section 7.3 of standard TS 38.212, and the format type of DCI may also indicate the subframe slot allocation scheme. This is for example the case for the DCI format DCI 2_0 defined in the standard defined in section 11.1.1 of TS 38.213. Some DCIs include frequency-domain resource allocations and time-domain resource allocations that allow the definition of resource allocations in time and frequency, such as DCI Format 0, also referred to as UL grants.
[0298] In addition, configuration may be provided to the UE for time and frequency allocation via the RRC message RRCreconfig, which includes an IE called ConfiguredGrantConfig. Frequency allocation can be defined in the FrequencyInfoUL and FrequencyInfoDL parameters (defined in TS 38.331).
[0299] In the TA command-based approach, the declaration of the selected resource allocation scheme (i.e., the transmission of the selected resource allocation scheme to the UE) is also the first measurement frame used by the UE during delay propagation determination. may be used by the gNB to provide information regarding the transmission time of the gNB. For example, the gNB allocates one or more uplink resources to the UE in the vicinity of the reference time. Therefore, when the UE has to transmit the first measurement frame, it comes from the allocated resources of the resource allocation scheme. The transmission of time may for example relate to the start of a system frame, slot or symbol that the UE obtains by virtue of the synchronization signal of FIG. 4.
[0300] In order to guarantee the synchronization accuracy between the gNB and the UE, the present invention takes into account the update of the time counter of the UE, and the reference time T by the gNB. R may be performed when transmitting to the UE.
[0301] Figure 17 shows a second embodiment of the method according to the second aspect of the invention, in step 1702, after obtaining the synchronization requirements (step 1701), a resource allocation scheme is first determined by the gNB. In step 1703, the gNB then schedules a reference system frame close to a resource (e.g., a slot) with uplink and downlink resources that provides the possibility to transmit measurement frames (i.e., a reference point in time and an associated reference time T R ). Therefore, the gNB schedules the transmission of reference frames (and thus reference time points) such that the selected resource allocation scheme around the reference time points matches the resource requirements for exchanging measurement frames.
[0302] FIG. 18 shows a third embodiment similar to that of FIG. 16, where once the gNB selects the resource allocation scheme, the gNB can choose the first (uplink ) Send a trigger frame to the UE to trigger the transmission of measurement frames.
[0303] Steps 1801-1804 are the same as steps 1601-1604 described above.
[0304] In addition to these steps, the gNB requests the UE to transmit an uplink measurement frame (ie, the first measurement frame). Therefore, as an alternative example, the gNB may trigger the scheduling of the transmission of the first measurement frame relative to the reference time of the reference system frame provided to the UE. This applies to both PTP-based and TA-based approaches.
[0305] Upon receiving the gNB request, the UE may then schedule transmission of a first measurement frame to determine propagation delay.
[0306] According to some embodiments, the gNB trigger frame may be, for example, an RTT measurement trigger frame as described in connection with FIG. 11.
[0307] According to some embodiments, in response to the gNB trigger frame, the UE may transmit a first measurement frame.
[0308] The gNB trigger frame is the requested measurement frame (for propagation delay measurement) and the reference time T (for synchronization processing). R should show the connection between In other words, the gNB trigger frame should emphasize that measurement of the propagation delay is required within the context of the synchronization process of the gNB and UE time counters.
[0309] According to some embodiments, when the request is sent to the UE, it is sent using a new flag included in the IE ReferenceTimeInfo. Upon reception of ReferenceTimeInfo with this new flag set to true, the UE is forced to send the first measurement frame in response.
[0310] Embodiments of the method according to the second aspect of the invention are therefore carried out in parallel to the method according to the first aspect of the invention. In particular, based on the selected resource allocation scheme provided by the gNB, the UE (and optionally the gNB) can use the PTP method or The transmission of the first measurement frame of any of the TA mechanisms (and optionally the second measurement frame in the case of PTP methods) may be scheduled.
[0311] The resource allocation may be for time division duplexing or frequency division duplexing, as shown below in FIGS. 13 and 14, respectively. As shown in FIG. 16, if the reference signal is used to calculate the propagation delay, the resource allocation for the reference signal is also configured.
[0312] As an example, the UE may schedule the first measurement frame by selecting uplink symbols around a reference time. This is possible because the gNB provided slots or resources with an appropriate resource allocation scheme.
[0313] According to some embodiments, the gNB may schedule the second measurement frame by selecting downlink symbols around the reference time.
[0314] Therefore, as illustrated by these three embodiments, in order to ensure that an accurate estimation of the propagation delay of the reference frame system is taken into account, the second aspect of the invention A method is proposed for updating a time counter of a user equipment in a wireless network comprising a plurality of user equipments and a plurality of user equipments. The method includes, at the base station, transmitting a reference frame to signal a reference point in time relative to a reference time within a reference system frame to configure a time counter of the user equipment; The method is further selecting at least one resource in the system frame relative to a reference point in time in the reference system frame; selecting at least one resource allocation scheme for the selected resource, a resource allocation scheme that defines an allocation of each symbol of the selected resource to a downlink transmission or an uplink transmission, or both; performing a propagation delay measurement by exchanging at least one measurement frame using the selected resource.
[0315] Such a method ensures that the determination of the propagation delay between the UE and the gNB is performed as close as possible to the reference time in order to improve the accuracy of updating the UE's time counter.
[0316] Exemplary scenarios using slot allocation schemes according to embodiments of the present invention are shown in FIGS. 13, 14, and 15.
[0317] 13, 14 illustrate uplink and downlink resource allocation schemes according to the first and second embodiments of the present invention in time division duplex mode and frequency division duplex mode, respectively.
[0318] In the figure below, for ease of explanation, the two subframes (#9 and #0) each have 4 slots (considered as resources), the uplink symbols are represented in black, and the downlink symbols are Represented in gray and flexible symbols (which can be used in either downlink or uplink) are represented in white.
[0319] In this embodiment, the reference time is defined at the end boundary of reference system frame #3. Propagation delay measurements are preferably taken near this reference point in time. Therefore, subframes #9 and #0 are two subframes near the reference time and are used for exchanging measurement frames.
[0320] In this way, the gNB selects a slot close to the reference time.
[0321] As shown in Figure 13, the slots closest to the reference time are specifically the last slot 1301 of the last subframe #9 of the reference system frame #3, and the last slot 1301 of the last subframe #0 of the subsequent system reference #4. This is the first slot 1302. In the two illustrated examples of Figure 13, the gNB selects slots 1301 and 1302 as resources and therefore uses their slot allocation scheme to ensure the transmission of the frames needed to determine the propagation delay. Select.
[0322] Accordingly, two slots are both selected directly adjacent to the reference time point and are included in reference system frame #3 and system frame #4 immediately following the reference system frame, respectively.
[0323] According to some embodiments, the selected slots may be included in the same system frame. For example, the selected slot may be included within the reference system frame or within a system frame adjacent to the reference system frame.
[0324] In the first example (middle of the figure), two measurement frames (uplink and downlink) are transmitted before the reference time in the same slot 1301, as shown in FIG. 12. To that end, in this example, the selected slot allocation scheme for the last slot 1301 of subframe #9 may be the predefined slot allocation scheme 55 that alternates uplink and downlink symbols. Of course, there are other schemes that also provide uplink and downlink symbols.
[0325] Therefore, measurement frames 1303 and 1304 are transmitted using some of the uplink symbols (here symbols 5, 6 and 7) and some of the downlink symbols (8, 9 and 10), respectively. It will be done.
[0326] Further, in this first example, a follow-up message is sent in a first slot 1302 immediately after the reference time. To that end, in this example, the selected slot allocation scheme for the first slot 1302 of the first subframe #0 of system frame #4 following reference system frame #3 is a predefined slot allocation scheme containing only downlink symbols. Slot allocation method 1 may be used. Of course, there are other schemes that also provide downlink symbols.
[0327] Therefore, t2 and / or t3 or gNB Tx-Rx A follow-up message 1306 comprising is sent to the UE using some of these downlink symbols, e.g. symbols 5, 6, and 7.
[0328] Therefore, the gNB allows the propagation delay measurement to be performed near the reference time point by selecting the slot allocation scheme of slots 1301 and 1302 that are adjacent to the reference time point from the perspective of propagation delay measurement.
[0329] In the second example (bottom of the diagram), the first measurement frame 1303 (uplink) is sent before the reference time, and the second measurement frame 1304 (downlink) and the follow-up message 1306 (downlink) Both, if any, are transmitted after the reference time point, as shown in FIG.
[0330] Therefore, in this example, the selected slot assignment scheme for the last slot 1301 of subframe #9 may be the predefined slot assignment scheme 0, which includes only uplink symbols. Of course, there are other schemes that also provide uplink symbols.
[0331] Therefore, the first measurement frame 1303 is transmitted by the UE using some of the uplink symbols of slot 1301, eg, 0-3.
[0332] Furthermore, in the second example, a second measurement frame 1304 and follow-up message, if any, are transmitted during slot 1302 immediately after the reference time. To that end, in this example, the selected slot allocation scheme for the first slot 1302 of the first subframe #0 of system frame #4 following reference system frame #3 is a predefined slot allocation scheme containing only downlink symbols. Slot allocation method 1 may be used. Of course, there are other schemes that also provide downlink symbols.
[0333] Therefore, t2 and / or t3 or gNB Tx-Rx A second measurement frame 1304 comprising a follow-up message 1306 is transmitted to the UE using some of these downlink symbols, eg, symbols 0-4 and symbols 11-13, respectively.
[0334] In both examples, the number of symbols used for transmission may vary according to the size of the messages (measurement frames and follow-up messages) and the subcarrier spacing used.
[0335] In Fig. 14, similar to Fig. 13, the gNB selects an appropriate resource allocation scheme and selects the slot closest to the reference time to enable propagation determination according to the first aspect of the invention. . The closest resources are specifically the last slot 1401 of the last subframe #9 of the reference system frame #3 and the first slot 1402 of the subsequent subframe #0 of the subsequent system frame #4.
[0336] The proposed resource allocation of FIG. 14 is in frequency division duplex, as shown depending on two frequencies F1 and F2 (more frequencies may be contemplated). In other words, during slots 1401 and 1402, messages may be transmitted using symbols organized across two (or more) different frequencies (on two different subcarriers). OFDM symbols can be used as described above.
[0337] Therefore, unlike FIG. 13, slots 1401 and 1402 include two frequencies.
[0338] The resource allocation scheme for slot 1401 is selected by the gNB so that it has: On the first frequency, only uplink symbols. Of course, other schemes providing sufficient uplink symbols may be used. On the second frequency, only downlink symbols. Of course, other schemes that provide sufficient downlink symbols may be used.
[0339] In the illustrated example, the resource allocation scheme for slot 1402 is selected by the gNB to comprise only downlink symbols on both the first and second frequencies. Of course, other schemes providing sufficient downlink symbols may be used.
[0340] Thereby, a first measurement frame 1403 is transmitted by the UE using some of the uplink symbols on the first frequency of slot 1401. The second measurement frame 1404 and follow-up message 1406 include some of the downlink symbols on the second frequency in slot 1401 (for the first measurement frame) and slot 1402 (for the follow-up message). and some of the downlink symbols on the second frequency of the gNB, respectively.
[0341] Therefore, the first and second measurement frames 1403, 1404 are transmitted in parallel near the reference time.
[0342] Of course, this example is a downlink frame, i.e., the second measurement frame and the follow-up message are transmitted using either the downlink symbols in slot 1401 on the second frequency and in slot 1402 on both frequencies. As you get, it is not limited.
[0343] Further, the assignment is such that the first slot 1401 comprises only downlink symbols on both frequencies, the second slot 1402 comprises only downlink symbols on the second frequency, and the uplink symbols on the first frequency. It can be inverted to include only symbols.
[0344] The gNB then declares the selected resource allocation scheme to the UE so that the UE knows which symbols / frequency carriers it can use to transmit or receive data to / from the gNB. The ordering of resource allocation, ie, the configuration of uplink and downlink slots, is provided by the gNB to the UE by several methods described above.
[0345] The examples of FIGS. 13, 14 and 15 (when only SRS is used) also apply to TA-based approaches where the second measurement frame is not transmitted.
[0346] Figure 15 shows a third embodiment of resource allocation, where the reference signals Position Reference Signal (PRS) and Sounding Reference Signal are commonly used in the positioning framework defined in Section 5.1.30 of TS 38.215. (SRS) is used as the measurement frame according to the first aspect of the invention.
[0347] The PRS and SRS signals are time difference UE used to determine the propagation delay, as described in relation to Figures 7a and 7b. Rx-Tx and gNB Tx-Rx This is a dedicated signal for calculating .
[0348] To ensure that the PRS and SRS signals are transmitted close to the reference time, in this example the last two subframes of reference system frame #3, namely subframe #8 and subframe #9, are It comprises symbols reserved by the gNB for downlink transmission and uplink transmission of SRS, respectively.
[0349] Subframe #8 is selected and its resource allocation scheme provides only downlink symbols consisting of multiple subcarriers. The PRS, which is considered as the second measurement frame, is transmitted by the gNB to the UE via the slots (and symbols) of the selected subframe #8.
[0350] Similarly, subframe #9 is selected, and its resource allocation scheme provides only uplink symbols consisting of multiple subcarriers. The SRS, considered the first measurement frame, is received from the UE via the slot of this subframe #9.
[0351] In this example, subframes #8 and #9 are the same system frame, preferably the last subframe of the reference system frame. It may be possible that the selected subframe may be included in two consecutive system frames.
[0352] The configuration of the first and second patterns, ie, SRS and PRS transmissions, may vary. The gNB must ensure that the patterns remain compatible with the format of the symbols used for their transmission, ie the resource allocation scheme.
[0353] According to this configuration, the first and second measurement frames are transmitted near the reference time.
[0354] The configuration of reference signals PRS and SRS is defined in sections 7.4.1.7 and 6.4.1.4 of standard TS38.211, respectively.
[0355] The configuration of PRS and SRS allows the gNB to specify the allocated resources for the transmission of these reference signals. This configuration also allows specifying the periodicity that characterizes the transmission pattern.
[0356] SRS and PRS configuration may also allow for aperiodic configuration that may be triggered by the DCI with SRS requests and / or PRS requests, respectively. For example, only one SRS message may be sent.
[0357] The gNB trigger frame of the third embodiment of FIG. 18 is compatible with the resource scheme allocation described above. In the embodiments of FIGS. 13 and 14, the gNB trigger frame may be transmitted on the PDCCH of a system frame that includes the transmission of an IE ReferenceTimeInfo comprising information regarding both the reference time and the reference point in time. In the embodiment of FIG. 15, the gNB trigger frame may be transmitted in the PDCCH of the reference system frame by using the SRS request field in the DCI.
[0358] There is also a programmable device comprising a set of instructions for implementing the aforementioned embodiments of the first and second aspects of the invention when loaded into and executed by the programmable device. A computer program product for the device is provided.
[0359] Further provided is a non-transitory computer readable storage medium storing computer program instructions for implementing the above-described embodiments of the first and second aspects of the invention.
[0360] Any step of the algorithm of the first and second aspects of the invention involves the execution of a set of instructions or programs by a programmable computing machine such as a PC ("personal computer"), DSP ("digital signal processor") or microcontroller. It may be implemented in software by an FPGA (“Field Programmable Gate Array”) or in hardware by a mechanical or dedicated component such as an FPGA (“Field Programmable Gate Array”) or an ASIC (“Application Specific Integrated Circuit”).
[0361] Although the first and second aspects of the present invention have been described above with reference to specific embodiments, the first and second aspects of the present invention are not limited to the specific embodiments, and the present invention Modifications will be apparent to those skilled in the art that fall within the scope of the first and second embodiments.
[0362] Many further modifications and changes may be made to the above-described exemplary embodiments which are not intended to limit the scope of the first and second aspects of the invention, which are determined solely by the appended claims. Reference may be made to those skilled in the art. In particular, different features from the various embodiments may be interchanged where appropriate.
[0363] Each embodiment of the first and second aspects of the present invention described above can be implemented alone or as a combination of multiple embodiments. Also, features from the various embodiments may be combined as desired or when a combination of elements or features from individual embodiments in a single embodiment is advantageous.
[0364] In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite article "a" or "an" does not exclude a plurality. The mere fact that different features are recited in mutually different dependent claims does not indicate that a combination of these features cannot be used to advantage.
Claims
1. 1. A method for updating a time counter of a user equipment in a wireless network comprising a base station and a plurality of user equipments, the method comprising the steps of: receiving a reference time and instructions for determining a reference point in time associated with the reference time; scheduling a determination of a propagation delay relative to said reference time instant; determining a propagation delay to the base station according to the scheduling; updating a time counter using the reference time and the determined propagation delay; A method comprising:
2. 2. The method of claim 1, wherein scheduling the determination of the propagation delay further comprises: scheduling the transmission of a first measurement frame relative to the reference time instant; A method comprising:
3. 3. The method of claim 2, wherein the first measurement frame is scheduled to be transmitted in a reference system frame that includes the reference instant, preferably in a reference system subframe that includes the reference instant or in a reference system subframe preceding the reference subframe that includes the reference instant.
4. 3. The method of claim 2, wherein the first measurement frame is scheduled to be transmitted during a predetermined system frame preceding, and preferably immediately preceding, a reference system frame that includes the reference instant.
5. 2. The method of claim 1, wherein scheduling the determination of the propagation delay further comprises: determining a time to start determining the propagation delay based on a system frame number of a current system frame, a current value of the time counter, and a system frame number of a reference system frame that includes the reference time instant.
6. 6. The method of claim 5, wherein scheduling the determination of the propagation delay further comprises: setting a decrement timer to the determined start time; and initiating the determination of the propagation delay when the decrement timer expires.
7. 2. The method of claim 1, wherein scheduling the determination of a propagation delay comprises deriving a transmission time from a message received from the base station, the transmission time setting the time for transmission of a first measurement frame; A method, wherein the determining of the propagation delay includes receiving a timing advance command from the base station that includes information regarding a propagation delay estimated by the base station.
8. 2. The method of claim 1, wherein the determining of the propagation delay to the base station comprises: transmitting a first measurement frame to the base station; storing a transmission time of the first measurement frame; receiving a second measurement frame from the base station; and storing a time of receipt of the second measurement frame.
9. 9. The method according to claim 8, wherein the second measurement frame is transmitted in a reference system frame which includes the reference instant, preferably the second measurement frame being a reference frame signalling the reference instant.
10. 9. The method of claim 8, wherein the second measurement frame is transmitted during a system frame immediately following the reference system frame.
11. 3. The method according to claim 1 or 2, further comprising, in the user equipment, The method further comprising receiving from the base station at least one parameter for determining the propagation delay to and from the base station.
12. A method as described in claim 11, wherein the at least one parameter includes at least one of the arrival time of the first measurement frame at the base station, the transmission time of the second measurement frame by the base station, and the difference between the arrival time of the first measurement frame and the transmission time of the second measurement frame.
13. A method as described in claim 8, wherein the arrival time of the first measurement frame at the base station is received in the second measurement frame, and the transmission time of the second measurement frame by the base station is received in an additional message following the second measurement frame.
14. A method as described in claim 8, wherein the propagation delay is determined using the stored transmission time of the first measurement frame, the stored reception time of the second measurement frame, and at least one parameter for determining the propagation delay.
15. 2. The method of claim 1, wherein the reference point in time is an end of a reference system frame and the indication includes the sequence number of the reference system frame.
16. 2. The method of claim 1, wherein the reference point in time is the beginning of a reference system frame and the indication includes the sequence number of a system frame preceding the reference system frame.
17. 1. A method for updating a time counter of a user equipment in a wireless network comprising a base station and a plurality of user equipments, comprising: transmitting an instruction to determine a reference point in a reference system frame for setting the time counter of the user equipment; transmitting a measurement frame to the user equipment for determining a propagation delay to the base station by the user equipment and updating the time counter of the user equipment; Including, A method according to claim 1, wherein the transmission of the measurement frame is scheduled relative to the reference time instant of the reference system frame.
18. 1. A method for updating a time counter of a user equipment in a wireless network comprising at least one base station and a plurality of user equipments, comprising: transmitting an instruction to determine a reference point in a reference system frame for setting the time counter of the user equipment; The method further comprises: selecting at least one resource within a system frame for the reference time instant of the reference system frame; selecting at least one resource allocation scheme for the selected resources, the resource allocation scheme defining an allocation of each symbol of the selected resources to downlink transmission or uplink transmission, or both; performing a propagation delay measurement by exchanging at least one measurement frame using the selected resource; A method comprising:
19. 20. The method of claim 18, wherein the selected resource is a time slot of a system frame, and the selecting step further comprises: selecting at least one time slot within a system frame relative to the reference time instant of the reference system frame; selecting, for each selected timeslot, a slot allocation scheme from among predefined slot allocation schemes, the slot allocation scheme defining an allocation of each symbol that constitutes the timeslot to downlink transmission or uplink transmission, or both; A method comprising:
20. 20. The method of claim 18, wherein the selected resource is included in the reference system frame or in a system frame adjacent to the reference system frame.
21. 20. The method of claim 18, wherein the selected resource is immediately adjacent to the reference time instant.
22. 20. The method of claim 18, wherein the selected resource allocation scheme for a first selected resource includes at least one uplink symbol, and a first measurement frame is received from the user equipment via the at least one uplink symbol.
23. 23. The method of claim 22, wherein the resource allocation scheme selected for the first selected resource further comprises at least one downlink symbol, and a second measurement frame is transmitted to the user equipment via the at least one downlink symbol.
24. 24. The method of claim 23, wherein the uplink symbols and the downlink symbols are time division duplexed.
25. 24. The method of claim 23, wherein the uplink symbols and the downlink symbols are frequency division duplexed.
26. 23. The method of claim 22, wherein the selected resource allocation scheme for the second selected resource comprises at least one downlink symbol, and at least one further measurement frame is transmitted to the user equipment via the at least one downlink symbol.
27. 27. The method of claim 26, wherein the at least one further measurement frame comprises a second measurement frame.
28. 27. The method of claim 26, wherein the at least one further measurement frame includes a follow-up measurement frame that provides the user equipment with time information of one or more exchanged measurement frames.
29. 23. The method of claim 22, wherein the first resource is the last slot of the reference system frame.
30. 27. The method of claim 26, wherein the second resource is a starting slot of the system frame immediately following the reference system frame.
31. 20. The method of claim 18, 11. A method according to claim 10, wherein all slots of a subframe in a system frame are selected with a resource allocation scheme providing only uplink symbols made from a plurality of subcarriers, and a first measurement frame is received from the user equipment via slots of the subframe.
32. 32. The method of claim 31, wherein all slots of another subframe in the system frame are selected with a resource allocation scheme providing only downlink symbols made from a plurality of subcarriers, and the second measurement frame is transmitted to the user equipment via slots of this other subframe.
33. 33. The method of claim 32, wherein the subframe and the other subframe are consecutive subframes within a same system frame.
34. 34. The method of claim 33, wherein the subframe and the other subframe are the last two subframes of a same system frame.
35. 35. The method of claim 34, wherein the end of the same system frame corresponds to the reference instant.
36. 1. A method for updating a time counter of a user equipment in a wireless network comprising a base station and a plurality of user equipments, comprising: transmitting a reference frame for signaling a reference instant associated with a reference time for setting a time counter of a user equipment; performing a measurement of a propagation delay by exchanging at least one measurement frame using at least one resource of a system frame; Including, The method of claim 1, wherein the reference time instant is determined based on a resource allocation policy for at least one resource.
37. A device in a wireless network comprising at least one base station and a plurality of user equipments comprising a processor configured to perform the steps of claim 1.
38. A computer readable storage medium storing computer program instructions for carrying out the method of any one of claims 1, 17, 18 and 36 when loaded and executed on a programmable device.
39. A computer program which when executed causes the computer to carry out the method of any one of claims 1, 17, 18 and 36.