Control device and control method for robot system
The control device enhances robot system efficiency by coordinating operating and transport robots through advanced data management, addressing the inefficiencies in complex task performance and automation.
Patent Information
- Application Number
- JP2024106812
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2019-01-14
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-02
AI Technical Summary
Existing robot systems lack the sophistication to perform complex tasks efficiently, requiring human intervention and failing to optimize storage and retrieval operations, leading to inefficiencies in automation and functionality.
A control device and method for a robot system that includes an operating robot, data acquisition and storage units, and a robot control unit to manage information about operation targets and racks, enabling sophisticated coordination between units like operating and transport robots to enhance storage and retrieval efficiency.
The solution allows for efficient storage and retrieval of operation targets in racks, improving the functionality and cooperation between robot units, reducing human intervention, and optimizing storage efficiency and work accuracy.
Smart Images

Figure 2024133556000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure generally relates to a robot system, and more particularly to a control device, a control method, a logistics system, a program, and a recording medium for a robot system that manipulates an object such as an article. [Background technology]
[0002] Many robots (e.g., machines configured to perform physical actions automatically / independently) are now widely used in many fields due to their ever-improving performance and decreasing cost. For example, robots can be used to perform various tasks, such as maneuvering and moving objects in manufacturing, assembly, packaging, transporting, conveying, shipping, etc. In performing tasks, robots can repeat human actions, thereby replacing or reducing dangerous or repetitive tasks performed by humans.
[0003] As an example of a system using such a robot (robot system), Patent Document 1 proposes an automated logistics system that includes a transport container storage mechanism that temporarily stores transport containers, and an automatic item sending mechanism that automatically collects items in the transport container into a shipping container based on shipping information, in order to automate and reduce the labor required for the process from receiving to shipping items. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2018-167950 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, despite technological advances, robots often lack the sophistication required to replicate human involvement to perform larger and / or more complex tasks. As a result, automation and sophistication in robotic systems is still insufficient, and there are quite a few tasks that are difficult to replace human involvement, or tasks that are physically possible to replace with robots but have not been automated due to efficiency reasons. Thus, there remains a need for technological improvements to manage various actions and / or interactions between robots and further promote automation and sophistication of robotic systems. Therefore, an object of the present disclosure is to provide a control device and a control method for a robotic system that realizes high-level cooperation between units including, for example, a robot. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems, the present invention employs the following configuration.
[0007] [1] In other words, the control device according to the present disclosure is a device for controlling a robot system including an operation robot that operates an operation object by using a robot arm and an end effector, such as a fetching robot, a de-bunking robot, or a piece-picking robot, to store the operation object in a rack and / or remove the operation object from the rack, and a transport robot that transports the rack. The control device includes: (1) a data acquisition unit that acquires first data including information about the operation target and information about the rack before storing the operation target in the rack and / or removing the operation target from the rack; (2) a data storage unit that stores the first data; and (3) a robot control unit that selects the rack and transports it to an access position based on the first data before storing the operation target in the rack and / or removing the operation target from the rack, creates or acquires a control sequence for storing the operation target in the rack and / or removing the operation target from the rack, and instructs the transport robot to execute a task for transporting the rack to the access position based on the control sequence, and instructs the operation robot to execute a task for storing the operation target in the rack and / or removing it from the rack.
[0008] Here, the term "operation target" refers to an object operated by an operating robot provided in a robot system, and includes, for example, one or more items, and containers such as bottles, containers, and boxes in which the items are placed or stored. The containers may be packed or unpackaged, and may have a part (e.g., the top) of the container open (so-called "top-cut" containers). In other embodiments and examples, the term "operation target" may be a concept including a shelf, a pallet, a conveyor, and other temporary storage areas. Furthermore, a "rack" transported by a transport robot provided in a robot system refers to an instrument that has one or more shelves and can hold at least one operation target on the shelves. Furthermore, "information about the operation target" and "information about the rack" refer to information associated with the identification information of the operation target and information associated with the identification information of the rack, respectively. Furthermore, the "access position" of the "rack" refers to a position where the operation robot can access the rack. Furthermore, "control sequence" refers to the order of operations that is set in advance when controlling one or more units in a robot system to execute individual tasks (both the operation robot and the transport robot are types of "units"). Furthermore, "before" refers to a point in time or before that point in time, and "after" refers to a point in time or after that point in time.
[0009] According to this configuration, before storing the operation target in the rack and / or before removing the operation target from the rack, information about the operation target and the rack is grasped, and a task is executed based on a control sequence that is created based on the first data including the information. Therefore, the operation of storing the operation target in the rack and / or the operation of removing the operation target from the rack can be performed efficiently and smoothly. In addition, at that time, cooperation between units in the robot system, particularly high-level cooperation between the operation robot and the transport robot, can be realized, thereby achieving high functionality of the robot system.
[0010] [2] In the above configuration, the data acquisition unit may acquire second data including information about the operation target and information about the rack after storing the operation target in the rack and / or removing the operation target from the rack, and the data storage unit may be configured to store the second data.
[0011] According to this configuration, after the operation target is stored in the rack and / or after the operation target is removed from the rack, information on each of the operation target and the rack can be grasped, which makes it possible to reliably grasp and track the state or situation of the rack after the operation target is stored in and / or after the operation target is removed.
[0012] [3] In the above configuration, the robot control unit may be configured to create or acquire the control sequence based on the second data so that the arrangement of the operation objects on the rack is consolidated.
[0013] According to this configuration, after the operation target is stored in the rack and / or removed from the rack, the free space information of the rack can be grasped from the second data related to the operation target and the rack. Therefore, in the next stage, the rack can be efficiently selected when storing (filling) the operation target in the rack and / or removing the operation target from the rack. As a result, the storage efficiency of the operation target in the rack can be improved, and the fragmentation of the wasted space on the rack can be prevented (defragmentation). Furthermore, the occurrence of such wasted space can be suppressed, and the centralized management of the position information of the operation target and the rack can be further facilitated.
[0014] [4] In the above configuration, the robot control unit may be configured to instruct the operation robot to perform at least a part of the operations in the control sequence before the rack reaches the access position.
[0015] According to this configuration, while the transport robot is transporting the rack to the access position (i.e., before the rack arrives at the access position), the operation robot can "preempt" the operation of storing or retrieving the operation target. As a result, more advanced cooperation that can further shorten the operation time becomes possible.
[0016] [5] In the above configuration, the data acquisition unit may acquire relative position information between the transport robot and the rack, and the robot control unit may be configured to correct position information of the rack at the access position based on the relative position information, and to create or acquire the control sequence based on the corrected position information.
[0017] According to this configuration, when the operation robot accesses the rack, regardless of whether the rack or the transport robot is used as the position reference for its operation, it is possible to correct the positional deviation between the rack and the transport robot that holds the rack. This allows the operation robot to more accurately perform both the operation of storing the operation target in the rack and the operation of removing the operation target from the rack, thereby further improving the accuracy and efficiency of the work.
[0018] [6] In the above configuration, the rack is configured so that the operation object is stored and / or removed from the side, and a fall prevention device for the operation object is provided at the end of the rack, the operation robot grasps the operation object from the side (for example, a de-vanning gripper or the like can be used. De-vanning is, for example, the task of unloading a container), and the robot control unit may create or acquire the control sequence so that the operation object moves beyond the fall prevention device. Note that the "end of the rack" refers to the entire circumference or a part of the entire circumference near the periphery of the upper surface of the shelf of the rack, or refers to a position where at least a part of the operation object and at least a part of the fall prevention device interfere with each other when the operation object, such as an item, is placed on the shelf.
[0019] According to this configuration, the fall prevention device provided on the shelf of the rack prevents the operation object placed on the shelf from falling out of the rack. Also, the operation object is grasped by the operation robot from the side, and in that state is stored in and / or removed from the rack from the side. Therefore, even if the rack has multiple shelves and is configured in multiple stages, the operation object can be easily stored in and / or removed from the rack. In addition, at that time, the operation robot moves the operation object so as to avoid (go over) the fall prevention device, so that the operation object can be stored in and removed from the rack smoothly and reliably.
[0020] [7] In the above configuration, the data storage unit may be configured to store position information (placement information) of the multiple operation objects on the rack on an operation object basis or on a shelf basis of the rack, and as two-dimensional information or three-dimensional information.
[0021] According to this configuration, the position of the operation target placed on the shelf of the rack can be grasped on an operation target basis or on a shelf board basis (in this case, it can also be called a layer basis). In addition, the arrangement of multiple operation targets can be managed centrally as two-dimensional information or three-dimensional information across the same shelf board or different shelves. Therefore, for example, by identifying one operation target, it is possible to identify all operation targets stored on the same shelf board of the rack or all operation targets stored in the rack at once. As a result, for example, it is possible to reduce the amount of work required for inventory management and inventory taking, thereby improving work efficiency.
[0022] [8] In the above configuration, the robot system may further include a sensor that captures an image of the rack in which the object to be operated is stored, and the robot control unit may be configured to create or acquire the control sequence for storing the object to be operated in the rack so that the sensor can measure identification information (representing an identification code or identification tag) of the object to be operated.
[0023] According to this configuration, even when the operation target is stored in the rack, the identification information of the operation target can be measured and confirmed by a sensor. In this case, if the identification information of the operation target is attached at least to the side, the identification information can be exposed so as to be visible from the outside of the shelf board, and the identification information attached to the operation target (the identification code or identification tag representing the identification information) can be easily recognized by, for example, capturing an image with a sensor such as a camera. Therefore, even when the operation target is stored in the rack, the operation target can be easily identified and specified. In this case, if the position information of multiple operation targets in the rack is stored as two-dimensional information or three-dimensional information as described in [7] above, by specifying one operation target, the operation targets stored in the rack can be more easily specified collectively by shelf board or rack. As a result, the efficiency of inventory management and inventory can be further improved.
[0024] [9] In this case, more specifically, the robot system may further include a sensor that images the rack in which the object to be operated is stored, and the sensor may be configured to image the rack when the transport robot holding the rack is stationary or when the transport robot holding the rack is moving.
[0025]
[10] In the above configuration, the robot control unit may be configured to determine that the storing of the operation object on the rack and / or the removal of the operation object from the rack are completed before the storing of the operation object on the rack and / or the removal of the operation object from the rack are completed.
[0026] According to this configuration, it is possible to determine the completion of the storing and removing operations of the operation target in the rack before the storing and removing of the operation target from the rack is completed. Therefore, the operation of the task to be executed as the next step can be started smoothly and timely, the occurrence of work delays is suppressed, and a more advanced cooperation between units is possible.
[0027]
[11] In the above configuration, the data acquisition unit may be configured to acquire actual measured values or estimated values of information related to the operation object and / or information related to the rack. This makes it possible to confirm the position of the operation object inside / outside the rack, the position of the rack, and the position of the identification information attached to the operation object by actually measuring it with a sensor such as a camera, or to estimate it based on master data without actually measuring it.
[0028]
[12] Furthermore, a logistics system according to the present disclosure includes a robot system including a control device having the above-described configurations, the operation robot, and the transport robot.
[0029]
[13] In the above configuration, the control device may be configured to identify the robot system and an area associated with the robot system, and calculate tasks (including unit tasks and tasks formed by combining multiple unit tasks) based on the control sequence, the tasks including a task associated with transporting the rack by the robot system and manipulating the object to be manipulated, as well as multiple tasks executed by the robot system across adjacent and / or overlapping areas.
[0030]
[14] Furthermore, the program according to the present disclosure is configured as a program for causing a computer to function as a control device for each of the above configurations.
[0031]
[15] Furthermore, a recording medium according to the present disclosure is configured as a non-transitory computer-readable recording medium having the above program recorded thereon.
[0032]
[16] Furthermore, the control method according to the present disclosure is a control method for a robot system including an operation robot that operates an operation object and a transport robot that transports the rack in order to store the operation object in a rack and / or remove the operation object from the rack, and is executed using a control device having a data acquisition unit, a data storage unit, and a robot control unit. Then, (1) the data acquisition unit acquires first data including information about the operation target and information about the rack before storing the operation target in the rack and / or removing the operation target from the rack, (2) the data storage unit stores the first data, and (3) the robot control unit selects the rack and transports it to an access position based on the first data before storing the operation target in the rack and / or removing the operation target from the rack, creates or acquires a control sequence for storing the operation target in the rack and / or removing the operation target from the rack, and instructs the transport robot to execute a task for transporting the rack to the access position based on the control sequence, and instructs the operation robot to execute a task for storing the operation target in the rack and / or removing the operation target from the rack. [Brief description of the drawings]
[0033] [Figure 1] FIG. 1 is a schematic flow diagram illustrating an exemplary task sequence in which a robotic system may operate according to an embodiment of the present disclosure. [Diagram 2] 1A and 1B are perspective views that diagrammatically illustrate an exterior of an exemplary transport robot in accordance with one or more embodiments of the present disclosure. [Diagram 3] FIG. 1 is a perspective view illustrating a schematic appearance of an exemplary operational robot in accordance with one or more embodiments of the present disclosure. [Figure 4] 1A and 1B are perspective views that generally illustrate the appearance of an exemplary operational robot in one or more embodiments of the present disclosure. [Diagram 5]FIG. 2 is a block diagram illustrating an example of a hardware configuration and a functional configuration of a robot system according to an embodiment of the present disclosure. [Figure 6] 1 is a front view (partial functional configuration diagram) showing an example of a flow of work executed by a robot system according to an embodiment of the present disclosure, and an example of a functional configuration of a control device provided in the robot system. FIG. [Figure 7] FIG. 11 is a flow diagram illustrating an example of a procedure for operating a robot system according to an embodiment of the present disclosure to execute a first task. [Figure 8] FIG. 11 is a flow diagram illustrating an example of a procedure for operating the robot system according to the embodiment of the present disclosure to perform a second task. [Figure 9A] FIG. 1 is a schematic plan view illustrating an exemplary environment in which a robotic system according to an embodiment of the present disclosure may operate. [Figure 9B] 9B is a schematic plan view of a portion of an exemplary environment in which a robotic system according to an embodiment of the present disclosure may operate, showing the classification area in FIG. 9A and its surrounding conditions. [Figure 10A] FIG. 13 is a schematic plan view illustrating another exemplary environment in which a robotic system according to an embodiment of the present disclosure may operate. [Figure 10B] FIG. 10B is a schematic plan view showing another exemplary environment in which a robotic system according to an embodiment of the present disclosure can operate, showing the classification area in FIG. 10A and its surroundings. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0034] According to the present disclosure, there are provided a robot system in which multiple units (e.g., various robots, various devices, and control devices provided integrally or separately therefrom) are highly integrated, a control device thereof, a logistics system including the same, and a method therefor, etc. That is, a robot system according to an embodiment of the present disclosure is, for example, an integrated system that can autonomously execute one or more tasks.
[0035] Here, "task" may include, for example, a task for a robot or the like to access the operation objects, a task for moving, storing, safekeeping, retrieving, organizing, etc., the operation objects from one location to another, a task for classifying the operation objects into multiple groups, a task for imaging, observing, and managing the operation objects, etc.
[0036] Furthermore, a "task" may include a combination of a plurality of tasks executed in the warehousing of operation objects in a logistics system (receiving, transporting, palletizing (loading), depalletizing (unloading), storing, etc.), replenishment of operation objects (opening, filling, refilling, etc.), and release of operation objects (removal, picking up, packing, stowage, palletizing, etc.). Furthermore, a "task" may include, for example, grasping or lifting an operation object at a designated position, moving it along a designated route, and releasing, lowering, or placing it at a designated position in order to rearrange, change, replace, etc., the operation object.
[0037] Furthermore, the robot system according to the present disclosure can access the operation object via a plurality of units such as an operation robot and a transport robot, and thereby the robot system can automate the work of the operation object's warehousing process, replenishment process, and retrieval process. Furthermore, the robot system according to the present disclosure can appropriately classify (group) the operation objects, move or place them at a target position or a specified location, access the operation objects, and rearrange or reclassify them at that location or to another location, and can rearrange or replace them according to the characteristics of the operation objects. In this case, the robot system can read one or more pieces of identification information (e.g., a barcode or a Quick Response (QR) Code (registered trademark), etc.) attached to one or more specific positions or surfaces of the operation object, and compare it with master data as necessary, thereby identifying and / or specifying the operation object and acquiring information associated with the operation object.
[0038] Furthermore, the robot system according to the present disclosure may include a sensor such as an image sensor for identifying the position and state (e.g., orientation, etc.) of the operation target and / or the surrounding environment of the operation target. The image sensor can acquire images of the work positions (e.g., pick-up position, drop position, position along the path, etc. of the operation target) in the tasks executed by each unit of the robot system, and images of the operation target at each position. Furthermore, the robot system according to the present disclosure may process images of the operation target according to a predetermined order (e.g., from the top to the bottom of the operation target, from the outer edge, from the inside, etc.). In this case, the state or situation of the operation target may be appropriately determined by identifying or classifying the outer shape or environment of the operation target based on, for example, the color, brightness, or changes in the values of adjacent pixels in the image of the operation target.
[0039] The robot system according to the present disclosure can acquire and execute control sequences for executing tasks such as accessing and operating an object to be operated, and tasks such as transporting, moving, placing, and storing the object to be operated. Such control sequences may include combinations of basic control sequences for driving the operating mechanisms of each unit. The robot system can create or acquire control sequences for executing various tasks by, for example, motion planning, machine learning such as deep learning, and the like.
[0040] Here, for example, in a conventional robot system used in a typical logistics system, when performing tasks related to storing, replenishing, and retrieving an operation target, it is often difficult to perform advanced interactions between multiple units, and the assistance of an operator is often required between different tasks that are performed consecutively. In addition, for example, in a conventional robot system, it is possible to access an operation target in response to an order, but it is often necessary for an operator to classify or order the ordered items. Furthermore, in a conventional robot system, for example, when changing a unit that operates an operation target or changing an operation procedure of an operation target, it is often difficult to change them through autonomous dialogue between units. In particular, when a unit that requires work including a task that requires the intervention or assistance of an operator is included, it is extremely difficult to autonomously or automatically change the control sequence.
[0041] Furthermore, in conventional robot systems, a task such as grasping an object to be operated at a certain position, moving it to another position in that state, and releasing it is executed as a basic control sequence. However, such basic operations alone cannot be said to have sufficiently improved the storage efficiency of the object to be operated and the work efficiency of each unit. In particular, from the viewpoint of improving the storage efficiency of the object to be operated, there are cases where intervention or support by an operator (adjustment, redoing, supplementation, system shutdown, etc.) is required.
[0042] In contrast, the robot system according to the present disclosure in various aspects exemplified below is different from the conventional one in that it can adjust and control the interaction between separate units (e.g., an operation robot and a transport robot, etc.) to execute a task, and can cooperate with the different units. This reduces the intervention and assistance of an operator that was previously required, and can improve the storage efficiency, work efficiency, and economy of the operation target.
[0043] In addition, the robot system according to the present disclosure can reliably identify the motion area, motion path, position or state of the target, or a combination thereof, for each unit, and can execute tasks executed by different units smoothly and cross-sectionally. In addition, in this case, the storage efficiency of the target can be optimized based on shape information, identification information, position information, etc. of the target, so that the space utilization efficiency can be further improved. To this end, the robot system according to the present disclosure can create or obtain a suitable control sequence that can realize a highly coordinated operation of each unit based on one or more algorithms that order the tasks of different units, one or more protocols that control the interaction between the units, and information on the state of the target, and execute the control sequence.
[0044] Hereinafter, an embodiment according to an example of the present disclosure will be described with reference to the drawings. However, the embodiment described below is merely an example, and is not intended to exclude the application of various modifications and technologies not specified below. That is, an example of the present disclosure can be implemented by various modifications within the scope of its purpose. In addition, in the description of the drawings below, the same or similar parts are given the same or similar symbols, and the drawings are schematic and do not necessarily match the actual dimensions, ratios, etc. Furthermore, there may be parts in which the dimensional relationship and ratios differ between the drawings. In addition, it goes without saying that the embodiments described below are some embodiments of the present disclosure, and not all embodiments. Furthermore, other embodiments that can be obtained by a person skilled in the art without requiring creative acts based on the embodiments of the present disclosure are all included in the scope of protection of the present disclosure.
[0045] Also, in each embodiment, the technology introduced herein may be implemented without those specific details. Moreover, well-known functions, such as specific functions or routines, are not described in detail to avoid unnecessarily obscuring the present disclosure. Also, well-known structures or processes often associated with robotic systems and subsystems may not be described in detail for the purpose of clarity. References herein to "an embodiment," "one embodiment," and the like mean that the particular feature, structure, material, or characteristic described is included in at least one embodiment of the present disclosure. Thus, appearances of such phrases herein do not necessarily all refer to the same embodiment. However, such references are not necessarily mutually exclusive. Moreover, particular features, structures, materials, or characteristics may be combined in any suitable manner in one or more embodiments. It should be understood that the various embodiments shown are merely illustrative representations and are not necessarily drawn to scale.
[0046] Additionally, many embodiments or aspects of the present disclosure may take the form of computer-executable or controller-executable instructions, including processes, steps, routines, blocks, etc., executed by a programmable computer or controller. Those skilled in the relevant art will appreciate that the techniques of the present disclosure may be implemented in computer or controller systems other than those shown in the embodiments. The techniques described herein may be implemented in a special purpose computer or data processor that is programmed, configured, or constructed to execute one or more computer-executable instructions described below.
[0047] Thus, the terms "computer" and "controller" as generally used herein include any data processor, including Internet appliances and handheld devices, including palmtop computers, wearable computers, cellular or mobile telephones, multiple processor systems, processor-based or programmable consumer electronics appliances, network computers, minicomputers, etc. Information manipulated by these computers and controllers may be provided to any suitable display medium, including, for example, a liquid crystal display (LCD).
[0048] Instructions for performing computer or controller executable operations may be stored on any suitable computer-readable non-transitory storage medium, including hardware, firmware, or a combination of hardware and firmware, and may be contained in any suitable memory device, including, for example, a flash drive, and / or other suitable media.
[0049] The terms "coupled" and "connected" and the like may be used to describe a structural relationship between components. However, these terms are not intended to be synonymous with each other. Specifically, in certain embodiments, "connected" may be used to indicate that two or more elements are in direct contact with each other. Unless otherwise clear from the context, the term "coupled" may be used to indicate that two or more elements are in direct or indirect contact with each other (with other intervening elements between them), or that two or more elements cooperate or interact with each other (e.g., in a causal relationship, such as with respect to signal transmission / reception or function calls), or both.
[0050] [Example of application] 1 is a schematic flow diagram showing an exemplary operation sequence of a logistics system including a robot system according to an embodiment of the present disclosure. The operation sequence includes, for example, an in-stock process P10 for receiving operation objects (in this embodiment, for example, containers such as carton boxes containing items) into a logistics center or the like, a replenishment process P20 for replenishing and storing operation objects placed on, for example, pallets, on, for example, racks, and a shipping process P30 for picking up ordered items from the operation objects replenishing and storing them on the racks and shipping them out of the warehouse.
[0051] In the warehousing process P10, first in step S101, the operation object brought in by a vehicle or the like is received and unloaded using, for example, a devanning robot. In step S102, the operation object is transported by a conveyor or the like to a waiting position for a pallet for transfer, for example, using a sorting system. Next, in step S103, the transported operation object is stacked on an appropriate pallet by, for example, a palletizing robot.
[0052] In the replenishment process P20, in step S104, the pallet on which the operation object is mounted is transported to a position for unpacking the operation object, for example, using a pallet AGV (automated guided vehicle configured to mount or lift and move a pallet), and the operation object is unloaded from the pallet by, for example, a depalletizing robot. In step S105, the operation object is unpacked by cutting (top cutting) the top surface of the operation object to open the top surface, for example, using a top cutting machine, and the operation object is transported to a standby position of a rack for storage by a conveyor or the like. Next, in step S106, the operation object is stored in an appropriate position on the rack, for example, using a fetching robot, and is transported to a storage position on the rack by, for example, a rack AGV (automated guided vehicle configured to mount or lift and move a rack), and is stored in an appropriate state.
[0053] In the outgoing process P30, when an order for an item is received, in step S107, a rack containing the operation object containing the ordered item is transported to a pick-up position, for example, using a rack AGV, and the desired operation object is picked up from the rack, for example, by a fetching robot. In step S108, the ordered item is picked up from the operation object, for example, by a piece-picking robot, and transferred to a shipping container or the like. Then, in step S109, the shipping container or the like is packed, for example, using a packing machine, and in step S110, the packed shipping container is loaded onto, for example, an appropriate cart or vehicle, and is outgoing (shipped).
[0054] As such, the robot system according to an embodiment of the present disclosure may include a de-vanning robot, a palletizing robot, a fetching robot, a piece-picking robot, a packing machine, etc. as an operation robot that is a transfer / sorting unit configured to perform an operation for moving an operation target between different locations. In addition, the robot system according to an embodiment of the present disclosure may include a sorting system, a pallet AGV, a rack AGV, etc. as a transport robot that is a transport unit.
[0055] 2(A) and 2(B) are perspective views that are schematic views of the exterior of exemplary transport robots 11 and 12 in one or more embodiments of the present disclosure. The transport robots 11 and 12 may include mobile / wheeled robots such as rack AGVs configured to transport racks between predetermined positions. For example, the transport robots 11 and 12 may have external dimensions that enable them to move under and / or between racks. The transport robots 11 and 12 may also include a lifting mechanism configured to lift the rack from the ground (transport path surface).
[0056] The transport robots 11 and 12 can be guided and steered (navigated) by various mechanisms. For example, the transport robots 11 and 12 can move on their own to follow a predetermined path, for example, a floor marking (for example, painting, tape, etc.), based on a command from a control device of the robot system in the embodiment of the present disclosure. The transport robots 11 and 12 can also calculate a current position via a mapping / positioning mechanism (for example, a dead reckoning system, a laser-based system, and / or a wireless communication signal-based system), and can move along a specified path and route based on the current position. Furthermore, the transport robot 12 may have a function of storing an operation target in the rack and / or removing an operation target stored in the rack, in addition to transporting the rack itself.
[0057] In addition, the robot system in the embodiment of the present disclosure can transmit the target position of the rack to be transported, the holding position of the rack, the identification information of the rack, the path, the motion plan, or a combination thereof, to the transport robot 11, 12, for example, via a control device as a standalone device or part of another unit. Based on the communication command information, the transport robot 11, 12 can execute a task such as moving to the holding position of the rack to be transported, lifting the rack, transporting the rack to a specified position, and / or placing the rack at a specified position. Furthermore, the transport robot 11, 12 can execute or complete a task by returning the rack to be transported, for example, to the original holding position or a different storage position.
[0058] 3 and 4 are respectively a perspective view and a side view that show a schematic external view of an exemplary manipulation robot 13, 14 in one or more embodiments of the present disclosure. The manipulation robot 13, 14 may include, for example, a robot configured to transfer a manipulation target 16 (see FIG. 4) between predetermined positions. For example, the manipulation robot 13, 14 has structural members such as end effectors 131, 141 such as grippers that can grip the manipulation target by reduced pressure or vacuum suction, and robot arms 132, 142 to which the end effectors are attached. This allows the manipulation robots 13, 14 to grip the manipulation target from the lateral direction. The manipulation robots 13, 14 may be fixed at a predetermined position or may be movably provided. In addition, the end effector 141 of the manipulation robot 14 may have a plate-like guide or the like for supporting (holding) the manipulation target 16 from below, like a so-called de-bunning gripper. This improves the load resistance and gripping ability when gripping the operation object 16, and as shown in FIG. 4, it becomes easier to handle a relatively large operation object transported in a vehicle 40 or the like.
[0059] The operation robots 13 and 14 can be driven based on, for example, a command from a control device of the robot system in the embodiment of the present disclosure. The operation robots 13 and 14 can also calculate the current position of the operation target, and can operate the operation target along a specified path and route based on the current position. The robot system in the embodiment of the present disclosure can transmit the target position and pick-up position of the operation target, the identification information of the operation target, the path, the motion plan, or a combination thereof, to the operation robots 13 and 14, for example, via a control device as a standalone device or as part of another unit. Based on the communication command information, the operation robots 13 and 14 can perform tasks such as moving the end effectors 131 and 141 to a gripping position of the operation target, gripping and lifting the operation target, transporting it to a specified position, and / or placing it at a specified position.
[0060] [Configuration example] 5 is a block diagram showing an example of a hardware configuration and a functional configuration of a robot system according to an embodiment of the present disclosure. For example, the robot system 500 may include electronic / electrical devices such as a processor 502, a storage device 504, a communication device 506, an input-output device 508, an actuation device 512, a transport motor 514, a sensor 516, or a combination thereof. The robot system 500 may include one or more of each of these elements and devices.
[0061] Additionally, each of these elements and devices may be coupled to one another via wired and / or wireless connections. For example, the robotic system 500 may include a bus such as a system bus, a Peripheral Component Interconnect (PCI) bus or a PCI-Express bus, a HyperTransport or an Industry Standard Architecture (ISA) bus, a Small Computer System Interface (SCSI) bus, a Universal Serial Bus (USB), an IIC (I2C) bus, or an Institute of Electrical and Electronics Engineers (IEEE) Standard 1394 bus (also known as "Firewire").
[0062] The robotic system 500 may also include, for example, bridges, adapters, controllers, or other signal-related devices to provide wired connections between devices. Wireless connections may be based on, for example, cellular communication protocols (e.g., 3G, 4G, LTE, 5G, etc.), wireless local area network (LAN) protocols (e.g., wireless fidelity (WIFI)), peer-to-peer or device-to-device communication protocols (e.g., Bluetooth, Near-Field Communication (NFC), etc.), Internet of Things (IoT) protocols (e.g., NB-IoT, LTE-M, etc.), and / or other wireless communication protocols.
[0063] The processor 502 may include a data processor (e.g., a central processing unit (CPU), a special purpose computer, and / or an on-board server) configured to execute instructions (e.g., software instructions) stored in a storage device 504 (e.g., a computer memory). The processor 502 may execute program instructions to control / interact with other devices, thereby causing the robotic system 500 to perform various actions, operations, and / or manipulations in a task.
[0064] Storage device 504 may include a non-transitory computer-readable medium having program instructions (e.g., software) stored thereon. Some examples of storage device 504 include volatile memory (e.g., cache and / or random access memory (RAM)), non-volatile memory (e.g., flash memory and / or magnetic disk drives), portable memory drives, cloud storage devices, etc.
[0065] In some embodiments, the storage device 504 can further store and access processing results, predetermined data, predetermined thresholds, predetermined parameters, etc. For example, the storage device 504 can store master data 552 including information data associated with an object that can be operated by the robot system 500.
[0066] The master data 552 may include dimensions, shapes (e.g., computer-generated templates of possible states, computer-generated models for recognizing the objects in different states, etc.), color schemes, images, identification information (e.g., bar codes, Quick Response (QR) codes, logos, etc., expected locations, etc.), expected weights, or combinations thereof, for objects to be manipulated by the robotic system 500. The master data 552 may also include relevant information regarding the objects and their manipulation, such as the location of the center of mass (center of gravity) of each object, expected sensor measurements (e.g., forces, torques, pressures, contact metrics, various measurements thereof, etc.) in response to one or more actions / movements, or combinations thereof.
[0067] Also, for example, the storage device 504 can store object tracking data 554 regarding tracking of objects by the robotic system 500. The object tracking data 554 can include a log of objects that have been scanned or manipulated. The object tracking data 554 can also include image data (e.g., photographs, point clouds, live video feeds, etc.) of the objects at one or more locations (e.g., designated pick-up or drop locations and / or locations on a conveyor belt), and the location and / or state (e.g., orientation) of the objects at the one or more locations.
[0068] The communication device 506 may include circuitry configured to communicate with external or remote devices over a network. For example, the communication device 506 may include a receiver, a transmitter, a conditioner / demodulator (modem), a signal detector, a signal encoder / decoder, a connector port, a network card, etc. The communication device 506 may be configured to transmit, receive, and / or process electrical signals according to one or more communication protocols (e.g., Internet Protocol (IP), wireless communication protocols, etc.). The robotic system 500 may use the communication device 506 to exchange information between units of the robotic system 500 and / or with systems / equipment external to the robotic system 500, for purposes such as data collection, analysis, reporting, troubleshooting, etc.
[0069] The input-output devices 508 may include user interface devices configured to communicate information to and / or receive information from an operator. For example, the input-output devices 508 may include a display 510 and / or other output devices, such as a speaker, haptic circuitry, or tactile feedback devices, for communicating information to an operator. The input-output devices 508 may also include control or receiving devices, such as a keyboard, mouse, touch screen, microphone, user interface (UI) sensors (e.g., a camera for receiving motion commands), wearable input devices, etc. The robotic system 500 may use the input-output devices 508 to interact with an operator in performing a task, action, operation, manipulation, or combination thereof performed by the robotic system 500.
[0070] Suitable units in the robotic system 500 may include structural members connected at joints for movement (e.g., rotation and / or translation), such as end effectors configured to grip, rotate (spin), weld, etc., and robotic arms configured to manipulate the end effectors (see also, e.g., FIGS. 3 and 4). The robotic system 500 may also include actuation devices 512 (e.g., motors, actuators, wires, artificial muscles, electroactive polymers, etc.) configured to drive or manipulate (e.g., displace and / or orient) the structural members at or around the joints, and transport motors 514 configured to transport the units from one position to another.
[0071] The robotic system 500 may include sensors 516 for obtaining information used to drive or steer the structural members and / or perform a transport task of each unit, etc. The sensors 516 may include various devices configured to detect or measure one or more physical characteristics of the robotic system 500 (e.g., the state, condition, position, etc. of one or more joints or structural members) and / or characteristics of the surrounding environment. Such sensors 516 may include accelerometers, gyroscopes, force sensors, strain gauges, torque sensors, etc., as well as imaging sensors 522, position sensors 524, contact sensors 526, etc.
[0072] The sensors 516 can include one or more imaging sensors 522 configured to detect the surrounding environment, such as visible and / or infrared cameras, two-dimensional and / or three-dimensional imaging cameras (2D vision and / or 3D vision), ranging devices such as lidar or radar, etc. The imaging sensors 522 can generate representation data, such as digital images and / or point clouds, that can be used to control units and controls, for example, in automated inspection, robotic guidance, or other robotic applications.
[0073] The robot system 500 can acquire and analyze images of a designated area (e.g., an area including a gripping position, a pick-up position, a drop position, and other work positions of the operation object) to identify each position in order to operate the operation object. For example, the image sensor 522 can include the above-mentioned camera, a distance measuring device, and the like configured to generate image data and distance data of the designated area. The robot system 500 can determine, for example, a gripping position, a pick-up position, a drop position, and other work positions of the operation object based on the acquired image and / or distance measurement data. Note that the work may include scanning the operation object to log the operation object during transportation / receiving. In this case, the image sensor 522 can include one or more scanners (e.g., a barcode scanner and / or a QR code scanner (registered trademark)) configured to scan the identification information of the operation object during transportation of the operation object.
[0074] The sensors 516 may also include position sensors 524, such as position encoders, potentiometers, etc., configured to detect positions of the above structural members (e.g., robot arms and / or end effectors) and / or joints in each unit of the robot system 500. The robot system 500 may use the position sensors 524 to track the positions and / or states (such as orientations) of the structural members and / or joints while performing operations in a task.
[0075] Further, the sensors 516 may include contact sensors 526, such as pressure sensors, force sensors, strain gauges, piezoresistive / piezoelectric sensors, capacitive sensors, elasto-resistive sensors, other tactile sensors, etc., configured to measure a characteristic associated with direct contact between physical structures or surfaces. The contact sensors 526 may measure a characteristic corresponding to, for example, a gripping operation of the end effector on the object. Thus, the contact sensors 526 may be configured to detect a physical quantity corresponding to the degree of contact or attachment between the object and the gripper, and may output a quantified measurement (e.g., force, torque, pressure, contact metrics, various measurements thereof, etc.). It is noted that the contact metrics may include one or more force or torque readings related to the force applied by the end effector to the object.
[0076] In the above and following descriptions, the robotic system 500 is described as an example in a warehouse or logistics system, but is not limited thereto, and can be configured to perform various tasks in other environments / purposes to perform manufacturing, assembly, packaging, health care, and / or other types of automation operations. The robotic system 500 can also include other units, such as manipulators, service robots, modular robots, etc., that are not shown. The robotic system 500 can also operate, for example, in a warehouse or distribution / transportation hub and include various unloading / loading robots for transferring objects from cage carts or pallets to conveyors or other pallets, sorting systems, unpacking robots for unpacking objects, top cutting machines, container switching robots for transferring objects from one container to another, packaging robots for packaging objects, packing machines, or combinations thereof.
[0077] [Example] 6 is a front view (partial functional configuration diagram) showing an example of a flow of work executed by a robot system according to an embodiment of the present disclosure and an example of a functional configuration of a control device provided in the robot system. The robot system 600 in this embodiment may be provided in, for example, a warehouse or the like that is a warehousing, replenishment, storage, and shipping base of a logistics system, and may include a control device 610 as a device that adjusts and controls the operation of each unit in the robot system 600. In addition, the robot system 600 can be said to be a system that is particularly suitable for storing an operation target in a rack in the replenishment process P20 shown in FIG. 1, and for removing an operation target from the rack in the shipping process P30.
[0078] As described above, the control device 610 is configured as a standalone device or a part of another unit, and can adjust and control the operations in tasks performed by units such as the transport robots 11 and 12 (illustrated as the transport robot 11 in FIG. 6; the same applies below) and the operation robots 13 and 14 (illustrated as the operation robot 13 in FIG. 6; the same applies below). More specifically, the control device 610 is connected to the transport robot 11, the operation robot 13, and the sensors 516 including the image sensor 522, and is also connected to a warehouse management system (WMS: Warehouse Management System), other higher-level systems, and / or external systems, not shown, as necessary.
[0079] 5, the control device 610 is mainly composed of the processor 502, the storage device 504, and the communication device 506. In particular, the processor 502 can function as the data acquisition unit 612 and the robot control unit 616, and the storage device 504 can function as the data storage unit 614. The robot system 600 can be configured to execute a first task for storing the operation target 16 in the rack 15 and / or a second task for removing the operation target 16 from the rack 15.
[0080] [First task: storing the operation target 16 in the rack 15] In the first task, the following tasks A1 to A5 are executed in a suitable order and at a suitable timing in combination. A1: The rack 15 stored in the storage area 101 is transported by the transport robot 11 from its storage position to the access position 601 (stop position SL) in the classification area 103. A2: The operation object 16, which is temporarily placed, for example, on a transfer position 602 (transfer position OL) on a conveyor in the classification area 103, is grasped, for example, by suction from the side, by the operation robot 13 (the operation robot 14 may support it from below; the same applies below). A3: The grasped operation target 16 is moved from the transfer position 602 to the access position 601. A4: The operation target 16 is stored (replenished) in a designated vacant position on the rack 15 held by the transport robot 11 which is stationary. A5: The rack 15 replenished with the operation object 16 is returned by the transport robot 11 from the access position 601 to a storage position in the storage area 101.
[0081] 7 is a flow diagram showing an example of a procedure for operating the robot system according to an embodiment of the present disclosure to execute a first task. First, in block 701, the data acquisition unit 612 acquires first data including, for example, information on the operation target 16 before executing task A1 and information on each rack 15, and the data storage unit 614 stores the first data in association with the operation target 16 and the rack 15.
[0082] For example, the data acquisition unit 612 can acquire information about the operation target 16, such as identification information, position information, shape information, weight, and center of mass, based on the result of processing the image data of the operation target 16 temporarily placed on the transfer position 602 of the classification area 103 by an image sensor 522 such as a 3D vision, and the master data 552 as necessary. Alternatively, the information about the operation target 16 and the rack 15 can be estimated or identified from the tracking information of the operation target 16 and the rack 15 in the master data 552. In addition, as a method for identifying / tracking the operation target 16, for example, the methods described in Japanese Patent Application No. 2019-118678, Japanese Patent Application No. 2019-080213, U.S. Patent Application No. 16 / 258,120, etc. by the present applicant can be applied. Alternatively, the data acquisition unit 612 can acquire information about the operation target 16 from a higher-level system such as a WMS. In this case, information about the operation target 16 can be acquired in advance before the operation target 16 is placed at the transfer position 602.
[0083] Next, in block 702, the robot control unit 616 determines a rack 15 for storing the operation target 16 based on information on the operation target 16 and information on each rack 15 stored in the storage area 101. In this case, based on shape information on the operation target 16, free space information in the rack 15 (space information on the space where the operation target 16 is not stored), the SKU (Stock Keeping Unit) of the operation target 16 to be stored, the SKU of the operation target 16 already stored in the rack 15, and the like, a suitable candidate rack 15 is selected to enhance the storage efficiency of the entire warehouse while consolidating the operation targets 16 as much as possible by SKU unit. Furthermore, one or more optimal racks 15 can be determined taking into consideration the transport route to the classification area 103, and the like.
[0084] Next, in block 703, the robot control unit 616 creates or acquires, for example, by machine learning, a control sequence including designation of a transport robot 11 for transporting the determined one or more racks 15 from the storage area 101 to the access position 601 in the sorting area 103 and a transport path of the rack 15 by each transport robot 11. Based on the control sequence, the robot control unit 616 commands the designated transport robot 11 to execute task A1 for transporting the rack 15 to the access position 601.
[0085] Simultaneously with task A1, or before or after task A1, in block 704, the robot control unit 616 creates or acquires, for example, by machine learning or the like, a control sequence for having the operation robot 13 suck and grasp the operation target 16 temporarily placed at the transfer position 602, for example, by lateral suction, and move the operation target 16 from the transfer position 602 to the access position 601, based on information about the operation target 16. The robot control unit 616 commands the operation robot 13 to execute tasks A2 and A3 for grasping the operation target 16 by the operation robot 13 and moving it to the access position 601, based on the control sequence.
[0086] The timing of executing these tasks A2 and A3 is not particularly limited, and for example, the robot control unit 616 may instruct the operation robot 13 to execute at least a part of the operations in the above control sequence before the rack 15 reaches the access position 601. In this case, the operation robot 13 can complete grasping the operation target 16 and moving it to the access position 601 before the rack 15 reaches the access position 601, and immediately after the arrival of the rack 15, task A4 can be executed to store the operation target 16 in the rack 15.
[0087] Next, in block 705, the control device 610, as necessary, captures an image of the operation target 16 and the rack 15 at the access position 601 by the imaging sensor 522 such as a 3D vision, and processes the image data to confirm the state and status of the operation target 16 and the rack 15. In block 705, the robot control unit 616 further creates or acquires, for example, by machine learning, a control sequence including a position on the shelf of the rack 15 for storing the operation target 16 and a movement path of the operation target 16 to that position, based on information on the operation target 16 and information on the rack 15 (particularly, the vacancy status of the rack 15). Based on the control sequence, the robot control unit 616 commands the operation robot 13 to execute task A4 for dropping the operation target 16 at a designated vacant position on the rack 15 held by the stationary transport robot 11.
[0088] At this time, the robot control unit 616 can set, for example, an arbitrary position of the rack 15 held by the transport robot 11 stopped at the access position 601 as the reference coordinate when the operation robot 13 accesses the rack 15. The rest position of the rack 15 can be calculated based on the access position 601 where the transport robot 11 holding the rack 15 stops, but the position of the rack 15 on the transport robot 11 may deviate from the standard position. Therefore, the control device 610 calculates the positions of the transport robot 11 and the rack 15 from image data of the rack 15 at the access position 601, and the data acquisition unit 612 can acquire relative position information between the transport robot 11 and the rack 15. Then, the robot control unit 616 corrects the position information of the rack 15 at the access position 601 based on the relative position information between them, and preferably creates or acquires a control sequence for task A4 based on the corrected position information of the rack 15 by, for example, machine learning or the like.
[0089] The rack 15 is configured with multiple shelves, and is configured so that the operation target 16 can be stored on or taken out from the shelves from the side, and a drop prevention device 152 having a convex shape, for example, is provided on the end of each shelf of the rack 15. Therefore, the robot control unit 616 can create or acquire, for example, by machine learning, a control sequence including a path for moving the operation target 16 past the drop prevention device 152 so that the moving operation target 16 does not interfere with the drop prevention device 152 when the operation robot 13 grasps the operation target 16 from the side (horizontal direction).
[0090] After the storage (replenishment) of the operation object 16 in the rack 15 is thus completed, in block 706, the robot control unit 616 creates or acquires, for example, by machine learning, a control sequence including a transport path for returning the rack 15, to which the operation object 16 has been replenished, from the access position 601 to a storage position in the storage area 101 by the transport robot 11. Based on the control sequence, the robot control unit 616 commands the transport robot 11 to execute task A5 for transporting and returning the rack 15 to the storage area 101.
[0091] After the first task of storing the operation object 16 in the rack 15 is completed, in block 707, the data acquisition unit 612 acquires second data including information about the rack 15 in which the operation object 16 is stored and information about the storage position of the operation object 16 in the rack 15, and the data storage unit 614 stores the second data in association with the operation object 16 and the rack 15.
[0092] The robot control unit 616 can create or acquire a control sequence based on the second data so that the operation objects 16 are arranged in the rack 15 in a concentrated manner, in other words, so that the operation objects 16 are stored densely to minimize unnecessary space, when storing (replenishing) the operation objects 16 in the rack 15 from the next time onward. In this case, it is also possible to create or acquire a control sequence based on the characteristics of the operation objects 16, for example, so that operation objects 16 having the same SKU are stored together, or operation objects 16 having the same or similar shape and dimensions are stored together. The second data related to the storage status of the operation objects 16 in the rack 15 acquired in this way is updated for each operation object 16 and for each storage operation of the operation objects 16, and can be used appropriately in the second task (removal of the operation objects 16 from the rack 15) described later.
[0093] Furthermore, based on the second data thus obtained, the data storage unit 614 can store position (arrangement) information of multiple operation objects 16 on the rack 15 on a per operation object 16 basis or per shelf (layer) basis of the rack 15, and can also store the information as two-dimensional information on a per shelf basis or as three-dimensional information across multiple shelves.
[0094] The operation target 16 may have an identification code or an identification tag on its side as identification information. In this way, even when the operation target 16 is stored in the rack 15, the identification information of the operation target 16 may be exposed so as to be visible from the outside of the rack 15 depending on the arrangement state. Then, by confirming the identification information of the operation target 16 using the image sensor 522 or the like, it is possible to easily identify and specify the operation target 16 even when the operation target 16 is stored in the rack 15. In this case, as described above, if the position information of the multiple operation targets 16 in the rack 15 is stored as two-dimensional information or three-dimensional information, it is possible to easily specify the operation targets 16 stored in the rack 15 by identifying one operation target 16, on a shelf board basis or a rack 15 basis. In addition, the imaging sensor 522 can be configured to capture an image of the rack 15 in either a state in which the transport robot 11 holding the rack 15 is stationary or a state in which the transport robot 11 holding the rack 15 is moving, i.e., in either a state in which the rack 15 is stationary or moving.
[0095] The robot control unit 616 may be configured to determine that the storing of the operation target 16 in the rack 15 is completed before the storing operation (task A4) of the operation target 16 in the rack 15 is actually completed. For example, it can be determined that the storing of the operation target 16 is completed when all or most of the operation target 16 has moved onto the shelf of the rack 15, or when part of the operation target 16 has come into contact with the shelf, based on the operating state of the end effector of the operation robot 13 or by tracking the movement of the operation target 16 with the image sensor 522.
[0096] The robot system 600 can perform a first task (storing the operation target 16 into the rack 15) and a second task (removing the operation target 16 from the rack 15) by combining unit tasks B1 to B5 shown below in an appropriate order and at an appropriate timing.
[0097] [Second task: Removal of operation target 16 from rack 15] In the second task, the following tasks B1 to B5 are executed in a suitable combination in a suitable order and at a suitable timing. B1: The rack 15 stored in the storage area 101 and housing, for example, operation objects 16 ordered for shipment is transported by the transport robot 11 from its storage position to the access position 601 (stop position SL) in the sorting area 103. B2: The operation target 16 on the rack 15 held by the transport robot 11 stationary at the access position 601 is gripped by the operation robot 13, for example, by suction from the side. B3: The grasped operation target 16 is moved from the access position 601 to the transfer position 602. B4: The operation target 16 is dropped at the transfer position 602 and temporarily placed there. B5: The rack 15 from which the operation target 16 has been removed is returned by the transport robot 11 from the access position 601 to a storage position in the storage area 101.
[0098] 8 is a flow diagram showing an example of a procedure for operating the robot system according to an embodiment of the present disclosure to execute the second task. First, in block 801, the data acquisition unit 612 acquires first data including, for example, information on the operation target 16 before executing task B1 and information on each rack 15, and the data storage unit 614 stores the first data in association with the operation target 16 and the rack 15.
[0099] For example, when a shipping order for the operation target 16 is received, the data acquisition unit 612 can acquire information on the operation target 16, such as identification information, position information, shape information, weight, center of mass, etc., and identification information and storage position information of the rack 15 in which the operation target 16 is stored, based on the second data stored in the data storage unit 614 and, if necessary, the master data 552. Then, in block 802, the robot control unit 616 can select a rack 15 for taking out the operation target 16 based on the information on the operation target 16 and the information on each rack 15 stored in the storage area 101, and determine one or more optimal racks 15 taking into consideration the transport route to the sorting area 103, etc.
[0100] Next, in block 803, the robot control unit 616 creates or acquires, for example, by machine learning, a control sequence including designation of a transport robot 11 for transporting the determined one or more racks 15 from the storage area 101 to the access position 601 in the sorting area 103 and a transport path of the rack 15 by each transport robot 11. Based on the control sequence, the robot control unit 616 commands the designated transport robot 11 to execute task B1 for transporting the rack 15 to the access position 601.
[0101] When the end effector of the operation robot 13 is not at the access position 601, simultaneously with task B1 or before or after task B1, the robot control unit 616 commands the operation robot 13 to execute a task of moving the end effector of the operation robot 13 to the access position 601. In this case, by completing the movement of the operation robot 13 before the rack 15 reaches the access position 601, it is possible to execute task B2 of taking the operation target 16 out of the rack 15 immediately after the arrival of the rack 15.
[0102] When the transport robot 11 arrives at the access position 601, in block 804, the control device 610 uses the imaging sensor 522, such as a 3D vision, to capture images of the operation target 16 and the rack 15 at the access position 601, and processes the image data to confirm the state and status of the operation target 16 and the rack 15. In block 804, the robot control unit 616 further creates or acquires, based on information about the operation target 16 and information about the rack 15 (particularly, the storage status in the rack 15), a control sequence including a designation of the position of the operation target 16 on the rack 15 and a movement path of the end effector to that position, for picking up the operation target 16, and moving it from the access position 601 to the transfer position 602, for example, by machine learning or the like. Based on the control sequence, the robot control unit 616 instructs the operation robot 13 to execute tasks B2 and B3 for grasping the operation object 16 on the rack 15 held by the transport robot 11 stationary at the access position 601 and moving it to the transfer position 602.
[0103] At this time, similarly to the first task, the control device 610 calculates the positions of the transport robot 11 and the rack 15 from the image data of the rack 15 at the access position 601, and the data acquisition unit 612 can acquire relative position information of the transport robot 11 and the rack 15. Then, the robot control unit 616 corrects the position information of the rack 15 at the access position 601 based on the relative position information of the two, and preferably creates or acquires a control sequence for task B2 based on the corrected position information of the rack 15 by, for example, machine learning. In addition, the robot control unit 616 can create or acquire a control sequence including a path for the moving operation target 16 to move beyond the fall prevention tool 152 so that the moving operation target 16 does not interfere with the fall prevention tool 152 by, for example, machine learning.
[0104] Next, in block 805, the control device 610, as necessary, captures an image of the operation target 16 held at the transfer position 602 and the transfer position 602 (for example, on a conveyor, a final position, etc.) by the imaging sensor 522 such as a 3D vision, and checks the state and situation of the operation target 16 and the transfer position 602 by processing the image data. In block 805, the robot control unit 616 further creates or acquires a control sequence including a designated position to which the operation target 16 is transferred and a movement path of the operation target 16 to the designated position, for example, by machine learning. Based on the control sequence, the robot control unit 616 commands the operation robot 13 to execute task B4 for dropping the operation target 16 at the designated position in the transfer position 602. Note that, when the operation target 16 is directly transferred to a shipping container or the like prepared at the transfer position 602, the imaging sensor 522 may check the vacancy status in the shipping container to improve storage efficiency.
[0105] After removal of the operation target 16 from the rack 15 is thus completed, in block 806, the robot control unit 616 creates or acquires, for example, by machine learning, a control sequence including a transport path for returning the rack 15 from which the operation target 16 has been removed, by the transport robot 11, from the access position 601 to a storage position in the storage area 101. Based on the control sequence, the robot control unit 616 commands the transport robot 11 to execute task B5 for transporting the rack 15 to the storage area 101.
[0106] After the second task of removing the operation target 16 from the rack 15 is completed, in block 807, the data acquisition unit 612 acquires second data including information on the rack 15 from which the operation target 16 was removed and information on the storage positions of other operation targets 16 stored in the rack 15, and the data storage unit 614 stores the second data in association with the operation target 16 and the rack 15. In this way, the second data on the storage status of the operation target 16 in the rack 15 is updated for each operation target 16 and each time the operation target 16 is removed. Also, similar to the first task, the data storage unit 614 can store position information of the multiple operation targets 16 in the rack 15 based on the second data, for each operation target 16 or each shelf of the rack 15, and can store the information as two-dimensional information or three-dimensional information.
[0107] Also, similarly to the first task, if the operation target 16 has identification information on its side, even when the operation target 16 is stored in the rack 15, depending on the arrangement state, the identification information of the operation target 16 can be confirmed by the image sensor 522, and the operation target 16 can be easily identified by actual measurement even when the operation target 16 remains stored in the rack 15. Furthermore, the image sensor 522 can be configured to capture an image of the rack 15 when the transport robot 11 holding the rack 15 is stationary or when the transport robot 11 holding the rack 15 is moving.
[0108] The robot control unit 616 may be configured to determine that removal of the operation target 16 from the rack 15 is complete before the operation (task B2) of removing the operation target 16 from the rack 15 is actually completed. For example, by tracking the movement of the operation target 16 using the imaging sensor 522 or the operating state of the end effector of the operation robot 13, it can be determined that removal of the operation target 16 is complete when all or most of the operation target 16 has moved outside the rack 15, or when all or part of the operation target 16 has left the shelf board, etc.
[0109] According to the control device 610 and the control method of the robot system 500, 600 configured as described above, before storing the operation target 16 in the rack 15 or before removing the operation target 16 from the rack 15, information about the operation target 16 and the rack 15 is grasped, and tasks (first and second tasks) based on a control sequence created or acquired by, for example, machine learning based on the first data including the information are executed. This makes it possible to efficiently and smoothly perform the operation of storing the operation target 16 in the rack 15 or the operation of removing the operation target 16 from the rack 15. In addition, at that time, advanced cooperation between units (for example, the transport robot 11 and the operation robot 13) in the robot system 500, 600 can be realized, and thus the robot system 500, 600 can be made highly functional.
[0110] [Other application example 1] FIG. 9A is a schematic plan view showing an exemplary environment in which a robot system according to an embodiment of the present disclosure can operate. Like the robot system 600, the robot system 100 can be installed in a warehouse or the like that is a warehousing, replenishment, storage, and shipping base of a logistics system. The robot system 100 can be configured to perform or execute one or more tasks and / or a task consisting of a combination of a plurality of appropriate tasks. These tasks can be suitably performed or executed by the robot system 100 including one or more units (e.g., various robots, various devices, control devices provided integrally or separately therewith, etc.). The robot system 100 can be applied to the transfer of ordered items from an operation target to a shipping container in the shipping process P30 shown in FIG. 1.
[0111] As shown in FIG. 9A, the robot system 100 may include one or more transport robots 11, 12 (e.g., rack AGVs and AGVs configured to remove containers from racks and load them onto racks and place them in predetermined positions) as transport units, one or more operation robots 13 (e.g., piece-picking robots) as transfer / sorting units configured to move operation objects between different locations, and their control devices (not shown in FIG. 9A).
[0112] The tasks executed by the robot system 100 may be configured to be combined so that each unit executes individual tasks in an appropriate order to achieve a predetermined purpose, or each unit may be configured to appropriately select and execute various different tasks. In the robot system 100, each unit may execute one or more tasks for accessing various different items stored in the racks 15 or containers 16 and distributed in the storage area 101, and / or various different items classified based on a predetermined storage order or packing order, or item characteristics.
[0113] The transport robot 11 can perform a task of transporting, for example, a rack 15 on which containers 16 containing ordered items are stacked between the storage area 101 and the transport area 102. Meanwhile, the transport robot 12 can take out (pick up) the container 16 containing the ordered items from the transported rack 15. Also, the transport robot 12 can perform a task of transporting the container 16 between the transport area 102 and the sorting area 103 (area for grouping items: stopping position SL of the container 16 in FIG. 9A). Meanwhile, the operation robot 13 can perform a task of picking up the ordered items from the container 16 in the sorting area 103 and moving it to a transfer position OL (for example, a container or box for packing the ordered items, a conveyor or temporary storage area on which they are placed, etc.) and / or another shipping container, etc.
[0114] When performing a task, for example, when a shipping order is issued, when stored items are rearranged, when items are replenished, etc., the robot system 100 can identify different areas in which each unit and / or a group of grouped units operate. For example, the robot system 100 can identify a storage area 101 in which the transport robot 11 operates, a transport area 102 in which the transport robot 12 operates, and a sorting area 103 in which the transport robot 12 and / or the operation robot 13 operate. Note that the areas in which the transport robots 11, 12, and the operation robot 13 operate are not limited to the above, and for example, the transport robot 11 may further operate in the transport area 102 and the transport robot 12 may further operate in the storage area 101 according to an appropriate control sequence.
[0115] In addition, the areas in which the units operate may be adjacent to each other or may partially overlap each other. For example, the storage area 101 may be adjacent to the transport area 102, and the transport area 102 may partially overlap the classification area 103. In this case, the transport robots 11 and 12 can operate in separate areas by accessing the racks 15 in the transport area 102, for example, as shown in FIG. 9A. As a result, the robot system 100 can reduce the possibility of potential collisions between different types of units and / or the possibility of them becoming obstacles to each other. Note that the operation robot 13 can be fixedly disposed at a predetermined position, and in this case, the transport robot 12 can easily enter the classification area 103 without colliding with other units or causing congestion during movement.
[0116] Furthermore, the robot system 100 can use an appropriate path to guide and steer transport units such as the transport robots 11 and 12. For example, the robot system 100 can use a first path P1 for steering one or more transport robots 11 and / or a second path P2 for steering one or more transport robots 12. Note that the first path P1 and the second path P2 may be set to be separated by a distance or space so as not to overlap with each other, as shown in FIG. 9A, for example, but are not limited to this.
[0117] In addition, the first path P1 and the second path P2 may be provided with floor markings (e.g., paint, tape, etc.) that transport units such as the transport robots 11 and 12 can follow when moving autonomously. This allows the robot system 100 to identify the shape / position of the floor markings and use the identified information when instructing the transport units on route calculation and / or ordering of positions (e.g., pick-up positions and / or drop positions of transport objects). Furthermore, the first path P1 and the second path P2 may include a series of links (e.g., paths between racks 15) and nodes (e.g., intersecting positions of paths or designated positions when changing the direction of movement).
[0118] The robot system 100 can also calculate routes for transport units such as the transport robots 11 and 12 to move between pick-up and drop positions of transported objects efficiently and without interfering with other units. The transport units can calculate their current positions within the routes, for example using a position / navigation system, and move along the specified routes and routes based on their current positions.
[0119] As described above, the robot system 100 can set a task as a series of tasks to be performed by multiple units, and can adjust and control each unit based on the characteristics of each task so as to optimize the execution of the integrated task. For example, adjustments can be made to define a range of operations that requires multiple units, or to define a range of operations that spans multiple specified areas.
[0120] For example, to fulfill a shipping order, a task may be configured and executed to fulfill the order by identifying the storage location of the ordered items in the storage area 101, e.g., the rack 15 on which the items are stored or the rack 15 on which the container 16 containing the ordered items is loaded, transporting the rack 15 to the transport area 102, transporting the container 16 from the rack 15 to the sorting area 103, transferring the ordered items from the container 16 to a target location, e.g., a shipping container and / or conveyor, returning the container 16 to the rack 15, returning the rack 15 to the storage area 101, or any suitable combination of these tasks.
[0121] In addition, to accommodate the receipt or replenishment of goods, available storage locations can be determined, for example, according to a demand forecast, by determining a container 16 capable of storing the goods and a rack 15 capable of storing the container 16 as the storage location for the goods, storing the received or replenished goods in the container 16, loading the container 16 with the received or replenished goods on the rack 15, transporting the rack 15 to a specified corresponding storage location, or setting and executing a task that performs an appropriate combination of these tasks.
[0122] Furthermore, in order to operate each unit, the robot system 100 can generate, for example, a command for operating an actuator in each unit, a setting condition, an operation plan, a position, identification information, a path, a current unit position, status and progress information, or a combination thereof. The generated information can be communicated between each unit, and the generated various information can be shared between the control device and each unit to execute a task.
[0123] FIG. 9B is a schematic plan view showing a part of an exemplary environment in which a robot system according to an embodiment of the present disclosure can operate, and is a diagram showing the sorting area 103 in FIG. 9A and its surroundings. The sorting area 103 corresponds to an area where the operation robot 13 picks up an article from the container 16 and transfers it to a transfer position OL on a conveyor or the like, and / or rearranges the article in the container 16. The sorting area 103 can include, for example, one or more stop positions SL where the transport robot 12 moves to a position near the operation robot 13 and stops. Each stop position SL corresponds to a reference position where each of the one or more transport robots 12 is stationary while the operation robot 13 performs a task of manipulating an article. In addition, each stop position SL includes a position where an end effector (e.g., a gripping tool (damper, debunning gripper, etc.) or a hand, etc.) provided at the tip of the robot arm of the operation robot 13, for example, can access the container 16 on the transport robot 12.
[0124] The robotic system 100 may also include an imaging sensor (not shown in FIGS. 9A and 9B ) configured to image one or more locations. The imaging sensor may include, for example, a two-dimensional / three-dimensional camera (2D / 3D vision), lidar, radar, etc. configured to image the containers 16 in the sorting area 103 (e.g., on the transport robot 12 at the stop position SL and / or at the transfer position OL). The robotic system 100 may process and use image data acquired by the imaging sensor for various purposes.
[0125] For example, the robotic system 100 may be configured to recognize an item, determine an item or a combination of items, grasp an item, and determine the location or state (e.g., orientation) of an item. The image data can be processed and used to identify the status of the container 16. Additionally, the robotic system 100 can use the image data to calculate a status associated with the container 16, such as the number of items contained in the container 16, and whether the container 16 is full or empty. The internal status of the container 16 can be determined by the number of items and / or the height of the items contained within the container 16, etc.
[0126] As a more specific example, when an order including four different items is placed, the control device of the robot system 100 transmits commands based on control sequences corresponding to the respective operations to four different transport robots 12 that pick up the four containers 16 containing the respective ordered items. The four transport robots 12 that pick up and transport the containers 16 corresponding to the four ordered items can stop at one of the stop positions SL in the sorting area 103, for example, as shown in FIG. 9B. When the containers 16 arrive at the sorting area 103 in this way and the transport robots 12 stop at the stop positions SL as shown in FIGS. 9A and 9B, each container 16 functions as a container for dispensing or receiving items.
[0127] The robotic system 100 can then steer the handling robot 13 to, for example, pick up the order items from each bin 16 and place them onto a shipping bin or a transport conveyor corresponding to the order. Additionally, the robotic system 100 can include one or more units (e.g., conveyors, container sealing robots, loading robots, outgoing vehicles, etc.; not shown) configured to place the shipping bins at an outgoing location, such as a loading bay.
[0128] In the above explanation of the robot system 100, the state in which a task related to the outflow (shipment) of goods is being executed has been mainly described. However, when executing a task related to the inflow or replenishment of goods, it is basically possible to create or obtain a control sequence for operating the robot system 100 by, for example, machine learning in the reverse order to that described above, and execute a task based on that control sequence.
[0129] [Other application example 2] 10A and 10B are schematic plan views showing another exemplary environment in which a robot system according to an embodiment of the present disclosure can operate, and FIG. 10B is a diagram showing the sorting area 103 in FIG. 10A and the surrounding state. The robot system 200 according to this embodiment has a similar configuration to the robot system 100 shown in FIG. 9A and FIG. 9B, except that the robot system 200 is a system in which the object to be inspected in the present disclosure is the object itself, rather than storing the object in the container 16 and then storing the container 16 in the rack. In this way, the robot system 200 can be regarded as an example in which the object to be inspected in the present disclosure is the object itself, and can be applied to directly storing the object in the rack and directly removing the object from the rack in the replenishment process P20 and the retrieval process P30 shown in FIG. 1 when the object to be operated is the object itself.
[0130] That is, the robot system 200 does not need to include the transport robot 12 as the transport unit in the robot system 100, and as a result, the transport robot 11, which has accessed the storage area 101 and picked up a rack 15, can move along the first path P1, transport the rack 15 to the sorting area 103, and stop at a stop position SL near the operation robot 13. When the rack 15 arrives at the sorting area 103 in this way and the transport robot 11 stops at the stop position SL as shown in Figures 10A and 10B, each rack 15 functions as a container for dispensing or receiving an item.
[0131] The robotic system 200 can then steer the handling robot 13 to, for example, pick up the order items from each rack 15 and transfer them into a shipping container or the like corresponding to the order. Additionally, the robotic system 200 can include one or more units (e.g., conveyors, container sealing robots, loading robots, outgoing vehicles, etc.; not shown) configured to place the shipping container or the like at an outgoing location, for example, a loading bay.
[0132] According to the robot system 200 configured and controlled as described above, the transport robot 12, the transport area 102, and the second path P2 in the robot system 100 can be omitted, which contributes to space saving and improvement of work efficiency. Note that, in the above explanation of the robot system 200, the state in which a task related to the outgoing (shipping) of an article is executed has been mainly described, but when executing a task related to the ingoing or replenishing of an article, it is possible to respond by creating or acquiring a control sequence for operating the robot system 200 in the reverse order to that described above, for example by machine learning, and executing a task based on the control sequence.
[0133] Although the embodiment as an example of the present disclosure has been described in detail above, the above description merely shows an example of the present disclosure in every respect, and is intended to facilitate understanding of the present invention, and is not intended to limit the present invention. Furthermore, it goes without saying that various improvements and modifications can be made without departing from the scope of the present disclosure, and each element of the embodiment, as well as its arrangement, material, conditions, shape, size, etc., are not limited to those exemplified or specific ones, and can be changed as appropriate.
[0134] In other words, the embodiments according to the present disclosure do not exclude other configurations, nor do they limit the present disclosure to the above-mentioned embodiments. Various modifications equivalent to the above-mentioned embodiments according to the present disclosure are possible within the scope of the present disclosure. For example, the order of execution of processes, steps, routines, or blocks may be executed in a different order according to alternative implementations within the scope of the present disclosure, and some processes, steps, routines, or blocks may be deleted, moved, added, subdivided, combined, and / or modified within the scope of the present disclosure. Also, each of these processes, steps, routines, or blocks may be executed in various different ways. Furthermore, even if processes, steps, routines, or blocks are executed sequentially in the above-mentioned embodiments, the processes, steps, routines, or blocks may be executed in parallel or may be executed non-sequentially at different times. Furthermore, certain numbers shown herein may have different values or ranges.
[0135] Moreover, the above-mentioned embodiment is not limited as a "best mode" that can be envisaged as a specific example of the present disclosure, and may be implemented in many alternative ways. Furthermore, the details of the above-mentioned embodiment may vary significantly in its specific implementation, but still be included in the technology of the present disclosure. In addition, a specific term used in describing a particular feature or aspect of the present disclosure is not limited to the specific characteristic, feature, or aspect of the present disclosure with which the term is associated, or to a particular embodiment, and thus the present invention is not limited in a particular sense except as provided by the claims. Furthermore, the present invention is defined in any number of claim forms, but it goes without saying that various aspects are envisaged within the scope of the present disclosure.
[0136] This application is based on U.S. patent application No. 62 / 792,348, filed on January 14, 2019, the contents of which are incorporated herein by reference. [Explanation of symbols]
[0137] 11, 12...Transport robot, 13, 14...Operation robot, 15...Rack, 16...Operation object, container, 40...Vehicle, 100, 200, 500, 600...Robot system, 101...Storage area, 102...Transport area, 103...Sorting area, 131, 141...End effector, 132, 142...Robot arm, 152...Fall prevention device, 502...Processor, 504...Storage device, 506...Communication device, 508...Input-output device Chair, 510...display, 512...actuating device, 514...transfer motor, 516...sensor, 522...imaging sensor, 524...position sensor, 526...contact sensor, 552...master data, 554...object tracking data, 601...access position, 602...transfer position, 610...control device, 612...data acquisition unit, 614...data storage unit, 616...robot control unit, OL...transfer position, P1...first path, P2...second path, SL...stop position.
Claims
1. A control device for a robot system including an operation robot that operates an operation object in order to store the operation object in a rack and / or remove the operation object from the rack, and a transport robot that transports the rack, a data acquisition unit that acquires first data including information about the operation target and information about the rack before the operation target is stored in the rack and / or removed from the rack; a data storage unit that stores the first data; a robot control unit that, before storing the operation object in the rack and / or removing the operation object from the rack, selects the rack and transports it to an access position based on the first data, creates or acquires a control sequence for storing the operation object in the rack and / or removing the operation object from the rack, and commands the transport robot to execute a task for transporting the rack to the access position based on the control sequence, and commands the operation robot to execute a task for storing the operation object in the rack and / or removing the operation object from the rack; A control device comprising:
2. the data acquisition unit acquires second data including information on the operation target and information on the rack after the operation target is stored in the rack and / or removed from the rack, The data storage unit stores the second data. The control device according to claim 1 .
3. The robot control unit creates or acquires the control sequence based on the second data so that an arrangement of the operation targets on the rack is consolidated. The control device according to claim 2.
4. the robot control unit instructs the operation robot to execute at least a part of the operations in the control sequence before the rack reaches the access position; A control device according to any one of claims 1 to 3.
5. the data acquisition unit acquires relative position information between the transport robot and the rack; the robot control unit corrects position information of the rack at the access position based on the relative position information, and creates or acquires the control sequence based on the corrected position information. A control device according to any one of claims 1 to 4.
6. The rack is configured so that the operation object is stored and / or removed from the side, and a fall prevention device for the operation object is provided at an end of the rack, The operation robot grasps the operation target from a lateral direction, The robot control unit creates or acquires the control sequence so that the operation target moves beyond the fall prevention tool. A control device according to any one of claims 1 to 5.
7. The data storage unit stores position information of the plurality of operation objects in the rack as two-dimensional information or three-dimensional information for each operation object or each shelf board of the rack. A control device according to any one of claims 1 to 6.
8. The robot system further includes a sensor for capturing an image of the rack in which the operation target is stored, the robot control unit creates or acquires the control sequence for storing the operation object in the rack so that the sensor can measure the identification information of the operation object; A control device according to any one of claims 1 to 7.
9. The robot system further includes a sensor for capturing an image of the rack in which the operation target is stored, The sensor captures an image of the rack while the transport robot holding the rack is stationary or while the transport robot holding the rack is moving. A control device according to any one of claims 1 to 8.
10. the robot control unit determines that the putting of the operation object into the rack and / or the taking of the operation object from the rack is completed before the putting of the operation object into the rack and / or the taking of the operation object from the rack is completed. A control device according to any one of claims 1 to 9.
11. The data acquisition unit acquires actual values or estimated values of information regarding the operation target and / or information regarding the rack. A control device according to any one of claims 1 to 10.
12. A control device according to any one of claims 1 to 11; a robot system including the operation robot and the transport robot; A logistics system equipped with
13. The controller identifies the robotic system and a region associated with the robotic system and calculates a task based on the control sequence; The tasks include a task related to the transportation of the rack by the robot system and the operation of the operation object, and a plurality of tasks executed by the robot system across adjacent and / or overlapping areas. The logistics system according to claim 12.
14. A program for causing a computer to function as the control device according to any one of claims 1 to 11.
15. A non-transitory computer-readable recording medium having the program according to claim 14 recorded thereon.
16. A control method for a robot system including an operation robot that operates an operation object in a rack and / or a transport robot that transports the rack in order to store the operation object in a rack and / or remove the operation object from the rack, the control method being executed by a control device having a data acquisition unit, a data storage unit, and a robot control unit, the data acquisition unit acquires first data including information about the operation target and information about the rack before storing the operation target in the rack and / or removing the operation target from the rack; The data storage unit stores the first data, the robot control unit, before storing the operation object in the rack and / or removing the operation object from the rack, selects the rack and transports it to an access position based on the first data, creates or acquires a control sequence for storing the operation object in the rack and / or removing the operation object from the rack, and commands the transport robot to execute a task for transporting the rack to the access position based on the control sequence, and commands the operation robot to execute a task for storing the operation object in the rack and / or removing the operation object from the rack. Control methods.
Citation Information
Patent Citations
Automatic physical distribution system
JP2018167950A
