Robot control device and robot system

The robot control device and system efficiently stack multiple articles in a shipping container by utilizing a stowage management unit and multi-core processor to manage and optimize the loading process, addressing the inefficiencies of conventional systems in handling multiple items simultaneously.

JP2024141224AInactive Publication Date: 2024-10-10HITACHI LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023052746
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies do not efficiently stack multiple items into a single shipping container, such as in mail-order sales or store delivery applications, where conventional systems assume individual handling of items rather than simultaneous loading.

Method used

A robot control device and system that includes a stowage management unit, predetermined and specific stowage work units, a robot body, and imaging sections to efficiently stack multiple articles in a specific area by controlling the loading process, using a multi-core processor to manage and optimize the stacking operations.

Benefits of technology

Enables efficient stacking of multiple articles in a specific area like a shipping container, improving throughput by allowing simultaneous processing of multiple tasks and reducing processing time through parallel execution of stowage work tasks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To efficiently stack a plurality of articles in a specific area.SOLUTION: A robot control device comprises a stacking management unit, a predetermined stacking work unit, and a specific stacking work unit. The stacking management unit controls an overall operation of a stacking work of stacking, by a robot, a plurality of articles in a specific area, and notifies of a start command of the article stacking work. The predetermined stacking work unit receives the start command from the stacking management unit, and controls the stacking work for one article. Further, the predetermined stacking work unit notifies of use-completion information on a predetermined device when the predetermined device to be used in a predetermined process performed first in the stacking work before completion of the stacking work is completed in use in the stacking work. Then, the specific stacking work unit receives the use-completion information on the predetermined device from the predetermined stacking work unit, and starts the stacking work for the one article.SELECTED DRAWING: Figure 19
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a robot control device and a robot system. [Background technology]

[0002] Conventionally, in the field of logistics, devices such as conveyors and AGVs (Automated Guided Vehicles) that transport items in warehouses have been widely used. In recent years, with an increase in the number of shipped packages due to e-commerce and a decrease in the domestic working population, the development of robots that automate the unloading and stacking of items (so-called picking robots) has progressed (see, for example, Patent Document 1). Patent Document 1 discloses technology for a robot system that handles and processes multiple items using multiple robots and workers. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2022-1513 Summary of the Invention [Problem to be solved by the invention]

[0004] Incidentally, in applications such as mail order sales through electronic commerce and store delivery in food wholesale, it is necessary to load multiple packages into one shipping container. However, the technology disclosed in Patent Document 1 does not assume that multiple packages will be loaded into one shipping container.

[0005] The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a robot control device and a robot system that are capable of efficiently stacking multiple items (baggage) within a specific area, such as a single shipping container. [Means for solving the problem]

[0006] In order to solve the above problem, the robot control device of the present invention includes a stowage management unit, a predetermined stowage work unit, and a specific stowage work unit. The stowage management unit controls the overall operation of a work in which a robot stows a plurality of items in a specific area, and notifies a command to start the stowage work of the items. The predetermined stowage work unit controls the stowage work for one item upon receiving the start command from the stowage management unit. Furthermore, before the stowage work is completed and when a predetermined device used in a predetermined process performed first in the stowage work has been used in the stowage work, the predetermined stowage work unit notifies usage information of the predetermined device. Then, the specific stowage work unit starts the stowage work for one item upon receiving the usage information of the predetermined device from the predetermined stowage work unit.

[0007] In order to solve the above problems, the robot system of the present invention includes a robot main body, an imaging unit, and a robot control unit. The robot main body executes a task of stacking a plurality of items in a specific area, and the imaging unit photographs the specific area in which the items to be transported are placed in a specific process that is performed first in the stacking task for one item. The robot control unit has a configuration similar to that of the robot control device of the present invention. Effect of the Invention

[0008] According to the present invention having the above-mentioned configuration, a plurality of items can be efficiently loaded into a specific area, such as a single shipping container. [Brief description of the drawings]

[0009] [Figure 1] 1 is a schematic configuration diagram of an item stowing system using a picking robot according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a block diagram of an article stowage system according to an embodiment of the present invention. [Diagram 3] FIG. 2 is a functional block diagram of a robot controller according to an embodiment of the present invention. [Figure 4]2 is a diagram showing an example of the data configuration of an order slip received by the item stowage system according to one embodiment of the present invention; FIG. [Diagram 5] FIG. 13 is a diagram showing an example of the configuration of a control plan table for the entire stowing work generated by a robot controller according to an embodiment of the present invention. [Figure 6] FIG. 2 is a diagram showing the correspondence between various work tasks executed by a robot controller according to an embodiment of the present invention and the types of core CPUs assigned to each work task. [Figure 7] 13 is a diagram showing an example of the configuration of a utilization device information table referenced in an item stowing work task according to an embodiment of the present invention; FIG. [Figure 8] 13 is a diagram showing an example of the configuration of a product type-specific action ID table referenced in an item stowing work task according to an embodiment of the present invention. FIG. [Figure 9] 13 is a diagram showing an example of the configuration of a storage container camera type-specific operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 10] 13 is a diagram showing an example of the configuration of a shipping container camera type-specific operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 11] 13 is a diagram showing an example of the configuration of a picking operation ID table for each hand type referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 12] 13 is a diagram showing an example of the configuration of an arm type-specific holding and lifting operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 13] 13 is a diagram showing an example of the configuration of an arm type-specific holding and conveying operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 14] 13 is a diagram showing an example of the configuration of an arm type-specific holding and lowering operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 15]13 is a diagram showing an example of the configuration of a hand type-specific placing action ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 16] 13 is a diagram showing an example of the configuration of an arm type-specific non-holding lifting operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 17] 13 is a diagram showing an example of the configuration of an arm type-specific non-holding transport operation ID table referenced in an item stowing work task in one embodiment of the present invention. FIG. [Figure 18] FIG. 1 is a diagram showing an example of a control operation of a stowage operation of a plurality of items by a conventional item stowage system. [Figure 19] FIG. 2 is a diagram showing an example of a control operation of a stowage operation of a plurality of items by the item stowage system according to one embodiment of the present invention. [Figure 20] 10 is a flowchart showing a processing procedure for an item stowing work task according to an embodiment of the present invention. [Figure 21] 13 is a flowchart showing a processing procedure for photographing a storage container performed in an item stowing work task according to an embodiment of the present invention. [Figure 22] 13 is a flowchart showing a processing procedure for photographing a shipping container performed in an item stowing work task according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A robot control device and a robot system according to an embodiment of the present invention will be specifically described below with reference to the drawings.

[0011] [Configuration of the goods stacking system and picking robot] Fig. 1 is a schematic diagram of an article stowing system using a picking robot according to an embodiment of the present invention. Fig. 1 shows only the components necessary for the article stowing work by the picking robot. The operation indicated by the dashed arrow in Fig. 1 is the transport operation of an article 10 when the picking robot 2 performs the stowing work of one article 10.

[0012] As shown in Fig. 1, the item stowage system 1 includes a picking robot 2 and various peripheral devices used for the stowage work of items 10 by the picking robot 2. In the example shown in Fig. 1, the peripheral devices include a camera 3 for photographing storage containers, a camera 4 for photographing shipping containers, a storage container 5, a conveyor 6 for storage containers, a shipping container 7, and a conveyor 8 for shipping containers. In this embodiment, the picking robot 2, the camera 3 for photographing storage containers, and the camera 4 for photographing shipping containers form a robot system 11 (see Fig. 2 described later).

[0013] The picking robot 2 includes a robot arm 21, a robot hand 22, and a robot controller 23 (robot control device, robot control unit). The robot arm 21 and the robot hand 22 constitute a robot main body.

[0014] The robot arm 21 has a plurality of joints, and by driving a motor provided at each joint, the posture of the robot arm 21 is changed and the article 10 is transported from the storage container 5 to the shipping container 7.

[0015] The robot hand 22 is attached to the tip of the robot arm 21, and holds the item 10 by performing a picking operation (removal operation) on the item 10. The robot hand 22 includes a suction pad for suctioning and holding the item 10, and / or a gripping mechanism for gripping and holding the item 10. Note that, in order to simplify the explanation, only the suction pad is shown for the robot hand 22 in Fig. 1, and the gripping mechanism is not shown.

[0016] When the picking robot 2 is not in operation, such as before the start or end of a loading work task described below, the robot hand 22 is placed at a predetermined initial position, and the robot arm 21 waits in its initial posture. At this time, the initial posture of the robot arm 21 and the initial position of the robot hand 22 are appropriately set so that the picking robot 2 does not overlap with the storage containers 5 and the shipping containers 7 when viewed from the storage container photographing camera 3 and the shipping container photographing camera 4. In addition, the initial posture of the robot arm 21 and the initial position of the robot hand 22 are set so as not to affect the transport operation of the storage containers 5 and the shipping containers 7.

[0017] The robot controller 23 is electrically connected to the robot arm 21, the robot hand 22, the storage container photographing camera 3, the shipping container photographing camera 4, the storage container conveyor 6, and the shipping container conveyor 8. When the stowing work of the items 10 is performed, the robot controller 23 outputs control signals (instruction signals) to each of these connection components, and controls the overall operation of the item stowing system 1.

[0018] The storage-container photographing camera 3 is fixedly disposed above the storage container 5 transported by the storage-container conveyor 6 to the picking position for the item 10 and at a position that does not affect the operation of the picking robot 2. The storage-container photographing camera 3 photographs the entire interior of the storage container 5 transported to the position where the picking operation for the item 10 will be performed. In other words, the storage-container photographing camera 3 photographs the storage status of the item 10 inside the storage container 5.

[0019] The camera 4 for photographing shipping containers is fixedly disposed above the shipping container 7 transported by the shipping container conveyor 8 to the placement position for the item 10 and at a position that does not affect the operation of the picking robot 2. The camera 4 for photographing shipping containers photographs the entire interior of the shipping container 7 transported to the position where the placement operation for the item 10 is performed. In other words, the camera 4 for photographing shipping containers photographs the loading (placement) status of the items 10 inside the shipping container 7.

[0020] The shipping container photographing camera 4 may be the same as or different from the storage container photographing camera 3. The images captured by the storage container photographing camera 3 are mainly used to identify the item 10 to be picked and its placement position in the storage container 5. On the other hand, the images captured by the shipping container photographing camera 4 are used to identify the position in the shipping container 7 where the item 10 can be placed. In other words, since the images captured by the shipping container photographing camera 4 only need to identify the empty space in the shipping container 7 where the item 10 is not placed, the shipping container photographing camera 4 can be a camera with lower performance, such as resolution, than the storage container photographing camera 3. In this case, an inexpensive camera can be used as the shipping container photographing camera 4, and therefore the cost of the robot system 11 can be reduced.

[0021] The storage container 5 (predetermined area) is a container capable of storing multiple items 10 of the same type. When not in use, the storage container 5 is stored in a predetermined location, such as a storage shelf (not shown). Note that, although the example shown in FIG. 1 shows a box-shaped storage container 5, the shape of the storage container 5 can be changed as desired depending on, for example, the type, shape, and dimensions of the item 10 to be stored.

[0022] The storage container conveyor 6 transports the storage container 5 storing the items 10 of the type to be shipped from its storage location to a location where the picking operation by the picking robot 2 will be performed, in response to a storage container 5 set instruction signal input from the robot controller 23. Also, in response to a storage container 5 replacement instruction signal input from the robot controller 23, the storage container conveyor 6 transports the used storage container 5 to the corresponding storage location, and then transports the storage container 5 to be used in the next loading operation to the location where the picking operation will be performed.

[0023] The shipping container 7 (specific area) is a container for loading items 10 to be shipped. In this embodiment, not only multiple items 10 of the same type can be loaded into one shipping container 7, but multiple items 10 of different types can also be loaded into the same shipping container 7. Note that, although the example shown in FIG. 1 shows a box-shaped shipping container 7, the shape of the shipping container 7 can be changed as desired depending on, for example, the type, shape, dimensions, etc. of the items 10 to be loaded.

[0024] The shipping container conveyor 8 transports a specific shipping container 7 in which items 10 are to be loaded to a position where a place operation is performed by the picking robot 2 in response to a set instruction signal for the shipping container 7 input from the robot controller 23. The shipping container conveyor 8 also transports the shipping container 7 in which one or more items 10 are loaded to a position where the next step of the loading process is performed in response to a shipping instruction signal for the shipping container 7 input from the robot controller 23 when the loading work of the items 10 is completed. At this time, if the shipping instruction signal includes replacement instruction information for the shipping container 7, the shipping container conveyor 8 transports the shipping container 7 in which the items 10 have been loaded to the next step, and then transports the shipping container 7 to be used in the next loading work to a position where a place operation is performed.

[0025] [Internal configuration of the goods loading system] Fig. 2 is a block diagram showing the hardware configuration of the item stowage system 1 and the robot system 11. As shown in Fig. 2, the robot system 11 has a robot arm 21, a robot hand 22, a robot controller 23, a storage container photographing camera 3, and a shipping container photographing camera 4. The robot controller 23 has a multi-core processor 231, a memory 232, and a communication interface unit 233. Although not shown in Fig. 2, within the robot controller 23, the multi-core processor 231, the memory 232, and the communication interface unit 233 are connected to each other via a bus.

[0026] The multi-core processor 231 is a calculation processing device that executes various operations performed by the item stowage system 1 using software. The multi-core processor 231 has multiple CPU cores, and in this embodiment, an example having four CPU cores (first core 231A to fourth core 231D) will be described. Note that the present invention is not limited to this, and the multi-core processor 231 may be a multi-core processor having three or more CPU cores other than four.

[0027] The memory 232 includes a read only memory (ROM) and a random access memory (RAM), not shown. The ROM stores various programs and various data (tables) for executing various tasks performed by the item stowage system 1. The RAM has a working area for executing various programs, and not only program codes required for the computational processing of various tasks performed by the item stowage system 1, but also variables and parameters generated during the computational processing are temporarily written to the RAM.

[0028] The communication interface unit 233 communicates with external devices. In this embodiment, the communication interface unit 233 is connected to the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4. The communication interface unit 233 is also connected to the storage container conveyor 6 and the shipping container conveyor 8.

[0029] That is, in this embodiment, the multi-core processor 231 of the robot controller 23 is connected to the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4 via the communication interface unit 233. The multi-core processor 231 is also connected to the storage container conveyor 6 and the shipping container conveyor 8 via the communication interface unit 233. Therefore, when the stowing work of the items 10 is performed, the multi-core processor 231 outputs control signals to the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4 via the communication interface unit 233. Also, when the stowing work of the items 10 is performed, the multi-core processor 231 outputs control signals to the storage container conveyor 6 and the shipping container conveyor 8 via the communication interface unit 233.

[0030] [Robot controller function block configuration] Fig. 3 is a functional block diagram of the robot controller 23. Note that, in order to simplify the explanation, only the functional block units related to the operation control during the stowing work of the articles 10 are shown here. Note that the processing of each functional block unit in the robot controller 23 shown in Fig. 3 is executed by the multi-core processor 231. In other words, each functional block unit in the robot controller 23 shown in Fig. 3 is functionally included in the multi-core processor 231.

[0031] 3, the robot controller 23 (multi-core processor 231) functionally has an operating system 234 and a robot control application 235. The operating system 234 is basic software for executing the processing of the robot control application 235. The robot control application 235 is a software application for controlling the operation of the article stowage system 1 and the robot system 11 in the stowage work.

[0032] The robot control application 235 has a stowage management task 235A, a first stowage work task 235B, a second stowage work task 235C, a third stowage work task 235D, a utilization device information storage unit 235E, and a control information storage unit 235F.

[0033] The stowage management task 235A (stowage management unit) is a task (processing program) for managing the progress of the stowage work of a plurality of items 10 and controlling the entire stowage work. In this embodiment, the stowage management task 235A is assigned to the first core 231A in the multi-core processor 231, and the processing of the stowage management task 235A is executed using the first core 231A in the multi-core processor 231.

[0034] Each of the first stowage work task 235B to the third stowage work task 235D is a task (processing program) for controlling the execution processing of the stowage work for one item 10. In this embodiment, the first stowage work task 235B to the third stowage work task 235D are assigned to the second core 231B to the fourth core 231D in the multi-core processor 231, respectively. Therefore, the processing of the first stowage work task 235B to the third stowage work task 235D is executed using the second core 231B to the fourth core 231D in the multi-core processor 231, respectively. Also, in this embodiment, the first stowage work task 235B to the third stowage work task 235D are connected to the stowage management task 235A in terms of processing function. Furthermore, the first stowing work task 235B to the third stowing work task 235D are also connected to one another in terms of processing functions, allowing input and output of information between the stowing work tasks (hereinafter referred to as "inter-task communication").

[0035] The utilization device information storage unit 235E stores information on the correspondence between various processing operations constituting the stowing task and the devices (hereinafter referred to as "utilization devices") used in each processing operation. The information on the utilization devices to be stored in the utilization device information storage unit 235E is information on the utilization status of the robot arm 21, the robot hand 22, the storage container photographing camera 3, the shipping container photographing camera 4, the storage container 5, and the shipping container 7 (see FIG. 7 described later). The configuration of the information (data) stored in the utilization device information storage unit 235E will be described in detail later with reference to the drawings.

[0036] The control information storage unit 235F stores various data (tables, etc.) that are referred to or used in the stowing work of a plurality of items 10 executed by the robot control application 235. For example, the control information storage unit 235F stores various operation plan data for the stowing work, various control information for each type of item 10 that is referred to when generating the operation plan data, various control information for each type of robot arm 21, various control information for each type of robot hand 22, etc. The configuration of the various information (data) stored in the control information storage unit 235F will be described in detail later with reference to the drawings.

[0037] In the present embodiment, an example has been described in which the processing functions of the various functional blocks included in the robot controller 23 are realized by software, but the present invention is not limited to this. For example, some or all of the various functional blocks included in the robot control application 235 may be configured by hardware.

[0038] Here, we will explain the outline of the operation of the stowing work of the multiple items 10 by the item stowing system 1. Note that here, we consider a case where three items 10 of the same type are successively stowed into a shipping container 7, and where stowing work is performed for one item 10 in each of the first stowing work task 235B to the third stowing work task 235D.

[0039] In the above case, when the series of stowing work starts, the stowing management task 235A issues a stowing work start command to the first stowing work task 235B to the third stowing work task 235D. That is, when the series of stowing work starts, the first stowing work task 235B to the third stowing work task 235D are activated simultaneously, and parallel processing of the first stowing work task 235B to the third stowing work task 235D starts. However, in this embodiment, although processing of the first stowing work task 235B starts at the start of stowing work, processing of the second stowing work task 235C and the third stowing work task 235C does not actually start.

[0040] The processing of the second stowage work task 235C is started when the first stowage work task 235B notifies the start possibility information of the second stowage work task 235C during the processing of the first stowage work task 235B. Therefore, the second stowage work task 235C is started when a command to start stowage work is input, but the second stowage work task 235C is in a standby state during the period from the input of the command to start stowage work to the input of the start possibility information from the first stowage work task 235B. In other words, the second stowage work task 235C (specific stowage work unit) is actually executed as a subsequent task of the first stowage work task 235B (predetermined stowage work unit).

[0041] Furthermore, the processing of the third stowage work task 235D is started when the second stowage work task 235C notifies the start possibility information of the third stowage work task 235D during the processing of the second stowage work task 235C. Therefore, the third stowage work task 235D is started when a command to start stowage work is input, but the third stowage work task 235D is in a standby state during the period from the input of the command to start stowage work to the input of the start possibility information from the second stowage work task 235C. In other words, the third stowage work task 235D (specific stowage work unit) is actually executed as a subsequent task of the second stowage work task 235C (predetermined stowage work unit).

[0042] As described above, in the stowing work of the multiple items 10 by the item stowing system 1 of this embodiment, a subsequent stowing work task is started before a preceding stowing work task is completed. Therefore, in this embodiment, the work throughput can be improved compared to, for example, a stowing work of the multiple items 10 in which a subsequent stowing work task is started after a preceding stowing work task is completed. In other words, in the stowing work of the multiple items 10 by the item stowing system 1 of this embodiment, multiple items can be stowing more efficiently compared to, for example, a configuration in which multiple stowing work tasks are executed sequentially.

[0043] [Specific examples of cargo stowage using the cargo stowage system] Hereinafter, detailed control of the stowage work of a plurality of items 10 using the item stowage system 1 of this embodiment will be described with a specific example. Consider a case where three boxes of cookies, two PET (Polyethylene terephthalate) bottles containing green tea, and four bags of bagged noodles are collectively loaded into one shipping container 7 for shipping.

[0044] <Example of data structure of purchase order slip> In this case, first, data of an order slip indicating multiple types of products (items 10) to be shipped is input to the robot controller 23 of the item stowage system 1. Fig. 4 is a diagram showing an example of the configuration of the data (table) of the order slip. As shown in Fig. 4, in the order slip table, each product (item 10) is associated with product ID (Identification) information (hereinafter referred to as "product ID"), product name, and shipment quantity.

[0045] In the example shown in Fig. 4, the product name "Cookies" and the shipment quantity "3" are associated with the product ID "101" for cookies. The product name "PET Green Tea" and the shipment quantity "2" are associated with the product ID "102" for green tea. Additionally, the product name "Packaged Noodles" and the shipment quantity "4" are associated with the product ID "103" for packaged noodles.

[0046] In this embodiment, the input order slip table (data) is stored in the control information storage unit 235F (see FIG. 3) of the robot control application 235. However, the present invention is not limited to this, and for example, a separate storage unit for order slips may be provided within the robot control application 235, and the order slip data may be stored in that storage unit.

[0047] <Example of control plan data for the entire loading operation> When the data of the order slip is input to the robot controller 23, the robot controller 23 creates plan data for controlling the entire stowing work for the multiple items 10 based on the input data of the order slip. Specifically, the robot controller 23 creates control plan data for completing the stowing work of the three types of products (items 10) specified in the order slip.

[0048] Fig. 5 is a diagram showing an example of the configuration of control plan data (table) for the entire stowing work. As shown in Fig. 5, the control plan table for the entire stowing work specifies ID information (hereinafter referred to as "work task IDs") for various work tasks executed by the stowing management task 235A and the first stowing work task 235B to the third stowing work task 235D. At this time, the work task IDs are specified in the order in which the work tasks are executed, starting from the top of the control plan table for the entire stowing work on the drawing.

[0049] Furthermore, in the control plan table for the entire stowing work, the product ID, the ID information of the storage container 5 (hereinafter referred to as the "storage container ID"), and the ID information of the shipping container 7 (hereinafter referred to as the "shipping container ID") are associated with each work task ID and specified. For reference, the "remarks" column in Fig. 5 also lists the processing content of each work task ID. Note that in the control plan table for the entire stowing work, only the work task IDs are specified for the various work tasks (work task IDs "#A" to "#E" in the figure) executed by the stowing management task 235A.

[0050] Furthermore, in this embodiment, the generated control plan table for the entire stowing operation is stored in the control information storage unit 235F (see FIG. 3) of the robot control application 235. However, the present invention is not limited to this, and for example, a storage unit for storing the control plan table for the entire stowing operation may be provided separately within the robot control application 235, and the control plan table for the entire stowing operation may be stored in this storage unit.

[0051] The storage container 5 with storage container ID "501" specified in the control plan table for the entire loading work is a storage container for cookies (box) with product ID "101". The storage container 5 with storage container ID "502" is a storage container for green tea PET bottles with product ID "102". The storage container 5 with storage container ID "503" is a storage container for bagged noodles (bag) with product ID "103". In addition, the shipping container 7 with shipping container ID "701" specified in the control plan table for the entire loading work is a shipping container for loading three boxes of cookies (boxes), two green tea PET bottles (bottles), and four bags of bagged noodles (bags) together.

[0052] The process of work task ID "#A" specified in the control plan table for the entire loading operation is a process of setting the storage container 5 with storage container ID "501" and the shipping container 7 with shipping container ID "701". In this process, the storage container 5 is set (transported) to a position where the picking operation of the item 10 will be performed, and the shipping container 7 is set (transported) to a position where the placing operation of the item 10 will be performed. Each process of work task IDs "#1" to "#3" is a process of removing one box of cookies (box) with product ID "101" from the storage container 5 with storage container ID "501", transporting it, and loading it into the shipping container 7 with shipping container ID "701".

[0053] The process of work task ID "#B" specified in the control plan table for the entire stacking operation is a storage container 5 replacement operation process. In this process, the storage container 5 (storage container ID "501") for cookies (box) is returned to its original storage location, and then the storage container 5 (storage container ID "502") for green tea PET bottle is transported to a position where the picking operation of the item 10 is performed. The processes of work task IDs "#4" and "#5" are processes for removing one green tea PET bottle (product ID "102") from the storage container 5 with storage container ID "502", transporting it, and stacking it in the shipping container 7 with shipping container ID "701".

[0054] The process of work task ID "#C" specified in the control plan table for the entire loading operation is a storage container 5 replacement operation process. In this process, the storage container 5 (storage container ID "502") for green tea PET bottles is returned to the original storage location, and then the storage container 5 (storage container ID "503") for bagged noodles (bags) is transported to a position where the picking operation of the item 10 is performed. Each of the processes of work task IDs "#6" to "#9" is a process for removing one bag of bagged noodles (bag) with product ID "103" from the storage container 5 with storage container ID "503", transporting it, and loading it into the shipping container 7 with shipping container ID "701".

[0055] Additionally, the process for work task ID "#D" specified in the control plan table for the entire loading operation is the return operation process for the storage container 5. In this process, the storage container 5 (storage container ID "503") for the bagged noodles (bags) is returned to its original storage location. Additionally, the process for work task ID "#E" is the shipping operation process for the shipping container 7 with shipping container ID "701" after the loading operation of the products specified in the order slip has been completed. In this process, the shipping container 7 after the loading operation has been completed is transported to the position where the next step of the loading operation will be carried out.

[0056] As described above, in the example of the stowage work of the articles 10 shown in FIG. 5, the articles 10 are stowed into the shipping container 7 in succession according to the type of the articles 10 to be stowed.

[0057] <Correspondence between each task and the type of core CPU used> Fig. 6 is a diagram showing the correspondence between each work task with work task IDs "#A" to "#E" and "#1" to "#9" and the type of core CPU assigned to each work task. For reference, Fig. 6 also shows the processing content of each work task ID.

[0058] The first core 231A is assigned to the work tasks with work task IDs "#A" to "#D" as shown in Fig. 6. That is, the work tasks with work task IDs "#A" to "#D" are executed by the stowing management task 235A.

[0059] The second core 231B to the fourth core 231D are assigned to the work tasks (cookie (box) stacking work tasks) with work task IDs "#1" to "#3", respectively. That is, the work tasks with work task IDs "#1" to "#3" are executed by the first stacking work task 235B to the third stacking work task 235D, respectively.

[0060] The second core 231B and the third core 231C are assigned to the work tasks with work task IDs "#4" and "#5" (storage work tasks for green tea PET bottles), respectively. That is, the work tasks with work task IDs "#4" and "#5" are executed by the first stowing work task 235B and the second finding work task 235C, respectively.

[0061] Further, the second core 231B to the fourth core 231D are assigned to the work tasks with work task IDs "#6" to "#8" (work tasks for stacking bagged noodles (bags)). And the CPU core used in the work task that has finished at the start of the work task is assigned to the work task with work task ID "#9" (work task for stacking bagged noodles (bags)). In the example shown in FIG. 6, the second core 231B used for work task ID "#6" is assigned to work task ID "#9". That is, the work tasks with work task IDs "#6" to "#8" are executed by the first stacking work task 235B to the third stacking work task 235D, respectively, and the work task with work task ID "#9" is executed by the first stacking work task 235B.

[0062] When CPU cores are assigned to each work task ID as described above, it is possible to process and transfer large amounts of data, such as image data and arm trajectory data, within the same stowage work task, thereby reducing the processing time and processing load.

[0063] Note that the CPU core allocation mode when the number of work tasks to be processed in parallel is greater than the number of CPU cores capable of parallel processing, such as work task IDs "#6" to "#9", is not limited to the example shown in FIG. 6. For example, first, the second core 231B and the third core 231C may be allocated to work tasks with work task IDs "#6" and "#7", respectively. Then, the second core 231B and the third core 231C may be allocated to work tasks with work task IDs "#8" and "#9", respectively. When such a CPU core allocation mode is adopted, the number of CPU cores actually processed in parallel is reduced from three to two, so that the processing load on the multi-core processor 231 can be reduced.

[0064] <Example of data configuration of device information table> 7 is a diagram showing an example of the data configuration of the device-to-be-used information table stored in the device-to-be-used information storage unit 235E (see FIG. 3). The device-to-be-used information table (specific information) specifies the correspondence between various processing operations of the robot system 11 constituting a stowing task for one item 10 and information on the device to be used in each processing operation.

[0065] Specifically, as shown in Fig. 7, the utilization apparatus information table specifies the correspondence between ID information of each processing operation constituting a stowing work task (hereinafter referred to as "operation ID") and information indicating the utilization or interference state of the utilization apparatus (utilization device) involved in each processing operation. The utilization apparatuses specified in the utilization apparatus information table are the robot arm 21, the robot hand 22, the camera 3 for photographing storage containers, the camera 4 for photographing shipping containers, the storage containers 5, and the shipping containers 7. For ease of explanation, Fig. 7 also lists the operation names corresponding to the operation IDs.

[0066] In the utilization equipment information table, the operation IDs "901" to "912" of the processing operations constituting the stowing work task for one item 10 are specified in the order of execution of the processing operations from the top on the drawing. Note that each of the processing operations with operation IDs "901" to "912" specified in the utilization equipment information table is a processing operation constituting each of the stowing work tasks with work task IDs "#1" to "#9" in the control plan table for the entire stowing work shown in FIG. 5.

[0067] In the utilization device information table, as shown in the "utilization device" column in Fig. 7, a utilization device that is in a utilization state for each processing operation constituting the stowing work of the items 10 is indicated by a black circle, and a utilization device that is in an interfering state is indicated by a white circle. The "utilization state" here refers to the state in which the corresponding utilization device is actually utilized when each processing operation of the stowing work is performed.

[0068] Meanwhile, the "interference state" here refers to a state in which the picking robot 2 (robot arm 21 and robot hand 22) is present on the photographing line from the storage container photographing camera 3 to the storage container 5 during the stowing work of the item 10. In addition, a state in which the picking robot 2 is present on the photographing line from the shipping container photographing camera 4 to the shipping container 7 during the stowing work of the item 10 is also called an "interference state". That is, a state in which the picking robot 2 and the storage container 5 appear to overlap when viewed from the storage container photographing camera 3 side, and a state in which the picking robot 2 and the shipping container 7 appear to overlap when viewed from the shipping container photographing camera 4 side are interference states. In the former interference state, the storage container photographing camera 3 is in an interference state, and in the latter interference state, the shipping container photographing camera 4 is in an interference state. Therefore, in the utilization device information table shown in FIG. 7, an interference state (white circle mark) is defined only for the storage container photographing camera 3 and the shipping container photographing camera 4.

[0069] The used device information table is referenced when the loading task notifies the subsequent loading task of information about a device that has been used or interfered with during the loading task, that is, when performing inter-task communication. Specifically, the used device information table is referenced first, and for a used device that is in a used state or interfered state in the currently running processing operation, it is determined whether or not the use state or interfered state of the used device will end (resolve) in the next processing operation to be performed. Then, if the use state or interfered state of the used device will end in the next processing operation to be performed, information about the used device is notified to the subsequent loading task after the currently running processing operation is completed. With this configuration, the notification timing and type of information about the used device to be notified in the inter-task communication can be easily specified (determined) simply by referring to the used device information table, which simplifies the processing of the inter-task communication and the processing of the loading task.

[0070] Next, the contents of each processing operation of the operation IDs "901" to "912" specified in the utilization device information table will be described. The processing programs and various data (including various driving data of the robot arm 21 and the robot hand 22) required when executing each processing operation specified by each operation ID are stored in the memory 232 (ROM) of the robot controller 23. At this time, these various data are linked to the corresponding operation ID and stored in the memory 232. Then, when an execution instruction command for the processing operation of each operation ID is issued, the processing program and various data linked to the operation ID are called and executed. Each processing operation of the stowing work of the items 10 described below is controlled by a corresponding CPU core in the multi-core processor 231.

[0071] (1) Photographing a storage container (action ID "901") The processing operation with operation ID "901" is a processing operation called "storage container photographing." In storage container photographing, the storage container photographing camera 3 photographs the entire interior of the storage container 5, i.e., the storage status of the items 10 within the storage container 5. Therefore, in storage container photographing (predetermined processing), as shown in FIG. 7, the storage container photographing camera 3 (predetermined device, imaging device, imaging unit) and the storage container 5 are in use. Note that in this embodiment, as described below, the operation ID for photographing a storage container varies depending on the type of item 10 to be photographed and the type of storage container photographing camera 3 (see FIG. 8 and FIG. 9 described below).

[0072] (2) Picking motion plan (motion ID "902") The processing operation with operation ID "902" is a processing operation called "picking operation plan." In the picking operation plan, first, the storage status of the item 10 in the storage container 5 is recognized from the captured image obtained by photographing the storage container (operation ID "901"). In this recognition operation, the position, etc. of the item 10 stored in the storage container 5 is recognized (detected). Then, the item 10 to be picked up from the storage container 5 is determined, and the operations of the robot arm 21 and the robot hand 22 for removing the item 10 from the storage container 5 are planned. Specifically, trajectory data (including start point information and end point information) of the robot arm 21 for moving the robot hand 22 from the initial position to the picking position of the item 10 to be removed in the storage container 5 is generated.

[0073] The picking motion plan also sets the type of the robot arm 21 to be used. Furthermore, the picking motion plan sets the type of the robot hand 22, and also determines the picking motion of the item 10 (motion of holding the item 10) corresponding to the type.

[0074] In addition, since the picking operation plan is controlled by the CPU core, in this processing operation, the device to be used that is in a used state or an interference state is not specified as shown in Fig. 7. In addition, in this embodiment, as will be described later, the operation ID of the picking operation plan changes depending on the type of the item 10 to be picked (see Fig. 8 described later).

[0075] (3) Photographing shipping containers (action ID "903") The processing action with action ID "903" is a processing action called "photographing a shipping container." When photographing a shipping container, the camera 4 for photographing shipping containers photographs the entire interior of the shipping container 7, i.e., the loading status of items 10 inside the shipping container 7. Therefore, when photographing a shipping container, the camera 4 for photographing shipping containers and the shipping container 7 are in use, as shown in Figure 7. Note that in this embodiment, as described below, the action ID for photographing a shipping container varies depending on the type of item 10 to be photographed and the type of camera 4 for photographing shipping containers (see Figures 8 and 10 described below).

[0076] (4) Place motion plan (motion ID "904") The processing operation of operation ID "904" is a processing operation called "placement operation plan". In the placement operation plan, first, the loading status of the items 10 in the shipping container 7 is recognized from the photographed image obtained by photographing the shipping container (operation ID "903"). In this recognition operation, the position of the empty space in the shipping container 7 where the items 10 can be loaded is recognized (detected). Then, the placement position (loading position) of the items 10 in the shipping container 7 is determined, and the operations of the robot arm 21 and the robot hand 22 for loading the items 10 into the shipping container 7 are planned. In addition, in the placement operation plan, after the items 10 to be loaded are loaded into the shipping container 7, the posture of the robot arm 21 is returned to the initial posture, and the operations of the robot arm 21 and the robot hand 22 are planned for returning the robot hand 22 to the initial position.

[0077] Specifically, the placing operation plan moves the robot hand 22 from the placing position in the shipping container 7 to the initial position, and generates trajectory data (including start point information and end point information) for the robot arm 21 to return the attitude of the robot arm 21 to the initial attitude. Furthermore, the placing operation plan determines the placing operation of the item 10 (the operation of releasing the holding function of the item 10) according to the type of the robot hand 22.

[0078] In addition, since the placement operation plan is controlled by the CPU core, in this processing operation, the device to be used or in the interference state is not specified as shown in Fig. 7. In addition, in this embodiment, as described later, the operation ID of the placement operation plan changes depending on the type of the article 10 to be placed (see Fig. 8 described later).

[0079] (5) Arm motion plan (motion ID "905") The processing operation with the operation ID "905" is a processing operation called "arm motion plan." In the arm motion plan, based on the end point information of the robot hand 22 planned in the picking motion plan and the start point information of the robot hand 22 planned in the placing motion plan, trajectory data of the robot arm 21 between the two is planned. Note that the end point information of the robot hand 22 planned in the picking motion plan is the end position of the picking motion of the item 10, and the start point information of the robot hand 22 planned in the placing motion plan is the start position of the placing motion of the item 10.

[0080] Specifically, the arm motion plan generates trajectory data for the robot arm 21 from the end position of the picking operation of the robot hand 22 to the start position of the placing operation. Note that since the arm motion plan is controlled by the CPU core, this processing operation does not specify the device to be used or in an interference state, as shown in Fig. 7. Also, in this embodiment, as described later, the operation ID of the arm motion plan changes depending on the type of the item 10 to be stowed (see Fig. 8 described later).

[0081] (6) Picking operation control (operation ID "906") The processing operation with the operation ID "906" is a processing operation called "picking operation control". In the picking operation control, first, the robot arm 21 is controlled to move the robot hand 22 from an initial position to a picking position of the item 10 to be picked in the storage container 5. After that, the robot hand 22 is controlled to hold the item 10 and remove it from the storage container 5. Therefore, in the picking operation control, the robot arm 21, the robot hand 22, and the storage container 5 are in a use state as shown in FIG. 7. Also, in the picking operation control, a state occurs in which the picking robot 2 and the storage container 5 appear to overlap when viewed from the storage container photographing camera 3 side during the operation, so that the storage container photographing camera 3 is in an interference state as shown in FIG. 7.

[0082] The above-mentioned picking operation control is performed based on a plan generated by the picking operation plan (operation ID "902"). In this embodiment, as described later, the operation ID of the picking operation control varies depending on the type of the item 10 to be picked and the type of the robot hand 22 (see Figs. 8 and 11 described later).

[0083] (7) Arm movement control (hold up) (movement ID "907") The processing operation with the operation ID "907" is a processing operation called "arm operation control (holding and lifting)". In the arm operation control (holding and lifting), first, the robot arm 21 is controlled to move (lift) the item 10 picked up by the picking operation control to a predetermined position above the storage container 5. After that, the robot arm 21 is controlled to move the item 10 to a position where the picking robot 2 and the storage container 5 do not overlap when viewed from the storage container photographing camera 3 side. Therefore, in the arm operation control (holding and lifting), the robot arm 21 and the robot hand 22 are in a use state as shown in FIG. 7. Also, in the arm operation control (holding and lifting), a state occurs in which the picking robot 2 and the storage container 5 appear to overlap when viewed from the storage container photographing camera 3 side during the operation, so that the storage container photographing camera 3 is in an interference state as shown in FIG. 7.

[0084] The above-mentioned arm motion control (holding and lifting) is performed based on the plan generated in the arm motion plan (motion ID "905"). Note that the starting position (starting point) of the robot hand 22 in the arm motion control (holding and lifting) is the ending position (ending point) of the picking motion of the robot hand 22 planned in the picking motion plan (motion ID "902"). In this embodiment, as described later, the motion ID of the arm motion control (holding and lifting) varies depending on the type of the item 10 to be transported and the type of the robot arm 21 (see Figs. 8 and 12 described later).

[0085] (8) Arm operation control (holding and transport) (operation ID "908") The processing operation with operation ID "908" is a processing operation called "arm operation control (holding and transport)." In the arm operation control (holding and transport), the robot arm 21 is controlled to move the item 10 that has moved to the end position (end point) of the arm operation control (holding and lifting) to a position above the shipping container 7. Therefore, in the arm operation control (holding and transport), the robot arm 21 and the robot hand 22 are in a utilization state, as shown in FIG. 7.

[0086] In addition, the starting position (starting point) of the transport operation of the item 10 by the arm operation control (holding and transport), i.e., the ending position (end point) of the arm operation control (holding and lifting), is a position where the picking robot 2 and the storage container 5 do not overlap when viewed from the storage container photographing camera 3 side. Therefore, at the end of the arm operation control (holding and lifting), the interference state of the storage container photographing camera 3 is released, so that in the arm operation control (holding and transport), there is no device in an interference state, as shown in FIG. 7. Note that, at the end position of the item 10 in the arm operation control (holding and transport), the picking robot 2 and the shipping container 7 appear to overlap when viewed from the shipping container photographing camera 4 side. Therefore, in the arm operation control (holding and transport), the shipping container photographing camera 4 may be in an interference state.

[0087] The above-mentioned arm motion control (holding and conveying) is performed based on a plan generated by the arm motion plan (motion ID "905"). In this embodiment, as described later, the motion ID of the arm motion control (holding and conveying) varies depending on the type of the article 10 to be conveyed and the type of the robot arm 21 (see Figs. 8 and 13 described later).

[0088] (9) Arm motion control (hold down) (motion ID "909") The processing operation of operation ID "909" is a processing operation called "arm operation control (holding and lowering)". In the arm operation control (holding and lowering), the robot arm 21 is controlled to move the item 10, which has been moved above the shipping container 7 by the arm operation control (holding and transporting), to a predetermined position (end point) in the shipping container 7. Note that the end point of the robot hand 22 in the arm operation control (holding and lowering) is the starting position (start point) of the placing operation of the item 10 by the robot hand 22 planned in the placing operation plan (operation ID "904"). Therefore, in the arm operation control (holding and lowering), the robot arm 21 and the robot hand 22 are in a use state as shown in FIG. 7. Also, in the arm operation control (holding and lowering), the picking robot 2 and the shipping container 7 appear to overlap when viewed from the shipping container photographing camera 4 side, so the shipping container photographing camera 4 is in an interference state.

[0089] The above-mentioned arm motion control (holding and lowering) is performed based on a plan generated by the arm motion plan (motion ID "905"). In this embodiment, as described later, the motion ID of the arm motion control (holding and lowering) varies depending on the type of the article 10 to be conveyed and the type of the robot arm 21 (see Figs. 8 and 14 described later).

[0090] (10) Place action control (action ID "910") The processing operation with the operation ID "910" is a processing operation called "place operation control." In the place operation control, the holding control (holding control of the suction pad and / or gripping functional unit) of the robot hand 22 for the item 10 that has been moved to a predetermined position in the shipping container 7 by the arm operation control (holding and lowering) is ended (release control). As a result, the item 10 is loaded (placed) in the shipping container 7. Therefore, in the place operation control, the robot arm 21, the robot hand 22, and the shipping container 7 are in a usable state as shown in FIG. 7. Also, in the place operation control, the picking robot 2 and the shipping container 7 appear to overlap when viewed from the shipping container photographing camera 4 side, so that the shipping container photographing camera 4 is in an interference state as shown in FIG. 7.

[0091] The above-mentioned placing operation control is performed based on a plan generated by the placing operation plan (operation ID "904"). In this embodiment, as described later, the operation ID of the placing operation control changes depending on the type of the article 10 to be stowed and the type of the robot hand 22 (see Figs. 8 and 15 described later).

[0092] (11) Arm motion control (non-holding lift) (motion ID "911") The processing operation of the operation ID "911" is a processing operation called "arm operation control (non-holding ascent)". In the arm operation control (non-holding ascent), first, the robot arm 21 is controlled to move (ascend) the robot hand 22, which has been subjected to release control by the place operation control, to a predetermined position above the shipping container 7. After that, the robot arm 21 is controlled to move the robot hand 22 to a position where the picking robot 2 and the shipping container 7 do not overlap as seen from the shipping container photographing camera 4 side. Therefore, in the arm operation control (non-holding ascent), the robot arm 21 and the robot hand 22 are in a use state as shown in FIG. 7. Also, in the arm operation control (non-holding ascent), a state occurs in which the picking robot 2 and the shipping container 7 appear to overlap as seen from the shipping container photographing camera 4 side during the operation, so that the shipping container photographing camera 4 is in an interference state as shown in FIG. 7.

[0093] The above-mentioned arm motion control (non-holding lift) is performed based on a plan generated by the place motion plan (motion ID "904"). In this embodiment, as described later, the motion ID of the arm motion control (non-holding lift) varies depending on the type of the robot arm 21 (see Figs. 8 and 16 described later).

[0094] (12) Arm operation control (non-holding transport) (operation ID "912") The processing operation with operation ID "912" is a processing operation called "arm operation control (non-holding transport)." In the arm operation control (non-holding transport), the robot arm 21 is controlled to move the robot hand 22, which has moved to the end position (end point) of the arm operation control (non-holding ascent), to the initial position. At this time, the robot arm 21 is also controlled to return the posture of the robot arm 21 to its initial posture. This puts the picking robot 2 (robot arm 21 and robot hand 22) into a standby state. Therefore, in the arm operation control (non-holding transport), the robot arm 21 and robot hand 22 are in a utilization state, as shown in FIG. 7.

[0095] Furthermore, the starting position (starting point) of the robot hand 22 in the arm operation control (non-holding transport) is the end position (ending point) of the robot hand 22 in the arm operation control (non-holding lift). That is, the starting position of the robot hand 22 in the arm operation control (non-holding transport) is a position where the picking robot 2 and the shipping container 7 do not overlap when viewed from the shipping container photographing camera 4 side. Therefore, since the interference state of the shipping container photographing camera 4 is released at the end of the arm operation control (non-holding lift), there is no interfering device in the arm operation control (non-holding transport) as shown in FIG. 7.

[0096] The above-mentioned arm motion control (non-holding transport) is performed based on a plan generated by the place motion plan (ID information "904"). In this embodiment, as described later, the ID information of the arm motion control (non-holding transport) varies depending on the type of the robot arm 21 (see FIG. 8 and FIG. 17 described later).

[0097] <Various operation ID tables (prescribed information)> FIG. 8 is a diagram showing an example of the data configuration of a table of action IDs of each processing action of the stowage work defined for each product type (hereinafter referred to as the "product type-specific action ID table"). The product type-specific action ID table defines the correspondence between product IDs "101" to "103" and the action IDs of each processing action of the stowage work set for each type of product ID. For ease of explanation, FIG. 8 also lists the action names of each processing action that constitutes the stowage work. The product type-specific action ID table is stored in the control information storage unit 235F (see FIG. 3).

[0098] The operation ID of each processing operation in the stowage work is appropriately changed according to the type of product ID, as shown in FIG. 8. That is, in the stowage work of the item 10 in this embodiment, an appropriate operation pattern is selected according to the type (characteristics) of the item 10. For example, in the picking operation control, an appropriate operation pattern can be selected according to, for example, the shape, weight, packaging, etc. of the product (item 10) (see FIG. 11 described later), and the optimal picking operation control can be used for each type of item 10. Therefore, by providing an operation ID table for each product type, an appropriate operation pattern can be selected according to, for example, the shape, weight, packaging, etc. of the product, and a transport operation that does not damage the product and has a low risk of dropping can be realized, thereby improving the throughput of the stowage work.

[0099] Furthermore, in this embodiment, the operation ID (operation pattern) that is actually set for each processing operation of the stowage work varies depending not only on the type of item 10 but also on the types of the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4. Below, we will explain configuration examples of various operation ID tables defined for each of these types, and specific examples of operation IDs that are actually set for each processing operation of the stowage work. The various operation ID tables explained below are stored in the control information storage unit 235F (see FIG. 3).

[0100] (1) Action ID for photographing storage container The action ID "901" for photographing a storage container varies depending on the product type (product ID). In the example shown in Fig. 8, if the product 10 is a cookie with product ID "101", the action ID for photographing a storage container is effectively set to "901A". If the product 10 is a PET bottle of green tea with product ID "102" or a bag of noodles with product ID "103", the action ID for photographing a storage container is effectively set to "901B".

[0101] Furthermore, the operation IDs "901A" and "901B" for photographing storage containers change depending on the type of storage-container photographing camera 3. Fig. 9 is a diagram showing an example of the data configuration of a table of operation IDs for photographing storage containers defined for each type of storage-container photographing camera 3 (hereinafter referred to as "operation ID table for each storage-container camera type").

[0102] The storage-container camera type-specific operation ID table defines the correspondence between the type ID of the storage-container photographing camera 3 (hereinafter referred to as the "storage-container camera ID") and the operation ID for photographing the storage container, which is set for each type of storage-container camera ID, as shown in Fig. 9. For ease of explanation, Fig. 9 also lists the operation name corresponding to the operation ID for photographing the storage container.

[0103] The storage-container photographing camera 3 with storage-container camera ID "301" listed in the operation ID table for each storage-container camera type is a camera capable of recognizing items 10 such as boxes, PET bottles, and bags. The storage-container photographing camera 3 with storage-container camera ID "302" is a camera capable of recognizing only box items 10. In other words, the camera with storage-container camera ID "301" is a camera (a more expensive camera) with better performance, such as resolution, than the camera with storage-container camera ID "302".

[0104] In this embodiment, since the items 10 to be stowed are cookies (box), green tea PET bottle, and bag of noodles, a camera with a storage container camera ID of "301" is used as the storage container photographing camera 3. Therefore, in this embodiment, when the item 10 to be stowed is a cookie (box) with product ID "101", the action ID "901A1" is substantially set as the action ID for photographing the storage container ("901", "901A"). Also, when the item 10 to be stowed is a green tea PET bottle with product ID "102" or bag of noodles with product ID "103", the action ID "901B1" is substantially set as the action ID for photographing the storage container ("901", "901B").

[0105] By providing the above configuration, the item stowage system 1 of this embodiment can accommodate a plurality of types of storage-container photographing cameras 3 that differ, for example, in model, performance, etc. Therefore, in this embodiment, in consideration of throughput, cost, etc., it is possible to select an optimal camera from among a plurality of types of cameras as the storage-container photographing camera 3, and to set an operation suitable for the selected camera.

[0106] (2) Picking motion plan motion ID The motion ID "902" of the picking motion plan changes depending on the product type (product ID). In the example shown in FIG. 8, when the item 10 is a cookie with a product ID "101", the motion ID "902A" is actually set as the motion ID of the picking motion plan. When the item 10 is a green tea PET bottle with a product ID "102", the motion ID "902B" is actually set as the motion ID of the picking motion plan. When the item 10 is a bag of noodles with a product ID "103", the motion ID "902C" is actually set as the motion ID of the picking motion plan. That is, in the example shown in FIG. 8, the motion ID (motion pattern) of the picking motion plan is set separately for each product type (product ID).

[0107] (3) Action ID for photographing shipping containers The action ID "903" for photographing shipping containers may change depending on the product type (product ID). However, as described above, when photographing shipping containers using the shipping container photographing camera 4, all that is required is to identify the empty space inside the shipping container 7 on which no item 10 is placed, so in this embodiment, the action ID for photographing shipping containers is set to the same regardless of the product type (product ID). Therefore, in the example shown in FIG. 8, the action ID for photographing shipping containers does not change regardless of the product type (product ID), and the action ID "903A" is essentially set as the action ID for photographing shipping containers.

[0108] Furthermore, the operation ID "903A" for photographing shipping containers varies depending on the type of the shipping container photographing camera 4. Fig. 10 is a diagram showing an example of the data configuration of a table of operation IDs for photographing shipping containers defined for each type of shipping container photographing camera 4 (hereinafter referred to as "operation ID table for each shipping container camera type").

[0109] The operation ID table for each type of camera for shipping containers defines the correspondence between the type ID of the camera 4 for photographing shipping containers (hereinafter referred to as the "camera ID for shipping containers") and the operation ID for photographing shipping containers that is set for each type of camera ID for shipping containers, as shown in Fig. 10. For ease of explanation, Fig. 10 also lists the operation names that correspond to the operation IDs for photographing shipping containers.

[0110] The camera 4 for photographing shipping containers with the shipping container camera ID "401" listed in the operation ID table for each camera type for shipping containers is a camera capable of recognizing items 10 such as boxes, PET bottles, and bags. The camera 4 for photographing shipping containers with the shipping container camera ID "402" is a camera capable of recognizing only items 10 such as boxes. In other words, the camera with the shipping container camera ID "401" is a camera (a more expensive camera) with better performance, for example, resolution, than the camera with the shipping container camera ID "402".

[0111] In this embodiment, as described above, since it is sufficient to identify the empty space inside the shipping container 7 on which no item 10 is placed in order to photograph the shipping container, a camera with a shipping container camera ID of "402" (a low-cost camera) is used as the shipping container photographing camera 4. Therefore, in this embodiment, regardless of the type of product ID of the item 10 to be loaded, the operation ID "903A2" is essentially set as the operation ID ("903", "903A") for photographing the shipping container.

[0112] By providing the above configuration, the item stowage system 1 of this embodiment can accommodate multiple types of cameras 4 for photographing shipping containers, which differ, for example, in model, performance, etc. Therefore, in this embodiment, taking into consideration throughput, cost, etc., it is possible to select the most suitable camera from multiple types of cameras as the camera 4 for photographing shipping containers, and to set an operation suitable for the selected camera.

[0113] (4) Placement action plan action ID The motion ID "904" of the placing motion plan changes depending on the product type (product ID). In the example shown in FIG. 8, when the item 10 is a cookie with product ID "101", the motion ID "904A" is actually set as the motion ID of the placing motion plan. When the item 10 is a PET bottle of green tea with product ID "102", the motion ID "904B" is actually set as the motion ID of the placing motion plan. When the item 10 is a bag of noodles with product ID "103", the motion ID "904C" is actually set as the motion ID of the placing motion plan. That is, in the example shown in FIG. 8, the motion ID (motion pattern) of the placing motion plan is set separately for each product type (product ID).

[0114] (5) Arm motion plan motion ID The motion ID "905" of the arm motion plan varies depending on the product type (product ID). In the example shown in FIG. 8, when the product 10 is a cookie with a product ID "101" or a packet of noodles with a product ID "103", the motion ID "905A" is substantially set as the motion ID of the arm motion plan. When the product 10 is a PET bottle of green tea with a product ID "102", the motion ID "905B" is substantially set as the motion ID of the arm motion plan. That is, in the example shown in FIG. 8, different motion IDs (motion patterns) are set for the arm motion plan for the relatively light product 10 (cookies (box) and packet of noodles (bag)) and the arm motion plan for the relatively heavy product 10 (PET bottle of green tea (bottle)).

[0115] (6) Picking operation control operation ID The action ID "906" of the picking action control changes depending on the product type (product ID). In the example shown in FIG. 8, when the product 10 is a cookie with a product ID "101", the action ID "906A" is actually set as the action ID of the picking action control. When the product 10 is a green tea PET bottle with a product ID "102", the action ID "906B" is actually set as the action ID of the picking action control. When the product 10 is a bag of noodles with a product ID "103", the action ID "906C" is actually set as the action ID of the picking action control. That is, in the example shown in FIG. 8, the action ID (action pattern) of the picking action control is set separately for each product type (product ID).

[0116] Furthermore, the motion IDs "906A" to "906C" of the picking motion control change depending on the type of the robot hand 22. Fig. 11 is a diagram showing an example of the data configuration of a table of motion IDs of the picking motion control defined for each type of the robot hand 22 (hereinafter referred to as a "picking motion ID table for each hand type").

[0117] 11, the picking operation ID table for each hand type specifies the correspondence between the type ID of the robot hand 22 (hereinafter referred to as "hand ID") and the operation ID of the picking operation control set for each type of the robot hand 22. For convenience of explanation, FIG. 11 also lists the operation name corresponding to the operation ID of the picking operation control.

[0118] The processing operations of the operation IDs "906A" and "906B" described in the picking operation ID table by hand type are picking operation control using both the suction pad and the gripping mechanism. On the other hand, the processing operation of the operation ID "906C" is picking operation control using only the suction pad. Specifically, in the operation called "picking operation control (suction pick and grip)" of the operation ID "906A", the suction pad of the robot hand 22 first picks up the item 10 to be taken out, and then pulls out the item 10 slightly upward from the storage container 5. Then, the gripping mechanism grips the pulled-out part of the item 10. In the operation called "picking operation (suction pick and grip)" of the operation ID "906B", the suction pad of the robot hand 22 first picks up the item 10 to be taken out, and then, in that state, the gripping mechanism grips the item 10. In addition, in the operation called "picking operation (suction pick only)" with operation ID "906C", the item 10 to be picked up is held only by the suction operation of the suction pad.

[0119] In addition, the robot hands 22 with hand IDs "221" and "222" listed in the picking operation ID table by hand type are different models, but both are robot hands equipped with both an article holding mechanism of a suction pad and a gripping mechanism. On the other hand, the robot hand 22 with hand ID "223" is a robot hand equipped with only an article holding mechanism of a suction pad. In other words, the robot hands with hand IDs "221" and "222" are more expensive than the robot hand with hand ID "223".

[0120] Therefore, in the picking motion ID table by hand type, motion IDs "906A1" to "906C1" corresponding to the motion IDs "906A" to "906C" of the picking motion control, respectively, are defined for the robot hand 22 with hand ID "221". Motion IDs "906A2" to "906C2" corresponding to the motion IDs "906A" to "906C" of the picking motion control, respectively, are defined for the robot hand 22 with hand ID "222". Motion IDs "906C3" corresponding to the motion ID "906C" of the picking motion control, respectively, are defined for the robot hand 22 with hand ID "223".

[0121] In this embodiment, a robot hand 22 equipped with both a suction pad and a gripping mechanism and having a hand ID of "221" is used. Note that the picking operation of the robot hand 22 equipped with both a suction pad and a gripping mechanism for the article 10 differs depending on the type (shape, weight, etc.) of the article 10 to be picked up, the arrangement of the multiple articles 10 inside the storage container 5, etc.

[0122] For example, when the item 10 to be picked is a box-shaped item, and multiple items 10 are arranged inside the storage container 5 with almost no gap between them, and a gripping mechanism cannot be inserted between adjacent items 10, picking operation control (gripping after suction picking) must be performed. Therefore, when the item 10 to be picked is a cookie (box) with product ID "101", the operation ID "906A1" is substantially set as the operation ID ("906", "906A") of the picking operation control.

[0123] For example, if the item 10 to be removed is a bottle-shaped container and a gripping mechanism can be inserted between the tips (mouths of the bottle containers) of adjacent items 10 in the storage container 5, picking operation control (suction pick and grip) can be used. Therefore, if the item 10 to be removed is a green tea PET bottle with product ID "102", the operation ID "906B1" is effectively set as the operation IDs ("906", "906B") of the picking operation control.

[0124] Also, for example, picking operation control (only suction pick) can be used for a relatively light item 10. Therefore, when the item 10 to be picked is a bag of noodles with product ID "103", the operation ID "906C1" is substantially set as the operation ID ("906", "906C") of the picking operation control.

[0125] By providing the above configuration, the item stowing system 1 of this embodiment can accommodate multiple types of robot hands 22 that differ, for example, in model, performance, etc. Therefore, in this embodiment, it is possible to select the optimal robot hand from multiple types of robot hands in consideration of throughput, cost, etc., and to set an operation suitable for the selected robot hand.

[0126] (7) Operation ID of arm operation control (hold up, hold transport, hold down) The arm motion control (hold up) operation ID "907", the arm motion control (hold transport) operation ID "908", and the arm motion control (hold down) operation ID "909" vary depending on the product type (product ID).

[0127] In the example shown in FIG. 8, when the item 10 is a cookie with a product ID of "101" or a packet of noodles with a product ID of "103", the motion IDs "907A", "908A" and "909A" are substantially set as the motion IDs of the arm motion control (holding and lifting), the motion IDs of the arm motion control (holding and conveying), and the motion IDs of the arm motion control (holding and lowering), respectively. When the item 10 is a green tea PET bottle with a product ID of "102", the motion IDs "907B", "908B" and "909B" are substantially set as the motion IDs of the arm motion control (holding and lifting), the motion IDs of the arm motion control (holding and conveying), and the motion IDs of the arm motion control (holding and lowering), respectively. That is, in the example shown in FIG. 8, different motion IDs (motion patterns) are set for the arm motion control for the relatively light-weight item 10 (cookies (box) and packet of noodles (bag)) and the arm motion control for the relatively heavy-weight item 10 (green tea PET bottle (bottle)).

[0128] The height (vertical coordinate) of the end position of the article 10 in the arm operation control (holding and lowering) varies depending on the type of the article 10 to be transported. This is to arrange multiple articles 10 without gaps in the shipping container 7. For example, if the article 10 is a cookie (box), the height of the end position of the article 10 in the arm operation control (holding and lowering) is a height slightly higher than the placement height in the shipping container 7. Specifically, the height of the end position of the article 10 is set to a height such that the gripping functional part of the robot hand 22 does not contact the edge of the article 10 and / or the shipping container 7 that has already been placed next to the planned placement position of the article 10 being transported in the shipping container 7. Also, for example, if the article 10 is a green tea PET bottle or bagged noodles (bag), the height of the end position of the article 10 in the operation control (holding and lowering) is the placement height in the shipping container 7.

[0129] Furthermore, each operation ID of the arm operation control (hold ascent), arm operation control (hold transport), and arm operation control (hold descent) changes depending on the type of the robot arm 21. FIG. 12 is a diagram showing an example of a data configuration of a table of operation IDs of the arm operation control (hold ascent) defined for each type of the robot arm 21 (hereinafter referred to as the "hold ascent operation ID table for each arm type"). FIG. 13 is a diagram showing an example of a data configuration of a table of operation IDs of the arm operation control (hold transport) defined for each type of the robot arm 21 (hereinafter referred to as the "hold transport operation ID table for each arm type"). Also, FIG. 14 is a diagram showing an example of a data configuration of a table of operation IDs of the arm operation control (hold descent) defined for each type of the robot arm 21 (hereinafter referred to as the "hold descent operation ID table for each arm type").

[0130] The arm type-specific hold ascent operation ID table, as shown in FIG. 12, defines a correspondence relationship between the type ID (hereinafter referred to as "arm ID") of the robot arm 21 and the operation ID of the arm operation control (hold ascent) set for each type of the robot arm 21. The arm type-specific hold transport operation ID table, as shown in FIG. 13, defines a correspondence relationship between the arm ID of the robot arm 21 and the operation ID of the arm operation control (hold transport) set for each type of the robot arm 21. The arm type-specific hold descent operation ID table, as shown in FIG. 14, defines a correspondence relationship between the arm ID of the robot arm 21 and the operation ID of the arm operation control (hold descent) set for each type of the robot arm 21. For convenience of explanation, FIGS. 12 to 14 also show operation names corresponding to the operation IDs of the arm operation controls (hold ascent, hold transport, hold descent).

[0131] The robot arms 21 with arm IDs "211" and "212" shown in Figs. 12 to 14 are different models, but both are robot arms that can be driven (transport an article 10) at both high and low speeds. On the other hand, the robot arm 21 with arm ID "213" is a robot arm that can be driven only at low speed. In other words, the robot arms with arm IDs "211" and "212" are more expensive than the robot arm with arm ID "213".

[0132] The operation ID "907A" described in the arm type-specific hold and lift operation ID table (FIG. 12) is an arm operation control (hold and lift) for transporting an article 10 at high speed, and the operation ID "907B" is an arm operation control (hold and lift) for transporting an article 10 at low speed. Therefore, in the arm type-specific hold and lift operation ID table, operation IDs "907A1" and "907B1" corresponding to the operation IDs "907A" and "907B" of the arm operation control (hold and lift), respectively, are defined for the robot arm 21 with the arm ID "211". Operation IDs "907A2" and "907B2" corresponding to the operation IDs "907A" and "907B" of the arm operation control (hold and lift), respectively, are defined for the robot arm 21 with the arm ID "212". Further, for the robot arm 21 with the arm ID "213", the motion ID "907B3" corresponding to the motion ID "907B" of the arm motion control (hold up) is specified.

[0133] The operation ID "908A" described in the holding and conveying operation ID table by arm type (FIG. 13) is an arm operation control (holding and conveying) for conveying an article 10 at high speed, and the operation ID "908B" is an arm operation control (holding and conveying) for conveying an article 10 at low speed. Therefore, in the holding and conveying operation ID table by arm type, operation IDs "908A1" and "908B1" corresponding to the operation IDs "908A" and "908B" of the arm operation control (holding and conveying), respectively, are defined for the robot arm 21 with the arm ID "211". Operation IDs "908A2" and "908B2" corresponding to the operation IDs "908A" and "908B" of the arm operation control (holding and conveying), respectively, are defined for the robot arm 21 with the arm ID "212". Further, for the robot arm 21 with the arm ID "213", an operation ID "908B3" corresponding to the operation ID "908B" of the arm operation control (holding and transport) is specified.

[0134] Moreover, the operation ID "909A" described in the hold-and-lower operation ID table by arm type (FIG. 14) is an arm operation control (hold-and-lower) for transporting an article 10 at high speed, and the operation ID "909B" is an arm operation control (hold-and-lower) for transporting an article 10 at low speed. Therefore, in the hold-and-lower operation ID table by arm type, operation IDs "909A1" and "909B1" corresponding to the operation IDs "909A" and "909B" of the arm operation control (hold-and-lower), respectively, are defined for the robot arm 21 with the arm ID "211". Operation IDs "909A2" and "909B2" corresponding to the operation IDs "909A" and "909B" of the arm operation control (hold-and-lower), respectively, are defined for the robot arm 21 with the arm ID "212". Further, for the robot arm 21 with the arm ID "213", an operation ID "909B3" corresponding to the operation ID "909B" of the arm operation control (hold lowering) is specified.

[0135] In this embodiment, a robot arm 21 with an arm ID of "211" that can be driven at low and high speeds is used. Therefore, in this embodiment, when the item 10 to be loaded is a cookie (box) with a product ID of "101", the operation ID "907A1" is substantially set as the operation ID ("907", "907A") of the arm operation control (hold and lift). In this case, the operation ID "908A1" is substantially set as the operation ID ("908", "908A") of the arm operation control (hold and transport). In this case, the operation ID "909A1" is substantially set as the operation ID ("909", "909A") of the arm operation control (hold and lower).

[0136] In this embodiment, when the item 10 to be stowed is a green tea PET bottle with product ID "102", the operation ID "907B1" is effectively set as the operation ID ("907", "907B") for the arm operation control (hold and lift). In this case, the operation ID "908B1" is effectively set as the operation ID ("908", "908B") for the arm operation control (hold and transport). In this case, the operation ID "909B1" is effectively set as the operation ID ("909", "909B") for the arm operation control (hold and lower).

[0137] Furthermore, in this embodiment, if the item 10 to be stowed is a bag of noodles with product ID "103", then the operation ID "907A1" is effectively set as the operation ID ("907", "907A") for the arm operation control (hold and lift). In this case, the operation ID "908A1" is effectively set as the operation ID ("908", "908A") for the arm operation control (hold and transport). In this case, the operation ID "909A1" is effectively set as the operation ID ("909", "909A") for the arm operation control (hold and lower).

[0138] By providing the above configuration, the item stowage system 1 of this embodiment can accommodate multiple types of robot arms 21 that differ, for example, in model, performance, etc. Therefore, in this embodiment, it is possible to select an optimal robot arm from multiple types of robot arms in consideration of throughput, cost, etc., and to set an operation suitable for the selected robot arm.

[0139] (8) Place action control action ID The action ID "910" of the placing action control changes depending on the product type (product ID). In the example shown in FIG. 8, when the product 10 is a cookie with product ID "101", the action ID "910A" is actually set as the action ID of the picking action control. When the product 10 is a green tea PET bottle with product ID "102", the action ID "910B" is actually set as the action ID of the placing action control. When the product 10 is a bag of noodles with product ID "103", the action ID "910C" is actually set as the action ID of the placing action control. That is, in the example shown in FIG. 8, the action ID (action pattern) of the placing action control is set separately for each product type (product ID).

[0140] Furthermore, the motion IDs "910A" to "910C" of the place motion control change depending on the type of the robot hand 22. Fig. 15 is a diagram showing an example of the data configuration of a table of motion IDs of the place motion control defined for each type of the robot hand 22 (hereinafter referred to as a "place motion ID table for each hand type").

[0141] 15, the place action ID table for each hand type defines the correspondence between the hand ID of the robot hand 22 and the action ID of the place action control set for each type of the robot hand 22. For convenience of explanation, FIG. 15 also lists the action name corresponding to the action ID of the place action control.

[0142] The processing operations with the operation IDs "910A" and "910B" in the hand type-specific place operation ID table are place operation controls that use both the suction pad and the gripping mechanism, whereas the processing operation with the operation ID "910C" is a place operation control that uses only the suction pad.

[0143] Specifically, in the processing operation with the operation ID "910A" and called "Place operation control (suction release after grip release)", first, release control of the gripping function part of the robot hand 22 is performed on the article 10 that has been moved to a predetermined position (a position slightly above the placement height) in the shipping container 7. Then, after the article 10 held only by the suction pick of the robot hand 22 is moved (lowered) to the placement height in the shipping container 7, release control of the suction pad is performed. In the processing operation with the operation ID "910B" and called "Place operation control (suction and grip release)", release control of both the suction pad and the gripping function part of the robot hand 22 is performed on the article 10 that has been moved to a predetermined position (placement position) in the shipping container 7. At this time, release control of the suction pad and release control of the gripping function part are performed simultaneously, or release control of one is performed first and then release control of the other. In addition, in the processing operation called "Place operation control (release of suction only)" with operation ID "910C", release control of the suction pad of the robot hand 22 is performed on the item 10 that has been moved to a predetermined position (placement position) in the shipping container 7.

[0144] Therefore, in the place motion ID table for each hand type, motion IDs "910A1" to "910C1" corresponding to the motion IDs "910A" to "910C" of the place motion control, respectively, are defined for the robot hand 22 with hand ID "221". Motion IDs "910A2" to "910C2" corresponding to the motion IDs "910A" to "910C" of the place motion control, respectively, are defined for the robot hand 22 with hand ID "222". Motion IDs "910C3" corresponding to the motion ID "910C" of the place motion control, respectively, are defined for the robot hand 22 with hand ID "223".

[0145] In this embodiment, as described above, the robot hand 22 equipped with both a suction pad and a gripping mechanism and having a hand ID of "221" is used. Note that the placing operation of the article 10 by the robot hand 22 equipped with both a suction pad and a gripping mechanism differs depending on the type (shape, weight, etc.) of the article 10 to be loaded, the arrangement of the multiple articles 10 in the storage container 5, etc.

[0146] For example, when the item 10 to be stowed is a box-shaped item and multiple items 10 are arranged inside the shipping container 7 with almost no gaps, a gripping mechanism cannot be inserted between adjacent items 10, so a place operation control (suction release after grip release) must be performed. Therefore, when the item 10 to be stowed is a cookie (box) with product ID "101", the operation ID "910A1" is substantially set as the operation ID ("910", "910A") of the place operation control.

[0147] For example, if the item 10 to be stowed is a bottle-shaped container and a gripping mechanism can be inserted between the tips (mouths of the bottle containers) of adjacent items 10 in the shipping container 7, the place operation control (suction and grip release) can be used. Therefore, if the item 10 to be stowed is a green tea PET bottle with product ID "102", the operation ID "910B1" is substantially set as the operation ID ("910", "910B") of the place operation control.

[0148] Also, for example, the place operation control (suction and release only) can be used for a relatively light item 10. Therefore, when the item 10 to be loaded is a bag of noodles with product ID "103", the operation ID "910C1" is substantially set as the operation ID ("910", "910C") of the place operation control.

[0149] By providing the above configuration, the item stowing system 1 of this embodiment can accommodate multiple types of robot hands 22 that differ, for example, in model, performance, etc. Therefore, in this embodiment, it is possible to select the optimal robot hand from multiple types of robot hands in consideration of throughput, cost, etc., and to set an operation suitable for the selected robot hand.

[0150] (9) Operation ID of arm operation control (non-hold lift, non-hold transfer) In the arm operation control (non-holding lift) and the arm operation control (non-holding transport), the item 10 is not held by the robot hand 22. Therefore, the operation ID "911" of the arm operation control (non-holding lift) and the operation ID "912" of the arm operation control (non-holding transport) are the same regardless of the product type (product ID). In the example shown in Fig. 8, the operation ID "911A" is effectively set as the operation ID of the arm operation control (non-holding lift), and the operation ID "912A" is effectively set as the operation ID of the arm operation control (non-holding transport), regardless of the type of product ID.

[0151] Furthermore, the operation IDs of the arm operation control (non-hold lift) and the arm operation control (non-hold transport) change depending on the type of the robot arm 21. Fig. 16 is a diagram showing an example of the data configuration of a table of operation IDs of the arm operation control (non-hold lift) defined for each type of the robot arm 21 (hereinafter referred to as the "non-hold lift operation ID table for each arm type"). Fig. 17 is a diagram showing an example of the data configuration of a table of operation IDs of the arm operation control (non-hold transport) defined for each type of the robot arm 21 (hereinafter referred to as the "non-hold transport operation ID table for each arm type").

[0152] 16, the non-hold lift operation ID table for each arm type specifies the correspondence between the arm ID of the robot arm 21 and the operation ID of the arm operation control (non-hold lift) set for each type of robot arm 21. Also, as shown in Fig. 17, the non-hold transport operation ID table for each arm type specifies the correspondence between the arm ID of the robot arm 21 and the operation ID of the arm operation control (non-hold transport) set for each type of robot arm 21. For ease of explanation, Figs. 16 and 17 also list the operation names corresponding to the operation IDs of the arm operation control (non-hold lift, non-hold transport).

[0153] The operation ID "911A" described in the non-hold lift operation ID table for each arm type (FIG. 16) is arm operation control (non-hold lift) for transporting an article 10 at high speed, and the operation ID "911B" is arm operation control (non-hold lift) for transporting an article 10 at low speed. Therefore, in the non-hold lift operation ID table for each arm type, operation IDs "911A1" and "911B1" corresponding to the operation IDs "911A" and "911B" of the arm operation control (non-hold lift), respectively, are defined for the robot arm 21 with the arm ID "211". Operation IDs "911A2" and "911B2" corresponding to the operation IDs "911A" and "911B" of the arm operation control (non-hold lift), respectively, are defined for the robot arm 21 with the arm ID "212". Further, for the robot arm 21 with the arm ID "213", an operation ID "911B3" corresponding to the operation ID "911B" of the arm operation control (non-holding lift) is specified.

[0154] Further, the operation ID "912A" described in the non-holding transport operation ID table by arm type (FIG. 17) is arm operation control (non-holding transport) for transporting the article 10 at high speed, and the operation ID "912B" is arm operation control (non-holding transport) for transporting the article 10 at low speed. Therefore, in the non-holding transport operation ID table by arm type, operation IDs "912A1" and "912B1" corresponding to the operation IDs "912A" and "912B" of the arm operation control (non-holding transport), respectively, are defined for the robot arm 21 with the arm ID "211". Operation IDs "912A2" and "912B2" corresponding to the operation IDs "912A" and "912B" of the arm operation control (non-holding transport), respectively, are defined for the robot arm 21 with the arm ID "212". Further, for the robot arm 21 with the arm ID "213", an operation ID "912B3" corresponding to the operation ID "912B" of the arm operation control (non-holding transport) is specified.

[0155] In this embodiment, as described above, a robot arm 21 with arm ID "211" that can be driven at low and high speeds is used. Therefore, in this embodiment, regardless of the type of item 10 to be stowed, the operation ID "911A1" is effectively set as the operation ID ("911", "911A") for the arm operation control (non-hold lift). Also, in this embodiment, regardless of the type of item 10, the operation ID "912A1" is effectively set as the operation ID ("912", "912A") for the arm operation control (non-hold transport).

[0156] By providing the above configuration, the item stowage system 1 of this embodiment can accommodate multiple types of robot arms 21 that differ, for example, in model, performance, etc. Therefore, in this embodiment, it is possible to select an optimal robot arm from multiple types of robot arms in consideration of throughput, cost, etc., and to set an operation suitable for the selected robot arm.

[0157] <Example of control operation for loading goods> Next, an example of the control operation of the goods stowing work in the goods stowing system 1 of this embodiment will be described. However, here, to simplify the explanation, the control operation when stacking three boxes of cookies with the product ID "101" in succession will be mainly described. That is, an example of the control operation of the work task IDs "#1" to "#3" in the control plan data for the entire stowing work shown in FIG. 5 will be described.

[0158] (1) Example of conventional control operation for loading and unloading goods First, before describing an example of control operations for an article stowing operation in the article stowing system 1 of this embodiment, for comparison, an example of control operations for an article stowing operation in a conventional article stowing system will be described.

[0159] Fig. 18 is a diagram showing an example of the control operation of an item stowing operation in a conventional item stowing system. Note that a stowing management task 240A shown in Fig. 18 is a task (processing program) for managing the progress of the stowing operation of a plurality of items 10 (three boxes of cookies, two PET bottles of green tea, and four bags of noodles) and controlling the entire stowing operation. Also, each of the first stowing operation task 240B to the third stowing operation task 240D is a task (processing program) for controlling the execution processing of the operation of transporting one box of cookies from a storage container 5 and stowing it in a shipping container 7.

[0160] In the conventional item stowing system and robot system, as shown in Fig. 18, first, a stowing instruction is notified from a stowing management task 240A to a first stowing work task 240B (arrow C1 in Fig. 18), and the first stowing work task 240B is started. Next, in the first stowing work task 240B, a picking robot is controlled to perform an operation of taking out one box of cookies from a storage container 5, an operation of transporting one box of cookies to a shipping container 7, and an operation of stowing one box of cookies in the shipping container 7, in that order. Then, when the operation of stowing one box of cookies in the shipping container 7 is completed, the first stowing work task 240B notifies the stowing management task 240A of completion information of the stowing work (arrow C2 in Fig. 18).

[0161] Thereafter, the loading management task 240A notifies the second loading work task 240C of a loading instruction (arrow C3 in FIG. 18), and the second loading work task 240C is started. In the second loading work task 240C, one box of cookies is loaded into the shipping container 7 in the same manner as in the first loading work task 240B. Then, when the loading work of one box of cookies into the shipping container 7 by the second loading work task 240C is completed, the second loading work task 240C notifies the loading management task 240A of completion information of the loading work (arrow C4 in FIG. 18).

[0162] Thereafter, the loading management task 240A notifies the third loading work task 240D of a loading instruction (arrow C5 in FIG. 18), and the third loading work task 240D is started. In the third loading work task 240D, one box of cookies is loaded into the shipping container 7 in the same manner as the first loading work task 240B. Then, when the loading work of one box of cookies into the shipping container 7 by the third loading work task 240D is completed, the third loading work task 240D notifies the loading management task 240A of completion information of the loading work (arrow C6 in FIG. 18).

[0163] In other words, in a conventional item stowage system, when stowage work for multiple items 10 is performed in succession, after the stowage work task for one item 10 is completed, the stowage work task for the next item 10 is performed.

[0164] Although not shown in FIG. 18, after the third stacking task 240D is completed, the stacking management task 240A performs a storage container replacement task, and then the stacking of the two green tea PET bottles is performed in the same manner as the stacking task for the cookies described above. Next, the stacking management task 240A performs a storage container replacement task again, and then the stacking task for the four bags of bagged noodles is performed in the same manner as the stacking task for the cookies described above. Then, after the stacking task for the bagged noodles is completed, the storage container is returned to the specified storage location, and the shipping container is transported to the work location for the next process, and the entire process of the item stacking work is completed.

[0165] (2) Example of control operation for stowing goods in this embodiment FIG. 19 is a diagram showing an example of the control operation of the goods stowing work in the goods stowing system 1 of this embodiment. Note that the stowing management task 235A shown in FIG. 19 is a task (processing program) for managing the progress of the stowing work of a plurality of goods 10 (three boxes of cookies, two PET bottles of green tea, and four bags of bagged noodles) and controlling the entire stowing work. Also, each of the first stowing work task 235B to the third stowing work task 235D is a task (processing program) for controlling the execution processing of the work of transporting one box of cookies (goods 10 with product ID "101") from the storage container 5 and stowing it in the shipping container 7. Note that each of the first stowing work task 235B to the third stowing work task 235D is composed of various processing operations with operation IDs "901" to "912" shown in FIG. 7 and FIG. 8.

[0166] In this embodiment, although not shown in Fig. 19, first, a set task (task with work task ID "#A" in Fig. 5) of the storage container 5 and the shipping container 7 is performed by the stowage management task 235A. In this set task, the stowage management task 235A controls the storage container conveyor 6, and the storage container 5 with storage container ID "501" is transported (set) to a position where the picking operation will be performed. In addition, the stowage management task 235A controls the shipping container conveyor 8, and the shipping container 7 with shipping container ID "701" is transported (set) to a position where the placing operation will be performed.

[0167] After the set task is completed, as shown in Fig. 19, the stowing management task 235A notifies the first stowing work task 235B to the third stowing work task 235D of a stowing instruction at the same time (arrow C11 in Fig. 19). This stowing instruction starts the first stowing work task 235B to the third stowing work task 235D at the same time.

[0168] However, the processing operation of the first stowing work task 235B is started by the stowing instruction from the stowing management task 235A, but the processing operation of the second stowing work task 235C and the third stowing work task 235D is not actually started, although they are activated. The second stowing work task 235C and the third stowing work task 235D are started when the preceding stowing work task notifies the storage container photographing camera 3 of the information (hereinafter referred to as "used information") indicating that the storage container photographing camera 3 has been used in the preceding stowing work task. That is, the second stowing work task 235C is actually started when the first stowing work task 235B notifies the storage container photographing camera 3 of the used information. Also, the third stowing work task 235D is actually started when the second stowing work task 235C notifies the storage container photographing camera 3 of the used information.

[0169] First, the operation of the first stowing work task 235B that is started upon notification of a stowing instruction from the stowing management task 235A will be described.

[0170] In the first stowing work task 235B, first, a storage container photograph 251 with an operation ID "901" (see Figs. 8 and 9) is performed. Then, when the storage container photograph 251 is completed, the first stowing work task 235B notifies the second stowing work task 235C of information on the device that has been used in the storage container photograph 251 (device that will not be used in the next processing operation) (arrow C12 in Fig. 19). Specifically, the first stowing work task 235B notifies the second stowing work task 235C of information indicating that the storage container photographing camera 3 and the storage container 5 (see the black circle in Fig. 7) are now available for use. Next, a picking operation plan 252 with an operation ID "902" (see Fig. 8) is performed based on the photographing result of the storage container photograph 251.

[0171] After the picking operation plan 252 is completed, a shipping container photograph 253 with operation ID "903" (see Figs. 8 and 10) is performed. Then, when the shipping container photograph 253 is completed, the first stowing work task 235B notifies the second stowing work task 235C of information on the device that has been used in the shipping container photograph 253 (device that will not be used in the next operation control) (arrow C13 in Fig. 19). Specifically, the first stowing work task 235B notifies the second stowing work task 235C of information indicating that the shipping container photographing camera 4 and the shipping container 7 (see the black circle in Fig. 7) are now available for use.

[0172] After the shipping container photography 253 is completed, a placing motion plan 254 with motion ID "904" (see FIG. 8) is made based on the results of the shipping container photography 253. Next, an arm motion plan 255 with motion ID "905" (see FIG. 8) is made based on the contents of the picking motion plan 252 and the placing motion plan 254.

[0173] After the arm motion plan 255 is completed, the picking robot 2 (robot arm 21 and robot hand 22) is driven and controlled according to the contents of the picking motion plan 252, and a picking motion control 256 of motion ID "906" (see FIGS. 8 and 11) is performed. By this processing operation, one box of cookies (items 10) in the storage container 5 is held by the robot hand 22 and taken out of the storage container 5.

[0174] After the picking operation control 256 is completed, the picking robot 2 (robot arm 21 and robot hand 22) is driven and controlled according to the contents of the arm operation plan 255, and arm operation control 257 is performed. In this arm operation control 257, the arm operation control (hold and lift) of operation ID "907", the arm operation control (hold and transport) of operation ID "908", and the arm operation control (hold and lower) of operation ID "909" are performed in this order (see Fig. 8 and Figs. 12 to 14). Through this processing operation, one box of cookies (items 10) held by the robot hand 22 in the picking operation control 256 is transported from the picking position in the storage container 5 to the placing position in the shipping container 7.

[0175] In addition, in the arm operation control 257, when the arm operation control (holding and lifting) is ended, the first stowage work task 235B notifies the second stowage work task 235C of information on the device whose interference state has ended in the arm operation control (holding and lifting) (arrow C14 in FIG. 19). Specifically, as shown in FIG. 7 (see white circle mark), the storage container photographing camera 3 is in an interference state in the arm operation control (holding and lifting) of operation ID "907", but the interference state is resolved in the next processing operation (arm operation control (holding and transport) of operation ID "908"). Therefore, when the arm operation control (holding and lifting) is ended, information that the interference state of the storage container photographing camera 3 has ended is notified to the second stowage work task 235C as the used information of the storage container photographing camera 3. Then, the second stowage work task 235C, which has received the used information of the storage container photographing camera 3 from the first stowage work task 235B, starts the storage container photographing 261 as a trigger.

[0176] The timing of the notification of the used information of the storage-container photographing camera 3 is not limited to the above example, and can be set to any timing after the interference state of the storage-container photographing camera 3 is resolved and before the stowing work task is completed. For example, the timing of the notification of the used information of the storage-container photographing camera 3 may be the end of the arm operation control 257. Also, for example, the timing of the notification of the used information of the storage-container photographing camera 3 may be the time when the interference state of the storage-container photographing camera 3 is resolved during the execution (before the completion) of the arm operation control (holding and lifting).

[0177] Furthermore, the robot arm 21 and robot hand 22 used in the arm operation control (hold and lift) with operation ID "907" are also being used in the next processing operation (arm operation control (hold and transport) with operation ID "908" (see the black circle in FIG. 7). Therefore, in the inter-task communication at the end of the arm operation control (hold and lift), information about the device that has been used in the arm operation control (hold and lift) is not notified.

[0178] After the arm motion control 257 is completed, the picking robot 2 (the robot arm 21 and the robot hand 22) is driven and controlled according to the contents of the placing motion plan 254, and the placing motion control 258 of the motion ID "910" (see FIG. 8 and FIG. 15) is performed. By this processing operation, one box of cookies (items 10) is stacked in the shipping container 7, and the holding mechanism of the robot hand 22 for one box of cookies is released. Furthermore, when the placing motion control 258 is completed, the first stacking work task 235B notifies the second stacking work task 235C of information on the device that has been used in the placing motion control 258 (the device that will not be used in the next motion control) (arrow C15 in FIG. 19). Specifically, the first stacking work task 235B notifies the second stacking work task 235C of information indicating that the shipping container 7 (see the black circle in FIG. 7) has become available.

[0179] The robot arm 21 and robot hand 22 used in the place operation control 258 with operation ID "910" will also be in use in the next processing operation (arm operation control with operation ID "911" (non-holding ascent)) (see the black circle in FIG. 7). In addition, the camera 4 for photographing shipping containers, which is in an interference state in the place operation control 258 with operation ID "910", will also continue in the next processing operation (arm operation control with operation ID "911" (non-holding ascent)) (see the white circle in FIG. 7). Therefore, in the inter-task communication at the end of the place operation control 258, only information indicating that the shipping container 7 (see the black circle in FIG. 7) has become available is notified.

[0180] After the placing operation control 258 is completed, the picking robot 2 (robot arm 21 and robot hand 22) is driven and controlled according to the contents of the placing operation plan 254, and arm operation control 259 is performed. In this arm operation control 259, the arm operation control of operation ID "911" (non-holding lift) and the arm operation control of operation ID "912" (non-holding transport) are performed in this order (see Figs. 8, 16, and 17). Through this processing operation, the robot hand 22 moves from the stacking position of the cookies (items 10) in the shipping container 7 to the initial position, and the posture of the robot arm 21 returns to the initial posture.

[0181] Furthermore, within the arm motion control 259, at the end of the arm motion control (non-hold lift), the first stowage work task 235B notifies the second stowage work task 235C of information on the device for which the interference state has ended in the arm motion control (non-hold lift) (arrow C16 in FIG. 19). Specifically, as shown in FIG. 7 (see white circle), the shipping container photographing camera 4 is in an interference state in the arm motion control (non-hold lift) of operation ID "911", but the interference state is resolved in the next processing operation (arm motion control (non-hold transport) of operation ID "912"). Therefore, at the end of the arm motion control (non-hold lift), information that the interference state of the shipping container photographing camera 4 has ended is notified to the second stowage work task 235C as used information of the shipping container photographing camera 4. Then, the second stowing work task 235C, which receives a notification of the usage information of the shipping container photographing camera 4 from the first stowing work task 235B, becomes capable of starting the shipping container photographing 263.

[0182] The timing of notification of the usage information of the camera 4 for photographing shipping containers is not limited to the above example, and can be set to any timing after the point in time when the interference state of the camera 4 for photographing shipping containers is resolved. For example, the timing of notification of the usage information of the camera 4 for photographing shipping containers may be the end of the arm operation control 259. Also, for example, the timing of notification of the usage information of the camera 4 for photographing shipping containers may be the point in time when the interference state of the camera 4 for photographing shipping containers is resolved during (before completion of) the execution of the arm operation control (non-holding ascent).

[0183] Furthermore, the robot arm 21 and robot hand 22 used in the arm operation control (non-hold lift) with operation ID "911" are also being used in the next processing operation (arm operation control (non-hold transport) with operation ID "912" (see the black circle in FIG. 7). Therefore, in the inter-task communication at the end of the arm operation control (non-hold lift), information regarding the device that has been used in the arm operation control (non-hold lift) is not notified.

[0184] Furthermore, when the arm motion control 259 is completed, i.e., when the arm motion control (non-holding transport) is completed, the first stowing work task 235B notifies the second stowing work task 235C of information on the devices that have been used in the arm motion control (non-holding transport) (arrow C17 in FIG. 19). Specifically, the first stowing work task 235B notifies the second stowing work task 235C of information indicating that the robot arm 21 and robot hand 22 (see black circles in FIG. 7) that have been used in the arm motion control (non-holding transport) are now available for use.

[0185] After the arm motion control 259 ends, the first stacking work task 235B notifies the stacking management task 235A of the completion of the stacking work (arrow C18 in FIG. 19), and the first stacking work task 235B ends. This ends the stacking work of the first box of cookies (items 10).

[0186] Next, the operation of the second stowage work task 235C will be described.

[0187] When the stowage management task 240A notifies the second stowage work task 235C of a stowage instruction (arrow C11 in FIG. 19), the second stowage work task 235C starts. However, at this point, the first stowage work task 235B has not notified the second stowage work task 235C of the usage information of the storage-container photographing camera 3 used in the first processing operation (storage-container photographing 261) of the second stowage work task 235C. Therefore, in the second stowage work task 235C, standby processing is performed from the timing of startup (timing of arrow C11) to the timing of notification of the usage information of the storage-container photographing camera 3 (timing of arrow C14).

[0188] Then, when the first stowing work task 235B notifies the second stowing work task 235C of the usage information of the storage container photographing camera 3, the storage container photographing 261 of the second stowing work task 235C is started. Thereafter, similar to the first stowing work task 235B, the picking operation plan 262, the shipping container photographing 263, the placing operation plan 264, and the arm operation plan 265 of the second stowing work task 235C are executed in this order. Also, in the second stowing work task 235C, after the arm operation plan 265 is completed, the picking operation control 266, the arm operation control 267, the placing operation control 268, and the arm operation control 269 are executed in this order, similar to the first stowing work task 235B.

[0189] The second stowage work task 235C's photographing of shipping containers 263 is not executed until the first stowage work task 235B notifies the second stowage work task 235C of the used information of the camera 4 for photographing shipping containers (arrow C16 in FIG. 19). Therefore, if the timing of the notification of the used information of the camera 4 for photographing shipping containers is before the end of the picking operation plan 262, the second stowage work task 235C's photographing of shipping containers 263 starts immediately after the end of the picking operation plan 262. On the other hand, if the timing of the notification of the used information of the camera 4 for photographing shipping containers is after the end of the picking operation plan 262, a standby process is performed after the end of the picking operation plan 262 until the used information of the camera 4 for photographing shipping containers is notified.

[0190] In addition, between the second stowage work task 235C and the third stowage work task 235D, an information notification operation is performed in the same manner as the information notification operation (inter-task communication) performed between the first stowage work task 235B and the second stowage work task 235C.

[0191] Specifically, at the end of the storage container photographing 261, the second stowage work task 235C notifies the third stowage work task 235D of information indicating that the storage container photographing camera 3 and the storage container 5 are now available for use (arrow C22 in FIG. 19). At the end of the shipping container photographing 263, the second stowage work task 235C notifies the third stowage work task 235D of information indicating that the shipping container photographing camera 4 and the shipping container 7 are now available for use (arrow C23 in FIG. 19).

[0192] Furthermore, at the end of the arm movement control (hold and lift) in the arm movement control 267 of the second stowage work task 235C, the second stowage work task 235C notifies the third stowage work task 235D of the usage information of the storage-container photographing camera 3 (arrow C24 in FIG. 19). Then, in the third stowage work task 235 which has received the usage information of the storage-container photographing camera 3 from the second stowage work task 235C, this triggers the start of storage-container photographing 271.

[0193] Furthermore, at the end of the place operation control 268 of the second stowing work task 235C, the second stowing work task 235C notifies the third stowing work task 235D of information indicating that the shipping container 7 has become available (arrow C25 in FIG. 19). At the end of the arm operation control (non-holding lift) in the arm operation control 269, the second stowing work task 235C notifies the third stowing work task 235D of information indicating that the shipping container photographing camera 4 has been used (arrow C26 in FIG. 19). At the end of the arm operation control 269, that is, at the end of the arm operation control (non-holding transport), the second stowing work task 235C notifies the third stowing work task 235D of information indicating that the robot arm 21 and the robot hand 22 have become available (arrow C27 in FIG. 19).

[0194] Then, in the second loading work task 235C, after the arm motion control 269 ends, the second loading work task 235C notifies the loading management task 235A of loading completion information (arrow C28 in FIG. 19), and the second loading work task 235C ends. This ends the loading work of the second box of cookies (items 10).

[0195] Next, the details of the operation control in the third stowage work task 235D will be described.

[0196] When the stowage management task 240A notifies the third stowage work task 235D of a stowage instruction (arrow C11 in FIG. 19), the third stowage work task 235D starts. However, at this point, the second stowage work task 235C has not notified the third stowage work task 235D of the usage information of the storage-container photographing camera 3 used in the first processing operation (storage-container photographing 271) of the third stowage work task 235D. Therefore, in the third stowage work task 235D, standby processing is performed from the timing of startup (timing of arrow C11) to the timing of notification of the usage information of the storage-container photographing camera 3 (timing of arrow C24).

[0197] Then, when the second stowing work task 235C notifies the third stowing work task 235D of the usage information of the storage container photographing camera 3, the storage container photographing 271 of the third stowing work task 235D is started. Thereafter, although not shown in FIG. 19, the picking operation plan, shipping container photographing, placing operation plan, and arm operation plan of the third stowing work task 235D are executed in this order, similar to the first stowing work task 235B. Also, although not shown in FIG. 19, in the third stowing work task 235D, after the arm operation plan is completed, the picking operation control, arm operation control, placing operation control, and arm operation control are executed in this order, similar to the first stowing work task 235B.

[0198] In the example shown in FIG. 19, since there is no subsequent stowing work task of the third stowing work task 235D, no information notification operation (inter-task communication) is performed from the third stowing work task 235D to the subsequent stowing work task.

[0199] Then, in the third loading work task 235D, when the arm motion control (not shown) performed after the place motion control is completed, the third loading work task 235D notifies the loading management task 235A of loading completion information (arrow C31 in FIG. 19), and the third loading work task 235D is completed. This completes the loading work of the third box of cookies (items 10).

[0200] In addition, in the item stowing work by the item stowing system 1 of this embodiment, after the third stowing work task 235D is completed, the stowing management task 235A performs a storage container 5 replacement task (task with work task ID "#B" in FIG. 5), although this is not shown in FIG. 19. After the storage container replacement task is completed, a stowing work task (tasks with work task IDs "#4" and "#5" in FIG. 5) for two PET bottles of green tea (item 10 with product ID "102") is executed in the same manner as the above-mentioned cookie stowing work task.

[0201] After that, the storage container replacement task (task with task ID "#C" in FIG. 5) is performed again by the stowing management task 235A. After the second storage container replacement task is completed, the stowing task (tasks with task IDs "#6" to "#9" in FIG. 5) for four bags of bagged noodles (item 10 with product ID "103") is executed in the same manner as the stowing task for cookies described above. After the stowing task for four bags of bagged noodles is completed, the storage container 5 is returned to a predetermined storage location (task with task ID "#D" in FIG. 5), and the shipping container 7 is transported to the work location for the next process (task with task ID "#E" in FIG. 5). This completes all the steps of the stowing task by the item stowing system 1 of this embodiment. As described above, in the item stowing system 1 of this embodiment, when stowing tasks for a plurality of items 10 of the same type are performed consecutively, the subsequent stowing task is started before all the operations of the preceding stowing task are completed.

[0202] <Process flow of goods loading work task> The processing operations of the above-mentioned stowing work tasks (tasks with work task IDs "#1" to "#9" in FIG. 5) performed for one item 10 are executed by a corresponding CPU core (any of the second core 231B to fourth core 231D) in the multi-core processor 231. Here, the processing flow of the stowing work task executed by the CPU core (hereinafter simply referred to as "CPU") will be described.

[0203] (1) Processing flow of loading work tasks Fig. 20 is a flow chart showing the processing procedure of each stowing work task with the work task IDs "#1" to "#9" in Fig. 5. Note that this stowing work task is called and executed by the stowing management task 235A.

[0204] In the stowing task, first, the CPU photographs the storage container (S1). In this process, the CPU controls the storage container photographing camera 3 to photograph the storage state of the items 10 in the storage container 5. Details of the storage container photographing will be described later with reference to FIG. 21.

[0205] Next, the CPU performs inter-task communication processing (S2). In this processing, the CPU notifies the subsequent stowing work task of information indicating that the storage container photographing camera 3 and the storage container 5 are available for use. Specifically, the CPU notifies the subsequent stowing work task of the below-described availability status of the storage container photographing camera 3 and the storage container 5, "available". This inter-task communication processing of S2 corresponds to, for example, the inter-task communication operation shown by arrows C12 and C22 in FIG. 19. Note that if there is no subsequent stowing work task for the stowing work task being executed (if the stowing work task is, for example, the third stowing work task 235D), the processing of S2 is not performed.

[0206] Next, the CPU performs a picking operation plan (S3). In this process, the CPU determines the item 10 to be picked up and its placement position in the storage container 5 based on the result (photographed image) of the storage container photographing (S2), and plans the operation of the robot hand 22 and the robot arm 21 to remove the item 10 from the storage container 5.

[0207] Next, the CPU photographs the shipping container (S4). In this process, the CPU controls the shipping container photographing camera 4 to photograph the stacking state of the items 10 in the shipping container 7. Details of photographing the shipping container will be described later with reference to FIG.

[0208] Next, the CPU performs inter-task communication processing (S5). In this processing, the CPU notifies the subsequent stowing work task of information indicating that the shipping container photographing camera 4 and the shipping container 7 are available for use. Specifically, the CPU notifies the subsequent stowing work task of the below-described availability status "available" of the shipping container photographing camera 4 and the shipping container 7. This inter-task communication processing of S5 corresponds to, for example, the inter-task communication operation shown by arrows C13 and C23 in FIG. 19. Note that if there is no subsequent stowing work task for the currently executed stowing work task (if the stowing work task is, for example, the third stowing work task 235D), the processing of S5 is not performed.

[0209] Next, the CPU performs a placing operation plan (S6). In this process, first, the CPU recognizes (detects) the loading status of the items 10 in the shipping container 7 and the location of available free space for loading, based on the result (photographed image) of the shipping container photographing (S4). Next, the CPU determines the loading position of the items 10 in the shipping container 7, and plans the operation of the robot hand 22 and the robot arm 21 for loading the items 10 into the shipping container 7.

[0210] Next, the CPU performs arm motion planning (S7). In this process, the CPU plans a trajectory of the robot arm 21 for transporting the article 10 between the end position of the robot hand 22 planned in the picking motion plan and the start position of the robot hand 22 planned in the placing motion plan.

[0211] Next, the CPU performs picking operation control (S8). In this process, the CPU controls the robot arm 21 and the robot hand 22 based on the picking operation plan generated in S3, and the robot hand 22 holds the item 10 to be picked up in the storage container 5 and removes it from the storage container 5.

[0212] Next, the CPU performs arm operation control (hold and raise) (S9). In this process, first, the CPU controls the robot arm 21 to move (raise) the item 10 held by the robot hand 22 to a predetermined position above the storage container 5. Next, the CPU controls the robot arm 21 to move the item 10 held by the robot hand 22 to a position where the picking robot 2 and the storage container 5 do not overlap when viewed from the storage container photographing camera 3 side. Note that these processes are performed based on the arm operation plan generated in S7.

[0213] Next, the CPU performs inter-task communication processing (S10). In this processing, the CPU notifies the subsequent stowing work task of information that the interference state of the storage-container photographing camera 3 has been resolved as usage information of the storage-container photographing camera 3. This inter-task communication processing of S10 corresponds to, for example, the inter-task communication operation shown by arrows C14 and C24 in Fig. 19. Note that if there is no subsequent stowing work task for the currently executed stowing work task (if the stowing work task is, for example, the third stowing work task 235D), the processing of S10 is not performed.

[0214] Next, the CPU performs arm operation control (holding and transporting) (S11). In this process, the CPU controls the robot arm 21 to move the item 10 held by the robot hand 22 from the end position (end point) of the arm operation control (holding and transporting) to a position above the shipping container 7. Next, the CPU performs arm operation control (holding and lowering) (S12). In this process, the CPU controls the robot arm 21 to move (lower) the item 10 held by the robot hand 22 from the end position (end point) of the arm operation control (holding and transporting) to a stacking position in the shipping container 7. Note that these processes are performed based on the arm operation plan generated in S7.

[0215] Next, the CPU performs a placing operation control (S13). In this process, the CPU controls the robot arm 21 and the robot hand 22 based on the placing operation plan generated in S6 to load the article 10 into the shipping container 7 and release the holding function of the robot hand 22.

[0216] Next, the CPU performs inter-task communication processing (S14). In this processing, the CPU notifies the subsequent stowage work task of information indicating that the shipping container 7 has become available. This inter-task communication processing of S14 corresponds to, for example, the inter-task communication operations indicated by arrows C15 and C25 in Fig. 19. Note that if there is no subsequent stowage work task for the stowage work task being executed (if the stowage work task is, for example, the third stowage work task 235D), the processing of S14 is not performed.

[0217] Next, the CPU performs arm operation control (non-holding lift) (S15). In this process, first, the CPU controls the robot arm 21 to move (lift) the robot hand 22 that has released the item 10 to a predetermined position above the shipping container 7. Next, the CPU controls the robot arm 21 to move the robot hand 22 to a position where the picking robot 2 and the storage container 5 do not overlap when viewed from the shipping container photographing camera 4 side. Note that these processes are performed based on the placing operation plan generated in S6.

[0218] Next, the CPU performs inter-task communication processing (S16). In this processing, the CPU notifies the subsequent stowing work task of information that the interference state of the camera 4 for photographing shipping containers has been resolved as usage information of the camera 4 for photographing shipping containers. This inter-task communication processing of S16 corresponds to, for example, the inter-task communication operation shown by arrows C16 and C26 in Fig. 19. Note that if there is no subsequent stowing work task for the currently executed stowing work task (if the stowing work task is, for example, the third stowing work task 235D), the processing of S16 is not performed.

[0219] Next, the CPU performs arm operation control (non-holding transport) (S17). In this process, the CPU controls the robot arm 21 to move the robot hand 22 from the end position (end point) of the arm operation control (non-holding ascent) to the initial position of the robot hand 22. This process is performed based on the place operation plan generated in S6.

[0220] Next, the CPU performs inter-task communication processing (S18). In this processing, the CPU notifies the subsequent stowing work task of information indicating that the robot arm 21 and the robot hand 22 have become available for use. This inter-task communication processing of S18 corresponds to, for example, the inter-task communication operations indicated by the arrows C17 and C27 in Fig. 19. Note that if there is no subsequent stowing work task for the currently executed stowing work task (if the stowing work task is, for example, the third stowing work task 235D), the processing of S18 is not performed.

[0221] Next, the CPU notifies the stowing management task 235A of the completion information of the stowing work (S19), and ends the stowing work task.

[0222] <Processing flow for photographing storage containers> Next, a process flow for photographing a storage container performed in S1 in the stowing work task (see FIG. 20) will be described with reference to Fig. 21. Fig. 21 is a flowchart showing the process procedure for photographing a storage container.

[0223] First, the CPU determines whether the storage-container photographing camera 3 has been used in the preceding stowing work task (S21). In this process, the CPU determines whether the storage-container photographing camera 3 has been notified of its use information from the preceding stowing work task. If the storage-container photographing camera 3 has been notified of its use information from the preceding stowing work task, the CPU determines the result of S21 as YES, and if the storage-container photographing camera 3 has not been notified of its use information, the CPU determines the result of S21 as NO.

[0224] If there is no preceding stowing task for the stowing task being executed (for example, if the stowing task is the first stowing task 235B), the CPU does not perform the process of S21. In this case, when a stowing instruction is notified from the stowing management task 235A, the process of photographing the storage container starts from the process of S22 described later.

[0225] In S21, when the CPU determines that the storage container photographing camera 3 has not been used in the preceding stowing task (when S21 is determined to be NO), the CPU repeats the process of S21. That is, the CPU performs standby processing until S21 is determined to be YES.

[0226] On the other hand, in S21, if the CPU determines that the storage container photographing camera 3 has already been used in the preceding loading work task (if S21 is judged as YES), the CPU sets the usage status of both the storage container photographing camera 3 and the storage container 5 to "in use" (S22).

[0227] Next, the CPU photographs the storage container 5 (measurement process) (S23). Next, the CPU changes the usage status of both the storage container photographing camera 3 and the storage container 5 to "available" (S24). Then, after processing S24, the CPU ends the storage container photographing and moves the process to S2 in the stowage work task (see FIG. 20). Note that information on the usage status of the storage container photographing camera 3 and the storage container 5 set in S24 is notified to the subsequent stowage work task in the inter-task communication process of S2 that is performed after the storage container photographing is completed.

[0228] In the above-mentioned determination process of S21, an example of making a determination by referring to the usage information of the storage container photographing camera 3 has been described, but the present invention is not limited to this. In the determination process of S21, the determination may be made by referring to not only the usage information of the storage container photographing camera 3 but also the usage status of the storage container photographing camera 3 and the storage container 5. For example, at the time of S21, if the usage information of the storage container photographing camera 3 is notified from the preceding stowage work task and the usage status of the storage container photographing camera 3 and the storage container 5 is "available", the determination result of S21 may be a YES determination. Note that, at the time of S21 of the stowage work task being executed, the usage status of the storage container photographing camera 3 and the storage container 5 has already been set to "available" by the storage container photographing of the preceding stowage work task (S24 in FIG. 20). When such a determination method is adopted, it is possible to more accurately determine whether or not the storage container photographing, i.e., the stowage work task, can be started.

[0229] <Process flow for photographing shipping containers> Next, a process flow for photographing a shipping container performed in S4 in the stowing work task (see FIG. 20) will be described with reference to Fig. 22. Fig. 22 is a flowchart showing the process procedure for photographing a shipping container.

[0230] First, the CPU determines whether or not the camera 4 for photographing shipping containers has been used in the preceding stowage work task (S31). In this process, the CPU determines whether or not the preceding stowage work task has notified the user of the camera 4 for photographing shipping containers. If the preceding stowage work task has notified the user of the camera 4 for photographing shipping containers, the CPU determines the result of S31 as YES, and if the preceding stowage work task has not notified the user of the camera 4 for photographing shipping containers, the CPU determines the result of S31 as NO.

[0231] If there is no preceding stowing task for the currently executing stowing task (for example, if the stowing task is the first stowing task 235B), the CPU does not perform the process of S31. In this case, after the picking operation plan (S3) is completed, the process of photographing shipping containers is started from S32 described later without waiting.

[0232] In S31, if the CPU determines that the shipping container photographing camera 4 has not been used in the preceding stowing task (if the result of S31 is NO), the CPU repeats the process of S31. That is, the CPU performs standby processing until the result of S31 is YES.

[0233] On the other hand, in S31, if the CPU determines that the camera 4 for photographing shipping containers has already been used in the preceding loading work task (if S31 returns a YES judgment), the CPU sets the usage status of both the camera 4 for photographing shipping containers and the shipping containers 7 to "in use" (S32).

[0234] Next, the CPU photographs the shipping containers 7 (measurement processing) (S33). Next, the CPU changes the usage status of both the camera 4 for photographing shipping containers and the shipping containers 7 to "available" (S34). Then, after processing S34, the CPU ends photographing the shipping containers and moves the processing to S5 in the stowage work task (see FIG. 20). Note that information on the usage status of the camera 4 for photographing shipping containers and the shipping containers 7 set in S34 is notified to the subsequent stowage work task in the inter-task communication processing of S5 that is performed after photographing the shipping containers is completed.

[0235] In the above-mentioned determination process of S31, an example in which the determination is made by referring to the usage information of the camera 4 for photographing shipping containers has been described, but the present invention is not limited to this. In the determination process of S31, the determination may be made by referring to not only the usage information of the camera 4 for photographing shipping containers, but also the usage status of the camera 4 for photographing shipping containers and the shipping containers 7. For example, at the time of S31, if the usage information of the camera 4 for photographing shipping containers is notified from the preceding stowage work task and the usage status of the camera 4 for photographing shipping containers and the shipping containers 7 is "available", the determination result of S31 may be a YES determination. Note that, at the time of S31 of the stowage work task being executed, the usage status of the camera 4 for photographing shipping containers and the shipping containers 7 has already been set to "available" by the shipping container photography of the preceding stowage work task (S34 in FIG. 20). When such a determination method is adopted, it is possible to more accurately determine whether or not it is possible to start photographing the shipping containers.

[0236] <Error countermeasures> In the article stowage system 1 of this embodiment, the following two error countermeasures are provided in consideration of the occurrence of a situation in which the stowage work of the articles 10 cannot be completed during the stowage work of the articles 10. When an error occurs, one of the two error countermeasures is appropriately executed. (1) An upper limit value for the processing time of a stowing work task for one item 10 is set in advance, and when the processing time of the stowing work task exceeds the upper limit value, the stowing work itself is terminated. (2) An upper limit value for the processing time of a loading task for one item 10 is set in advance, and if the processing time of a loading task exceeds the upper limit value, the loading task determines that the task cannot continue and notifies the loading management task of that effect. Then, upon receiving the notification, the loading management task stops the loading task being executed and starts the subsequent loading task. In other words, the execution order of the loading management tasks is changed.

[0237] [Various variations] In the above embodiment of the item stowage system 1, a stowage task is provided for each item, and the stowage task is managed by a stowage management task. However, the present invention is not limited to this. For example, the stowage management task may be configured to directly issue instructions to the processing operations that make up the stowage task to execute the stowage work of the items 10.

[0238] In the above embodiment of the item stowage system 1, an example has been described in which the action IDs of the processing actions constituting the stowage work task are appropriately changed depending on the types of the items 10, the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4. However, the present invention is not limited to this, and the action IDs of the processing actions constituting the stowage work task may be appropriately changed depending on the type of at least one of the items 10, the robot arm 21, the robot hand 22, the storage container photographing camera 3, and the shipping container photographing camera 4.

[0239] In the above embodiment of the item stowing system 1, when multiple items 10 of the same type are successively stowed, a configuration example has been described in which a subsequent stowing task is executed before the completion of a preceding stowing task, but the present invention is not limited to this. The control method for the stowing work for multiple items 10 of the same type described in the above embodiment can be similarly applied to the case where different types of items 10 are successively stowed. For example, when multiple storage containers 5 (storage spaces) storing different types of items 10 can be set within the shooting range of the storage container shooting camera 3 and within the range that can be picked by the picking robot 2, multiple items 10 of different types can be successively stowed in the same manner as in the above embodiment.

[0240] In the above embodiment of the item stowage system 1, a configuration example has been described in which a conveyor is used as the transport means for the storage containers 5 and the shipping containers 7, but the present invention is not limited to this. The transport means for the storage containers 5 and the shipping containers 7 are arbitrary and can be set appropriately depending on, for example, the type of item 10 and the manner of cooperation with surrounding transport systems (transport shelves, AGVs, etc.) in the warehouse. Also, in cases where workers or the like directly place the storage containers 5 and the shipping containers 7 in predetermined positions (in cases where they place them manually), the item stowage system 1 does not need to provide transport means for the storage containers 5 and the shipping containers 7.

[0241] In addition, in the above embodiment of the item stowage system 1, a configuration example in which multiple items 10 are stowed in a shipping container 7 has been described, but the present invention is not limited to this. For example, the item stowage system 1 and the robot system 11 in the above embodiment can also be applied to cases in which multiple items 10 are stowed in a predetermined specific area (space) or on a pallet. Furthermore, in the above embodiment of the item stowage system 1, a configuration example in which multiple items 10 are stored in a storage container 5 has been described, but the present invention is not limited to this. For example, the storage mode of the multiple items 10 may be a configuration in which the multiple items 10 are stored in a predetermined specified area (space) or on a pallet.

[0242] [Various effects] In the stowing work of the goods 10 by the robot system 11 of this embodiment, as described above, information that the device to be used in the first processing operation in the stowing work task has already been used is notified from the preceding stowing work task to the succeeding stowing work task. Then, the notification of the already-used information triggers the start of the succeeding stowing work task. That is, in this embodiment, the succeeding stowing work task is started before the entire operation control of the preceding stowing work task is completed. Therefore, in this embodiment, the work throughput during stowing of goods can be improved compared to the conventional system shown in FIG. 18. That is, in this embodiment, multiple goods can be efficiently stowing in a specific area such as, for example, one shipping container.

[0243] Furthermore, in the stowing work of the articles 10 by the robot system 11 of this embodiment, as described above, a stowing instruction (start command) is notified to multiple stowing work tasks simultaneously from the stowing management task 235A (see arrow C11 in FIG. 19). Therefore, in this embodiment, compared to the conventional system (FIG. 18), the stowing management task 235A only needs to notify multiple stowing work tasks of a stowing instruction once, and the amount of processing in the stowing management task 235A can be reduced. In other words, this configuration can further improve the work throughput when stowing articles.

[0244] Furthermore, in the stowing work of the articles 10 by the robot system 11 of this embodiment, as described above, a stowing work task is provided for each article 10, and the stowing work task is managed by a stowing management task (see FIG. 19). That is, since various processing operations constituting the stowing work task are executed within the same task, large amounts of data such as various image data and various plan data can be shared between processing operations within a task. Therefore, in this embodiment, the transfer process of large amounts of data between processing operations is not required, the processing load of the robot controller 23 is reduced, the processing efficiency is improved, and thus high processing performance can be achieved.

[0245] Furthermore, in the stowing work of the articles 10 by the robot system 11 of this embodiment, as described above, information on devices that have been used or interfered with during the stowing work is shared between multiple stowing work tasks that are processed in parallel through inter-task communication. Therefore, in this embodiment, the processing efficiency of the stowing work of the articles by the robot controller 23 can be improved.

[0246] [others] The above describes the item stowage system 1, robot system 11, robot controller 23, and the stowage work of items 10 using them according to one embodiment of the present invention and various modifications thereof, but the present invention is not limited to these. For example, the above-mentioned embodiment examples are detailed and specific descriptions of the configurations of the system and device in order to explain the present invention in an easy-to-understand manner, and are not necessarily limited to those having all of the described configurations. In addition, the present invention may take on various other applications and modifications without departing from the gist of the present invention described in the claims.

[0247] Furthermore, each of the configurations, functions, processing units, etc. relating to the above-mentioned control may be realized in hardware, for example, by designing a part or all of them in an integrated circuit. Also, each of the configurations, functions, etc. relating to the above-mentioned control may be realized in software by a processor interpreting and executing a program that realizes each function. Note that information (data) such as programs, tables, files, etc. that realize each function can be stored in a memory, a recording device such as a hard disk or SSD (Solid State Drive), or a recording medium such as an IC card, SD card, or DVD. [Explanation of symbols]

[0248] Reference Signs List 1...Item stowage system, 2...Picking robot, 3...Camera for photographing storage container, 4...Camera for photographing shipping container, 5...Storage container, 6...Conveyor for storage container, 7...Shipping container, 8...Conveyor for shipping container, 10...Item, 11...Robot system, 21...Robot arm, 22...Robot hand, 23...Robot controller, 235...Robot control application, 235A...Stowage management task, 235B...First stowage work task, 235C...Second stowage work task, 235D...First stowage work task

Claims

1. a stowing management unit that controls the overall operation of a task of stowing a plurality of items in a specific area by a robot and issues a command to start the stowing task of the items; a predetermined stowing work unit that receives the start command from the stowing management unit, controls the stowing work for one of the items, and notifies the user of usage information of a predetermined device used in a predetermined process performed first in the stowing work before the stowing work is completed, the predetermined device being used in the stowing work; a specific stowing work unit that receives utilization information of the predetermined device from the predetermined stowing work unit and starts stowing work for one of the items; Robot control device.

2. The stowing operation includes an operation of removing an item to be transported from a predetermined area where the item is placed by the robot, and then transporting the item to the specific area; the predetermined device is an imaging device that captures an image of the predetermined area, When a situation occurs in which the robot does not overlap with the predetermined area as viewed from the imaging device during the operation of transporting the item, the predetermined stowage work unit notifies the specific stowage work unit of usage information of the predetermined device. The robot control device according to claim 1 .

3. The type of the goods to be loaded at the predetermined loading work unit is the same as the type of the goods to be loaded at the specific loading work unit. The robot control device according to claim 2 .

4. The method further includes a utilization device information storage unit that stores identification information of each of the plurality of processing operations constituting the stowing work and specific information regarding a correspondence relationship between the device used in each processing operation, The predetermined stowing work unit determines whether or not to notify the usage information of the predetermined device based on the specific information. The robot control device according to claim 1 .

5. and a control information storage unit in which predetermined information regarding a correspondence between each identification information of a plurality of types of processing operations constituting the stowing work and at least one type of the item, the robot, and the predetermined device is stored. The robot control device according to claim 1 .

6. the stowage management unit notifies the predetermined stowage work unit and the specific stowage work unit of the start command simultaneously; The specific stowing work unit performs standby processing during the period from when the start command is received until when the usage information of the specific device is received. The robot control device according to claim 1 .

7. The specific stowage work unit receives the utilization information of the predetermined device from the predetermined stowage work unit, and if the predetermined device is available, starts the stowage work. The robot control device according to claim 1 .

8. a robot main body that performs a task of stacking a plurality of items in a specific area; an imaging unit that captures an image of a predetermined area in which the item to be transported is placed in a predetermined process that is performed first in a stowing operation for one of the items; a robot control unit having a stowage management unit that controls the overall operation of the robot main body unit in stowage work of the plurality of items and notifies a command to start stowage work of the items, a predetermined stowage work unit that receives the start command from the stowage management unit, controls the stowage work for one of the items, and notifies usage information of the imaging unit before the stowage work is completed and when the imaging unit has been used in the stowage work, and a specific stowage work unit that receives usage information of the imaging unit from the predetermined stowage work unit and starts the stowage work for one of the items. Robot system.

Citation Information

Patent Citations

  • Handling system and control method

    JP2022001513A