Information processing method, program, and information processing apparatus

The method calculates dry ice requirements based on usage data, addressing the issue of inaccurate supply determination in existing systems, ensuring efficient and sustainable dry ice delivery.

JP2024143387AInactive Publication Date: 2024-10-11ENEOS HLDG INC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023056034
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing systems fail to accurately determine the appropriate amount of dry ice supplies required, leading to potential shortages or excesses that can disrupt operations and cause environmental waste.

Method used

An information processing method that acquires usage data from dry ice jackets, including the number of users, usage time, and intensity, to calculate the required amount of dry ice supplies using predefined formulas or AI models, ensuring precise delivery quantities.

Benefits of technology

This approach allows for accurate determination of dry ice needs, reducing worker discomfort due to shortages and minimizing environmental impact from excess supplies, while also streamlining the ordering process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143387000001_ABST
    Figure 2024143387000001_ABST
Patent Text Reader

Abstract

To provide an information processing method which allows for specifying an appropriate necessary amount of dry ice products.SOLUTION: The information processing method according to one aspect causes an information processing apparatus to acquire the number of users of dry ice 92 for use in a dry ice jacket 91, a use time, and an intensity during use and specify a necessary amount of dry ice products on the basis of the acquired number of users, use time and intensity and perform processing of outputting the specified necessary amount of dry ice products. Thus, it is possible to specify an appropriate necessary amount of dry ice products.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an information processing method, a program, and an information processing device. [Background technology]

[0002] In recent years, the development of technology related to the supply and demand of dry ice products has been actively promoted. For example, Patent Document 1 discloses a supply and demand management system in which an administrator promises to supply dry ice to a consumer, the consumer pays the administrator for the supply, the actual delivery of the dry ice is performed by a supplier entrusted by the administrator, and the administrator pays the supplier for the supply. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-096667 Summary of the Invention [Problem to be solved by the invention]

[0004] However, the invention of Patent Document 1 has a problem in that it is not possible to specify the appropriate amount of dry ice equipment required.

[0005] One aspect of the present invention is to provide an information processing method etc. capable of identifying the appropriate amount of dry ice required. [Means for solving the problem]

[0006] An information processing method according to one aspect is characterized in that it acquires the number of users, usage time, and strength of dry ice to be used in a dry ice jacket, determines the required amount of dry ice equipment based on the acquired number of users, usage time, and strength, and executes a process to output the identified required amount of dry ice equipment. Effect of the Invention

[0007] In one aspect, it is possible to identify the appropriate amount of dry ice required. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is an explanatory diagram showing an overview of a dry ice ordering system. [Diagram 2] FIG. 2 is a block diagram showing an example of the configuration of a server. [Diagram 3] FIG. 2 is an explanatory diagram showing an example of a record layout of a user DB and an order DB. [Figure 4] FIG. 2 is a block diagram showing an example of the configuration of a user terminal. [Diagram 5] FIG. 13 is an explanatory diagram showing an example of an ordering screen for dry ice supplies. [Figure 6] 10 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies. [Figure 7] 10 is a flowchart showing a processing procedure for accepting a confirmation request for an order for dry ice supplies. [Figure 8] 13 is a flowchart showing a processing procedure for accepting a request to cancel the confirmation of an order for dry ice supplies. [Figure 9] 13 is a flowchart showing a processing procedure for displaying order history data. [Figure 10] FIG. 13 is an explanatory diagram illustrating an example of a record layout of an order DB in the second embodiment. [Figure 11] FIG. 11 is an explanatory diagram showing an example of an ordering screen for dry ice supplies in the second embodiment. [Figure 12] 10 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies in the second embodiment. [Figure 13] 11 is a flowchart showing the procedure of a subroutine for identifying the required amount of dry ice supplies. [Figure 14] FIG. 13 is an explanatory diagram showing an example of a record layout of an order DB in the third embodiment. [Figure 15]FIG. 13 is an explanatory diagram showing an example of an ordering screen for dry ice supplies in embodiment 3. [Figure 16] 13 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies in the third embodiment. [Figure 17] 13 is a flowchart showing the procedure of a subroutine for identifying the required amount of dry ice equipment in the third embodiment. [Figure 18] FIG. 13 is a block diagram showing an example of the configuration of a server in the fourth embodiment. [Figure 19] 13 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies in the fourth embodiment. [Figure 20] FIG. 13 is an explanatory diagram showing an example of an ordering screen for dry ice products by day. [Figure 21] 11 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies by day. [Figure 22] 13 is a flowchart showing the procedure of a subroutine for identifying the required amount of dry ice equipment in the fifth embodiment. [Figure 23] 11 is a flowchart showing a processing procedure for re-determining the required amount of dry ice supplies. [Figure 24] FIG. 23 is a block diagram showing an example of the configuration of a server in the sixth embodiment. [Diagram 25] FIG. 23 is an explanatory diagram showing an example of the record layout of an order DB and a trader DB in the sixth embodiment. [Figure 26] 20 is a flowchart showing a processing procedure for outputting the required amount of dry ice supplies in the sixth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, the present invention will be described in detail with reference to the drawings showing embodiments thereof.

[0010] (Embodiment 1) The first embodiment relates to a form for specifying the required amount of dry ice supplies to be used in a dry ice jacket. Fig. 1 is an explanatory diagram showing an outline of a dry ice ordering system. The system of this embodiment includes an information processing device 1 and an information processing terminal 2, and each device transmits and receives information via a network N such as the Internet.

[0011] The information processing device 1 is an information processing device that processes, stores, and transmits / receives various types of information. The information processing device 1 is, for example, a server device, a personal computer, or a general-purpose tablet PC (personal computer). In this embodiment, the information processing device 1 is a server device, and hereinafter, for simplicity, it will be read as server 1.

[0012] The information processing terminal 2 is a terminal device that receives and transmits usage information of the dry ice 92 used in the dry ice jacket 91, and receives and displays the required amount of dry ice equipment specified based on the usage information. The usage information will be described later.

[0013] The information processing terminal 2 is an information processing device such as a smartphone, a mobile phone, a wearable device such as an Apple Watch (registered trademark), a tablet, or a personal computer terminal. For simplicity, the information processing terminal 2 will be referred to as a user terminal 2 below.

[0014] The dry ice jacket 91 has a dry ice storage pocket and the like, and is a jacket that cools the body of a user who uses the dry ice jacket 91 by sublimation of dry ice 92 placed in the dry ice storage pocket.

[0015] The dry ice supplies include block-shaped dry ice 92, a liquid cylinder 93 for producing the dry ice 92, or both the dry ice 92 and the liquid cylinder 93. The liquid cylinder 93 is filled with a raw material (e.g., liquefied carbon dioxide gas) for producing the dry ice 92. Also, by using the liquid cylinder 93 and a dry ice production device 94 for producing the dry ice 92, the block-shaped dry ice 92 can be produced.

[0016] Therefore, the delivery form of the dry ice supplies includes the delivery of dry ice 92, the delivery of liquid cylinder 93, or the delivery of both dry ice 92 and liquid cylinder 93. The delivery of dry ice 92 is a delivery form in which dry ice 92 is delivered directly to the user. The delivery of liquid cylinder 93 is a delivery form in which liquid cylinder 93 is delivered to the user. In the delivery of liquid cylinder 93, the user uses dry ice production equipment 94 to produce dry ice 92, and generates (produces) block-shaped dry ice 92 from the raw material filled in the delivered liquid cylinder 93.

[0017] The delivery of both the dry ice 92 and the liquid cylinder 93 is a delivery form in which the dry ice 92 and the liquid cylinder 93 are delivered to the user. For example, depending on the required amount of dry ice supplies, the dry ice 92 that is 40% of the required amount and the liquid cylinder 93 that can produce 60% of the required amount may be delivered to the user.

[0018] A problem with normal dry ice ordering is that it is not possible to determine the appropriate amount of dry ice required by simply accepting an order. Since the order relies on the experience or intuition of the person placing the order, there is a risk of over- or under-required amounts. Therefore, it is necessary to determine the appropriate amount of dry ice required, since too much will be wasted, or too little will make it difficult for workers to work comfortably.

[0019] The server 1 according to this embodiment acquires usage information including the number of users, usage time, and strength of the dry ice 92 used in the dry ice jacket 91 from the user terminal 2. The server 1 identifies the required amount of dry ice supplies based on the acquired usage information. The server 1 transmits (outputs) the identified required amount of dry ice supplies to the user terminal 2.

[0020] 2 is a block diagram showing an example of the configuration of the server 1. The server 1 includes a control unit 11, a storage unit 12, a communication unit 13, a reading unit 14, and a large-capacity storage unit 15. Each component is connected by a bus B.

[0021] The control unit 11 includes an arithmetic processing device such as a central processing unit (CPU), a micro-processing unit (MPU), a graphics processing unit (GPU), a field programmable gate array (FPGA), a digital signal processor (DSP), or a quantum processor. The control unit 11 reads out and executes a control program 1P (program product) stored in the storage unit 12, thereby performing various information processing, control processing, and the like related to the server 1.

[0022] The control program 1P can be deployed to be executed on a single computer, or on multiple computers located at one site, or distributed across multiple sites and interconnected by a communications network. Although the control unit 11 is described in FIG. 2 as being a single processor, it may be a multiprocessor.

[0023] The storage unit 12 includes memory elements such as a RAM (Random Access Memory) and a ROM (Read Only Memory), and stores the control program 1P or data required for the control unit 11 to execute processing. The storage unit 12 also temporarily stores data required for the control unit 11 to execute arithmetic processing. The communication unit 13 is a communication module for performing processing related to communication, and transmits and receives information to and from the user terminal 2, etc. via the network N.

[0024] The reading unit 14 reads the portable storage medium 1a including a CD (Compact Disc)-ROM or a DVD (Digital Versatile Disc)-ROM. The control unit 11 may read the control program 1P from the portable storage medium 1a via the reading unit 14 and store it in the mass storage unit 15. The control unit 11 may also download the control program 1P from another computer via a network N or the like and store it in the mass storage unit 15. Furthermore, the control unit 11 may read the control program 1P from the semiconductor memory 1b.

[0025] The mass storage unit 15 includes a recording medium such as a hard disk drive (HDD) or a solid state drive (SSD). The mass storage unit 15 includes a user database (DB) 151 and an order DB 152. The user DB 151 stores information about users who order dry ice products. The order DB 152 stores order information for dry ice products.

[0026] In this embodiment, the storage unit 12 and the large-capacity storage unit 15 may be configured as an integrated storage device. The large-capacity storage unit 15 may be configured with a plurality of storage devices. Furthermore, the large-capacity storage unit 15 may be an external storage device connected to the server 1.

[0027] The server 1 may execute various information processing and control processing, etc., on a single computer, or may execute the processing in a distributed manner on multiple computers. The server 1 may be realized by multiple virtual machines provided in one server, or may be realized using a cloud server. The above-mentioned various information processing and control processing, etc. may be performed on the user terminal 2 side.

[0028] FIG. 3 is an explanatory diagram showing an example of the record layout of the user DB 151 and the order DB 152. As shown in FIG. The user DB 151 includes a user ID column, a company name column, and an address column. The user ID column stores a unique user ID to identify each user. The company name column stores the user's company name. The address column stores the user's address.

[0029] The order DB 152 includes an order ID column, a user ID column, a delivery form column, a work date column, a work location column, a number of employees column, a use time column, a strength column, a required amount column, an order status column, and a confirmation date column. The order ID column stores a uniquely specified order data ID to identify the order data of each dry ice product. The user ID column stores a user ID that identifies the user.

[0030] The delivery form column stores the delivery form of the dry ice supplies (delivery of block-shaped dry ice 92, delivery of liquid cylinder 93, or delivery of both dry ice 92 and liquid cylinder 93). The work date column stores the work date of the user who uses the dry ice jacket 91. The work location column stores the work location of the user (e.g., location name or longitude and latitude).

[0031] The number of users column stores the number of people (people) using the dry ice 92. The usage time column stores the usage time of the dry ice 92 (hours / person·day). The usage time is the average usage time of multiple users who use the dry ice jacket 91 per day. For example, if the dry ice jacket 91 is used for two days, the usage time is 16 hours, and the number of users is four, the usage time is 2 hours / person·day (16 / 2 / 4). The intensity column stores the work intensity or exercise intensity of the user who uses the dry ice jacket 91. Intensity will be described later.

[0032] The required quantity column stores the required quantity of the specified dry ice product. When the delivery form is the delivery of dry ice 92, the required quantity column stores the weight of the dry ice 92 (e.g., 310 kg). When the delivery form is the delivery of liquid cylinder 93, the required quantity column stores the amount (e.g., 90 kg) of the raw material (e.g., liquefied carbon dioxide gas) filled in liquid cylinder 93.

[0033] When the delivery form is delivery of both the dry ice 92 and the liquid cylinder 93, the required amount column stores the weight of the dry ice 92 and the amount of the raw material filled in the liquid cylinder 93. The correspondence between the weight of the dry ice 92 and the amount of the raw material filled in the liquid cylinder 93 may be determined by known technology or past performance, etc.

[0034] The order status column stores the order status of the dry ice product. The order status includes a "confirmed" state where the order is confirmed, an "unconfirmed" state where the order is not confirmed, etc. The confirmation date and time column stores information on the date and time when the order of the dry ice product is confirmed.

[0035] The above-mentioned storage formats of each DB are merely examples, and other storage formats may be used as long as the relationships between the data are maintained.

[0036] 4 is a block diagram showing an example of the configuration of the user terminal 2. The user terminal 2 includes a control unit 21, a storage unit 22, a communication unit 23, an input unit 24, and a display unit 25. Each component is connected by a bus B.

[0037] The control unit 21 includes an arithmetic processing device such as a CPU, an MPU, an FPGA, a DSP, or a quantum processor, and performs various information processing, control processing, and the like related to the user terminal 2 by reading and executing a control program 2P (program product) stored in the storage unit 22. Note that, although the control unit 21 is described in Fig. 4 as being a single processor, it may be a multiprocessor.

[0038] The storage unit 22 includes memory elements such as RAM and ROM, and stores the control program 2P or data required for the control unit 21 to execute processing. The storage unit 22 also temporarily stores data required for the control unit 21 to execute arithmetic processing.

[0039] The communication unit 23 is a communication module for performing processing related to communication, and transmits and receives information to and from the server 1, etc., via the network N. The input unit 24 may be a keyboard, a mouse, or a touch panel integrated with the display unit 25. The display unit 25 is a liquid crystal display, an organic EL (electroluminescence) display, or the like, and displays various information according to instructions from the control unit 21.

[0040] Next, a process for identifying the required amount of dry ice supplies will be described. The user terminal 2 accepts the setting of the delivery form of the dry ice supplies by the user. The delivery form of the dry ice supplies includes delivery of block-shaped dry ice 92, delivery of a liquid cylinder 93, or delivery of both the dry ice 92 and the liquid cylinder 93.

[0041] The user terminal 2 accepts input (setting) of usage information by the user. The usage information includes the work date of the user using the dry ice jacket 91, the work location, the number of users of the dry ice 92 used in the dry ice jacket 91, the usage time, and the intensity during use. The usage time is the average value of the usage time of multiple users using the dry ice jacket 91. The intensity includes the work intensity or exercise intensity of the user using the dry ice jacket 91. Note that the intensity may be calculated based on the work intensity and the exercise intensity. For example, the intensity may be the average value of the work intensity and the exercise intensity.

[0042] Work intensity is an index showing the magnitude of various types of force that a worker applies to a work object, and may be set according to the work object. As an example, work intensity is classified into five ranks: work intensity "5", work intensity "4", work intensity "3", work intensity "2" and work intensity "1". Work intensity "5" is an index showing continuous physical work. Work intensity "4" is an index showing work that requires constant physical movement or discontinuous physical work. Work intensity "3" is an index showing standard work or continuous light work. Work intensity "2" is an index showing discontinuous light work. Work intensity "1" is an index showing work that requires almost no physical movement.

[0043] Exercise intensity is an index that indicates the load or difficulty during exercise. As an example, exercise intensity is classified into three ranks: exercise intensity "3", exercise intensity "2", and exercise intensity "1". Exercise intensity "3" is an index that indicates high intensity that feels hard and makes you out of breath. Exercise intensity "2" is an index that indicates medium intensity that does not feel painful. Exercise intensity "1" is an index that indicates low intensity that allows you to exercise comfortably.

[0044] The user terminal 2 transmits the delivery form and usage information (work date, work location, number of users, usage time and strength, etc.) of the received dry ice supplies to the server 1 in association with the user ID. The server 1 receives the user ID and the delivery form and usage information of the dry ice supplies transmitted from the user terminal 2. The server 1 specifies the required amount of dry ice supplies based on the number of users, usage time and strength included in the received usage information.

[0045] As an example, the required amount of dry ice supplies is expressed by the following formula (1). Required amount (Kg) = Number of users x (strength / k1+k2) x usage time / k3) x k4 …(1) k1, k2, k3, and k4 are coefficients (for example, positive numbers) for calculating the required amount of dry ice supplies, and may be set by a system administrator or the like.

[0046] The server 1 calculates (specifies) the required amount of dry ice supplies using the above-mentioned formula (1) based on the received number of users, usage time, and strength. The server 1 assigns an order ID to the dry ice supplies to be ordered. The server 1 stores the user ID, delivery form of the dry ice supplies, work date, work location, number of users, usage time, strength, and the specified required amount of dry ice supplies in the order DB 152 as one record in association with the assigned order ID.

[0047] Based on the user ID, the server 1 transmits the order ID and the required amount of the specified dry ice product to the user terminal 2. The user terminal 2 receives and displays the order ID and the required amount of the dry ice product transmitted from the server 1.

[0048] When the user terminal 2 receives an order confirmation request from the user for the identified required amount of dry ice supplies, it transmits the order ID and the order confirmation request to the server 1. The server 1 confirms the order for the dry ice supplies in response to the order ID and the order confirmation request transmitted from the user terminal 2. The server 1 updates the order DB 152 with the order status as "confirmed" and the confirmation date and time in association with the order ID.

[0049] Furthermore, when the user terminal 2 receives a request to cancel the order confirmation from the user for order data whose order status is "confirmed", the user terminal 2 transmits the order ID and the request to cancel the order confirmation to the server 1. The server 1 determines whether or not the order confirmation can be canceled in response to the order ID and the request to cancel the order confirmation transmitted from the user terminal 2.

[0050] Specifically, the server 1 determines that the order can be cancelled if the order confirmation date is earlier than the date on which the order can be cancelled. The server 1 determines that the order cannot be cancelled if the order confirmation date is not earlier than the date on which the order can be cancelled. The date on which the order can be cancelled is the day before the order closing date (e.g., the day before the work day). Note that the order closing date is not limited to one day, such as the day before, but may be two days, such as the day before, or several days.

[0051] In addition, the process of determining whether to cancel the order confirmation is not limited to the process of determining whether to cancel the order confirmation based on the confirmation cancellation date. For example, the process of determining whether to cancel the order confirmation may be performed based on the shipping status of the dry ice product. For example, the order confirmation can be cancelled for dry ice products whose shipping status is "not shipped."

[0052] When the server 1 determines that the order can be cancelled, it cancels the order confirmation of the dry ice product. The server 1 updates the order DB 152 with the order status of "unconfirmed" and the confirmation date and time of "-" or blank, in association with the order ID.

[0053] 5 is an explanatory diagram showing an example of an order screen for dry ice supplies. The screen includes a delivery form selection field 11a, a user number reception field 11b, a use time reception field 11c, a strength reception field 11d, a work date reception field 11e, a work location reception field 11f, a required amount display field 11g, an order confirmation checkbox 11h, and a required amount calculation button 11i.

[0054] The delivery form selection field 11a is a field for accepting the selection (setting) of the delivery form of the dry ice equipment. The number of users reception field 11b is a field for accepting the input of the number of users of the dry ice 92 to be used in the dry ice jacket 91. The usage time reception field 11c is a field for accepting the input of the average usage time (average usage time) of multiple users who use the dry ice jacket 91. The intensity reception field 11d is a field for accepting the input of the work intensity of the users who use the dry ice jacket 91.

[0055] The work date reception field 11e is a field that receives input of the user's work date. The work location reception field 11f is a field that receives input of the user's work location. The required amount display field 11g is a display field that displays the required amount of the specified dry ice product. The order confirmation check box 11h is a check box that receives a request to confirm or cancel the confirmation of an order for dry ice products. The required amount calculation button 11i is a button that receives a request to calculate the required amount of dry ice products.

[0056] Note that the order confirmation check box 11h is not limited to a check box. For example, the order confirmation check box 11h may be an object such as a button, an icon, or a radio button that can accept a request to confirm or cancel the order for dry ice products.

[0057] The server 1 transmits an order screen including a delivery form selection field 11a, a number of users reception field 11b, a usage time reception field 11c, a strength reception field 11d, a work date reception field 11e, a work location reception field 11f, a required amount display field 11g, an order confirmation checkbox 11h, and a required amount calculation button 11i to the user terminal 2. The user terminal 2 receives the order screen transmitted from the server 1 and displays it.

[0058] When the user terminal 2 receives a selection operation in the delivery form selection field 11a, the user terminal 2 receives the delivery form of the dry ice product selected by the user. Items in the delivery form selection field 11a are, for example, "block dry ice," "liquid cylinder," and "both dry ice and liquid cylinder."

[0059] When the user terminal 2 receives an input operation in the number-of-users receiving field 11b, it acquires the number of users of the dry ice 92 input by the user. When the user terminal 2 receives an input operation in the usage time receiving field 11c, it acquires the average usage time of the dry ice 92 input by the user.

[0060] When the user terminal 2 receives an input operation in the intensity reception field 11d, it acquires the user's activity intensity input by the user. When the user terminal 2 receives an input operation in the work date reception field 11e, it acquires the work date input by the user. When the user terminal 2 receives an input operation in the work location reception field 11f, it acquires the work location input by the user.

[0061] When the user terminal 2 receives a touch (click) operation of the required amount calculation button 11i, it transmits the acquired delivery form, work date, work location, number of users, usage time, and intensity to the server 1 in association with the user ID. The server 1 receives the user ID, delivery form, work date, work location, number of users, usage time, and intensity transmitted from the user terminal 2. The server 1 determines the required amount of dry ice supplies using the above-mentioned formula (1) based on the received number of users, usage time, and intensity.

[0062] The server 1 assigns an order ID to the dry ice product to be ordered. The server 1 transmits the assigned order ID and the identified required amount of the dry ice product to the user terminal 2. The user terminal 2 receives the order ID and required amount of the dry ice product transmitted from the server 1. The user terminal 2 displays the received required amount of the dry ice product in the required amount display field 11g.

[0063] When the user terminal 2 receives a check operation on the order confirmation checkbox 11h, it transmits the order ID and an order confirmation request for the dry ice product to the server 1. The server 1 confirms the order for the dry ice product in response to the order ID and the order confirmation request transmitted from the user terminal 2. The server 1 stores the order status of "confirmed" and the confirmation date and time in the order DB 152 in association with the order ID.

[0064] Furthermore, when the user terminal 2 receives an operation to uncheck the order confirmation check box 11h whose check state is checked, it transmits the order ID and a request to cancel the order confirmation for the dry ice product to the server 1. In response to the order ID and the request to cancel the order confirmation transmitted from the user terminal 2, the server 1 determines whether or not the order confirmation can be canceled based on the order confirmation date and the order cancellation possible date.

[0065] When the server 1 determines that the order can be cancelled, it cancels the order confirmation of the dry ice product. The server 1 updates the order DB 152 with the order status of "unconfirmed" and the confirmation date and time of "-" or blank, in association with the order ID.

[0066] 6 is a flowchart showing a process for outputting the required amount of dry ice supplies. The control unit 21 of the user terminal 2 receives a setting of the delivery form of the dry ice supplies (delivery of dry ice 92, delivery of liquid cylinder 93, or delivery of both) by the user through the input unit 24 (step S201). The control unit 21 receives an input of usage information by the user through the input unit 24 (step S202).

[0067] The usage information includes the work date and work location of the user who uses the dry ice jacket 91, the number of people using the dry ice 92 used in the dry ice jacket 91, the usage time, and the strength at the time of use.

[0068] The control unit 21 transmits the received delivery form and usage information of the dry ice supplies to the server 1 via the communication unit 23 in association with the user ID (step S203). The control unit 11 of the server 1 receives the user ID, delivery form and usage information of the dry ice supplies transmitted from the user terminal 2 via the communication unit 13 (step S101). The control unit 11 determines the required amount of dry ice supplies using the above-mentioned formula (1) based on the number of users, usage time and intensity included in the received usage information (step S102).

[0069] The control unit 11 stores the identified required amount of the dry ice equipment in the order DB 152 of the mass storage unit 15 (step S103). Specifically, the control unit 11 assigns an order ID to the dry ice equipment to be ordered. The control unit 11 stores the user ID, the delivery form of the dry ice equipment, the work date, the work location, the number of users, the use time, the strength, and the identified required amount of the dry ice equipment as one record in the order DB 152 in association with the assigned order ID.

[0070] The control unit 11 transmits the identified required amount of dry ice equipment to the user terminal 2 via the communication unit 13 based on the user ID (step S104). The control unit 21 of the user terminal 2 receives the required amount of dry ice equipment transmitted from the server 1 via the communication unit 23 (step S204). The control unit 21 displays the received required amount of dry ice equipment on the display unit 25 (step S205). The control unit 21 ends the process.

[0071] 7 is a flowchart showing a processing procedure for accepting an order confirmation request for dry ice supplies. The control unit 21 of the user terminal 2 accepts a user's order confirmation request for dry ice supplies via the input unit 24 (step S211). The control unit 21 transmits the accepted order confirmation request to the server 1 via the communication unit 23 in association with the order ID (step S212).

[0072] The control unit 11 of the server 1 receives the order ID and the order confirmation request transmitted from the user terminal 2 via the communication unit 13 (step S111). In response to the received order confirmation request, the control unit 11 confirms the order for the dry ice product (step S112). The control unit 11 updates the order DB 152 in the mass storage unit 15 with the order status of "confirmed" and the confirmation date and time in association with the order ID (step S113).

[0073] The control unit 11 transmits the result of the order confirmation for the dry ice product to the user terminal 2 via the communication unit 13 in association with the order ID (step S114). The control unit 21 of the user terminal 2 receives the order ID and the result of the order confirmation transmitted from the server 1 via the communication unit 23 (step S213). The control unit 21 displays the received result of the order confirmation on the display unit 25 (step S214). For example, the control unit 21 sets the check status of the order confirmation checkbox 11h (FIG. 5) to a checked state. The control unit 21 ends the process.

[0074] 8 is a flowchart showing a processing procedure for accepting a request to cancel the order confirmation for a dry ice product. The control unit 21 of the user terminal 2 accepts a request to cancel the order confirmation for a dry ice product from a user through the input unit 24 (step S221). The control unit 21 transmits the accepted request to cancel the order confirmation to the server 1 through the communication unit 23 in association with the order ID (step S222).

[0075] The control unit 11 of the server 1 receives the order ID and the order confirmation cancellation request transmitted from the user terminal 2 via the communication unit 13 (step S121). In response to the received order confirmation cancellation request, the control unit 11 determines whether the order confirmation can be cancelled based on the order confirmation date and the order confirmation cancellation possible date (step S122).

[0076] When the control unit 11 determines that the order cannot be released from the confirmed state (NO in step S122), it transmits a message indicating that the order cannot be released from the confirmed state to the user terminal 2 via the communication unit 13 (step S126). The control unit 21 of the user terminal 2 receives the message indicating that the order cannot be released from the confirmed state sent from the server 1 via the communication unit 23 (step S223). The control unit 21 displays the received message indicating that the order cannot be released from the confirmed state on the display unit 25 (step S224).

[0077] When the control unit 11 determines that the order can be cancelled (YES in step S122), it cancels the order confirmation for the dry ice product (step S123). The control unit 11 updates the order DB 152 with the order status of "unconfirmed" and the confirmation date and time that is "-" or blank, in association with the order ID (step S124). The control unit 11 transmits the result of the order cancellation for the dry ice product to the user terminal 2 via the communication unit 13, in association with the order ID (step S125).

[0078] The control unit 21 of the user terminal 2 receives the order ID and the result of the order confirmation cancellation sent from the server 1 through the communication unit 23 (step S225). The control unit 21 displays the received result of the order confirmation cancellation on the display unit 25 (step S226). For example, the control unit 21 sets the checked state of the order confirmation checkbox 11h (FIG. 5) to an unchecked state. The control unit 21 ends the process.

[0079] Next, a process for displaying history data of orders for dry ice products will be described. 9 is a flowchart showing a processing procedure for displaying order history data. The control unit 21 of the user terminal 2 transmits the user ID and the target period (e.g., February 2023) for displaying the order history data of dry ice products to the server 1 via the communication unit 23 (step S231). The control unit 11 of the server 1 receives the user ID and the target period transmitted from the user terminal 2 via the communication unit 13 (step S131).

[0080] Based on the received user and target period, the control unit 11 acquires the order history data of the dry ice supplies whose order status is "confirmed" from the order DB 152 in the mass storage unit 15 (step S132). The history data includes the order ID, delivery form, work date, number of users, usage time, strength, required amount of dry ice supplies, or the confirmed date and time.

[0081] Based on the user ID, the control unit 11 transmits the acquired order history data to the user terminal 2 via the communication unit 13 (step S133). The control unit 21 of the user terminal 2 receives the order history data transmitted from the server 1 via the communication unit 23 (step S232). The control unit 21 displays the received order history data on the display unit 25 (step S233). The control unit 21 ends the process.

[0082] According to this embodiment, the required amount of dry ice equipment can be determined more accurately based on the number of users, the duration of use, and the strength of the dry ice 92 used in the dry ice jacket 91. This makes it possible to avoid an increase in the burden on workers due to a shortage of dry ice equipment, and to reduce the environmental burden due to an excess of dry ice equipment.

[0083] According to this embodiment, the required amount of dry ice supplies is automatically identified, thereby reducing the effort or burden on the person in charge of ordering dry ice supplies.

[0084] According to this embodiment, by displaying the order history data of dry ice products, it is possible to realize planned ordering or budget management.

[0085] (Embodiment 2) The second embodiment relates to a form in which the required amount of dry ice equipment is specified based on the number of users, the duration of use, the intensity, and the heat index. Note that the description of the contents overlapping with the first embodiment will be omitted. The heat index includes temperature, humidity, WBGT (Wet Bulb Globe Temperature), etc. In the following, an example in which the heat index is WBGT will be described, but the same can be applied to other types of heat index. For other types of heat index, for example, temperature, humidity, wind speed, radiation temperature, etc. may be used alone or in combination.

[0086] Fig. 10 is an explanatory diagram showing an example of a record layout of the order DB 152 in embodiment 2. Note that a description of the contents that overlap with Fig. 3 will be omitted. The order DB 152 includes a WBGT column.

[0087] The WBGT column stores the WBGT value, which indicates the heat index. WBGT is a heat index estimated based on temperature and humidity. For example, the WBGT value may be "31 or more: do not exercise in principle, 28 to 31: high alert, 25 to 28: alert, 21 to 25: caution, less than 21: almost safe."

[0088] Fig. 11 is an explanatory diagram showing an example of an order screen for dry ice supplies in the second embodiment. The same reference numerals are used for the same contents as in Fig. 5, and the description thereof will be omitted. The order screen includes a WBGT display field 12a. The WBGT display field 12a is a display field that displays the WBGT value indicating the heat index.

[0089] When the user terminal 2 receives a touch operation of the required amount calculation button 11i, it transmits to the server 1 the delivery form of the dry ice equipment selected in the delivery form selection field 11a, the number of users obtained in the number of users reception field 11b, the usage time obtained in the usage time reception field 11c, the user's work intensity obtained in the intensity reception field 11d, the work date obtained in the work date reception field 11e, and the work location obtained in the work location reception field 11f, in association with the user ID.

[0090] The server 1 receives the user ID, number of users, usage time, intensity, work date, and work location transmitted from the user terminal 2. Based on the received work date and work location, the server 1 acquires the WBGT value, which is the heat index announced by the Japan Meteorological Agency, for example, from an external weather forecast server or site. The server 1 determines whether the acquired WBGT value is less than a predetermined WBGT threshold (for example, 20).

[0091] If the WBGT value is less than a predetermined WBGT threshold, the server 1 uses the above-mentioned formula (1) to determine the required amount of dry ice supplies. If the WBGT value is equal to or greater than a predetermined WBGT threshold, the server 1 determines the required amount of dry ice supplies based on the number of users, the usage time, the intensity, and the WBGT value. The required amount of dry ice supplies based on the WBGT is expressed, for example, by the following formula (2). Required amount (Kg)=(k5×WBGT-k6)×Number of users×(Strength / k1+k2)×Usage time / k3)×k4…(2) k5 and k6 are coefficients (for example, positive numbers) related to the WBGT value, and may be set by a system administrator or the like.

[0092] The server 1 identifies the required amount of dry ice supplies using the above-mentioned formula (2) based on the received number of users, usage time, intensity, and the acquired WBGT value. The server 1 transmits the order ID, WBGT value, and the identified required amount of dry ice supplies to the user terminal 2 based on the user ID. The user terminal 2 receives the order ID, WBGT value, and required amount of dry ice supplies transmitted from the server 1. The user terminal 2 displays the received WBGT value in the WBGT display field 12a. The user terminal 2 displays the received required amount of dry ice supplies in the required amount display field 11g.

[0093] Fig. 12 is a flow chart showing the processing procedure for outputting the required amount of dry ice equipment in embodiment 2. Note that the same reference numerals are used for the contents overlapping with Fig. 6, and the description thereof will be omitted. After executing the process of step S101, the control unit 11 of the server 1 acquires the WBGT value announced by the Japan Meteorological Agency, for example, from an external weather forecast server or site, via the communication unit 13, based on the work date and work location of the user who uses the dry ice jacket 91 (step S105).

[0094] The control unit 11 executes a subroutine for processing to specify the required amount of dry ice equipment (step S106). The subroutine for processing to specify the required amount will be described later. The control unit 11 stores the specified required amount of dry ice equipment in the order DB 152 of the mass storage unit 15 (step S107). The control unit 11 executes the processing of step S104.

[0095] Specifically, the control unit 11 assigns an order ID to the dry ice product to be ordered. The control unit 11 stores the user ID, the delivery form of the dry ice product, the work date, the work location, the number of users, the use time, the strength, the WBGT value, and the required amount of the identified dry ice product in the order DB 152 as one record in association with the assigned order ID.

[0096] 13 is a flowchart showing the procedure of a subroutine for processing to identify the required amount of dry ice equipment. The control unit 11 of the server 1 determines whether the acquired WBGT value is less than a predetermined WBGT threshold (step S01). If the WBGT value is less than the predetermined WBGT threshold (YES in step S01), the control unit 11 identifies the required amount of dry ice equipment using the above-mentioned formula (1) (first formula) (step S02). The control unit 11 ends the subroutine for processing to identify the required amount and returns.

[0097] If the WBGT value is equal to or greater than the predetermined WBGT threshold (NO in step S01), the control unit 11 uses the above-mentioned formula (2) (second formula) to determine the required amount of dry ice equipment (step S03). The control unit 11 ends the subroutine for the process of determining the required amount and returns.

[0098] According to this embodiment, it is possible to determine the required amount of dry ice supplies based on the number of users, the duration of use, the intensity, and the heat index.

[0099] (Embodiment 3) The third embodiment relates to a form in which the required amount of dry ice equipment is specified based on the number of users, the duration of use, the intensity, the heat index, and a coefficient. Note that the description of the contents overlapping with the first and second embodiments will be omitted. The coefficient is a coefficient related to the intensity or the heat index, etc.

[0100] Fig. 14 is an explanatory diagram showing an example of a record layout of the order DB 152 in the third embodiment. Description of the contents overlapping with Fig. 10 will be omitted. The order DB 152 includes a coefficient column. The coefficient column stores coefficients related to strength or heat index, etc., in order to specify the required amount of dry ice supplies.

[0101] Fig. 15 is an explanatory diagram showing an example of an order screen for dry ice supplies in the third embodiment. The same reference numerals are used for the contents that overlap with Fig. 11, and the description will be omitted. The order screen includes a coefficient reception field 12b and a legend display field 12c. The coefficient reception field 12b is a field for receiving input of coefficients related to intensity or heat index, etc. The legend display field 12c is a display field for displaying legend information such as the correspondence between work intensity and coefficients, and the correspondence between WBGT values ​​and coefficients.

[0102] The user terminal 2 acquires legend information indicating the correspondence between the work intensity and the coefficient, and the correspondence between the WBGT value and the coefficient, etc. The legend information may be stored in advance in the storage unit 22 of the user terminal 2. The user terminal 2 displays the acquired legend information in the legend display field 12c.

[0103] As shown in the figure, the coefficients corresponding to work intensity "5", work intensity "4", work intensity "3", work intensity "2" and work intensity "1" are 1.0, 0.8, 0.6, 0.4 and 0.2, respectively. In terms of WBGT values, the coefficients corresponding to "31°C or higher", "28-31°C", "25-28°C" and "21-25°C" are 1.0, 0.8, 0.5 and 0.2, respectively. The coefficients can be the average of the intensity coefficient and the WBGT coefficient.

[0104] When the user terminal 2 receives an input operation of the coefficient reception field 12b, it receives the coefficient input by the user. When the user terminal 2 receives a touch operation of the required amount calculation button 11i, it transmits to the server 1, in association with the user ID, the delivery form of the dry ice product selected in the delivery form selection field 11a, the number of users acquired in the number of users reception field 11b, the usage time acquired in the usage time reception field 11c, the work intensity of the user acquired in the intensity reception field 11d, the work date acquired in the work date reception field 11e, the work place acquired in the work place reception field 11f, and the coefficient acquired in the coefficient reception field 12b.

[0105] The server 1 receives the user ID, number of users, usage time, intensity, work date, work location, and coefficients transmitted from the user terminal 2. Based on the received work date and work location, the server 1 acquires the WBGT value announced by the Japan Meteorological Agency, for example, from an external weather forecast server or site. The server 1 determines whether the acquired WBGT value is below a predetermined WBGT threshold. If the WBGT value is below the predetermined WBGT threshold, the server 1 identifies the required amount of dry ice supplies using formula (3) described below.

[0106] The required amount of dry ice equipment based on the coefficient is expressed, as an example, by the following equation (3). Required amount (kg) = number of users × (intensity / k1+k2) × usage time / k3) × k4 × coefficient … (3)

[0107] If the WBGT value is equal to or greater than a predetermined WBGT threshold, the server 1 identifies the required amount of dry ice equipment using the formula (4) described below. The required amount of dry ice equipment based on the WBGT and coefficients is expressed by the following formula (4), for example. Required amount (Kg)=(k5×WBGT-k6)×Number of users×(Strength / k1+k2)×Usage time / k3)×k4×Coefficient…(4)

[0108] The server 1 transmits the order ID and the required amount of the specified dry ice product to the user terminal 2 based on the user ID. The user terminal 2 receives the order ID and the required amount of the dry ice product transmitted from the server 1. The user terminal 2 displays the received required amount of the dry ice product in the required amount display field 11g.

[0109] Fig. 16 is a flow chart showing the processing procedure for outputting the required amount of dry ice equipment in embodiment 3. Note that the same reference numerals are used for the same contents as in Fig. 12, and the description thereof will be omitted. After executing the process of step S201, the control unit 21 of the user terminal 2 accepts input of the user's usage information (the number of people using the dry ice 92, the usage time, and the strength during use) and coefficients via the input unit 24 (step S241).

[0110] The control unit 21 transmits the received delivery form, usage information, and coefficients of the dry ice equipment to the server 1 via the communication unit 23 in association with the user ID (step S242). The control unit 11 of the server 1 receives the user ID, delivery form, usage information, and coefficients of the dry ice equipment transmitted from the user terminal 2 via the communication unit 13 (step S141). The control unit 11 executes the process of step S105.

[0111] 17 is a flowchart showing the procedure of a subroutine for specifying the required amount of dry ice equipment in embodiment 3. The control unit 11 of the server 1 determines whether the acquired WBGT value is less than a predetermined WBGT threshold value (step S11).

[0112] If the WBGT value is less than the predetermined WBGT threshold (YES in step S11), the control unit 11 uses the above-mentioned formula (3) (third formula) to specify the required amount of dry ice equipment (step S12). The control unit 11 ends the subroutine for specifying the required amount and returns.

[0113] If the WBGT value is equal to or greater than the predetermined WBGT threshold (NO in step S11), the control unit 11 uses the above-mentioned formula (4) (fourth formula) to determine the required amount of dry ice equipment (step S13). The control unit 11 ends the subroutine for the process of determining the required amount and returns.

[0114] According to this embodiment, it is possible to determine the required amount of dry ice supplies based on the number of users, usage time, intensity, heat index and coefficients.

[0115] (Embodiment 4) The fourth embodiment relates to a form in which artificial intelligence (AI) is used to specify the required amount of dry ice supplies. Note that a description of the contents that overlap with the first to third embodiments will be omitted.

[0116] Fig. 18 is a block diagram showing a configuration example of the server 1 in the fourth embodiment. Note that the same reference numerals are used for the contents overlapping with Fig. 2, and the description thereof will be omitted. The mass storage unit 15 includes a necessary amount specifying model 153. The necessary amount specifying model 153 is an estimator that estimates (specifies) the necessary amount of dry ice supplies, and is a trained model generated by machine learning.

[0117] The required amount specification model 153 is used as a program module that is a part of artificial intelligence software. The required amount specification model 153 is an estimator that has already constructed (generated) a neural network that receives the number of people using the dry ice 92, the usage time, the strength during use, and the heat index as inputs, and outputs the result of specifying the required amount of the dry ice equipment.

[0118] The neural network is, for example, a DNN (Deep Neural Network(s)), and has an input layer that accepts inputs of the number of people using dry ice 92, the duration of use, the strength, and the heat index, an output layer that outputs the results of identifying the required amount of dry ice equipment, and an intermediate layer that has been trained by backpropagation. Each layer has one or more neurons (nodes), and each neuron has a value. Neurons between one layer and the next layer are connected by edges, and each edge has variables (or parameters) such as weights and biases.

[0119] In a DNN, the neuron values ​​of each layer are calculated by performing a predetermined calculation based on the neuron values ​​of the previous layer and edge weights, etc. When input data is input to the neurons of the input layer, the neuron values ​​of the next layer are calculated by a predetermined calculation, and the data calculated by the calculation is used as input to calculate the neuron values ​​of the next layer by a predetermined calculation of that layer. The neuron values ​​of the final layer, the output layer, become the output data for the input data.

[0120] The server 1 compares the results output from the output layer (required amount of dry ice supplies) with the required amount of dry ice supplies contained in the training data, i.e., the correct answer value, and optimizes the variables used in the calculation process in the middle layer so that the output value from the output layer approaches the correct answer value. The training data is data generated by associating the required amount of dry ice supplies obtained from past sales results with the number of people using dry ice 92, the usage time, the strength, and the heat index. The required amount of highly rated dry ice supplies may also be obtained from a survey of users (customers), etc.

[0121] The variables are, for example, weights (coupling coefficients) between neurons, coefficients of activation functions used in each neuron, etc. Although there are no particular limitations on the method of optimizing the variables, for example, the server 1 optimizes various variables using the backpropagation method.

[0122] The server 1 performs the above-mentioned processing on the number of users, the duration of use, the strength, and the heat index of the dry ice 92 included in the training data, and generates the necessary amount specifying model 153. Note that, in the present embodiment, an example in which the necessary amount specifying model 153 is generated by the server 1 has been described, but this is not limiting. For example, the necessary amount specifying model 153 may be generated by an external information processing device or a cloud server.

[0123] The input data to be input to the required amount specification model 153 is not limited to the number of people using the dry ice 92, the usage time, the strength, and the heat index. For example, the input data may include the number of people using the dry ice 92, the usage time, the strength, the heat index, and a coefficient.

[0124] When the server 1 acquires the number of users, usage time, intensity, and heat index of the dry ice 92, it inputs the acquired number of users, usage time, intensity, and heat index to the required amount identification model 153. The server 1 performs a calculation process in the middle layer of the required amount identification model 153 to extract feature amounts of the number of users, usage time, intensity, and heat index. The server 1 inputs the extracted feature amounts to the output layer of the required amount identification model 153, and outputs the identification result that identifies the required amount of dry ice supplies. For example, the identified required amount of dry ice supplies is 320 kg.

[0125] The classification results for the required amount of dry ice supplies may be output from the required amount specification model 153. For example, for input data including the number of users, the usage time, the intensity, and the heat index, the classification results for the required amount of dry ice supplies may be "320 kg", "315 kg", "325 kg", and "305 kg", and the probability values ​​of each classification result may be "0.07", "0.84", "0.06", and "0.03" may be output.

[0126] Alternatively, a specified threshold may be used to output the identification result. For example, when the server 1 determines that the probability value (0.84) of "315 kg" is equal to or greater than a specified threshold (e.g., 0.80), the server 1 outputs the identification result that the required amount of dry ice supplies is "315 kg" for the input data including the number of users, the usage time, the intensity, and the heat index. Note that, without using the above-mentioned threshold, the required amount of dry ice supplies corresponding to the highest probability value among the probability values ​​of each classification result may be output as the identification result.

[0127] In this embodiment, the required amount identification model 153 is described as a DNN; however, the required amount identification model 153 is not limited to a DNN, and may be a trained model constructed with any learning algorithm, such as a Convolutional Neural Network (CNN), a Regions with Convolutional Neural Network (RCNN), a Fast RCNN, a Faster RCNN, a Single Shot Multibook Detector (SSD), a You Only Look Once (YOLO), a Support Vector Machine (SVM), a Bayesian network, a Transformer network, or a regression tree.

[0128] 19 is a flowchart showing a process procedure for outputting the required amount of dry ice equipment in embodiment 4. The control unit 11 of the server 1 inputs the number of users, the usage time, the strength, and the heat index of the dry ice 92 to the required amount specification model 153 (step S21). The control unit 11 outputs the required amount of the dry ice equipment specified by the required amount specification model 153 (step S22).

[0129] Specifically, the control unit 11 inputs the number of people using dry ice 92, the usage time, the strength, and the heat index to the input layer of the required amount determination model 153. The control unit 11 extracts features of the input information by using the intermediate layer by changing the number of dimensions of the input information input from the input layer. The control unit 11 identifies (estimates) the required amount of dry ice supplies according to the extracted features by using the fully connected layer in which parameters are learned by backpropagation. The control unit 11 outputs the identified required amount of dry ice supplies from the output layer.

[0130] According to this embodiment, it is possible to more accurately specify the required amount of dry ice supplies using the required amount specification model 153.

[0131] (Embodiment 5) The fifth embodiment relates to a form in which the required amount of dry ice supplies is output by day. Note that the description of the contents that overlap with the first to fourth embodiments will be omitted.

[0132] Fig. 20 is an explanatory diagram showing an example of an ordering screen for dry ice supplies by day. Note that the same reference numerals are used for the same contents as in Fig. 15, and the description thereof will be omitted. The ordering screen includes a required amount update button 12d. The required amount update button 12d is a button for receiving a request to update the required amount of dry ice supplies.

[0133] The user terminal 2 receives input of the number of users, usage time, intensity, work location, and coefficient for multiple days (for example, August 1 to August 5) of the dry ice 92. Note that the reception process of the number of users, usage time, intensity, work date, work location, and coefficient is similar to that in FIG. 15, and therefore description thereof will be omitted.

[0134] When the user terminal 2 receives a touch operation of the required amount calculation button 11i, it transmits the received number of users, usage time, intensity, work location, and coefficients for multiple days to the server 1. The server 1 receives the number of users, usage time, intensity, work location, and coefficients for multiple days transmitted from the user terminal 2. Based on the received work dates and work locations, the server 1 acquires the WBGT values ​​for each work day announced by the Japan Meteorological Agency from, for example, an external weather forecast server or site.

[0135] The server 1 identifies the required amount of dry ice supplies for each work day based on the received number of users, usage time, intensity, and coefficient for each work day and the acquired WBGT value for each work day. Note that the process of identifying the required amount of dry ice supplies is similar to that of the first to fourth embodiments, and therefore a description thereof will be omitted. The server 1 transmits the identified required amount of dry ice supplies for each work day to the user terminal 2. The user terminal 2 displays the required amount of dry ice supplies for each work day transmitted from the server 1 in a required amount display field 11g.

[0136] When the user terminal 2 receives a check operation on the order confirmation checkbox 11h corresponding to each work day, it transmits the order ID corresponding to each work day and an order confirmation request to the server 1. The server 1 confirms the order of dry ice supplies for each work day in response to the order ID corresponding to each work day and the order confirmation request transmitted from the user terminal 2. The server 1 stores the order status of "confirmed" and the confirmation date and time in the order DB 152 in association with the order ID corresponding to each work day.

[0137] Furthermore, when the user terminal 2 receives an operation to uncheck the order confirmation check box 11h whose check status is checked, it transmits the order ID corresponding to each work day and a request to cancel the order confirmation to the server 1. The server 1 cancels the order confirmation of the dry ice supplies for each work day in response to the order ID corresponding to each work day and the request to cancel the order confirmation transmitted from the user terminal 2. The server 1 stores the order status of "unconfirmed" and the confirmation date and time that is "-" or blank in the order DB 152 in association with the order ID corresponding to each work day.

[0138] When the user terminal 2 receives a touch operation of the required amount update button 12d, it transmits usage information (delivery type, number of users, usage time, strength, work location, coefficient, etc.) corresponding to each work date (e.g., August 4 and August 5) with an order status of "unconfirmed" in association with the user ID to the server 1. The server 1 receives the user ID, delivery type, and usage information transmitted from the user terminal 2.

[0139] Based on the received work date and work location, the server 1 acquires the WBGT value for each work date announced by the Japan Meteorological Agency, for example, from an external weather forecast server or site. The server 1 re-specifies the required amount of dry ice supplies based on the received usage information and the acquired WBGT value. Note that the process of specifying the required amount of dry ice supplies is the same as in the first to fourth embodiments, and therefore a description thereof will be omitted.

[0140] The server 1 transmits the updated WBGT value and the re-specified required amount of dry ice equipment for each work day to the user terminal 2 based on the user ID. The user terminal 2 receives the updated WBGT value and the re-specified required amount of dry ice equipment for each work day transmitted from the server 1. The user terminal 2 displays (updates) the received updated WBGT value in the WBGT display field 12a, and displays (updates) the re-specified required amount of dry ice equipment in the required amount display field 11g, for each work day.

[0141] On the other hand, for each work day where the order status is "confirmed" (for example, August 1st to August 3rd), the required amount of dry ice products is not updated.

[0142] In addition, in Fig. 20, the required amount update button 12d is provided, but the required amount update button 12d is not essential. The required amount of dry ice supplies can be automatically updated. The timing for updating the required amount of dry ice supplies is not particularly limited, but it may be updated periodically, such as daily, or it may be configured to update the required amount of dry ice supplies when the system is started or when the Japan Meteorological Agency announces the WBGT value.

[0143] 21 is a flowchart showing a process procedure for outputting the required amount of dry ice equipment by day. The control unit 21 of the user terminal 2 accepts the setting of the delivery form of the dry ice equipment by the user through the input unit 24 (step S251). The control unit 21 accepts the input of usage information (the number of people using the dry ice 92, the usage time, the strength during use, etc.) for multiple days (for example, August 1st to August 5th) through the input unit 24 (step S252).

[0144] The control unit 21 transmits the received delivery form of the dry ice product and the usage information for multiple days to the server 1 via the communication unit 23 in association with the user ID (step S253). The control unit 11 of the server 1 receives the user ID, the delivery form of the dry ice product, and the usage information for multiple days transmitted from the user terminal 2 via the communication unit 13 (step S151).

[0145] The control unit 11 acquires the WBGT value for each work day announced by the Japan Meteorological Agency from, for example, an external weather forecast server or site, via the communication unit 13 based on the work day and work location of the user who uses the dry ice jacket 91 (step S152). The control unit 11 executes a subroutine for processing to specify the required amount of dry ice equipment (step S153). The subroutine for processing to specify the required amount in the fifth embodiment will be described later.

[0146] The control unit 11 stores the identified required amount of the dry ice equipment for each work day in the order DB 152 of the mass storage unit 15 (step S154). Specifically, the control unit 11 assigns an order ID to the dry ice equipment to be ordered for each work day. The control unit 11 stores the user ID, the delivery form of the dry ice equipment, the work day, the work location, the number of users, the use time, the strength, and the identified required amount of the dry ice equipment as one record in the order DB 152 in association with the assigned order ID for each work day.

[0147] The control unit 11 transmits the required amount of dry ice supplies for each identified work day to the user terminal 2 via the communication unit 13 based on the user ID (step S155). The control unit 21 of the user terminal 2 receives the required amount of dry ice supplies for each work day transmitted from the server 1 via the communication unit 23 (step S254). The control unit 21 displays the received required amount of dry ice supplies for each work day on the display unit 25 (step S255). The control unit 21 ends the process.

[0148] Fig. 22 is a flow chart showing the processing procedure of a subroutine of the process of identifying the required amount of dry ice equipment in the fifth embodiment. Note that the same reference numerals are used for the same contents as in Fig. 13, and the description thereof will be omitted. The control unit 11 of the server 1 acquires one of the accepted multiple work days (step S04). The control unit 11 executes the processes of steps S01 to S03.

[0149] The control unit 11 determines whether the work day is the last work day among the multiple work days (step S05). If the work day is not the last work day (NO in step S05), the control unit 11 returns to the process of step S04. If the work day is the last work day (YES in step S05), the control unit 11 ends the subroutine of the required amount determination process and returns.

[0150] The above-mentioned daily required amount of dry ice equipment is determined based on the number of users, the duration of use, the intensity, and the WBGT value, but is not limited to this. For example, the daily required amount of dry ice equipment may be determined based on the number of users, the duration of use, the intensity, the WBGT value, and a coefficient.

[0151] Next, a process for re-determining the required amount of the dry ice product when the order for the dry ice product is not yet confirmed will be described.

[0152] 23 is a flowchart showing a processing procedure for re-determining the required amount of dry ice supplies. The control unit 21 of the user terminal 2 transmits a user ID to the server 1 via the communication unit 23 (step S261). The control unit 11 of the server 1 receives the user ID transmitted from the user terminal 2 via the communication unit 13 (step S161).

[0153] Based on the received user ID, the control unit 11 extracts order data whose order status is "unconfirmed" from the order DB 152 in the mass storage unit 15 (step S162). The order data includes the order ID, work date (unconfirmed date), work location, number of users, use time, and intensity, etc. Based on the unconfirmed date and work location corresponding to each extracted order data, the control unit 11 acquires the WBGT value for each unconfirmed date announced by the Japan Meteorological Agency, for example, from an external weather forecast server or site (step S163).

[0154] The control unit 11 executes a subroutine for specifying the required amount based on the number of users, the duration of use, and the strength included in the extracted order data for each unconfirmed day and the acquired WBGT value for each unconfirmed day, thereby respecifying the required amount of dry ice supplies for each unconfirmed day (step S164).The control unit 11 updates the order DB 152 with the respecified required amount in association with the user ID and the order ID of each order data (step S165).

[0155] The control unit 11 transmits the necessary amount of dry ice supplies for each re-specified unconfirmed date to the user terminal 2 via the communication unit 13 based on the user ID (step S166). The control unit 21 of the user terminal 2 receives the necessary amount of dry ice supplies for each unconfirmed date transmitted from the server 1 via the communication unit 23 (step S262). The control unit 21 displays the received necessary amount of dry ice supplies for each unconfirmed date on the display unit 25 (step S263). The control unit 21 ends the process.

[0156] According to this embodiment, it is possible to output the required amount of dry ice supplies by day.

[0157] According to this embodiment, when an order for dry ice supplies is pending, it is possible to re-specify the required amount of dry ice supplies on the pending date.

[0158] (Embodiment 6) The sixth embodiment relates to a form for identifying a company that delivers or commissions dry ice supplies. Note that a description of the contents that overlap with the first to fifth embodiments will be omitted.

[0159] The user selects a company that will deliver or consign the dry ice supplies, and the dry ice supplies are delivered to the user by the selected company. However, depending on the schedule or the amount of dry ice supplies, the selected company may not be able to handle the request. In this case, it becomes necessary to identify a second company (a company different from the selected company) that can deliver or consign the dry ice supplies.

[0160] Fig. 24 is a block diagram showing a configuration example of the server 1 in the sixth embodiment. The same reference numerals are used for the contents that overlap with Fig. 18, and the description thereof will be omitted. The mass storage unit 15 includes a vendor DB 154. The vendor DB 154 stores information on vendors that deliver or commission dry ice supplies.

[0161] Fig. 25 is an explanatory diagram showing an example of the record layout of the order DB 152 and the trader DB 154 in the embodiment 6. Note that a description of the contents that overlap with Fig. 14 will be omitted. The order DB 152 includes a vendor ID column that stores the vendor IDs of vendors that deliver or commission dry ice products.

[0162] The vendor DB 154 includes a vendor ID column, a vendor name column, a service area column, a service quantity column, a holiday column, and a priority column.

[0163] The supplier ID column stores a unique supplier ID to identify each supplier. The supplier name column stores the name of the supplier. The service area column stores the area (area name or area division, etc.) that the supplier can handle. The compatible product quantity column stores the quantity of dry ice product that the supplier can handle (e.g., 500 to 1500 kg). The holiday column stores the supplier's holidays. The priority order column stores the priority order of the supplier by service area.

[0164] The above-mentioned storage formats of each DB are merely examples, and other storage formats may be used as long as the relationships between the data are maintained.

[0165] Fig. 26 is a flow chart showing a processing procedure for outputting the required amount of dry ice supplies in embodiment 6. Note that the same reference numerals are used for the contents that overlap with Fig. 6, and the description thereof will be omitted.

[0166] After executing the process of step S202, the control unit 21 of the user terminal 2 accepts the selection of a trader by the user through the input unit 24 (step S271). The control unit 21 transmits the accepted delivery form, usage information, and trader (the trader ID, the trader name, etc.) of the dry ice product in association with the user ID to the server 1 through the communication unit 23 (step S272).

[0167] The control unit 11 of the server 1 receives the user ID, the delivery form of the dry ice product, the usage information, and the vendor transmitted from the user terminal 2 via the communication unit 13 (step S171). The control unit 11 executes the process of step S102. Based on the received vendor, the control unit 11 determines whether the vendor can accept (deal with) the dry ice product (step S172).

[0168] Specifically, the control unit 11 acquires the region and the amount of product that the company can handle based on the company ID from the company DB 154 in the mass storage unit 17. The control unit 11 determines whether the work location of the worker who uses the dry ice product to be ordered is within the region that the company can handle (for example, Tokyo) and whether the required amount of the identified dry ice product is within the range of the product amount that the company can handle (for example, 500 to 1500 kg).

[0169] The control unit 11 determines that the business operator can accept the dry ice supplies if the work location is within the service area and the required amount of dry ice supplies is within the range of the service amount. The control unit 11 determines that the business operator cannot accept the dry ice supplies if the work location is outside the service area or the required amount of dry ice supplies is outside the range of the service amount.

[0170] The process is not limited to the above-mentioned process for determining whether the dry ice equipment can be accepted. For example, the control unit 11 acquires holiday information of the business from the business DB 154 in the mass storage unit 17 based on the business ID. The control unit 11 may add the above-mentioned process and determine that the business can accept the dry ice equipment based on the work day on which the dry ice equipment is used and the business's holidays, for example, if the dry ice equipment can be delivered by a specified date and time (the day before the work day, or 8:00 on the work day, etc.).

[0171] When the control unit 11 determines that the supplier can accept the dry ice supplies (YES in step S172), it stores the identified required amount of the dry ice supplies in the order DB 152 of the mass storage unit 15 (step S173). Specifically, the control unit 11 assigns an order ID to the dry ice supplies to be ordered. The control unit 11 stores the user ID, the delivery form of the dry ice supplies, the work date, the work location, the number of users, the use time, the strength, the WBGT value, the coefficient, the identified required amount of the dry ice supplies, and the supplier ID as one record in the order DB 152 in association with the assigned order ID. The control unit 11 executes the process of step S104.

[0172] When the control unit 11 determines that the supplier cannot accept the dry ice product (NO in step S172), it identifies a second supplier that can accept the dry ice product (step S174). Specifically, the control unit 11 extracts the supplier ID of the corresponding second supplier from the supplier DB 154 of the mass storage unit 17 based on the work location where the dry ice product to be ordered is used, the work date, and the required amount of the dry ice product. When the control unit 11 extracts the supplier IDs of multiple second suppliers, it identifies the supplier ID with the highest priority for each service area according to the priority of the suppliers stored in the supplier DB 154 as the supplier ID of the second supplier. The control unit 11 executes the process of step S173.

[0173] When the control unit 11 identifies a second provider that can handle the request, the control unit 11 may transmit the identified second provider (such as a provider ID or provider name) along with the required amount of the identified dry ice supplies to the user terminal 2. Alternatively, the control unit 11 may transmit a notification to the user terminal 2 that the selected provider cannot accept the dry ice supplies. In this case, the control unit 21 of the user terminal 2 receives the user's selection of the second provider through the input unit 24 in response to the notification transmitted from the server 1.

[0174] According to this embodiment, it is possible to accept the selection of a company that will deliver or commission dry ice supplies.

[0175] According to this embodiment, if the selected vendor cannot accept the dry ice equipment, it is possible to automatically identify a second vendor that can accept the dry ice equipment.

[0176] The embodiments disclosed herein are illustrative in all respects and should not be considered as limiting. The scope of the present invention is defined by the claims, not by the above meaning, and is intended to include all modifications within the scope and meaning equivalent to the claims.

[0177] The matters described in each embodiment can be combined with each other. In addition, the independent claims and dependent claims described in the claims can be combined with each other in any combination regardless of the reference format. Furthermore, the claims use a format in which a claim references two or more other claims (multiple claim format), but this is not limited to this format. [Explanation of symbols]

[0178] 1. Information processing device (server) 11 Control section 12 Storage section 13. Communications Department 14 Reading unit 15 Mass storage 151 User DB 152 Order DB 153 Demand Specific Model 154 Vendor DB 1a Removable storage media 1b Semiconductor memory 1P control program 2. Information processing terminal (user terminal) 2P control program 21 Control section 22 Memory section 23 Communications Department 24 Input section 25 Display section 91 Dry Ice Jacket 92 Dry Ice 93 Liquid Cylinder 94 Dry ice production equipment

Claims

1. Obtain the number of people using the dry ice jacket, the duration of use, and the strength of the dry ice when in use. Based on the number of users, duration and intensity of use, determine the required amount of dry ice supplies; Output the required amount of dry ice supplies identified Information processing methods.

2. Get the heat index The required amount of dry ice supplies is determined based on the number of users, duration of use, intensity, and heat index obtained. The information processing method according to claim 1 .

3. Accept the coefficient settings, Identifying the required amount of dry ice supplies based on the acquired number of users, usage time, intensity, and heat index, and the received coefficient.

3. The information processing method according to claim 1.

4. The intensity includes the work intensity or exercise intensity of the user who uses the dry ice jacket.

3. The information processing method according to claim 1.

5. The usage time is an average value of usage times of a plurality of users who use the dry ice jacket.

3. The information processing method according to claim 1.

6. The dry ice equipment includes the dry ice in a block form, a liquid cylinder for producing the dry ice, or both the dry ice and the liquid cylinder.

3. The information processing method according to claim 1.

7. Obtain the number of people using the dry ice, the duration of use, and the strength of the dry ice during use for multiple days; Obtain the heat index corresponding to the date obtained, Based on the number of users, duration, intensity, and heat index for each day, the required amount of dry ice supplies for each day is determined; Output the required amount of specified dry ice supplies by day 3. The information processing method according to claim 1.

8. outputting an object for confirming the order for the dry ice product; Accept confirmation or cancellation of the order by operating the object. The information processing method according to claim 7.

9. When the order for the dry ice product is pending, a heat index for the pending date is obtained; Re-identifying the required amount of dry ice supplies for the undetermined date based on the number of users, the duration of use, the intensity, and the obtained heat index; Output the re-identified required amount of dry ice supplies The information processing method according to claim 8.

10. The acquired number of users, duration of use, intensity during use, and heat index are input to a learning model that has been trained to output the required amount of dry ice supplies when the number of users of dry ice, duration of use, intensity during use, and heat index are input, and the required amount of dry ice supplies is output.

3. The information processing method according to claim 1.

11. Obtain the number of people using the dry ice jacket, the duration of use, and the strength of the dry ice when in use. Based on the number of users, duration and intensity of use, determine the required amount of dry ice supplies; Output the required amount of dry ice supplies identified A program that causes a computer to carry out processing.

12. An information processing device including a control unit, The control unit is Obtain the number of people using the dry ice jacket, the duration of use, and the strength of the dry ice when in use. Based on the number of users, duration and intensity of use, determine the required amount of dry ice supplies; Output the required amount of dry ice supplies identified Information processing device.

13. We accept settings for the number of people using the dry ice jacket, the duration of use, and the strength of the dry ice used. Receive a specific amount of dry ice supplies required based on the number of users, duration and intensity of use received; Display the required amount of received dry ice supplies A program that causes a computer to carry out processing.

14. Accept the setting of the dry ice product including the block-shaped dry ice, a liquid cylinder for generating the dry ice, or both the dry ice and the liquid cylinder. The program according to claim 13.

15. obtaining historical data of orders for said dry ice supplies; View historical data for retrieved orders 15. The program according to claim 13 or 14.

16. Displaying an object for confirming the order for the dry ice product; Accept confirmation or cancellation of the order by operating the object.

15. The program according to claim 13 or 14.

17. If the order for the dry ice supplies is pending, re-receive the required amount of the dry ice supplies for the pending date, which is determined based on the received number of users, duration and intensity of use and the heat index for the pending date; Display the required amount of re-delivered dry ice supplies The program according to claim 16.

Citation Information

Patent Citations

  • Demand and supply management system

    JP2021096667A