Method for checking secondary battery and method for manufacturing secondary battery

The method corrects secondary battery test capacity by measuring gas correlation using ultrasonic waves and applying a correction value, addressing inaccurate capacity testing due to gas accumulation, ensuring accurate quality assessment and reducing misclassification.

JP2024148050AActive Publication Date: 2024-10-17PRIME PLANET ENERGY & SOLUTIONS INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023060934
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-17
Estimated Expiration
2043-04-04

AI Technical Summary

Technical Problem

During secondary battery manufacturing, gas generated during the initial charging process accumulates between the positive and negative electrode plates, leading to inaccurate capacity testing due to the gas layer interfering with the test capacity measurement, which affects the determination of battery quality.

Method used

A method for testing secondary batteries that involves adjusting the state of charge (SOC) to a specific range, measuring test capacitance, obtaining a gas correlation amount using ultrasonic waves, and applying a capacity correction value based on the gas correlation to determine the corrected test capacity, ensuring accurate quality assessment.

Benefits of technology

Enables accurate determination of secondary battery quality by correcting test capacity for varying gas amounts, preventing misclassification of good batteries as defective and defective batteries as good, thereby improving manufacturing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024148050000001_ABST
    Figure 2024148050000001_ABST
Patent Text Reader

Abstract

To provide a method for checking a secondary battery that can appropriately check a capacity to be checked of the secondary battery, and a method for manufacturing the secondary battery using the same.SOLUTION: The method for checking a secondary battery 1 provided with a case 5 and an electrode body 2 includes: an SOC adjustment step S51 of adjusting an SOC of the secondary battery to an SOC at start of checking; a measurement step S52 of capacity to be checked, which measures the capacity CP to be checked by performing constant current charging or constant current discharging on the secondary battery, over an SOC checking range from the SOC at start of checking to an SOC at end of checking; a gas correlation amount acquiring step S53 of acquiring a gas correlation amount SG which has a correlation with a gas amount GSA interposing between a positive electrode plate 2P and a negative electrode plate 2N of the electrode body; a correction step S54 of acquiring a capacity correction value ΔCP corresponding to the acquired gas correlation amount SG, based on a relationship between the gas correlation amount SG and the capacity correction value ΔCP acquired in advance, and acquiring a checked capacity CPp after correction, from the capacity CP to be checked and the capacity correction value ΔCP; and a determination step S55 of determining a quality of the secondary battery, with the use of the checked capacity CPp after the correction.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for inspecting a secondary battery and a method for manufacturing a secondary battery. [Background technology]

[0002] In manufacturing a secondary battery, a capacity test may be performed to determine the quality of the secondary battery based on the capacity of the secondary battery. For example, Patent Document 1 discloses a method for manufacturing a secondary battery in which a capacity test process is performed after an initial charging process, a high-temperature aging process, etc. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-015745 Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the manufacture of secondary batteries, gas generated during the initial charging process may accumulate in layers between the positive and negative plates of the electrode body, which face each other via a separator, and may not be able to escape to the outside. When a capacity test is performed on such a secondary battery that contains a gas layer in the electrode body, the test capacity obtained is smaller than the test capacity of a secondary battery that does not contain a gas layer. For this reason, it has been found that the quality of the secondary battery may not be determined appropriately based on the test capacity.

[0005] The present invention has been made in consideration of the current situation, and provides a method for inspecting a secondary battery that can properly inspect the inspection capacity of a secondary battery, and a method for manufacturing a secondary battery using the same. [Means for solving the problem]

[0006] (1) One aspect of the present invention for solving the above problem is a method for inspecting a secondary battery including a case and an electrode assembly housed in the case, the method comprising: an SOC adjustment step of adjusting an SOC of the secondary battery to a test start SOC; an inspection capacity measurement step of measuring an inspection capacity by performing a constant current charge or constant current discharge on the secondary battery over an inspection SOC range from the test start SOC to the test end SOC, which is a part of an SOC range of SOC 0% to 100%; a gas correlation amount acquisition step of acquiring a gas correlation amount having a correlation with an amount of gas present between a positive electrode plate and a negative electrode plate of the electrode assembly; a correction step of obtaining a capacity correction value corresponding to the acquired gas correlation amount based on a relationship between the gas correlation amount and a capacity correction value obtained in advance, and obtaining a corrected inspection capacity from the measured inspection capacity and the capacity correction value; and a determination step of determining whether the secondary battery is good or bad using the corrected inspection capacity.

[0007] In this secondary battery inspection, in addition to measuring the inspection capacity of the secondary battery, a gas correlation amount that is correlated with the amount of gas in the electrode body is obtained, and a capacity correction value is obtained based on the relationship between the gas correlation amount and the capacity correction value. Then, a corrected inspection capacity is obtained from the inspection capacity and the capacity correction value, and the quality of the secondary battery is judged using the corrected inspection capacity obtained. Thus, for secondary batteries with different amounts of gas in the electrode body, the inspection capacity is appropriately corrected for each, and the quality of the secondary battery can be appropriately judged based on the corrected inspection capacity.

[0008] Examples of the secondary battery include a lithium ion secondary battery, a sodium ion secondary battery, a calcium ion secondary battery, etc. Examples of the electrode body of the secondary battery include a laminated electrode body, a cylindrical wound type electrode body, and a flat wound type electrode body.

[0009] The test start SOC, test end SOC and test SOC range may be selected from within the SOC range of 0 to 100%. However, if a wide test SOC range is selected, the amount of electricity charged or discharged by the constant current charge or constant current discharge in the test capacity measurement process will be large, and the time required for the test will be long. For this reason, the test start SOC and test end SOC may be selected so that the test SOC range is, for example, 50% or less, preferably 20% or less. In addition, the larger the test current flowing through the secondary battery in the constant current charge or constant current discharge, the shorter the time required for the constant current charge or constant current discharge. Therefore, for example, the test current may be set to 1C or more, preferably 5C or more, which is less than the maximum current that can be flowed through the secondary battery.

[0010] As the gas correlation quantity having a correlation with the amount of gas in the electrode body, any suitable physical quantity can be used as long as it is a gas correlation quantity that changes depending on the amount of gas in the electrode body. For example, the transmission intensity of ultrasonic waves irradiated from the outside and transmitted through the electrode body of the secondary battery is measured at each predetermined position of the electrode body or the entire predetermined area of ​​the electrode body, and the obtained transmission intensity values ​​are integrated or averaged. In addition, in a laminated type or flat wound type electrode body, the elasticity value in the thickness direction at each position of the electrode body is measured, and the obtained elasticity value can be integrated.

[0011] (2) In the energy storage device described in (1) above, the gas correlation quantity acquisition process may be an ultrasonic irradiation process for obtaining the gas correlation quantity based on the transmission intensity of ultrasonic waves that are irradiated to the secondary battery and transmitted through the electrode body.

[0012] When ultrasonic waves are irradiated from the outside to a secondary battery, the intensity of the transmitted ultrasonic waves that pass through the electrode body in a portion where a gas layer exists is lower than the intensity of the transmitted ultrasonic waves that pass through a portion of the electrode body where there is no gas layer. This is because a portion of the transmitted ultrasonic waves is reflected by the gas layer. For this reason, if a gas correlation amount that is correlated with the amount of gas is obtained from the transmitted intensity of the ultrasonic waves in the ultrasonic irradiation process, it is possible to appropriately correct the test capacity according to the amount of gas.

[0013] As described above, examples of gas correlation quantities include the integrated value or average value obtained by measuring the transmitted intensity of ultrasonic waves at each predetermined position of the electrode body or over the entire predetermined area of ​​the electrode body and accumulating the obtained intensity values.

[0014] (3) In the method for inspecting a secondary battery described in (1) or (2) above, the inspection capacity measurement process may be a method for inspecting a secondary battery in which the inspection capacity is measured by performing constant current charging or constant current discharging at a test current of 5 C or more over the inspection SOC range of 20% or less.

[0015] In the test capacity measurement step of this test method, the test capacity is measured by performing a constant current charge or discharge at a test current of 5C or more over a test SOC range of 20% or less. In this way, by measuring the test capacity at a large test current over a narrow test SOC range, the test capacity measurement step can be completed in a short time. On the other hand, it has been found that when the test capacity is measured at a large test current over such a narrow test SOC range, the obtained test capacity is likely to vary depending on the amount of gas in the electrode body. In the area where a gas layer exists between the positive and negative electrode plates, the battery action is unlikely to occur locally. For this reason, it is considered that the secondary battery is unlikely to be charged or discharged at a large test current in a short time, resulting in a small test capacity. In contrast, in the present invention, a capacity correction value corresponding to the gas correlation amount is obtained in the correction process, and a corrected test capacity is obtained from the measured test capacity and the capacity correction value, so that the decrease in test capacity due to the presence of a gas layer can be corrected and the quality of the secondary battery can be appropriately determined in the judgment process.

[0016] (4) Another solution is a method for manufacturing a secondary battery, comprising: an inspection step of inspecting a secondary battery whose inspection capacity has not been inspected by the secondary battery inspection method described in any one of (1) to (3); and a sorting step of retaining the secondary batteries that have been judged to be good in the judgment step.

[0017] In this method of manufacturing a secondary battery, secondary batteries whose test capacity has not been inspected are inspected using the inspection method described above, and secondary batteries that are judged to be good in the sorting process are retained, so that the test capacity is properly inspected, and secondary batteries with good test capacity can be manufactured. [Brief description of the drawings]

[0018] [Figure 1] 4 is a flowchart showing the procedure for inspecting and manufacturing a battery according to an embodiment. [Diagram 2] 5 is an explanatory diagram showing a state in which the intensity of ultrasonic waves transmitted through a battery is acquired in an ultrasonic irradiation process according to an embodiment. FIG. [Diagram 3] 13 is a graph showing the relationship between the integrated value of the intensity of the obtained transmitted ultrasonic waves and the capacitance correction value. [Figure 4] FIG. 11 is an explanatory diagram showing an example of the test capacity and the corrected test capacity of each sample battery. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] (Embodiment) A lithium ion secondary battery (hereinafter simply referred to as battery) 1 according to an embodiment of the present invention will be described below with reference to Figures 1 to 4. This battery 1 is a rectangular, sealed lithium ion secondary battery, and is mounted in vehicles such as hybrid cars, plug-in hybrid cars, and electric cars, as well as in various devices.

[0020] The battery 1 (see FIG. 2) of this embodiment is composed of a case 5, an electrode assembly 2 accommodated inside the case 5, a positive electrode terminal 6P and a negative electrode terminal 6N fixed to the case 5, and an insulating member (not shown) that insulates between these and the case 5. The case 5 is made of metal (aluminum in this embodiment) and has a rectangular box shape. The electrode assembly 2 is covered in a bag-shaped insulating film (not shown) inside the case 5. An electrolyte 3 is accommodated inside the case 5, a part of which is impregnated in the electrode assembly 2 and a part of which is accumulated at the bottom of the case 5. In this embodiment, the description will be given with the vertical direction in FIG. 2 as the height direction HH, the horizontal direction as the thickness direction TH, and the front-rear direction perpendicular to the paper surface as the width direction WH.

[0021] The electrode assembly 2 housed in the case 5 is a so-called flat wound electrode assembly, which is formed by winding a strip-shaped positive electrode plate 2P and a strip-shaped negative electrode plate 2N with a pair of strip-shaped separators 2S interposed therebetween and pressing and flattening the electrode assembly 2 in the thickness direction TH (left-right direction in the figure) in Fig. 2. The electrode assembly 2 is housed in the case 5 in a horizontal position with the axis 2X coinciding with the width direction WH.

[0022] The positive electrode terminal 6P is made of an aluminum plate, and is connected to a positive electrode current collector (not shown) of the electrode body 2 inside the case 5, and is also drawn out to the outside of the case 5. The negative electrode terminal 6N is made of a copper plate, and is connected to a negative electrode current collector (not shown) of the electrode body 2 inside the case 5, and is also drawn out to the outside of the case 5.

[0023] As described later, after the initial charging step S2 is completed, the battery 1 may have a gas layer GS in which gas such as hydrogen is accumulated between the positive electrode plate 2P and the negative electrode plate 2N through the separator 2S at various locations in the electrode body 2. This is considered to be because the gas generated during the initial charging step could not escape to the outside of the electrode body 2. In this case, it is considered that the battery reaction is locally difficult to occur in the gas interposed portion 2G between the positive electrode plate 2P and the negative electrode plate 2N, where the gas layer GS is interposed. For this reason, when the battery 1 having the gas interposed portion 2G is charged or discharged for a short time, particularly when the battery 1 is charged or discharged for a short time with a large charging or discharging current, causing a small change in SOC, the gas interposed portion 2G does not contribute to charging or discharging, so that the capacity of the battery 1 appears to be reduced.

[0024] However, even if a gas-interposed portion 2G is formed in the electrode body 2 of the battery 1, when charging or discharging is performed for a long time, for example, when charging or discharging is performed for a long time with a small charging current or discharging current, causing a large change in SOC (for example, a change in the entire range of SOC from 0 to 100%), there is not much difference in the amount of charged or discharged electricity compared to a battery 1 that does not have a gas-interposed portion 2G. This is believed to be because the gas-interposed portion 2G also contributes to charging or discharging through the area surrounding the gas-interposed portion 2G due to the diffusion of Li ions in the positive electrode active material layer or negative electrode active material layer.

[0025] Incidentally, when inspecting the capacity of the manufactured battery 1 and selecting only good batteries 1, the test capacity CP of the battery 1 may be measured. In this case, in order to measure the test capacity CP of the battery 1 in a short time and determine whether the battery 1 is good or bad, a large charging current or discharging current is passed as the test current Ich, and charging or discharging is performed for a short time, causing a small change in SOC. However, when measuring such a test capacity CP, as described above, if the gas-containing portion 2G is present in the battery 1, the obtained test capacity CP is measured as a small value due to the influence of the presence of the gas-containing portion 2G. For this reason, a battery 1 that should have been judged as good may be judged as defective, or a battery 1 that should have been judged as defective may be judged as good.

[0026] Therefore, in the manufacturing process of the battery 1 according to this embodiment and in the inspection process S5 therein, the inspection capacity CP is corrected, and the corrected inspection capacity CPp is used to judge the quality of the battery 1. The manufacture of the battery 1 according to this embodiment will be described below (see FIGS. 1 and 2).

[0027] First, in the uncharged battery assembly process S1, an uncharged battery 1 is assembled. Specifically, an electrode body 2 is fabricated, and a positive electrode terminal 6P and a negative electrode terminal 6N fixed to a case lid 5L are connected to a positive electrode current collector and a negative electrode current collector (not shown) of the electrode body 2, respectively. A bag-shaped insulating film (not shown) is placed over the electrode body 2 and housed in a case main body 5B, and the entire periphery of the case lid 5L is laser welded to the case main body 5B to form a case 5. Furthermore, an electrolyte 3 is poured into the case 5 through an injection hole (not shown) provided in the case lid 5L, and the electrolyte 3 is impregnated into the electrode body 2.

[0028] Thereafter, in the initial charging step S2, the battery 1 is initially charged. Specifically, CC charging is performed at a constant current value of 10C until the SOC reaches 80%. As a result, an SEI film is formed on the surfaces of the negative electrode active material particles (not shown) of the negative electrode plate 2N and the positive electrode active material particles (not shown) of the positive electrode plate 2P, which is generated by decomposition of a part of the electrolyte 3. Most of the gases such as hydrogen gas generated during this initial charging are released to the outside of the electrode body 2 through between the positive electrode plate 2P and the negative electrode plate 2N. However, among the batteries 1, there are cases where, as shown in FIG. 2, gas is accumulated between the positive electrode plate 2P and the negative electrode plate 2N at various points in the electrode body 2, forming a gas layer GS.

[0029] After the initial charging step S2, a sealing step S3 involves welding a filling plug (not shown) to the filling hole to airtightly seal the case 5. Then, in the high-temperature aging step S4, the battery 1 is left in an environment at 60° C. for 20 hours.

[0030] Then, in the inspection process S5, the quality of the battery 1 is inspected based on the inspection capacity CP. Specifically, first, in the SOC adjustment process S51, the SOC of the battery 1 is charged to 90% by CCCV charging at 10C (cut off at 1 hour) in a room temperature environment, and the inspection start SOC of each battery 1 is adjusted to 90%.

[0031] Next, in the test capacity measurement step S52, the magnitude of the test current Ich for CC discharge is set to 5C or more, specifically 10C. Then, the SOC of the battery 1 is CC discharged over a range of 20% or less from the test start SOC to the test end SOC, specifically over a test SOC range of 10% from SOC 90% to SOC 80%. The time required for this test capacity measurement step S52 is short, about 6 minutes, because the discharge is terminated after only CC discharge and no CV discharge is performed. The amount of electricity discharged from the battery 1 during this time is obtained as the test capacity CP.

[0032] Next, in an ultrasonic irradiation step (a type of gas correlation amount acquisition step) S53, an integrated value SG of transmitted ultrasonic intensity IG, which is correlated with the gas amount GSA in the electrode body 2, is obtained as shown in Fig. 2. Specifically, first, the battery 1 is placed on a movable table MT. This movable table MT is a table that can move the placed battery 1 in a height direction HH (up and down in Fig. 2) and a width direction WH (direction perpendicular to the paper surface in Fig. 2).

[0033] The ultrasonic transmitter UST connected to the controller CTL and oriented in the thickness direction TH emits irradiated ultrasonic waves US1 toward the battery 1 placed on the moving table MT. Then, a part of the irradiated ultrasonic waves US1 irradiated to the battery 1 passes through the case 5 and the electrode body 2 in the thickness direction TH as passing ultrasonic waves US2, and is emitted from the battery 1 as transmitted ultrasonic waves US3. The transmitted ultrasonic waves US3 are received by the ultrasonic receiver USR, and the magnitude of the transmitted ultrasonic wave intensity IG, which is the intensity of the transmitted ultrasonic waves US3, is obtained in the controller CTL. In this embodiment, the ultrasonic transmitter UST and the ultrasonic receiver USR are used at a distance from the battery 1, but they may be used in contact with the battery 1.

[0034] In addition, if a gas layer GS exists in the electrode body 2 and exists on the passage path of the passing ultrasonic wave US2, the acoustic impedance of the gas layer GS is significantly different from the acoustic impedance of the positive electrode plate 2P, the negative electrode plate 2N, the separator 2S, etc., which are impregnated with the electrolyte 3 constituting the electrode body 2. Therefore, a part of the passing ultrasonic wave US2 is reflected at the interface between the gas layer GS and the positive electrode plate 2P, etc. As a result, the transmitted ultrasonic wave intensity IG of the transmitted ultrasonic wave US3 that reaches the ultrasonic receiver USR is reduced compared to when the gas layer GS does not exist on the passage path of the passing ultrasonic wave US2. It is considered that the degree of reduction in the transmitted ultrasonic wave intensity IG increases as the number of layers of the gas layer GS existing on the passage path of the passing ultrasonic wave US2, that is, the gas amount GSA, increases. In other words, the transmitted ultrasonic wave intensity IG is a value that has a correlation with the gas amount GSA in the area where the passing ultrasonic wave US2 passes.

[0035] In addition, the gas layer GS is considered to exist locally in the electrode body 2. This is because the gas layer GS is formed by gas generated with the formation of the SEI coating in each positive electrode plate 2P or negative electrode plate 2N accumulating between the positive electrode plate 2P and the negative electrode plate 2N. Therefore, the battery 1 is moved in the height direction HH and the width direction WH by the moving table MT, and the transmitted ultrasonic intensity IG is measured at each of a plurality of locations of the battery 1 where the flat portion of the electrode body 2 exists in the thickness direction TH. For example, the battery 1 is moved by the moving table MT to obtain the transmitted ultrasonic intensity IG at a total of 50 locations, 5 stages in the height direction HH and 10 stages in the width direction WH. The sum of these values ​​is the integrated value SG of the transmitted ultrasonic intensity IG. This integrated value SG is a value that has a correlation with the gas amount GSA in almost the entire area of ​​the electrode body 2. By using this integrated value SG, the test capacity CP can be appropriately corrected according to the gas amount GSA, as described later.

[0036] However, as mentioned above, even if a gas-containing portion 2G is present in the electrode body 2 of the battery 1, when charging or discharging is performed over a long period of time with a small charging or discharging current, causing a large change in SOC (for example, the entire range of SOC from 0 to 100%), it has been found that there is little difference in the amount of electricity charged or discharged compared to a battery 1 that does not have a gas-containing portion 2G.

[0037] Therefore, in this embodiment, the above-mentioned inspection capacity CP and the integrated value SG of the above-mentioned transmitted ultrasonic wave intensity IG are obtained in advance for a plurality of sample batteries 1, and the discharge capacity of the battery 1 is measured by CCCV discharge (cut off at 3 hours) from SOC 100% to 0% with a discharge current of 1 / 2C during CC discharge. As described above, this discharge capacity value is obtained by performing long-term discharge over a large SOC range of 100-0% with a small discharge current (1 / 2C or less in this embodiment), and is not easily affected by the presence or absence of the gas-containing portion 2G in the electrode body 2 of the battery 1. Therefore, among the plurality of sample batteries 1, a plurality of batteries 1 (three in this embodiment) having approximately the same measured discharge capacity value are selected. In the following, the three selected batteries 1 are referred to as sample batteries SP1 to SP3. The graph in Figure 3 plots the integrated values ​​SG and differences ΔCP of each of the sample batteries SP1 to SP3, with the test capacity CP obtained for sample battery SP1, which has the largest integrated value SG of the transmitted ultrasonic intensity IG among the selected sample batteries SP1 to SP3, as the reference value, and the difference in test capacity CP between sample battery SP1 and sample battery SP2, and the difference in test capacity CP between sample battery SP1 and sample battery SP3 as ΔCP.

[0038] FIG. 3 shows that, although the sample batteries SP1 to SP3 have almost the same discharge capacity, when the integrated value SG, which is the gas correlation amount, is different, the test capacity CP also differs. Since the sample batteries SP1 to SP3 have almost the same discharge capacity, it is presumed that if the gas amount GSA contained in the electrode body 2 was similar, the obtained test capacity CP would also be almost the same. Therefore, for the sample batteries SP2 and SP3, by adding the above-mentioned difference ΔCP to the obtained test capacity CP, it was possible to correct it to be the same as the test capacity CP of the sample battery SP1, which has a small gas amount GSA. That is, in FIG. 3, it can be seen that the difference ΔCP can be used as a capacity correction value that corrects the obtained test capacity CP to be the same as the test capacity CP of the sample battery SP1, which has a small gas amount GSA, depending on the integrated value SG.

[0039] Therefore, in this embodiment, after obtaining an integrated value SG in the ultrasonic irradiation step S53, in the correction step S54, a capacity correction value ΔCP according to the integrated value SG is obtained from the graph in FIG. 3, and a correction is performed by adding this to the test capacity CP to calculate a corrected test capacity CPp (CPp=CP+ΔCP). For example, FIG. 4 shows the test capacity CP and the corrected test capacity CPp obtained for the sample batteries SP1 to SP4. In FIG. 4, the corrected test capacity CPp of the sample battery SP1 is equal to the test capacity CP. It can also be seen that the corrected test capacity CPp of the sample batteries SP2 and SP3 is approximately equal to the corrected test capacity CPp of the sample battery SP1.

[0040] In FIG. 4, CPmin indicates the lower limit of the capacity, and CPmax indicates the upper limit of the capacity. That is, the range CPmin to CPmax between the two dashed lines is the pass range CPG of the test capacity CP (corrected test capacity CPp). Looking at the test capacity CP before correction, the test capacity CP and the corrected test capacity CPp of the sample batteries SP1 and SP2 are both within the pass range CPG. However, the test capacity CP of the sample battery SP3 is outside the pass range CPG. This is because the amount of gas GSA contained in the electrode body 2 is large, and the test capacity CP is a small value. In contrast, it can be seen that the corrected test capacity CPp of the sample battery SP3 is included within the pass range CPG. Thus, according to this embodiment, the calculation of the corrected test capacity CPp can prevent the battery 1, which should be a good product, from being judged to be a defective product.

[0041] However, like the sample battery SP4, there are cases where the test capacity CP is within the pass range CPG but the corrected test capacity CPp is outside the pass range CPG. Thus, according to this embodiment, by calculating the corrected test capacity CPp, it is possible to prevent a battery 1 that should actually be determined to be defective from being determined to be a non-defective product.

[0042] Therefore, in the judgment step S55, the calculated corrected inspection capacity CPp is used to judge the quality of the battery 1. Specifically, as described above, it is determined whether the corrected inspection capacity CPp is within the pass range CPG. Thus, in the inspection step S5, the quality of the battery 1 can be appropriately judged based on the corrected inspection capacity CPp.

[0043] Thereafter, in the sorting step S6, the batteries 1 that are determined to be good (OK) in the judgment step S55 are kept, and the batteries 1 that are determined to be defective (NG) are removed as defective. In this way, it is possible to manufacture good batteries 1 whose corrected inspection capacity CPp falls within the pass range CPG.

[0044] The present invention has been described above in accordance with the embodiment and Examples 1 to 6, etc. However, the present invention is not limited to the embodiment, etc., and can be modified as appropriate without departing from the spirit of the present invention. For example, in the embodiment, in the ultrasonic irradiation step S53, an integrated value SG of the transmitted ultrasonic intensity IG is obtained, but instead, an average value of the transmitted ultrasonic intensity IG may be calculated and used to carry out the subsequent steps. [Explanation of symbols]

[0045] 1,SP1,SP2,SP3 battery (secondary battery) 2 Electrode body 2X (electrode body) central axis 2P positive electrode plate 2N negative electrode plate 2G Gas-containing section GS Gas Layer GSA Gas Quantity US3 transmission ultrasound IG transmitted ultrasound intensity SG (transmitted ultrasonic intensity) integrated value (gas correlation amount) S4 High temperature aging process S5 Inspection process S51 SOC adjustment process S52 Inspection volume measurement process S53 Ultrasonic irradiation process (gas correlation amount acquisition process) S54 Correction process S55 Judgment process S6 Sorting process CP Inspection Capacity ΔCP Capacity correction value CPp corrected inspection volume CPG pass range

Claims

1. A method for inspecting a secondary battery including a case and an electrode assembly housed in the case, comprising the steps of: an SOC adjusting step of adjusting an SOC of the secondary battery to an inspection start SOC; an inspection capacity measurement step of measuring an inspection capacity by performing a constant current charge or a constant current discharge on the secondary battery over an inspection SOC range from the inspection start SOC to the inspection end SOC, which is a part of an SOC range of 0% to 100% SOC; a gas correlation quantity acquisition step of acquiring a gas correlation quantity having a correlation with an amount of gas present between the positive electrode plate and the negative electrode plate of the electrode body; a correction step of obtaining the capacitance correction value corresponding to the acquired gas correlation amount based on a relationship between the gas correlation amount and a capacitance correction value obtained in advance, and obtaining a corrected test capacitance from the measured test capacitance and the capacitance correction value; and a determining step of determining whether the secondary battery is good or bad using the corrected inspection capacity. Inspection method for secondary batteries.

2. 2. The method for inspecting a secondary battery according to claim 1, The gas correlation amount acquisition step includes: an ultrasonic irradiation step of obtaining the gas correlation quantity based on the transmission intensity of ultrasonic waves irradiated to the secondary battery and transmitted through the electrode body; Inspection method for secondary batteries.

3. 3. A method for inspecting a secondary battery according to claim 1, comprising: The test capacitance measuring step includes: The test capacity is measured by performing a constant current charge or discharge at a test current of 5 C or more over the test SOC range of 20% or less. Inspection method for secondary batteries.

4. an inspection step of inspecting a secondary battery whose inspection capacity has not been inspected by the inspection method for a secondary battery according to any one of claims 1 to 3; a sorting step of retaining the secondary batteries that are determined to be good in the determining step. A method for manufacturing a secondary battery.

Citation Information

Patent Citations

  • Nonaqueous electrolyte secondary battery

    JP2014086384A

  • Nonaqueous electrolyte secondary battery

    JP2015187925A

  • Nonaqueous electrolyte secondary battery

    JP2018049775A

  • Method for manufacturing secondary battery

    JP2021015745A