Control apparatus, image projection apparatus, image projection system, control method, and program

The control device simplifies image projection system adjustments by automatically managing projection states based on adjustment items, addressing complexity and visibility issues in multi-device systems.

JP2024157583AInactive Publication Date: 2024-11-08CANON KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023071981
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing image projection systems require complex user operations to switch between projection states of multiple devices during adjustments, complicating tasks like focus and color tone adjustments due to interference and visibility issues.

Method used

A control device that automatically adjusts the projection states of multiple image projection devices based on selected adjustment items, using a group table to determine whether to hide or maintain projections on non-adjusted devices, simplifying operations.

Benefits of technology

Facilitates seamless adjustment operations by automatically managing projection states of multiple devices, enhancing visibility and reducing operational complexity during tasks like focus and color tone adjustments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024157583000001_ABST
    Figure 2024157583000001_ABST
Patent Text Reader

Abstract

To provide a control apparatus capable of switching a projecting state of an image projection apparatus corresponding to an adjustment item.SOLUTION: The control apparatus is used in an image projection system including a first image projection apparatus for projecting a first image and a second image projection apparatus for projecting a second image, the image projection apparatuses being connected to be capable of communication between each other. The control apparatus comprises: an acquisition unit which acquires an adjustment item selected from a plurality of adjustment items; and a control unit which controls displayed states of the first image and the second image based on the selected adjustment item.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a control device for use in an image projection system including a plurality of image projection devices. [Background technology]

[0002] In an image projection system that displays an entire image by superimposing a part or all of the projected images projected from each of a plurality of image projection devices, when adjusting an image projection device to be adjusted, the projected images from the other image projection devices may interfere with the adjustment work. Patent Document 1 discloses a configuration in which a black image is displayed on the image projection devices other than the one to be adjusted among the plurality of image projection devices. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 4655999 Summary of the Invention [Problem to be solved by the invention]

[0004] However, depending on the adjustment item, it may be better for multiple image projection devices including the adjustment target to project the projection image. For example, when performing focus adjustment, it is easier to adjust if only the image projection device to be adjusted projects the projection image so that the visibility of the overlapping part is not impaired. Also, when adjusting the color tone of the entire image, the projection screen to be adjusted is compared with the adjacent projection screen, so the adjustment is easier if multiple image projection devices project the projection image. In the configuration of Patent Document 1, when switching between the projection of the image projection device to be surveyed and the projection of multiple image projection devices including the survey target depending on the adjustment item, a switching operation by the user is required, which may make the operation complicated.

[0005] An object of the present invention is to provide a control device capable of switching the projection state of an image projection device in accordance with an adjustment item. [Means for solving the problem]

[0006] A control device as one aspect of the present invention is a control device used in an image projection system including a first image projection device that projects a first image and a second image projection device that projects a second image, the first and second image projection devices being communicatively connected to each other, and is characterized in having an acquisition unit that acquires an adjustment item selected from a plurality of adjustment items, and a control unit that controls the display state of the first image and the second image based on the selected adjustment item. Effect of the Invention

[0007] According to the present invention, it is possible to provide a control device capable of switching the projection state of an image projector in accordance with an adjustment item. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a configuration diagram of a projector according to a first embodiment. [Diagram 2] FIG. 1 is a configuration diagram of an image projection system according to a first embodiment. [Diagram 3] 4 is a flowchart showing the operation of the image projection system according to the first embodiment. [Figure 4] FIG. 13 is a diagram showing an example of a group table for each image quality adjustment menu in the first and second embodiments. [Diagram 5] 1A to 1C are diagrams illustrating image states for explaining the effects of the first embodiment. [Figure 6] 1A to 1C are diagrams illustrating image states for explaining the effects of the first embodiment. [Figure 7] FIG. 11 is a configuration diagram of an image projection system according to a second embodiment. [Figure 8] 10 is a flowchart showing the operation of the image projection system according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the drawings, the same reference numerals are used to refer to the same components, and duplicated descriptions will be omitted. EXAMPLES

[0010] 1 is a configuration diagram of a projector (image projection device) 100 of this embodiment. A video signal provided from an external device such as a PC is first input to a video signal input unit 101. The video signal input unit 101 includes an AD conversion unit that converts an analog signal such as a VGA or video signal into a digital signal, and a receiver that converts a digital signal such as an HDMI (registered trademark) or DVI into a predetermined digital signal format.

[0011] The digital signal converted by the video signal input unit 101 is sent to the video signal processing unit 102. The video signal processing unit 102 is composed of a processor dedicated to video signal processing, and performs a scaling process to read the resolution of the input video signal and convert it into a resolution required for internal processing, a menu display when a button is operated, and trapezoidal correction (keystone correction) processing, etc.

[0012] The digital signal processed into a predetermined format by the video signal processing unit 102 is sent to a panel driving unit 103 and converted into a liquid crystal driving signal for driving a liquid crystal panel 109, which will be described later.

[0013] The power supply unit 104 converts AC power input from the outside into DC power, and supplies the power to the light source drive unit 105 or each unit within the projector 100 .

[0014] The light source driving unit 105 is a driving circuit for turning on the light source unit 106, and controls the amount of light by turning the light on and off and controlling the power, current, etc., in response to a drive control signal from the control unit 113.

[0015] The light source unit 106 is configured with a lamp light source or a solid-state light source such as a laser light source or an LED light source. When the light source unit 106 is configured with a lamp light source, for example, an extra-high pressure mercury lamp or a xenon lamp that emits white light is used. When the light source unit 106 is configured with a laser light source, for example, a configuration is used in which white light is obtained by combining a monochromatic laser light with fluorescent light obtained by exciting a phosphor with the laser light. When the light source unit 106 is configured with an LED light source, for example, a configuration is used in which white light is obtained by combining LED lights of each color R, G, and B.

[0016] The light emitted from the light source unit 106 is irradiated onto the illumination optical system 107. The illumination optical system 107 homogenizes the light from the light source unit 106 by using a plurality of optical elements such as a fly-eye lens.

[0017] The color separation optical system 108 separates the white light from the illumination optical system 107 into three colors, RGB.

[0018] The liquid crystal panel (light modulation element) 109 modulates each of the light separated into three colors in accordance with a liquid crystal drive signal from the panel drive unit 103.

[0019] The color synthesis optical system 110 synthesizes the three color lights of RGB modulated by the three liquid crystal panels 109 into the same optical path.

[0020] Projection lens unit 111 enlarges and projects the light emitted from color synthesis optical system 110 onto a screen at a predetermined magnification.

[0021] The operation unit 112 is configured with buttons for turning the power on / off and for performing various adjustment settings. The operation unit 112 is a remote control or an operation button provided on the projector 100.

[0022] Control unit 113 receives control signals input from operation unit 112 and communication unit 115, and controls each operational block of projector 100. Control unit 113 includes acquisition unit 113a and determination unit 113b. Acquisition unit 113a acquires an image quality adjustment menu selected from a plurality of image quality adjustment menus (adjustment items). A user can select an image quality adjustment menu with an OSD (On Screen Display) menu. Determination unit 113b determines to which group in a group table by image quality adjustment menu, described later, the image quality adjustment menu acquired by acquisition unit 113a belongs.

[0023] The adjustment pattern display unit 114 displays on the screen a predetermined adjustment pattern selected by a user operation.

[0024] The communication unit 115 is connected to the communication unit 115 of the other projectors. In this embodiment, the multiple projectors are connected by a wired LAN via the communication unit 115 of each projector. Note that the method of connecting to the other projectors is not limited to this, and other connection methods such as wireless LAN, USB, and Bluetooth may be used as long as communication with the other projectors is possible.

[0025] The communication unit 115 includes a transmission unit 115a and a reception unit 115b. The transmission unit 115a transmits a signal to change the projection state of the other projectors. The reception unit 115b receives a signal from the other projectors and transmits an instruction to the control unit 113 to change the projection state of the own projector.

[0026] 2 is a configuration diagram of an image projection system (multi-projection system) 200 of this embodiment. The image projection system 200 has a first projector 100A, a second projector 100B, and a control device PC. The first projector 100A and the second projector 100B are projectors having the same configuration as the projector 100 described in FIG. 1, but are given different reference numerals for convenience of explanation. Note that, in this embodiment, the image projection system 200 has two projectors, but may have three or more projectors.

[0027] The image projection system 200 displays a single multi-image SC that is a composite of a first image SCA projected from a first projector 100A and a second image SCB projected from a second projector 100B. The multi-image SC has a blending area B where at least a portion of the first image SCA and the second image SCB are superimposed. Projection methods of the image projection system 200 include stack projection, which superimposes all of the images to increase the brightness of the multi-image SC, and multi projection, which superimposes a portion of the images to display a larger multi-image SC.

[0028] The control device PC is a personal computer equipped with a CPU such as a microcomputer. The control device PC generates and supplies image data corresponding to the portions to be displayed by the first projector 100A and the second projector 100B from the image data constituting the multi-image SC. The control device PC also transmits commands for operating the first projector 100A and the second projector 100B.

[0029] The control device PC is connected to the first projector 100A by an image cable CA1 and supplies an image signal to the first projector 100A. The first projector 100A and the second projector 100B are connected to each other by a communication cable CA2 via the communication unit 115 described above and transmit and receive various data.

[0030] The brightness of blending area B increases compared to non-overlapping areas due to the overlapping of the projected images. Therefore, in order to equalize the brightness of blending area B and the non-overlapping area, dimming processing is performed on blending area B. More specifically, processing is performed to gradually reduce the brightness from the start point to the end point of the overlap of each image.

[0031] The operation of the image projection system 200 will be described below. Fig. 3 is a flowchart showing the operation of the image projection system 200 of this embodiment. The flow of Fig. 3 starts after the image projection system 200 receives an operation by a user to display an image quality adjustment menu. The image quality adjustment includes adjustments related to installation such as focus, angle of view, and lens shift, and adjustments related to color tone such as color temperature, gamma, and contrast.

[0032] In this embodiment, the first projector 100A is the master projector, and the control unit 113 of the first projector 100A controls the operation of the image projection system 200, but the present invention is not limited to this. The control unit 113 of the second projector 100B or the control device PC may control the operation of the image projection system 200.

[0033] In step S101, control unit 113 of first projector 100A determines whether or not there are multiple projectors belonging to image projection system 200, based on the results of communication with other projectors via communication cable CA2 by communication unit 115. If control unit 113 of first projector 100A determines that there are multiple projectors belonging to image projection system 200, it executes the process of step S102, and if it determines that there are not multiple projectors belonging to image projection system 200, it ends this flow.

[0034] In step S102, the control unit 113 of the first projector 100A determines whether the target of the user's operation is the master projector (the first projector 100A in this embodiment). When the control unit 113 of the first projector 100A determines that the target of the user's operation is the first projector 100A, the control unit 113 executes the process of step S103. When the control unit 113 of the first projector 100A determines that the target of the user's operation is not the first projector 100A, that is, in this embodiment, that the target of the user's operation is the second projector 100B, the control unit 113 executes the process of step S107. Note that the target of the user's operation is determined by the operation unit 112 operated by the user. When a remote control is used as the operation unit 112, the device that receives an operation signal from the remote control out of the first projector 100A and the second projector 100B is determined as the target of the user's operation. When a button provided on the main body is used as operation unit 112, either first projector 100A or second projector 100B which has accepted a button operation is determined to be the object to be operated by the user.

[0035] In step S103, control unit 113 (determination unit 113b) of first projector 100A first compares the image quality adjustment menu selected by the user, acquired by acquisition unit 113a, with the group table for each image quality adjustment menu.

[0036] FIG. 4 is a diagram showing an example of a group table for each image quality adjustment menu. The group table for each image quality adjustment menu is a table in which selected image quality adjustment menus for performing single unit projection (group A) and for performing multiple unit projection (group B) are stored in advance. Group A includes, for example, menus such as focus adjustment, keystone adjustment, and registration adjustment. Group B includes, for example, menus for adjusting the color tone of the multi-image SC such as 6-axis color adjustment, gamma adjustment, and HDR adjustment, and menus for adjusting the installation state of the multi-image SC such as zoom adjustment and lens shift adjustment. Note that the image quality adjustment menus in FIG. 4 are not limited to these, and the groups to which each menu belongs are also examples. In addition, the image quality adjustment menu may be configured so that the user can arbitrarily change the group to which each image quality adjustment menu belongs. In addition, the control unit 113 may include a storage unit that stores the group table for each image quality adjustment menu, or may acquire the group table for each image quality adjustment menu stored in another configuration.

[0037] Next, the control unit 113 (determination unit 113b) of the first projector 100A determines which group the image quality adjustment menu selected by the user belongs to. Then, the control unit 113 of the first projector 100A controls the display state of the first image SCA and the second image SCB based on information about the group to which the image quality adjustment menu selected by the user belongs. Specifically, in this embodiment, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu selected by the user belongs to group A in FIG. 4. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, it executes the process of step S104. Also, if the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user is not group A, that is, it is group B, it executes the process of step S105.

[0038] In step S104, the control unit 113 of the first projector 100A controls the second projector 100B to hide the second image SCB. Specifically, the control unit 113 of the first projector 100A causes the transmission unit 115a of the first projector 100A to transmit a signal for hiding the second image SCB to the reception unit 115b of the second projector 100B. The control unit 113 of the second projector 100B controls to hide the second image SCB based on the signal received by the reception unit 115b. Note that, as a method for hiding the second image SCB, a method of displaying a black image on the entire screen may be used, or a method of physically blocking light emitted from the projection lens unit 111 by a shutter (not shown) may be used.

[0039] In step S105, in order to continue displaying the second image SCB, the control unit 113 of the first projector 100A does not cause the transmitting unit 115a of the first projector 100A to transmit a signal to the receiving unit 115b of the second projector 100B. That is, the first projector 100A and the second projector 100B continue projection.

[0040] In step S106, control unit 113 of first projector 100A determines whether the image quality adjustment menu of first projector 100A is displayed. If control unit 113 of first projector 100A determines that the image quality adjustment menu of first projector 100A is displayed, it executes the process of step S103. If control unit 113 of first projector 100A determines that the image quality adjustment menu of first projector 100A is not displayed, that is, that the display of the image quality adjustment menu of first projector 100A has been canceled, it ends this flow.

[0041] In step S107, control unit 113 of first projector 100A identifies the slave projector to be operated. In this embodiment, the slave projector is second projector 100B.

[0042] In step S108, the control unit 113 (determination unit 113b) of the first projector 100A first compares the image quality adjustment menu selected by the user acquired by the acquisition unit 113a with the group table for each image quality adjustment menu. Next, the control unit 113 (determination unit 113b) of the first projector 100A determines which group the image quality adjustment menu selected by the user belongs to. Then, the control unit 113 of the first projector 100A controls the display state of the first image SCA and the second image SCB based on information about the group to which the image quality adjustment menu selected by the user belongs. In this embodiment, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu selected by the user belongs to group A in FIG. 4. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, the control unit 113 executes the process of step S109. Furthermore, when control unit 113 of first projector 100A determines that the image quality adjustment menu selected by the user is not group A, that is, is group B, control unit 113 executes the process of step S110.

[0043] Note that part of the processing in this step may be performed by determination unit 113b of second projector 100B, and control unit 113 of first projector 100A may acquire the result of the determination by determination unit 113b of second projector 100B.

[0044] In step S109, control unit 113 of first projector 100A controls first projector 100A to hide the first image SCA. Note that, as a method for hiding the first image SCA, a method of displaying a black image on the entire screen or a method of physically blocking the light emitted from projection lens unit 111 by a shutter (not shown) may be used.

[0045] In step S110, control unit 113 of first projector 100A maintains the projection state of first projector 100A in order to continue displaying second image SCB. That is, first projector 100A and second projector 100B continue projection.

[0046] In step S111, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu of the second projector 100B is displayed. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu of the second projector 100B is displayed, the control unit 113 of the first projector 100A executes the process of step S108. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu of the second projector 100B is not displayed, that is, the display of the image quality adjustment menu of the second projector 100B is canceled, the control unit 113 of the first projector 100A ends this flow.

[0047] The effects of the configuration of this embodiment will be described below. First, as an example, the operation of image projection system 200 when the user operates the image quality adjustment menu of first projector 100A and selects the focus adjustment menu will be described with reference to FIG.

[0048] Fig. 5(a) shows an adjustment screen for the multiple images SC when the configuration of this embodiment is not applied, and Fig. 5(b) shows an adjustment screen for the multiple images SC when the configuration of this embodiment is applied.

[0049] In FIG. 5(a), focus adjustment charts FCA and FCB are displayed on the first image SCA and the second image SCB, respectively.

[0050] The focus adjustment chart FCA and the focus adjustment chart FCB are displayed when the user selects a test pattern stored in advance in the control unit 113. Alternatively, a test pattern corresponding to an adjustment menu may be registered in advance in association with the adjustment menu, and the registered test pattern may be displayed at the same time as the adjustment menu is selected.

[0051] In addition, the focus adjustment chart FCA and the focus adjustment chart FCB are configured to display cross shapes in five locations on the first image SCA and the second image SCB, namely the center, upper right, lower right, upper left, and lower left, respectively, but the shapes and display locations are not limited to this. They may be a lattice pattern that displays vertical and horizontal lines across the entire screen, may be configured to display predetermined text continuously, or may be configured to display a predetermined photograph.

[0052] Incidentally, in the blending region B, the focus adjustment chart FCA and the focus adjustment chart FCB are displayed close to each other or overlap each other, which may hinder the operation of adjusting the focus of the first image SCA.

[0053] Since the focus adjustment menu belongs to group A in Fig. 4, the second image SCB projected from the second projector 100B is not displayed in Fig. 5(b). Therefore, only the focus adjustment chart FCA is displayed on the first image SCA including the blending area B, so the focus adjustment work of the first image SCA is not hindered. Note that, although the blending area B is drawn in Fig. 5(b) for convenience of explanation, the blending area B does not actually exist because the second image SCB is not displayed. First, as an example, the operation of image projection system 200 when the user operates the image quality adjustment menu of first projector 100A and selects the focus adjustment menu will be described.

[0054] As another example, the operation of image projection system 200 when the user operates the image quality adjustment menu of second projector 100B and selects the lens shift adjustment menu will be described with reference to FIG.

[0055] Fig. 6 shows an adjustment screen for a multi-image SC to which the configuration of this embodiment is applied. Fig. 6(a) shows the adjustment screen for a multi-image SC in a state where the lens shift adjustment has started. Fig. 6(b) shows the adjustment screen for a multi-image SC in a state where the lens shift adjustment has been completed.

[0056] 6(a), the first image SCA and the second image SCB are projected at positions separated from each other, and a single multi-image SC is not formed. Therefore, it is necessary to adjust the projection positions of the first image SCA and the second image SCB by lens shift adjustment so that they are connected via an appropriate blend area B.

[0057] It is preferable to adjust the projection position by lens shift adjustment while viewing the projected image of the other projector. Since the lens shift adjustment menu belongs to group B in FIG. 4, the first image SCA projected from the first projector 100A is not hidden. Therefore, the user can adjust the position of the second image SCB with the first image SCA as the reference position, and can perform the lens shift adjustment of the second projector 100B. Then, as shown in FIG. 6(b), the user can adjust the first image SCA and the second image SCB so that they are connected via an appropriate blend area B.

[0058] As described above, according to the configuration of this embodiment, it is possible to switch the projection state of image projectors other than the one to be adjusted in accordance with the adjustment item. EXAMPLES

[0059] In this embodiment, only the configuration different from the first embodiment will be described, and the same functions or configurations as those in the first embodiment will be denoted by the same reference numerals and detailed description will be omitted.

[0060] 7 is a configuration diagram of an image projection system 300 according to this embodiment. The image projection system 300 is used, for example, for multiple screen display in a large conference room or for signage in a commercial facility. In the image projection system 300, a first image SCA projected from a first projector 100A and a second image SCB projected from a second projector 100B are displayed on different projection surfaces.

[0061] In the image projection system 300, when one of the first image SCA and the second image SCB is adjusted, the other is hidden. As a method for hiding an image, a method of displaying a black image on the entire screen or a method of physically blocking the light emitted from the projection lens unit 111 by a shutter (not shown) may be used.

[0062] The operation of the image projection system 300 will be described below. Fig. 8 is a flowchart showing the operation of the image projection system 300 of this embodiment. The flow of Fig. 8 starts after the image projection system 300 receives an operation by a user to display an image quality adjustment menu. The image quality adjustment includes adjustments related to installation such as focus, angle of view, and lens shift, and adjustments related to color tone such as color temperature, gamma, and contrast.

[0063] In this embodiment, the control unit 113 of the first projector 100A is described as controlling the operation of the image projection system 300, but the present invention is not limited to this. The control unit 113 of the second projector 100B or the control device PC may control the operation of the image projection system 300.

[0064] In step S201, control unit 113 of first projector 100A determines whether or not there are multiple projectors belonging to image projection system 300, based on the results of communication with other projectors by communication unit 115 via communication cable CA2. If control unit 113 of first projector 100A determines that there are multiple projectors belonging to image projection system 300, it executes the process of step S202, and if it determines that there are not multiple projectors belonging to image projection system 300, it ends this flow.

[0065] In step S202, the control unit 113 of the first projector 100A determines whether the target of the user's operation is the master projector (the first projector 100A in this embodiment). When the control unit 113 of the first projector 100A determines that the target of the user's operation is the first projector 100A, the control unit 113 executes the process of step S203. When the control unit 113 of the first projector 100A determines that the target of the user's operation is not the first projector 100A, that is, in this embodiment, that the target of the user's operation is the second projector 100B, the control unit 113 executes the process of step S206. Note that the target of the user's operation is determined by the operation unit 112 operated by the user. When a remote control is used as the operation unit 112, the device that receives an operation signal from the remote control out of the first projector 100A and the second projector 100B is determined as the target of the user's operation. When a button provided on the main body is used as operation unit 112, either first projector 100A or second projector 100B which has accepted a button operation is determined to be the object to be operated by the user.

[0066] In step S203, the control unit 113 (determination unit 113b) of the first projector 100A first compares the image quality adjustment menu selected by the user acquired by the acquisition unit 113a with the group table for each image quality adjustment menu. Next, the control unit 113 (determination unit 113b) of the first projector 100A determines which group the image quality adjustment menu selected by the user belongs to. Then, the control unit 113 of the first projector 100A controls the display state of the first image SCA and the second image SCB based on information on the group to which the image quality adjustment menu selected by the user belongs. Specifically, in this embodiment, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu selected by the user belongs to group A in FIG. 4. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, it executes the process of step S205. Furthermore, when control unit 113 of first projector 100A determines that the image quality adjustment menu selected by the user is not group A, that is, is group B, control unit 113 executes the process of step S204.

[0067] When the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, the control unit 113 does not cause the transmitting unit 115a of the first projector 100A to transmit a signal to the receiving unit 115b of the second projector 100B. Therefore, the second projector 100B maintains the non-display state.

[0068] In step S204, the control unit 113 of the first projector 100A controls the second projector 100B to display the second image SCB. Specifically, the control unit 113 of the first projector 100A causes the transmission unit 115a of the first projector 100A to transmit a signal for displaying the second image SCB to the reception unit 115b of the second projector 100B. The control unit 113 of the second projector 100B controls the display of the second image SCB based on the signal received by the reception unit 115b.

[0069] In step S205, control unit 113 of first projector 100A determines whether the image quality adjustment menu of first projector 100A is displayed. If control unit 113 of first projector 100A determines that the image quality adjustment menu of first projector 100A is displayed, it executes the process of step S203. If control unit 113 of first projector 100A determines that the image quality adjustment menu of first projector 100A is not displayed, that is, that the display of the image quality adjustment menu of first projector 100A has been canceled, it ends this flow.

[0070] In step S206, control unit 113 of first projector 100A identifies the slave projector to be operated. In this embodiment, the slave projector is second projector 100B.

[0071] In step S207, the control unit 113 (determination unit 113b) of the first projector 100A first compares the image quality adjustment menu selected by the user acquired by the acquisition unit 113a with the group table for each image quality adjustment menu. Next, the control unit 113 (determination unit 113b) of the first projector 100A determines which group the image quality adjustment menu selected by the user belongs to. Then, the control unit 113 of the first projector 100A controls the display state of the first image SCA and the second image SCB based on information about the group to which the image quality adjustment menu selected by the user belongs. In this embodiment, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu selected by the user belongs to group A in FIG. 4. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, it executes the process of step S209. Furthermore, when control unit 113 of first projector 100A determines that the image quality adjustment menu selected by the user is not group A, that is, is group B, control unit 113 executes the process of step S208.

[0072] When the control unit 113 of the first projector 100A determines that the image quality adjustment menu selected by the user belongs to group A, the control unit 113 does not cause the transmitting unit 115a of the second projector 100B to transmit a signal to the receiving unit 115b of the first projector 100A. Therefore, the first projector 100A maintains the non-display state.

[0073] Furthermore, part of the processing in this step may be performed by determination unit 113b of second projector 100B, and control unit 113 of first projector 100A may acquire the result of the determination by determination unit 113b of second projector 100B.

[0074] In step S208, control unit 113 of first projector 100A controls first projector 100A to display first image SCA. Note that control unit 113 of first projector 100A may control first projector 100A based on a signal for displaying first image SCA transmitted from transmission unit 115a of second projector 100B to reception unit 115b of first projector 100A.

[0075] In step S209, the control unit 113 of the first projector 100A determines whether the image quality adjustment menu of the second projector 100B is displayed. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu of the second projector 100B is displayed, the control unit 113 of the first projector 100A executes the process of step S207. If the control unit 113 of the first projector 100A determines that the image quality adjustment menu of the second projector 100B is not displayed, that is, the display of the image quality adjustment menu of the second projector 100B is canceled, the control unit 113 of the first projector 100A ends this flow.

[0076] The effect of the configuration of this embodiment will be described below. In this embodiment, as described above, when one of the first image SCA and the second image SCB is adjusted, the other is hidden. For example, when a user performs color adjustment of the first image SCA, the color adjustment menu belongs to group B in FIG. 4, so when the color adjustment menu is selected, the second image SCB is displayed. Therefore, the user can adjust the image quality to the intended level while comparing the first image SCA and the second image SCB.

[0077] As described above, according to the configuration of this embodiment, it is possible to switch the projection state of image projectors other than the one to be adjusted in accordance with the adjustment item. [Other Examples] The present invention can also be realized by a process in which a program for implementing one or more of the functions of the above-mentioned embodiments is supplied to a system or device via a network or a storage medium, and one or more processors in a computer of the system or device read and execute the program. It can also be realized by a circuit (e.g., ASIC) that implements one or more of the functions.

[0078] The disclosure of this embodiment includes the following configurations and methods.

[0079] (Configuration 1) A control device for use in an image projection system including a first image projector that projects a first image and a second image projector that projects a second image, the first image projector and the second image projector being communicatively connected to each other, comprising: an acquisition unit that acquires an adjustment item selected from a plurality of adjustment items; a control unit that controls a display state of the first image and the second image based on the selected adjustment item. (Configuration 2) The control device according to configuration 1, characterized in that the control unit controls the display states of the first image and the second image based on information regarding a group to which the selected adjustment item belongs, the information being obtained using a table in which the plurality of adjustment items are divided into a plurality of groups. (Configuration 3) the plurality of groups includes a first group and a second group, The control device according to configuration 2, wherein the control unit displays the first image and the second image when the selected adjustment item belongs to the first group, and hides one of the first image and the second image when the selected adjustment item belongs to the second group. (Configuration 4) 4. The control device according to configuration 2 or 3, further comprising a storage unit that stores the table. (Configuration 5) 5. The control device according to any one of configurations 1 to 4, wherein the first image and the second image are at least partially overlapped. (Configuration 6) 6. The control device according to any one of configurations 1 to 5, wherein the first image and the second image are images for adjustment corresponding to the selected adjustment item. (Configuration 7) 7. The control device according to any one of configurations 1 to 6, wherein the adjustment item is an item related to image quality adjustment. (Configuration 8) 8. The control device according to any one of configurations 1 to 7, wherein the adjustment item is selectable through an OSD (On Screen Display) menu. (Configuration 9) 1. An image projection device having a light modulation element that modulates light from a light source, and projecting an image by projecting light modulated by the light modulation element, 9. An image projection device comprising the control device according to any one of configurations 1 to 8. (Configuration 10) A control device according to any one of configurations 1 to 8; and one or more projection devices communicatively connected to the control device. (Method 1) 1. A control method for controlling an image projection system including a first image projector that projects a first image and a second image projector that projects a second image, the first image projector and the second image projector being communicatively connected to each other, the control method comprising: obtaining a selected adjustment item from a plurality of adjustment items; and determining whether to hide one of the first image and the second image based on the selected adjustment item. (Configuration 11) A program for causing a computer to execute the control method according to method 1.

[0080] Although the preferred embodiments of the present invention have been described above, the present invention is not limited to these embodiments, and various modifications and changes are possible within the scope of the gist of the present invention. [Explanation of symbols]

[0081] 113 Control unit (control device, control unit) 113a Acquisition Department 200 Image Projection System 100A First projector (first image projection device) 100B Second projector (second image projection device)

Claims

1. A control device for use in an image projection system including a first image projector for projecting a first image and a second image projector for projecting a second image, the first image projector and the second image projector being communicatively connected to each other, the control device comprising: an acquisition unit that acquires an adjustment item selected from a plurality of adjustment items; a control unit that controls a display state of the first image and the second image based on the selected adjustment item.

2. 2. The control device according to claim 1, wherein the control unit controls the display states of the first image and the second image based on information regarding a group to which the selected adjustment item belongs, the information being acquired using a table in which the adjustment items are divided into a plurality of groups.

3. the plurality of groups includes a first group and a second group, 3. The control device according to claim 2, wherein the control unit displays the first image and the second image when the selected adjustment item belongs to the first group, and hides one of the first image and the second image when the selected adjustment item belongs to the second group.

4. 3. The control device according to claim 2, further comprising a storage unit for storing the table.

5. The control device according to claim 1 , wherein the first image and the second image at least partially overlap each other.

6. 5. The control device according to claim 1, wherein the first image and the second image are images for adjustment corresponding to the selected adjustment item.

7. 5. The control device according to claim 1, wherein the adjustment items are items related to image quality adjustment.

8. 5. The control device according to claim 1, wherein the adjustment items are selectable through an OSD (On Screen Display) menu.

9. 1. An image projection device having a light modulation element that modulates light from a light source, and projecting an image by projecting light modulated by the light modulation element, 5. An image projection device comprising the control device according to claim 1.

10. A control device according to any one of claims 1 to 4; and one or more projection devices communicatively connected to the control device.

11. 1. A control method for controlling an image projection system including a first image projector that projects a first image and a second image projector that projects a second image, the first image projector and the second image projector being communicatively connected to each other, the control method comprising: obtaining a selected adjustment item from a plurality of adjustment items; A control method comprising the step of controlling a display state of the first image and the second image based on the selected adjustment item.

12. A program causing a computer to execute the control method according to claim 11.

Citation Information

Patent Citations

  • Method for displaying menu images in a projection display system

    JP4655999B2