Charging state estimation device, charging state estimation system, and charging state estimation program
The state of charge estimation device improves SOC accuracy in storage batteries by using historical charging and discharging data to adjust and measure OCV, addressing errors caused by varying C rates and ensuring accurate charging control.
Patent Information
- Application Number
- JP2023074306
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-04-28
AI Technical Summary
Existing state of charge (SOC) estimation methods for storage batteries, particularly lithium iron phosphate (LFP) batteries, suffer from inaccuracies due to errors in open circuit voltage (OCV) caused by varying C rates during charging and discharging, especially during rapid charging, which can lead to improper charging control.
A state of charge estimation device and system that includes a storage unit to store charging and discharging history, a charge/discharge determination unit to determine the battery's state, a charge/discharge control unit to adjust the battery's state, an open circuit voltage acquisition unit to measure OCV, and a state-of-charge estimation unit to estimate SOC using reference curves, thereby reducing OCV errors by controlling charging and discharging based on historical data.
The solution effectively suppresses OCV errors due to varying C rates, improving the accuracy of SOC measurement by considering hysteresis characteristics and historical usage patterns, ensuring precise charging and discharging control.
Smart Images

Figure 2024158785000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a state of charge estimation device, a state of charge estimation system, and a state of charge estimation program that estimate the state of charge of a storage battery. [Background technology]
[0002] Conventionally, there are known techniques for estimating the state of charge (SOC) from the open circuit voltage (OCV) of a storage battery. Some of these techniques take into consideration the difference between a charge curve, which is an OCV-SOC curve when the storage battery is charged, and a discharge curve, which is an OCV-SOC curve when the storage battery is discharged, that is, the hysteresis characteristics of the storage battery. For example, there is a technique that always charges the battery and then estimates the SOC from the OCV based on the charge curve. Such a technique is described, for example, in Patent Document 1. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-38146 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, we discovered that an error occurs in the OCV when the C (Capacity) rate during charging and discharging is high or low. This tendency is particularly noticeable in the case of LFP (lithium iron phosphate) batteries. As a result, there was a problem that the accuracy of the SOC estimation deteriorated as a result of estimating the SOC using an OCV with an error.
[0005] In addition, high-rate characteristics (charging and discharging at a large current) are required for storage batteries used in electric vehicles, and for example, the C-rate is higher in quick charging using a quick charger compared to normal charging using a normal charger installed in an ordinary home. That is, in such storage batteries, the error in OCV due to the difference in C-rate is expected to be large. Accordingly, the error in SOC is also expected to be large, and there was a concern that quick charging could not be completed appropriately when controlled based on SOC.
[0006] The present invention has been made in consideration of the above-mentioned circumstances, and its main object is to provide a state of charge estimation device, a state of charge estimation system, and a state of charge estimation program that can improve the accuracy of measuring the state of charge of a storage battery. [Means for solving the problem]
[0007] A first means for solving the above problem is summarized as follows: in a charge state estimation device that estimates the charge state of a storage battery, the device comprises a memory unit that stores a charge and discharge history of the storage battery; a charge and discharge determination unit that determines whether the storage battery has been charged or discharged based on the charge and discharge history stored by the memory unit; a charge and discharge control unit that discharges the storage battery by a predetermined amount when the charge and discharge determination unit determines that the storage battery has been charged, and charges the storage battery by a predetermined amount when the charge and discharge determination unit determines that the storage battery has been discharged; an open circuit voltage acquisition unit that acquires an open circuit voltage of the storage battery after the charge and discharge control unit charges and discharges the storage battery; and a charge state estimation unit that estimates the charge state of the storage battery from the open circuit voltage acquired by the open circuit voltage acquisition unit by referring to a charge and discharge curve that indicates the relationship between the open circuit voltage of the storage battery and the charge state of the storage battery.
[0008] This makes it possible to suppress errors in the open-circuit voltage due to differences in the usage state of the storage battery, thereby improving the accuracy of measuring the state of charge of the storage battery.
[0009] A second means for solving the above problem includes a first storage battery and a second storage battery, and a state-of-charge estimation system for estimating states of charge of the first storage battery and the second storage battery, the system including: a storage unit that stores a charge / discharge history of each of the storage batteries; a charge / discharge determination unit that determines for each of the storage batteries whether the storage batteries are charged or discharged based on the charge / discharge history stored in the storage unit; and a storage battery that is determined to be charged by the charge / discharge determination unit, and a storage battery that is determined to be discharged by the charge / discharge determination unit, an open-circuit voltage acquisition unit that acquires the open-circuit voltage of each of the storage batteries for each of the storage batteries after the charge / discharge control unit has charged or discharged the storage batteries; and a charge state estimation unit that estimates the charge state of each of the storage batteries from the open-circuit voltage of each of the storage batteries acquired by the open-circuit voltage acquisition unit by referring to a charge / discharge curve that indicates the relationship between the open-circuit voltage of the storage battery and the charge state of the storage battery, wherein the charge / discharge control unit charges and discharges each of the storage batteries by transferring power between the first storage battery and the second storage battery.
[0010] This makes it possible to suppress errors in the open-circuit voltage due to differences in the usage state of the storage battery, thereby improving the accuracy of measuring the state of charge of the storage battery.
[0011] A third means for solving the above problem is summarized as a state of charge estimation program that causes a state of charge estimation device that estimates the state of charge of a storage battery to perform a storage process for storing a charge / discharge history of the storage battery, a charge / discharge determination process for determining whether the storage battery is charging or discharging based on the charge / discharge history stored by the storage process, a charge / discharge control process for discharging the storage battery when it is determined by the charge / discharge determination process that the storage battery is charging, and charging the storage battery when it is determined by the charge / discharge determination process that the storage battery is discharging, an open circuit voltage acquisition process for acquiring an open circuit voltage of the storage battery after the storage battery has been charged or discharged by the charge / discharge control process, and a state of charge estimation process for estimating the state of charge of the storage battery from the open circuit voltage acquired by the open circuit voltage acquisition process by referring to a charge / discharge curve that shows the relationship between the open circuit voltage of the storage battery and the state of charge of the storage battery.
[0012] This makes it possible to suppress errors in the open-circuit voltage due to differences in the usage state of the storage battery, thereby improving the accuracy of measuring the state of charge of the storage battery. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a configuration diagram of a power supply system according to a first embodiment. [Diagram 2] (a) is a graph showing the OCV error after charging, and (b) is a graph showing the OCV error after discharging. [Diagram 3] FIG. 2 shows an OCV-SOC curve. [Figure 4] 13 is a flowchart of a storage process. [Diagram 5] 4 is a flowchart of a SOC estimation process. [Figure 6] 4 is a timing chart showing charging and discharging timing. [Figure 7] FIG. 13 is a configuration diagram of a power supply system according to a modified example. [Figure 8] FIG. 13 is a configuration diagram of a power supply system according to a modified example. [Figure 9] 13 is a flowchart of a storage process according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] A first embodiment of a state of charge estimation device, a state of charge estimation system, and a state of charge estimation program according to the present disclosure will be described below with reference to the drawings. In the following embodiments and modified examples, the same or equivalent parts are denoted by the same reference numerals in the drawings, and the explanations of the same reference numerals are incorporated herein. A power supply system 100 as the state of charge estimation system of this embodiment is mounted on a moving body such as an electric vehicle, an electric hybrid vehicle, an electric aircraft, an electric ship, etc. In this embodiment, an electric vehicle is assumed.
[0015] As shown in Fig. 1, the power supply system 100 includes a motor 10, an inverter 20, and a battery pack 30. The motor 10 is a three-phase synchronous machine, and includes star-connected U-, V-, and W-phase armature windings 11, and a rotor (not shown). The armature windings 11 of each phase are arranged with an electrical angle of 120°. The motor 10 is, for example, a permanent magnet synchronous machine. The rotor is capable of transmitting power to the drive wheels of the vehicle. Therefore, the motor 10 serves as a source of torque for driving the vehicle.
[0016] The inverter 20 includes three phases of series-connected upper-arm switches SWH and lower-arm switches SWL. An upper-arm diode DH, which is a freewheeling diode, is connected in anti-parallel to the upper-arm switch SWH, and a lower-arm diode DL, which is a freewheeling diode, is connected in anti-parallel to the lower-arm switch SWL. Hereinafter, the upper-arm switch SWH and the lower-arm switch SWL may be collectively referred to as switches SWH and SWL. In this embodiment, each switch SWH and SWL is a semiconductor switching element, for example, an IGBT (Insulated Gate Bipolar Transistor).
[0017] The inverter 20 includes a smoothing capacitor 21. A high-potential terminal of the smoothing capacitor 21 is connected to a positive bus H1. A low-potential terminal of the smoothing capacitor 21 is connected to a negative bus L1. The smoothing capacitor 21 may be provided outside the inverter 20.
[0018] In each phase, a first end of the armature winding 11 is connected to a connection point between an emitter serving as a low potential terminal of the upper arm switch SWH and a collector serving as a high potential terminal of the lower arm switch SWL via a conductive member 23 such as a bus bar. Second ends of the armature windings 11 of each phase are connected to each other at a neutral point.
[0019] The collectors of the upper arm switches SWH of each phase are connected to a positive bus H1. The emitters of the lower arm switches SWL of each phase are connected to a negative bus L1. The battery pack 30 is connected to the inverter 20 via the positive bus H1 and the negative bus L1.
[0020] The battery pack 30 of the power supply system 100 includes a first storage battery 31 and a second storage battery 32. Each of the storage batteries 31, 32 serves as a power supply source for rotating the rotor of the motor 10. Each of the storage batteries 31, 32 is an assembled battery configured as a series connection of battery cells, which are single cells. The positive terminal of the first storage battery 31 is connected to a positive bus H1, and the negative terminal of the second storage battery 32 is connected to a negative bus L1. The terminal voltages (e.g., rated voltages) of the battery cells constituting the assembled battery are set to be the same, for example. The battery cells are, for example, secondary batteries such as lithium ion batteries. The terminal voltages (e.g., rated voltages) of the storage batteries 31, 32 may be the same or different.
[0021] Each of the storage batteries 31, 32 can be charged by an external charger 40 provided outside the vehicle. The external charger 40 is, for example, a stationary charger. The external charger 40 may be either a normal charger or a rapid charger. A positive terminal of the external charger 40 is connected to one end of a positive charging path 43, and the other end of the charging path 43 is connected to a positive bus H1. A negative terminal of the external charger 40 is connected to one end of a negative charging path 44, and the other end of the charging path 44 is connected to a negative bus L1.
[0022] The battery pack 30 of the power supply system 100 is provided with a positive main switch SMRH that switches between energization and de-energization of a positive bus H1 that connects between the first storage battery 31 and the inverter 20. The positive main switch SMRH is provided on the positive bus H1. The battery pack 30 of the power supply system 100 is also provided with a negative main switch SMRL that switches between energization and de-energization of a negative bus L1 that connects between the second storage battery 32 and the inverter 20. The positive charging path 43 of the power supply system 100 is also provided with a high-potential side charging switch DCRH that switches between energization and de-energization of the positive charging path 43. The negative charging path 44 of the power supply system 100 is also provided with a low-potential side charging switch DCRL that switches between energization and de-energization of the negative charging path 44. The positive side main switch SMRH, the negative side main switch SMRL, the high potential side charging switch DCRH, and the low potential side charging switch DCRL may be collectively referred to as switches SMRH, SMRL, DCRH, and DCRL.
[0023] In this embodiment, the switches SMRH, SMRL, DCRH, and DCRL are mechanical relays. When turned off, the switches SMRH, SMRL, DCRH, and DCRL block bidirectional current flow, and when turned on, allow bidirectional current flow. Note that the switches SMRH, SMRL, DCRH, and DCRL are not limited to mechanical relays and may be, for example, semiconductor switching elements.
[0024] The battery pack 30 of the power supply system 100 includes a first switch SW1, a second switch SW2, a third switch SW3, and a fourth switch SW4 as switches for switching the connection state of the first storage battery 31 and the second storage battery 32. In the following, the first switch SW1, the second switch SW2, the third switch SW3, and the fourth switch SW4 may be collectively referred to as switches SW1 to SW4.
[0025] In this embodiment, the switches SW1 to SW4 are mechanical relays. When the switches SW1 to SW4 are turned off, they block the flow of current in both directions, and when they are turned on, they allow the flow of current in both directions. Note that the switches SW1 to SW4 are not limited to mechanical relays, and may be, for example, semiconductor switching elements.
[0026] The first switch SW1 is provided on a first electrical path 24 that connects the negative terminal of the first storage battery 31 and the positive terminal of the second storage battery 32. When the first switch SW1 is turned on, the negative terminal of the first storage battery 31 and the positive terminal of the second storage battery 32 are electrically connected. On the other hand, when the first switch SW1 is turned off, the negative terminal of the first storage battery 31 and the positive terminal of the second storage battery 32 are electrically disconnected.
[0027] The second switch SW2 is provided on a second electrical path 25 that connects the negative terminal of the first storage battery 31 and the negative bus bar L1. When the second switch SW2 is turned on, the negative terminal of the first storage battery 31 and the negative bus bar L1 are electrically connected. On the other hand, when the second switch SW2 is turned off, the negative terminal of the first storage battery 31 and the negative bus bar L1 are electrically disconnected.
[0028] The third switch SW3 and the fourth switch SW4 are provided in a third electrical path 26 that connects a portion of the first electrical path 24 closer to the second storage battery 32 than the first switch SW1 and the neutral point of the armature winding 11. The third switch SW3 is provided on the second storage battery 32 side, and the fourth switch SW4 is provided on the neutral point side. When the third switch SW3 and the fourth switch SW4 are turned on, the neutral point of the armature winding 11 and the positive terminal of the second storage battery 32 are electrically connected. On the other hand, when the third switch SW3 or the fourth switch SW4 is turned off, the neutral point of the armature winding 11 and the positive terminal of the second storage battery 32 are electrically disconnected.
[0029] The power supply system 100 is provided with a neutral point capacitor 22. A high potential side terminal of the neutral point capacitor 22 is connected to the neutral point (more specifically, the third electrical path 26 between the third switch SW3 and the fourth switch SW4). Also, a low potential side terminal of the neutral point capacitor 22 is connected to the negative bus bar L1.
[0030] The power supply system 100 also includes various sensors. As shown in Fig. 1, a first current sensor A11 that measures a current flowing through the first storage battery 31 is provided in an electrical path between the main switch SMRH on the positive electrode side and the first storage battery 31. Note that the sensor may be provided at any position on the electrical path as long as it can measure the current flowing through the first storage battery 31.
[0031] Further, in the first electrical path 24, a second current sensor A12 that measures the current flowing through the second storage battery 32 is provided between the first switch SW1 and the second storage battery 32 (more specifically, between the connection point with the third electrical path 26 and the positive terminal of the second storage battery 32). Note that the second current sensor A12 may be provided at any location on the electrical path as long as it can measure the current flowing through the second storage battery 32. Further, a first voltage sensor V11 that measures the OCV (open circuit voltage) of the first storage battery 31 and a second voltage sensor V12 that measures the OCV of the second storage battery 32 are provided.
[0032] The inverter 20 may be housed in the battery pack 30. Also, outside the battery pack 30, some or all of the switches SMRH, SMRL, and SW1 to SW4 may be disposed.
[0033] The power supply system 100 includes a control device 50 as a state-of-charge estimation device. The control device 50 is mainly configured with a microcomputer, and the microcomputer includes a CPU, a RAM, a ROM, and the like. The functions provided by the control device 50 can be provided by software recorded in a substantial memory device and a computer that executes the software, by software alone, by hardware alone, or by a combination of these. For example, when the microcomputer is provided by an electronic circuit that is hardware, it can be provided by a digital circuit including a large number of logic circuits, or by an analog circuit. For example, the microcomputer executes a program stored in a non-transitory tangible storage medium such as a memory that the microcomputer includes. The program includes, for example, a program for a process shown in FIG. 3 or FIG. 4, which will be described later. The program is executed to execute a method (process) corresponding to the program. The memory is, for example, a non-volatile memory. The program stored in the memory can be updated via a communication network such as the Internet, for example, OTA (Over The Air), or the like.
[0034] Information (detection values) from various sensors are input to the control device 50. The various sensors include, for example, the above-mentioned first current sensor A11, second current sensor A12, first voltage sensor V11, and second voltage sensor V12. In addition, the various sensors include, for example, a rotation angle sensor that detects the rotation angle (electrical angle) of the rotor, and a phase current sensor that detects the phase current flowing through the armature windings 11 of each phase, although not shown.
[0035] The control device 50 performs various processes according to a program based on information such as detection values input from various sensors. The various processes performed include, for example, a process for controlling the inverter 20. In detail, the control device 50 performs switching control of the switches SWH, SWL, etc. constituting the inverter 20 to feedback control the control amount of the motor 10 to a command value based on the detection values of each sensor. The control amount is, for example, torque. In each phase, the upper arm switch SWH and the lower arm switch SWL are alternately turned on. This feedback control transmits the rotational power of the rotor to the drive wheels, and the vehicle runs.
[0036] Furthermore, when the external charger 40 is connected, the control device 50 performs a process of controlling the on / off of each switch SMRH, SMRL, DCRH, DCRL, SW1 to SW4 and each switch SWH, SWL constituting the inverter 20 in order to charge the first storage battery 31 and the second storage battery 32. For example, when the external charger 40 is a rapid charger, the control device 50 connects the first storage battery 31 and the second storage battery 32 in series to perform rapid charging. In some cases, the control device 50 connects the first storage battery 31 and the second storage battery 32 in parallel via the neutral point of the motor 10 to perform charging. At that time, the control device 50 may substitute the inverter 20 and the armature winding 11 of the motor 10 as a voltage converter (DCDC converter) to step down (or step up) the charging voltage of the external charger 40 to charge.
[0037] Furthermore, the control device 50 acquires the OCV of each of the storage batteries 31, 32 according to the state of charge estimation program, and performs a process of estimating the SOC (state of charge) of each of the storage batteries 31, 32 from the OCV.
[0038] Incidentally, an error occurs in the OCV and SOC of each of the storage batteries 31, 32 depending on the usage state of each of the storage batteries 31, 32. To explain in more detail, in a vehicle, the torque required for the motor 10 may change significantly depending on the running state of the vehicle. Also, each of the storage batteries 31, 32 may be charged by a quick charger or a normal charger. For this reason, the charging or discharging speed, i.e., the C rate (the ratio of the charging / discharging current value to the battery capacity) of each of the storage batteries 31, 32 used in the vehicle may change significantly.
[0039] The present inventors have discovered that, as shown in FIG. 2(a), even if the SOC immediately after charging is the same "X%" (e.g., 50%), the OCV does not match depending on whether the C rate is high or low. In FIG. 2, the OCV when the C rate is high is shown by a solid line, and the OCV when the C rate is low is shown by a dashed line. Similarly, the present inventors have discovered that, as shown in FIG. 2(b), even if the SOC immediately after discharging is the same "Y%" (e.g., 50%), the OCV does not match depending on whether the C rate is high or low. It is self-evident that an SOC cannot be estimated accurately based on an OCV that includes an error.
[0040] In particular, it is known that the OCV-SOC curves (charge / discharge curves) of the storage batteries 31 and 32 have a plateau region where the curve temporarily becomes flat, as shown in FIG. 3. When estimating the SOC in such a plateau region, even a slight error in the OCV will result in a large error in the SOC.
[0041] 3, the OCV-SOC curve C11, which is a charge curve during charging, does not match the OCV-SOC curve C13, which is a discharge curve during discharging. That is, the storage batteries 31 and 32 have hysteresis characteristics. For this reason, it is necessary to estimate the SOC by taking into account the hysteresis characteristics of each of the storage batteries 31 and 32.
[0042] Hereinafter, various functions of the control device 50 and various processes executed by the control device 50 will be described in detail in order to estimate the SOC of each of the storage batteries 31, 32 from the OCV of each of the storage batteries 31, 32. Various functions related to the estimation of the SOC are realized by the microcomputer of the control device 50 executing a program (state of charge estimation program) stored in the memory or the like of the control device 50.
[0043] 1, the various functions related to SOC estimation include, for example, functions as a storage unit 51, a charge / discharge determination unit 52, a charge / discharge control unit 53, an open circuit voltage acquisition unit 54, and a state-of-charge estimation unit 55. The various functions will be described in detail below.
[0044] First, the storage unit 51 will be described. The storage unit 51 stores the charge / discharge history of each of the storage batteries 31, 32. The charge / discharge history is a history indicating the tendency of charging / discharging each of the storage batteries 31, 32. For example, a current integrated value calculated by integrating the amount of current flowing out or in from each of the storage batteries 31, 32 during the period from the previous SOC estimation to the present may be stored as the charge / discharge history.
[0045] Here, the storage process of the charge / discharge history in this embodiment will be described with reference to Fig. 4. The control device 50 as the storage unit 51 performs the storage process at predetermined intervals. The storage process is performed for each of the storage batteries 31 and 32. Here, the storage process related to the first storage battery 31 will be mainly described, but the storage process related to the second storage battery 32 is similar.
[0046] When the storage process is started, as shown in Fig. 4, the control device 50 determines whether the current value of the first storage battery 31 has been continuously equal to or greater than the first threshold value Th1 for a predetermined time (step S11). Here, the current value is expressed as a positive value (plus) when a current is flowing into the first storage battery 31 (i.e., when charging), and is expressed as a negative value (minus) when a current is flowing out of the first storage battery 31 (i.e., when discharging). The predetermined time is an arbitrary time, but may be, for example, the execution cycle of the storage process. The first threshold value Th1 is an arbitrary positive value.
[0047] That is, in step S11, it is determined whether or not the battery has been charged to an amount of current equal to or greater than the absolute value of the first threshold value Th1 times a predetermined time. If the result of this determination is positive, the control device 50 counts up (adds 1) the charge / discharge counter stored in the memory of the control device 50 (step S12). Then, the storage process ends.
[0048] If the determination result in step S11 is negative, the control device 50 determines whether the current value of the first storage battery 31 has been continuously equal to or less than the second threshold value Th2 for a predetermined time (step S13). The second threshold value Th2 is an arbitrary negative value. That is, in step S13, it is determined whether the first storage battery 31 has been discharged by an amount equal to or more than the current amount represented by the absolute value of the second threshold value Th2 times the predetermined time. If the determination result is positive, the control device 50 counts down (subtracts 1) the charge / discharge counter (step S14). Then, the storage process ends.
[0049] On the other hand, if the determination result in step S13 is negative, i.e., if it cannot be determined that either charging or discharging has been performed, the control device 50 decides to maintain the value of the charge / discharge counter (step S15) and terminates the storage process.
[0050] The charge / discharge determination unit 52 determines whether each of the storage batteries 31, 32 is in a charged state or in a discharged state based on the charge / discharge history acquired from the storage unit 51. For example, the charge / discharge determination unit 52 may determine that each of the storage batteries 31, 32 is in a charged state if the current integrated value is within a charging range indicating a tendency after charging, and may determine that each of the storage batteries 31, 32 is in a discharging range indicating a tendency after discharging. Moreover, when the current integrated value is neither within the charging range nor within the discharging range, it may determine that the storage batteries 31, 32 are unclear.
[0051] In this embodiment, the charge / discharge determination unit 52 determines that the battery is after charging when the charge / discharge counter stored in the storage unit 51 is equal to or greater than a first determination value J1 indicating that the battery is in the charging range. On the other hand, the charge / discharge determination unit 52 determines that the battery is after discharging when the charge / discharge counter is equal to or less than a second determination value J2 indicating that the battery is in the discharging range. Note that, when the charge / discharge counter is greater than the second determination value J2 and less than the first determination value J1, the charge / discharge determination unit 52 determines that the battery is unknown.
[0052] When the charge / discharge determination unit 52 determines that the first storage battery 31 is charged, the charge / discharge control unit 53 discharges the first storage battery 31. At this time, the control device 50 discharges the first storage battery 31 so that the SOC decreases by a predetermined amount (for example, 5.0%).
[0053] On the other hand, when it is determined that the first storage battery 31 is discharged, the charge / discharge control unit 53 charges the first storage battery 31. At this time, the control device 50 charges the first storage battery 31 so that the SOC increases by a predetermined amount (for example, 2.5%).
[0054] At this time, the charge amount and the discharge amount may be different as in this embodiment, or may be the same. The speed at which the charge and discharge are performed (C rate) is determined in advance, and in this embodiment, the charge and discharge are performed at a low rate. The charge and discharge current amount and the C rate are determined by experiments or the like so as to effectively suppress the error of the OCV.
[0055] Further, the charge / discharge determination unit 52 of this embodiment performs charging / discharging of the first storage battery 31 by transferring power between the first storage battery 31 and the second storage battery 32. Specifically, the control device 50 as the charge / discharge determination unit 52 controls the inverter 20 to turn on the switches SMRH, SW2 to SW4 and convert (boost) the voltage of the second storage battery 32. As a result, the discharged power of the second storage battery 32 is supplied to the first storage battery 31, and the first storage battery 31 is charged. Similarly, the control device 50 controls the inverter 20 to turn on the switches SMRH, SW2 to SW4 and convert the voltage of the first storage battery 31. As a result, the discharged power of the first storage battery 31 is supplied to the second storage battery 32, and the second storage battery 32 is charged.
[0056] In this embodiment, the first storage battery 31 is charged and discharged by transferring electric power between the first storage battery 31 and the second storage battery 32, but the present invention is not limited to this method as long as charging and discharging are possible. For example, the first storage battery 31 may be discharged by connecting a predetermined electric load to the first storage battery 31 and supplying electric power thereto. The first storage battery 31 may also be charged by connecting an external charger 40 or a generator (such as the motor 10) to the first storage battery 31.
[0057] After the charge / discharge control unit 53 charges / discharges the first storage battery 31, the open circuit voltage acquisition unit 54 acquires the OCV (open circuit voltage) of the first storage battery 31. For example, the open circuit voltage acquisition unit 54 turns off the switches SW1 to SW4 to place the first storage battery 31 in an unloaded state, and acquires the open circuit voltage of the first storage battery 31 from the first voltage sensor V11.
[0058] The charge state estimation unit 55 estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired by the open circuit voltage acquisition unit 54, by referring to an OCV-SOC curve (charge / discharge curve) showing the relationship between the OCV of the first storage battery 31 and the SOC of the first storage battery 31.
[0059] In this embodiment, as shown in FIG. 3, three types of OCV-SOC curves are prepared. Specifically, an OCV-SOC curve C11 during charging, an OCV-SOC curve C12 during rest (complete rest), and an OCV-SOC curve C13 during discharging are prepared. The OCV-SOC curve C11 is a charging curve that can be obtained as a result of continuing charging at a predetermined current amount (C rate) from the specified lower limit value to the specified upper limit value of the SOC. The OCV-SOC curve C12 is a curve that can be obtained as a result of natural discharging from the specified upper limit value to the specified lower limit value of the SOC. The OCV-SOC curve C13 is a discharging curve that can be obtained as a result of continuing discharging at a predetermined current amount (C rate) from the specified upper limit value to the specified lower limit value of the SOC. The OCV-SOC curves are identified by simulation, experiment, or the like, and are stored in advance in a memory or the like of the control device 50.
[0060] When the charge / discharge determination unit 52 determines that the first storage battery 31 is charged, the control device 50 as the state-of-charge estimation unit 55 reads out the OCV-SOC curve C11 during charging. Then, the control device 50 refers to the OCV-SOC curve C11 and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired by the open circuit voltage acquisition unit 54.
[0061] Furthermore, when the charge / discharge determination unit 52 determines that the first storage battery 31 is discharged, the control device 50 as the charge / discharge estimation unit 55 reads out the OCV-SOC curve C13 during discharging. Then, the control device 50 refers to the OCV-SOC curve C13 and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired by the open circuit voltage acquisition unit 54.
[0062] When the charge / discharge determination unit 52 determines that the first storage battery 31 is neither charged nor discharged and is therefore unknown, the control device 50 reads out the OCV-SOC curve C12 during suspension. The control device 50 then refers to the OCV-SOC curve C12 and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired by the open circuit voltage acquisition unit 54.
[0063] Next, the SOC estimation process for estimating the SOC will be described with reference to Fig. 5. The SOC estimation process is executed by the control device 50 after an SOC estimation command signal is input from the upper control device and charging / discharging of the first storage battery 31 is completed. The SOC estimation supply signal is output at a predetermined timing, for example, when the vehicle is stopped.
[0064] When the SOC estimation process is started, as shown in FIG. 5, the control device 50 determines whether the charge / discharge counter stored in the memory by the storage unit 51 is equal to or greater than a first determination value J1 indicating that the battery is in the charging range (step S101).
[0065] If the result of this determination is positive, the control device 50 discharges the first storage battery 31 so that the SOC decreases by a predetermined amount (approximately 5.0%) (step S102). After discharging the first storage battery 31, the control device 50 obtains the OCV of the first storage battery 31 from the first voltage sensor V11 (step S103).
[0066] Then, the control device 50 refers to the OCV-SOC curve C11 during charging, and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired in step S103 (step S104), and then ends the SOC estimation process.
[0067] On the other hand, if the determination result in step S101 is negative, the control device 50 determines whether the charge / discharge counter stored in the memory by the storage unit 51 is equal to or less than a second determination value J2 indicating that the counter is in the discharge range (step S105). If the determination result is positive, the control device 50 charges the first storage battery 31 so that the SOC increases by a predetermined amount (approximately 2.5%) (step S106). After charging the first storage battery 31, the control device 50 obtains the OCV of the first storage battery 31 from the first voltage sensor V11 (step S107).
[0068] Then, the control device 50 refers to the OCV-SOC curve C13 during discharging, and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired in step S107 (step S108). Then, the SOC estimation process ends.
[0069] On the other hand, if the determination result in step S105 is negative, the control device 50 charges the first storage battery 31 so that the SOC increases by a predetermined amount, and then discharges the first storage battery 31 so that the SOC decreases by a predetermined amount (step S109). It is preferable that the charge amount and the discharge amount in step S109 are the same, but they may be different. Note that the control device 50 may discharge the first storage battery 31 so that the SOC decreases by a predetermined amount, and then charge the first storage battery 31 so that the SOC increases by a predetermined amount.
[0070] After the first storage battery 31 is charged or discharged, the control device 50 acquires the OCV of the first storage battery 31 from the first voltage sensor V11 (step S110). Then, the control device 50 refers to the OCV-SOC curve C12 during rest and estimates the SOC of the first storage battery 31 from the OCV of the first storage battery 31 acquired in step S110 (step S111). Then, the SOC estimation process ends.
[0071] The processes of steps S101 and S105 correspond to a charge / discharge determination process, and by performing these processes, the control device 50 functions as a charge / discharge determination unit 52. The processes of steps S102, S106, and S109 correspond to a charge / discharge control process, and by performing these processes, the control device 50 functions as a charge / discharge control unit 53. The processes of steps S103, S107, and S110 correspond to an open circuit voltage acquisition process, and by performing these processes, the control device 50 functions as an open circuit voltage acquisition unit 54. The processes of steps S104, S108, and S111 correspond to a charge state estimation process, and by performing these processes, the control device 50 functions as a charge state estimation unit 55.
[0072] The flow of the SOC estimation process will be described with reference to a specific example shown in FIG. 6. Here, FIG. 6(a) shows the charge / discharge current of the first storage battery 31. FIG. 6(b) shows the increase / decrease of the charge / discharge counter, and FIG. 6(c) shows the result when charge / discharge is determined. FIG. 6(c) shows that the positive side (upper side) is determined as after charging, and the negative side (lower side) is determined as after discharging. FIG. 6(d) shows an OCV acquisition request flag, which is turned on (H level) when the SOC estimation process is started, and turned off (L level) when the OCV is acquired. FIG. 6(e) shows a charge / discharge end flag, which is turned off (L level) if the first storage battery 31 is charging / discharging, and turned on (H level) when it is not charging / discharging. FIG. 6(f) shows a resolution control flag, which is turned on (H level) when charge / discharge control for suppressing an error in the OCV is requested, and turned off (L level) when the charge / discharge control is completed. The charge / discharge control for suppressing the error in the OCV is, for example, the control related to the processing of steps S102, S106, and S109. Fig. 6(g) shows the OCV acquisition flag, which is on (H level) during the period from the start to the end of the processing for acquiring the OCV (steps S103, S107, and S110).
[0073] As shown in Fig. 6(a) and Fig. 6(b), from time T1 to time T10, the charge / discharge counter increases / decreases according to the current value of the charge / discharge current of the first storage battery 31. For example, from time T2 to T4 and T7 to T9, the current value of the first storage battery 31 continues to be equal to or greater than the first threshold value Th1, so the charge / discharge counter counts up at predetermined intervals. Similarly, from time T5 to T6, the current value of the first storage battery 31 continues to be equal to or less than the second threshold value Th2, so the charge / discharge counter counts down at predetermined intervals. From time T1 to T2, T4 to T5, T6 to T7, and T9 to T10, the current value of the first storage battery 31 is greater than the second threshold value Th2 and less than the first threshold value Th1, so the value of the charge / discharge counter is maintained.
[0074] Then, as shown in FIG. 6(b), after time T3, the value of the charge / discharge counter becomes equal to or greater than the first judgment value J1, so that, as shown in FIG. 6(c), if a charge / discharge judgment is made after time T3, it will be judged as having been charged.
[0075] Here, as shown in Fig. 6(d), when the SOC estimation command signal is input at time T8, the OCV acquisition request flag is turned on. However, as shown in Fig. 6(a) and Fig. 6(e), since charging / discharging is in progress (the charging / discharging end flag is not on), the SOC estimation process does not start and the system enters a standby state.
[0076] Thereafter, at time T10, the charging and discharging of the first storage battery 31 ends, the charging and discharging end flag is turned on, and the SOC estimation process is started. Accordingly, the cancellation control flag is turned on. Then, at time T11, a predetermined time after the charging and discharging end flag and the cancellation control flag are turned on, the charging and discharging control is performed to suppress the error in the OCV. At this time, as shown in FIG. 6(c), it is determined that the battery is after charging, so discharging is performed to suppress the error in the OCV (times T11 to T12). Thereafter, at times T13 to T14, a process for acquiring the OCV is performed. After acquiring the OCV, the SOC is estimated.
[0077] Next, the effect of performing this process will be explained. As shown in Figure 2(a), even if the SOC immediately after charging is the same "X%", an error occurs in the OCV depending on whether the C rate is high or low. However, by subsequently discharging so that the SOC decreases by a specified amount (by moving it to the left in Figure 2(a)), the OCV error becomes smaller. This makes it possible to reduce the OCV error caused by differences in the C rate.
[0078] As shown in Fig. 2(a), even if it is determined that the first storage battery 31 is charged, it is known that the error in the OCV can be reduced by charging the first storage battery 31 so that the SOC increases by a predetermined amount (so that the SOC moves to the right) As shown in Fig. 2(a), however, compared to discharging (left side), it is more difficult to eliminate the error when charging (right side), and it is necessary to increase the amount of charging current.
[0079] Therefore, in this embodiment, when it is determined that the first storage battery 31 is charged, the first storage battery 31 is discharged so that the SOC decreases by a predetermined amount. This reduces the time required to eliminate the error of the OCV, and suppresses the amount of fluctuation in the SOC that accompanies the error elimination (or error reduction, the same applies below).
[0080] Also, as shown in Figure 2(b), even if the SOC immediately after discharge is the same "Y%", an error occurs in the OCV depending on the C rate. However, by subsequently charging the battery so that the SOC increases by a certain amount, the OCV error becomes smaller. This makes it possible to reduce the OCV error caused by differences in the C rate.
[0081] As shown in Fig. 2(b), even if it is determined that the first storage battery 31 is discharged, it is known that the error in the OCV can be reduced by discharging the first storage battery 31 so that the SOC decreases by a predetermined amount. However, as shown in Fig. 2(b), it is more difficult to eliminate the error when discharging compared to when charging, and it is necessary to increase the amount of discharge current.
[0082] Therefore, in this embodiment, when it is determined that the first storage battery 31 is discharged, the first storage battery 31 is charged so that the SOC increases by a predetermined amount. This reduces the time required to eliminate the error of the OCV, and suppresses the amount of fluctuation in the SOC that accompanies the reduction of the error.
[0083] The effects of the power supply system 100 in the first embodiment will be described below. Note that, although the effects will be mainly described when the first storage battery 31 is the measurement target, similar effects can be obtained even when the second storage battery 32 is the measurement target.
[0084] When the control device 50 determines that the first storage battery 31 is in a charged state, the control device 50 discharges the first storage battery 31, whereas when the control device 50 determines that the first storage battery 31 is in a discharged state, the control device 50 charges the first storage battery 31 and then detects and acquires the OCV of the first storage battery 31. This makes it possible to reduce an error in the OCV caused by differences in the C rate. Since the error in the OCV can be reduced, the error in the SOC estimated based on the OCV can also be reduced.
[0085] The charge / discharge history is an integrated current value calculated by accumulating the current flowing out or flowing in from the first storage battery 31. Specifically, the integrated current value is measured by adding 1 to the charge / discharge counter when a predetermined amount of current is charged, and subtracting 1 from the charge / discharge counter when a predetermined amount of current is discharged.
[0086] Then, the control device 50 determines that the battery is after charging if the current integrated value is within a charging range indicating a tendency after charging, and determines that the battery is after discharging if the current integrated value is within a discharging range indicating a tendency after discharging. Specifically, the control device 50 determines that the battery is after charging if the charge / discharge counter is equal to or greater than a first determination value J1, and determines that the battery is after discharging if the charge / discharge counter is equal to or less than a second determination value J2. This allows the determination to be made by referring to the charge / discharge history over a certain period of time, so that the usage state of the first storage battery 31 can be accurately determined.
[0087] When the control device 50 cannot determine whether the first storage battery 31 has been charged or discharged from the charge / discharge history, that is, when the determination result in step S105 is negative, the control device 50 charges the first storage battery 31 once and then discharges it, or discharges the first storage battery 31 once and then charges it, as shown in step S109. This makes it possible to suppress an error in the OCV due to the C rate even if the usage state of the first storage battery 31 is unknown.
[0088] As can be seen by comparing FIG. 2(a) and FIG. 2(b), it is more difficult to eliminate the error in the OCV when discharging after charging (FIG. 2(a)) than when charging after discharging (FIG. 2(b)). Therefore, the control device 50 differentiates the amount of current discharged when it is determined that the battery is after charging from the amount of current discharged when it is determined that the battery is after charging. Specifically, as shown in steps S102 and S105, when it is determined that the battery is after charging, the control device 50 discharges the battery so that the SOC decreases by about 5.0%, and when it is determined that the battery is after discharging, the control device 50 charges the battery so that the SOC increases by about 2.5%. This makes it possible to reduce the amount of current and the charging time to charge the battery in step S105 in order to eliminate the error in the OCV.
[0089] When the control device 50 determines that the first storage battery 31 is in a charged state (when the determination result in step S101 is positive), it estimates the SOC by referring to the OCV-SOC curve C11 during charging (step S104). When the control device 50 determines that the first storage battery 31 is in a discharged state (when the determination result in step S105 is positive), it estimates the SOC by referring to the OCV-SOC curve C13 during discharging (step S108). When the control device 50 determines that the usage state of the first storage battery 31 is unknown (when the determination results in steps S101 and S105 are negative), it estimates the SOC by referring to the OCV-SOC curve C12 during suspension (step S111). This makes it possible to estimate the SOC taking into account the influence of the hysteresis characteristics of the first storage battery 31 during charging and discharging, and to suppress errors in the SOC.
[0090] (Modification) A modification in which a part of the configuration of the power supply system 100 of the above embodiment is changed will be described.
[0091] In the above embodiment, the magnitude of the error of the OCV varies depending on the magnitude of the current integration value. Therefore, in steps S102 and S105, the control device 50 may determine the amount of current to be charged and discharged based on the current integration value. That is, when the current integration value is large, the control device 50 may increase the amount of current to be charged and discharged, and when the current integration value is small, the control device 50 may decrease the amount of current to be charged and discharged. For example, when the absolute value of the charge / discharge counter indicating the current integration value is large, the control device 50 may increase the amount of current to be charged and discharged compared to when the absolute value is small.
[0092] In the above embodiment, the OCV-SOC curve (charge / discharge curve) differs depending on the usage state of the storage batteries 31, 32, i.e., the amount of charged / discharged current, due to the hysteresis characteristics of the storage batteries 31, 32. Therefore, four or more OCV-SOC curves may be prepared, an OCV-SOC curve may be associated with each integrated current value, and the associated OCV-SOC curve may be identified from the integrated current value.
[0093] For example, four or more OCV-SOC curves corresponding to each charge / discharge counter indicating the current integrated value may be stored, and in steps S104, S108, and S111, the control device 50 may identify the associated OCV-SOC curve from the value of the charge / discharge counter indicating the current integrated value, and estimate the SOC based on the identified charge / discharge curve.
[0094] In the above embodiment, the storage batteries 31, 32 may be only one or three or more. As shown in Fig. 7, DC-DC converters 121, 122 may be employed instead of the motor 10 and the inverter 20 to perform voltage conversion. As shown in Fig. 8, the storage batteries 31, 32 may be connected in parallel to the inverter 20 without the motor 10.
[0095] In the storage process of the above embodiment, the results are accumulated, but the judgment may be made based on the immediately preceding result. Specifically, the storage process may be as shown in FIG. 9. This will be described in detail below. When the storage process of the modified example shown in FIG. 9 is started, the control device 50 judges whether the current value of the first storage battery 31 continues to be equal to or greater than the first threshold value Th1 for a predetermined time (step S21). That is, in step S21, it is judged whether the amount of current represented by the absolute value of the first threshold value Th1 times the predetermined time has been charged. If the judgment result is positive, the control device 50 sets a value indicating that charging has been performed (for example, 1) to a charge / discharge counter stored in the memory of the control device 50 (step S22). Then, the storage process ends.
[0096] If the determination result in step S21 is negative, the control device 50 determines whether the current value of the first storage battery 31 has been continuously equal to or less than the second threshold value Th2 for a predetermined time (step S23). That is, in step S23, it is determined whether the amount of current expressed by the absolute value of the second threshold value Th2 times the predetermined time has been discharged. If the determination result is positive, the control device 50 sets a value (e.g., −1) indicating that the battery has been discharged in the charge / discharge counter (step S24). Then, the storage process ends.
[0097] On the other hand, if the determination result in step S23 is negative, that is, if it cannot be determined that either charging or discharging has been performed, the control device 50 sets a value (e.g., zero) indicating that the charging / discharging counter is unknown (step S25), and ends the storage process. Then, in the SOC estimation process wave, it is determined whether the charging / discharging counter value indicates that the charging / discharging counter value is after charging, after discharging, or unknown, and performs charging / discharging control and specifies the OCV-SOC curve. In this way, the charging / discharging history can be stored with simple control.
[0098] In the above embodiment, the current integration value may be measured by a known method and used as the charge / discharge history.
[0099] The control unit and the method described in the present disclosure may be realized by a special-purpose computer provided by configuring a processor and a memory programmed to execute one or more functions embodied in a computer program. Alternatively, the control unit and the method described in the present disclosure may be realized by a special-purpose computer provided by configuring a processor with one or more dedicated hardware logic circuits. Alternatively, the control unit and the method described in the present disclosure may be realized by one or more special-purpose computers configured by a combination of a processor and a memory programmed to execute one or more functions and a processor configured with one or more hardware logic circuits. In addition, the computer program may be stored in a computer-readable non-transitory tangible recording medium as instructions executed by a computer.
[0100] Characteristic configurations extracted from each of the above-described embodiments will be described below. [Configuration 1] A state-of-charge estimation device (50) for estimating a state of charge of a storage battery, a memory unit (51) that stores a charge / discharge history of the storage battery; a charge / discharge determination unit (52) that determines whether the storage battery is charged or discharged based on the charge / discharge history stored in the memory unit; a charge / discharge control unit (53) that, when the charge / discharge determination unit determines that the storage battery is charged, discharges the storage battery by a predetermined amount, and, when the charge / discharge determination unit determines that the storage battery is discharged, charges the storage battery by a predetermined amount; an open-circuit voltage acquisition unit (54) that acquires an open-circuit voltage of the storage battery after the charge / discharge control unit charges or discharges the storage battery; and a state-of-charge estimation unit (55) that estimates a state of charge of the storage battery from the open-circuit voltage acquired by the open-circuit voltage acquisition unit by referring to a charge / discharge curve indicating a relationship between the open-circuit voltage of the storage battery and the state of charge of the storage battery. [Configuration 2] The charge / discharge history is a current integrated value calculated by integrating a current flowing out or flowing into the storage battery, The charge / discharge determination unit determines that the state of charge is after charging if the integrated current value is within a charging range indicating a tendency after charging, and determines that the state of charge is after discharging if the integrated current value is within a discharging range indicating a tendency after discharging. [Configuration 3] 3. The device for estimating a state of charge according to configuration 2, wherein the charge / discharge control unit determines an amount of current to be charged / discharged based on the current integrated value. [Configuration 4] A charge / discharge curve is previously associated with each of the current integrated values, The device for estimating a state of charge according to configuration 2, wherein the state of charge estimation unit identifies a corresponding charge / discharge curve from the current integrated value, and estimates the state of charge based on the identified charge / discharge curve. [Configuration 5] A charge state estimation device according to any one of configurations 1 to 4, wherein when the charge / discharge determination unit cannot determine whether the battery has been charged or discharged from the charge / discharge history, the charge / discharge control unit first charges the storage battery and then discharges it a predetermined amount, or first discharges the storage battery and then charges it a predetermined amount. [Configuration 6] A charge state estimation device described in any one of configurations 1 to 5, wherein the charge / discharge control unit differentiates the amount of current discharged when it is determined that the battery is after charging from the amount of current discharged when it is determined that the battery is after charging. [Configuration 7] The charge state estimation device according to any one of configurations 1 to 6, wherein, when the charge / discharge determination unit determines that the storage battery is charged, the charge state estimation unit estimates the charge state by referring to a charging curve showing the relationship between the open circuit voltage and the charge state during charging, and, when the charge / discharge determination unit determines that the storage battery is discharged, the charge state estimation unit estimates the charge state by referring to a discharging curve showing the relationship between the open circuit voltage and the charge state during discharging. [Configuration 8] A state-of-charge estimation system (100) including a first storage battery and a second storage battery, the system estimating states of charge of the first storage battery and the second storage battery, a memory unit (51) that stores a charge / discharge history of each of the storage batteries; a charge / discharge determination unit (52) that determines, for each of the storage batteries, whether the storage battery is in a charged or discharged state based on the charge / discharge history stored in the memory unit; a charge / discharge control unit (53) that discharges the storage battery that is determined to be charged by the charge / discharge determination unit, and charges the storage battery that is determined to be discharged by the charge / discharge determination unit; an open-circuit voltage acquisition unit (54) that acquires an open-circuit voltage of each of the storage batteries after the charge / discharge control unit charges or discharges each of the storage batteries; a state-of-charge estimation unit (55) that estimates a state of charge of each of the storage batteries from the open-circuit voltages of each of the storage batteries acquired by the open-circuit voltage acquisition unit, by referring to a charge / discharge curve indicating a relationship between an open-circuit voltage of the storage battery and a state of charge of the storage battery; The charge / discharge control unit is a charge state estimation system that charges and discharges each of the first storage battery and the second storage battery by transferring power between the first storage battery and the second storage battery. [Configuration 9] A state-of-charge estimation device (50), A storage process for storing a charge / discharge history of the storage battery; a charge / discharge determination process for determining whether the storage battery is being charged or discharged based on the charge / discharge history stored in the storage unit; a charge / discharge control process for discharging the storage battery when the charge / discharge determination unit determines that the storage battery is being charged, and for charging the storage battery when the charge / discharge determination unit determines that the storage battery is being discharged; an open-circuit voltage acquisition process for acquiring an open-circuit voltage of the storage battery after the charge / discharge control unit charges or discharges the storage battery; a charge state estimation process that estimates the charge state of the storage battery from the open circuit voltage acquired by the open circuit voltage acquisition unit by referring to a charge / discharge curve that shows the relationship between the open circuit voltage of the storage battery and the charge state of the storage battery. [Explanation of symbols]
[0101] 10...motor, 20...inverter, 31...first storage battery, 32...second storage battery, 40...external charger, 50...control device, 51...memory unit, 52...charge / discharge determination unit, 53...charge / discharge control unit, 54...open circuit voltage acquisition unit, 55...charge state estimation unit, 100...power supply system.
Claims
1. A state-of-charge estimation device (50) for estimating a state of charge of a storage battery, A storage unit (51) that stores a charge / discharge history of the storage battery; a charge / discharge determination unit (52) that determines whether the storage battery is in a charged or discharged state based on the charge / discharge history stored in the memory unit; a charge / discharge control unit (53) that, when the charge / discharge determination unit determines that the storage battery is charged, discharges the storage battery by a predetermined amount, and, when the charge / discharge determination unit determines that the storage battery is discharged, charges the storage battery by a predetermined amount; an open-circuit voltage acquisition unit (54) that acquires an open-circuit voltage of the storage battery after the charge / discharge control unit charges or discharges the storage battery; a charge state estimation unit (55) that estimates the charge state of the storage battery from the open circuit voltage acquired by the open circuit voltage acquisition unit by referring to a charge / discharge curve showing the relationship between the open circuit voltage of the storage battery and the charge state of the storage battery.
2. The charge / discharge history is a current integrated value calculated by integrating a current flowing out or flowing into the storage battery, 2. The device according to claim 1, wherein the charge / discharge determination unit determines that the battery is after charging if the integrated current value is within a charging range indicating a tendency after charging, and determines that the battery is after discharging if the integrated current value is within a discharging range indicating a tendency after discharging.
3. The device for estimating a state of charge according to claim 2 , wherein the charge / discharge control unit determines an amount of current to be charged / discharged based on the current integrated value.
4. A charge / discharge curve is previously associated with each of the current integrated values, The device for estimating a state of charge according to claim 2 , wherein the state of charge estimation unit identifies a corresponding charge / discharge curve from the current integrated value, and estimates the state of charge based on the identified charge / discharge curve.
5. The charge state estimation device according to any one of claims 1 to 4, wherein when the charge / discharge determination unit cannot determine from the charge / discharge history whether the battery has been charged or discharged, the charge / discharge control unit first charges the storage battery and then discharges it a predetermined amount, or first discharges the storage battery and then charges it a predetermined amount.
6. The charge state estimation device according to any one of claims 1 to 4, wherein the charge / discharge control unit differentiates the amount of current discharged when it is determined that the battery is after charging from the amount of current discharged when it is determined that the battery is after charging.
7. The charge state estimation device according to any one of claims 1 to 3, wherein when the charge / discharge determination unit determines that the storage battery is charged, the charge state estimation unit estimates the charge state by referring to a charging curve showing the relationship between the open circuit voltage and the charge state at the time of charging, and when the charge / discharge determination unit determines that the storage battery is discharged, the charge state estimation unit estimates the charge state by referring to a discharging curve showing the relationship between the open circuit voltage and the charge state at the time of discharging.
8. A state-of-charge estimation system (100) including a first storage battery and a second storage battery, the system estimating states of charge of the first storage battery and the second storage battery, A memory unit (51) that stores the charge / discharge history of each of the storage batteries; a charge / discharge determination unit (52) that determines for each of the storage batteries whether the storage batteries are in a charged or discharged state based on the charge / discharge history stored in the memory unit; a charge / discharge control unit (53) that discharges the storage battery that is determined to be charged by the charge / discharge determination unit, and charges the storage battery that is determined to be discharged by the charge / discharge determination unit; an open-circuit voltage acquisition unit (54) that acquires an open-circuit voltage of each of the storage batteries after the charge / discharge control unit charges and discharges each of the storage batteries; a charge state estimation unit (55) that estimates a charge state of each of the storage batteries from the open circuit voltage of each of the storage batteries acquired by the open circuit voltage acquisition unit, by referring to a charge / discharge curve indicating a relationship between an open circuit voltage of the storage battery and a charge state of the storage battery; The charge / discharge control unit is a charge / discharge state estimation system that charges and discharges each of the first storage battery and the second storage battery by transferring power between the first storage battery and the second storage battery.
9. A state-of-charge estimation device (50) for estimating a state of charge of a storage battery, A storage process for storing a charge / discharge history of the storage battery; a charge / discharge determination process for determining whether the storage battery is being charged or discharged based on the charge / discharge history stored by the storage process; a charge / discharge control process for discharging the storage battery when it is determined that the storage battery is being charged by the charge / discharge determination process, and for charging the storage battery when it is determined that the storage battery is being discharged by the charge / discharge determination process; an open-circuit voltage acquisition process for acquiring an open-circuit voltage of the storage battery after the storage battery is charged or discharged by the charge / discharge control process; a charge state estimation process that estimates the charge state of the storage battery from the open circuit voltage acquired by the open circuit voltage acquisition process by referring to a charge / discharge curve that shows the relationship between the open circuit voltage of the storage battery and the charge state of the storage battery.
Citation Information
Patent Citations
Echelon utilization state interval division method for retired lithium batteries
CN111239629A
Charge rate estimating device
JP2018194357A
Secondary battery system
JP2019148492A
Secondary battery charge state estimation method and secondary battery charge state estimation device
JP2019164148A
Secondary battery system and SOC estimation method for secondary battery
JP2020038146A
