Skilled worker qualification management system
The skilled worker qualification management system addresses the inefficiencies in managing and presenting qualification data by using a network of communication nodes and blockchain, ensuring smooth construction work and timely hiring of qualified workers.
Patent Information
- Application Number
- JP2023077051
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-09
- Publication Date
- 2024-11-21
AI Technical Summary
The existing craftsman information provision system fails to centrally manage the various qualifications held by skilled workers at construction sites, leading to inefficiencies in presenting qualification certificates, difficulty in finding skilled workers with necessary skills and experience, and hindering smooth construction work.
A skilled worker qualification management system that utilizes a management node to store and transmit qualification data via a network of communication nodes, allowing for efficient management and presentation of qualification data, skill data, and construction performance data, preventing falsification through blockchain technology.
Enables smooth construction work by eliminating the need for manual presentation of qualification certificates, facilitates timely search and hiring of skilled workers with required qualifications and experience, and ensures accurate and up-to-date qualification data management.
Smart Images

Figure 2024161958000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a skilled worker qualification management system for managing the qualifications of skilled workers who work at construction sites. [Background technology]
[0002] A craftsman information providing system is disclosed that has a craftsman information acquiring means for acquiring fee information for each of multiple predetermined units for the provision of skills by each craftsman among multiple craftsmen who provide skills, a user information acquiring means for acquiring target information about a target from which a user who wishes to receive skill provision from one of the multiple craftsmen, a unit identification means for identifying each of the multiple units based on the target information acquired by the user information acquiring means, and an output means for outputting fee information for the provision of skills by each craftsman based on the individual units identified by the position identification means (see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-17023 A Summary of the Invention [Problem to be solved by the invention]
[0004] The craftsman information providing system disclosed in the above-mentioned Patent Document 1 allows users who wish to receive skills provided by skilled workers (craftsmen) to easily obtain fee information for the provision of skills. When constructing a building, skilled workers (craftsmen) with various qualifications, various skills, and various construction work records are involved in the planning, design, construction, inspection, etc. of the building, and these skilled workers enter the construction site on different days and perform various different construction work. However, the craftsman information providing system of the above-mentioned Patent Document 1 does not centrally manage the various qualifications held by skilled workers working at each construction site, and does not output qualification certificate data that proves the validity of these qualifications. At the construction site, each skilled worker (craftsman) carries a large number of various qualification certificates that indicate the validity of the various qualifications he / she holds, and presents the qualification certificate corresponding to each qualification to the on-site personnel such as the site supervisor, site manager, and site manager of the construction site. It takes time and effort to find the desired qualification certificate from the various qualification certificates and present the qualification certificate to the on-site personnel each time, which interferes with the actual construction work and makes it difficult to carry out the construction work smoothly. In addition, this craftsman information providing system cannot search for skilled workers who have the necessary skills and construction work experience at each construction site, and cannot find skilled workers who have the necessary skills and construction work experience at each construction site.Furthermore, it cannot provide job information for each construction site to skilled workers who have the required skills and construction work experience.
[0005] An object of the present invention is to provide a skilled worker qualification management system that can present, without time and effort, qualification certificates showing the validity of various qualifications held by each skilled worker, and enable each skilled worker to smoothly carry out construction work. Another object of the present invention is to provide a skilled worker qualification management system that can search for skilled workers who have the necessary skills and necessary construction work experience at each construction site, and can find skilled workers who have the necessary skills and necessary construction work experience at each construction site. Another object of the present invention is to provide a skilled worker qualification management system that can provide job information for each construction site to skilled workers who have the required skills and construction work experience. [Means for solving the problem]
[0006] The present invention for solving the above problem is characterized in that it is formed from a management node that manages various qualifications required at construction sites that are obtained by a specific number of skilled workers, and a plurality of various communication nodes that are held by the skilled workers and form a network with the management node via a specific blockchain, wherein the specific communication node has a qualification data transmission means that transmits qualification data proving the validity of the various qualifications obtained by the skilled workers to the management node and other communication nodes, and a skilled worker identification information transmission means that transmits skilled worker identification information that identifies the skilled worker to the management node, the management node and those communication nodes have a qualification data storage means that separates and stores the qualification data transmitted from the specific communication node by the qualification data transmission means for each skilled worker, and the management node has a qualification data output means that, when skilled worker identification information is transmitted from those communication nodes by the skilled worker identification information transmission means, outputs skilled worker qualification data corresponding to the transmitted skilled worker identification information to the communication node that transmitted the skilled worker identification information.
[0007] As one example of the present invention, when a skilled worker acquires new qualifications required at a construction site, the qualification data transmission means transmits new qualification data attesting to the acquired new qualifications to the management node and other communication nodes, and when new qualification data is transmitted from a specified communication node by the qualification data transmission means, the qualification data storage means updates the qualification data by adding the new qualification data to the already stored qualification data.
[0008] In another example of the present invention, the qualification data includes the name of the qualification, the date of acquisition of the qualification, the validity period of the qualification, and the qualification certification organization of the qualification, and the qualification data output means outputs the name of the qualification, the acquisition date, the validity period, and the qualification certification organization of the qualification held by the skilled worker corresponding to the skilled worker identification information transmitted from the communication node to the communication node that transmitted the skilled worker identification information.
[0009] In another example of the present invention, a specified communication node includes a qualification renewal time data transmitting means for transmitting renewal time data of various qualifications acquired by skilled workers to a management node and other communication nodes, the management node and other communication nodes include renewal time data storage means for storing the renewal time data transmitted from the specified communication node by the qualification renewal time data transmitting means, for each skilled worker and for each qualification, and the management node includes renewal time data output means for outputting to the communication node of the skilled worker who has acquired that qualification a qualification corresponding to renewal time data whose renewal time is approaching among the renewal time data stored by the renewal time data storage means and the renewal time data of that qualification.
[0010] In another example of the present invention, the management node and its communication nodes include an update procedure data storage means for storing update procedure data for various qualifications acquired by skilled workers, divided for each skilled worker and for each qualification, and the management node includes an update procedure data output means for outputting the qualifications corresponding to update time data with an upcoming update time among the update time data stored by the update time data storage means and the update procedure data for those qualifications to the communication node of the skilled worker who has acquired those qualifications.
[0011] Another example of the present invention includes a qualification keyword storage means for storing qualification keywords representing qualifications, categorized by qualification, in a management node, a skilled worker search means for searching for skilled workers who hold the qualifications corresponding to a specified qualification keyword when the qualification keyword is transmitted to the management node from the communication node of each construction site, and a skilled worker output means for outputting to the communication node of the construction site a skilled worker who holds the qualification corresponding to the qualification keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site.
[0012] In another example of the present invention, the communication nodes include a qualification keyword sending means for sending a predetermined qualification keyword to a management node, and the management node includes a job information output means for outputting job information for each construction site where skilled workers having the qualifications corresponding to the qualification keyword searched for by the skilled worker search means and sent from the communication nodes are available to work to the communication node that sent the qualification keyword.
[0013] In another example of the present invention, a specified communication node includes a skill data transmission means for transmitting skill data of various skills acquired by skilled workers to a management node and other communication nodes, the management node and other communication nodes include a skill data storage means for dividing and storing the skill data transmitted from the specified communication node by the skill data transmission means for each skilled worker, the management node includes a skill keyword storage means for dividing and storing skill keywords representing the specified skill data for each skill data, and when a skill keyword representing a required skill is transmitted from the communication node of each construction site, a skilled worker search means identifies the skill data corresponding to the skill keyword and searches for a skilled worker equipped with the identified skill, and a skilled worker output means outputs to the communication node of the construction site a skilled worker equipped with the skill corresponding to the skill keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site.
[0014] In another example of the present invention, the communication nodes include a skill keyword transmitting means for transmitting a predetermined skill keyword to the management node, and a job information output means outputs job information for each construction site where skilled workers with skills corresponding to the skill keywords searched for by the skilled worker search means and transmitted from the communication nodes are available to the communication node that transmitted the skill keyword.
[0015] In another example of the present invention, a specified communication node includes a construction work performance data transmission means for transmitting construction work performance data of a construction site where a skilled worker has worked to a management node and other communication nodes, the management node and other communication nodes include a construction work performance data storage means for storing the construction work performance data transmitted from the specified communication node by the construction work performance data transmission means, classified for each skilled worker, the management node includes a construction work performance keyword storage means for storing construction work performance keywords representing the specified construction work performance data, classified for each construction work performance data, and a skilled worker search means, when a construction work performance keyword representing the required construction work performance is transmitted from the communication node of each construction site, searches for a skilled worker having the identified construction work performance while identifying the construction work performance data corresponding to the construction work performance keyword, and a skilled worker output means outputs to the communication node of the construction site a skilled worker having construction work performance corresponding to the construction work performance keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site.
[0016] In another example of the present invention, the communication nodes include a construction work record keyword sending means for sending construction work record keywords to the management node, and a job information output means outputs job information for each construction site where skilled workers with construction work records corresponding to the construction work record keywords searched for by the skilled worker search means and sent from the communication nodes are available to work, to the communication node that sent the construction work record keywords. Effect of the Invention
[0017] According to the skilled worker qualification management system of the present invention, when skilled worker identification information is transmitted from the communication nodes, the management node outputs the skilled worker's qualification data corresponding to the transmitted skilled worker identification information to the communication node that transmitted the skilled worker identification information, so that while the qualification data of the qualifications held by each skilled worker is managed in the management node and the communication nodes, the skilled worker's qualification data corresponding to the transmitted skilled worker identification information is output to the communication node that transmitted the skilled worker identification information, and the qualification data (electronic data) of the qualifications held by each skilled worker can be presented to the site supervisor, site manager, site manager, and other site related parties in a lump sum, and construction work can be carried out smoothly without the need for time and effort to present the qualification data. The skilled worker qualification management system eliminates the need for each skilled worker to carry around multiple qualification certificates indicating the validity of various qualifications held by each skilled worker, and frees them from the hassle of always carrying multiple qualification certificates, allowing them to concentrate on construction work. The skilled worker qualification management system transmits the qualification data of the qualifications held by skilled workers to the management node and other communication nodes, and the transmitted qualification data is classified for each skilled worker and stored in the management node and communication node, so that many skilled workers with the specified qualifications can enter the skilled worker qualification management system, and skilled workers with the necessary qualifications at each construction site can obtain employment opportunities. The skilled worker qualification management system allows skilled workers with the necessary qualifications to work at each construction site, so that buildings can be constructed as designed and specified buildings can be constructed as planned. The skilled worker qualification management system forms a network between the management node and those communication nodes via a blockchain, and the qualification data is stored in the management node and communication node as transaction data, so that an accurate history of the qualification data can be preserved while preventing tampering with the qualification data.
[0018] When a skilled worker acquires new qualifications required at a construction site, new qualification data that certifies the acquired new qualifications is sent to the management node and other communication nodes, and when new qualification data is sent from a specified communication node, the skilled worker qualification management system updates the qualification data by adding the new qualification data to the already stored qualification data. The skilled worker qualification management system is always equipped with the latest qualification data, and by outputting the latest qualification data to the communication node that transmitted the skilled worker identification information, the latest qualification data (electronic data) of the qualifications held by each skilled worker can be presented to site personnel such as the site supervisor, site manager, and site manager all at once, and construction work can be carried out smoothly without the need for time and effort to present the qualification data. In the skilled worker qualification management system, the management terminal and the communication nodes form a network via a blockchain, and the latest updated qualification data is stored in the management node and communication node as transaction data, so that an accurate history of the qualification data can be preserved while preventing tampering with the qualification data.
[0019] The skilled worker qualification management system, in which the qualification data includes the qualification name, acquisition date, validity period, and qualification certification organization of the qualification held by a skilled worker corresponding to the skilled worker identification information transmitted from those communication nodes, outputs the qualification name, acquisition date, validity period, and qualification certification organization of the qualification held by the skilled worker corresponding to the skilled worker identification information transmitted to the communication node that transmitted the skilled worker identification information, along with the skilled worker qualification data corresponding to the transmitted skilled worker identification information, to the communication node that transmitted the skilled worker identification information.By doing so, the skilled worker qualification management system can present the qualification name, acquisition date, validity period, and qualification certification organization of the qualification along with the qualification certification data (electronic data) of the qualification held by each skilled worker to site personnel such as site supervisors, site managers, and site supervisors all at once, allowing site personnel to know the qualification name, acquisition date, validity period, and qualification certification organization of the qualification held by each skilled worker.
[0020] A specified communication node transmits renewal time data for various qualifications acquired by skilled workers to a management node and other communication nodes, the management node and other communication nodes store the renewal time data transmitted from the specified communication node separately for each skilled worker and for each qualification, and the management node outputs the qualifications corresponding to the renewal time data whose renewal time is approaching among the renewal time data and the renewal time data for that qualification to the communication node of the skilled worker who has acquired that qualification.Since skilled workers can learn the renewal time data for qualifications that are due for renewal soon among the qualifications they hold via the communication node, they can prevent missing the renewal deadline and reliably update the qualifications they hold.
[0021] A skilled worker qualification management system in which a management node and its communication nodes store renewal procedure data for various qualifications acquired by skilled workers, separated for each skilled worker and for each qualification, and the management node outputs the qualifications corresponding to the renewal time data with the upcoming renewal date among the renewal time data and the renewal procedure data for that qualification to the communication node of the skilled worker who has acquired that qualification, allows skilled workers to learn the renewal procedure data for qualifications that are close to renewal date among the qualifications they hold via the communication node, so that they can reliably update the qualifications they hold without making any mistakes in the renewal procedure.
[0022] The skilled worker qualification management system categorizes and stores qualification keywords that represent qualifications by qualification, and when a specific qualification keyword is transmitted to the management node from the communication node of each construction site, searches for skilled workers who hold the qualifications corresponding to the qualification keyword, and outputs skilled workers who have the qualifications corresponding to the qualification keyword transmitted from the communication node of the construction site to the communication node of the construction site.Since the skilled worker qualification management system outputs skilled workers with the qualifications corresponding to the qualification keyword transmitted from the communication node of the construction site to the communication node of each construction site, it is possible to search for skilled workers with the necessary qualifications at each construction site, and to find skilled workers with the necessary qualifications at each construction site in a timely manner.
[0023] In the skilled worker qualification management system, these communication nodes transmit a specific qualification keyword to a management node, and the management node outputs job information for each construction site where skilled workers with the qualifications corresponding to the qualification keyword transmitted from the communication node are available to work to the communication node that transmitted the qualification keyword.By transmitting a qualification keyword representing one's own qualifications from a communication node to the management node, job information for each construction site where skilled workers with the qualifications corresponding to the qualification keyword are available to work is output to the communication node, allowing each skilled worker to know the job vacancies at each construction site where they can work and require their qualifications, providing employment opportunities to skilled workers with the necessary qualifications at each construction site and making it possible to obtain labor with the necessary qualifications in a timely manner for each construction site.
[0024] A specified communication node transmits skill data on various skills possessed by skilled workers to a management node and other communication nodes, the management node and other communication nodes classify and store the skill data transmitted from the specified communication node for each skilled worker, the management node classifies and stores skill keywords representing the specified skill data for each skill data, and when a skill keyword representing a required skill is transmitted from the communication node of each construction site, a skilled worker having the specified skill is searched for while identifying the skill data corresponding to the skill keyword, and a skilled worker having the specified skill corresponding to the skill keyword transmitted from the communication node of the construction site is output to the communication node of the construction site.The skilled worker qualification management system identifies the skill data corresponding to the skill keyword transmitted from the communication node of each construction site while searching for a skilled worker having the specified skill, and outputs a skilled worker having the skill corresponding to the transmitted skill keyword to the communication node of each construction site, so that skilled workers having the required skills at each construction site can be searched for, and skilled workers having the required skills at each construction site can be found in a timely manner. The skilled worker qualification management system transmits skill data of various skills acquired by skilled workers to the management node and other communication nodes, and the transmitted skill data is classified for each skilled worker and stored in the management node and other communication nodes, so that many skilled workers with predetermined skills can enter the skilled worker search system, and skilled workers with the necessary skills at each construction site can obtain employment opportunities. The skilled worker qualification management system allows skilled workers with the necessary skills at each construction site to work on construction, so that buildings can be constructed as designed and predetermined buildings can be constructed as planned. The skilled worker qualification management system forms a network between the management node and those communication nodes via a blockchain, and skill data is stored in the management node and communication nodes as transaction data, so that an accurate history of the skill data can be preserved while preventing tampering with the skill data.
[0025] In a skilled worker qualification management system, these communication nodes transmit specific skill keywords to a management node, and the management node outputs job information for each construction site where skilled workers with the skills corresponding to the skill keywords transmitted from the communication nodes are available to the communication node that transmitted the skill keyword.By transmitting skill keywords representing the skills one possesses from a communication node to the management node, job information for each construction site where skilled workers with the skills corresponding to the skill keyword are available to work is output to the communication node that transmitted the skill keyword, so that skilled workers can learn of job vacancies at each construction site where work corresponding to their skills is available, providing employment opportunities for skilled workers with the necessary skills at each construction site and making it possible to obtain labor with the necessary skills in a timely manner for each construction site.
[0026] A predetermined communication node transmits construction performance data of a construction site where a skilled worker has worked to a management node and other communication nodes, the management node and other communication nodes classify and store the construction performance data transmitted from the predetermined communication node for each skilled worker, the management node classifies and stores construction performance keywords representing the predetermined construction performance data for each construction performance data, and when a construction performance keyword representing necessary construction performance is transmitted from the communication node of each construction site, the skilled worker qualification management system searches for a skilled worker with the specified construction performance while specifying the construction performance data corresponding to the construction performance keyword transmitted from the communication node of each construction site, and outputs a skilled worker with construction performance corresponding to the transmitted construction performance keyword to the communication node of each construction site. Therefore, it is possible to search for skilled workers with the necessary construction performance at each construction site, and it is possible to timely find skilled workers with the necessary construction performance at each construction site. The skilled worker qualification management system transmits construction performance data of various construction work achievements held by skilled workers to the management node and other communication nodes, and the transmitted construction performance data is stored in the management node and other communication nodes categorized for each skilled worker, so that many skilled workers with predetermined construction work achievements can enter the skilled worker search system, and skilled workers with the necessary construction work achievements at each construction site can obtain employment opportunities. The skilled worker qualification management system allows skilled workers with the necessary construction work achievements to be engaged in construction at each construction site, so that buildings can be constructed as designed and predetermined buildings can be constructed as planned.In the skilled worker qualification management system, management nodes and their communication nodes form a network via a blockchain, and construction performance data is stored in the management nodes and communication nodes as transaction data, making it possible to preserve an accurate history of the construction performance data while preventing tampering with the data.
[0027] In a skilled worker qualification management system, these communication nodes transmit construction work experience keywords to a management node, and the management node outputs job information for each construction site where skilled workers with construction work experience corresponding to the construction work experience keywords transmitted from these communication nodes are available to the communication node that transmitted the construction work experience keywords.By transmitting construction work experience keywords that represent one's own construction work experience from a communication node to the management node, job information for each construction site where skilled workers with construction work experience corresponding to the construction work experience keywords are available to the communication node that transmitted the construction work experience keyword, each skilled worker can learn of job vacancies at each construction site where they are available to work that correspond to their construction work experience, and skilled workers with the necessary construction work experience at each construction site can be given employment opportunities, while also making it possible to obtain the necessary labor force with construction work experience for each construction site in a timely manner. [Brief description of the drawings]
[0028] [Figure 1] FIG. 2 is a configuration diagram of an example of a skilled worker qualification management system. [Diagram 2] FIG. 13 is a diagram showing an example of a qualification data input screen outputted on a touch panel of a tablet. [Diagram 3] FIG. 13 is a diagram showing an example of a skill data input screen output on a touch panel of a tablet. [Figure 4] FIG. 13 is a diagram showing an example of a construction execution performance data input screen output on a touch panel of a tablet. [Diagram 5] FIG. 13 is a diagram showing an example of a labor field data input screen output on a touch panel of a tablet. [Figure 6]FIG. 13 is a diagram showing an example of a qualification keyword input screen output on the display of the first personal computer. [Figure 7] FIG. 13 is a diagram showing an example of a skilled worker output screen output on the display of a first personal computer. [Figure 8] A figure showing an example of a skill keyword input screen output on the display of a first personal computer. [Figure 9] FIG. 13 is a diagram showing another example of a skilled worker output screen output on the display of the first personal computer. [Figure 10] FIG. 13 is a diagram showing an example of a construction record keyword input screen output on the display of a first personal computer. [Figure 11] FIG. 13 is a diagram showing another example of a skilled worker output screen output on the display of the first personal computer. [Figure 12] 13 is a diagram showing an example of a skilled worker specific information input screen displayed on a touch panel of a tablet carried by a skilled worker. FIG. [Figure 13] FIG. 13 is a diagram showing an example of a credential data output screen displayed on a touch panel of a tablet. [Figure 14] FIG. 13 shows an example of a qualification / qualification keyword input screen displayed on the touch panel of a tablet held by a skilled worker. [Figure 15] FIG. 13 is a diagram showing an example of a job information output screen displayed on a touch panel of a tablet. [Figure 16] A diagram showing an example of a skills / skill keyword input screen displayed on the touch panel of a tablet held by a skilled worker. [Figure 17] FIG. 13 is a diagram showing another example of a job information output screen displayed on a touch panel of a tablet. [Figure 18] FIG. 13 shows an example of a construction work record / construction work record keyword input screen displayed on the touch panel of a tablet held by a skilled worker. [Figure 19] FIG. 13 is a diagram showing another example of a job information output screen displayed on a touch panel of a tablet. [Figure 20] FIG. 13 is a diagram showing an example of an output screen of update timing data and update procedure data outputted to a tablet carried by a skilled worker. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] The skilled worker qualification management system according to the present invention will be described in detail below with reference to the attached drawings such as FIG. 1, which is a block diagram of a skilled worker qualification management system 10 shown as an example. Note that FIG. 1 illustrates two tablets 11a, 11b (communication nodes), two smartphones 12a, 12b (communication nodes), and three personal computers 13a to 13c (communication nodes), but in reality, a number of various types (a specific number) of first to n-th tablets, a number of various types (a specific number) of first to n-th personal computers, and a number of various types (a specific number) of first to n-th smartphones, more than those illustrated, form the skilled worker qualification management system 10. Note that the communication nodes include, in addition to the tablets 11a, 11b, smartphones 12a, 12b, and personal computers 13a to 13c, digital signage, and nodes such as a number of various types of highly functional mobile communication terminals that can connect to the Internet and will be developed in the future.
[0030] The skilled worker qualification management system 10 is formed of a plurality of (specific) tablets 11a, 11b (1st to nth communication nodes) of various types owned by a plurality of skilled workers (craftsmen) who can work at each construction site, a plurality of (specific) smartphones 12a, 12b (1st to nth communication nodes) of various types owned by the skilled workers (craftsmen), first to third personal computers 13a to 13c (1st to nth communication nodes) installed at the construction site, and a management server 14 (management node) that distributes predetermined data to the tablets 11a, 11b, the smartphones 12a, 12b, and the personal computers 13a to 13c. The tablets 11a, 11b, the smartphones 12a, 12b, the personal computers 13a to 13c, and the management server 14 form a network via a blockchain. The skilled worker qualification management system 10 may be a client-server model.
[0031] The tablets 11a, 11b and the personal computers 13a to 13c are physical computers equipped with a central processing unit (CPU or MPU) and memory (main memory and cache memory), and have a large-capacity storage area (or large-capacity hard disk). Among the first to third personal computers 13a to 13c (first to nth communication terminal devices), the first personal computer 13a is installed in an on-site office or a temporary prefabricated office at the first construction site, the second personal computer 13b is installed in an on-site office or a temporary prefabricated office at the second construction site, and the third personal computer 13c is installed in an on-site office or a temporary prefabricated office at the third construction site. In addition, a first digital signage may be installed in an on-site office or a temporary prefabricated office of the first construction site in place of or together with the first computer 13a, a second digital signage may be installed in an on-site office or a temporary prefabricated office of the second construction site in place of or together with the second computer 13b, and a third digital signage may be installed in an on-site office or a temporary prefabricated office of the third construction site in place of or together with the third computer 13c.
[0032] The memories of the tablets 11a, 11b and the computers 13a to 13c store (contain) communication node identification information (communication node identification identifier) that identifies each tablet 11a, 11b and each computer 13a to 13c and that identifies each skilled worker, and the URL of the management server 14. As the communication node identification information (communication node identification identifier), the IP addresses, MAC addresses, URLs, email addresses, cookie information, and individual identification numbers of the tablets 11a, 11b and the computers 13a to 13c can be used, or the management server 14 can independently generate unique identifiers that identify the tablets 11a, 11b and the computers 13a to 13c, and use the generated identifiers as communication node identification information.
[0033] The tablets 11a, 11b and the PCs 13a to 13b have a DNS server function, a database server function, a Web server function, a mail server function, and a document server function. The tablets 11a, 11b and the PCs 13a to 13b can access and log in to the management server 14 using the URL of the management server 14, and can also access any other servers, tablets, and PCs that have no access restrictions via a plurality of DNS servers connected to the Internet (network). The tablets 11a, 11b and the PCs 13a to 13b can provide various information (text data and image data) to a plurality of other servers, tablets, PCs, and smartphones including the management server 14 using the Internet, and can receive various information from a plurality of other servers, tablets, PCs, and smartphones including the management server 14 using the Internet.
[0034] A skilled worker qualification management application that executes each means of the skilled worker qualification management system 10 is stored in the main memory of the tablets 11a, 11b, the main memory of the smartphones 12a, 12b, and the main memory of the personal computers 13a-13b. The central processing units of the tablets 11a, 11b, the central processing units of the smartphones 12a, 12b, and the central processing units of the personal computers 13a-13b start up a skilled worker search application stored in the memory under the control of an operating system (OS), and execute each means described below according to the application. Note that each means executed by the tablets 11a, 11b and the smartphones 12a, 12b is the same.
[0035] The skilled worker search application is downloaded (installed) from the management server 14 after directly accessing the management server 14 or accessing the management server 14 from another server via a link. Alternatively, the skilled worker search application is downloaded (installed) from the management server 14 after accessing the management server 14 by reading a barcode (QR code (registered trademark)). When the skilled worker search application is downloaded to the tablets 11a, 11b and the smartphones 12a, 12b, the personal information of the skilled workers (users) who own the tablets and smartphones is transmitted (registered) to the management server. When the skilled worker search application is downloaded to the tablets 11a, 11b and the smartphones 12a, 12b, a skilled worker registration number that identifies the skilled worker who owns the tablets 11a, 11b or the smartphones 12a, 12b is assigned from the management server 14.
[0036] Construction site information, skilled worker conditions required at each construction site (each planned construction site), and job information at each construction site (each planned construction site) are input to the first to third computers 13a to 13b, and the construction site information, skilled worker conditions, and job information are stored (stored) in the large-capacity storage areas (or large-capacity hard disks) of the first to third computers 13a to 13b. The construction site information includes the names of the construction sites and planned construction sites, the addresses of the construction sites and planned construction sites, the telephone numbers and email addresses of the construction sites and planned construction sites, the construction periods of each construction site and planned construction site, construction site specific information (construction site specific identifier) that identifies the construction sites and planned construction sites, and the name of the person in charge of the construction site. The skilled worker conditions include the qualifications held by skilled workers, the skills of skilled workers, the construction work performance of skilled workers, and the labor field. The job information includes the number of people to be hired, the hiring period, salary conditions, working style, and welfare benefits.
[0037] Construction site information, skilled worker conditions, and job information are stored in the large-capacity storage area (or large-capacity hard disk) of the personal computers 13a-13b in association with construction site specific information (construction site specific identifier) and communication node specific information. The central processing units of the first to third personal computers 13a-13b transmit the construction site information, skilled worker conditions (skilled worker qualifications, skills, construction work performance, labor field), and job information to the management server 14 together with the construction site specific information and communication node specific information.
[0038] The smartphones 12a and 12b each have a central processing unit (CPU or MPU) and memory (main memory and cache memory), and each have a built-in physical computer that operates on an independent operating system (OS), and each has a large-capacity hard disk. The smartphones 12a and 12b can connect to the Internet using a web browser, and can access and log in to an unspecified number of other servers (physical servers and virtual servers) using the Internet, and can use various search engines on the Internet. The smartphones 12a and 12b can access and log in to the server 14 using the URL of the management server 14, and can provide various information (text data and image data) to multiple other servers including the management server 14, tablets, personal computers, and smartphones using the Internet, and can receive various information from multiple other servers including the management server 14, tablets, personal computers, and smartphones using the Internet.
[0039] The hard disks of the smartphones 12a, 12b store communication node identification information (communication node identification identifier) that identifies each of the smartphones 12a, 12b and each skilled worker, and the URL of the management server 14. As the communication node identification information (communication node identification identifier), the IP addresses, MAC addresses, URLs, email addresses, cookie information, individual identification numbers, etc. of the smartphones 12a, 12b can be used, or the management server 14 can independently generate unique identifiers that identify the smartphones 12a, 12b and use the generated identifiers as communication node identification information.
[0040] The hard disks of the tablets 11a, 11b and the smartphones 12a, 12b store personal information of skilled workers who have the authority to use them in association with communication node identification information. The personal information includes passwords, ID numbers, the names of the skilled workers, the addresses of the skilled workers, the telephone numbers and fax numbers of the skilled workers, the ages of the skilled workers, the genders of the skilled workers, email addresses, photographs of the skilled workers, communication node identification information and URLs of the tablets 11a, 11b and smartphones 12a, 12b owned by the skilled workers, etc.
[0041] The management server 14 (management node) is constructed in the cloud (cloud computing). The management server 14 is a virtual server having a virtual CPU or virtual MPU (central processing unit), a virtual main memory, and a virtual cache memory (memory), and operates on an independent operating system (virtual OS), and a large-capacity virtual storage area is formed. As the cloud, Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) can be used. The management server 14 may be a physical server installed in a data center contracted by the administrator (management company) who manages the skilled worker qualification management system 10. The physical management server 14 is a physical computer equipped with a central processing unit (CPU or MPU) and memory (main memory and cache memory), and has a large-capacity storage area (or a large-capacity hard disk). Although not shown, input devices such as a keyboard and a mouse, and output devices such as a display and a printer are connected to the management server 14 via interfaces.
[0042] The management server 14 (virtual server) has a DNS server function, a database server function, a Web server function, a mail server function, and a document server function, and is divided by software according to each server function. The management server 14 can access any other server with no access restrictions using the Internet via a plurality of DNS servers and the like connected to the Internet (network). The management server 14 forms a network via the Internet with other servers in a data center installed somewhere in the world.
[0043] The management server 14 stores, in its large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)), management node identification information (management node identification identifier) for identifying the server 14, the URL and email address of the tablets 11a and 11b, the communication node identification information of the tablets 11a and 11b, the URL and email address of the smartphones 12a and 12b, the communication node identification information of the smartphones 11a and 11b, the URL and email address of the first to third personal computers 13a to 13b, the communication node identification information of the personal computers 13a to 13b, and personal information of the registered skilled workers. The management node identification information (management node identification identifier) may be the IP address, MAC address, URL, email address, cookie information, or individual identification number of the management server 14, or the management server 14 may independently generate a unique identifier for identifying it, and the generated identifier may be used as the management node identification information.
[0044] The large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 stores the above-mentioned construction site information of multiple construction sites (construction site information storage means). The construction site information is transmitted from the first to third personal computers 13a to 13b, or input to the management server 14 via an input device. The large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 stores the above-mentioned various skilled worker conditions of each construction site (including each planned construction site) (skilled worker conditions storage means), and also stores the above-mentioned job information of each construction site (including each planned construction site) (job information storage means). The skilled worker conditions and job information are transmitted from the first to third personal computers 13a to 13b, or input to the management server 14 via an input device.
[0045] Construction site information, skilled worker conditions, and job information are stored in a large-capacity virtual memory area (large-capacity memory area (or large-capacity hard disk)) of the management server 14 in a state associated with construction site identification information (construction site identification identifier) that identifies each construction site (including each planned construction site). The latest construction site information is input to the management server 14 and the latest construction site information is updated as needed, the latest skilled worker conditions are input and the latest skilled worker conditions are updated as needed, and the latest job information is input and the latest job information is updated as needed.
[0046] A variety of qualification keywords representing the qualifications of skilled workers, a variety of skill keywords representing the skills of skilled workers, and a variety of construction work performance keywords representing the construction work performance of skilled workers are input to the management server 14. The large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 stores the input qualification keywords, skill keywords, and construction work performance keywords (qualification keyword storage means, skill keyword storage means, construction work performance keyword storage means).
[0047] For example, qualification keywords for first-class and second-class construction engineers include "construction engineer" and "construction," while qualification keywords for first-class and second-class construction management engineers include "construction work" and "management." Qualification keywords for first-class and second-class pipework construction management engineers include "pipework" and "pipework," while qualification keywords for electricians and chief electrical engineers include "electrical work" and "chief engineer."
[0048] For example, formwork skill keywords and construction performance keywords include "concrete panel" and "formwork," while demolition skill keywords and construction performance keywords include "demolition" and "demolition." Concrete skill keywords and construction performance keywords include "ready mixed concrete" and "concrete pouring," while rebar skill keywords and construction performance keywords include "rebar" and "framework."
[0049] The skill keywords and construction performance keywords for plasterers include "mortar" and "plaster," while the skill keywords and construction performance keywords for scaffolders include "temporary" and "scaffolding." The skill keywords and construction performance keywords for painters include "painting" and "paint," while the skill keywords and construction performance keywords for plumbers include "water pipes" and "gas pipes." The skill keywords and construction performance keywords for construction machinery operators include "heavy machinery" and "operation," while the skill keywords and construction performance keywords for anchor workers include "ground anchors" and "boreholes."
[0050] Skill keywords and construction performance keywords for ALC workers include "partition wall" and "ALC panel," while those for interior finish workers include "floor tile" and "wallpaper." Skill keywords and construction performance keywords for waterproofing workers include "waterproofing" and "water leakage," while those for joinery workers include "fittings" and "furniture." Skill keywords and construction performance keywords for roofing workers include "tile" and "slate," while those for glass workers include "windows" and "glass." Skill keywords and construction performance keywords can be freely determined, and keywords can be added or existing keywords can be replaced with new keywords.
[0051] A variety of qualifications (qualification names) required at each construction site (including each planned construction site) are input to the management server 14. For example, first-class construction engineer, second-class construction engineer, first-class construction management engineer, second-class construction management engineer, first-class civil engineering construction management engineer, second-class civil engineering construction management engineer, first-class pipework construction management engineer, second-class pipework construction management engineer, electrician, chief electrical engineer, interior coordinator, construction equipment engineer, etc. The input qualifications (qualification data) are stored in the large-capacity virtual storage area (large-capacity storage area (or large-capacity hard disk)) of the management server 14 (skilled worker condition storage means).
[0052] A variety of labor fields (labor field names) required at each construction site (including each planned construction site) are input to the management server 14. Examples of labor fields (labor field names) that are input include formwork work, demolition work, concrete work, reinforcing bar work, plastering work, scaffolding work, painters, plumbers, construction machinery operators, anchor work, ALC work, interior finishing work, waterproofing work, fittings work, roofers, and glaziers. The input labor fields (labor field data) are stored in the large-capacity virtual memory area (large-capacity memory area (or large-capacity hard disk)) of the management server 14 (skilled worker condition storage means).
[0053] FIG. 2 is a diagram showing an example of a qualification data input screen 16 output (displayed) on the touch panel 15 of the tablet 11a, and FIG. 3 is a diagram showing an example of a skill data input screen 17 output (displayed) on the touch panel 15 of the tablet 11a. FIG. 4 is a diagram showing an example of a construction work performance data input screen 18 output (displayed) on the touch panel 15 of the tablet 11a, and FIG. 5 is a diagram showing an example of a labor field data input screen 19 output (displayed) on the touch panel 15 of the tablet 11a. Note that in FIGS. 2 to 5, the display of each data in each output area and each input area is omitted. Below, the skilled worker qualification management system 10 will be described using the tablet 11a as an example, but a screen similar to the touch panel 15 of the tablet 11a is output (displayed) on the touch panels of the tablet 11b and the smartphones 12a and 12b.
[0054] When a skilled worker who has registered in the skilled worker qualification management system 10 registers his / her qualifications, etc. in the management server 14 (management node), he / she taps (clicks) an icon (not shown) representing the skilled worker qualification management system 10 output (displayed) on the touch panel 15 of the tablet 11a. When the icon representing the skilled worker qualification management system 10 is tapped, the skilled worker qualification management system 10 is started, and an initial screen (menu screen) is output (displayed) on the touch panel 15 of the tablet 11a (not shown). On the initial screen, a qualification data input button, a skill data input button, a construction work performance data input button, a labor field data input button, a data update (addition change) button, a system use button, and an end button are output (displayed). When the end button is tapped, the skilled worker qualification management system 10 is terminated (the same applies to the end button below). Note that, if the qualification data, skill data, construction work performance data, and labor field data have already been input on the tablet 11a, a data update (addition change) button, a system use button, and an end button are output (displayed) on the initial screen.
[0055] When a skilled worker registered in the skilled worker qualification management system 10 inputs his / her own qualification data, he / she taps a qualification data input button on the initial screen output (displayed) on the touch panel 15 of the tablet 11a. When the qualification data input button is tapped, a qualification data input screen 16 shown in FIG. 2 is output (displayed) on the touch panel 15 of the tablet 11a. On the qualification data input screen 16, a skilled worker registration number output area 16a in which the skilled worker registration number is output (displayed), a name output area 16b in which the skilled worker's name is output (displayed), a face photo output area 16c in which the skilled worker's face photo is output (displayed), a qualification name input area 16d in which the name of the qualification is input, a qualification certificate data input area 16e in which qualification certificate data (award certificate, certificate of passing, certificate card, etc. that certifies the qualification) that proves the validity of the qualification that the skilled worker has obtained is input, an update time data input area 16f in which the renewal time of the qualification is input, a send button 16g, a clear button 16h, a back button 16i, and an end button 16j are output (displayed). Clicking the Clear button 16h clears the data entered in the input area (the same applies to the following Clear buttons). Tapping the Back button 16i returns to the previous screen (the same applies to the following Back buttons).
[0056] After checking the skilled worker registration number, name, and facial photograph, the skilled worker inputs the name of the qualification he or she holds in the qualification name input area 16d (qualification name input means), takes a photograph of the certificate, passing certificate, certification card, etc. that proves the qualification in the qualification certification data input area 16e, and pastes (inputs) the photograph in the qualification certification data input area 16e (qualification certification data input means).Furthermore, he or she inputs the renewal time data of the qualification he or she holds in the renewal time data input area 16f (qualification renewal time data input means).
[0057] After inputting the qualification name and renewal time data and pasting the qualification data, the skilled worker taps the send button 16g on the touch panel 15. When the send button 16g is tapped, the central processing unit of the tablet 11a stores the qualification data (qualification name, qualification data, qualification renewal time data) in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the personal computers 13a to 13b using the URLs of the management server 14, the other tablets 11b, the other smartphones 12a, 12b, and the other personal computers 13a to 13b, and transmits the input qualification data to the management server 14 (management node), the other tablets 11b (other communication nodes), the other smartphones 12a, 12b (other communication nodes), and the other personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (qualification name transmission means, qualification data transmission means, qualification renewal time data transmission means).
[0058] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive qualification data (qualification name, qualification data, qualification renewal time data) from tablet 11a (specified communication node) store the qualification data and the reception date and time together with a specified hash value in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of tablet 11a (specified communication node) and the skilled worker registration number that identifies the skilled worker (qualification name storage means, qualification data storage means, renewal time data storage means).
[0059] The management server 14 (management node) acquires renewal procedure data (renewal method, cost, renewal location, etc.) for various construction-related qualifications through input / transmission from each qualification certification organization, input using an input device, etc. The renewal procedure data is stored in a block (large-capacity virtual storage area or large-capacity hard disk) of the management server 14 (management node), tablets 11a, 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) in a state associated with a qualification name and a qualification keyword together with a predetermined hash value (renewal procedure data storage means).
[0060] If a skilled worker has acquired a new qualification and that qualification is to be added to the existing qualification data, the data update (add / change) button on the initial screen is tapped. When the data update (add / change) button is tapped, a data add / change screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a. On the data add / change screen, a qualification data add / change button, a skill data add / change button, a construction performance data add / change button, a labor field data add / change button, and an end button are output (displayed). When a new qualification is to be added, the qualification data add / change button on the data add / change screen is tapped. When the qualification data add / change button is tapped, a qualification data add / change screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a.
[0061] The screen for adding and changing the qualification data outputs (displays) the skilled worker registration number output area, the name output area, the face photo output area, the qualification name output area where the entered qualification name is output (displayed), the qualification data output area where the entered qualification data is output (displayed), the new qualification name input area where the new qualification name is input, the new qualification data input area where the qualification data of the new qualification (award certificate, certificate of passing, certificate card, etc. that proves the qualification) is input, the renewal time data input area where the renewal time of the new qualification is input, the send button, the back button, and the end button are output (displayed). After checking the skilled worker registration number, the name, the face photo, and the entered qualification name, the skilled worker inputs the qualification name of the new qualification in the new qualification name input area (new qualification name input means), takes a photo of the award certificate, certificate of passing, certificate card, etc. that proves the new qualification in the new qualification data input area, and pastes (inputs) the photo in the new qualification data input area (new qualification data input means). Furthermore, the renewal time data of the new qualification is input in the renewal time data input area (new qualification renewal time data input means).
[0062] After inputting the new qualification name and the new qualification renewal time data and pasting the new qualification data, the skilled worker taps the send button on the touch panel 15. When the send button is tapped, the central processing unit of the tablet 11a stores the qualification data (new qualification name, new qualification data, new qualification renewal time data) in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the personal computers 13a to 13b using the URLs of the management server 14, other tablets 11b, other smartphones 12a, 12b, and other personal computers 13a to 13b, and transmits the qualification data to the management server 14 (management node), the tablet 11b (other communication node), the smartphones 12a, 12b (other communication node), and the personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (new qualification name transmission means, new qualification data transmission means, new qualification renewal time data transmission means).
[0063] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive the qualification data (new qualification name, new qualification proof data) from the tablet 11a (specified communication node) store (update) the qualification data (qualification data obtained by adding the new qualification name and new qualification proof data and new qualification update time data to the qualification name and qualification proof data) along with a specified hash value and the reception date and time in a block (large-capacity virtual storage area or large-capacity hard disk) in association with the communication node identification information of the tablet 11a (specified communication node) and the skilled worker registration number of the skilled worker (qualification name update means, qualification proof data update means, update time data update means).
[0064] The skilled worker qualification management system 10 stores qualification data (qualification name, qualification data, new qualification name, new qualification data) as transaction data in blocks on the management server 14 (management node), tablets 11a, 11b (communication nodes), smartphones 12a, 12b (communication nodes), and personal computers 13a to 13b (communication nodes) that form a network via blockchain, making it possible to preserve an accurate history of the qualification data while preventing tampering with the qualification data (qualification name, qualification data, qualification renewal time data, new qualification name, new qualification data, new qualification renewal time data).
[0065] When a skilled worker registered in the skilled worker search system 10 wants to input his / her own skill data, he / she taps a skill data input button on the initial screen output (displayed) on the touch panel 15 of the tablet 11a. When the skill data input button is tapped, a skill data input screen 17 shown in Fig. 3 is output (displayed) on the touch panel 15 of the tablet 11a. On the skill data input screen 17, a skilled worker registration number output area 17a, a name output area 17b, a facial photo output area 17c, a skill data input area 17d for inputting skill data, a send button 17e, a clear button 17f, a back button 17g, and an end button 17h are output (displayed).
[0066] After confirming the skilled worker registration number, name, and photograph, the skilled worker inputs his / her skill data in the skill data input area 17d (skill data input means). If the skilled worker is a formworker who makes forms for pouring concrete, he / she inputs, for example, "I can precisely process concrete panels (plywood) and make formwork." If the skilled worker is a demolition worker who demolishes buildings, he / she inputs, for example, "I can demolish (tear down) wooden buildings and reinforced concrete buildings." If the skilled worker is a scaffolding worker, he / she inputs, for example, "I can do scaffolding work that assembles temporary scaffolding at the beginning of construction work, assembles steel frames that form the framework of a building, and drives in piles that form the legs of a building." If the skilled worker is a reinforcing bar worker, he / she inputs, for example, "I can assemble reinforcing bars." In this way, each skilled worker inputs the specific skills he / she possesses.
[0067] After inputting the skill data, the skilled worker taps the send button 17e on the touch panel 15. When the send button 17e is tapped, the central processing unit of the tablet 11a stores the skill data together with a predetermined hash value in a block (large-capacity hard disk), and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a and 12b, and the personal computers 13a to 13b using the URLs of the management server 14, the other tablets 11b, the other smartphones 12a and 12b, and the other personal computers 13a to 13b, and transmits the input skill data to the management server 14 (management node), the other tablets 11b (other communication nodes), the other smartphones 12a and 12b (other communication nodes), and the other personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (skill data transmission means).
[0068] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive skill data from the tablet 11a (specified communication node) store the skill data and the date and time of receipt together with a specified hash value in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet (specified communication node) and the skilled worker registration number of the skilled worker (skill data storage means).
[0069] When a skilled worker has acquired a new skill and wishes to add that skill to existing skill data, the data update (add / change) button on the initial screen is tapped, and then the skill data add / change button on the data add / change screen (not shown) output (displayed) on the touch panel 15 of the tablet 11a is tapped. When the skill data add / change button is tapped, the skill data add / change screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a. On the skill data add / change screen, a skilled worker registration number output area, a name output area, a face photo output area, a skill output area that outputs (displays) the skills that have already been entered, a new skill input area for inputting new skills, a send button, a back button, a system use button, and an end button are output (displayed). After checking the skilled worker registration number, name, face photo, and skills that have already been entered, the skilled worker inputs his / her new skill data in the new skill input area (new skill data input means).
[0070] After inputting the new skill, the skilled worker taps the send button on the touch panel 15. When the send button is tapped, the central processing unit of the tablet 11a stores the skill data (new skill) in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the personal computers 13a to 13b using the URLs of the management server 14, the other tablets 11b, the other smartphones 12a, 12b, and the other personal computers 13a to 13b, and transmits the skill data to the management server 14 (management node), the other tablets 11b (other communication nodes), the other smartphones 12a, 12b (other communication nodes), and the other personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (new skill data transmission means).
[0071] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive skill data (new skills) from the tablet 11a (specified communication node) store (update) the skill data (skill data obtained by adding new skills to skills) and the date and time of receipt together with a specified hash value in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet (specified communication node) and the skilled worker registration number of the skilled worker (skill data update means).
[0072] The skilled worker qualification management system 10 stores skill data (skills, new skills) as transaction data in blocks on the management server 14 (management node), tablets 11a, 11b (communication nodes), smartphones 12a, 12b (communication nodes), and personal computers 13a to 13b (communication nodes) that form a network via blockchain, making it possible to prevent tampering with the skill data (skills, new skills) while preserving an accurate history of the skill data.
[0073] When a skilled worker registered in the skilled worker search system 10 inputs his / her own construction work performance data, he / she taps a construction work performance data input button on the initial screen output (displayed) on the touch panel 15 of the tablet 11a. When the construction work performance data input button is tapped, a construction work performance data input screen 18 shown in Fig. 4 is output (displayed) on the touch panel 15 of the tablet 11a. On the construction work performance data input screen 18, a skilled worker registration number output area 17a, a name output area 17b, a face photo output area 17c, a construction work performance data input area 17d for inputting construction work performance data, a send button 17e, a clear button 17f, a back button 17g, and an end button 17h are output (displayed).
[0074] After confirming the skilled worker registration number, name, and face photo, the skilled worker inputs his / her own construction work performance data in the construction work performance data input area 18d (construction work performance data input means). For example, if the skilled worker is a painter who applies finishing materials to buildings, he / she inputs "I have experience as a painter painting XX properties, XX buildings, and XX bridge piers." If the skilled worker is a plumber who installs piping equipment in buildings, he / she inputs "I have experience as a plumber installing piping equipment in XX buildings, XX properties, and XX buildings." If the skilled worker is an interior finisher who performs interior finishing work, he / she inputs "I have experience as an interior finisher doing interior finishing work in XX buildings, XX properties, and XX buildings." If the skilled worker is a roofer who builds roofs, he / she inputs "I have experience as a roofer building roofs in XX buildings, XX properties, and XX buildings." In this way, each skilled worker inputs his / her past construction work performance in detail.
[0075] After inputting the construction work performance data, the skilled worker taps the send button 18e on the touch panel 15. When the send button 18e is tapped, the central processing unit of the tablet 11a stores the construction work performance data in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the personal computers 13a to 13b using the URLs of the management server 14, the other tablets 11b, the other smartphones 12a, 12b, and the other personal computers 13a to 13b, and transmits the construction work performance data to the management server 14 (management node), the other tablets 11b (other communication nodes), the other smartphones 12a, 12b (other communication nodes), and the other personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (construction work performance data transmission means).
[0076] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive construction work performance data from the tablet 11a (specified communication node) store the construction work performance data and the reception date and time together with a specified hash value in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet (specified communication node) and the skilled worker registration number of the skilled worker (construction work performance data storage means).
[0077] When a skilled worker performs new construction work and the construction work record is to be added to the existing construction work record data, the user taps the data update (add / change) button on the initial screen and then taps the construction work record data add / change button on the data add / change screen (not shown) output (displayed) on the touch panel 15 of the tablet 11a. When the construction work record data add / change button is tapped, the construction work record data add / change screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a. The construction work record data add / change screen outputs (displays) a skilled worker registration number output area, a name output area, a face photo output area, a construction work record output area that outputs (displays) the input construction work record, a new construction work record input area for inputting new construction work record, a send button, a back button, a system use button, and an end button. After checking the skilled worker registration number, name, face photo, and input construction work record, the skilled worker inputs his / her new construction work record data in the new construction work record input area (new construction work record data input means).
[0078] After inputting the new construction work results, the skilled worker taps the send button on the touch panel 15. When the send button is tapped, the central processing unit of the tablet 11a stores the construction work results data (new construction work results) in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the personal computers 13a to 13b using the URLs of the management server 14, other tablets 11b, other smartphones 12a, 12b, and other personal computers 13a to 13b, and transmits the new construction work results data to the management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that form a network by the blockchain (new construction work results data transmission means).
[0079] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive new construction work performance data (new construction work performance) from the tablet 11a (specified communication node) store (update) the construction work performance data (construction work performance data obtained by adding new construction work performance to construction work performance) along with a specified hash value and the reception date and time in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet 11a (specified communication node) and the skilled worker registration number of the skilled worker (construction work performance data update means).
[0080] In the skilled worker qualification management system 10, construction work performance data (construction work performance, new construction work performance) is stored as transaction data in blocks of a management server 14 (management node), tablets 11a, 11b (communication nodes), smartphones 12a, 12b (communication nodes), and personal computers 13a to 13b (communication nodes) that form a network via blockchain, so that an accurate history of the construction work performance data can be preserved while preventing tampering with the construction work performance data (construction work performance, new construction work performance).
[0081] When a skilled worker registered in the skilled worker search system 10 wants to enter his or her own labor field, the worker taps a labor field data input button on the initial screen output (displayed) on the touch panel 15 of the tablet 11a. When the labor field data input button is tapped, a labor field data input screen 19 shown in Fig. 5 is output (displayed) on the touch panel of the tablet. On the labor field data input screen 19, a skilled worker registration number output area 19a, a name output area 19b, a facial photo output area 19c, a labor field data input area 19d for inputting labor field data, a send button 19e, a clear button 19f, a back button 19g, and an end button 19h are output (displayed).
[0082] After confirming the skilled worker registration number, name, and facial photograph, the skilled worker enters his / her own labor field data (labor field name) in the labor field data input area 19d (labor field data input means). For example, formwork work, demolition work, concrete work, reinforcing bar work, plastering work, scaffolding work, painter, plumber, etc. are entered in the labor field data input area. After entering the labor field data, the skilled worker taps the send button 19e on the touch panel 15. When the send button 19e is tapped, the central processing unit of the tablet 11a stores the labor field data in a block (large capacity hard disk) along with a predetermined hash value indicating the contents of the previous data, and uses the URLs of the management server 14, other tablets 11b, other smartphones 12a, 12b, and other personal computers 13a to 13b to access and log in to the management server 14, tablets 11b, smartphones 12a, 12b, and personal computers 13a to 13b, and transmits the labor field data to the management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that form a network using blockchain (labor field data transmission means).
[0083] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive labor field data from the tablet 11a (specified communication node) store the labor field data and the reception date and time together with a specified hash value in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet 11a (specified communication node) and the skilled worker registration number of the skilled worker (labor field data storage means).
[0084] When a skilled worker wants to add a new labor field to existing labor field data, he or she taps the data update (add / change) button on the initial screen, and then taps the labor field data add / change button on the data add / change screen (not shown) output (displayed) on the touch panel 15 of the tablet 11a. When the labor field data add / change button is tapped, the labor field data add / change screen (not shown) is output (displayed) on the touch panel 15 of the tablet 11a. On the labor field data add / change screen, a skilled worker registration number output area, a name output area, a face photo output area, a labor field output area that outputs (displays) the entered labor field, a new labor field input area for inputting a new labor field, a send button, a back button, a system use button, and an end button are output (displayed). After checking the skilled worker registration number, name, face photo, and entered labor field, the skilled worker inputs his or her new labor field data in the new labor field input area (new labor field data input means).
[0085] After inputting the new labor field, the skilled worker taps the send button on the touch panel 15. When the send button is tapped, the central processing unit of the tablet 11a stores the labor field data (new labor field) in a block (large-capacity hard disk) together with a predetermined hash value indicating the contents of the previous data, and accesses and logs into the management server 14, the tablet 11b, the smartphones 12a, 12b, and the computers 13a to 13b using the URLs of the management server 14, other tablets 11b, other smartphones 12a, 12b, and other computers 13a to 13b, and transmits the labor field data to the management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other computers 13a to 13b (other communication nodes) that form a network by blockchain (new labor field data transmission means).
[0086] The management server 14 (management node), other tablets 11b (other communication nodes), other smartphones 12a, 12b (other communication nodes), and other personal computers 13a to 13b (other communication nodes) that receive labor field data (new labor field) from the tablet 11a (specified communication node) store (update) the labor field data (labor field data obtained by adding the new labor field to the labor field) along with a specified hash value and the date and time of receipt in a block (large-capacity virtual memory area or large-capacity hard disk) in association with the communication node identification information of the tablet 11a (specified communication node) and the skilled worker registration number of the skilled worker (labor field data update means).
[0087] The skilled worker qualification management system 10 stores labor field data (labor field, new labor field) as transaction data in blocks of a management server 14 (management node), tablets 11a, 11b (communication nodes), smartphones 12a, 12b (communication nodes), and personal computers 13a to 13b (communication nodes) that form a network via blockchain, making it possible to preserve an accurate history of the labor field data while preventing tampering with the labor field data (labor field, new labor field).
[0088] Fig. 6 is a diagram showing an example of a qualification keyword input screen 21 output (displayed) on the display 20 of the first personal computer 13a, and Fig. 7 is a diagram showing an example of a skilled worker output screen 22 output (displayed) on the display 20 of the first personal computer 13a. Note that Figs. 6 and 7 omit the display of each data in each output area and each input area. Below, the procedure on the first personal computer 13a installed at the first construction site will be described as an example, but the same procedure can be performed on the second and third personal computers 13b, 13c installed at the second and third construction sites.
[0089] When a site manager, site supervisor, or other site personnel at the first construction site uses the skilled worker qualification management system 10 to search for skilled workers who have the necessary qualifications at the site, the site personnel clicks (tap) an icon (not shown) representing the skilled worker qualification management system 10 output (displayed) on the display 20 of the first personal computer 13a. When the icon representing the skilled worker qualification management system 10 is clicked, the skilled worker qualification management system 10 starts up, and an initial screen (menu screen) is output (displayed) on the display 20 of the first personal computer 13a (not shown). On the initial screen, a qualification keyword input button, a skill keyword input button, a construction work performance keyword input button, a labor field input button, a job information input button, and an end button are output (displayed). Next, the site personnel clicks the qualification keyword input button. To input job information at the construction site, the site personnel clicks the job information input button to output (display) a job information input screen (not shown) on the display 20.
[0090] When the qualification keyword input button is clicked, a qualification keyword input screen 21 shown in Fig. 6 is output (displayed) 20 on the display of the first personal computer 13a. The qualification keyword input screen 21 outputs (displays) a construction site name output area 21a in which the name of the first construction site is output (displayed), a construction site address output area 21b in which the address of the first construction site is output (displayed), a construction site specific information output area 21c in which construction site specific information (construction site number) that identifies the first construction site is output (displayed), a qualification keyword input area 21d for inputting a qualification keyword, a confirm button 21e, a clear button 21f, a back button 21g, and an end button 21h.
[0091] The site personnel input a predetermined qualification keyword or a predetermined qualification name in the qualification keyword input area 21d. It is assumed that "construction management" is input in the qualification keyword input area 21d. After inputting "construction management" in the qualification keyword input area 21d, the person clicks the Confirm button 21e. When the Confirm button 21e is clicked, the central processing unit of the first personal computer 13a accesses and logs into the server 14 using the URL of the management server 14, and transmits the input qualification keyword "construction management" to the management server 14 (qualification keyword transmission means).
[0092] The central processing unit of the management server 14, which has received the qualification keyword "construction management" from the first personal computer 13a, extracts "construction management" from the various qualification keywords stored in the large-capacity virtual storage area, determines the qualification name "first-class construction management engineer, second-class construction management engineer" represented by the extracted "construction management", and searches for skilled workers who have the qualification "first-class construction management engineer, second-class construction management engineer" (skilled worker search means). The central processing unit of the management server 14, which has searched for skilled workers, identifies the communication node specific information and skilled worker registration numbers of the multiple skilled workers who have the searched qualification "first-class construction management engineer, second-class construction management engineer", and transmits the personal information of the skilled workers (skilled worker's name, address, telephone number, fax number, age, sex, email address, and face photo) to the first personal computer 13a (skilled worker information transmission means).
[0093] Although not shown, a list of multiple skilled workers qualified as first-class construction management engineers and second-class construction management engineers, searched for using the qualification names "first-class construction management engineer, second-class construction management engineer", is output (displayed) on the display 20 of the first computer 13a. The site personnel select the desired skilled workers from the list (multiple selections possible) and click the OK button. When the OK button is clicked, a skilled worker output screen, which outputs (displays) the personal information, etc. of the selected skilled workers as shown in Fig. 7, is output (displayed) on the display 20 of the first computer 13a (skilled worker information output means).
[0094] The skilled worker output screen 22 in FIG. 7 outputs (displays) a qualification name output area 22a in which the qualification name "1st class construction management engineer, 2nd class construction management engineer" is output (displayed), a personal information output area 22b in which the name, address, telephone number and fax number, age, sex, email address, and face photo of the selected skilled worker are output (displayed), a menu button 22c, a back button 22d, and an end button 22e. When the menu button 22c is clicked, an initial screen (menu screen) is output (displayed) on the display 20 (similar to the following menu buttons). Using the skilled worker's email address (webmail, etc.), the site personnel can send construction site information and job information to the tablet (communication node) or smartphone (communication node) of each skilled worker who is searched for the qualification name "1st class construction management engineer, 2nd class construction management engineer", and each skilled worker can view the construction site information and job information sent by the site personnel on the tablet or smartphone he or she owns.
[0095] In the skilled worker qualification management system 10, by inputting the qualification keyword "construction management" into the first computer 13a, skilled workers (craftsmen) who are qualified as "1st class construction management engineers, 2nd class construction management engineers" corresponding to the qualification keyword "construction management" are searched for by the management server 14 (management node), and the personal information of the searched skilled workers can be viewed. In addition, construction site information and job information can be sent to the skilled workers' tablets (communication node) or smartphones (communication nodes). This makes it possible to find skilled workers (craftsmen) with the necessary qualifications at construction sites and planned construction sites in a timely manner, and provides an opportunity to hire skilled workers with the necessary qualifications.
[0096] Fig. 8 is a diagram showing an example of a skill keyword input screen 23 output (displayed) on the display 20 of the first personal computer 13a, and Fig. 9 is a diagram showing another example of a skilled worker output screen 24 output (displayed) on the display 20 of the first personal computer 13a. In Figs. 8 and 9, the display of each data in each output area and each input area is omitted. When a person involved in the first construction site uses the skilled worker qualification management system 10 to search for a skilled worker having the skills required for the site, he or she clicks on a skill keyword input button on the initial screen (menu screen) output (displayed) on the display 20 of the first personal computer 13a.
[0097] When the skill keyword input button is clicked, a skill keyword input screen 23 shown in Fig. 8 is output (displayed) on the display 20 of the first personal computer 13a. On the skill keyword input screen 23, a construction site name output area 23a of the first construction site, a construction site address output area 23b, a construction site specific information output area 23c, a skill keyword input area 23d for inputting a skill keyword, a confirm button 23e, a clear button 23f, a back button 23g, and an end button 23h are output (displayed).
[0098] The on-site personnel inputs a predetermined skill keyword or skill into the skill keyword input area 23d. It is assumed that "compane" is input into the skill keyword input area 23d. After inputting "compane" into the skill keyword input area 23d, the personnel clicks the Confirm button 23e. When the Confirm button 23e is clicked, the central processing unit of the first personal computer 13a accesses and logs into the server 14 using the URL of the management server 14, and transmits the input skill keyword "compane" to the management server 14 (skill keyword transmission means).
[0099] The central processing unit of the management server 14, which has received the skill keyword "concrete panel" from the first personal computer 13a, extracts "concrete panel" from the various multiple skill keywords stored in the large-capacity virtual storage area, identifies the skill corresponding to the extracted "concrete panel" as "formwork", and searches for skilled workers who have the skill registered as "formwork" (skilled worker search means). The central processing unit of the management server 14, which has searched for skilled workers with the skill of "formwork", identifies the communication node identification information and skilled worker registration numbers of the multiple skilled workers for the searched skill keyword "concrete panel", and transmits the personal information of the skilled workers (the skilled worker's name, address, telephone number, fax number, age, sex, email address, and facial photo) to the first personal computer 13a (skilled worker information transmission means).
[0100] Although not shown, a list of multiple skilled workers with the skill of "formwork" that was found by searching for the skill keyword "plywood" is output (displayed) on the display 20 of the first computer 13a. The site personnel select a desired skilled worker from the list (multiple selections are possible) and click the OK button. When the OK button is clicked, a skilled worker output screen that outputs (displays) personal information, etc. of the selected skilled worker as shown in Fig. 9 is output (displayed) on the display 20 of the first computer 13a (skilled worker information output means).
[0101] 9, a skill output area 24a is displayed with the skill keyword "concrete panel" and the skill "formworker", a personal information output area 24b is displayed with the name, address, telephone number, fax number, age, sex, email address, and face photo of the selected skilled worker, a menu button 24c, a back button 24d, and an end button 24e. Using the skilled worker's email address (webmail, etc.), the site personnel can send construction site information and job information to the tablet (communication node) or smartphone (communication node) of each skilled worker found by searching for the skill keyword "concrete panel", and each skilled worker can view the construction site information and job information sent by the site personnel on the tablet or smartphone they own.
[0102] In the skilled worker qualification management system 10, by inputting the skill keyword "concrete panel" into the first computer 13a, skilled workers (craftsmen) who have the skill of "formworker" corresponding to the skill keyword "concrete panel" are searched for by the management server 14 (management node), and the personal information of the searched skilled worker can be viewed. In addition, construction site information and job information can be sent to the skilled worker's tablet (communication node) or smartphone (communication node). This makes it possible to find skilled workers (craftsmen) with the necessary skills at construction sites and planned construction sites in a timely manner, and provides an opportunity to hire skilled workers with the necessary skills.
[0103] Fig. 10 is a diagram showing an example of a construction performance keyword input screen 25 output (displayed) on the display 20 of the first personal computer 13a, and Fig. 11 is a diagram showing another example of a skilled worker output screen 26 output (displayed) on the display 20 of the first personal computer 13a. In Figs. 10 and 11, the display of each data in each output area and each input area is omitted. When a person involved in the first construction site uses the skilled worker qualification management system 10 to search for a skilled worker who has the necessary construction performance at the site, he or she clicks on a construction performance keyword input button on the initial screen (menu screen) output (displayed) on the display 20 of the first personal computer 13a.
[0104] When the construction work record keyword input button is clicked, a construction work record keyword input screen 25 shown in Fig. 10 is output (displayed) on the display 20 of the first personal computer 13a. On the construction work record keyword input screen 25, a construction site name output area 25a of the first construction site, a construction site address output area 25b, a construction site specific information output area 25c, a construction work record keyword input area 25d for inputting a construction work record keyword, a confirm button 25e, a back button 25f, a clear button 25g, and an end button 25h are output (displayed).
[0105] The site personnel input a predetermined construction work record keyword or construction work record in the construction work record keyword input area 25d. It is assumed that "water pipe" is input in the construction work record keyword input area 25d. After inputting "water pipe" in the construction work record keyword input area 25d, the confirm button 25e is clicked. When the confirm button 25e is clicked, the central processing unit of the first personal computer 13a accesses and logs into the server 14 using the URL of the management server 14, and transmits the input construction work record keyword "water pipe" to the management server 14 (construction work record keyword transmission means).
[0106] The central processing unit of the management server 14, which has received the construction work record keyword "water pipe" from the first personal computer 13a, extracts "water pipe" from the various construction work record keywords stored in the large-capacity virtual storage area, identifies the "plumber" corresponding to the extracted "water pipe", and searches for skilled workers who have registered the construction work record of "plumber" (skilled worker search means). The central processing unit of the management server 14, which has searched for skilled workers who have the construction work record of "plumber", identifies the communication node identification information and skilled worker registration numbers of the multiple skilled workers for the searched construction work record keyword "water pipe", and transmits the personal information of the skilled workers (skilled worker's name, address, telephone number and fax number, age, sex, email address, and facial photo) to the first personal computer 13a (skilled worker information transmission means).
[0107] Although not shown, a list of multiple skilled workers with construction work experience of "plumber" that was found by searching using the construction work experience keyword "water pipe" is output (displayed) on the display 20 of the first computer 13a. The site personnel select a desired skilled worker from the list (multiple selections are possible) and click the OK button. When the OK button is clicked, a skilled worker output screen 26, which outputs (displays) personal information, etc. of the selected skilled worker as shown in Fig. 11, is output (displayed) on the display 20 of the first computer 13a (skilled worker information output means).
[0108] 11, a skilled worker output screen 26 displays a skilled keyword output area 26a that outputs (displays) the construction work performance keyword "water pipe", a personal information output area 26b that outputs (displays) the name, address, telephone number and fax number, age, sex, email address, and face photo of the selected skilled worker, a menu button 26c, a back button 26d, and an end button 26e. Using the skilled worker's email address (webmail, etc.), the site personnel can send construction site information and job information to the tablet (communication node) or smartphone (communication node) of each skilled worker found by searching for the construction work performance keyword "water pipe", and each skilled worker can view the construction site information and job information sent by the site personnel on the tablet or smartphone they own.
[0109] In the skilled worker qualification management system 10, by inputting the construction work experience keyword "water pipe" into the first computer 13a, skilled workers (craftsmen) with construction work experience as "plumber" corresponding to the construction work experience keyword "water pipe" are searched for by the management server 14, and the personal information of the searched skilled worker can be viewed. In addition, construction site information and job information can be sent to the skilled worker's tablet (communication node) or smartphone (communication node). This makes it possible to timely find skilled workers (craftsmen) with the required construction work experience at construction sites and planned construction sites, and obtain the opportunity to hire skilled workers with the required construction work experience.
[0110] FIG. 12 is a diagram showing an example of a skilled worker specific information input screen 27 output (displayed) on the touch panel 15 of the tablet 11a held by a skilled worker, and FIG. 13 is a diagram showing an example of a qualification data output screen 28 output (displayed) on the touch panel 15 of the tablet 11a. In FIGS. 12 and 13, the display of each data in each output area and each input area is omitted. In order for a skilled worker registered in the skilled worker qualification management system 10 to output (display) the qualification data of his / her various qualifications on the tablet 11a, the skilled worker taps (clicks) the system use button on the above-mentioned initial screen (menu screen) output (displayed) on the touch panel 15 of the tablet 11a. When the system use button is tapped, a system use screen is output (displayed) on the touch panel 15 of the tablet 11a (not shown). On the system use screen, a qualification data output button, a qualification name / qualification keyword input button, a skill / skill keyword input button, a construction work performance / construction work performance keyword input button, a labor field input button, a back button, and an end button are output (displayed).
[0111] Next, the skilled worker taps the qualification data output button. When the qualification data output button is tapped, the skilled worker identification information input screen 27 shown in FIG. 12 is output (displayed) on the touch panel 15 of the tablet 11a. The skilled worker identification information input screen 27 outputs (displays) a skilled worker registration number output area 27a, a name output area 27b, a face photo output area 27c, a qualification name output area 27d in which the name of the qualification held by the skilled worker is output (displayed), a skilled worker registration number input area 27e (skilled worker identification information input area) in which the skilled worker registration number (skilled worker identification information) is input, a send button 27f, a clear button 27g, a back button 27h, and an end button 27i. After inputting his / her skilled worker registration number in the skilled worker registration number input area 27d (skilled worker identification information input area), the skilled worker taps the send button 27f.
[0112] When the send button 27f is tapped, the central processing unit of the tablet 11a accesses and logs into the server 14 using the URL of the management server 14, and transmits the skilled worker registration number (skilled worker identification information) entered in the skilled worker registration number input area 27e and a qualification data output request signal to the management server 14 (skilled worker identification information transmission means). The management server 14 (management node) that receives the skilled worker registration number (skilled worker identification information) and the qualification data output request signal extracts from the large-capacity virtual storage area multiple qualification data of skilled workers corresponding to the skilled worker identification information transmitted from the tablet 11a (communication node) by the skilled worker identification information transmission means, and outputs (displays) the extracted qualification data to the tablet 11a that transmitted the skilled worker identification information (qualification data output means).
[0113] A qualification data output screen 28 shown in Fig. 13 is output (displayed) on the touch panel 15 of the tablet 11a. The qualification data output screen 28 outputs (displays) a skilled worker registration number output area 28a, a name output area 28b, a face photo output area 28c, a qualification name output area 28d, a qualification data output area 28e in which a plurality of qualification data 29a to 29d transmitted from the management server 14 (management node) are output, a qualification detail information output button 28f, a back button 28g, a menu button 28h, and an end button 28i. By presenting the qualification data 29a to 29d in the qualification data output area 28e output (displayed) on the touch panel 15 of the tablet 11a at the construction site, a skilled worker can show the qualification data 29a to 29d to site personnel involved, such as the site supervisor, site manager, and site manager, all at once.
[0114] The skilled worker qualification management system 10 outputs (displays) the qualification data 29a-29d of the skilled worker corresponding to the transmitted skilled worker registration number (skilled worker identification information) on the touch panel 15 of the tablet 11a (communication node) that transmitted the skilled worker registration number, thereby making it possible to present the qualification data 29a-29d (electronic data) that certifies the validity of the qualifications held by each skilled worker to those involved on site all at once, thereby eliminating the time and effort required to present the qualification data 29a-29d and allowing construction work to be carried out smoothly.
[0115] The skilled worker qualification management system 10 eliminates the need for skilled workers to carry around multiple qualification certificates that show the validity of the various qualifications they hold, and frees them from the hassle of always carrying multiple qualification certificates, allowing them to concentrate on construction work. The skilled worker qualification management system 10 transmits the qualification certificate data 29a-29d of the qualifications held by skilled workers to the management server 14 (management node), and the transmitted qualification certificate data 29a-29d are stored in the management server 14 in a classified manner for each skilled worker, so that many skilled workers with the required qualifications can enter the skilled worker qualification management system 10, and skilled workers with the necessary qualifications can have employment opportunities at each construction site.
[0116] The skilled worker qualification management system 10 allows skilled workers with the necessary qualifications to work at each construction site, so that buildings can be constructed as designed and predetermined buildings can be constructed as planned. In the skilled worker qualification management system 10, the management server 14 (management node), tablets 11a and 11b (communication nodes), smartphones 12a and 12b (communication nodes), and personal computers 13a to 13c (communication nodes) form a network via a blockchain, and the qualification data is stored as transaction data in the management server 14 (management node), tablets 11a and 11b (communication nodes), smartphones 12a and 12b (communication nodes), and personal computers 13a to 13c (communication nodes) (blocks), so that the qualification data can be prevented from being tampered with and an accurate history of the qualification data can be stored.
[0117] To view the details of the qualification related to the qualification data, the skilled worker specifies (highlights) the qualification name output (displayed) in the qualification name output area 28d, or specifies (highlights) any one of the qualification data 29a to 29d among the qualification data 29a to 29d, and then taps the qualification detail information output button 28f on the qualification data output screen 28. When the qualification detail information output button 28f is tapped, a qualification detail screen in which detailed information of the specified qualification is output (displayed) is output (displayed) on the touch panel 15 of the tablet 11a (not shown). In the qualification detail screen, a skilled worker registration number output area, a name output area, a face photo output area, a qualification name output area, a qualification name output area in which the names of various qualifications held by the skilled worker are output (displayed), a qualification acquisition date output area in which the acquisition dates of the qualifications are output (displayed), a qualification validity period output area in which the validity periods of the qualifications are output (displayed), a qualification certification organization output area in which the certification organizations of the qualifications are output (displayed), a back button, and an end button are output (displayed). By looking at the qualification details screen, skilled workers can check the details of the qualifications they hold, and can show the qualification details to site supervisors, site managers, site managers, and other site related parties all at once.
[0118] The skilled worker qualification management system 10 outputs (displays) the skilled worker qualification data 29a-29d corresponding to the transmitted skilled worker identification information, as well as the qualification name, acquisition date, validity period, and qualification certification organization on the touch panel 15 of the tablet 11a (communication node) that transmitted the skilled worker identification information, so that the qualification data 29a-29d (electronic data) of the qualifications held by each skilled worker, as well as the qualification name, acquisition date, validity period, and qualification certification organization can be presented to site personnel such as the site supervisor, site manager, and site supervisor all at once, allowing site personnel to know the qualification name, acquisition date, validity period, and qualification certification organization of the qualifications held by each skilled worker.
[0119] FIG. 14 is a diagram showing an example of a qualification / qualification keyword input screen 30 output (displayed) on the touch panel 15 of the tablet 11a held by a skilled worker, and FIG. 15 is a diagram showing an example of a job information output screen 31 output (displayed) on the touch panel 15 of the tablet 11a. In FIGS. 14 and 15, the display of each data in each output area and each input area is omitted. In order for a skilled worker registered in the skilled worker qualification management system 10 to search for job information based on his / her qualification, the skilled worker taps (clicks) the system use button on the initial screen (menu screen) output (displayed) on the touch panel 15 of the tablet 11a, causes the system use screen to be output (displayed) on the touch panel 15 of the tablet 11a (not shown), and taps the qualification / qualification keyword input button on the system use screen. When the qualification / qualification keyword input button is tapped, the qualification / qualification keyword input screen 30 shown in FIG. 14 is output (displayed) on the touch panel 15 of the tablet 11a.
[0120] The qualification / qualification keyword input screen 30 outputs (displays) a skilled worker registration number output area 30a, a name output area 30b, a face photo output area 30c, a qualification name output area 30d which outputs (displays) the name of the qualification held by the skilled worker, a qualification / qualification keyword input area 30e for inputting qualification / qualification keywords, a send button 30f, a clear button 30g, a back button 30h, and an end button 30i. After inputting the qualification keyword or qualification name in the qualification / qualification keyword input area 30e, the skilled worker taps the send button 30f.
[0121] When the send button 30f is tapped, the central processing unit of the tablet 11a accesses and logs into the server 14 using the URL of the management server 14, and transmits the qualification keyword or qualification name entered in the qualification / qualification keyword input area 30e and a job information output request signal to the management server 14 (qualification / qualification keyword transmission means). The virtual central processing unit of the management server 14 (management node) that receives the qualification keyword or qualification name and the job information output request signal searches for skilled workers who have the qualification corresponding to the qualification keyword or qualification name transmitted from the tablet 11a (communication node) by the qualification / qualification keyword transmission means (skilled worker search means), and searches for work sites and scheduled work sites that are recruiting skilled workers with the qualification. Next, it extracts the job information of each construction site and each scheduled work site where a skilled worker who has the qualification corresponding to the qualification keyword or qualification name can work, and outputs (displays) the extracted job information on the touch panel 15 of the tablet 11a (communication node) that transmitted the qualification keyword or qualification (job information output means).
[0122] A list screen of construction sites with job openings and planned construction sites that display a list of construction sites and planned construction sites that have job openings for skilled workers with specified qualifications is output (displayed) on the touch panel 15 of the tablet 11a (not shown). When a skilled worker taps on a specific construction site or planned construction site from the list screen of construction sites with job openings and planned construction sites, a job information output screen that outputs (displays) the job information for the tapped construction site or planned construction site is output (displayed) on the touch panel 15 of the tablet 11a.
[0123] As shown in FIG. 15, the job information output screen 31 outputs (displays) a skilled worker registration number output area 31a, a name output area 31b, a face photo output area 31c, a qualification output area 31d in which the qualification corresponding to the qualification keyword or the qualification name is output (displayed), a construction site information output area 31e of the construction site and the construction site where the job is available, a job information output area 31f, a job application button 31g, a menu button 31h, a back button 31i, and an end button 31j. The construction site information output area 31e outputs (displays) the site name of the construction site and the construction site where the job is scheduled, the address of the construction site and the construction site where the job is scheduled, the telephone number and email address of the construction site and the construction site where the job is scheduled, the construction period of the construction site and the construction site where the job is scheduled, and the name of the person in charge of the construction site and the construction site where the job is scheduled. The job information output area 31f outputs (displays) the number of people to be hired, the employment period, the salary conditions, the working style, and the welfare benefits. A skilled worker who has viewed the job information can apply for the job by tapping the job application button 31g. If there are no job openings, a message indicating "no job openings" is output (displayed) on the touch panel 15 of the tablet 11a.
[0124] The skilled worker qualification management system 10 allows a skilled worker to send a qualification keyword or qualification name representing the qualification he or she holds from the tablet 11a (communication node) to the management server 14 (management node), and job information for each construction site and each planned construction site where a skilled worker who has the qualification corresponding to the qualification keyword or qualification name is available for work is output to the tablet 11a, allowing each skilled worker to know the job vacancies at each construction site and each planned construction site where he or she can work and requires his or her qualification. This provides employment opportunities for skilled workers who have the necessary qualifications at each construction site and each planned construction site, and makes it possible to obtain labor with the necessary qualifications in a timely manner for each construction site and each planned construction site.
[0125] FIG. 16 is a diagram showing an example of a skill / skill keyword input screen 32 output (displayed) on the touch panel 15 of the tablet 11a held by a skilled worker, and FIG. 17 is a diagram showing another example of a job information output screen 33 output (displayed) on the touch panel 15 of the tablet 11a. In FIGS. 16 and 17, the display of each data in each output area and each input area is omitted. In order for a skilled worker registered in the skilled worker qualification management system 10 to search for job information based on his / her own skills, the skilled worker taps (clicks) the system use button on the initial screen (menu screen) output (displayed) on the touch panel 15 of the tablet 11a, causes the system use screen to be output (displayed) on the touch panel 15 of the tablet 11a (not shown), and taps the skill / skill keyword input button on the system use screen. When the skill / skill keyword input button is tapped, the skill / skill keyword input screen 32 shown in FIG. 16 is output (displayed) on the touch panel 15 of the tablet 11a.
[0126] The skill / skill keyword input screen 32 outputs (displays) a skilled worker registration number output area 32a, a name output area 32b, a facial photo output area 32c, a skill output area 32d which outputs (displays) the skills possessed by the skilled worker, a skill / skill keyword input area 32e for inputting skills / skill keywords, a send button 32f, a clear button 32g, a back button 32h, and an end button 32i. After inputting a skill keyword or skill in the skill / skill keyword input area 32e, the skilled worker taps the send button 32f.
[0127] When the send button 32f is tapped, the central processing unit of the tablet 11a accesses and logs into the server 14 using the URL of the management server 14, and transmits the skill keyword or skill input in the skill / skill keyword input area 32e and a job information output request signal to the management server 14 (skill / skill keyword transmission means). The virtual central processing unit of the management server 14 (management node) that receives the skill keyword or skill and the job information output request signal searches for skilled workers who have the skill corresponding to the skill keyword or skill transmitted from the tablet 11a (communication node) by the skill / skill keyword transmission means (skilled worker search means), and searches for work sites and scheduled work sites that are recruiting skilled workers with that skill. Next, it extracts job information for each construction site and each scheduled work site where skilled workers who have the skill corresponding to the skill keyword or skill can work, and outputs the extracted job information to the touch panel 15 of the tablet 11a (communication node) that transmitted the skill keyword or skill (job information output means).
[0128] A list screen of construction sites with job openings and planned construction sites that display a list of construction sites and planned construction sites that have job openings for skilled workers with specified skills is output (displayed) on the touch panel 15 of the tablet 11a (not shown). When a skilled worker taps on a specified construction site or planned construction site from the list screen of construction sites with job openings and planned construction sites, a job information output screen that outputs (displays) the job information for the tapped construction site or planned construction site is output (displayed) on the touch panel 15 of the tablet 11a.
[0129] As shown in FIG. 17, the job information output screen 33 outputs (displays) a skilled worker registration number output area 33a, a name output area 33b, a face photo output area 33c, a skill output area 33d in which a skill keyword or a skill corresponding to the skill is output (displayed), a construction site information output area 33e for construction sites and planned construction sites with job openings, a job information output area 33f, a job application button 33g, a menu button 33h, a back button 33i, and an end button 33j. The construction site information output area 33e outputs (displays) the names of the construction sites and planned construction sites, the addresses of the construction sites and planned construction sites, the telephone numbers and email addresses of the construction sites and planned construction sites, the construction periods of the construction sites and planned construction sites, and the names of the people in charge of the construction sites and planned construction sites. The job information output area 33f outputs (displays) the number of people to be hired, the hiring period, the salary conditions, the working style, and the welfare benefits. A skilled worker who has viewed the job information can apply for the job by tapping the job application button 33g. If there are no job openings, a message indicating "no job openings" is output (displayed) on the touch panel 15 of the tablet 11a.
[0130] The skilled worker qualification management system 10 allows a skilled worker to send a skill keyword or skill representing the skill he or she possesses from a tablet 11a (communication node) to a management server 14 (management node), and job information for each construction site and each planned construction site where skilled workers with the skill corresponding to the skill keyword or skill are available to work is output to the tablet, allowing each skilled worker to know job vacancies at each construction site and each planned construction site where his or her skill is required, providing employment opportunities to skilled workers with the necessary skills at each construction site and each planned construction site, and making it possible to obtain labor with the necessary skills in a timely manner for each construction site and each planned construction site.
[0131] FIG. 18 is a diagram showing an example of a construction work performance / construction work performance keyword input screen 34 output (displayed) on the touch panel 15 of the tablet 11a held by a skilled worker, and FIG. 19 is a diagram showing another example of a job information output screen 35 output (displayed) on the touch panel 15 of the tablet 11a. In FIGS. 18 and 19, display of each data in each output area and each input area is omitted. In order for a skilled worker registered in the skilled worker qualification management system 10 to search for job information based on his / her construction work performance, the skilled worker taps (clicks) the system use button on the initial screen (menu screen) output (displayed) on the touch panel 15 of the tablet 11a, causes the system use screen to be output (displayed) on the touch panel 15 of the tablet 11a (not shown), and taps the construction work performance / construction work performance keyword input button on the system use screen. When the construction work performance / construction work performance keyword input button is tapped, the construction work performance / construction work performance keyword input screen 32 shown in FIG. 18 is output (displayed) on the touch panel 15 of the tablet 11a.
[0132] The construction work record / construction work record keyword input screen outputs (displays) a skilled worker registration number output area 34a, a name output area 34b, a face photo output area 34c, a construction work record output area 34d that outputs (displays) the construction work record possessed by the skilled worker, a construction work record / construction work record keyword input area 34e for inputting the construction work record / construction work record keyword, a send button 34f, a clear button 34g, a back button 34h, and an end button 34i. After inputting the construction work record keyword or construction work record in the construction work record / construction work record keyword input area 34e, the skilled worker taps the send button 34f.
[0133] When the send button 34f is tapped, the central processing unit of the tablet 11a accesses and logs into the server 14 using the URL of the management server 14, and transmits the construction work record keyword or construction work record and job information output request signal input in the construction work record / construction work record keyword input area 34e to the management server 14 (construction work record / construction work record keyword transmission means). The virtual central processing unit of the management server 14 (management node) that has received the construction work record keyword or construction work record and job information output request signal searches for skilled workers who have construction work record keywords or construction work records corresponding to the construction work record keyword or construction work record transmitted from the tablet 11a (communication node) by the construction work record / construction work record keyword transmission means (skilled worker search means), and searches for work sites and planned work sites that are hiring skilled workers with that construction work record. Next, job information for each construction site and each planned work site where skilled workers who have construction work experience corresponding to the construction work experience keyword or construction work experience are available is extracted, and the extracted job information is output to the touch panel 15 of the tablet 11a (communication node) that transmitted the construction work experience keyword or construction work experience (job information output means).
[0134] A list screen of construction sites with job openings and planned construction sites that displays a list of construction sites with job openings for skilled workers with a certain construction performance record is output (displayed) on the touch panel 15 of the tablet 11a (not shown). When a skilled worker taps on a certain construction site or planned construction site from the list screen of construction sites with job openings and planned construction sites, a job information output screen 35 that outputs (displays) the job information for the tapped construction site or planned construction site is output (displayed) on the touch panel 15 of the tablet 11a.
[0135] As shown in FIG. 19, the job information output screen 35 outputs (displays) a skilled worker registration number output area 35a, a name output area 35b, a face photo output area 35c, a construction work record output area 35d that outputs (displays) construction work records corresponding to construction work record keywords or construction work records, a construction site information output area 35e for construction sites and planned construction sites with job openings, a job information output area 35f, a job application button 35g, a menu button 35h, a back button 35i, and an end button 35j. The construction site information output area 35e outputs (displays) the names of the construction sites and planned construction sites, the addresses of the construction sites and planned construction sites, the telephone numbers and email addresses of the construction sites and planned construction sites, the construction periods of the construction sites and planned construction sites, and the names of the people in charge of the construction sites and planned construction sites. The job information output area 35f outputs (displays) the number of people to be hired, the hiring period, the salary conditions, the working style, and the employee benefits. A skilled worker who has viewed the job information can apply for the job by tapping the job application button 35g. If there are no job openings, a message indicating "no job openings" is output (displayed) on the touch panel 15 of the tablet 11a.
[0136] The skilled worker qualification management system 10 allows a skilled worker to send construction work experience keywords or construction work experience representing his / her own construction work experience from the tablet 11a (communication node) to the management server 14 (management node), and then outputs job information for each construction site and each planned construction site where a skilled worker with construction work experience corresponding to the construction work experience keyword or construction work experience is available to work on the tablet. This enables each skilled worker to know the job vacancies at each construction site and each planned construction site where his / her construction work experience is required, providing employment opportunities to skilled workers with the necessary construction work experience at each construction site and each planned construction site, and making it possible to obtain the labor force with the necessary construction work experience in a timely manner for each construction site and each planned construction site.
[0137] Fig. 20 is a diagram showing an example of the renewal time data and renewal procedure data output screen 36 output (displayed) on a tablet carried by a skilled worker. In Fig. 20, the display of each data in each output area and each input area is omitted. The central processing unit of the management server 14 (management node) refers to the renewal times of various qualifications stored by the renewal time data storage means and the new qualification renewal time data transmission means, and extracts qualifications corresponding to the renewal time data with an upcoming renewal time. Here, the upcoming renewal deadline is, for example, 10 days, 1 month, or 2 months before the renewal deadline, and the deadline can be set arbitrarily.
[0138] The virtual central processing unit of the management server 14 extracts the qualifications corresponding to the update time data whose update time is approaching, and then searches for skilled workers who have the qualifications (skilled worker search means). After searching for skilled workers, the virtual central processing unit of the management server 14 identifies the communication node identification information and skilled worker registration numbers of the multiple skilled workers with the searched qualifications, and then uses the URL of the tablet 11a corresponding to the identified communication node identification information, and outputs (displays) the qualifications and the update time data of the qualifications corresponding to the update time data whose update time is approaching among the update time data stored by the update time data storage means on the touch panel 15 of the tablet 11a of the URL (the communication node of the skilled worker who has obtained the qualification) (update time data output means). Furthermore, the virtual central processing unit of the management server 14 extracts the update procedure data of the qualifications corresponding to the update time data whose update time is approaching among the update procedure data stored by the update procedure data storage means, and outputs (displays) the extracted update procedure data on the touch panel 15 of the tablet 11a of the URL (the communication node of the skilled worker who has obtained the qualification) (update procedure data output means). An update time data and update procedure data output screen 36 is output (displayed) on the touch panel 15 of the tablet 11a.
[0139] As shown in Fig. 20, the renewal time data and renewal procedure data output screen 36 outputs (displays) a skilled worker registration number output area 36a, a name output area 36b, a face photo output area 36c, a qualification name output area 36d in which the name of the qualification whose renewal time is approaching is output (displayed), a renewal time output area 36e in which the renewal time of the qualification whose renewal time is approaching is output (displayed), a renewal procedure output area 36f in which the renewal procedure data of the qualification whose renewal time is approaching is output (displayed), a menu button 35g, and an end button 35h. Each skilled worker can know the qualification whose renewal time is approaching by looking at the qualification name output (displayed) in the qualification name output area 36d, can know the renewal time of the qualification whose renewal time is approaching by looking at the renewal time output (displayed) in the renewal time output area 36e, and can know the renewal procedure (how to renew) of the qualification whose renewal time is approaching by looking at the renewal procedure data output (displayed) in the renewal procedure output area 36f.
[0140] The skilled worker qualification management system 10 has a management server 14 (management node) that outputs (displays) on the tablet 11a (communication node) of the skilled worker who has obtained the qualification the name of the qualification corresponding to the renewal time data whose renewal date is approaching among the renewal time data, and the renewal time data for that qualification. This allows each skilled worker to know the renewal time data for each qualification that he or she holds whose renewal date is approaching via the tablet 11a, thereby preventing the renewal date from being missed and ensuring that the qualifications he or she holds can be updated.
[0141] The skilled worker qualification management system 10 has a management server 14 (management node) that outputs qualification renewal procedure data corresponding to the renewal time data with the upcoming renewal date among the renewal time data to the tablet 11a (communication node) of the skilled worker who has obtained the qualification, so that the skilled worker can learn the renewal procedure data for the qualifications he holds that are due for renewal soon via the tablet 11a, and therefore can reliably update the qualifications he holds without making any mistakes in the renewal procedure. [Explanation of symbols]
[0142] 10 Skilled Worker Qualification Management System 11a,b Tablet (communication node) 12a,b Smartphone (communication node) 13a~c 1st~3rd PC 14 Management Server (Management Node) 15 Touch Panel 16 Qualification data entry screen 17 Skill data input screen 18 Construction work performance data input screen 19 Labor field data entry screen 20 Display 21 Qualification keyword input screen 22 Skilled worker output screen display 23 Skill keyword input screen 24 Skilled worker output screen 25 Construction record keyword input screen 26 Skilled Worker Output Screen 27 Skilled worker specific information input screen 28 Credentials data output screen 29a-29d Certification Data 30 Qualification / Qualification keyword input screen 31 Job information output screen 32 Skills and Skill Keywords Input Screen 33 Job information output screen 34 Construction work record / Construction work record keyword input screen 35 Job information output screen 36 Update time data and update procedure data output screen
Claims
1. The system is composed of a management node that manages various qualifications required at construction sites obtained by a specific number of skilled workers, and a plurality of communication nodes that are held by the skilled workers and form a network with the management node via a specific blockchain. a predetermined communication node has a qualification data transmission means for transmitting qualification data attesting to the validity of various qualifications acquired by the skilled worker to the management node and other communication nodes, and a skilled worker identification information transmission means for transmitting skilled worker identification information for identifying the skilled worker to the management node; A skilled worker qualification management system characterized in that the management node and those communication nodes have a qualification data storage means for storing the qualification data transmitted from a specified communication node by the qualification data transmitting means, classified for each skilled worker, and the management node has a qualification data output means for outputting the skilled worker qualification data corresponding to the transmitted skilled worker identification information to the communication node that transmitted the skilled worker identification information, when the skilled worker identification information is transmitted from those communication nodes by the skilled worker identification information transmitting means.
2. 2. A skilled worker qualification management system as described in claim 1, wherein, when a skilled worker acquires new qualifications required at the construction site, the qualification data transmission means transmits new qualification data to the management node and other communication nodes to certify the acquired new qualifications, and when new qualification data is transmitted from a specified communication node by the qualification data transmission means, the qualification data storage means updates the qualification data by adding the new qualification data to the already stored qualification data.
3. 3. A skilled worker qualification management system as described in claim 1 or claim 2, wherein the qualification data includes the name of the qualification, the date of acquisition of the qualification, the validity period of the qualification, and the qualification certification organization of the qualification, and the qualification data output means outputs the name of the qualification, the acquisition date, the validity period, and the qualification certification organization of the qualification held by the skilled worker corresponding to the skilled worker identification information transmitted from those communication nodes to the communication node that transmitted the skilled worker identification information.
4. 4. A skilled worker qualification management system as described in any one of claims 1 to 3, wherein a predetermined communication node includes a qualification renewal time data transmission means for transmitting renewal time data of various qualifications acquired by the skilled worker to the management node and other communication nodes, the management node and other communication nodes include an renewal time data storage means for storing the renewal time data transmitted from the predetermined communication node by the qualification renewal time data transmission means for each skilled worker and for each qualification, and the management node includes an renewal time data output means for outputting to the communication node of the skilled worker who has acquired that qualification a qualification corresponding to renewal time data whose renewal time is approaching among the renewal time data stored by the renewal time data storage means and the renewal time data of that qualification.
5. 5. A skilled worker qualification management system as described in claim 4, wherein the management node and the communication nodes include an update procedure data storage means for storing update procedure data for various qualifications acquired by the skilled workers for each skilled worker and for each qualification, and the management node includes an update procedure data output means for outputting to the communication node of the skilled worker who has acquired the qualification, the qualification corresponding to update time data whose update time is approaching among the update time data stored by the update time data storage means, and the update procedure data for that qualification.
6. The skilled worker qualification management system as described in claim 5, wherein the management node includes a qualification keyword storage means for storing qualification keywords representing the qualifications, classified by each qualification, a skilled worker search means for searching for skilled workers who hold a qualification corresponding to a specified qualification keyword when the qualification keyword is transmitted to the management node from the communication node of each construction site, and a skilled worker output means for outputting to the communication node of the construction site a skilled worker who has the qualification corresponding to the qualification keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site.
7. A skilled worker qualification management system as described in claim 6, wherein the communication nodes include a qualification keyword sending means for sending a predetermined qualification keyword to the management node, and the management node includes a job information output means for outputting job information for each construction site where skilled workers having the qualifications corresponding to the qualification keyword searched for by the skilled worker search means and sent from the communication nodes are available to work to the communication node which sent the qualification keyword.
8. 8. A skilled worker qualification management system as described in claim 7, wherein a specified communication node includes a skill data transmission means for transmitting skill data of various skills acquired by the skilled worker to the management node and other communication nodes, the management node and other communication nodes include a skill data storage means for dividing and storing the skill data transmitted from the specified communication node by the skill data transmission means for each skilled worker, the management node includes a skill keyword storage means for dividing and storing skill keywords representing specified skill data for each skill data, the skilled worker search means, when a skill keyword representing a required skill is transmitted from the communication node of each construction site, identifies the skill data corresponding to the skill keyword and searches for a skilled worker equipped with the identified skill, and the skilled worker output means outputs a skilled worker equipped with the skill corresponding to the skill keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site to the communication node of the construction site.
9. A skilled worker qualification management system as described in claim 8, wherein the communication nodes include a skill keyword transmitting means for transmitting a predetermined skill keyword to the management node, and the job information output means outputs job information for each construction site where skilled workers having the skills corresponding to the skill keyword searched for by the skilled worker search means and transmitted from the communication nodes are available to the communication node that transmitted the skill keyword.
10. 10. The skilled worker qualification management system according to claim 9, wherein the predetermined communication node includes a construction work performance data transmission means for transmitting construction work performance data of the construction site where the skilled worker worked to the management node and other communication nodes, the management node and other communication nodes include a construction work performance data storage means for storing the construction work performance data transmitted from the predetermined communication node by the construction work performance data transmission means by dividing it for each skilled worker, the management node includes a construction work performance keyword storage means for dividing and storing construction work performance keywords representing predetermined construction work performance data by the construction work performance data, and when a construction work performance keyword representing the required construction work performance is transmitted from the communication node of each construction site, the skilled worker search means searches for a skilled worker having the identified construction work performance while identifying the construction work performance data corresponding to the construction work performance keyword, and the skilled worker output means outputs a skilled worker having construction work performance corresponding to the construction work performance keyword searched for by the skilled worker search means and transmitted from the communication node of the construction site to the communication node of the construction site.
11. The skilled worker qualification management system as described in claim 10, wherein the communication nodes include a construction work experience keyword sending means for sending the construction work experience keyword to the management node, and the job information output means outputs job information for each construction site where skilled workers with construction work experience corresponding to the construction work experience keyword searched for by the skilled worker search means and sent from the communication nodes are available to work to the communication node that sent the construction work experience keyword.
Citation Information
Patent Citations
Craftsman information providing system and program
JP2020017023A
