Foundation strength inspection method and inspection equipment for foundation repair work
The use of cosmic ray muons to measure and analyze ground strength changes post-repair work addresses the limitations of conventional methods, providing accurate and non-destructive assessment of ground hardness for improved construction planning.
Patent Information
- Application Number
- JP2023082845
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-19
- Publication Date
- 2024-11-29
AI Technical Summary
Conventional inspection methods are inadequate for non-destructively assessing the ground strength after repair work, particularly in low-lying urban areas with fine sand or cobbles, due to limitations in depth penetration and practicality of existing underground inspection techniques.
A method and device using cosmic ray muons to measure changes in direction distribution and amount before and after ground repair work, employing a muon detector installed underground to evaluate ground strength by analyzing cosmic ray muon data.
Enables non-destructive analysis of ground strength changes post-repair, allowing for accurate determination of ground hardness and suitability for further construction by eliminating interference from surrounding structures and environmental factors.
Smart Images

Figure 2024166631000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a ground strength inspection method and inspection device for ground repair work using cosmic ray muons. [Background technology]
[0002] Troubles seen in underground construction work are common in large cities built on low-lying land, and occur in ground with a small uniformity coefficient, such as fine sand or large gravel. Even in recent years, underground cavities thought to be caused by shield construction have been discovered, and as repair work for loosened ground after such troubles, high-pressure jet mixing method from above ground, chemical injection method, mechanical mixing method, etc. are known. For example, in the high-pressure jet mixing method, air and cement-based solidification material are mixed and mixed with the soil while being sprayed at high pressure into the underground sand layer, and a cylindrical improved body is created.
[0003] There is an increasing demand for non-destructive testing of the hardness of soil after soil repair, specifically the converted N-value of the improved body. The N-value is an index of the strength of the soil, and is the bearing capacity (kN / m 2 For example, in the case of a high-rise apartment building, a layer of 5m or more with an N value of 50 or more is used as the supporting layer. Generally, the higher the N value of sandy ground, the higher the relative density. For example, the Meyerhof relation shown in Equation 1 is known. (Number 1) D r =21√(N / (σ v +0.7))···(1)
[0004] Here, D r is the relative density, σ v is the effective overburden pressure (kgf / cm 2 ).
[0005] Known underground inspection methods include underground radar, resistivity tomography, and elastic wave tomography, but underground radar is practically unsuitable for detection at depths of 5m or more due to the scattering and absorption of electromagnetic waves underground.In addition, resistivity tomography and elastic wave tomography are not practical because they require the drilling of many boreholes.
[0006] On the other hand, a known technique for imaging the inside of materials is a radiography technique using charged particles such as cosmic ray muons. Cosmic ray muons, which are generated by cosmic rays, have very high energy and have a higher penetrating power than X-rays and other radiation, so they are used as an imaging method for large structures such as volcanoes and pyramids. In addition, a method has been proposed in which a muon detector is installed in a tunnel to measure the change in muon flux due to the thickness of the earth overburden, or a muon detector installed underground to measure the angular distribution of muons, to perform tomography analysis of the underground.
[0007] Cosmic ray muons (hereinafter referred to as "muons") pass through matter while gradually losing energy. The energy loss of muons is roughly proportional to the density length of the object, that is, the product of the density and thickness of the object. Therefore, the density length of the object can be estimated from the amount of cosmic ray muons that arrive. [Prior art documents] [Patent documents]
[0008] [Patent Document 1] JP 2010-271059 A [Patent Document 2] JP 2002-106291 A [Patent Document 3] JP 2011-202356 A [Patent Document 4] International Publication No. 2011 / 058911 Summary of the Invention [Problem to be solved by the invention]
[0009] None of the above-mentioned conventional inspection methods have been applied to ground strength inspection after ground repair work.
[0010] An object of the embodiments of the present invention is to provide an inspection method and an inspection device for non-destructively analyzing ground strength caused by ground repair work. [Means for solving the problem]
[0011] In order to solve the above problems, the ground strength inspection method for ground repair work according to this embodiment is an inspection method for analyzing underground properties during ground repair work, which uses a muon detector installed underground in the area where the repair work is carried out, measures changes in the distribution of arrival directions and amount of cosmic ray muons associated with changes in ground conditions due to the ground repair work, and combines and analyzes information before the ground repair work and information after the repair work to evaluate the ground strength after repair.
[0012] Furthermore, the ground strength inspection device for ground repair work according to the above embodiment is an inspection device that analyzes the underground properties for ground repair work, and is characterized in that it is composed of a muon detector installed underground in the area where the repair work is carried out, and an analysis device that measures changes in the arrival direction distribution and amount of cosmic ray muons measured by this muon detector and evaluates the ground strength after repair. Effect of the Invention
[0013] According to the ground strength inspection method and inspection device for ground repair work of this embodiment, by using an inspection device consisting of a muon detector, it is possible to analyze ground strength and changes therein. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 is a configuration diagram of a ground strength inspection device for ground repair work according to a first embodiment. [Diagram 2] FIG. 2 is an explanatory diagram of the ground strength inspection method for ground repair work according to the first embodiment. [Diagram 3] FIG. [Figure 4] FIG. 3 is a view taken along the line III in FIG. [Diagram 5] FIG. 11 is a configuration diagram of a ground strength inspection device for ground repair work according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, an embodiment of a ground repair work inspection method and a ground strength inspection device according to the present invention will be described with reference to the drawings. [First embodiment]
[0016] The inspection method and inspection device for ground repair work according to the first embodiment will be described with reference to Fig. 1 and Fig. 2. Here, Fig. 1 is a schematic configuration diagram of the ground strength inspection device before ground repair work according to the first embodiment, and Fig. 2 is an explanatory diagram of the ground strength inspection method after ground repair work.
[0017] The ground strength inspection device 9 for ground repair work according to this first embodiment is composed of a muon detector 1 and an analysis device 7 installed in a tunnel 4 excavated by a shield construction method, in which loose ground 2 is located underground 3 below an above-ground structure 5 such as a building or a house, as shown in Figure 1.
[0018] The muon detector 1 may be any detector capable of measuring charged particles on a particle-by-particle basis, and may be a drift tube detector, a multi-wire detector, a GEM detector (gas electron multiplier: gas detector), a scintillation detector, a photographic plate, an imaging plate, or any other detector with at least two layers of detection surface. There is no restriction on the detection method or the outer shape of the detector. Also, a method capable of identifying positions in two orthogonal directions with a single detector may be used.
[0019] The operation and configuration of the muon detector 1 will be described below using an example of a drift tube detector. The muon detector 1 uses a drift tube detector 14 that detects the passage position in the muon detector 1 based on the drift time of the movement of electrons generated by the passage of a cosmic ray muon 11 through the muon detector 1 as shown in Figures 3 and 4. The drift tube detector 14 as the muon detector 1 has a core wire 16 to which a high voltage is applied stretched at the center position within a cylindrical tube 15 as a cylinder, and an ionized gas mainly composed of a rare gas is sealed within the cylindrical tube 15. When a cosmic ray muon 11 passes through the drift tube detector 14, the ionized gas is ionized and separated into ions and electrons.
[0020] When the separated electrons move and reach the core wire 16, a detection signal is output from the drift tube detector 14, and the passage of the cosmic ray muon 11 through the drift tube detector 14 is detected. The travel time (drift time) from when the electrons are generated by ionization of the ionized gas to when they reach the core wire 16 is determined from the time when the electrons are generated by ionization of the ionized gas and the time when the electrons reach the core wire 16 (the time when the detection signal is generated). By calculating the travel distance (drift radius) of the electrons to the core wire 16 based on this drift time, the passage position of the cosmic ray muon 11 within the drift tube detector can be detected.
[0021] 3 and 4, the muon detector 1 that detects the cosmic ray muons 11 and outputs a detection signal is provided with four or more layers (e.g., six layers) in which a plurality of detectors are arranged in the X direction to constitute an X-direction calculation unit 20X that detects the X-direction position of the cosmic ray muons 11, and is provided with four or more layers (e.g., six layers) in which a plurality of detectors are arranged in the Y direction perpendicular to the X direction to constitute a Y-direction calculation unit 20Y that detects the Y-direction position of the cosmic ray muons 11. Here, the layers of the muon detector 1 in the X-direction calculation unit 20X and the layers of the muon detector 1 in the Y-direction calculation unit 20Y are alternately arranged, for example, every two layers.
[0022] The X-direction calculation unit 20X is configured to have, in addition to the multiple muon detectors 1 in, for example, six layers as described above, a plurality of signal processing circuits 12 each connected to each muon detector 1, and a plurality of time calculation means 13 each connected to the plurality of signal processing circuits 12. Similarly, the Y-direction calculation unit 20Y is configured to have, in addition to the multiple muon detectors 1 in, for example, six layers, a plurality of signal processing circuits 12 each connected to each muon detector 1, and a plurality of time calculation means 13 each connected to the plurality of signal processing circuits 12.
[0023] The muon detector 1, signal processing circuit 12, and time calculation means 13, which respectively constitute the above-mentioned X-direction calculation unit 20X and Y-direction calculation unit 20Y, constitute a module structure 21 that is supported by a frame 17 and detects the trajectory of a muon. In this module structure 21, the periphery of the frame 17 is covered with a cover 18. This cover 18 is formed with a heat dissipation window 19 as a heat dissipation means for dissipating heat generated within the cover 18. The muon detector 1, signal processing circuit 12, and time calculation means 13 of the above-mentioned module structure 21 detect cosmic ray muons 11 incident from near the Z direction, which is perpendicular to the X and Y directions.
[0024] The frame 17 is for fixing and supporting the muon detector 1, the signal processing circuit 12, and the time calculation means 13, and there are no limitations on the material and shape of the frame 17. However, the frame 17 needs to have characteristics such as rigidity to an extent that the installation precision when installing the muon detector 1 can be ensured even when it is bent due to a load or distorted due to temperature changes.
[0025] This muon detector 1 makes it possible to evaluate the density length of a substance from the transmission rate of cosmic ray muons 11 through the substance.
[0026] This muon detector 1 may be placed directly below the improved body 6 as shown in Figure 2, or may be placed in a location outside the improved body 6 that is within the viewing angle. This muon detector 1 measures cosmic ray muons 11 coming from above within the viewing angle α for a preset period of time.
[0027] In the example of FIG. 1 and FIG. 2, one muon detector 1 is arranged, but the number may be increased to two or more in order to shorten the measurement time.
[0028] Furthermore, the analysis device 7 may be disposed near the muon detector 1 , but may also be disposed outside the tunnel 4 .
[0029] In the thus configured ground strength inspection device 10 for ground repair work, it is assumed that an improved body 6 has been created by the ground repair work as shown in Figure 2. The ground repair work in this case is a high-pressure jet mixing method, a chemical injection method, or a mechanical mixing method. By analyzing the difference between the arrival direction distribution and arrival amount of cosmic ray muons 11 measured before the ground repair work and the arrival direction distribution and arrival amount of cosmic ray muons 11 measured during or after the ground repair work, it is possible to obtain the position, shape, density, and composition of the improved body while eliminating the influence of structures other than the improved body.
[0030] Then, by using the density length obtained from the distribution of the directions of arrival and the amount of arrival of cosmic ray muons, and subtracting the density length of the improved body from the total density length obtained from the measurement of the amount of arrival of muons, the converted N value of the ground hardness, which is the ground strength of the improved body 6, can be analyzed by the analysis device 7. Furthermore, the amount or density length of the arrival of the obtained cosmic ray muons 11 can be compared numerically or visually with the simulation results.
[0031] The information before the ground repair work includes the position and density or composition of aboveground structures, the position and density or composition of improved bodies formed by the ground repair work, surrounding drilling data, the position of groundwater and soil density obtained by underground radar, aquifer distribution obtained by resistivity tomography, density and soil hardness obtained by elastic wave tomography, temperature and humidity or air pressure during measurement, information on the movement of heavy objects above or underground within the field of view of the muon detector, and combinations of these.
[0032] The measurement time may be continuous, or may be taken at key points in the construction process or when necessary, such as during regular inspections. It is also possible to measure the strength of the ground and its changes at any time by measuring and analyzing the time-dependent changes in the distribution of the direction of arrival of cosmic ray muons and the amount of arrival before, during, and after construction.
[0033] In addition, the muon detector 1 can eliminate or calibrate changes in the distribution of the direction and amount of cosmic ray muons 11 caused by heavy objects such as vehicles moving on the ground or underground 3 within the field of view, and can analyze the properties of the underground 3 and those changes.
[0034] As described above, according to the method and device for inspecting ground strength for underground construction according to the first embodiment, even if there are structures that affect the measured values of cosmic ray muons 11, such as aboveground structures 5 such as buildings and houses, underground structures such as sewer pipes in the ground 3, cavities existing in the ground 3, underground water veins, etc., by looking at the difference in the measured values of cosmic ray muons before and after the ground repair work, it is possible to measure the position and shape of the improved body 6 constructed in the ground repair work while eliminating these influences, and further, it is possible to evaluate the converted N value as the ground strength from the amount of cosmic ray muons 11 that are coming in, and appropriate construction can be carried out in the subsequent construction process, etc. In addition to the converted N value, it is of course possible to adopt the bearing capacity of the ground or the ground hardness obtained from the composition and density of the ground based on the measured values of cosmic ray muons as the ground strength. [Second embodiment]
[0035] The inspection method and inspection device for ground repair work according to the second embodiment will be described with reference to Fig. 5. Note that the same or similar configurations as those in the first embodiment are given the same reference numerals and duplicated explanations will be omitted.
[0036] In the second embodiment, as shown in Fig. 5, the inspection device 30 for ground repair work is installed in two units, muon detector 1a and muon detector 1b, at shifted locations inside the tunnel 4. These muon detectors 1a and 1b may be placed directly below the improved body 6, or may be placed outside directly below and in a location that includes the improved body 6 within the viewing angle. Also, a single muon detector 1 may be operated to measure cosmic ray muons at shifted positions within a range that is not affected by changes in the ground condition over time.
[0037] The effects are the same as those of the first embodiment, but the underground can be analyzed three-dimensionally by utilizing the parallax of multiple muon detectors 1. This makes it possible to analyze the density distribution of the improved bodies 6 underground, the distribution of the converted N value, and their changes over a wide range, and to visualize them by color-coding each distribution.
[0038] The number and measurement positions of the muon detectors 1a, 1b arranged inside the tunnel 4 are not limited, and can be increased or decreased as appropriate, and the positions can also be changed to predetermined locations as appropriate.
[0039] Although the embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, modifications, and combinations can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents described in the claims, as well as in the scope and spirit of the invention. [Explanation of symbols]
[0040] 1, 1a to 1b... muon detector, 2... loose ground, 3... underground, 4... tunnel, 5... above-ground structure, 6... improved body, 7... analysis device, 9, 10, 30... inspection device for ground repair work, 11... cosmic ray muon, 12... signal processing circuit, 13... time calculation means, 14... drift tube detector, 15... cylindrical tube, 16... core wire, 17... frame, 18... cover, 19... heat dissipation window, 20X... X-direction calculation unit, 20Y... Y-direction calculation unit, 21... module structure.
Claims
1. In an inspection method for analyzing the underground strength of ground repair work, Using a muon detector installed underground in the area where the repair work will be carried out, A ground strength inspection method for ground repair work, characterized by measuring changes in the distribution of cosmic ray muons' arrival direction and amount due to time-dependent changes in ground conditions caused by the ground repair work, combining and analyzing information before the ground repair work with information during or after the ground repair work, and evaluating the ground strength after repair work.
2. A method for inspecting ground strength for ground repair work according to claim 1, characterized in that the evaluation is the ground strength after repair in the ground repair work and the position, shape, density and composition of the improved body.
3. 2. The method for inspecting ground strength for ground repair work according to claim 1, wherein the ground repair work is a high-pressure jet mixing method, a chemical injection method, or a mechanical mixing method.
4. 2. The method for inspecting ground strength for ground repair work according to claim 1, wherein the muon detector is any one of a drift tube detector having two or more layers, a multi-wire detector having two or more layers, a GEM detector having two or more layers, a scintillation detector having two or more layers, a photographic plate having two or more layers, or an imaging plate having two or more layers.
5. 5. The method for inspecting ground strength for ground repair work according to claim 1, wherein a plurality of the muon detectors are installed at different locations, and each of the muon detectors measures the distribution of the direction of arrival of cosmic ray muons, and analyzes or images the three-dimensional density distribution in the ground and its changes.
6. 5. The method for inspecting ground strength for ground repair work according to claim 1, wherein the muon detector is installed in an underground tunnel excavated by a shield tunneling method.
7. A method for inspecting ground strength for ground repair work described in any one of claims 1 to 4, characterized in that the analysis is performed by measuring the distribution of incoming direction and number of cosmic ray muons before and after the ground repair work, or during the ground repair work.
8. A method for inspecting ground strength for ground repair work as described in any one of claims 1 to 4, characterized in that the information before the ground repair work is the position and density or composition of structures on the ground, the position and density or composition of improved bodies formed by the ground repair work, surrounding boring data, the position of groundwater and soil density obtained by underground radar, aquifer distribution obtained by resistivity tomography, density and soil hardness obtained by elastic wave tomography, temperature and humidity or atmospheric pressure during measurement, information on the movement of heavy objects on the ground or underground within the field of view of the muon detector, and combinations of these.
9. A method for inspecting ground strength for ground repair work described in any one of claims 1 to 4, characterized in that the analysis involves subtracting the density length of the improved body from the total density length obtained from the measured amount of muons arriving to obtain the density length of the improved body.
10. 5. The method for inspecting ground strength for ground repair work according to claim 1, wherein the analysis comprises a numerical or image comparison of the amount or density length of the obtained cosmic ray muons with the simulation results.
11. 5. The method for inspecting ground strength for ground repair work according to claim 1, wherein the ground strength is a converted N value, a bearing capacity or a ground hardness.
12. Inspection equipment for analyzing underground properties during ground repair work, A muon detector was installed underground in the area where the repair work will be carried out, This ground strength inspection device for ground repair work is characterized by being composed of an analysis device that measures the changes in the distribution of cosmic ray muon arrival directions and the amount of arrivals measured by this muon detector, and evaluates the ground strength after repair.
13. The muon detector is installed at a plurality of locations underground in the area where the repair work is to be performed; The ground strength inspection device for ground repair work according to claim 12, characterized in that the analysis device uses the parallax angle of the muon detector measured at multiple locations to analyze or image the ground strength in three dimensions.
Citation Information
Patent Citations
Working face-forward geological prediction method using electromagnetic wave
JP2002106291A
Ground survey system
JP2010271059A
Tunnel working face forward probing device
JP2011202356A
Ground survey method
WO2011058911A1
