User equipment and method therefor

JP2025026498AActive Publication Date: 2025-02-21PANASONIC INTELLECTUAL PROPERTY CORP OF AMERICA
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2024210526
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2019-01-10
Filing Date
2024-12-03
Publication Date
2025-02-21
Estimated Expiration
2039-12-11

Smart Images

  • Figure 2025026498000001_ABST
    Figure 2025026498000001_ABST
Patent Text Reader

Abstract

To provide improved procedures for saving power in user equipment.SOLUTION: The present disclosure relates to user equipment (UE) comprising: a receiver which, in operation, receives power saving signals (PoSSs) from a serving base station on which the UE is camping; UE-side processing circuitry which, in operation, monitors the reception of the PoSSs to determine UE behavior regarding processing of a physical downlink control channel (PDCCH). The PoSSs comprise a behavior indication indicating that the UE follows first behavior or second behavior. The PoSSs further comprise a configuration indication indicating at least one configuration parameter associated with the first or second behavior. The UE-side processing circuitry, in operation, determines to perform PDCCH monitoring in the case the first behavior is indicated and to skip PDCCH monitoring in the case the second behavior is indicated, and accordingly applies the at least one configuration parameter.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to user equipment and methods in a communication system, such as a 3GPP communication system. [Background technology]

[0002] Currently, the 3rd Generation Partnership Project (3GPP®) is working on technical specifications for the next generation of cellular technology, also known as the fifth generation (5G).

[0003] One objective is to provide a single technical framework that addresses all usage scenarios, requirements, and deployment scenarios, including at least enhanced mobile broadband (eMBB), ultra-reliable low-latency communications (URLLC), and massive machine type communication (mMTC) (see, e.g., Section 6 of TR 38.913 version 15.0.0, which is incorporated herein by reference). For example, deployment scenarios for eMBB may include indoor hotspots, dense urban areas, suburban, urban, and high-speed. Deployment scenarios for URLLC may include industrial control systems, mobile health management (remote monitoring, diagnosis, and treatment), real-time control of vehicles, and wide-area monitoring and control systems for smart grids. Deployment scenarios for mMTC may include scenarios using a large number of devices with low-latency sensitive data transmission, such as smart wearables and sensor networks. eMBB and URLLC services are similar in that they both require very high bandwidth, but differ in that URLLC services may preferably require ultra-low latency.

[0004] A second objective is to achieve forward compatibility: backward compatibility to Long Term Evolution (LTE, LTE-A) cellular systems is not required, which facilitates the introduction of completely new system designs and / or new features. Summary of the Invention

[0005] The non-limiting exemplary embodiments contribute to providing improved procedures for conserving power in user equipment.

[0006] In one general example, the disclosed technology features a user equipment (UE) including a receiver that, during operation, receives a power saving signal (PoSS) from a serving base station to which the UE is camped, and a UE-side processing circuit that, during operation, monitors reception of the PoSS to determine a UE behavior with respect to processing a physical downlink control channel (PDCCH), the PoSS including a behavior indication instructing the UE to follow a first behavior or a second behavior, the PoSS further including a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior, the UE-side processing circuit, during operation, determines to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated, and applies the at least one configuration parameter accordingly.

[0007] In one general example, the techniques disclosed herein feature a method including the following steps performed by a UE: receiving a power saving signal (PoSS) from a serving base station to which the UE is camped; and monitoring reception of the PoSS to determine a UE behavior with respect to processing a physical downlink control channel (PDCCH), where the PoSS includes a behavior indication instructing the UE to follow a first behavior or a second behavior, and the PoSS further includes a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior, and where a processing circuit determines to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated, and applies the at least one configuration parameter accordingly.

[0008] In one general example, the technology disclosed herein features a base station (BS), comprising a transmitter configured, during operation, to transmit a power saving signal (PoSS) to at least one user equipment (UE) camped on the BS, and a BS-side processing circuit configured, during operation, to generate a PoSS, the PoSS including a behavior indication instructing the UE to follow a first behavior or a second behavior, the PoSS further including a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior, the PoSS being generated to cause the UE to perform PDCCH monitoring if the first behavior is indicated, and to skip PDCCH monitoring if the second behavior is indicated, and to apply the at least one configuration parameter accordingly.

[0009] It should be noted that the general or specific embodiments may be realized as a system, a method, an integrated circuit, a computer program, a storage medium, or any combination thereof.

[0010] Further benefits and advantages of the disclosed embodiments and various implementations will become apparent from the specification and drawings. These benefits and / or advantages may be obtained individually by the various embodiments and features of the specification and drawings. However, it is not necessary for all of these features to be present in order to obtain one or more of such benefits and / or advantages. [Brief description of the drawings]

[0011] In the following, exemplary embodiments are explained in more detail with reference to the accompanying drawings. [Figure 1] FIG. 1 illustrates an example architecture for a 3GPP NR system. [Diagram 2] FIG. 1 illustrates an example user and control plane architecture for LTE eNB, gNB, and UE. [Diagram 3] FIG. 1 illustrates messages exchanged between a gNB and a UE when performing a power saving procedure using PoSS. [Figure 4] FIG. 1 shows an exemplary simplified configuration of a UE and a gNB. [Diagram 5] FIG. 1 illustrates a configuration of a UE according to an exemplary implementation of the first embodiment. [Figure 6] 1 is a flow diagram of UE behavior according to an exemplary embodiment; [Figure 7] 1 is a flow diagram of UE behavior according to another exemplary embodiment; [Figure 8] 1 is a timing diagram for UE behavior according to an exemplary embodiment of a first behavior; [Figure 9] 1 is a timing diagram for UE behavior according to an exemplary embodiment of a second behavior; [Figure 10] FIG. 1 illustrates a DCI configuration according to an exemplary embodiment of the first solution. [Figure 11] FIG. 2 illustrates a DCI configuration according to another exemplary embodiment of the first solution. [Figure 12] FIG. 1 illustrates a DCI configuration according to an exemplary embodiment of the second solution. [Figure 13]FIG. 1 illustrates a configuration of a DCI according to another exemplary embodiment of the second solution. [Figure 14] FIG. 1 illustrates a DCI configuration according to an exemplary embodiment of the third solution. [Figure 15] FIG. 13 illustrates a DCI configuration according to another exemplary embodiment of the third solution. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] (5G NR system architecture and protocol stack) 3GPP is working on the next release of the fifth generation of cellular technology, simply referred to as 5G, which involves the development of a new radio access technology (NR) that will operate in the frequency range up to 100 GHz. 3GPP must identify and develop the necessary technology elements to successfully standardize an NR system that meets both immediate market needs and longer-term requirements in a timely manner. To achieve this, the evolution of the air interface and radio network architecture is being considered in the study item "New Radio Access Technology". Results and agreements are collected in technical report TR38.804 v14.0.0, which is incorporated herein by reference in its entirety.

[0013] Among other things, the overall system architecture assumes a NG-RAN (Next Generation-Radio Access Network) including gNBs, which provide NG-Radio Access User Plane (SDAP / PDCP / RLC / MAC / PHY) and Control Plane (RRC) protocol termination towards the UEs. The gNBs are interconnected with each other by an Xn interface. The gNBs are also connected to the NGC (Next Generation Core) by a Next Generation (NG) interface, more specifically to the AMF (Access and Mobility Management Function) (e.g., a specific core entity that runs the AMF) by an NG-C interface, and to the UPF (User Plane Function) (e.g., a specific core entity that runs the UPF) by an NG-U interface. The NG-RAN architecture is shown in FIG. 1 (see, e.g., 3GPP TS38.300 v15.2.0, Section 4, which is incorporated herein by reference).

[0014] Various different deployment scenarios may be supported (see, for example, 3GPP TR38.801 v14.0.0, which is incorporated herein by reference). For example, a non-centralized deployment scenario (see, for example, section 5.2 of TR38.801; a centralized deployment is shown in section 5.4) is presented therein, in which base stations supporting 5G NR may be deployed. FIG. 2 illustrates an exemplary non-centralized deployment scenario (see, for example, FIG. 5.2.-1 of TR38.801), additionally showing a LTE eNB and a user equipment (UE) connected to both a gNB and an LTE eNB. The new eNB for NR 5G may be exemplarily referred to as a gNB. The eLTE eNB is an evolution of the eNB that supports connections to an EPC (Evolved Packet Core) and an NGC (Next Generation Core).

[0015] The user plane protocol stack for NR (see, for example, 3GPP TS38.300 v15.2.0, section 4.4.1, which is incorporated herein by reference) includes PDCP (Packet Data Convergence Protocol, see section 6.4 of TS38.300), RLC (Radio Link Control, see section 6.3 of TS38.300), and MAC (Medium Access Control, see section 6.2 of TS38.300) sublayers, which terminate at the gNB on the network side. Furthermore, a new Access Stratum (AS) sublayer (SDAP (Service Data Adaptation Protocol)) is introduced on top of PDCP (see, for example, 3GPP TS38.300 version 15.2.0, which is incorporated herein by reference). A control plane protocol stack is also defined for NR (see, for example, TS38.300, section 4.4.2). An overview of Layer 2 functionality is given in TS38.300, clause 6. The PDCP, RLC and MAC sublayer functionality is listed in TS38.300, clauses 6.4, 6.3 and 6.2, respectively. The RRC layer functionality is listed in TS38.300, clause 7. The above clauses of TS38.300 are incorporated herein by reference.

[0016] For example, the Medium Access Control (MAC) layer handles logical channel multiplexing, and scheduling and scheduling related functions, including handling various numerologies.

[0017] For the physical layer, the MAC layer uses services in the form of transport channels. A transport channel can be defined by how information is transmitted over the air interface and with what characteristics it is transmitted. A random access channel (RACH) is also defined as a transport channel that does not carry transport blocks but is processed by the MAC. One of the procedures supported by the MAC layer is the random access procedure.

[0018] The physical layer (PHY) is responsible for e.g. coding, PHY HARQ processing, modulation, multi-antenna processing, and mapping of signals to appropriate physical time-frequency resources. The physical layer also handles mapping of transport channels to physical channels. The physical layer provides services to the MAC layer in the form of transport channels. A physical channel corresponds to a set of time-frequency resources used for transmission of a particular transport channel, and each transport channel is mapped to a corresponding physical channel. One physical channel is the PRACH (Physical Random Access Channel) used for random access.

[0019] Use cases / deployment scenarios for NR can include enhanced Mobile Broadband (eMBB), ultra-reliable and low-latency communications (URLLC), and massive machine-type communications (mMTC), which have diverse requirements in terms of data rates, latency, and coverage. For example, eMBB is expected to support peak data rates (20 Gbps in downlink and 10 Gbps in uplink) and user-perceived data rates on the order of three times those offered by IMT-Advanced. On the other hand, URLLC is expected to support ultra-low latency (user plane latency of 0.5 ms for UL and DL, respectively) and high reliability (1-10 ms within 1 ms). -5 Finally, mMTC is preferably designed for high connection density (1 km 2 These applications may require large data rates (1 million devices per second), wide coverage in harsh environments, and extremely long battery life (15 years) for low-cost devices.

[0020] Therefore, OFDM numerology (e.g., subcarrier spacing, OFDM symbol duration, cyclic prefix (CP) duration, number of symbols per scheduling interval) suitable for one use case may not work well for another use case. For example, low latency services may preferably require a shorter symbol duration (hence a larger subcarrier spacing) and / or fewer symbols per scheduling interval (also known as TTI) than mMTC services. Furthermore, deployment scenarios with large channel delay spreads may preferably require a longer CP duration than scenarios with short delay spreads. To keep similar CP overhead, the subcarrier spacing should be optimized accordingly. NR can support multiple values ​​of subcarrier spacing. Correspondingly, subcarrier spacings of 15 kHz, 30 kHz, 60 kHz... are currently being considered. The symbol duration Tu and the subcarrier spacing Δf are directly related through the formula Δf=1 / Tu. Similar to LTE systems, the term "resource element" may be used to denote the smallest resource unit consisting of one subcarrier for the length of one OFDM / SC-FDMA symbol.

[0021] In the new radio system 5G-NR, for each numerology and carrier, a resource grid consisting of subcarriers and OFDM symbols is defined for the uplink and downlink, respectively. Each element in the resource grid is called a resource element and is identified based on a frequency index in the frequency domain and a symbol position in the time domain (see 3GPP TS38.211 v15.2.0, which is incorporated herein by reference).

[0022] (Control signaling / PDCCH / DCI / search space) The main purpose of DCI (Downlink Control Information) in 5G NR is the same as DCI in LTE, i.e. a set of special information for scheduling downlink data channels (e.g. PDSCH) or uplink data channels (e.g. PUSCH). In 5G NR, several different DCI formats are defined (see, e.g., TS38.212 v15.2.0 section 7.3.1, which is incorporated herein by reference). An overview is given by the following table: [Table 1]

[0023] The PDCCH search space is a region in the downlink resource grid (time-frequency resources) that can carry the PDCCH (DCI). In a broad sense, the radio resource region is used by the base station to transmit control information in the downlink to one or more UEs. The UE performs blind decoding through the search space in an attempt to find the PDCCH data (DCI). Conceptually, the search space concept in 5G NR is similar to the LTE search space, but there are many differences in terms of details.

[0024] (Synchronization signal block measurement timing setting (SMTC)-PSS / SSS,PBCH) NR introduces so-called synchronization signal blocks (SS blocks (SSBs)), which include a Primary Synchronization Signal (PSS), a Secondary Synchronization Signal (SSS), and a Physical Broadcast Channel (PBCH). The PSS and SSS can be used by UEs to discover, synchronize to, and identify a network. The PBCH carries minimal system information, including an indication on which the remaining broadcast system information is to be transmitted.

[0025] In LTE, these three signals PSS, SSS, and PBCH were also used, but not as part of one SSB. In NR, these three components of an SSB are always transmitted together, e.g., they have the same period. A given SSB may be repeated within an SS burst set, which may potentially be used for gNB beam sweeping transmissions. The SS burst set may be limited to a certain period (such as a 5 ms window). In initial cell selection, the UE may assume a default period of the SS burst set of 20 ms.

[0026] The 5G NR PSS is a physical layer specific signal for identifying radio frame boundaries and is a type of m-sequence. The 5G NR SSS is a physical layer specific signal for identifying subframe boundaries and is also an m-sequence (see, e.g., TS38.211 v15.2.0 Section 7.4.2, which is incorporated herein by reference).

[0027] (reference signal) Similar to LTE, several different types of reference signals (RS) are used in 5G NR (see 3GPP TS38.211 v15.3.0 Section 7.4.1, which is incorporated herein by reference). In 5G NR, at least the following reference signals are available: -CSI-RS (Channel State Information Reference Signal) that can be used to obtain channel state information and manage beams - PDSCH DMRS (Demodulation Reference Signal) that can be used for PDSCH demodulation PDCCH DMRS (Demodulation Reference Signal) that can be used for PDCCH demodulation PBCH DMRS (Demodulation Reference Signal) available for PBCH demodulation ·PTRS (Phase Tracking Reference Signal) that can be used for PDSCH phase tracking Tracking reference signal that can be used for time tracking

[0028] Furthermore, the PBCH DMRS may be exemplarily considered to be part of the SSB reference signal (see 3GPP TS38.215 v15.3.0 Section 5.1.1 "SS reference signal received power (SS-RSRP)").

[0029] The main differences between reference signals in a 5G NR communication system and those in LTE are that in 5G NR, there are no cell-specific reference signals, a new reference signal PTRS is introduced for time / phase tracking, DMRS is introduced for both downlink and uplink channels, and in NR, reference signals are transmitted only when necessary.

[0030] As a DL-only signal, the CSI-RS received by the UE is used to estimate the channel and report channel quality information to the gNB. During MIMO operation, NR can use different antenna approaches based on the carrier frequency. At low frequencies, the system uses a smaller number of active antennas for MU-MIMO and adds FDD operation. In this case, the UE can use the CSI-RS to calculate CSI and report CSI in the UL direction. The CSI-RS can be further characterized according to the following: This is used for DL ​​CSI acquisition. Used for RSRP measurements during mobility and beam management. Also used for frequency / time tracking, demodulation, and UL reciprocity-based precoding. · CSI-RS is configured specific to a UE, but multiple users may share the same resource. The 5G NR standard allows a high level of flexibility in CSI-RS configuration, with resources configurable for up to 32 ports. · The CSI-RS resource can start at any OFDM symbol of the slot and typically occupies 1 / 2 / 4 OFDM symbols depending on the number of ports configured. · CSI-RS may be periodic, semi-persistent or aperiodic (due to DCI trigger). For time / frequency tracking, the CSI-RS can be either periodic or aperiodic. It is transmitted in bursts of 2 or 4 symbols spread over 1 or 2 slots.

[0031] (Quasi-Collocation (QCL) Concept) The Quasi-Collocation (QCL) concept is utilized in LTE and NR and can be simplified and explained as follows: If two signals are QCL, this means that the UE can assume the same receive / transmit parameters in large-scale channel parameters (e.g., Doppler shift, Doppler spread, mean delay, delay spread, spatial receive parameters and beam direction), which helps to improve channel estimation and receive performance.

[0032] As mentioned above, conventionally, a UE performs PDCCH monitoring and blind decoding when it is not necessarily required, thereby consuming energy unnecessarily.

[0033] Therefore, the inventors have identified the possibility of reducing the cost for PDCCH monitoring and blind decoding by providing a power saving signal (PoSS) that allows to trigger the UE to monitor the PDCCH or to instruct the UE to skip PDCCH monitoring until a predefined time. When the UE skips PDCCH monitoring, the UE active time can be reduced, which saves power. As shown in FIG. 3, the base station transmits a PoSS to the UE, which can generally make the UE follow two different behaviors. In the first behavior, shown on the left side of FIG. 3, the PoSS instructs the UE that it should monitor the PDCCH. In this case, the UE receives the PDCCH and sends back a scheduled transmission according to the received PDCCH. On the other hand, if the PoSS instructs the UE to follow the second behavior, the UE skips monitoring the PDCCH, as shown diagrammatically on the right side of FIG. 3. Thus, the gNB does not transmit the PDCCH to the UE. Even if the PDCCH is transmitted, the UE cannot receive it.

[0034] In the following, UEs, base stations, and procedures that meet such needs are described for new radio access technologies envisaged for 5G mobile communication systems, but may also be used in LTE mobile communication systems. Various implementations and variants are also described. The following disclosure is facilitated by, and may be based, for example, at least in part on, the above discussion and findings.

[0035] In general, it should be noted that many assumptions have been made herein so as to be able to clearly and understandably describe the principles underlying the present disclosure. However, these assumptions should be understood as merely examples made herein for illustrative purposes that should not limit the scope of the present disclosure. Those skilled in the art will recognize that the principles of the following disclosure as described in the claims may be applied to different scenarios and in ways not explicitly described herein.

[0036] Furthermore, even if the specific terminology used in the context of new radio access technologies for the upcoming 3GPP 5G communication system has not yet been fully determined, some of the terms such as procedures, entities, layers, etc. used below are closely related to the terms used in the current standardization of LTE / LTE-A systems or 3GPP 5G. Thus, the terms may be changed in the future without affecting the functionality of the embodiments. As a result, those skilled in the art will recognize that the embodiments and their scope of protection should not be limited to the specific terms used illustratively in this specification due to the lack of newer terms or terms that will eventually be agreed upon, but should be more broadly understood with respect to the functions and ideas underlying the functions and principles of the present disclosure.

[0037] For example, a mobile station or mobile node or user terminal or user equipment (UE) is a physical entity (physical node) in a communication network. A node may have multiple functional entities. A functional entity refers to a software or hardware module that performs a predefined set of functions and / or provides a predefined set of functions to other functional entities of the same node or another node or network. A node may have one or more interfaces that connect the node to a communication facility or medium over which the node can communicate. Similarly, a network entity may have logical interfaces that connect a functional entity to a communication facility or medium over which the node can communicate with other functional entities or corresponding nodes.

[0038] Here, the term "base station" or "radio base station" refers to a physical entity in a communication network. Similar to a mobile station, a base station may have multiple functional entities. A functional entity refers to a software or hardware module that performs a predefined set of functions and / or provides a predefined set of functions to other functional entities of the same node or another node or network. A physical entity performs some control tasks for communication devices, including one or more of scheduling and configuration. It should be noted that the functions of a base station and the functions of a communication device may be integrated in a single device. For example, a mobile terminal may also implement the functions of a base station for other terminals. The term used in LTE is eNB (or eNodeB), whereas the term currently used in 5G NR is gNB.

[0039] 4 shows a generalized simplified exemplary block diagram of a user equipment (also referred to as a communication device) and a scheduling device (here exemplarily assumed to be located in a base station (e.g., an eLTE eNB (alternatively referred to as ng-eNB) or a gNB in ​​5G NR). The UE and the eNB / gNB communicate with each other via (radio) physical channels using their respective transceivers.

[0040] A communication device may include a transceiver and a processing circuit. And the transceiver may include a receiver and / or a transmitter and / or may function as a receiver and / or a transmitter. The processing circuit may be one or more hardware such as one or more processors or any LSI. Between the transceiver and the processing circuit, there are input / output points (or input / output nodes), and the processing circuit may control the transceiver during operation, i.e., control the receiver and / or the transmitter and exchange receive / transmit data, via the input / output points (or input / output nodes). The transceiver may include an RF (radio frequency) front end, including one or more antennas, amplifiers, RF modulators / demodulators, etc., as a transmitter and a receiver. The processing circuit may perform control tasks such as controlling the transceiver to transmit user data and control data provided by the processing circuit and / or to receive user data and control data that are further processed by the processing circuit. The processing circuit may also be responsible for performing other processes such as judging, discriminating, deciding, calculating, measuring, etc. The transmitter may be responsible for performing a transmitting process and other processes related to the transmitting process. The receiver may be responsible for performing the receiving process and other processes related to the receiving process, such as monitoring the channel.

[0041] The solutions provided below are described primarily in relation to 5G NR standardization for unlicensed operation (e.g., standalone or dual connectivity). Nevertheless, as already alluded to above, the present ideas, ideas, and improvements are not limited to 5G NR unlicensed standardization, but are equally applicable to 5G NR licensed operation, and to unlicensed and / or licensed operation in LTE(-A) communication systems. Future communication systems could also benefit from the ideas disclosed in this application.

[0042] A first embodiment is described below with reference to FIGS.

[0043] Figure 5 shows a simplified exemplary UE configuration according to the present solution, which may be implemented based on the general UE configuration described in relation to Figure 4 above. The various components of the UE shown in this figure may be interconnected between each other, e.g., by means of corresponding input / output nodes (not shown), for example, to exchange control and user data and other signals. Although not shown for illustrative purposes, the UE may include further components.

[0044] As can be seen from this figure, the UE may include a power save signal receiver, a power save signal monitor circuit, a behavior determination circuit, and a setting selection circuit to participate in improved procedures for reducing UE power consumption described below.

[0045] In this case, as will become clear from the following disclosure, a processor (processing circuit) may be exemplarily configured to at least partially execute one or more of the steps of monitoring reception of a power saving signal (PoSS) from a serving base station on which the UE is camped to determine a UE behavior with respect to processing a physical downlink control channel (PDCCH), the PoSS including a behavior indication instructing the UE to follow a first behavior or a second behavior, and the PoSS further including a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior. The processor determines to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated, and applies the at least one configuration parameter accordingly.

[0046] The receiver may be configured to at least partially perform one or more of the steps of receiving a power saving signal and receiving information regarding the threshold via system information or a configuration message (such as a configuration message of the RRC protocol).

[0047] FIG. 6 is a sequence diagram of the UE behavior according to this improved power saving procedure.

[0048] It is exemplarily assumed that the UE is in an idle mode, but it is also possible that the UE is in a connected mode. The radio cell on which the UE is currently camped is exemplarily referred to as a serving radio cell controlled by the serving base station in the following.

[0049] As shown in FIG. 6, the UE first receives the PoSS and confirms that the PoSS is correctly received. Then, the UE determines the behavior instruction of the PoSS. Two possible behaviors can be indicated: the first behavior can include performing PDCCH monitoring, whereas the second behavior can include skipping PDCCH monitoring, thus saving energy. Depending on which behavior is indicated, the UE then evaluates the configuration instruction of the PoSS and accordingly performs PDCCH monitoring and applies one or more configuration parameters associated with the first behavior. If not, the UE evaluates the configuration instruction of the DCI and skips PDCCH monitoring. In this case, the UE applies one or more configuration parameters associated with the second behavior.

[0050] The process may return to the step of checking whether a PoSS is detected.

[0051] FIG. 7 shows a sequence diagram of UE behavior according to another exemplary improved power saving procedure. In the first step, it must be confirmed that the UE is configured by the base station to monitor the power saving signal (PoSS). If not, the process returns to the startup procedure. On the other hand, if the UE is configured to monitor the PoSS, in the next step, the UE receives the PoSS and monitors the reception of the PoSS, which may be in the form of a DCI according to an exemplary embodiment. If the PoSS is not detected, the UE performs a default behavior. In the exemplary embodiment, the default behavior is defined as the behavior when the PoSS is erroneously indicated by the UE. As such, the UE has no behavior indication from the PoSS DCI. Specifically, it is shown in the flow diagram that the UE may have two different possibilities for default behavior when the PoSS is not detected. If the UE is in a state of discontinuous reception (DRX) that is on ("DRX_ON"), the UE only needs to perform normal PDCCH monitoring. Alternatively, the default behavior when the PoSS is not detected may be to not monitor the PDCCH during DRX_OFF.

[0052] When a PoSS is detected, the UE evaluates the behavior instruction included in the DCI of the PoSS. From the behavior instruction, the UE determines whether the indicated UE behavior is to skip PDCCH monitoring or to perform PDCCH monitoring. If the behavior instruction indicates that PDCCH monitoring should be performed, the configuration instruction of the DCI is evaluated and the configuration parameters associated with the first behavior are applied. According to this embodiment, the first behavior includes monitoring the PDCCH and therefore does not provide an energy saving function.

[0053] On the other hand, if the behavior indication indicates that PDCCH monitoring should be skipped, evaluation of the configuration indication induces the UE to apply at least one configuration parameter associated with a second behavior, the second behavior being related to energy saving and specifically including skipping PDCCH monitoring.

[0054] The process may return to the step of checking whether a PoSS is detected.

[0055] 8 illustrates, in a timing diagram, a first behavior of the UE according to an exemplary embodiment. According to this embodiment, the UE monitors a power saving signal (PoSS), which may also be referred to as a power saving channel, in the configured resources.

[0056] As will be described in more detail later, the first behavior generally includes triggering the UE to start monitoring the PDCCH. If no trigger is detected, for example, the default behavior of the UE may be to not receive and decode the PDCCH. This means that the base station may need to schedule the UE in a short time. To facilitate power saving, the interval between this indication and the actual scheduling may be as short as possible. For this, the UE needs to start performing time / frequency tracking, automatic gain control (AGC) training, channel state information (CSI) / radio resource management (RRM) measurement and reporting, and sounding reference signal (SRS) transmission. In this way, the base station can obtain downlink / uplink (DL / UL) channel conditions in time and start scheduling in a short time. This can reduce the total UE active time, which can save power. To further save power, the PDCCH monitoring can be reduced by further indication of a control resource set (CORESET), search space information, and / or a set of slots.

[0057] As shown in Fig. 8, after ramping up, the UE receives a Synchronization Signal Block (SSB) burst and immediately thereafter a PoSS, which indicates to start PDCCH monitoring. In the warm-up block, the UE receives Reference Signals (RS) for time and / or frequency tracking, Automatic Gain Control (AGC), Channel State Information (CSI) reference resources, and Radio Resource Management (RRM) reference resources. Furthermore, CSI reporting resources and finally Sounding Reference Signal (SRS) transmission resources are available to the UE.

[0058] As shown in FIG. 8, the UE remains active for the next two SSB bursts and then returns to the inactive state.

[0059] Unlike FIG. 8, FIG. 9 illustrates a timing diagram when the UE receives a PoSS indicating that the UE should skip PDCCH monitoring. This may be referred to as the second behavior of the UE in this disclosure. In this situation, the UE ramps down after receiving the PoSS and remains inactive during the off period. Illustratively, the off period lasts for three or more SSB bursts.

[0060] Specifically, the PoSS may instruct the UE to skip PDCCH monitoring until a specified time point. If the PoSS is not detected, the default behavior of the UE may be to receive the PDCCH.

[0061] For the second behavior, no further time / frequency tracking, AGC training, CSI / RRM measurement / reporting, or SRS transmission is required. The UE may be instructed that it does not need to receive the PDCCH until the next semi-static DRX cycle or the next opportunity to receive the configured PoSS. Alternatively, the UE may be instructed that it does not need to receive the PDCCH in the next X slots (X may be dynamically instructed or semi-statically configured).

[0062] Furthermore, in addition to being instructed that the UE does not need to receive the PDCCH, the UE may also be instructed that it does not need to receive the PoSS until the next semi-static DRX cycle or the next opportunity to receive the configured PoSS, or the UE may be instructed that it does not need to receive the PoSS in the next X slots (X may be dynamically instructed or semi-statically configured).

[0063] In order to provide a PoSS that can indicate the first and second behaviors to the UE as required, it is proposed to transmit a PoSS DCI to the UE that allows integrating the different functions of PDCCH monitor trigger and skip into one DCI design.

[0064] Generally, one DCI is shared by the UE behavior indication for both PDCCH monitoring and triggering. As a result, the UE only needs to decode one unified PoSS DCI to access further behavior indications. Exemplarily, three concepts, which are described in more detail below, can be used for this purpose. First, detailed UE behavior indications (i.e., configurations) are coded in a second field that may be based on the interpretation of the first field. Second, the indications to skip and trigger PDCCH monitoring and the configuration indications may be jointly coded in only one common field. Third, the interpretation of the indication to skip or trigger PDCCH monitoring is based on the detected Radio Network Temporary Identifier (RNTI), while the configuration for the indicated behavior is coded in another field of the PoSS.

[0065] Furthermore, the PoSS DCI may be UE group specific or UE specific. In the UE group specific case, the way in which the bitmap is constructed may be similar to the existing NR DCI format_*. Each UE may illustratively be configured with an index to address its own indication in the DCI, so that the UE can determine which indication in the UE group specific PoSS is for itself.

[0066] (Solution 1 - First and second fields) Next, a first exemplary solution of the PoSS DCI will be described with reference to Fig. 10. According to this solution, the DCI includes a first field and a second field.

[0067] The first field contains, for example, one bit indicating to the UE that either a behavior of performing PDCCH monitoring (first behavior) or a behavior of skipping PDCCH monitoring (second behavior) is required. According to the indicated behavior, the UE processes the second field indicating a configuration associated with the first behavior or the second behavior. The second field may be placed directly following the respective first field and contains an identifier linked to a previously configured table.

[0068] According to one exemplary embodiment, the first field indicates, with respect to PDCCH monitoring, whether to perform PDCCH monitoring or not to perform PDCCH monitoring, where the default behavior of the UE is to not monitor the PDCCH. Alternatively, the first field indicates whether to skip monitoring the PDCCH, where the default behavior is to not skip monitoring the PDCCH.

[0069] According to the embodiment shown in Fig. 10, a second field is provided in the DCI, which is interpreted depending on the indication of the first field. The second field contains a configuration instruction depending on the content of the first field. For example, if the first field indicates to perform PDCCH monitoring, the UE interprets the second field to indicate at least one configuration related to how to monitor the PDCCH, such as one or a combination of the following: Channel State Information (CSI) Reference Resources Radio Resource Management (RRM) reference resources · CSI Reporting Resources RRM Reporting Resources Sounding Reference Signal (SRS) transmission resources · Quasi-colocation of CSI / RRM reference resources Quasi-colocation of CSI reporting resources, RRM reporting resources, and / or SRS transmission resources Control resource set (CORESET) information Search Space Information Set of slots for PDCCH monitoring Skipping PoSS monitoring within certain time or frequency resources, i.e., for example, once the UE is instructed by the PoSS to start monitoring the PDCCH, subsequent PoSS monitoring may be skipped or partially skipped. Hybrid Automatic Repeat Request-Acknowledgement (HARQ-ACK) resource parameter indication

[0070] For example, these configuration parameters may be included in a first table that is associated with a first behavior.

[0071] On the other hand, if the first field indicates not to monitor the PDCCH, the UE interprets the second field to configure how to skip monitoring of the PDCCH, e.g., if the first field indicates to skip PDCCH monitoring, then to indicate the next configuration, i.e., at least one or a combination of skipping PDCCH monitoring and / or skipping PoSS monitoring, until the next semi-static DRX cycle, or until the next opportunity of the configured power saving signal / channel, or in the next X slots (X is dynamically indicated or semi-statically configured).

[0072] These configuration parameters may be included in a second table that is associated with a second behavior.

[0073] For both types of indications, the combination of behavior and / or configuration parameters may be configured by Radio Resource Control (RRC).

[0074] Further, as shown in FIG. 11, the improvement may be implemented using a UE group-specific PoSS DCI, where the DCI includes a bitmap pattern with a first field and a second field in each bitmap for each UE of one group of UEs (e.g., UE#1, UE#2, and UE#3). Three UEs are exemplarily shown in FIG. 11. However, as will be appreciated by those skilled in the art, four or more UEs may of course be addressed by this PoSS DCI. As mentioned above, the gNB and the UE may exchange index values ​​for this group-specific PoSS DCI to enable the UE to determine which one of the various sets of first and second fields is intended for the UE.

[0075] (Solution 2 - Join field) Next, a second exemplary solution for PoSS DCI will be described with reference to FIG.

[0076] According to this solution, the PoSS DCI includes a combined field for behavior indication and setting indication, either for the first behavior or for the second behavior.

[0077] As shown in Figure 12, the PoSS DCI includes a common field that jointly encodes skip, trigger, and related configuration parameter information according to the required UE behavior. For example, a bitmap for a UE may include a 3-bit word that represents an indication index into a configuration table. Table 1 below shows an example of such a joint configuration table. [Table 2]

[0078] The entries in Table 1 may be configured, for example, by the RRC: as mentioned above, each bitmap in the common field selects one row and therefore one set of configuration parameters and behavior (column "PDCCH Monitor" is TRUE or FALSE).

[0079] There may be an imbalance in number between configuration parameters applicable to performing PDCCH monitoring and configuration parameters related to skipping PDCCH monitoring, as shown in Table 1. Overall, the joint coding in the common field shown in Figure 12 allows a reduction in overhead, e.g. compared to solution 1 described above.

[0080] This improvement may be implemented using a UE group specific PoSS DCI. According to Fig. 13, the PoSS DCI includes a bitmap pattern with a combined field for each UE of one group of UEs (e.g. UE#1, UE#2, and UE#3). Three UEs are exemplarily shown in Fig. 13. However, as will be clear to those skilled in the art, only one UE or more than three UEs may of course be addressed by this PoSS DCI.

[0081] As shown in Figure 13, the PoSS DCI includes a bitmap for each UE of a group that jointly encodes skip, trigger, and related configuration parameter information according to the required UE behavior. For example, the bitmap for each UE may include a 3-bit word representing an indication index into a configuration table. Table 1 shows an example of such a joint configuration table.

[0082] (Solution 3 - Using RNTI and PoSS DCI fields) A third exemplary solution for the PoSS DCI is now described with reference to Fig. 14. According to this solution, the DCI includes a field containing an indication indicating the configuration in case of a first behavior or a field containing an indication indicating the configuration in case of a second behavior. Furthermore, according to the third embodiment, different RNTIs are used to address a particular UE and to indicate the intended behavior.

[0083] For example, depending on whether PDCCH monitoring is performed or skipped, a different RNTI is used to mask the cyclic redundancy check (CRC) value of the PoSS DCI.

[0084] As shown in Figure 14, within the DCI of the detected PoSS, the CRC is transmitted together with a field that includes an indication of at least one particular configuration parameter associated with either the first behavior or the second behavior. The field may include, for example, 3 bits.

[0085] For example, if the CRC descrambling check indicates an RNTI associated with skipping PDCCH monitoring, the UE interprets the indication field in the PoSS DCI as an indication of configuration parameters related to skipping PDCCH monitoring, e.g., the UE knows how long it can remain in sleep mode.

[0086] On the other hand, if the CRC descrambling check indicates an RNTI associated with performing PDCCH monitoring, the UE interprets the indication in the PoSS DCI as indicating a configuration associated with the first behavior. For example, the UE accesses a table as shown below, such as Table 2, to obtain a set of configuration parameters and know the destination of the CSI report and SRS transmission before starting PDCCH monitoring. It is also possible to perform an update. [Table 3]

[0087] The configuration entries for the trigger or skip indication may be configured, for example, by the RRC, together with specific first and second RNTIs associated with the first and second behaviors, respectively.

[0088] As shown in Fig. 15, this improvement may be implemented using a UE group specific PoSS DCI. According to this embodiment, the DCI includes a bitmap pattern with a field in each bitmap for each UE of one group of UEs (e.g. UE#1, UE#2, and UE#3). Three UEs are exemplarily shown in Fig. 15. However, as will be clear to those skilled in the art, only one UE or more than three UEs may of course be addressed by this PoSS DCI. Furthermore, according to the third embodiment, different RNTIs are used to address specific UEs and indicate the intended behavior.

[0089] Each UE in each group accesses the appropriate field according to the sequence position of this field in the complete bitmap pattern based on the previously defined index.

[0090] Further Aspects According to a first aspect, there is provided a user equipment (UE), comprising: a receiver configured to receive, during operation, a power saving signal (PoSS) from a serving base station to which the UE is camped; and a UE side processing circuit configured to monitor, during operation, reception of the PoSS to determine a UE behavior with respect to processing of a physical downlink control channel (PDCCH), the PoSS including a behavior indication instructing the UE to follow a first behavior or a second behavior, the PoSS further including a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior, the processing circuit configured to determine, during operation, to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated, and to apply the at least one configuration parameter accordingly.

[0091] According to a second aspect provided in addition to the first aspect, if the first field indicates to perform PDCCH monitoring, the at least one configuration parameter is: A channel state information (CSI) reference resource; A radio resource management (RRM) reference resource; CSI reporting resources and RRM reporting resources; A sounding reference signal (SRS) transmission resource; Quasi-colocation of CSI / RRM reference resources; Quasi-colocation of CSI reporting resources, RRM reporting resources, and / or SRS transmission resources; Control resource set (CORESET) information; Search space information; a set of slots for PDCCH monitoring; PoSS monitor skip, Hybrid Automatic Repeat Request-Acknowledgement (HARQ-ACK) resource parameter indication; and The present invention includes at least one or a combination of the above.

[0092] According to a third aspect provided in addition to the first or second aspect, if the first field indicates to skip PDCCH monitoring, the at least one configuration parameter includes one of skipping PDCCH monitoring and / or skipping PoSS monitoring until the next semi-static DRX cycle, or until the next opportunity for the configured power saving signal / channel, or in the next X slots (X is dynamically indicated or semi-statically set).

[0093] According to a fourth aspect provided in addition to any of the first to third aspects, the UE, during operation, selects at least one configuration parameter from a configuration table, optionally configured by a radio resource control (RRC).

[0094] According to a fifth aspect provided in addition to any of the first to fourth aspects, the PoSS received by the UE includes behavior instructions and / or configuration instructions for a group of UEs.

[0095] According to a sixth aspect provided in addition to any of the first to fifth aspects, the PoSS is received as Downlink Control Information (DCI), the DCI including at least one first field for behavior instruction, the first field including a value indicating a first behavior or a second behavior, and the DCI including at least one second field for configuration instruction, the second field including a value that is interpreted as indicating at least one configuration parameter associated with the first behavior or the second behavior depending on the value of the first field.

[0096] According to a seventh aspect provided in addition to the sixth aspect, the first field instructs the UE to start PDCCH monitoring or not to start PDCCH monitoring, and the default behavior is to not start PDCCH monitoring, or the first field instructs the UE to skip PDCCH monitoring or not to skip PDCCH monitoring, and the default behavior is to not skip PDCCH monitoring.

[0097] According to an eighth aspect provided in addition to the first to fifth aspects, the PoSS is received as downlink control information (DCI), and the behavior instruction and the configuration instruction are jointly encoded in a common field of the DCI.

[0098] According to a ninth aspect provided in addition to the eighth and fourth aspects, the contents of the common field include a bitmap used by the UE to select at least one configuration parameter, and the configuration table includes a behavior instruction and a configuration instruction.

[0099] According to a tenth aspect provided in addition to the first to fifth aspects, the PoSS is received as downlink control information (DCI) and the behavior instruction is encoded as a first or second Radio Network Temporary Identifier (RNTI) that masks a cyclic redundancy check (CRC) value of the DCI, the RNTI identifying the UE and instructing the first or second behavior.

[0100] According to an eleventh aspect provided in addition to the tenth and fourth aspects, the DCI includes at least one bitmap used by the UE to select at least one configuration parameter from a configuration table.

[0101] According to a twelfth aspect, there is provided a method comprising the following steps performed by a user equipment (UE), namely receiving a power saving signal (PoSS) from a serving base station on which the UE is camped, and monitoring reception of the PoSS to determine a UE behavior with respect to processing of a physical downlink control channel (PDCCH), wherein the PoSS includes a behavior indication instructing the UE to follow a first behavior or a second behavior, and the PoSS further includes a configuration indication instructing at least one configuration parameter associated with the first behavior or the second behavior, and wherein a processing circuitry decides to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated and applies the at least one configuration parameter accordingly.

[0102] According to a thirteenth aspect, there is provided a base station (BS), comprising: a transmitter unit configured, during operation, to transmit a power saving signal (PoSS) to at least one user equipment (UE) camped on the BS; and a BS side processing circuit configured, during operation, to generate a PoSS, wherein the PoSS includes a behavior instruction instructing the UE to follow a first behavior or a second behavior, the PoSS further includes a configuration instruction instructing at least one configuration parameter associated with the first behavior or the second behavior, and the PoSS is generated to cause the UE to perform PDCCH monitoring if the first behavior is indicated and to skip PDCCH monitoring if the second behavior is indicated and to apply the at least one configuration parameter accordingly.

[0103] According to a fourteenth aspect provided in addition to the thirteenth aspect, during operation the processing circuit combines PoSS for a group of UEs into a combined bitmap pattern.

[0104] According to a fifteenth aspect provided in addition to the thirteenth or fourteenth aspect, the PoSS is transmitted as downlink control information (DCI), the DCI comprises at least one first field for a behavior indication, the first field comprising a value indicating a first behavior or a second behavior, the DCI comprises at least one second field for a configuration indication, the second field comprising a value that is interpreted as indicating at least one configuration parameter associated with the first behavior or the second behavior depending on the value of the first field, or The behavior indication and the configuration indication are jointly coded in a common field of the DCI, or The behavior indication is encoded as a first or second Radio Network Temporary Identifier (RNTI) that masks a Cyclic Redundancy Check (CRC) value of the DCI, where the RNTI identifies the UE and indicates the first or second behavior.

[0105] (Hardware and software implementation of the present disclosure) The present disclosure can be realized by software, by hardware, or by software cooperating with hardware. Each functional block used in the description of each embodiment above can be realized in part or in whole by an LSI such as an integrated circuit, and each process described in each embodiment can be controlled in part or in whole by the same LSI or a combination of LSIs. The LSI can be formed individually as a chip, or one chip can be formed to include some or all of the functional blocks. The LSI can include a data input / output unit coupled to it. The LSI may be referred to herein as an IC (integrated circuit), a system LSI, a super LSI, or an ultra LSI depending on the degree of integration. However, the technology for realizing the integrated circuit is not limited to the LSI, and can be realized by using a dedicated circuit, a general-purpose processor, or a dedicated processor. In addition, an FPGA (field programmable gate array) that can be programmed after the LSI is manufactured, or a reconfigurable processor that can reconfigure the connection and settings of the circuit cells arranged inside the LSI, can also be used. The present disclosure can be realized as digital processing or analog processing. When LSI is replaced by a future integrated circuit technology as a result of advances in semiconductor technology or other derivative technologies, the future integrated circuit technology can be used to integrate the functional blocks. Biotechnology can also be applied.

[0106] The present disclosure may be implemented by any type of apparatus, device, or system having communication capabilities (collectively referred to as communications apparatus).

[0107] Non-limiting examples of communications devices include telephones (e.g., cell phones, smartphones, etc.), tablets, personal computers (PCs) (e.g., laptops, desktops, netbooks, etc.), cameras (e.g., digital still / video cameras), digital players (e.g., digital audio / video players), wearable devices (e.g., wearable cameras, smart watches, tracking devices, etc.), game consoles, digital book readers, telehealth and telemedicine devices, communications-enabled vehicles (e.g., cars, airplanes, boats, etc.), and combinations of the above devices.

[0108] Communications equipment includes, but is not limited to portable or mobile equipment, non-portable or fixed equipment, devices, or systems of any kind, such as smart home devices (appliances, lighting, smart meters, control panels, etc.), vending machines, and any other "things" that may be on an Internet of Things (IoT) network.

[0109] Communications include data communications via cellular systems, wireless LAN systems, communications satellite systems, etc., as well as data communications via combinations of these.

[0110] A communications apparatus also includes devices, such as controllers and sensors, connected or coupled to a communications device that performs the communications functions described in this disclosure. For example, a communications apparatus may include a controller or sensor that generates control or data signals used by the communications device to perform the communications functions of the communications apparatus.

[0111] The communications equipment also includes infrastructure facilities, such as base stations, access points, and any other equipment, device, or system that communicates with or controls the various equipment listed above, but which are not limited thereto.

[0112] Furthermore, the various embodiments may be realized by means of software modules which are executed by a processor or directly in hardware. It is also possible to combine software modules with a hardware implementation. The software modules may be stored on any kind of computer-readable storage medium, such as RAM, EPROM, EEPROM, flash memory, registers, hard disks, CD-ROM, DVD, etc. It is to be noted further that individual features of the different embodiments may also be the subject of another embodiment, either individually or in any combination.

[0113] Those skilled in the art will appreciate that numerous variations and / or modifications can be made to the present disclosure as illustrated in the specific embodiments, and the present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive.

Claims

1. A user equipment (UE), a receiver for receiving a power saving signal (PoSS) from a serving base station on which the UE is camped; a UE side processing circuit for monitoring reception of the PoSS and determining UE behavior with respect to processing of a Physical Downlink Control Channel (PDCCH); Equipped with The PoSS includes a behavior instruction instructing the UE to follow a first behavior or a second behavior, and the PoSS further includes a configuration instruction associated with the first behavior or the second behavior; The UE side processing circuit determines to perform PDCCH monitoring when the first behavior is indicated and to skip PDCCH monitoring when the second behavior is indicated, and applies the configuration instruction; The PoSS is received as Downlink Control Information (DCI); The behavior instruction and the configuration instruction are notified in one common field of the DCI, the notified behavior instruction is to skip monitoring a PDCCH, and the configuration instruction is an instruction regarding a channel state information (CSI) reference resource. User equipment.

2. If the first field indicates to perform PDCCH monitoring, the configuration indication may include: the channel state information (CSI) reference resource; A radio resource management (RRM) reference resource; CSI reporting resources; RRM reporting resources; Sounding reference signal (SRS) transmission resources; Quasi-colocation of CSI / RRM reference resources; Quasi-colocation of CSI reporting resources, RRM reporting resources, or SRS transmission resources; and Control resource set (CORESET) information; Search space information; a set of slots for PDCCH monitoring; PoSS monitor skip; Hybrid Automatic Repeat Request-Acknowledgement (HARQ-ACK) resource parameter indication; and at least one or a combination of The user equipment of claim 1 .

3. If the first field indicates to skip PDCCH monitoring, the configuration instruction includes one of skipping PDCCH monitoring or skipping PoSS monitoring until the next semi-static DRX cycle, or until the next opportunity for a configured power saving signal or channel, or in the next X slots (X is dynamically indicated or semi-statically configured). A user equipment according to claim 1 or 2.

4. the UE selects the configuration indication from a configuration table, optionally the configuration table being configured by a Radio Resource Control (RRC); A user equipment according to any one of claims 1 to 3.

5. The PoSS received by the UE includes behavior or configuration instructions for a group of UEs. A user equipment according to any one of claims 1 to 4.

6. the DCI includes at least one first field for the behavior indication, the first field including a value indicating the first behavior or the second behavior, and the DCI includes at least one second field for the configuration indication, the second field including a value that is interpreted as indicating the configuration indication associated with the first behavior or the second behavior depending on the value of the first field. A user equipment according to any one of claims 1 to 5.

7. The first field instructs the UE to start PDCCH monitoring or not to start PDCCH monitoring, and a default behavior is to not start PDCCH monitoring; or the first field instructs the UE to skip PDCCH monitoring or not to skip PDCCH monitoring, and a default behavior is to not skip PDCCH monitoring.

7. A user equipment as claimed in claim 6.

8. The content of the common field includes a bitmap used by the UE to select the configuration instruction, and the configuration table includes the behavior instruction and the configuration instruction. The user equipment of claim 4.

9. the behavior indication is encoded as a first or second Radio Network Temporary Identifier (RNTI) that masks a Cyclic Redundancy Check (CRC) value of the DCI, the RNTI identifying the UE and indicating the first behavior or the second behavior; A user equipment according to any one of claims 1 to 5.

10. the DCI includes at least one bitmap used by the UE to select the configuration indication from the configuration table; User equipment according to claim 9 when dependent on claim 4.

11. receiving a power saving signal (PoSS) from a serving base station on which the UE is camped; the UE monitoring reception of the PoSS to determine UE behavior with respect to processing of a Physical Downlink Control Channel (PDCCH); Including, The PoSS includes a behavior instruction instructing the UE to follow a first behavior or a second behavior; The PoSS further includes a setting instruction associated with the first behavior or the second behavior; The UE determines to perform PDCCH monitoring when the first behavior is indicated and to skip PDCCH monitoring when the second behavior is indicated, and applies the configuration instruction; The PoSS is received as Downlink Control Information (DCI); The behavior instruction and the configuration instruction are notified in one common field of the DCI, the notified behavior instruction is to skip monitoring a PDCCH, and the configuration instruction is an instruction regarding a channel state information (CSI) reference resource. method.

Citation Information

Patent Citations

  • Method and apparatus for saving power of user equipment in wireless communication system

    US20120213137A1

  • Control Indicator for Power Saving in a Mobile Wireless Communication Device

    US20180279223A1