Catch clamp

The new clamp design for construction scaffolding addresses the limitations of conventional clamps by allowing direct installation and removal, eliminating the need to go around round pipes and reducing work outside the scaffolding, thereby cutting descent time in half.

JP2025078556APending Publication Date: 2025-05-20佐藤 英雄
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2023201128
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-11-08
Publication Date
2025-05-20

AI Technical Summary

Technical Problem

Conventional clamps for construction scaffolding are limited by their installation and removal process, requiring them to go around round pipes and necessitating work outside the scaffolding, which is time-consuming.

Method used

A clamp design that allows installation and removal without going around round pipes, reducing the need to work outside the scaffolding and cutting the descent work in half.

Benefits of technology

Enables installation and removal of the clamp directly on scaffolding without the need to go around round pipes, significantly reducing installation and removal time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025078556000001_ABST
    Figure 2025078556000001_ABST
Patent Text Reader

Abstract

To provide a catch clamp for a construction scaffolding that can be used without time and labor and without restrictions on an installation location.SOLUTION: The catch clamp can be used in a round shape without going around the round pipe of the scaffolding, in such a form that the round pipe is clamped using a tightening bolt.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This invention relates to a catch clamp for use on construction scaffolding. [Background technology]

[0002] Conventional clamps have limitations on where they can be removed and are too time-consuming. Summary of the Invention [Problem to be solved by the invention]

[0003] This had the following drawbacks: (a) Conventional clamps were installed by going around a round pipe, so the space available was limited. (b) It took time to go to the top and bottom of the scaffolding to install it, and it also took time to remove it. Work was also done from outside the scaffolding. The present invention has been made in order to eliminate the above-mentioned drawbacks.

[0004] The present invention is a clamp that can be used without going around the round pipes of scaffolding. The clamp is constructed as described above.

[0005] (i) It can now be used in places where clamps cannot be used. (b) It is no longer necessary to reach outside the scaffolding. (C) The amount of work required to descend to the scaffolding was reduced by half. [Brief description of the drawings]

[0006] [Figure 1] Explanation of the side view 1. The nut for attaching the equipment to the movable part 2. The bolt for attaching the scaffold pipe and tightening the movable part at the same time 3. The curved part that allows the scaffold pipe to be easily tightened [Diagram 2] Explanation of the floor plan 1 The arched part is divided into two parts, which together exceed the shape of a semicircle.

Claims

[Claim 1] The catch clamp, which can be attached directly to the scaffolding pipe, can be easily attached and detached because the clamp is split in half.