Construction tool

A construction jig with guides for cutting and drilling assists in processing piping covers, enhancing installation precision and ease by stabilizing the processing tools relative to the cover.

JP2025182658APending Publication Date: 2025-12-15ONDA MFG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2024185807
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2024-06-03
Filing Date
2024-10-22
Publication Date
2025-12-15

AI Technical Summary

Technical Problem

Existing covers for piping components require on-site processing such as cutting and drilling, which can be difficult for inexperienced installers to perform accurately.

Method used

A construction jig with a half-cylindrical jig body and flanges that includes cutting and drilling position guides to assist in processing covers for piping components, ensuring stable placement and accurate cutting and drilling.

Benefits of technology

The jig stabilizes the processing guides, making it easier for installers to perform precise cuts and drills on piping covers, improving installation accuracy and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025182658000001_ABST
    Figure 2025182658000001_ABST
Patent Text Reader

Abstract

To provide a construction tool for assisting processing of a cover for piping member.SOLUTION: A cover 90 includes a half-split cylindrical cover body 91 covering a pipe and the like, and a cover flange 92 extended from both edge parts of the cover body 91. The construction tool 1 is used with the cover 90 to process the cover 90 on. A tool body 10 forms a half-split cylinder and is covered on the cover body 91. A tool flange 20 is formed on both edge parts of the tool body 10 and can contact the surface of the cover flange 92. A cut position guide 30 assists processing of the cover 90. The cut position guide 30 extends from one tool flange 20 to the other tool flange 20 via the tool body 10 at an end of the construction tool 1, guides a cut tool when cutting the cover 90, and performs guidance when marking the cut position on the cover 90.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to an installation jig used when installing a cover that covers a piping member such as a pipe. [Background technology]

[0002] A cover for covering a water supply pipe in a piping system is disclosed, for example, in Patent Document 1. As shown in Patent Document 1, particularly in Figure 1, the cover has a half-cylindrical main body and flanges extending from both edges of the main body. When installing the cover, the flanges are fixed to the wall surface (installation surface) with screws or the like. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 2020-056494 Summary of the Invention [Problem to be solved by the invention]

[0004] To fit this cover over the pipe and secure it to the wall, it was necessary to perform processing work at the construction site, such as cutting the cover to the length of the pipe with a saw or drilling pilot holes for screws into the flange.If the installer was inexperienced, it could be difficult to perform the processing properly, such as cutting the cover straight or drilling pilot holes in the appropriate positions.

[0005] An object of the present invention is to provide a construction jig that assists in the processing of a cover for a piping component. [Means for solving the problem]

[0006] The construction jig that solves the above problem is a construction jig that is used by placing it over a cover to process a cover that has a half-cylindrical cover body that covers a piping component and cover flanges extending from both edges of the cover body, and includes a half-cylindrical jig body that is placed over the cover body, jig flanges that are formed on both edges of the jig body and can abut against the surface of the cover flange, and a guide that assists in processing the cover, and the guide is a cutting position guide that extends from one of the jig flanges via the jig body to the other jig flange at the end of the construction jig, and guides a cutting tool when cutting the cover or guides when marking a cutting position on the cover.

[0007] The construction jig that solves the above problem is a construction jig that is used by placing it over a cover to process a cover that has a half-cylindrical cover body that covers a piping component and a cover flange extending from both edges of the cover body, and includes a half-cylindrical jig body that is placed over the cover body, jig flanges that are formed on both edges of the jig body and can abut against the surface of the cover flange, and a guide that assists in processing the cover, and the guide is a drilling position guide that guides a drilling tool when drilling holes in the cover flange on the jig flange or that guides when marking drilling positions on the cover flange.

[0008] The construction jig that solves the above problem is a construction jig that is used by placing it over a cover to process a cover that has a half-cylindrical cover body that covers a piping component and a cover flange extending from both edges of the cover body, and includes a half-cylindrical jig body that is placed over the cover body, jig flanges that are formed on both edges of the jig body and can abut against the surface of the cover flange, and a guide that assists in processing the cover, and the guide is a drilling position guide that guides a drilling tool when drilling holes in the cover body at the circumferential center of the jig body, or that guides when marking drilling positions on the cover body. [Effects of the Invention]

[0009] According to the above configuration, since the cover includes a half-split cylindrical cover body and a cover flange, and the half-split cylindrical jig body and the jig flange that abuts against the cover flange are provided, the construction jig can be stably placed on the cover, which stabilizes the guide relative to the cover and makes processing work on the cover easier. [Brief explanation of the drawings]

[0010] [Figure 1] 10A and 10B are perspective views showing the front, top, and right side of the installation jig and cover. [Figure 2] FIG. 2 is a perspective view showing the front, bottom, and left side of the construction jig. [Figure 3] FIG. [Figure 4] FIG. [Figure 5] FIG. [Figure 6] FIG. [Figure 7] FIG. [Figure 8] FIG. [Figure 9] FIG. [Figure 10] FIG. 10 is a cross-sectional view illustrating a method of using the construction jig. [Figure 11] 10A and 10B are perspective views showing the front, top, and right side of a construction jig according to a second embodiment. [Figure 12] 10A and 10B are perspective views showing the front, bottom, and left side of a construction jig according to a second embodiment. [Figure 13] FIG. 10 is a front view showing a construction jig according to a second embodiment. [Figure 14] FIG. 10 is a rear view showing the installation jig of the second embodiment. [Figure 15] FIG. 10 is a left side view showing the installation jig of the second embodiment. [Figure 16] FIG. 10 is a right side view showing the installation jig of the second embodiment. [Figure 17] FIG. 10 is a plan view showing a construction jig according to a second embodiment. [Figure 18] FIG. 10 is a bottom view showing the construction jig of the second embodiment. [Figure 19] 10A and 10B are perspective views showing the front, top, and right side of an installation jig and cover of a second embodiment. [Figure 20] FIG. 10 is a plan view illustrating a method of using the construction jig of the second embodiment. DETAILED DESCRIPTION OF THE INVENTION

[0011] [First embodiment] Hereinafter, one embodiment of the present invention will be described. 1, the construction jig 1 of this embodiment is used to assist in construction of a long cover 90. Specifically, the construction jig 1 is used to assist in processing operations such as cutting, drilling, or marking cutting and drilling positions on the cover 90.

[0012] 3 will be described as the front-to-back direction of the construction jig 1, the left-to-right direction of the paper will be described as the left-to-right direction of the construction jig 1, and the up-to-down direction of the paper will be described as the up-to-down direction of the construction jig 1. Therefore, in drawings other than FIG. 3, the directions on the paper may not match the directions indicated in the following description. The front-to-back direction of the construction jig 1 may also be referred to as the axial direction L1 (see FIG. 1).

[0013] As shown in FIG. 1 , the cover 90 includes a half-tubular (half-cylindrical in this embodiment) cover body 91 that covers a piping member, and cover flanges 92 extending from both edges of the cover body 91. The cover 90 is formed from a weather-resistant hard resin material and can be processed using tools such as cutting tools such as saws and drills. The cover 90 is intended to cover piping members such as pipes and joints for hot and cold water supply that are fixed to a wall surface (construction surface) of a house, for example. The cover 90 is, for example, 2 m long when shipped, and is cut to the appropriate length to fit the pipe, etc., at the construction site, and is fixed to the wall surface so as to cover the pipe, etc.

[0014] Next, we will explain the construction jig 1. The construction jig 1 is formed by injection molding using a resin material such as polypropylene or ABS resin, and is used by being placed over the cover 90 in order to process the cover 90.

[0015] 1 and 2, the construction jig 1 has a half-tubular shape (half-cylindrical shape in this embodiment) and includes a jig body 10 that covers a cover body 91, and jig flanges 20 that are formed on both edges of the jig body 10 and can abut against the surface of a cover flange 92. Furthermore, the construction jig 1 includes a cutting position guide 30, a first drilling position guide 40, and a second drilling position guide 50. These guides 30, 40, and 50 assist in the processing of the cover 90.

[0016] The jig body 10 has a shape corresponding to the cover body 91. The outer peripheral surface 10a of the jig body 10 has a shape that follows the outer peripheral surface 91a of the cover body 91 as a whole. In addition, as shown in Fig. 2, the inner peripheral surface 10b of the jig body 10 has a shape that follows the outer peripheral surface 91a of the cover body 91, and is a smooth curved surface without any irregularities.

[0017] As shown in Figures 1 and 5 to 7, the upper wall 11 of the jig body 10 is provided with a ring-shaped connecting portion 12 for connecting a connecting device such as a carabiner. A recess 12a is formed in the center of the connecting portion 12. During injection molding of the construction jig 1, a gate is positioned in the recess 12a, and a gate mark is formed in the recess 12a. A thick portion 13 is provided in the upper wall 11 of the jig body 10 in the front-to-rear direction of the connecting portion 12, and a through hole 14 is formed in a position corresponding to the connecting portion 12. This through hole 14 is a hole through which a mold for forming the connecting portion 12 passes during injection molding of the construction jig 1.

[0018] The two side wall portions 15 of the jig body 10 are provided with thick portions 16. The side surface 16a of one thick portion 16 and the side surface 16a of the other thick portion 16 extend substantially parallel to each other. A rib 17 is formed at the rear end of the jig body 10, extending outward from the jig body 10 in a direction perpendicular to the axial direction L1 of the jig body 10.

[0019] Both side surfaces of the jig flange 20 have a smooth uneven shape. Furthermore, both side surfaces of the jig flange 20 (specifically, at the apexes of the convex portions of the uneven shape) are formed with a plurality of vertically extending protrusions 21 that function as anti-slip surfaces when the jig flange 20 is gripped.

[0020] 2 and 8, ribs 22 extending downward are formed on the underside of the jig flange 20 from the front edge, rear edge, and the outer edge of the left and right edges. When the construction jig 1 is placed over the cover 90, the ribs 22 of the jig flange 20 function as abutment portions that abut against the cover flange 92. The surface 23 of the underside of the jig flange 20 excluding the ribs 22 is designed not to abut against the cover flange 92.

[0021] 1 to 3 and 7, the cutting position guide 30 extends from one jig flange 20 to the other jig flange 20 at the front end of the construction jig 1, via the jig body 10. In detail, the cutting position guide 30 has a flange shape that extends from the end of the jig body 10 toward the outside of the jig body 10 in a direction perpendicular to the axial direction L1. The cutting position guide 30 can guide a cutting tool such as a saw when cutting the cover 90, and can also guide when marking the cutting position on the cover 90.

[0022] 1 and 7, the first drilling position guide 40 includes a plurality of cylindrical metal fittings 41 attached to the jig flange 20. Holes of different diameters are formed in the plurality of metal fittings 41. The metal fittings 41 penetrate the jig flange 20 from the top to the bottom, and therefore the holes formed in the metal fittings 41 also penetrate the jig flange 20 from the top to the bottom. The ridges 21 of the jig flange 20 are aligned with the centers of the holes in the metal fittings 41 in the front-to-rear direction.

[0023] 4 and 7, the first drilling position guide 40 is provided on the rear end surface of the jig flange 20 and includes a recess 42 extending in the vertical direction. The recess 42 is aligned with the left-right center of the hole in the metal fitting 41. The first drilling position guide 40 can guide a drill or other drilling tool when drilling holes in the cover flange 92 of the jig flange 20, and can also provide guidance when marking drilling positions on the cover flange 92 (guiding a marking tool such as a marker or punch).

[0024] 1 and 7, the second drilling position guide 50 is provided at the circumferential center and rear end of the jig body 10, and has a circular hole 51. The second drilling position guide 50 can guide when marking a drilling position on the cover body 91 at the circumferential center of the jig body 10.

[0025] Next, a procedure for processing the cover 90 using the installation jig 1 will be described with reference to FIGS. When cutting the cover 90 to a predetermined length, as shown in FIG. 9 , the construction jig 1 is placed over the surface of the cover 90 so that the cutting position guide 30 is at cutting position P1. While holding the construction jig 1 still, a cutting tool such as a saw can be moved along the cutting position guide 30 to perform a straight cut at a perpendicular angle to the axial direction L2 of the cover 90. Alternatively, a marking tool such as a marker can be moved along the cutting position guide 30 to perform a straight marking at a perpendicular angle to the axial direction L2 of the cover 90. The cover 90 is then cut using the cutting tool along the marking line on the cover 90. Note that when the construction jig 1 is placed over the cover 90, the axial direction L1 of the construction jig 1 coincides with the axial direction L2 of the cover 90.

[0026] When drilling pilot holes D in the cover flange 92 of the cover 90 for screws to secure the cover 90, the hole in the metal fitting 41 that corresponds to the size of a drill or other drilling tool used to drill the pilot holes D is aligned with the position where the pilot holes D will be drilled. By passing the drilling tool through the hole in the metal fitting 41 of the first drilling position guide 40 while holding the construction jig 1 still, the drilling tool can be stably drilled at a predetermined position in the cover flange 92 without misalignment. Alternatively, the recess 42 of the first drilling position guide 40 can be aligned with the position where the pilot holes D will be drilled, and a marking tool such as a marker can be placed on the cover flange 92 at the position of the recess 42 to mark the predetermined drilling position P2. Then, using the marking at the drilling position P2 as a guide, the pilot holes D are formed in the cover flange 92 with the drilling tool.

[0027] In some cases, the cover 90 covers not only the pipe but also the valve connected to the pipe. In this case, it is necessary to open a circular opening E in the center of the cover body 91 and expose a handle for opening and closing the valve from the opening E to the outside of the cover 90. To do this, a marking tool such as a marker can be inserted into the hole 51 to mark a drilling position P3, which will be the center of the opening E, at the center of the cover body 91 in the left-right direction W. Thereafter, the opening E is formed in the cover body 91 using a drilling tool, using the marking at the drilling position P3 as a guide.

[0028] 10, when the construction jig 1 is placed over the cover 90, the rib 22 abuts against the cover flange 92, while the surface 23 of the jig flange 20 does not abut against the cover flange 92, leaving a gap G1 between the cover flange 92 and the jig flange 10. Therefore, the metal fittings 41 of the first drilling position guide 40 are spaced apart from the cover flange 92 without abutting against it. Furthermore, a small gap G2 exists between the upper wall 11 of the jig body 10 and the cover body 91. In other words, the upper wall 11 and the cover body 91 are slightly spaced apart without abutting against each other.

[0029] Next, the effects of this embodiment will be described. (1) For the cover 90 having a half-split cylindrical cover body 91 and a cover flange 92, the construction jig 1 has a half-split cylindrical jig body 10 and a jig flange 20 that abuts against the cover flange 92, so the construction jig 1 can be placed stably on the cover 90. Therefore, the cutting position guide 30, the first drilling position guide 40, and the second drilling position guide 50 are stable relative to the cover 90, making it easier to process the cover 90.

[0030] (2) The side wall portion 15 of the jig body 10 is provided with a thick portion 16. This improves the strength of the jig body 10, making it less susceptible to deformation, and making the construction jig 1 more stable during processing. Furthermore, since the side surface 16a of one thick portion 16 and the side surface 16a of the other thick portion 16 extend substantially parallel to each other, the side wall portion 15 is easier to grip than when the side wall portion 15 is curved.

[0031] (3) A rib 17 is formed at the rear end of the jig body 10, which improves the strength of the jig body 10 and makes it less likely to deform, making the construction jig 1 more stable during processing work.

[0032] (4) The ridge 21 of the jig flange 20 is aligned with the center of the hole in the metal fitting 41 in the front-to-rear direction. Therefore, by visually checking the ridge 21, it is easy to recognize the position of the hole in the metal fitting 41, and the first drilling position guide 40 can be easily aligned to the specified position. (5) Both side surfaces of the jig flange 20 have a smooth, uneven shape, and furthermore, a plurality of ridges 21 are formed on both side surfaces of the jig flange 20 (specifically, on the apexes of the convex portions of the uneven shape). The uneven shape of the jig flange 20 and the ridges 21 function as anti-slip surfaces when the jig flange 20 is gripped, making the processing operation using the jig 1 easier.

[0033] (6) A small gap G2 exists between the upper wall portion 11 of the jig body 10 and the cover body 91. For this reason, for example, if the cutting position guide 30 is soiled with a marking tool such as a marker, even if the construction jig 1 is rubbed on the cover 90 while the construction jig 1 is still covered by the cover 90, it is possible to prevent the dirt from the marking tool from adhering to the cover body 91.

[0034] (7) When the installation jig 1 is placed over the cover 90, a gap G1 exists between the surface 23 of the jig flange 20 and the cover flange 92, preventing the metal fittings 41 from coming into contact with the cover flange 92. This prevents the metal fittings 41 from damaging the cover flange 92.

[0035] [Second embodiment] Next, a second embodiment will be described with reference to Figures 11 to 20. The construction jig 2 of the second embodiment is different from the construction jig 1 of the first embodiment in the configuration of the connecting portion 12 of the jig body 10, the configuration of the side wall portion 15 of the jig body 10, the configuration of the underside of the jig flange 20, and the configuration of the first drilling position guide 40, but is otherwise identical in configuration. The same components as those of the first embodiment are designated by the same reference numerals, and redundant explanations will be omitted.

[0036] As shown in Figures 11 and 17, the connecting portion 12 of the jig body 10 of the construction jig 2 of the second embodiment does not have the recess 12a of the first embodiment, and the upper surface of the connecting portion 12 is a smooth surface.

[0037] As shown in Figures 11, 15 and 16, the side wall portion 15 of the jig body 10 of the construction jig 2 of the second embodiment has a rib 18 extending in the axial direction L1 of the construction jig 2, rather than the thick-walled portion 16 of the first embodiment.

[0038] As shown in FIGS. 12 and 18, no ribs 22 are formed on the lower surface of the jig flange 20 of the installation jig 2, and the entire lower surface of the jig flange 20 abuts against the cover flange 92.

[0039] As shown in FIG. 14, the rear end surface of the jig flange 20 does not have the recess 42 of the first embodiment, and is a flat surface.

[0040] The construction jig 2 of this embodiment has the following advantages in addition to the advantages (1) and (3) to (6) of the first embodiment. (8) The side wall portion 15 of the jig body 10 is provided with ribs 18. This improves the strength of the jig body 10, making it less susceptible to deformation, and making the construction jig 2 more stable during processing.

[0041] [Other embodiments] The above embodiment can be modified as follows, for example: The above embodiment and the following modifications can be combined and implemented within the scope of technical compatibility. The construction jigs 1 and 2 may be modified to process a cover having a cover body with a shape different from the half-split cylindrical cover body 91. For example, to process a cover having a half-split square tubular cover body, the jig body 10 may be formed in a half-split square tubular shape corresponding to the cover body.

[0042] The cutting position guide 30 of the above embodiment may be fitted with a metal plate or a plate made of a resin (such as polyacetal (POM) resin) that is more wear-resistant than the resin that constitutes the construction jigs 1 and 2. Alternatively, the cutting position guide 30 of the above embodiment itself may be made of metal or a wear-resistant resin. The second drilling position guide 50 may be provided with a metal fitting similar to the metal fitting 41 so that the second drilling position guide 50 can guide the drilling tool when drilling the cover body 91.

[0043] The construction jigs 1 and 2 may be provided with only one or two of the cutting position guide 30, the first drilling position guide 40, and the second drilling position guide 50. For example, the construction jigs 1 and 2 may be provided with only the cutting position guide 30, and the first drilling position guide 40 and the second drilling position guide 50 may not be provided.

[0044] Each first drilling position guide 40 may have one or two metal fittings 41, or may have four or more metal fittings 41. In each first drilling position guide 40, the metal fitting 41 may be omitted. The connecting portion 12 may be omitted. [Explanation of symbols]

[0045] 1...Construction jig, 2...Construction jig. 10...jig body (a...outer surface, b...inner surface), 11...upper wall portion, 12...connecting portion (a...recess), 13...thick portion, 14...through hole, 15...side wall portion, 16...thick portion (a...side surface), 17...rib, 18...rib. 20...jig flange, 21...protrusion, 22...rib, 23...surface. 30...Cutting position guide. 40...first drilling position guide, 41...metal fitting, 42...recess. 50...second drilling position guide, 51...hole. 90...Cover, 91...Cover body (a...Outer peripheral surface), 92...Cover flange. D...pre-hole, E...opening, G1, G2...gap, L1, L2...axial direction, P1...cutting position, P2, P3...drilling position, W...left / right direction.

Claims

1. A construction jig is used to cover a cover that includes a half-split cylindrical cover body that covers a piping member and cover flanges extending from both edge portions of the cover body, and is used to cover the cover, a jig body having a half-split cylindrical shape and adapted to be placed on the cover body; jig flanges formed on both edges of the jig body and capable of contacting the surface of the cover flange; a guide for assisting in processing the cover; Equipped with The guide is a cutting position guide that extends from one of the jig flanges at the end of the construction jig, via the jig body, to the other jig flange, and guides a cutting tool when cutting the cover or guides when marking a cutting position on the cover.

2. A construction jig is used to cover a cover that includes a half-split cylindrical cover body that covers a piping member and cover flanges extending from both edge portions of the cover body, and is used to cover the cover, a jig body having a half-split cylindrical shape and adapted to be placed on the cover body; jig flanges formed on both edges of the jig body and capable of contacting the surface of the cover flange; a guide for assisting in processing the cover; Equipped with The guide is a drilling position guide that guides a drilling tool when drilling holes in the cover flange at the jig flange, or that guides when marking drilling positions on the cover flange, in a construction jig.

3. A construction jig is used to cover a cover that includes a half-split cylindrical cover body that covers a piping member and cover flanges extending from both edge portions of the cover body, and is used to cover the cover, a jig body having a half-split cylindrical shape and adapted to be placed on the cover body; jig flanges formed on both edges of the jig body and capable of contacting the surface of the cover flange; a guide for assisting in processing the cover; Equipped with The guide is a drilling position guide located at the circumferential center of the jig body, which guides a drilling tool when drilling holes in the cover body or guides when marking drilling positions on the cover body.