Channel monitoring method, apparatus, device and storage medium
Patent Information
- Application Number
- JP2024540662
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2022-01-07
- Publication Date
- 2025-01-09
- Estimated Expiration
- 2042-01-07
AI Technical Summary
【0033】 本開示の方法を採用すれば、ユーザイクイップメントは、異なるモニタリング方式に基づいて、BWP切り替え前に受信されたPADに基づいてPDCCHモニタリングを実行するか否かを決定することができ、これにより、ユーザイクイップメントがBWP切り替え後に、どのような方式でPDCCHをモニタリングするかという問題を解決する。
Smart Images

Figure 2025500594000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to the field of wireless communication technologies, and in particular to a channel monitoring method, apparatus, device and storage medium. [Background technology]
[0002] The R17 power saving project proposes a physical downlink control channel (PDCCH) monitoring adaptation technology, which adopts a method of scheduling one bit field in downlink control information (DCI) to indicate PDCCH monitoring adaptation operation.
[0003] A User Equipment (UE) may receive a DCI indicating a Bandwidth Part (BWP) switching, which may be the same as or different from the DCI indicating a PDCCH monitoring adaptation operation. Summary of the Invention [Problem to be solved by the invention]
[0004] In view of this, the present disclosure provides a channel monitoring method, apparatus, device and storage medium. [Means for solving the problem]
[0005] According to a first aspect of an embodiment of the present disclosure, a channel monitoring method is provided, which is executed by a user equipment, and includes the steps of receiving a first downlink control information (DCI); and performing a physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme after a bandwidth portion (BWP) switching, where the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching.
[0006] In one embodiment, performing PDCCH monitoring based on the first monitoring scheme includes ignoring a PDCCH monitoring adaptation operation indicated by a first DCI.
[0007] In one embodiment, the step of performing PDCCH monitoring based on the first monitoring scheme further includes a step of stopping operation of a search space set group switching timer and / or a PDCCH skipping timer in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch.
[0008] In one embodiment, the step of performing PDCCH monitoring based on the first monitoring method includes a step of monitoring a default search space set group before a second DCI is received in response to a search space set group being set in the switched BWP, and a step of monitoring a search space set in the switched BWP before the second DCI is received in response to a search space set group not being set in the switched BWP, wherein the second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
[0009] In one embodiment, the default search space set group is defined by a communication protocol.
[0010] In one embodiment, the step of performing PDCCH monitoring based on the second monitoring scheme includes a step of performing a PDCCH monitoring adaptation operation indicated by a first DCI in response to the number of PDCCH skipping durations set in the BWP before the BWP switching and the BWP after the switching being the same, and the number of search space set groups in the BWP before the BWP switching and the BWP after the BWP switching being the same.
[0011] In one embodiment, the step of performing PDCCH monitoring based on the second monitoring scheme further includes a step of continuing to operate the search space set group switching timer and / or the PDCCH skipping timer in the BWP after the switch in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch.
[0012] In one embodiment, the step of performing PDCCH monitoring based on the second monitoring scheme includes the steps of: ignoring a PDCCH monitoring adaptation operation indicated by the first DCI in response to the number of PDCCH skipping durations set in the BWP before the BWP switching and the BWP after the switching being different and / or the number of search space set groups set in the BWP before the BWP switching and the BWP after the switching being different; monitoring a default search space set group before the second DCI is received in response to a search space set group being configured in the BWP after the switching; and monitoring a search space configured in the BWP after the switching before the second DCI is received in response to no search space set group being configured in the BWP after the switching, wherein the second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
[0013] In one embodiment, the step of performing PDCCH monitoring based on the second monitoring scheme further includes a step of stopping operation of a search space set group switching timer and / or a PDCCH skipping timer in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch.
[0014] In one embodiment, performing PDCCH monitoring based on the third monitoring scheme includes performing a PDCCH monitoring adaptive operation indicated by a first DCI in a post-switched BWP.
[0015] In one embodiment, the step of performing PDCCH monitoring based on the third monitoring scheme further includes a step of continuing to operate the search space set group switching timer and / or the PDCCH skipping timer in the BWP after the switch in response to the existence of an active search space set group switching timer and / or a PDCCH skipping timer.
[0016] In one embodiment, the step of performing PDCCH monitoring based on one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme includes a step of determining a PDCCH monitoring scheme based on a reception time or an effective time of a first DCI and a third DCI, and performing the PDCCH monitoring, wherein the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, and the third DCI includes information indicating a BWP switch.
[0017] In one embodiment, the step of determining a PDCCH monitoring scheme based on the reception times of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme in response to the reception time of the first DCI being before the reception time of the third DCI.
[0018] In one embodiment, the step of determining a PDCCH monitoring scheme based on the reception times of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme in response to the reception time of the first DCI and the reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being different.
[0019] In one embodiment, the step of determining a PDCCH monitoring scheme based on the reception times of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is the third monitoring scheme in response to the reception time of the first DCI and the reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being the same.
[0020] In one embodiment, the step of determining a PDCCH monitoring scheme based on the reception times of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme in response to the reception time of the first DCI and the reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being the same.
[0021] In one embodiment, the step of determining a PDCCH monitoring scheme based on the effective time of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme in response to the effective time of the first DCI being before the effective time of the third DCI.
[0022] In one embodiment, the step of determining a PDCCH monitoring scheme based on the effective times of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme in response to the effective time of the first DCI being the same as the effective time of the third DCI.
[0023] In one embodiment, the step of determining a PDCCH monitoring scheme based on the effective time of the first DCI and the third DCI includes a step of determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme in response to the effective time of the first DCI being after the effective time of the third DCI.
[0024] In one embodiment, the effective time of the third DCI is a time after a first offset after the end of the slot in which the third DCI is located, or a time after a second offset after the end of the PDCCH symbol in which the third DCI is transmitted, the first offset being equal to or greater than a BWP switching delay specified by a communication protocol, and the second offset being the first offset plus the remaining symbols after subtracting the PDCCH symbol in which the third DCI is transmitted from the slot in which the third DCI is located.
[0025] In one embodiment, the validity time of the first DCI is defined by a communication protocol or by a higher layer configuration.
[0026] In one embodiment, the step of performing PDCCH monitoring based on one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme includes the step of determining a PDCCH monitoring scheme and performing the PDCCH monitoring based on a PDCCH monitoring adaptive operation indicated by a first DCI, wherein the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
[0027] In one embodiment, the step of determining a PDCCH monitoring scheme based on a PDCCH monitoring adaptation operation indicated by the first DCI includes a step of determining that the PDCCH monitoring scheme is a third monitoring scheme in response to the PDCCH monitoring adaptation operation indicated by the first DCI being PDCCH skipping.
[0028] In one embodiment, the method further comprises the step of stopping PDCCH monitoring at the post-switching BWP in response to the post-switching BWP being a paused BWP.
[0029] According to a second aspect of an embodiment of the present disclosure, a channel monitoring device is provided, the device including: a receiving module adapted to receive first downlink control information (DCI) and a processing module adapted to perform physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme after a bandwidth portion (BWP) switching, the first DCI including information indicating a PDCCH monitoring adaptation operation and received by the user equipment before the BWP switching.
[0030] According to a third aspect of an embodiment of the present disclosure, there is provided a mobile terminal, the mobile terminal including a processor and a memory for storing instructions executable by the processor, the processor configured to execute the executable instructions in the memory to realize steps of the channel monitoring method.
[0031] According to a fourth aspect of an embodiment of the present disclosure, there is provided a non-transitory computer-readable storage medium having executable instructions stored thereon, the executable instructions, when executed by a processor, implementing steps of the above-mentioned channel monitoring method.
[0032] The technical solutions provided by the embodiments of the present disclosure may include the following beneficial effects. Effect of the Invention
[0033] By adopting the method disclosed herein, the user equipment can determine whether to perform PDCCH monitoring based on the PAD received before the BWP switching based on different monitoring methods, thereby solving the problem of how the user equipment should monitor the PDCCH after the BWP switching.
[0034] However, the above general description and the following detailed description are merely exemplary and explanatory and are not intended to limit the present disclosure. [Brief description of the drawings]
[0035] The drawings described herein are used to provide a further understanding of the embodiments of the present disclosure that form a part of this application, and the schematic embodiments of the embodiments of the present disclosure and their description are used to explain the embodiments of the present disclosure and do not constitute undue limitations on the embodiments of the present disclosure.
[0036] The drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification serve to explain the principles of the present disclosure. [Figure 1] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Diagram 2] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Diagram 3] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 4] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Diagram 5]4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 6] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 7] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 8] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 9] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 10] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 11] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 12] 4 is a flow chart of a channel monitoring method according to an exemplary embodiment; [Figure 13] 1 is a block diagram of a channel monitoring device according to an exemplary embodiment; [Figure 14] FIG. 2 is a block diagram of a channel monitoring device according to an exemplary embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0037] Examples of the present disclosure will now be further described in conjunction with the figures and specific embodiments.
[0038] Exemplary embodiments are described in detail herein, examples of which are illustrated in the drawings. Where the following description refers to the drawings, the same numerals in different drawings represent the same or similar elements unless otherwise stated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present disclosure. Rather, they are merely examples of apparatus and methods consistent with some aspects of the present disclosure, as detailed in the appended claims.
[0039] It should be noted that one embodiment of the present disclosure may include multiple steps, and although these steps are numbered for ease of explanation, these numbers do not limit the execution slots between the steps or the order of execution, and these steps may be performed in any order, and the embodiments of the present disclosure are not limited thereto.
[0040] A DCI including information indicating a PDCCH monitoring adaptation operation can be represented as a PDCCH adaptation DCI (PAD), and a DCI including information indicating a BWP switching can be represented as a BWP switching DCI (BSD).
[0041] After the user equipment receives the PAD, the operation of the user equipment can adopt any of the following: Beh 1: PDCCH skipping is not activated. Beh 1A: Stop PDCCH monitoring (ie, PDCCH skipping) within X time length, and the network device can dynamically indicate the value of X in DCI. Action 2 (Beh 2): Stop monitoring the search spaces in search space set group (SSSG) #1 and SSSG #2 (if this setting exists), and monitor the search space in SSSG #0. Action 2A (Beh 2A): Stop monitoring the search space in SSSG#0 and SSSG#2 (if this setting exists), and start monitoring the search space in SSSG#1. Action 2B (Beh 2B): Stop monitoring the search space in SSSG#0 and SSSG#1, and monitor the search space in SSSG#2 (if this setting exists).
[0042] Conventional communication protocols stipulate that PAD can only be sent before BSD or in the same Monitoring Occasion (MO).
[0043] Then, it is necessary to define the PDCCH monitoring operation in the scene where the user equipment performs BWP switching and receives a PDCCH monitoring adaptation indication.
[0044] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 1 is a flow chart of a channel monitoring method shown by an exemplary embodiment. As shown in Figure 1, the method includes the following steps 101-102:
[0045] In step 101, a first Downlink Control Information (DCI) is received.
[0046] In step 102, after a bandwidth portion (BWP) switching, perform physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme.
[0047] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0048] In one embodiment, the user equipment receives a PAD before a BWP switch, and performs PDCCH monitoring after a BWP switch based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme. In one embodiment, the BWP switch is a DCI BWP switch that receives an instruction to perform a BWP switch. In one embodiment, the BWP switch is a timer-based BWP switch.
[0049] In the above embodiment, the user equipment can determine whether to perform PDCCH monitoring based on the PAD received before the BWP switch based on different monitoring manners, thereby solving the problem of in what manner the user equipment should monitor the PDCCH after the BWP switch.
[0050] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 2 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 2, the method includes the following steps 201-202:
[0051] In step 201, a first DCI is received.
[0052] In step 202, after a bandwidth portion (BWP) switch, a PDCCH monitoring adaptation operation indicated by a first DCI is ignored, the first DCI including information indicating a PDCCH monitoring adaptation operation being received by the user equipment before the BWP switch.
[0053] In one embodiment, the user equipment receives a PAD before the BWP switch, and after the BWP switch, ignores the PAD received before the BWP switch, i.e., does not perform the PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch.
[0054] In one embodiment, the user equipment receives a PAD before the BWP switch, and ignores the PAD received before the BWP switch after the BWP switch, i.e., does not perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch. In response to a search space set group being set in the BWP after the switch, before the PAD is received after the BWP switch, the user equipment monitors a default search space set group. The default search space set group here is defined by a communication protocol, for example, SSSG#0.
[0055] In one embodiment, the user equipment receives a PAD before the BWP switch, and ignores the PAD received before the BWP switch after the BWP switch, i.e., does not perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch. In response to the search space set group not being set in the BWP after the switch, before the PAD is received after the BWP switch, the user equipment monitors the search space set in the BWP after the switch.
[0056] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the first monitoring manner.
[0057] In the above embodiment, when performing PDCCH monitoring, the user equipment ignores the PAD received before the BWP switching, so that the user equipment can perform PDCCH monitoring based on the setting of the BWP after the switching.
[0058] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 3 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 3, the method includes the following steps 301 to 303:
[0059] In step 301, a first DCI is received.
[0060] In step 302, after a bandwidth portion (BWP) switch, the PDCCH monitoring adaptation operation indicated by the first DCI is ignored.
[0061] In step 303, in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is running and associated with the BWP before the BWP switch, the operation of the search space set group switching timer and / or the PDCCH skipping timer is stopped.
[0062] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0063] In one embodiment, the user equipment receives a PAD before a BWP switch, and after a BWP switch, ignores the PAD received before the BWP switch, i.e., does not perform a PDCCH monitoring adaptation action indicated by the PAD received before the BWP switch. In a scene where a search space set group switching timer and / or a PDCCH skipping timer are active and associated with the BWP before the BWP switch, the search space set group switching timer and / or the PDCCH skipping timer are stopped from operating.
[0064] In one embodiment, the user equipment receives a PAD before the BWP switch, and ignores the PAD received before the BWP switch after the BWP switch, i.e., does not perform the PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch. In a scene where a search space set group switching timer and / or a PDCCH skipping timer are active and associated with the BWP before the BWP switch, the search space set group switching timer and / or the PDCCH skipping timer are stopped. In response to a search space set group being set in the switched BWP, the default search space set group is monitored before the PAD is received after the BWP switch. The default search space set group here is specified by the communication protocol, for example, SSSG#0.
[0065] In one embodiment, the user equipment receives a PAD before the BWP switch, and ignores the PAD received before the BWP switch after the BWP switch, i.e., does not perform the PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch. In a scene where a search space set group switching timer and / or a PDCCH skipping timer are active and associated with the BWP before the BWP switch, the search space set group switching timer and / or the PDCCH skipping timer are stopped. In response to the search space set group not being set in the BWP after the switch, before the PAD is received after the BWP switch, the search space set in the BWP after the switch is monitored.
[0066] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the first monitoring manner.
[0067] In the above embodiment, when performing PDCCH monitoring, the user equipment ignores the PAD received before the BWP switching, so that the user equipment can perform PDCCH monitoring based on the setting of the BWP after the switching.
[0068] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. Figure 4 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 4, the method includes the following steps 401-402:
[0069] In step 401, a first DCI is received.
[0070] In step 402, after a bandwidth portion (BWP) switching, in response to a search space set group being set in the switched BWP, a default search space set group is monitored before a second DCI is received, and in response to a search space set group not being set in the switched BWP, a search space set in the switched BWP is monitored before the second DCI is received.
[0071] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching, and the second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
[0072] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to a search space set group being set in the switched BWP, monitors a default search space set group before receiving a PAD after the BWP switch. In one embodiment, the default search space set group is defined by a communication protocol, for example, SSSG#0.
[0073] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to a search space set group not being set in the switched BWP, monitors the search space set in the switched BWP before the PAD is received after the BWP switch.
[0074] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the first monitoring manner.
[0075] In the above embodiment, when the user equipment performs PDCCH monitoring, it adopts different PDCCH monitoring methods based on whether a search space set group is set in the BWP after switching.
[0076] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 5 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 5, the method includes the following steps 501-502:
[0077] In step 501, a first DCI is received.
[0078] In step 502, in response to a bandwidth portion (BWP) switching, the number of PDCCH skipping durations set in the BWP before the BWP switching and the BWP after the switching are the same, and the number of search space set groups in the BWP before the BWP switching and the BWP after the BWP switching are the same, a PDCCH monitoring adaptation operation indicated by a first DCI is performed.
[0079] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0080] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being the same, and the number of search space set groups in the BWP before the BWP switch and the BWP after the switch being the same, the user equipment continues to perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch.
[0081] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the second monitoring manner.
[0082] In the above embodiment, in a scene where the number of PDCCH skipping durations and the number of search space set groups set in the BWP before and after the BWP switching are the same, the user continues to perform PDCCH monitoring based on the PAD received before the BWP switching. In this way, in a scene where the settings before and after the BWP switching are the same, the PDCCH monitoring adaptation operation before the BWP switching can be continued.
[0083] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 6 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 6, the method includes the following steps 601 to 603:
[0084] In step 601, a first DCI is received.
[0085] In step 602, in response to a bandwidth portion (BWP) switching, the number of PDCCH skipping durations set in the BWP before the BWP switching and the BWP after the switching are the same, and the number of search space set groups in the BWP before the BWP switching and the BWP after the BWP switching are the same, a PDCCH monitoring adaptation operation indicated by the first DCI is performed.
[0086] In step 602, in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is running and associated with the BWP before the BWP switch, the search space set group switching timer and / or the PDCCH skipping timer continue to run in the BWP after the switch.
[0087] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0088] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being the same and the number of search space set groups in the BWP before the BWP switch and the BWP after the switch being the same, continues to perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch, and in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch, continues to operate the search space set group switching timer and / or the PDCCH skipping timer in the BWP after the switch.
[0089] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the second monitoring manner.
[0090] In the above embodiment, in the scene where the number of PDCCH skipping durations and the number of search space set groups set in the BWP before and after the BWP switching are the same, the user equipment continues to perform PDCCH monitoring based on the PAD received before the BWP switching. In this way, in the scene where the settings before and after the BWP switching are the same, the PDCCH monitoring adaptation operation before the BWP switching can be continued, and the operation of the search space set group switching timer and / or the PDCCH skipping timer is not interrupted.
[0091] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes receiving a first DCI; after a bandwidth portion (BWP) switching, in response to a number of PDCCH skipping durations configured in a BWP before the BWP switching and a BWP after the switching being different and / or a number of search space set groups configured in a BWP before the BWP switching and a BWP after the switching being different, ignoring a PDCCH monitoring adaptation operation indicated by the first DCI, and in response to a search space set group being configured in the BWP after the switching, performing a default search space set group configuration before a second DCI is received. and in response to a search space set group not being set in the BWP after the switching, performing the operations of monitoring a space set group and monitoring a search space set in the BWP after the switching before the second DCI is received, wherein the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching, and the second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
[0092] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being different, or in response to the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, or in response to both the number of PDCCH skipping durations and the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, the user equipment performs the following operations: ignoring the PAD received before the BWP switch, i.e., not performing a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch; and in response to a search space set group being set in the BWP after the switch, monitoring a default search space set group before a PAD is received after the BWP switch.
[0093] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being different, or in response to the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, or in response to both the number of PDCCH skipping durations and the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, the user equipment performs the following operations: ignoring the PAD received before the BWP switch, i.e., not performing a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch; and in response to no search space set group being set in the BWP after the switch, before the PAD is received after the BWP switch, monitoring the search space set in the BWP after the switch.
[0094] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the second monitoring manner.
[0095] In the above embodiment, in a scene where at least one of the number of PDCCH skipping durations and the number of search space set groups set in the BWP before and after the BWP switching is different, the user equipment ignores the PAD received before the BWP switching. In this way, in a scene where the settings before and after the BWP switching are different, the PDCCH monitoring is not performed based on the PAD before the BWP switching, and thus the PDCCH monitoring can be performed based on the settings of the BWP after the switching.
[0096] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes receiving a first DCI; ignoring a PDCCH monitoring adaptation operation indicated by the first DCI in response to a bandwidth portion (BWP) switching in which a number of PDCCH skipping durations set in a BWP before the BWP switching and a BWP after the switching are different and / or a number of search space set groups set in a BWP before the BWP switching and a BWP after the switching are different; monitoring a default search space set group before a second DCI is received in response to a search space set group being set in the BWP after the switching; and monitoring a default search space set group before a second DCI is received in response to a search space set group not being set in the BWP after the switching. and performing the operations of monitoring a search space set in the post-BWP before the BWP is switched and stopping operation of a search space set group switching timer and / or a PDCCH skipping timer in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switching, wherein the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching, and the second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
[0097] In one embodiment, the user equipment receives a PAD before the BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being different, or in response to the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, or in response to both the number of PDCCH skipping durations and the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, ignores the PAD received before the BWP switch, i.e. does not perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch, and in response to a search space set group being set in the BWP after the switch, monitors a default search space set group before the PAD is received after the BWP switch. In response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch, the operation of the search space set group switching timer and / or the PDCCH skipping timer is stopped.
[0098] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the number of PDCCH skipping durations set in the BWP before the BWP switch and the BWP after the switch being different, or in response to the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, or in response to both the number of PDCCH skipping durations and the number of search space set groups set in the BWP before the BWP switch and the BWP after the switch being different, ignores the PAD received before the BWP switch, i.e. does not perform a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch, and in response to no search space set group being set in the BWP after the switch, before the PAD is received after the BWP switch, monitors the search space set in the BWP after the switch before the PAD is received. Also, in response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switch, stops the operation of the search space set group switching timer and / or the PDCCH skipping timer.
[0099] In the above embodiments, the PDCCH monitoring manners adopted by the user equipment all belong to the second monitoring manner.
[0100] In the above embodiment, in the same scene where at least one of the number of PDCCH skipping durations and the number of search space set groups set in the BWP before the BWP switching and the BWP after the switching is different, the user equipment ignores the PAD received before the BWP switching. In this way, in the scene where the settings before and after the BWP switching are different, the PDCCH monitoring is not performed based on the PAD before the BWP switching, and the search space set group switching timer and / or the PDCCH skipping timer associated with the BWP before the BWP switching is not continuously operated, so that the PDCCH monitoring can be performed based on the settings of the BWP after the switching.
[0101] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 7 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 7, the method includes the following steps 701-702:
[0102] In step 701, a first DCI is received.
[0103] In step 702, after a bandwidth portion (BWP) switching, a PDCCH monitoring adaptation operation indicated by a first DCI is performed in the switched BWP.
[0104] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0105] In one embodiment, the user equipment receives a PAD before the BWP switch, and after the BWP switch, performs a PDCCH monitoring adaptation operation in the post-switched BWP as indicated by the PAD received before the BWP switch.
[0106] In the above embodiments, the PDCCH monitoring schemes adopted by the user equipment all belong to the third monitoring scheme.
[0107] In the above embodiment, after the BWP switch, the user equipment continues to perform PDCCH monitoring based on the PAD received before the BWP switch.
[0108] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 8 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 8, the method includes the following steps 801 to 803:
[0109] In step 801, a first DCI is received.
[0110] In step 802, after a bandwidth portion (BWP) switching, a PDCCH monitoring adaptation operation indicated by a first DCI is performed in the switched BWP.
[0111] In step 803, in response to the existence of an active search space set group switching timer and / or a PDCCH skipping timer, the search space set group switching timer and / or the PDCCH skipping timer are continued to operate in the post-switching BWP.
[0112] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0113] In one embodiment, the user equipment receives a PAD before a BWP switch, and after a BWP switch, performs a PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch in the switched BWP. In response to the existence of an active search space set group switching timer and / or a PDCCH skipping timer, the search space set group switching timer and / or the PDCCH skipping timer continue to operate in the switched BWP. Note that the search space set group switching timer and the PDCCH skipping timer in this scenario do not belong to a specific BWP, and multiple BWPs share the search space set group switching timer and the PDCCH skipping timer.
[0114] In the above embodiments, the PDCCH monitoring schemes adopted by the user equipment all belong to the third monitoring scheme.
[0115] In the above embodiment, after the BWP switching, the user equipment continues to perform PDCCH monitoring based on the PAD received before the BWP switching, and continues to operate the search space set group switching timer and the PDCCH skipping timer that were operated in the BWP before the switching in the BWP after the switching.
[0116] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the embodiment of the present disclosure. Figure 9 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 9, the method includes the following steps 901-902:
[0117] In step 901, a first DCI is received.
[0118] In step 902, after a bandwidth portion (BWP) switching, a PDCCH monitoring manner is determined according to the receiving time or valid time of the first DCI and the third DCI, and the PDCCH monitoring is performed.
[0119] The PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, the first DCI includes information indicating PDCCH monitoring adaptive operation and is received by the user equipment before the BWP switching, and the third DCI includes information indicating BWP switching. For example, the first DCI may be a PAD, and the third DCI may be a BSD. The monitoring scheme can be correspondingly selected according to the transmission times of PAD and BSD and / or the valid times of PAD and BSD.
[0120] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, determines a PDCCH monitoring method based on the received BSD and the reception time of the PAD received before the BWP switch, and performs PDCCH monitoring based on the PDCCH monitoring method.
[0121] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, determines a PDCCH monitoring method based on the received BSD and the effective time of the PAD received before the BWP switch, and performs PDCCH monitoring based on the PDCCH monitoring method.
[0122] The PDCCH monitoring scheme determined in the above embodiment is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
[0123] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0124] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0125] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and after a bandwidth portion (BWP) switching, in response to a reception time of the first DCI being before a reception time of the third DCI, determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme, and performing the PDCCH monitoring, where the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching, and the third DCI includes information indicating a BWP switching.
[0126] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch being before the reception time of the BSD received, determines that the PDCCH monitoring scheme is a first monitoring scheme and performs PDCCH monitoring.
[0127] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch being before the reception time of the BSD received, determines that the PDCCH monitoring scheme is a second monitoring scheme and performs PDCCH monitoring.
[0128] The first and second monitoring methods have been described in detail in the above embodiments, so a detailed description thereof will be omitted here.
[0129] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0130] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and, after a bandwidth portion (BWP) switching, in response to a reception time of the first DCI and a reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being different, determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, and performing the PDCCH monitoring, the first DCI including information indicating a PDCCH monitoring adaptation operation, being received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0131] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are not the same DCI, the user equipment determines that the PDCCH monitoring scheme is a first monitoring scheme and performs PDCCH monitoring.
[0132] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are not the same DCI, the user equipment determines that the PDCCH monitoring scheme is a second monitoring scheme and performs PDCCH monitoring.
[0133] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are not the same DCI, the user equipment determines that the PDCCH monitoring scheme is a third monitoring scheme, and performs the PDCCH monitoring.
[0134] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0135] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0136] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and after a bandwidth portion (BWP) switching, in response to a reception time of the first DCI and a reception time of the third DCI being in the same PDCCH monitoring occasion, and the first DCI and the third DCI being the same, determining that the PDCCH monitoring scheme is the third monitoring scheme and performing the PDCCH monitoring, the first DCI including information indicating a PDCCH monitoring adaptation operation, being received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0137] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are the same DCI, the user equipment determines that the PDCCH monitoring scheme is a third monitoring scheme, and performs PDCCH monitoring.
[0138] It should be noted that in this scenario, the network device indicates PDCCH monitoring adaptation operation and BWP switching in the same DCI, so the PDCCH monitoring adaptation operation indicated by the network device in this DCI is switched according to the BWP indicated in this DCI. Therefore, the third monitoring scheme is most suitable for use in this scenario.
[0139] The third monitoring method has been described in detail in the above embodiment, so a description thereof will be omitted here.
[0140] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0141] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and after a bandwidth portion (BWP) switching, in response to a reception time of the first DCI and a reception time of the third DCI being in the same PDCCH monitoring occasion, and the first DCI and the third DCI being the same, determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme, and performing the PDCCH monitoring, the first DCI including information indicating a PDCCH monitoring adaptation operation, being received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0142] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are the same DCI, the user equipment determines that the PDCCH monitoring scheme is a first monitoring scheme and performs PDCCH monitoring.
[0143] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the reception time of the PAD received before the BWP switch and the reception time of the BSD received are in the same PDCCH monitoring occasion, and the PAD and the BSD are the same DCI, the user equipment determines that the PDCCH monitoring scheme is the second monitoring scheme, and performs PDCCH monitoring.
[0144] The first and second monitoring methods have been described in detail in the above embodiments, so a detailed description thereof will be omitted here.
[0145] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0146] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and after a bandwidth portion (BWP) switching, in response to an effective time of the first DCI being before an effective time of the third DCI, determining that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme, and performing the PDCCH monitoring, where the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching, and the third DCI includes information indicating a BWP switching.
[0147] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being before the effective time of the BSD received, determines that the PDCCH monitoring scheme is the first monitoring scheme and performs PDCCH monitoring.
[0148] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being before the effective time of the BSD received, determines that the PDCCH monitoring scheme is the second monitoring scheme and performs PDCCH monitoring.
[0149] The first and second monitoring methods have been described in detail in the above embodiments, so a detailed description thereof will be omitted here.
[0150] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the effective time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the effective time of the PAD received before the BWP switching.
[0151] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and, after a bandwidth portion (BWP) switching, in response to an effective time of the first DCI and an effective time of the third DCI being the same, determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, and performing the PDCCH monitoring, the first DCI including information indicating a PDCCH monitoring adaptation operation and received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0152] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being the same as the effective time of the BSD received, determines that the PDCCH monitoring scheme is the first monitoring scheme, and performs PDCCH monitoring.
[0153] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being the same as the effective time of the BSD received, determines that the PDCCH monitoring scheme is the second monitoring scheme, and performs PDCCH monitoring.
[0154] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being the same as the effective time of the BSD received, determines that the PDCCH monitoring scheme is the third monitoring scheme, and performs PDCCH monitoring.
[0155] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0156] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the effective time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the effective time of the PAD received before the BWP switching.
[0157] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; and, after a bandwidth portion (BWP) switching, in response to an effective time of the first DCI being after an effective time of the third DCI, determining that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, and performing the PDCCH monitoring, the first DCI including information indicating a PDCCH monitoring adaptation operation and received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0158] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being after the effective time of the BSD received, determines that the PDCCH monitoring scheme is the first monitoring scheme and performs PDCCH monitoring.
[0159] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being after the effective time of the BSD received, determines that the PDCCH monitoring scheme is the second monitoring scheme and performs PDCCH monitoring.
[0160] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the effective time of the PAD received before the BWP switch being after the effective time of the BSD received, determines that the PDCCH monitoring scheme is the third monitoring scheme and performs PDCCH monitoring.
[0161] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0162] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the effective time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the effective time of the PAD received before the BWP switching.
[0163] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. The method includes: receiving a first DCI; determining a PDCCH monitoring scheme according to a reception time or an effective time of the first DCI and a third DCI after a bandwidth portion (BWP) switching, and performing the PDCCH monitoring, the PDCCH monitoring scheme being one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, the first DCI including information indicating a PDCCH monitoring adaptation operation, being received by the user equipment before the BWP switching, and the third DCI including information indicating a BWP switching.
[0164] The effective time of the third DCI is a time after a first offset after the end of the slot in which the third DCI is located, or a time after a second offset after the end of the PDCCH symbol in which the third DCI is transmitted, the first offset being greater than or equal to a BWP switching delay specified by a communication protocol, and the second offset being the first offset added to the remaining symbols after subtracting the PDCCH symbol in which the third DCI is transmitted from the slot in which the third DCI is located.
[0165] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, determines a PDCCH monitoring method based on the received BSD and the reception time or validity time of the PAD received before the BWP switch, and performs PDCCH monitoring based on the PDCCH monitoring method.
[0166] The PDCCH monitoring scheme determined in the above embodiment is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
[0167] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0168] In one embodiment, the validity time of a received BSD is a time after a first offset after the end of the slot in which the BSD is located, the first offset being equal to or greater than the BWP switching delay defined by the communication protocol. In one embodiment, the first offset is 3 or 4 slots. In one embodiment, the first offset is the slot spacing between the scheduled PDSCH and the DCI indicated in the BSD.
[0169] In one embodiment, the validity time of the received BSD is a time after a second offset after the end of the PDCCH symbol transmitting the BSD, the second offset being the remaining symbols after subtracting the PDCCH symbol transmitting the BSD from the slot in which the BSD is located, plus the first offset. In one embodiment, there are 14 symbols in a slot, the PDCCH symbol transmitting the BSD is the first 3 symbols of the slot in which it is located, the remaining symbols are 11 symbols, and the second offset is the 11 symbols plus the first offset.
[0170] In one embodiment, the validity period of a PAD received before a BWP switch is defined by a communication protocol or higher layer configuration.
[0171] In the above embodiment, the PDCCH monitoring method is determined based on the received BSD and the reception time of the PAD received before the BWP switching, and an appropriate PDCCH monitoring method can be adopted based on the received BSD and the reception time of the PAD received before the BWP switching.
[0172] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. Figure 10 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 10, the method includes the following steps 1001-1002:
[0173] In step 1001, a first DCI is received.
[0174] In step 1002, after a bandwidth portion (BWP) switching, a PDCCH monitoring manner is determined according to a PDCCH monitoring adaptive operation indicated by a first DCI, and the PDCCH monitoring is performed.
[0175] The PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme, and the first DCI includes information indicating a PDCCH monitoring adaptive operation and is received by the user equipment before the BWP switching.
[0176] In one embodiment, the user equipment receives a PAD before the BWP switch, and after the BWP switch, determines a PDCCH monitoring manner based on the PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch, and performs PDCCH monitoring.
[0177] The PDCCH monitoring scheme determined in the above embodiment is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
[0178] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0179] In the above embodiment, according to the PDCCH monitoring adaptive operation indicated by the PAD received before the BWP switch, an appropriate PDCCH monitoring manner is adopted to perform PDCCH monitoring.
[0180] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. Figure 11 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 11, the method includes the following steps 1101-1102:
[0181] In step 1101, a first DCI is received.
[0182] In step 1102, after bandwidth portion (BWP) switching, in response to the PDCCH monitoring adaptation operation indicated by the first DCI being PDCCH skipping, determine that the PDCCH monitoring scheme is a third monitoring scheme, and perform the PDCCH monitoring.
[0183] The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switch.
[0184] In one embodiment, the user equipment receives a PAD before a BWP switch, and after the BWP switch, in response to the PDCCH monitoring adaptation operation indicated by the PAD received before the BWP switch being PDCCH skipping, determines that the PDCCH monitoring scheme is a third monitoring scheme and performs PDCCH monitoring.
[0185] The third monitoring method has been described in detail in the above embodiment, so a description thereof will be omitted here.
[0186] In the above embodiment, in the scenario where the PDCCH monitoring adaptive operation indicated by the PAD received before the BWP switching is PDCCH skipping, the third monitoring manner can be adopted to perform PDCCH monitoring.
[0187] An embodiment of the present disclosure provides a channel monitoring method, which is executed by a user equipment. The method may be executed individually or in combination with any other embodiment of the present disclosure. Figure 12 is a flow chart of a channel monitoring method according to an exemplary embodiment. As shown in Figure 12, the method includes the following steps 1201-1202:
[0188] In step 1201, a first DCI is received.
[0189] In step 1202, after a bandwidth portion (BWP) switching, perform physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme, and in response to the switched BWP being a paused BWP, stop PDCCH monitoring in the switched BWP.
[0190] In one embodiment, the user equipment receives a PAD before the BWP switching, and after the BWP switching, in a scene where the BWP after the switching is a paused BWP, stops PDCCH monitoring in the BWP after the switching.
[0191] In one embodiment, the user equipment receives a PAD before a BWP switching, and after the BWP switching, in a scene where the switched BWP is not a dormant BWP, performs physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme.
[0192] The first monitoring method, the second monitoring method and the third monitoring method have been described in detail in the above embodiments, so the description thereof will be omitted here.
[0193] In the above embodiment, if the BWP after the switching is a paused BWP, the PDCCH monitoring is stopped in the BWP after the switching.
[0194] An embodiment of the present disclosure provides a channel monitoring device, which is applied to a user equipment, and includes: a receiving module 1301 configured to receive a first downlink control information (DCI); and a processing module 1302 configured to perform physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme after a bandwidth portion (BWP) switching, as shown in FIG. 13, where the first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching.
[0195] In some embodiments, the receiving and processing modules of the channel monitoring apparatus shown in FIG. 13 can be used to perform the steps of any of the channel monitoring methods described above.
[0196] An embodiment of the present disclosure provides a mobile terminal, comprising: a processor; and a memory for storing instructions executable by the processor, the processor configured to execute the executable instructions in the memory to implement steps of the above channel monitoring method.
[0197] An embodiment of the present disclosure provides a non-transitory computer-readable storage medium having executable instructions stored thereon, which, when executed by a processor, implements steps of the above channel monitoring method.
[0198] 14 is a block diagram of a channel monitoring device 1400 shown in accordance with an exemplary embodiment. For example, the device 1400 may be a mobile phone, a computer, a digital broadcast terminal, a messaging device, a game console, a tablet device, a medical device, a fitness device, a personal digital assistant, etc.
[0199] Referring to FIG. 14, the device 1400 may include one or more of the following components: a processing component 1402, a memory 1404, a power component 1406, a multimedia component 1408, an audio component 1410, an input / output (I / O) interface 1412, a sensor component 1414, and a communication component 1416.
[0200] The processing component 1402 typically controls the overall operation of the device 1400, such as operations related to display, phone calls, data communication, camera operation, and recording operations. The processing component 1402 may include one or more processors 1420 for executing instructions to complete all or some of the steps of the above methods. It should be noted that the processing component 1402 may include one or more modules to facilitate interaction with other components. For example, the processing component 1402 may include a multimedia module to facilitate interaction between the processing component 1402 and the multimedia component 1408.
[0201] The memory 1404 is configured to store various types of data to support operation on the device 1400. Examples of these data include instructions for any application programs or methods for operating on the device 1400, contact data, phone book data, messages, images, videos, etc. The memory 1404 may be implemented by any type of volatile or non-volatile storage device or combination thereof, such as a static random access memory (SRAM), an electrically erasable programmable read-only memory (EEPROM), an erasable programmable read-only memory (EPROM), a programmable read-only memory (PROM), a read-only memory (ROM), a magnetic memory, a flash memory, a magnetic disk, or an optical disk.
[0202] The power component 1406 provides power to the various components of the device 1400. The power component 1406 can include a power management system, one or more power sources, and other components associated with the generation, management, and distribution of power for the device 1400.
[0203] The multimedia component 1408 includes a screen that provides an output interface between the device 1400 and a user. In some embodiments, the screen can include a liquid crystal display (LCD) and a touch panel (TP). If the screen includes a touch panel, the screen can be implemented as a touch screen to receive input signals from a user. The touch panel includes one or more touch sensors to sense touches, slides, and gestures on the touch panel. The touch sensors can detect the boundaries of touch or slide operations as well as the duration and pressure associated with the touch or slide operations. In some embodiments, the multimedia component 1408 includes a front camera and / or a rear camera. When the device 1400 is in an operation mode, such as a photo mode or a video mode, the front camera and / or the rear camera can receive external multimedia data. Each front camera and rear camera can be a fixed optical lens system or can have a focal length and optical zoom capability.
[0204] The audio component 1410 is configured to output and / or input audio signals. For example, the audio component 1410 includes a microphone (MIC) configured to receive external audio signals when the device 1400 is in an operational mode such as a call mode, a record mode, and a voice recognition mode. The received audio signals may be further stored in the memory 1404 or transmitted via the communication component 1416. In some embodiments, the audio component 1410 further includes a speaker for outputting audio signals.
[0205] The I / O interface 1412 provides an interface between the processing component 1402 and a peripheral interface module, which may be a keyboard, a click wheel, buttons, etc. These buttons may include, but are not limited to, a home button, volume buttons, a start button, and a lock button.
[0206] The sensor component 1414 includes one or more sensors to provide various aspects of status assessment for the device 1400. For example, the sensor component 1414 can detect the on / off state of the device 1400, the relative positioning of a component, such as the display and keypad of the device 1400, and can further detect a change in position of the device 1400 or one of its components, the presence or absence of contact between the user and the device 1400, the orientation and position or acceleration / deceleration of the device 1400, and a temperature change of the device 1400. The sensor component 1414 can also include a proximity sensor configured to detect the presence of a nearby object in the absence of any physical contact. The sensor component 1414 can further include an optical sensor, such as a CMOS or CCD image sensor used for imaging applications. In some embodiments, the sensor component 1414 can further include an acceleration sensor, a gyro sensor, a magnetic sensor, a pressure sensor, or a temperature sensor.
[0207] The communication component 1416 is configured to facilitate wired or wireless communication between the device 1400 and other devices. The device 1400 can access a wireless network based on a communication standard, such as WiFi, 2G, or 3G, or a combination thereof. In an exemplary embodiment, the communication component 1416 receives a broadcast signal or broadcast-related information from an external broadcast management system via a broadcast channel. In an exemplary embodiment, the communication component 1416 further includes a near field communication (NFC) module to facilitate short-range communication. For example, the NFC module may be implemented based on radio frequency identification (RFID) technology, infrared data association (IrDA) technology, ultra-wideband (UWB) technology, Bluetooth (BT) technology, and other technologies.
[0208] In an example embodiment, the apparatus 1400 may be implemented by one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), controllers, microcontrollers, microprocessors, or other electronic components to perform the methods described above.
[0209] In an exemplary embodiment, a non-transitory computer readable storage medium containing instructions, such as a memory 1404 containing instructions, may be provided, which may be executed by the processor 1420 of the apparatus 1400 to complete the method. For example, the non-transitory computer readable storage medium may be a ROM, a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device.
[0210] Those skilled in the art may easily conceive other implementations of the embodiments of the present disclosure after studying the specification and practicing the invention disclosed herein. This application is intended to cover any modifications, uses or variations of the embodiments of the present disclosure, which modifications, uses or variations follow the general principles of the embodiments of the present disclosure and include common knowledge or commonly used technical means in the art that are not disclosed in the present disclosure. The specification and examples are considered to be merely exemplary, with the true scope and spirit of the embodiments of the present disclosure being determined by the following claims.
[0211] It should be noted that the embodiments of the present disclosure are not limited to the exact structures described above and illustrated in the drawings, and various modifications and variations can be made without departing from the scope of the present disclosure, which is limited only by the scope of the appended claims.
[0212] Industrial Applicability By adopting the method disclosed herein, the user equipment can determine whether to perform PDCCH monitoring based on the PAD received before the BWP switching based on different monitoring methods, thereby solving the problem of how the user equipment should monitor the PDCCH after the BWP switching.
Claims
1. 1. A channel monitoring method, the method being performed by user equipment, comprising: receiving a first downlink control information (DCI); performing physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme after a bandwidth portion (BWP) switching; The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching.
23. A channel monitoring method comprising:
2. The step of performing PDCCH monitoring based on the first monitoring scheme includes: ignoring a PDCCH monitoring adaptation operation indicated by the first DCI; 2. The channel monitoring method according to claim 1 .
3. The step of performing PDCCH monitoring based on the first monitoring scheme includes: In response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switching, stopping the operation of the search space set group switching timer and / or the PDCCH skipping timer.
3. The channel monitoring method according to claim 2.
4. The step of performing PDCCH monitoring based on the first monitoring scheme includes: In response to a search space set group being set in the switched BWP, before a second DCI is received, monitoring a default search space set group; In response to a search space set group not being set in the switched BWP, before the second DCI is received, monitoring a search space set in the switched BWP; The second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
2. The channel monitoring method according to claim 1 .
5. The default search space set group is defined by a communication protocol.
5. The channel monitoring method according to claim 4.
6. The step of performing PDCCH monitoring based on the second monitoring scheme includes: In response to a number of PDCCH skipping durations set in the BWP before the BWP switching and a number of PDCCH skipping durations set in the BWP after the switching being the same, and a number of search space set groups in the BWP before the BWP switching and a number of PDCCH skipping durations set in the BWP after the switching being the same, the number of PDCCH skipping durations set ... being the same, 2. The channel monitoring method according to claim 1 .
7. The step of performing PDCCH monitoring based on the second monitoring scheme includes: In response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with a BWP before the BWP switching, continuing to operate the search space set group switching timer and / or the PDCCH skipping timer in the BWP after the switching.
7. The channel monitoring method according to claim 6.
8. The step of performing PDCCH monitoring based on the second monitoring scheme includes: In response to the number of PDCCH skipping durations set in the BWP before the BWP switching and the BWP after the switching being different, and / or the number of search space set groups set in the BWP before the BWP switching and the BWP after the switching being different, Ignoring a PDCCH monitoring adaptation operation indicated by the first DCI; and In response to the search space set group being set in the switched BWP, before the second DCI is received, monitoring a default search space set group; In response to a search space set group not being set in the switched BWP, before the second DCI is received, performing an operation of monitoring a search space set in the switched BWP; The second DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment after the BWP switching.
2. The channel monitoring method according to claim 1 .
9. The step of performing PDCCH monitoring based on the second monitoring scheme includes: In response to the existence of a search space set group switching timer and / or a PDCCH skipping timer that is active and associated with the BWP before the BWP switching, stopping the operation of the search space set group switching timer and / or the PDCCH skipping timer.
9. The channel monitoring method according to claim 8.
10. The step of performing PDCCH monitoring based on the third monitoring scheme includes: performing a PDCCH monitoring adaptation operation indicated by the first DCI in a post-switched BWP; 2. The channel monitoring method according to claim 1 .
11. The step of performing PDCCH monitoring based on the third monitoring scheme includes: In response to the existence of an active search space set group switching timer and / or a PDCCH skipping timer, the search space set group switching timer and / or the PDCCH skipping timer are continuously operated in the post-switching BWP. The channel monitoring method according to claim 10.
12. The step of performing PDCCH monitoring based on one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme includes: determining a PDCCH monitoring manner according to a reception time or an effective time of the first DCI and the third DCI, and performing the PDCCH monitoring; The PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme; The third DCI includes information indicating a BWP switch.
2. The channel monitoring method according to claim 1 .
13. The step of determining a PDCCH monitoring scheme based on reception times of the first DCI and the third DCI includes: determining, in response to a reception time of the first DCI being before a reception time of the third DCI, that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme.
13. The channel monitoring method according to claim 12.
14. The step of determining a PDCCH monitoring scheme based on reception times of the first DCI and the third DCI includes: determining, in response to a reception time of the first DCI and a reception time of the third DCI being in a same PDCCH monitoring occasion and the first DCI and the third DCI being different, that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme; 13. The channel monitoring method according to claim 12.
15. The step of determining a PDCCH monitoring scheme based on reception times of the first DCI and the third DCI includes: determining, in response to a reception time of the first DCI and a reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being the same, that the PDCCH monitoring scheme is the third monitoring scheme; 13. The channel monitoring method according to claim 12.
16. The step of determining a PDCCH monitoring scheme based on reception times of the first DCI and the third DCI includes: determining, in response to a reception time of the first DCI and a reception time of the third DCI being in the same PDCCH monitoring occasion and the first DCI and the third DCI being the same, that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme; 13. The channel monitoring method according to claim 12.
17. The step of determining a PDCCH monitoring mode based on effective times of the first DCI and the third DCI includes: determining, in response to a validity time of the first DCI being before a validity time of the third DCI, that the PDCCH monitoring scheme is the first monitoring scheme or the second monitoring scheme; 13. The channel monitoring method according to claim 12.
18. The step of determining a PDCCH monitoring mode based on effective times of the first DCI and the third DCI includes: determining, in response to a validity time of the first DCI being the same as a validity time of the third DCI, that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
13. The channel monitoring method according to claim 12.
19. The step of determining a PDCCH monitoring mode based on effective times of the first DCI and the third DCI includes: determining, in response to a validity time of the first DCI being after a validity time of the third DCI, that the PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
13. The channel monitoring method according to claim 12.
20. the effective time of the third DCI is a time after a first offset from the end of a slot in which the third DCI is located, or a time after a second offset from the end of a PDCCH symbol in which the third DCI is transmitted; the first offset is equal to or greater than a BWP switching delay defined by a communication protocol, and the second offset is obtained by adding the first offset to the remaining symbols after subtracting a PDCCH symbol for transmitting the third DCI from a slot in which the third DCI is located.
13. The channel monitoring method according to claim 12.
21. The effective time of the first DCI is specified by a communication protocol or by a higher layer configuration.
13. The channel monitoring method according to claim 12.
22. The step of performing PDCCH monitoring based on one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme includes: According to a PDCCH monitoring adaptation operation indicated by a first DCI, determining a PDCCH monitoring manner and performing the PDCCH monitoring; The PDCCH monitoring scheme is one of the first monitoring scheme, the second monitoring scheme, and the third monitoring scheme.
2. The channel monitoring method according to claim 1 .
23. Determining a PDCCH monitoring manner based on a PDCCH monitoring adaptive operation indicated by the first DCI includes: determining, in response to a PDCCH monitoring adaptation operation indicated by the first DCI being PDCCH skipping, that the PDCCH monitoring scheme is a third monitoring scheme; 23. The channel monitoring method of claim 22.
24. The method comprises: In response to the switched BWP being a paused BWP, stopping PDCCH monitoring in the switched BWP.
2. The channel monitoring method according to claim 1 .
25. A channel monitoring apparatus adapted for use in a user equipment, comprising: a receiving module configured to receive a first downlink control information (DCI); and a processing module configured to perform physical downlink control channel (PDCCH) monitoring based on one of a first monitoring scheme, a second monitoring scheme, and a third monitoring scheme after a bandwidth portion (BWP) switch; The first DCI includes information indicating a PDCCH monitoring adaptation operation and is received by the user equipment before the BWP switching. A channel monitoring device comprising:
26. A mobile terminal, A processor; a memory for storing instructions executable by a processor; The processor is configured to execute executable instructions in the memory to implement steps of a channel monitoring method according to any one of claims 1 to 24. A mobile terminal characterized by:
27. A non-transitory computer-readable storage medium, comprising: A non-transitory computer readable storage medium has executable instructions stored thereon, which, when executed by a processor, implement the steps of the channel monitoring method according to any one of claims 1 to 24. A non-transitory computer-readable storage medium comprising:
Citation Information
Patent Citations
Control channel monitoring in a wireless communication system
JP2022529115A
Skip receiving control channel information
JP2023527355A
Control channel monitoring in a wireless communication system
WO2020204802A1
Skipping reception of control channel information
WO2021109501A1