Methods for producing gravity-based structures (GBS) at special production sites.

The method of producing GBS with a central portion and protrusions addresses the challenges of complexity, transportability, and vulnerability in existing construction methods, achieving reduced construction time, enhanced stability, and protection against ice and ship impacts.

JP2025507252AActive Publication Date: 2025-03-18PUBLICHNOE AKTSIONERNOE OBSHCHESTVO NOVATEK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024542196
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2022-02-15
Filing Date
2022-10-14
Publication Date
2025-03-18
Estimated Expiration
2042-10-14

AI Technical Summary

Technical Problem

Existing methods for constructing gravity-based structures (GBS) face challenges such as increased complexity and duration in preparation stages, complications with roof beams, prolonged construction time due to 'cold joints', limited transportability through shallow waters, and vulnerability to external influences like ice and ship impacts.

Method used

A method for producing GBS with a central portion and protrusions, featuring a common base slab, where the central part is concreted in the form of a rectangular parallelepiped, and the protrusions provide additional buoyancy and stability, allowing for easier transportation and installation, while also protecting against ice and ship impacts.

Benefits of technology

The proposed method reduces construction time, enhances stability and buoyancy during transport, and provides protection against ice and ship impacts, thereby improving the efficiency and reliability of GBS deployment in challenging environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025507252000001_ABST
    Figure 2025507252000001_ABST
Patent Text Reader

Abstract

The present invention relates to the production of gravity-based structures (GBS). The GBS comprises a core and a protrusion with a common lower platform. For the core of the GBS, the outer and inner walls and the upper platform are cast in concrete, so that the GBS takes the shape of a rectangular parallelepiped. When the casting of the individual sections of the outer wall of the core is completed, a reinforcing frame is assembled, a temporary frame is installed, and the outer and inner walls of the protrusion of the GBS are cast in concrete. The outer wall of the GBS is formed along the entire periphery of the lower platform, and the height of the outer wall of the protrusion is lower than the height of the outer wall of the core. When the casting of the individual sections of the walls of the protrusion is completed, a reinforcing frame is assembled, a temporary frame is installed for the upper platform of the protrusion, and the upper platform of the protrusion is cast in concrete. When the casting of the core and the upper platform of the protrusion is completed and the concrete of the structure to be tensioned is sufficiently hardened, the introduction of post-tensioning is carried out on the upper platform of the core, as well as on the outer and inner walls of the core and the protrusion. As a result, the buoyancy of the GBS and the structure as a whole increases and its draft decreases during transportation to the installation site.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the fabrication (construction) of Gravity Based Structures (GBS), which can be used as part of the deployment of various types of onshore and offshore production, transportation, transshipment, and storage facilities (including natural gas liquefaction, ammonia, methanol, hydrogen production, and power generation). [Background technology]

[0002] A gravity-based structure (GBS) is a platform that is fixed to the seabed with the help of its own weight. Gravity-based structures are used in coastal and offshore waters where the water depth is sufficient to support a superstructure of the required height above the water level after the GBS is installed on the seabed. The GBS can feature an internal chamber that allows its buoyancy during transportation to its installation site. The GBS is designed to be floatable and has a ballast system that allows long distance transportation and installation for operation at the intended offshore site without the use of expensive lifting and transportation equipment. The GBS is mainly made of reinforced concrete and steel.

[0003] GBS is produced in specialized production facilities and shipyards.

[0004] There is a method for fabricating a reinforced concrete gravity structure (GBS) having a rectangular parallelepiped shape with a base slab, a top slab, and side walls for supporting a floating power plant and storing liquefied natural gas, which comprises placing reinforcing bars, concrete casting the GBS elements, and performing prestressing and post-tensioning of the GBS elements (Korean Patent Application Publication No. 20150136823, published on August 12, 2015).

[0005] The closest approach to what has been proposed features the Gravity Based Structure (GBS) fabrication for the Adriatic LNG, an offshore LNG receiving and regasification terminal built at the Algeciras production site in Spain (Design and Construction on Gravity Based Structure and Modularized LNG Tanks for the Adriatic LNG Terminal, Lisa B. Waters et al., ExxonMobil Development Company, 2007, http: / / www.ivt.ntnu.no / ept / fag / tep4215 / innhold / LNG%20Conferences / 2007 / fscommand / PS6_7_Waters_s.pdf.)

[0006] The GBS is made in the form of a rectangular parallelepiped with a top slab, a base slab, an intermediate support slab for the free-standing LNG tank, external walls, and internal longitudinal and transverse walls for separating the chambers.

[0007] The above production method is characterized by the following: The GBS construction site is prepared, including the creation of concrete cavities for the steel skirts, and the installation of these steel skirts so that the skirts hang loosely within the concrete cavities and the weight of the GBS is transferred to the site backfilled with gravel and concrete foundations. · Rectangular reinforcing cages are assembled for the base slab, formwork for the base slab is installed and then the base slab is concreted. Once the concreting of each base slab area is completed, the reinforcing cages for the external and internal walls will be erected and the external and internal walls will be constructed in slipform except for the short end wall on one side of the GBS (the side where the LNG tank is located). Simultaneously with the concreting of the walls, the reinforcing cage for the intermediate slab is assembled, the formwork is erected and the intermediate slab is concreted. ·Roof beams are fabricated and installed. When separate wall sections are concreted, the reinforcing cage for the top slab is erected, the top slab formwork is installed and then the top slab is concreted. ·Insulation and second barrier for the LNG tank room will be installed. A compartment for a free-standing LNG tank will be built. · The short end wall on one side of the GBS (the side where the LNG tank is installed) is poured into concrete. Top and base slabs and interior and exterior walls are post-tensioned with reinforcing strands.

[0008] This method has the following drawbacks:

[0009] The concrete cavity for the steel skirt and the installation of the steel skirt increase the scope and duration of work in the preparation phase, and the presence of the concrete cavity makes the preparation of the foundation more complicated.

[0010] The use of roof beams complicates construction operations and requires the use of cranes with higher lifting capacities.

[0011] The concreting of one short end wall of the GBS (where the LNG tank is installed) is done last after the tank is installed in the GBS room, which increases the construction time and violates the monolithic nature of the reinforced concrete structure due to the presence of "cold joints" in this section.

[0012] The rectangular shaped GBS has a large draft when transported to the installation site, which makes transportation through shallow waters impossible.

[0013] The rectangular shaped GBS does not provide protection from external influences such as drifting ice and emergency ship impacts. [Prior art documents] [Patent documents]

[0014] [Patent Document 1] Korean Patent Application Publication No. 20150136823 [Non-patent literature]

[0015] [Non-Patent Document 1] Design and Construction on Gravity Based Structure and Modularized LNG Tanks for the Adriatic LNG Terminal, Lisa B. Waters et al., ExxonMobil Development Company, 2007, http: / / www.ivt.ntnu.no / ept / fag / tep4215 / innhold / LNG%20Conferences / 2007 / fscommand / PS6_7_Waters_s.pdf. Summary of the Invention

[0016] The technical problem solved by the present invention is the following: Considering that an increasing proportion of production and infrastructure facilities are located in underdeveloped areas, including on the coasts and waters of the Arctic Ocean, there is an urgent need to develop new and efficient methods for the construction of gravity-based structures that can accommodate production, transport, transshipment and storage complexes for various purposes on the coasts and waters and be adapted for use in waters with icy conditions.

[0017] To solve the above problems, a method was proposed for producing a GBS that represents a three-dimensional reinforced concrete structure having internal walls separating the chambers, intended for installation at the bottom of the water of interest, and capable of serving as a base for housing a topside for various purposes. Furthermore, the GBS can remain afloat during transportation through a waterway from the production site to the installation site, and can withstand ice loads from an icy basin when installed at the seabed. The topside can be erected immediately after the GBS production, or after the placement of the GBS on the seabed, or in one of the interim locations during the transportation of the GBS from the production site to the installation site.

[0018] The technical problem was solved by the method of gravity-based structure (GBS) production, i.e. A reinforcing cage is assembled about the rectangular base slab, the base slab formwork is installed, and then the base slab is concreted; When the separate sections of the base slab are concreted, the reinforcing cages for the interior and exterior walls are assembled and concreted in slipform; When the separate wall sections are concreted, the reinforcing cage for the top slab is assembled, the top slab formwork is installed, and then the top slab is concreted; The top and base slabs and the interior and exterior walls are post-tensioned with reinforcing strands. At the same time, according to the present invention, The GBS is fabricated including a central section and protruding sections having a common base slab; For the central part of the GBS, the inner and outer walls and the top slab are concreted, which takes the form of a rectangular parallelepiped; When separate sections of the outer wall of the central section are concreted, for the inner and outer walls of the GBS protrusion, the reinforcing cage is assembled, the formwork is installed and the concrete pouring is carried out, the outer walls are made along the perimeter of the base slab, and at the same time the height of the outer wall of the protrusion is lower than that of the outer wall of the central section; When the separate wall sections of the overhang are concreted, the reinforcing cage is assembled and the formwork is installed for the upper slab of the overhang, which is then concreted; When the top slabs of the central section and the projections are concreted, the base slab and top slab of the central section and the interior and exterior walls of the central section and projections are post-tensioned and the concrete of the post-tensioned structure gains the required strength.

[0019] In addition, it is desirable to concrete the top slab with an upward bow in its center so that it will later drop under its own weight to its design position.

[0020] Furthermore, in a preferred option of the present invention, when the separate sections of the central top slab are concreted, the reinforcing cage is assembled, the formwork is installed, the embeds are fitted and the supports for the equipment are concreted onto the top slab.

[0021] In addition, when the outer and inner walls of the central section are concreted, it is desirable to leave openings for the removal of formwork and further installation of equipment inside the chamber of the GBS shaped by the walls and slab.

[0022] If at least one tank for the storage of liquids is to be accommodated in the GBS, simultaneously with the concreting of the central wall, a reinforcing cage is assembled, formwork is installed, the intermediate slab is concreted, post-tensioning is introduced and inside at least one chamber defined by the walls, the intermediate slab and the top slab, the tank for the storage of liquids is assembled with panels and delivered through the wall opening.

[0023] Technical results are achieved by the GBS manufactured with overhangs, which means: the overhangs increase the buoyancy of the GBS and the entire structure, as well as reduce its submergence during transportation to the installation site; the provision of additional ballast chambers on the periphery of the GBS inside the overhangs makes it easier to balance the GBS, i.e. to sink it evenly without trimming and listing; the increased width of the GBS lower part allows the installation of a larger height and weight of topside structures on top of the GBS, increasing the stability of the entire structure during its transportation.

[0024] Unlike platforms that are towed and deployed in deep water areas, a GBS that uses protrusions rather than having the same volume across its height has distinct advantages in terms of draft and overall weight-to-buoyancy ratio, allowing for much larger displacements for a relatively small increase in the platform's own weight.

[0025] The GBS overhang also protects the central section, which can house the main storage compartment, from drifting ice and emergency ship impacts.

[0026] Erecting both the side and short end walls before the top slab is formed, as well as having the possibility to assemble the tank from separate panels in a confined chamber, facilitates GBS fabrication and helps to reduce the number of "cold welds" in reinforced concrete construction.

[0027] To reduce overall GBS production time, certain stages are carried out in parallel. [Brief description of the drawings]

[0028] [Figure 1] FIG. 13 shows the fabrication of the base slab and the central wall of the GBS between the base slab and the mid-slab. [Diagram 2] FIG. 13 shows the fabrication of the base slab, intermediate slab and inner wall of the central part of the GBS. [Diagram 3] FIG. 13 shows the fabrication of the inner and outer walls of the GBS center section. [Figure 4] 13 shows the fabrication of the outer wall of the central part of the GBS, the top slab, the top support on the top slab, the outer wall of the GBS protrusion, and the tank for liquid storage inside the GBS. [Diagram 5] 13 shows the fabrication of the GBS central top slab, the GBS protruding top slab, and the superstructure supports. [Figure 6] A front view of the fabricated GBS as it is pulled out of the dock. [Figure 7] A side view of the fabricated GBS as it is pulled out of the dock. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0029] The fabrication program refers to mass production of the GBS as part of a staged process at a specialized fabrication site with drydock. The location of the fabrication site facility allows for the production of material for each separate stage of fabrication, within the limitations of the separate facilities, and subsequent transportation to the drydock for use in the GBS fabrication. The GBS fabrication sequence is designed to optimize the use of equipment and personnel and reduce construction time through the parallel execution of some of the work stages.

[0030] The GBS is produced as follows.

[0031] The dry dock is isolated from the adjacent waters using a dock gate, then the dock is pumped out. The bottom of the dock is then prepared with an area of ​​compacted crushed stone cover for the fabrication of the GBS foundation slab.

[0032] The reinforcement is cut and bent and the reinforcement cage is fabricated and labeled in the reinforcement shop. The reinforcement elements are transported by road to the dry dock and delivered by loader or lift crane to the GBS reinforcement cage assembly site. The GBS reinforcement cage is assembled by crimping, tying and sleeve joining.

[0033] Simultaneously with the reinforcing cages, duct pipes for the post-tensioning reinforcing strand bundles are installed into the tensioned structure, as well as into the anchors and penetrations for the equipment to be installed.

[0034] Three types of formwork are used for GBS concreting: conventional formwork, stock formwork, and permanent formwork. In the formwork shop, conventional and permanent formwork is produced and the stock formwork assembly sections are assembled. The completed sections are stored in the formwork laying area and, when required, are transported to the dry dock and installed for the concreting of the GBS structure.

[0035] Conventional formwork panels are produced from cut timber and laminated plywood in formwork factories. Conventional formwork is mainly used for concreting lower height objects, for slabs and supports.

[0036] The basic elements of stock formwork are panels or blocks, frames, load-bearing structures, connectors, and fasteners. Depending on the structure to be concreted, two types of stock formwork are applied: panel-form formwork and slipform formwork.

[0037] Panel-type formwork is foldable and consists of large-sized elements, facilitating the construction of large-scale objects. Slipform consists of two identical rows of panels, 1.0-1.2 m high, rigidly connected to each other by bolts and mounted on a special frame, which is moved upwards by jacks along with the concreting process of the structure. Slipform is used in the concreting of GBS walls. When slipform is applied, the concreting becomes monolithic, i.e. there are no "cold seams", thus improving the performance parameters of the structure. Moreover, the use of slipform allows the concreting of GBS walls very rapidly, upwards of 2.5 meters or more per day.

[0038] If removal of the formwork is not possible, for example during concreting of intermediate ceiling slabs when equipment is installed inside the chamber, permanent formwork is used. This type of formwork is also used in the construction of pit structures for LNG tanks and other parts of GBS, the removal of which requires a lot of labor after closing the outer structure.

[0039] Concrete, the main construction material for GBS production, is mixed in a concrete processing plant located close to the dry dock. The location of the concrete processing plant ensures that the distance the concrete has to be transported to the pouring point is minimal.

[0040] Bulk materials for concrete mixing may be delivered to the production site via a wharf located in front of the concrete processing plant, which ensures the shortest route for the materials from the shipping point to where they are stored and subsequently used.

[0041] GBS production utilizes a high-strength special concrete mix design with the required density and durability characteristics. The use of different density concretes, combined with weight control, allows for the achievement of optimal targets for the mass, buoyancy, and stability of the structure. The concrete mix is ​​delivered to the dry dock by a mixer truck. The concrete is pumped into the formwork with a concrete pump.

[0042] Concreting starts with the sectioned concrete casting of the base slab 1, which is common for the central and protruding parts of the GBS (Fig. 1). A reinforcing cage is assembled for the rectangular base slab 1, formwork for the base slab 1 is installed, and then the base slab 1 is concreted. Once the individual sections of the base slab 1 are completed, a reinforcing cage is assembled with the help of stock formwork in the central part of the GBS for the internal walls 2. In parallel, reinforcement installation is carried out for the internal and external walls 3 and 4 of the GBS central part (Fig. 2, Fig. 3), which are constructed with slipform. During this process, the GBS central part is shaped as a rectangular parallelepiped. For the purpose of removing the formwork and for the subsequent installation of equipment in the GBS room, a relatively small service opening is left in the wall, which is further completely closed and sealed once the work inside the room is completed.

[0043] If the GBS is fabricated with an intermediate slab 7 for housing at least one liquid storage tank 8 (Figure 4), then when the concreting of the individual sections of the central wall 2 between the base slab 1 and the intermediate slab 7 is completed, the concreting of the GBS intermediate slab 7 begins in parallel with the concreting of the internal and external walls 3 and 4 of the GBS central part. For this purpose, the reinforcing cage is assembled, the formwork is erected and the intermediate slab 7 is concreted.

[0044] When the individual sections of the central exterior wall 4 are concreted, the reinforcing cage is assembled, the formwork is installed and the external and internal walls of the protrusions are concreted section by section using slip forms. The GBS protrusion external walls 5 are erected along the entire perimeter of the base slab and the protrusion external walls 5 are lower than the central exterior wall 4.

[0045] In parallel, in the section where the concreting of the walls 3, 4 of the central part of the GBS is completed, the concreting of the upper slab 9 of the central part of the GBS begins. For this purpose, a reinforcing cage is assembled for the upper slab 9, the formwork is erected for the upper slab 9 and the upper slab 9 is concreted. In addition, for erecting the formwork, scaffolding and cradles are installed inside the GBS room, which allows to avoid the use of roof beams. The use of scaffolding in combination with the formwork provides a universal use both for the construction of the upper slab 9 and for the subsequent preparation and installation of the structural elements of the tank 8 at different heights, which ultimately results in the acceleration of the overall construction.

[0046] To counteract the downward bowing of the top slab 9 due to its weight, the center of the slab is bent upwards before concreting to ensure an opposing bowing. Once concreting is completed and the formwork is removed, the slab sinks under its weight, assuming a design configuration that allows partial counteracting of the downward bowing. The use of a beamless design for the top slab 9, with a non-uniform thickness (not shown) resembling an arc where the slab is thicker near the edges than at the spans, allows for better target specifications of weight and stiffness, as well as facilitating formwork installation, through the simplification of the slab bottom surface with no overhanging parts.

[0047] The liquid storage tank 8 is locally built in at least one of the chambers formed by the internal reinforced concrete wall 3, the intermediate slab 7 and the top slab 9 from panels delivered through openings in the walls.

[0048] In parallel, when the external wall 5 of the GBS projection is completed, the concreting of the top slab 6 of the GBS projection begins (Fig. 4, Fig. 5). The top slab 6 of the GBS projection is connected to the central external wall 4 by extending and tying the projection reinforcement into sleeves and anchor rods previously installed flush in the slipform of the wall 4 according to the design.

[0049] If the intended use of the GBS includes berthing of ships, supports are constructed from reinforced concrete along the outer edge of the GBS projection above the top slab 6 for the purpose of installing berthing structures and fenders for berthing and mooring of ships, allowing the GBS structure to be used as a berthing position. These supports are erected with the help of stock formwork.

[0050] Should it be required to fabricate a GBS with supports 10 for topside equipment to be installed on the top slab 9, the reinforcing cage is assembled, formwork is installed, fillers are fitted, and supports 10 are concreted to provide support for the load-bearing structure of the topside cage which may house the process equipment (FIG. 5).

[0051] The post-tensioning materials workshop accommodates the storage of reinforcing strands, duct pipes and anchors, preparation of materials and equipment for performing post-tensioning installation. The equipment is installed in the drydock in the area where a series of operations will allow this type of work to begin. Once the equipment is ready, the post-tensioning materials are transported to the drydock, where the strand bundles are installed and tensioned to the design value by anchoring and transferring the tension to the anchorages on the reinforced concrete structure of the GBS.

[0052] The concrete structure is post-tensioned with "tension to concrete" by bonded repair, which means that after pouring the concrete of the GBS tensioned reinforced concrete structure, the strands are pushed / pulled through pre-installed duct tubes made of corrugated steel. After the concrete has reached the required minimum strength, the strand bundles are tensioned and fixed, thus transferring the tension to the pre-installed steel anchorages at the short ends of the structure. The reinforcing strands are tensioned with hydraulic jacks. After the strand bundles are tensioned and pull-out tested, the duct tubes are filled with non-shrink cement mortar and all temporary openings and niches are plugged. The duct tubes protect the reinforcing strands from external impacts and transfer the loads partially from the strands to the concrete along the entire length of the structure.

[0053] The introduction of post-tensioning during the construction of the GBS allows the targeted performances to be achieved more efficiently, especially for limit state group II, such as crack resistance and impermeability. As a result, it reduces the amount of non-tensioned reinforcement required, contributing to a reduction in the structure weight, while increasing the overall spatial stiffness of the load-bearing reinforced concrete cage of the GBS.

[0054] Finally, the closing of process openings in the GBS walls, concreting of post-tensioning anchors and cleaning of the concrete surface are carried out.

[0055] After the GBS fabrication is completed, equipment 11 is installed inside the room and on the top slab 9, and the modular topside structure 12 is installed on supports 10 on the top slab 9 (see Figures 6 and 7). The topside modules 12 may be fabricated independently, in parallel with the GBS construction schedule, and then installed on the supports 10 with the aid of a specialized jacking and skid system. The supports 10 are also the main load-bearing elements supporting the load-bearing guardrails of the topside skid system.

[0056] In addition to the skid system, cranes are also used in the dry dock to allow heavy machinery and steel structures to be placed onto the GBS from areas near the dock.

[0057] After the construction of the GBS and installation of the equipment is completed, the dry dock 13 with the GBS inside is gradually filled with water 14 from the nearby body of water with the help of pumps. At each stage of dock flooding, the GBS room is checked for leak tightness by hydraulic and pneumatic tests. Along with the dock flooding, the GBS ballast room is also flooded to increase the weight of the structure and thus ensure its stability against the dock bottom.

[0058] Once testing is complete, the GBS is secured inside the dry dock by mooring lines and retaining and guiding mooring piles located at the bottom of the dry dock. Once testing and mooring of the GBS is complete, water is pumped out of the moored GBS chamber to ensure the GBS remains afloat during high tides.

[0059] The GBS is retrieved from the dock by a tugboat. After being retrieved from the dry dock, the GBS is towed to the installation site. The GBS is then installed at its destination around the quayside by a shore winch and tug, where it is connected to shore communication lines in the storage area. Once the position is confirmed as correct, the GBS is ballasted and installed on a foundation that has previously been placed on the bottom of the water.

Claims

1. A method of fabricating a gravity-supported structure (GBS), comprising: a reinforcing cage is assembled for a rectangular base slab, a base slab form is installed, the base slab is then concreted, and when the separate sections of the base slab are concreted, a reinforcing cage for the interior and exterior walls is assembled, the interior and exterior walls are concreted by slipform, and when the separate wall sections are concreted, a reinforcing cage for the top slab is assembled, a top slab form is installed, the top slab is then concreted, and the top and base slabs and the interior and exterior walls are post-tensioned by reinforcing strands, wherein the GBS is fabricated including a central section and protruding sections having the base slab in common, and further wherein for the central section of the GBS, the interior and exterior walls and the top slab are concreted by slipform, when a separate section of the outer wall of the central part is concreted, a reinforcing cage is assembled, formwork is set and concrete pouring is carried out for the inner and outer walls of the GBS projection, the outer wall of which is made along the periphery of the base slab, at the same time the height of the outer wall of the projection is lower than the height of the outer wall of the central part, when a separate wall section of the projection is concreted, a reinforcing cage is assembled, formwork is set and concrete poured for the top slab of the projection, when the separate wall section of the projection is concreted, the base slab and the top slab of the central part and the inner and outer walls of the central and projection are post-tensioned, and the concrete of the post-tensioned structure is hardened.

2. 2. The method of claim 1, wherein the top slab is concreted with a central portion of the slab bowing upward so that the central portion of the slab lowers under its own weight to a design position.

3. 2. The method of claim 1, wherein once the separate sections of the top slab of the central portion are concreted, a reinforcing cage is assembled, forms are installed, fillers are fitted, and supports for equipment are concreted onto the top slab.

4. 2. The method of claim 1, wherein during the process of concrete pouring the exterior and interior walls of the central section, openings are left for removal of formwork and further installation of equipment inside the GBS chamber defined by the walls and slab.

5. 4. The method according to claim 3, wherein simultaneously with the concrete pouring of the walls of the central section, a reinforcing cage is assembled, formwork is installed, an intermediate slab is concreted and post-tensioned, and a tank for storing liquid is arranged by panels inside at least one chamber defined by the walls, intermediate slab and top slab and delivered through a temporary wall opening.

Citation Information

Patent Citations

  • Caisson type platform with oil storage tank

    JP1983101915A

  • A sheet made of a concrete bottom plate supporting frame arm [...] marine - -

    JP1985076131U

  • Concrete gravity based structure type floating storage power plant system and construction method its

    KR1020150136823A

  • KR20150136823