Physical layer operation processing method, device and terminal

By performing a series of physical layer operations when processing the first synchronization signal/physical broadcast channel signal block (SSB) including the non-cell defined synchronization signal/physical broadcast channel signal block (NCD-SSB) in the terminal device, a series of physical layer operations are solved, and the terminal device cannot clarify which physical layer operations are completed by the NCD-SSB is achieved, and the system reliability and efficiency are improved.

JP2025511023AActive Publication Date: 2025-04-15VIVO MOBILE COMM CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2024557633
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2022-03-30
Filing Date
2023-03-29
Publication Date
2025-04-15
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

In the prior art, when the terminal device processes a non-cell-defined synchronization signal/physical broadcast channel signal block (NCD-SSB), it is impossible to identify which physical layer operations are completed by the NCD-SSB.

Method used

When the terminal device contains a first synchronization signal/physical broadcast channel signal block (SSB) including a non-cell defined synchronization signal/physical broadcast channel signal block (NCD-SSB), the following physical layer operations are performed: determine the energy (EPRE) of each resource element of the downlink channel state information reference signal (CSI-RS); determine the relevant operations of the physical downlink control channel (PDCCH) candidate resources; change the transmission direction corresponding to the flexible slot through the dynamic slot format indicator (SFI); determine the valid random access channel (PRACH) or uplink shared channel (PUSCH) opportunity; schedule repeated transmission of uplink authorization (RAR UL through the random access response grant) or initial downlink control information (DCI) encryption; determine the merged automatic retransmission request (HARQ) process number of the uplink shared channel (PUSCH) transmission and its corresponding transmission; determine the conditions for delayed transmission, including the initial time slot and delay conditions for semi-persistent scheduled merged automatic retransmission request acknowledgement (SPS HARQ-ACK) transmission; evaluate the wireless link quality or link recovery quality for each indication period.

Benefits of technology

By explicitly implementing physical layer operations based on non-cell-defined synchronization signal/physical broadcast channel signal block (NCD-SSB), the terminal device can perform physical layer operations set on the network side more accurately, thereby improving the reliability and efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025511023000001_ABST
    Figure 2025511023000001_ABST
Patent Text Reader

Abstract

The present application discloses a method, an apparatus, and a terminal for processing a physical layer operation, the method including: performing a physical layer operation based on a first SSB when a first downlink BWP includes a first SSB including a non-cell-defined SSB, and the physical layer operation includes at least one of: determining an EPRE of a CSI-RS; determining an associated operation on a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an available PRACH opportunity; scheduling repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in a first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in an indication period.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] (CROSS REFERENCE TO RELATED APPLICATIONS) This application claims priority to Chinese Patent Application No. 202210332752.2, filed in China on March 30, 2022, the entire contents of which are incorporated herein by reference.

[0002] The present application relates to the technical field of communications, and in particular to a processing method, device and terminal for physical layer operation. [Background technology]

[0003] In the related art, the Non Cell Defining (NCD)-Synchronization Signal and Physical Broadcast Channel (PBCH) signal block (SSB) has been introduced. From the terminal's perspective, when the current active bandwidth part (BWP) does not include a Cell Defining SSB (CD-SSB), the forced functions based on CD-SSB that the existing terminal must support, such as Radio Link Monitoring (RLM), Beam Failure Detection (BFD) and Radio Resource Management (RRM), can be completed based on NCD-SSB. However, it is not clear at present which physical layer operations of the terminal are completed based on NCD-SSB. Summary of the Invention [Problem to be solved by the invention]

[0004] The embodiments of the present application provide a processing method, device and terminal for physical layer operation that can solve the problem that it is not yet clear at present what the physical layer operation of a terminal completed based on NCD-SSB is. [Means for solving the problem]

[0005] In a first aspect, The terminal performs a physical layer operation based on a first SSB when the first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB; The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of evaluating a radio link quality or evaluating a link recovery quality at each indication period.

[0006] In a second aspect, A first processing module is used for performing a physical layer operation based on a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB when the first downlink bandwidth portion BWP includes the first synchronization signal / physical broadcast channel signal block SSB; The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of evaluating a radio link quality or evaluating a link recovery quality at each indication period.

[0007] In a third aspect, there is provided a terminal comprising a processor and a memory in which programs or commands executable by the processor are stored, the program or commands being executed by the processor to implement steps of the method according to the first aspect.

[0008] In a fourth aspect, a first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defining SSB, the first downlink bandwidth portion BWP includes a processor for performing a physical layer operation based on the first SSB, and a communication interface; The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and evaluating the wireless link quality or the link recovery quality in each indication period.

[0009] In a fifth aspect, there is provided a readable storage medium having stored thereon a program or instructions which, when executed by a processor, implements the steps of the method according to the first aspect.

[0010] In a sixth aspect, there is provided a chip comprising a processor and a communication interface, the communication interface and the processor being coupled to execute a program or command to implement the method according to the first aspect.

[0011] In a seventh aspect, there is provided a computer program / program product stored on a storage medium, the computer program / program product being adapted to implement the steps of the method according to the first aspect when executed by at least one processor.

[0012] In an eighth aspect, there is provided a communications device configured to perform to implement the steps of the method according to the first aspect.

[0013] In an embodiment of the present application, when the first downlink bandwidth portion BWP includes a first SSB including a non-cell-defined SSB, the terminal performs a physical layer operation based on the first SSB, and the physical layer operation includes at least one of: determining an EPRE of a downlink CSI-RS; determining an associated operation on a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an available PRACH opportunity; scheduling repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in the first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in each indication period. In the embodiment of the present application, it is clear that the above physical layer operation is completed based on the first SSB, which includes a non-cell-defined SSB, and the network side can correspondingly configure the first SSB according to the physical layer operation. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 shows a configuration diagram of a communication system to which an embodiment of the present application can be applied. [Diagram 2] 1 shows a schematic flow chart of a processing method for physical layer operations in an embodiment of the present application. [Diagram 3] 1 shows a schematic diagram of the relationship of BWPs assigned to terminals in an embodiment of the present application; [Figure 4] 1 shows a schematic diagram of a module of a processing device for physical layer operations in an embodiment of the present application. [Diagram 5] 1 shows a block diagram of a configuration of a communication device according to an embodiment of the present application. [Figure 6] FIG. 2 shows a block diagram of a terminal configuration according to an embodiment of the present application. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, the technical solutions in the embodiments of the present application will be clearly described with reference to the drawings in the embodiments of the present application, and it is to be understood that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art belong to the protection scope of the present application.

[0016] The terms "first", "second", etc. in the specification and claims of this application are not intended to describe a particular order or sequence, but are intended to distinguish between similar objects. It should be understood that the terms used in this manner may be substituted for each other where appropriate, so that the embodiments of this application may be practiced in other sequences than those shown or described herein, and that the objects distinguished by "first" and "second" generally belong to one category and do not limit the number of objects, for example, the first object may be one or more. In addition, in the specification and claims, "and / or" refers to at least one of the connected objects, and the symbol " / " generally refers to the relationship between the related objects of the preceding and following relationships being "or".

[0017] It should be noted that the techniques described in the embodiments of the present application are not limited to Long Term Evolution (LTE) / LTE-Advanced (LTE-A) systems, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency-Division Multiple Access (SC-FDMA), and other systems. The terms "system" and "network" in the embodiments of the present application are often used interchangeably, and the techniques described can be used in other systems and wireless technologies in addition to the systems and wireless technologies mentioned above. Although the following description describes a New Radio (NR) system for illustrative purposes, and NR terminology is used in much of the following description, it should be understood that these technologies are not limited to 6th Generation (6G) and 7th Generation (7G) systems. th The present invention can also be applied to applications other than NR system applications, such as 6G (Generation, 6G) communication systems.

[0018] FIG. 1 shows a block diagram of a wireless communication system applicable to an embodiment of the present application. The wireless communication system includes a terminal 11 and a network side device 12. Here, the terminal 11 may be a mobile phone, a tablet personal computer, a laptop computer also called a notebook computer, a personal digital assistant (PDA), a personal digital assistant, a netbook, an ultra-mobile personal computer (UMPC), a mobile Internet device (MID), an augmented reality (AR) / virtual reality (VR) device, a robot, a wearable device, a vehicle user equipment (VUE), a pedestrian user equipment (PUE), a smart home (a home device with a wireless communication function such as a refrigerator, a television, a washing machine, or furniture), a game machine, a personal computer (PC), an automated teller machine, a kiosk, or other terminal side device. The wearable device includes a smart watch, a smart wristband, a smart earphone, a smart glasses, a smart accessory (such as a smart bracelet, a smart ring, a smart necklace, a smart anklet, a smart wristlet, a smart wear, etc.) It should be noted that the specific type of the terminal 11 is not limited in the embodiments of the present application. The network side equipment 12 may include an access network equipment or a core network equipment, where the access network equipment may be called a radio access network equipment, a radio access network (Radio Access Network, RAN), a radio access network function, or a radio access network unit.The access network equipment may include a base station, a Wireless Local Area Network (WLAN) access point, or a WiFi node, etc., and the base station may be called a Node B, an evolved Node B (eNB), an access point, a Base Transceiver Station (BTS), a radio base station, a radio transceiver, a Basic Service Set (BSS), an Extended Service Set (ESS), a Home B node, a Home evolved B node, a Transmitting Receiving Point (TRP), or any other suitable term in the art. As long as the same technical effect can be achieved, the base station is not limited to a specific technical term. It should be noted that the embodiments of this application only take a base station in an NR system as an example, but the specific type of the base station is not limited.The core network devices are: Core Network Node, Core Network Function, Mobility Management Entity (MME), Access and Mobility Management Function (AMF), Session Management Function (SMF), User Plane Function (UPF), Policy Control Function (PCF), Policy and Charging Rules Function (PCRF), Edge Application Server Discovery Function (EASDF), Unified Data Management (UDM), Unified Data Repository (UDR), Home Subscriber Server (HSS), Centralized network configuration (CNC), Network Repository Function (NRF), Network Exposure Function (NEF), Local NEF (Local NEF or L-NEF), Binding Support Function (BSF), Application Function (Application Response Function (APPF)), Application Response Function (APF) and Application Response Function (APF). The present application may include, but is not limited to, at least one of the following: A-F (Automatic Frequency Division Multiplexing) Function (AF), etc. In the embodiments of the present application, only the core network device in the NR system is introduced as an example, but it should be explained that the specific type of the core network device is not limited.

[0019] Next, the processing method of physical layer operation provided in the embodiments of the present application will be described in detail based on several embodiments and their use cases with reference to the drawings.

[0020] As shown in FIG. 2, the embodiment of the present application is The terminal includes a step 201 of performing a physical layer operation based on a first SSB when a first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB; The physical layer operation includes: The operation of the first term is to determine the energy per resource element (EPRE) of a downlink Channel State Information Reference Signal (CSI-RS); The operation of the second term is to determine an associated operation for a Physical Downlink Control Channel (PDCCH) candidate resource; 3. changing the transmission direction corresponding to the flexible slot by a dynamic slot format indicator (SFI); 4. determining an available Physical Random Access Channel (PRACH) opportunity or a Physical Uplink Shared Channel (PUSCH) opportunity; 5. Scheduling repeated transmissions by a first Downlink Control Information (DCI) scrambled by an UpLink grant (UL grant) of a Random Access Response (RAR) or a Temporary Cell Radio Network Temporary Identifier (TC-RNTI); 6. determining a correspondence between a Hybrid Automatic Repeat Request (HARQ) process number and a plurality of scheduled Physical Uplink Shared Channel (PUSCH) transmissions; 8. The operation of claim 7, determining a first condition to trigger a delay in transmission of a Semi-Persistent Scheduling (SPS) Hybrid Automatic Repeat Request Acknowledgement (HARQ-ACK) in a first slot; The operation of paragraph 8, determining a second condition for delaying the SPS HARQ-ACK to a second slot for transmission; and (9) an operation of evaluating the radio link quality or evaluating the link recovery quality at each indication period.

[0021] The terminal in the embodiment of the present application may be a reduced capability terminal (RedCap device / UE or reduced capability terminal) or a conventional terminal, i.e., a non-reduced capability terminal.

[0022] It should be noted that the method of the embodiment of the present application can also be applied to the flexible / full duplex and multiple TRP scenarios of release-18 (Rel-18).

[0023] In an embodiment of the present application, when a first SSB including a non-cell-defined SSB is included in a first downlink bandwidth part (BWP), the terminal performs a physical layer operation based on the first SSB, the physical layer operation including at least one of: determining an EPRE of a downlink channel state information reference signal (CSI Reference Signal, CSI-RS); determining an associated operation for a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an effective PRACH opportunity; scheduling repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in a first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in each indication period. In the embodiment of the present application, it is clear that the above physical layer operation is completed based on the first SSB, which includes a non-cell-defined SSB, and the network side can correspondingly configure the first SSB according to the physical layer operation.

[0024] Optionally, with respect to the operation of paragraph 1 above, the terminal determining the energy E P RE of each resource element of the downlink CSI-RS based on the first SSB; This includes determining the EPRE based on a power offset parameter for the target first SSB of the CSI-RS and a synchronization signal block power (SS-PBCH-Block Power) set by a higher layer.

[0025] Specifically, the EPRE is obtained by adding or subtracting a value corresponding to the synchronization signal block power and the power offset parameter.

[0026] Selectable, the target 1st SSB is A first SSB included in the first BWP; The first SSB, as set or assigned by the network; one of the first SSBs having the same target parameters as the second SSB; The target parameters include at least one of a synchronization signal block power (SS-PBCH-Block Power) and a physical cell identifier (PCI), and the second SSB includes a cell defining SSB (CD-SSB).

[0027] Optionally, with respect to the operation of paragraph 2 above, the terminal determining a related operation on PDCCH candidate resources based on the first SSB; When a resource element corresponding to a PDCCH candidate resource overlaps with a resource element corresponding to the first SSB, the terminal performs a first operation, the first operation including: not monitoring the PDCCH candidate resources; monitoring the PDCCH candidate resources or not receiving the first SSB; and determining that configuration or scheduling by the network is incorrect.

[0028] The PDCCH candidate resources include a PDCCH potential search space. If at least one resource element of the PDCCH candidate resources of the terminal overlaps with at least one RE in which the first SSB is located, the terminal performs the first operation.

[0029] Here, when the resource elements corresponding to the PDCCH candidate resources overlap with the resource elements corresponding to the first SSB, not monitoring the PDCCH candidate resources ensures reception of the SSB, and helps the terminal to accurately determine the time and accurately estimate the measurement channel quality through the measurement of the SSB. Also, not monitoring the PDCCH candidate resources allows the network scheduling to be unrestricted, and resource collision between the PDCCH candidate resources scheduled by the network and the first SSB is allowed.

[0030] Here, when resource elements corresponding to PDCCH candidate resources overlap with resource elements corresponding to the first SSB, by not receiving the first SSB, it is possible to prioritize reception of the PDCCH and reduce loss or delay of data or control signals; and by not receiving the first SSB, it is possible to not restrict network scheduling, and resource collisions between the PDCCH candidate resources scheduled by the network and the first SSB are permitted.

[0031] Optionally, with respect to the operation of the above paragraph 3, the terminal changing the transmission direction corresponding to the flexible slot by the dynamic slot format indicator SFI based on the first SSB includes: When detecting a second DCI having a first Slot Format Indicator (SFI) index field value, the terminal discards reception of the first SSB, or receives the first SSB, or determines the operation of the terminal according to the implementation of the terminal. Here, receiving the first SSB helps the terminal to accurately determine the time and estimate the accurate measured channel quality by measuring the SSB, and discarding reception of the first SSB determines the flexibility of the network to change the transmission direction and helps save power in the terminal. Alternatively, the terminal determines that it does not want a second DCI having a first SFI index field value to be detected.

[0032] Optionally, the fact that the terminal does not want the second DCI having the above-mentioned first SFI index field value to be detected may be understood to mean that the base station cannot transmit the second DCI having the first SFI index field value to the terminal, or that if the base station transmits the second DCI having the first SFI index field value to the terminal, the operation of the terminal will be unclear.

[0033] Here, the first SFI index field value indicates that the transmission direction corresponding to the first symbol is an uplink transmission direction, and the first symbol is at least one symbol among the symbols corresponding to the first SSB.

[0034] Here, if the first terminal does not want DCI format 2_0 (i.e., the second DCI) having the first SFI index field value to be detected for a set of symbols in which the first SSB exists, and if the first terminal detects that any symbol in the set of symbols indicated by this value is an uplink, or any symbol in the set of symbols indicated by DCI format 2_0 having the first SFI index field value is an uplink, the first terminal discards reception of the first SSB, or the operation of the first terminal depends on the implementation by the terminal, or the first terminal receives the first SSB.

[0035] Optionally, with respect to the operation of paragraph 4 above, the terminal determining a valid PRACH opportunity or a physical uplink shared channel (PUSCH opportunity) based on the first SSB, determining a first opportunity that is after the third SSB and / or the fourth SSB and has a distance from the fourth SSB that is greater than a first distance as a valid first opportunity, the first opportunity including at least one of a PRACH opportunity and a PUSCH opportunity; The third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a first SSB, or is a first SSB set or designated by a network; Alternatively, the third SSB is a second SSB in a slot in which a PRACH or a PUSCH is located, and the fourth SSB is a first SSB or a first SSB set or designated by a network; Alternatively, the third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a second SSB; The second SSB is a cell-defined SSB.

[0036] In one possible implementation, the fourth SSB is the last first SSB in the first slot, or a first SSB configured or specified by the network, the first slot being the slot in which the first opportunity occurs, or a slot prior to the slot in which the first opportunity occurs, e.g., the fourth SSB is located in the last few symbols in slot n, and the PRACH opportunity is located in the previous few symbols in slot n+1. The fourth SSB and the third SSB may be the same SSB or different SSBs.

[0037] In an embodiment of the present application, the first interval includes M symbols, where M may be specified in a protocol or set by the network.

[0038] In relation to this clause 4, in a symmetric or paired spectrum, a terminal that does not have full-duplex capability determines a valid physical random access channel PRACH opportunity, and in an asymmetric or unpaired spectrum, a half-duplex terminal determines a valid physical random access channel PRACH opportunity, and in a flexible spectrum or full-duplex spectrum, a half-duplex / full-duplex or flexible-duplex terminal determines a valid physical random access channel PRACH opportunity.

[0039] As a first type of implementation of an embodiment of the present application, for an asymmetric spectrum, if a PRACH opportunity (or PRACH resource) is not located before the third SSB in the slot in which the PRACH exists (it may overlap with the third SSB), and is after the fourth SSB in the slot in which the PRACH exists, and the interval between the fourth SSB and the PRACH opportunity is greater than a first interval, the PRACH opportunity is determined to be a valid PRACH opportunity.

[0040] In a second type of realization of the embodiment of the present application, if a PUSCH opportunity for two-step random access and scheduling grant in a Radio Resource Control (RRC) idle or inactive state is not located before the third SSB in a slot in which a PUSCH exists (it may overlap with the third SSB), and is after the fourth SSB in a slot in which a PUSCH opportunity exists, and the interval between the fourth SSB and the PUSCH opportunity is greater than the first interval, the PUSCH opportunity is determined to be a valid PUSCH opportunity.

[0041] Optionally, in an embodiment of the present application, before the terminal determines a valid PRACH opportunity based on a first SSB, the method further comprises: The method further includes the step of: the terminal performing a second operation, the second operation including: When target information is set in an uplink BWP associated with a first downlink BWP or when the terminal is in a connected state, determining that the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, and / or determining that the fourth SSB is a first SSB; and determining, when the terminal is in a connected state, that at least one of the third SSB and the fourth SSB is a first SSB configured or designated by a network; The target information is Dedicated random access channel configuration information, Common random access channel setting information, Beam failure recovery setting information, The physical uplink shared channel setting information includes at least one of the physical uplink shared channel setting information related to the two-step random access.

[0042] With respect to the operation of paragraph 5, the terminal schedules repeated transmission by using an uplink grant (RAR UL grant) or a first downlink control information (DCI) of a random access response based on a first SSB; When a resource corresponding to the N-th repeated transmission overlaps with a resource corresponding to the first SSB, the terminal performs a third operation, where N is a positive integer, and the third operation includes: delaying said Nth repeated transmission; discarding the Nth repeated transmission; and performing the N-th repeated transmission; determining that the network configuration or network scheduling is incorrect; The repeated transmission includes repeated transmission of a PUSCH or repeated transmission of a PUCCH.

[0043] With respect to the operation of paragraph 6, the terminal determines a correspondence between the HARQ process number and a plurality of scheduled PUSCH transmissions based on the first SSB, When the terminal is scheduled for a plurality of PUSCH transmissions by a third DCI, the HARQ process number indicated by the third DCI is associated with a first PUSCH transmission that does not overlap with a second symbol, and the second symbol is A downlink symbol indicated in a time division duplex uplink-downlink common configuration or a time division duplex uplink-downlink dedicated configuration; At least one of the symbols corresponding to the first SSB is included.

[0044] Optionally, the method of the present application includes: The method further includes determining a process number of the subsequent PUDCH transmission according to a scheduling order of subsequent PUSCH transmissions after the first PUSCH transmission and a HARQ process number of the first PUSCH transmission.

[0045] Optionally, determining a process number of the subsequent PUSCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH transmission, If a symbol corresponding to the subsequent PUSCH transmission does not overlap with the second symbol, determining a process number of the subsequent PUSCH transmission according to a scheduling order of the subsequent PUSCH transmission and a HARQ process number of the first PUSCH.

[0046] In an embodiment of the present application, when a UE is scheduled to transmit multiple PUSCHs by a DCI (the above-mentioned third DCI), the HARQ process ID indicated by the DCI is applied to the first PUSCH that does not overlap with the downlink symbol indicated by the TDD-UL-DL-Configuration Common or TDD-UL-DL-Configuration Dedicated, or is applied to the first PUSCH that does not overlap with any symbol corresponding to the first SSB. Then, for each subsequent PUSCH according to the scheduling order, the HARQ process ID is incremented by one, and the total number of HARQ process numbers (nrofHARQ-ProcessesForPUSCH) of PUSCHs is multiplied by one. If at least one of the symbols in a slot in which a PUSCH transmission exists, as indicated by an index row of the resource allocation table, overlaps with a Downlink (DL) symbol or a symbol in which the first SSB exists, as indicated by the Tdd-UL-DL-ConfigurationCommon or Tdd-UL-DL-ConfigurationDedicated, the HARQ process ID is not incremented for this non-transmitted PUSCH.

[0047] With respect to the operation of paragraph 7, the first condition is: The method includes: in a first slot, a PUCCH for transmitting an SPS HARQ-ACK is indicated by a first parameter; and a symbol corresponding to the PUCCH overlaps with a symbol corresponding to the first SSB.

[0048] Here, the first parameter includes at least one of a PUCCH resource list (set) fed back by semi-persistent scheduling (HARQ) and a PUCCH resource fed back by semi-persistent scheduling (HARQ).

[0049] In an embodiment of the present application, in the first slot, when the PUCCH transmitting the SPS HARQ-ACK is provided by the PUCCH resource list (SPS-PUCCH-AN-List) fed back by the semi-persistent scheduling HARQ or the PUCCH resource (n1PUCCH-AN) parameter fed back by the semi-persistent scheduling HARQ, and the PUCCH overlaps with the symbol where the first SSB exists by at least one symbol, a delay of the transmission procedure of the SPS HARQ-ACK is triggered.

[0050] With respect to the operation of paragraph 8, the second condition is: The method further includes a method in which a symbol corresponding to a PUCCH carrying an SPS HARQ-ACK indicated by a first parameter and transmitted with a delay in a second slot does not overlap with a symbol corresponding to the first SSB.

[0051] In an embodiment of the present application, if the PUCCH carrying the delayed SPS HARQ-ACK provided by the SPS-PUCCH-AN-List or n1PUCCH-AN parameter in the second slot does not completely overlap with the existing symbol of the first SSB, it can be determined that the second slot is the slot used to transmit the delayed SPS HARQ-ACK.

[0052] Optionally, for operation 9, the indicated period is the maximum of the shortest period of the first SSB and a predetermined time length.

[0053] Specifically, the predetermined time length may be 10 ms.

[0054] In an embodiment of the present application, the physical layer of the first terminal uses the first SSB to evaluate the radio link quality or link recovery quality once in each indication period, where the first terminal determines the radio link monitoring resource, i.e., the shortest period of the first SSB and the maximum value among 10 milliseconds, as the indication period.

[0055] Optionally, in an embodiment of the present application, the non-cell defined SSB includes at least one of the following: SSB configured by UE-dedicated RRC signalling. SSBs configured by BWP downlink dedicated signaling (BWP-Downlink Dedicated). The SSBs configured by the BWP downlink dedicated signaling may include SSBs configured by the ssb-PositionsInBurst parameter in the BWP downlink dedicated signaling. An SSB configured by a radio resource control (RRC) parameter related to a non-cell defining SSB configuration (e.g., Non Cell Defining SSB). An SSB that is not used to acquire System Information Block 1 (SIB1) of the current serving cell or an SSB that is not used to acquire SIB1 corresponding to the PDCCH setting of the current serving cell.

[0056] In an embodiment of the present application, when the first downlink bandwidth portion BWP includes a first SSB including a non-cell-defined SSB, the terminal performs a physical layer operation based on the first SSB, and the physical layer operation includes at least one of: determining an EPRE of a downlink CSI-RS; determining an associated operation on a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an available PRACH opportunity; scheduling repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in the first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in each indication period. In the embodiment of the present application, it is clear that the above physical layer operation is completed based on the first SSB, which includes a non-cell-defined SSB, and the network side can correspondingly configure the first SSB according to the physical layer operation.

[0057] In one embodiment of the present application, the first terminal (UE1) has a currently activated BWP as BWP#1, and the first SSB (including NCD-SSB) is configured by the network, and the second terminal (UE2) has a currently activated BWP as BWP#2, and only CD-SSB is configured by the network for BWP#2. UE2 only sees CD-SSB, but from the network's point of view, BWP#2 actually includes CD-SSB and NCD-SSB, as shown in FIG. 3. For UE1, the following is true:

[0058] In one embodiment of the present application, UE1 is a half-duplex (HD) UE in paired spectrum, and when the HD-UE transmits PUSCH, PUCCH, or Sounding Reference Signal (SRS) based on higher layer configuration, and the presence of SS / PBCH blocks in the HD-UE's active BWP is indicated by ssb-PositionsInBurst in SIB1 or ServingCellConfigCommon, or by NonCellDefiningSSB, the HD-UE does not transmit: PUSCH or PUCCH. The last symbol of a PUSCH or PUCCH transmission must be at least N symbols after the first symbol of the next earliest SS / PBCH block. Tx-Rx T c [4, TS 38.211]. PUSCH or PUCCH. The first symbol of a PUSCH or PUCCH transmission is the last symbol N of the previous closest SS / PBCH block. Rx-Tx T c [4, TS 38.211]. SRS. The symbol containing the SRS transmission must be at least N symbols after the first symbol of the next earliest SS / PBCH block. Tx-Rx T c If it is not located before. SRS. The symbol containing the SRS transmission is the last symbol N of the SS / PBCH block immediately preceding the symbol Rx-Tx T c It is not located after

[0059] N Tx-Rx T c and N Rx-Tx T c It should be explained that these have the same meaning as conventional parameters.

[0060] If the HD-UE transmits PRACH based on the detected DCI format, and transmits PUSCH, PUCCH or SRS, and the ssb-PositionsInBurst in SIB1 or ServingCellConfigCommon or the NonCellDefiningSSB indicates that an SS / PBCH block is present in a set of symbols (symbol set) of the HD-UE's active BWP, then if an uplink transmission overlaps with any symbol in the symbol set, the HD-UE does not transmit PUSCH, PUCCH or PRACH, and the HD-UE does not transmit SRS in that symbol set.

[0061] When an HD-UE transmits a PRACH or MsgA PUSCH triggered by higher layers in a set of symbols and receives a PDCCH or PDSCH or CSI-RS or a Downlink Positioning Reference Signal (DL PRS), or the presence of an SS / PBCH block in a set of symbols (symbol set) of the active BWP is indicated by ssb-PositionsInBurst in SIB1 or ServingCellConfigCommon or by NonCellDefiningSSB, the HD-UE can select whether to transmit a PRACH, transmit an MsgA PUSCH, or receive a PDSCH or CSI-RS or DL ​​PRS or PDCCH or an SS / PBCH block according to its implementation.

[0062] When the HD-UE receives a PDCCH, a PDSCH, a CSI-RS, or a DL PRS based on a configuration of higher layers, or when the ssb-PositionsInBurst in SIB1 or ServingCellConfigCommon or NonCellDefiningSSB indicates that an SS / PBCH block exists in a set of symbols (symbol set) of an active BWP, and the HD-UE transmits a PRACH or MsgA PUSCH triggered by higher layers, the start or end symbol of the PRACH transmission is N from the last or first symbol in the symbol set, respectively. Rx-Tx T c Or N Tx-Rx T c If it is earlier or later than this, the HD-UE can choose to transmit a PRACH, transmit a MsgA PUSCH, or receive a PDSCH or CSI-RS or DL ​​PRS or PDCCH or SS / PBCH block depending on its implementation.

[0063] In one embodiment of the present application, the UE's monitoring of PDCCH candidates can be achieved by the following method.

[0064] Method 1: Regarding monitoring of PDCCH candidates by the UE, the UE: ssb-PositionsInBurst for the serving cell has already been received, Do not monitor PDCCH candidates in the Type0-PDCCH CSS set, If at least one RE for a PDCCH candidate overlaps with at least one RE of the RE in which the candidate SS / PBCH block corresponding to the SS / PBCH block index provided by ssb-PositionsInBurst resides, the UE does not need to monitor the PDCCH candidate.

[0065] Method 2: Regarding monitoring of PDCCH candidates by the UE, the UE: ssb-PositionsInBurst has been received in the ServingCellConfigCommon and / or NonCellDefiningSSB of the serving cell, Do not monitor PDCCH candidates in the Type0-PDCCH CSS set, If at least one RE of a PDCCH candidate overlaps with at least one RE of an RE in which a candidate SS / PBCH block of the SS / PBCH block index exists and the SS / PBCH block index is provided by ssb-PositionsInBurst and / or NonCellDefiningSSB (if this parameter is provided) in ServingCellConfigCommon, the UE does not need to monitor the PDCCH candidate.

[0066] In one embodiment of the present application, for a set of symbols in a slot corresponding to an SS / PBCH block, the candidate SS / PBCH block index corresponds to the SS / PBCH block index indicated to the UE by ssb-PositionsInBurst in SIB1 or ssb-PositionsInBurst in ServingCellConfigCommon or NonCellDefiningSSB, and the UE does not want to detect DCI format 2_0 with an SFI-index field value, which indicates that the set of symbols in the slot are uplink.

[0067] In one embodiment of the present application, the candidate SS / PBCH block index of the SS / PBCH block corresponds to the SS / PBCH block index provided by ssb-PositionsInBurst or ServingCellConfigCommon in SIB1, or is provided by NonCellDefiningSSB, for details, see the description of the related protocol.

[0068] In one embodiment of the present application, a PUSCH opportunity is valid if it does not overlap in time and frequency with any valid PRACH opportunity associated with a Type-1 random access procedure or a Type-2 random access procedure. For non-paired spectrum and SS / PBCH blocks with indexes provided by ssb-PositionsInBurst or ServingCellConfigCommon or NonCellDefiningSSB in SIB1, see the description of the relevant protocol.

[0069] In one embodiment of the present application, the SS / PBCH block symbol is a symbol of an SS / PBCH block having a candidate SS / PBCH block index, and corresponds to the SS / PBCH block index indicated to the UE by ssb-PositionsInBurst in SIB1 or ssb-PositionsInBurst in ServingCellConfigCommon, or the SS / PBCH block index indicated to the UE by NonCellDefiningSSB; for details, see the description of the related protocol.

[0070] The physical layer operation processing method provided in the embodiment of the present application may be executed by a physical layer operation processing device. In the embodiment of the present application, the physical layer operation processing device provided in the embodiment of the present application will be described by taking the physical layer operation processing method executed by the physical layer operation processing device as an example.

[0071] As shown in FIG. 4, the embodiment of the present application is A first processing module 301 for performing a physical layer operation based on a first SSB when the first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB; The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of an evaluation of the radio link quality or an evaluation of the link recovery quality at each indication period.

[0072] Optionally, the first processing module is used to determine an EPRE according to a power offset parameter for a target first SSB of a CSI-RS and a synchronization signal block power set by a higher layer.

[0073] Optionally, the target first SSB is: A first SSB included in the first BWP; The first SSB, as set or assigned by the network; one of the first SSBs having the same target parameters as the second SSB; The target parameters include at least one of a synchronization signal block power and a physical cell identifier PCI, and the second SSB includes a cell-defined SSB.

[0074] Optionally, the first processing module is adapted to perform a first operation when a resource element corresponding to a PDCCH candidate resource overlaps with a resource element corresponding to the first SSB, the first operation including: not monitoring the PDCCH candidate resources; monitoring the PDCCH candidate resources or not receiving the first SSB; and determining that configuration or scheduling by the network is incorrect.

[0075] Optionally, the first processing module: When detecting a second DCI having a first SFI index field value, the terminal discards reception of the first SSB, or receives the first SSB, or determines an operation of the terminal, which is implemented by the terminal; Alternatively, the second DCI having the first SFI index field value is used to determine that the terminal does not want to detect the second DCI, The first SFI index field value indicates that the transmission direction corresponding to a first symbol is an uplink transmission direction, and the first symbol is at least one symbol among the symbols corresponding to the first SSB.

[0076] Optionally, the first processing module: to determine a first opportunity that is after the third SSB and / or the fourth SSB and has a distance from the fourth SSB that is greater than a first distance as a valid first opportunity, the first opportunity including at least one of a PRACH opportunity and a PUSCH opportunity; The third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a first SSB, or is a first SSB set or designated by a network; Alternatively, the third SSB is a second SSB in a slot in which a PRACH or a PUSCH is located, and the fourth SSB is a first SSB or a first SSB set or designated by a network; Alternatively, the third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a second SSB; The second SSB is a cell-defined SSB.

[0077] Optionally, the first processing module is further adapted to perform a second operation, the second operation being: When target information is set in an uplink BWP associated with a first downlink BWP or when the terminal is in a connected state, determining that the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, and / or determining that the fourth SSB is a first SSB; and determining, when the terminal is in a connected state, that at least one of the third SSB and the fourth SSB is a first SSB configured or designated by a network; The target information is Dedicated random access channel configuration information, Common random access channel setting information, Beam failure recovery setting information, The physical uplink shared channel setting information includes at least one of the physical uplink shared channel setting information related to the two-step random access.

[0078] Optionally, the first processing module is adapted to perform a third operation when a resource corresponding to the Nth repeated transmission overlaps with a resource corresponding to the first SSB, where N is a positive integer, and the third operation includes: delaying said Nth repeated transmission; discarding the Nth repeated transmission; and performing the N-th repeated transmission; determining that the network configuration or network scheduling is incorrect; The repeated transmission includes repeated transmission of a PUSCH or repeated transmission of a PUCCH.

[0079] Optionally, the first processing module is used to associate a HARQ process number indicated by the third DCI with a first PUSCH transmission that does not overlap with a second symbol when the terminal is scheduled for a plurality of PUSCH transmissions by a third DCI, and the second symbol is A downlink symbol indicated in a time division duplex uplink-downlink common configuration or a time division duplex uplink-downlink dedicated configuration; At least one of the symbols corresponding to the first SSB is included.

[0080] Optionally, the device of the present application comprises: The PUDCH transmission method further includes: a second processing module used for determining a process number of the subsequent PUSCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH transmission.

[0081] Optionally, the first processing module is used to determine a process number of the subsequent PUSCH transmission according to a scheduling order of the subsequent PUSCH transmission and a HARQ process number of the first PUSCH when a symbol corresponding to the subsequent PUSCH transmission does not overlap with the second symbol.

[0082] Optionally, the first condition is: In a first slot, a PUCCH for transmitting an SPS HARQ-ACK is indicated by a first parameter, and a symbol corresponding to the PUCCH overlaps with a symbol corresponding to the first SSB; The first parameter includes at least one of SPS-PUCCH-AN-List and n1PUCCH-AN.

[0083] Optionally, the second condition is: A symbol corresponding to a PUCCH carrying an SPS HARQ-ACK indicated by a first parameter in a second slot and transmitted with a delay does not overlap with a symbol corresponding to the first SSB; The first parameter includes at least one of SPS-PUCCH-AN-List and n1PUCCH-AN.

[0084] Optionally, the indicated period is the maximum of the shortest period of the first SSB and a predetermined length of time.

[0085] Optionally, the non-cell defined SSB may: SSB set by terminal specific signalling, SSB configured by BWP downlink specific signaling, SSBs configured by radio resource control (RRC) parameters related to non-cell defined SSB configuration; It includes at least one of an SSB that is not used to acquire a system information block SIB1 of the current serving cell, or an SSB that is not used to acquire a SIB1 corresponding to the PDCCH setting of the current serving cell.

[0086] In an embodiment of the present application, when the first downlink bandwidth portion BWP includes a first SSB including a non-cell-defined SSB, a physical layer operation is performed based on the first SSB, the physical layer operation including at least one of: determining an EPRE of a downlink CSI-RS; determining an associated operation on a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an available PRACH opportunity; scheduling a repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in a first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in each indication period. In the embodiment of the present application, it is clear that the above physical layer operation is completed based on the first SSB, which includes a non-cell-defined SSB, and the network side can correspondingly configure the first SSB according to the physical layer operation.

[0087] The processing device of the physical layer operation in the embodiment of the present application may be an electronic device, for example an electronic device with an operating system, or may be a component in an electronic device, for example an integrated circuit or chip. The electronic device may be a terminal, or other devices other than a terminal. Exemplarily, the terminal may include, but is not limited to, the types of terminal 11 listed above, and the other devices may be a server, a network attached storage (NAS), etc. In the embodiment of the present application, there is no specific limitation.

[0088] The physical layer operation processing device provided in the embodiment of the present application can realize each step implemented in the method embodiment of FIG. 2 and achieve the same technical effect, and detailed description thereof will be omitted here to avoid repetition.

[0089] Optionally, as shown in FIG. 5, an embodiment of the present application further provides a communication device 400 including a processor 401 and a memory 402 in which programs or commands executable by the processor 401 are stored, for example, when the communication device 400 is a terminal, when the programs or commands are executed by the processor 401, each step of the embodiment of the physical layer operation processing method can be realized and the same technical effect can be achieved, and detailed description thereof will be omitted here to avoid repetition.

[0090] An embodiment of the present application is a terminal including a processor that performs a physical layer operation based on a first SSB when a first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defining SSB, and a communication interface, The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of evaluating a wireless link quality or evaluating a link recovery quality in each indication period.

[0091] This terminal embodiment corresponds to the above terminal side method embodiment, and each implementation step and realization form of the above method embodiment can be applied to this terminal embodiment, and the same technical effects can be achieved. Specifically, Figure 6 is a schematic diagram of the hardware configuration of a terminal that realizes the embodiment of this application.

[0092] The terminal 500 includes at least some elements such as, but not limited to, a radio frequency unit 501, a network module 502, an audio output unit 503, an input unit 504, a sensor 505, a display unit 506, a user input unit 507, an interface unit 508, a memory 509 and a processor 510.

[0093] As can be understood by those skilled in the art, the terminal 500 may further include a power source (e.g., a battery) for supplying power to each component, and the power source may be logically connected to the processor 510 via a power management system, which may further realize functions such as charge / discharge management and power consumption management. The configuration of the terminal shown in FIG. 6 is not intended to limit the terminal, and the terminal may include more or fewer components than those shown, or a combination of some components, or a different component arrangement, and detailed description thereof will be omitted here.

[0094] It should be understood that in the embodiment of the present application, the input unit 504 may include a graphics processing unit (GPU) 5041 and a microphone 5042 for processing image data of still or video captured by an image capture device (e.g., a camera) in a video capture mode or an image capture mode. The display unit 506 may include a display panel 5061, which may be arranged in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 507 includes at least one of a touch panel 5071 and other input devices 5072. The touch panel 5071 is also called a touch panel. The touch panel 5071 may include two parts: a touch detection device and a touch controller. The other input devices 5072 may include, but are not limited to, a physical keyboard, a function button (e.g., a volume control button, a switch button, etc.), a trackball, a mouse, and an operation lever. Detailed description is omitted here.

[0095] In the embodiment of the present application, the high frequency unit 501 can receive downlink data from the network side device, and then transmit the data to the processor 510 for processing. The high frequency unit 501 can also transmit uplink data to the network side device. Typically, the high frequency unit 501 includes, but is not limited to, an antenna, an amplifier, a receiver-transmitter, a coupler, a low-noise amplifier, a duplexer, etc.

[0096] The memory 509 can be used to store software programs or commands and various data. The memory 509 may mainly include a first storage area capable of storing an operating system, an application or command required for at least one function (e.g., a sound playback function, an image playback function, etc.), and a second storage area for storing data. The memory 509 may also include a volatile memory or a non-volatile memory, or the memory 509 may include both a volatile and a non-volatile memory. Here, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be Random Access Memory (RAM), Static Random Access Memory (SRAM), Dynamic Random Access Memory (DRAM), Synchronous Dynamic Random Access Memory (SDRAM), Double Data Rate Synchronous Dynamic Random Access Memory (DDRSDRAM), Enhanced Synchronous Dynamic Random Access Memory (ESDRAM), Synch link Dynamic Random Access Memory (SLDRAM), and Direct Rambus Random Access Memory (DRRAM). Memory 509 in embodiments of the present application includes, but is not limited to, these and any other suitable types of memory.

[0097] The processor 510 may include one or more processing units, and may optionally integrate an application processor that mainly processes operations related to an operating system, a user interface, applications, etc., and a modem processor that mainly processes wireless communication signals, such as a baseband processor, in the processor 510. It is understandable that the modem processor may not be integrated in the processor 510.

[0098] Wherein, the processor 510 is used for performing a physical layer operation based on a first SSB when the first downlink bandwidth portion BWP includes a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB; The physical layer operation includes: determining an energy E P RE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing a transmission direction corresponding to the flexible slot according to a dynamic slot format indicator (SFI); determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; scheduling repeated transmissions by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (SPS) hybrid automatic repeat request (HARQ-ACK) in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and evaluating the wireless link quality or the link recovery quality at each indication period.

[0099] Optionally, the processor 510 is further configured to determine an EPRE according to a power offset parameter for the target first SSB of the CSI-RS and a synchronization signal block power set by higher layers.

[0100] Optionally, the target first SSB is: A first SSB included in the first BWP; The first SSB, as set or assigned by the network; one of the first SSBs having the same target parameters as the second SSB; The target parameters include at least one of a synchronization signal block power and a physical cell identifier PCI, and the second SSB includes a cell-defined SSB.

[0101] Optionally, the processor 510 is further configured to cause the terminal to perform a first operation when a resource element corresponding to a PDCCH candidate resource overlaps with a resource element corresponding to the first SSB, the first operation comprising: not monitoring the PDCCH candidate resources; monitoring the PDCCH candidate resources or not receiving the first SSB; and determining that configuration or scheduling by the network is incorrect.

[0102] Optionally, the processor 510 is further configured to determine whether the terminal discards reception of the first SSB or receives the first SSB when detecting a second DCI having a first SFI index field value, or an operation of the terminal implemented by the terminal; Alternatively, the second DCI having the first SFI index field value is used to determine that the terminal does not want to detect the second DCI, The first SFI index field value indicates that the transmission direction corresponding to a first symbol is an uplink transmission direction, and the first symbol is at least one symbol among the symbols corresponding to the first SSB.

[0103] Optionally, the processor 510 is further adapted to determine a first opportunity that is after the third SSB and / or the fourth SSB and has a distance from the fourth SSB that is greater than a first distance as a valid first opportunity, the first opportunity including at least one of a PRACH opportunity and a PUSCH opportunity; The third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a first SSB, or is a first SSB set or designated by a network; Alternatively, the third SSB is a second SSB in a slot in which a PRACH or a PUSCH is located, and the fourth SSB is a first SSB or a first SSB set or designated by a network; Alternatively, the third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a second SSB; The second SSB is a cell-defined SSB.

[0104] Optionally, the processor 510 is further adapted to perform a second operation, the second operation being: When target information is set in an uplink BWP associated with a first downlink BWP or when the terminal is in a connected state, determining that the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, and / or determining that the fourth SSB is a first SSB; and determining, when the terminal is in a connected state, that at least one of the third SSB and the fourth SSB is a first SSB configured or designated by a network; The target information is Dedicated random access channel configuration information, Common random access channel setting information, Beam failure recovery setting information, The physical uplink shared channel setting information includes at least one of the physical uplink shared channel setting information related to the two-step random access.

[0105] Optionally, the processor 510 is further configured for the terminal to perform a third operation when a resource corresponding to the Nth repeated transmission overlaps with a resource corresponding to the first SSB, where N is a positive integer, and the third operation includes: delaying said Nth repeated transmission; discarding the Nth repeated transmission; and performing the N-th repeated transmission; determining that the network configuration or network scheduling is incorrect; The repeated transmission includes repeated transmission of a PUSCH or repeated transmission of a PUCCH.

[0106] Optionally, the processor 510 is further configured to, when the terminal is scheduled for a plurality of PUSCH transmissions by a third DCI, associate a HARQ process number indicated by the third DCI with a first PUSCH transmission that does not overlap with a second symbol, the second symbol being: A downlink symbol indicated in a time division duplex uplink-downlink common configuration or a time division duplex uplink-downlink dedicated configuration; At least one of the symbols corresponding to the first SSB is included.

[0107] Optionally, the processor 510 is further configured to determine a process number of the subsequent PUSCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH.

[0108] Optionally, the processor 510 is further configured to determine a process number of the subsequent PUSCH transmission according to the scheduling order of the subsequent PUSCH transmission and the HARQ process number of the first PUSCH when the symbol corresponding to the subsequent PUSCH transmission does not overlap with the second symbol.

[0109] Optionally, the first condition is: In a first slot, a PUCCH for transmitting an SPS HARQ-ACK is indicated by a first parameter, and a symbol corresponding to the PUCCH overlaps with a symbol corresponding to the first SSB; The first parameter includes at least one of SPS-PUCCH-AN-List and n1PUCCH-AN.

[0110] Optionally, the second condition is: A symbol corresponding to a PUCCH carrying an SPS HARQ-ACK indicated by a first parameter in a second slot and transmitted with a delay does not overlap with a symbol corresponding to the first SSB; The first parameter includes at least one of SPS-PUCCH-AN-List and n1PUCCH-AN.

[0111] Optionally, the indicated period is the maximum of the shortest period of the first SSB and a predetermined length of time.

[0112] Optionally, the non-cell defined SSB may: SSB set by terminal specific signalling, SSB configured by BWP downlink specific signaling, SSBs configured by radio resource control (RRC) parameters related to non-cell defined SSB configuration; It includes at least one of an SSB that is not used to acquire a system information block SIB1 of the current serving cell, or an SSB that is not used to acquire a SIB1 corresponding to the PDCCH setting of the current serving cell.

[0113] In an embodiment of the present application, when the first downlink bandwidth portion BWP includes a first SSB including a non-cell-defined SSB, the terminal performs a physical layer operation based on the first SSB, and the physical layer operation includes at least one of: determining an EPRE of a downlink CSI-RS; determining an associated operation on a PDCCH candidate resource; changing a transmission direction corresponding to a flexible slot according to an SFI; determining an available PRACH opportunity; scheduling repeated transmission according to an RAR UL grant or a first DCI; determining a correspondence between an HARQ process number and a plurality of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of an SPS HARQ-ACK in the first slot; determining a second condition for delaying transmission of the SPS HARQ-ACK to a second slot; and evaluating radio link quality or evaluating link recovery quality in each indication period. In the embodiment of the present application, it is clear that the above physical layer operation is completed based on the first SSB, which includes a non-cell-defined SSB, and the network side can correspondingly configure the first SSB according to the physical layer operation.

[0114] An embodiment of the present application further provides a readable storage medium in which a program or command is stored, and when the program or command is executed by a processor, the medium can realize each step of the embodiment of the physical layer operation processing method and achieve the same technical effect, and detailed description thereof will be omitted here to avoid repetition.

[0115] Wherein, the processor is the processor in the terminal according to the above embodiment. The readable storage medium includes a computer readable storage medium such as a computer read only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0116] An embodiment of the present application further provides a chip comprising a processor and a communication interface, the communication interface and the processor being coupled to each other, and the processor executing a program or command to realize each step of the embodiment of the above-mentioned physical layer operation processing method, and capable of achieving the same technical effect, and detailed description thereof will be omitted here to avoid repetition.

[0117] It should be understood that the chips referred to in the embodiments of this application may be referred to as system level chips, system chips, chip systems, system on chips, or the like.

[0118] The embodiments of the present application further provide a computer program / program product that can be stored in a storage medium and executed by at least one processor to realize each step of the embodiments of the above-mentioned physical layer operation processing method and achieve the same technical effects, and detailed descriptions thereof will be omitted here to avoid repetition.

[0119] It should be noted that in this specification, the terms "comprise", "consist of" or any other variations are intended to include a non-exclusive inclusion, whereby a process, method, article, or apparatus that includes a set of elements includes not only those elements, but also other elements not expressly stated or inherent to such process, method, article, or apparatus. Unless otherwise specified, an element limited by the phrase "comprises a ..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes the element. It should also be noted that the scope of the method and apparatus in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may include performing functions substantially simultaneously or in the reverse order depending on such functions, for example, the described method may be performed in a different order than described, and various steps may be added, omitted, or combined. Also, features described with reference to any example may be combined in other examples.

[0120] From the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be realized in the form of a combination of software and a necessary common hardware platform, and of course, they can also be realized by hardware, but in many cases the former is a more preferred embodiment. Based on this view, the technical solutions of the present application can be substantially or the part that contributes to the prior art can be embodied in the form of a computer software product, which is stored in a storage medium (e.g., ROM / RAM, magnetic disk, optical disk) and includes a number of commands that cause a terminal (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in the embodiments of the present application.

[0121] Although the examples of the present application have been described above with reference to the drawings, the present application is not limited to the above-mentioned specific embodiments, which are merely illustrative and not limiting. Based on the suggestions of the present application, many forms that a person skilled in the art can make without departing from the spirit of the present application and the scope of protection of the claims are all within the scope of protection of the present application.

Claims

1. The terminal performs a physical layer operation based on a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB when the first downlink bandwidth portion BWP includes the first synchronization signal / physical broadcast channel signal block SSB; The physical layer operation includes: determining an energy EPRE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing the transmission direction corresponding to the flexible slot according to a dynamic slot format indicator SFI; determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; - scheduling a recurring transmission by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (HARQ) HARQ-ACK in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of evaluating radio link quality or evaluating link recovery quality at each indication period.

2. The terminal determines an energy EPRE of each resource element of a downlink CSI-RS based on a first SSB, The method of claim 1 , comprising determining an EPRE according to a power offset parameter for a target first SSB of a CSI-RS and a synchronization signal block power set by a higher layer.

3. The target first SSB is A first SSB included in the first BWP; A first SSB configured or assigned by the network; one of the first SSBs having the same target parameter as the second SSB; 3. The method of claim 2, wherein the target parameters include at least one of a synchronization signal block power and a physical cell identifier PCI, and the second SSB includes a cell-defined SSB.

4. The terminal determines an associated operation for a PDCCH candidate resource based on the first SSB, When a resource element corresponding to a PDCCH candidate resource overlaps with a resource element corresponding to the first SSB, the terminal performs a first operation, the first operation including: not monitoring the PDCCH candidate resources; monitoring the PDCCH candidate resources or not receiving the first SSB; and determining that configuration or scheduling by the network is incorrect.

5. The terminal changes a transmission direction corresponding to a flexible slot according to a dynamic slot format indicator (SFI) based on a first SSB, When detecting a second DCI having a first SFI index field value, the terminal discards reception of the first SSB, or receives the first SSB, or determines an operation of the terminal, which is implemented by the terminal; Alternatively, the method includes determining that the terminal does not want a second DCI having a first SFI index field value to be detected; 2. The method of claim 1, wherein the first SFI index field value indicates that a transmission direction corresponding to a first symbol is an uplink transmission direction, and the first symbol is at least one symbol among symbols corresponding to the first SSB.

6. The terminal determines a valid PRACH opportunity or a physical uplink shared channel (PUSCH) opportunity based on the first SSB, determining a first opportunity that is after the third SSB and / or the fourth SSB and has an interval from the fourth SSB that is greater than a first interval as a valid first opportunity, the first opportunity including at least one of a PRACH opportunity and a PUSCH opportunity; The third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a first SSB, or is a first SSB set or designated by a network; Alternatively, the third SSB is a second SSB in a slot in which a PRACH or a PUSCH is located, and the fourth SSB is a first SSB or a first SSB set or designated by a network; Alternatively, the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a second SSB; The method of claim 1 , wherein the second SSB is a cell-defined SSB.

7. The method further includes the step of the terminal performing a second operation, the second operation including: When target information is set in an uplink BWP associated with a first downlink BWP or when the terminal is in a connected state, determining that the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, and / or determining that the fourth SSB is a first SSB; determining that at least one of the third SSB and the fourth SSB is a first SSB set or designated by a network when the terminal is in a connected state; The target information is Dedicated random access channel configuration information, Common random access channel setting information, Beam failure recovery setting information, The method of claim 6, further comprising at least one of physical uplink shared channel configuration information related to two-step random access.

8. The terminal schedules repeated transmission by an uplink grant (RAR UL grant) or a first downlink control information (DCI) of a random access response based on a first SSB, When a resource corresponding to the N-th repeated transmission overlaps with a resource corresponding to the first SSB, the terminal performs a third operation, where N is a positive integer, and the third operation includes: delaying the Nth repeated transmission; discarding the Nth repeated transmission; performing the N-th repeated transmission; determining that the network configuration or network scheduling is incorrect; The method of claim 1 , wherein the repeated transmission comprises repeated transmission of a PUSCH or repeated transmission of a PUCCH.

9. The terminal determines a correspondence between a HARQ process number and a plurality of scheduled PUSCH transmissions based on the first SSB, When the terminal is scheduled for a plurality of PUSCH transmissions by the third DCI, the HARQ process number indicated in the third DCI is associated with a first PUSCH transmission that does not overlap with a second symbol, and the second symbol is A downlink symbol indicated in a time division duplex uplink-downlink common configuration or a time division duplex uplink-downlink dedicated configuration; The method of claim 1 , including at least one of the symbols corresponding to a first SSB.

10. determining a process number of the subsequent PUDCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH; 10. The method of claim 9.

11. determining a process number of the subsequent PUDCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH, 11. The method of claim 10, further comprising: determining a process number of the subsequent PUDCH transmission according to a scheduling order of the subsequent PUSCH transmission and a HARQ process number of the first PUSCH when a symbol corresponding to the subsequent PUSCH transmission does not overlap with the second symbol.

12. The first condition is: A PUCCH carrying an SPS HARQ-ACK in a first slot is indicated by a first parameter, and a symbol corresponding to the PUCCH overlaps with a symbol corresponding to the first SSB; The method of claim 1 , wherein the first parameter comprises at least one of a PUCCH resource list fed back by semi-persistent scheduling HARQ and a PUCCH resource fed back by semi-persistent scheduling HARQ.

13. The second condition is: A symbol corresponding to a PUCCH carrying an SPS HARQ-ACK indicated by a first parameter and transmitted with a delay in a second slot does not overlap with a symbol corresponding to the first SSB; The method of claim 1 , wherein the first parameter comprises at least one of a PUCCH resource list fed back by semi-persistent scheduling HARQ and a PUCCH resource fed back by semi-persistent scheduling HARQ.

14. 2. The method of claim 1, wherein the indication period is the maximum of the shortest period of the first SSB and a predetermined time length.

15. The non-cell defined SSB is SSB set by terminal specific signaling, SSB configured by specific signaling in the downlink of the BWP; SSB configured by radio resource control (RRC) parameters related to non-cell defined SSB configuration; The method according to claim 1 , comprising at least one of: SSBs not used to acquire a system information block SIB1 of a current serving cell; or SSBs not used to acquire a SIB1 corresponding to a PDCCH configuration of a current serving cell.

16. A first processing module is used to perform a physical layer operation based on a first synchronization signal / physical broadcast channel signal block SSB including a non-cell-defined SSB when the first downlink bandwidth portion BWP includes the first synchronization signal / physical broadcast channel signal block SSB; The physical layer operation includes: determining an energy EPRE of each resource element of a downlink channel state information reference signal CSI-RS; determining an associated operation for a physical downlink control channel (PDCCH) candidate resource; changing the transmission direction corresponding to the flexible slot according to a dynamic slot format indicator SFI; determining an available physical random access channel (PRACH) or physical uplink shared channel (PUSCH) opportunity; - scheduling a recurring transmission by a random access response uplink grant RAR UL grant or a first downlink control information DCI scrambled by a temporary cell radio network temporary identifier TC-RNTI; Determining a correspondence between hybrid automatic repeat request (HARQ) process numbers and a number of scheduled PUSCH transmissions; determining a first condition for triggering a delay in transmission of a semi-persistent scheduling (HARQ) HARQ-ACK in a first slot; determining a second condition for delaying the SPS HARQ-ACK transmission to a second slot; and performing at least one of evaluating the radio link quality or evaluating the link recovery quality at each indication period.

17. The apparatus of claim 16, wherein the first processing module is used to determine an EPRE according to a power offset parameter for a target first SSB of a CSI-RS and a synchronization signal block power set by a higher layer.

18. The target first SSB is A first SSB included in the first BWP; A first SSB configured or assigned by the network; one of the first SSBs having the same target parameter as the second SSB; 20. The apparatus of claim 17, wherein the target parameters include at least one of a synchronization signal block power and a physical cell identifier PCI, and the second SSB includes a cell-defined SSB.

19. The first processing module is used to perform a first operation when a resource element corresponding to a PDCCH candidate resource overlaps with a resource element corresponding to the first SSB, and the first operation includes: not monitoring the PDCCH candidate resources; monitoring the PDCCH candidate resources or not receiving the first SSB; and determining that configuration or scheduling by the network is incorrect.

20. The first processing module is When detecting a second DCI having a first SFI index field value, discarding reception of the first SSB, receiving the first SSB, or determining an operation of the terminal, which is implemented by the terminal; Alternatively, the second DCI having the first SFI index field value is used to determine that the terminal does not want to detect the second DCI, 17. The apparatus of claim 16, wherein the first SFI index field value indicates that a transmission direction corresponding to a first symbol is an uplink transmission direction, and the first symbol is at least one symbol among symbols corresponding to the first SSB.

21. The first processing module is to determine a first opportunity that is after the third SSB and / or the fourth SSB and has an interval from the fourth SSB that is greater than a first interval as a valid first opportunity, the first opportunity including at least one of a PRACH opportunity and a PUSCH opportunity; The third SSB is a first SSB in a slot in which a PRACH or a PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a first SSB, or is a first SSB set or designated by a network; Alternatively, the third SSB is a second SSB in a slot in which a PRACH or a PUSCH is located, and the fourth SSB is a first SSB or a first SSB set or designated by a network; Alternatively, the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, or is a first SSB set or designated by a network, and the fourth SSB is a second SSB; The apparatus of claim 16 , wherein the second SSB is a cell-defined SSB.

22. The first processing module is further adapted to perform a second operation, the second operation comprising: When target information is set in an uplink BWP associated with a first downlink BWP or when the terminal is in a connected state, determining that the third SSB is a first SSB in a slot in which the PRACH or PUSCH is located, and / or determining that the fourth SSB is a first SSB; determining that at least one of the third SSB and the fourth SSB is a first SSB set or designated by a network when the terminal is in a connected state; The target information is Dedicated random access channel configuration information, Common random access channel setting information, Beam failure recovery setting information, 22. The apparatus of claim 21, further comprising at least one of physical uplink shared channel configuration information related to two-step random access.

23. The first processing module is used to perform a third operation when a resource corresponding to the Nth repeated transmission overlaps with a resource corresponding to the first SSB, where N is a positive integer, and the third operation includes: delaying the Nth repeated transmission; discarding the Nth repeated transmission; performing the N-th repeated transmission; determining that the network configuration or network scheduling is incorrect; The apparatus of claim 16 , wherein the repeated transmission comprises repeated transmission of a PUSCH or repeated transmission of a PUCCH.

24. The first processing module is used to associate a HARQ process number indicated in the third DCI with a first PUSCH transmission that does not overlap with a second symbol when a terminal is scheduled for a plurality of PUSCH transmissions by a third DCI, and the second symbol is A downlink symbol indicated in a time division duplex uplink-downlink common configuration or a time division duplex uplink-downlink dedicated configuration; 17. The apparatus of claim 16, including at least one of the symbols corresponding to a first SSB.

25. A second processing module is used to determine a process number of the subsequent PUDCH transmission according to a scheduling order of the subsequent PUSCH transmission after the first PUSCH transmission and a HARQ process number of the first PUSCH.

25. The apparatus of claim 24.

26. The apparatus of claim 25, wherein the first processing module is used to determine a process number of the subsequent PUDCH transmission according to a scheduling order of the subsequent PUSCH transmission and a HARQ process number of the first PUSCH when a symbol corresponding to the subsequent PUSCH transmission does not overlap with the second symbol.

27. The first condition is: A PUCCH carrying an SPS HARQ-ACK in a first slot is indicated by a first parameter, and a symbol corresponding to the PUCCH overlaps with a symbol corresponding to the first SSB; The apparatus of claim 16 , wherein the first parameter comprises at least one of a PUCCH resource list fed back by semi-persistent scheduling HARQ and a PUCCH resource fed back by semi-persistent scheduling HARQ.

28. The second condition is: A symbol corresponding to a PUCCH carrying an SPS HARQ-ACK indicated by a first parameter and transmitted with a delay in a second slot does not overlap with a symbol corresponding to the first SSB; The apparatus of claim 16 , wherein the first parameter comprises at least one of a PUCCH resource list fed back by semi-persistent scheduling HARQ and a PUCCH resource fed back by semi-persistent scheduling HARQ.

29. 17. The apparatus of claim 16, wherein the indication period is the maximum of a shortest period of the first SSB and a predetermined time length.

30. The non-cell defined SSB is SSB set by terminal specific signaling, SSB configured by specific signaling in the downlink of the BWP; SSB configured by radio resource control (RRC) parameters related to non-cell defined SSB configuration; The apparatus of claim 16, comprising at least one of an SSB that is not used to acquire a system information block SIB1 of a current serving cell, or an SSB that is not used to acquire a SIB1 corresponding to a PDCCH configuration of a current serving cell.

31. A terminal comprising a processor and a memory in which programs or commands executable by the processor are stored, the programs or commands being executed by the processor to implement the steps of the method for processing physical layer operations according to any one of claims 1 to 15.

32. A readable storage medium having stored thereon a program or command, which, when executed by a processor, implements the steps of the method for processing physical layer operations according to any one of claims 1 to 15.

Citation Information

Patent Citations

  • Power Control Procedures for Radio Systems

    US20220046552A1