Greenhouse gas emission management methods

JP2026104665APending Publication Date: 2026-06-25ASUNE CO LTD

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
ASUNE CO LTD
Filing Date
2024-12-13
Publication Date
2026-06-25

AI Technical Summary

Benefits of technology

【0008】 本発明によれば、事業者による水セキュリティの監査·保証業務を効率的に実現する方法を提供することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026104665000001_ABST
    Figure 2026104665000001_ABST
Patent Text Reader

Abstract

This provides a greenhouse gas emission management method that enables businesses to efficiently conduct water security audits. [Solution] In a greenhouse gas emissions management system in which an administrator terminal and multiple business terminals are interconnected via a communication network, a method to support an audit of a business operator's water security by an auditing firm, which is performed by the administrator terminal, involves the administrator terminal's control unit generating report data based on the business operator's water usage data, and generating question data along with the report data, which includes points to be raised regarding anomalies determined based on a comparison with the business operator's past water usage data.
Need to check novelty before this filing date? Find Prior Art

Claims

1. A method for supporting audits of a business operator's water security by an auditing firm, which is performed by a management terminal, The control unit of the aforementioned management terminal is: Based on the water usage data of the aforementioned business operator, report data is generated. A method for generating questionnaire data that includes, along with the aforementioned report data, points to be raised regarding anomalies determined based on a comparison with the business operator's past water usage data.

2. The method according to claim 1, wherein the control unit receives response data to the questionnaire data from the business operator's terminal.

3. The control unit, The method according to claim 2, wherein, based on the received response data, the fact that corrections have been made to the points raised is stored as a log in the storage unit of the management terminal.

4. The control unit, The method according to claim 2, wherein if it is determined that the abnormal value is a normal value based on the received response data, the highlighting of the abnormal value is turned off.

5. The control unit, The method according to claim 2, wherein, based on the received response data, if it is determined that the abnormal value is a normal value, the fact that it is a normal value is stored in the storage unit of the management terminal.