Projects within a Process Control Asset Management System

The asset management system addresses the issue of inaccurate statistics in process control plants by separating project and non-project device data, ensuring accurate tracking and reporting of device health and project progress.

JP7561176B2Active Publication Date: 2024-10-03FISHER ROSEMOUNT SYST INC
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2022203019
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2017-10-02
Filing Date
2022-12-20
Publication Date
2024-10-03
Estimated Expiration
2038-10-01

AI Technical Summary

Technical Problem

Current asset management systems in process control plants struggle to provide accurate statistical analysis during commissioning or maintenance projects, as they include devices that are not operational, leading to misleading health and operational status data, and lack the ability to filter out devices involved in projects from production statistics.

Method used

An asset management system that allows users to define projects, separate device data into project and non-project categories, and provide statistical information only for operational devices, using device manager and viewer applications to track project progress and health.

Benefits of technology

Enables accurate tracking of project progress and device health, filtering out non-operational devices, and providing precise health and operational status data, preventing misleading statistics and improving decision-making during commissioning and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561176000001
    Figure 0007561176000001
  • Figure 0007561176000002
    Figure 0007561176000002
  • Figure 0007561176000003
    Figure 0007561176000003
Patent Text Reader

Abstract

A method and asset management system for tracking device information in a plant having multiple plant assets is provided. [Solution] An asset management system includes a database that stores asset data for devices within a plant, and a viewing system that accesses the asset data and provides statistical information for plant assets. A user defines and stores projects within the plant and sets of plant assets associated with each project, performs statistical analysis of the assets for the defined projects, and presents raw statistical information for the assets within the projects via a user interface. An analysis engine determines device state or health status for assets associated with the projects and presents statistical and / or historical information for the number or percentage of assets within the projects that are in a particular state or status. The system enables a user to use the information to determine the progress or completion rate of a project.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS This application claims the benefit of U.S. Provisional Patent Application No. 62 / 566,792, entitled “Projects Within a Process Control Asset Management System,” filed on October 2, 2017, which is related to U.S. Patent Application No. 14 / 477,266, entitled “Bulk Field Device Operations,” filed on September 4, 2014, the entire disclosure of which is expressly incorporated herein by reference.

[0002] The present disclosure relates generally to process control plants and systems, and more particularly to determining and assessing the status of a particular set of process control devices within a process plant. [Background technology]

[0003] Distributed process control systems, such as those used in chemical, petroleum, industrial, or other process plants for manufacturing, refining, transforming, creating, or producing physical substances or products, typically include one or more process controllers communicatively coupled to one or more field devices via an analog bus, a digital bus, or a combined analog / digital bus, or via a wireless communication link or network. The field devices, which may be, for example, valves, valve positioners, switches, and transmitters (e.g., temperature, pressure, level, and flow sensors), are positioned within the process environment and generally perform physical or process control functions, such as opening or closing valves, measuring process and / or environmental parameters, such as temperature or pressure, to control one or more processes running within the process plant or system. Smart field devices, such as field devices conforming to the widely known Fieldbus protocol, may also perform control calculations, alarm functions, and other control functions typically implemented within a controller. A process controller, also typically located within a plant environment, executes a controller application that executes different control modules that receive signals indicative of process measurements made by and / or other information regarding the field devices, e.g., make process control decisions and generate control signals based on the received information, and interface with control modules or blocks embodied in the field devices, such as HART®, WirelessHART®, and FOUNDATION® Fieldbus field devices. The control modules within the controller send control signals over communication lines or links to the field devices, thereby controlling the operation of at least a portion of a process plant or system, e.g., controlling at least a portion of one or more industrial processes running or executing within the plant or system.I / O devices are also typically located within a plant environment and are generally disposed between a controller and one or more field devices to enable communication therebetween, for example, by converting electrical signals to digital values ​​and vice versa, converting between different communication protocols, etc.

[0004] Information from the field devices and controllers is typically transmitted along a data highway to one or more other hardware devices, such as operator workstations, personal computers or computing devices, data historians, report generators, centralized databases, or other centralized computing devices, which are typically located in the control room or other locations away from the harsher plant environment. or made available via a communications network. Each of these hardware devices is typically centralized throughout the process plant or throughout portions of the process plant. These hardware devices execute applications that may enable operators to perform functions related to the control of the process and / or operation of the process plant, such as, for example, changing settings of process control routines, modifying the operation of control modules in controllers or field devices, viewing the current state of the process, viewing alarms generated by field devices and controllers, simulating the operation of the process for purposes of training personnel or testing process control software, maintaining and updating configuration databases, etc. Utilizing the data highway through the hardware devices, the controllers and field devices may include wired communication paths, wireless communication paths, or a combination of wired or wireless communication paths.

[0005] As an example, the DeltaV™ control system sold by Emerson Process Management includes multiple applications stored in and executed by different devices located at various locations in a process plant. Configuration applications residing in one or more workstations or computing devices allow users to create or modify process control modules and download these process control modules over a data highway to dedicated distributed controllers and, in some cases, smart field devices. Typically, these control modules are composed of communicatively interconnected function blocks that are objects in an object-oriented programming protocol that perform functions in a control scheme based on inputs thereto and provide outputs to other function blocks in the control scheme. The configuration application may also allow the configuration designer to create or modify operator interfaces that are used by viewing applications to display data to an operator and to allow the operator to change settings such as set points in a process control routine. Each dedicated controller, and in some cases, one or more field devices, stores and executes a respective controller application that executes the control modules assigned to and downloaded thereto to implement the actual process control functions. A viewing application may be executed on one or more operator workstations (or one or more remote computing devices communicatively connected to the operator workstations and the data highway) and may receive data from the controllers via the data highway and display this data to a process control system designer, operator, or user using a user interface to provide any of a number of different views, such as an operator's view, an engineer's view, a technician's view, etc.While the data historian application is typically stored on and executed by a data historian device that collects and stores some or all of the data provided across the data highway, the configuration database application may be executed on a more remote computer attached to the data highway to store the current process control routine configuration and its associated data. Alternatively, the configuration database may be located on the same workstation as the configuration application.

[0006] Many process plants include or are installed with asset management systems that track or collect data about various assets in the plant, such as, for example, field devices (sensors, transmitters, valves, etc.), controllers, input / output (I / O) devices, servers, communication networks, user interfaces, databases, handheld devices, etc. Information about the devices or assets is stored in one or more asset management databases within the plant or databases, such as cloud-based The data may be stored in a database and this data may be used to provide raw and statistical information about the devices in the plant, such as the status of various devices, the health of various devices, maintenance data for the devices, such as the device's most recent calibration date, scheduled maintenance, etc., as well as information related to various other devices. These current asset management systems typically store and provide data for all devices or assets in a plant or group of plants (e.g., an enterprise system) and allow a user to view statistical information about the entire set of devices in the plant or system, such as the number or percentage of devices that have health or other status issues, require maintenance, etc. As a result, these asset management systems are very good at providing an overview of the plant (from a maintenance perspective) when the plant is up and running normally.

[0007] However, often a process plant may experience a situation where some of the plant assets, such as field devices, are not running or operating in a normal operating mode. More specifically, in a process control plant, there are periods during operational operation when a user will know that the plant or a portion of the plant will be down for a period of time. During this period, the user may not want to be bothered with alarms and alerts coming from smart field device equipment associated with the "down" devices that may delay attention from more important devices that are currently still running the plant. Also, when a new part of the plant is coming online or being commissioned for the first time, the user may want to know what alerts the field devices have, but not necessarily want to handle these alerts with the same priority or in the way that they handle field devices that are operating in an operational mode to control the process.

[0008] For example, a plant may be under an expansion initiative where new devices are being installed and commissioned in the plant, and a section of the plant (a process line, a room, a particular area, etc.) may be undergoing maintenance activities that require, for example, taking all of these devices offline simultaneously. Thus, generally speaking, any group of devices may be involved in one or more projects being conducted within the plant that will remove these devices from the operational system for the duration of the project. Such projects may be maintenance projects, expansion projects, upgrade projects, retrofit projects, commissioning projects, or other types of projects.

[0009] Typically, during a plant expansion or upgrade, new devices are added to the plant to provide new or additional capabilities to the plant. Often, these activities include commissioning new devices or assets in a process plant or system that enables various components of the plant or system to operate as intended by the system or plant. Commissioning is an intricate and complex process. For example, commissioning may include actions or activities such as verifying the identity of installed process control devices (such as field devices) and their connections, determining and providing tags that uniquely identify the process control devices within the process control system or plant, setting or configuring parameter initial values, limit points, etc., verifying the correctness of device installation by manipulating signals provided to the devices, generating as-built I / O lists to indicate the actual physical connections of the devices implemented within the plant, to name a few. For some commissioning tasks, a user may utilize a commissioning tool (e.g., a handheld or portable computing device) locally on the target process control device or loop. Some commissioning tasks involve operator interfaces of process control systems, e.g. the backend of a process plant. The present invention may be implemented in an operator interface of an operator workstation included in a desktop environment.

[0010] Typically, commissioning a process plant requires physical devices, connections, wiring, etc. to be installed, set up, and interconnected within the field environment of the process plant. In the back-end environment of the plant (e.g., in a centralized computing device, such as an operator workstation, personal computer or computing device, centralized database, configuration tool, etc., typically located in a control room or other location away from the plant's harsher field environment), data that specifically identifies and / or specifies the various devices, their configuration, and their interconnections is consolidated, verified, or commissioned, and stored. Thus, after the physical hardware is installed and configured, identification information, logic instructions, and other instructions and / or data are downloaded or otherwise provided to the various devices disposed within the field environment, thereby enabling the various devices to communicate with the other devices. This process is referred to as configuring the devices.

[0011] Typically, process plant components are commissioned according to a set of desired parameters or specifications, which may be specified by one or more documents and / or tools developed by the commissioner. The components are commissioned using system interfaces and utilities that are also used for other management functions within the process plant, including system configuration, maintenance, and management activities during process plant operation. However, commissioning personnel are often limited to using the system interfaces and utilities, which often leads commissioning personnel to implement limited, proprietary tools and utilities that do not interact with the control systems and field devices, resulting in delays, inconsistencies, and errors. These processes are time-consuming, prone to inconsistencies and errors, and do not allow for efficient and effective determination of whether field devices are properly commissioned.

[0012] Similarly, a large-scale maintenance project, such as the routine cleaning of a line of refinery equipment, may require that some or many, if not all, of the plant's devices be taken offline and / or reconfigured, calibrated, repackaged (e.g., valves), or otherwise maintained in some manner according to the specifications of the particular project. Of course, other types of projects may involve other sets of devices or assets within the plant.

[0013] As will be appreciated, when devices or other plant assets are involved in a project, such as a commissioning or maintenance project, these devices may be in various stages or states of configuration or operation that indicate the devices are not fully functional. Because asset management systems are typically limited to tracking all devices in a plant and providing statistics based on all tracked devices, these systems provide confusing and incomplete statistical data regarding the health or operational state of the plant as a whole when one or more commissioning, upgrade, maintenance, or other projects are in progress, making it difficult for users to access and understand the actual state of parts of the plant that should be operating normally. Thus, for example, when a group of devices are undergoing a commissioning or maintenance project, these devices are typically not fully operational or in a state that indicates they are not as healthy (for operational devices) as desired. However, asset management systems do not have the ability to limit the statistical analysis being performed to devices that are not associated with a project, and thus present statistical data that includes devices that are involved in operational activities and devices that are involved in projects where the devices are not supposed to go into operational operation. This situation can result in incorrect information regarding the operational state of the plant. Additionally, current asset management systems do not have the ability to determine or provide any statistical analysis regarding the progress or progress of a particular maintenance or commissioning project because the asset management system does not know which devices are involved in a particular commissioning or maintenance project. Summary of the Invention

[0014] An asset management system for use in a process control plant or other control system includes a database that stores asset data for each of a number of assets, e.g., devices, in the plant, and a viewing system or application that accesses the asset data to provide raw and statistical information to a user regarding the plant assets. The asset management system allows a user to define one or more projects in a plant or enterprise environment, each project including a set of assets or devices, and store these projects and their associated devices in an asset database. The asset management system may then perform statistical analysis on the assets in one of the projects and present to the user, via a user interface, for example, raw and statistical information related to the assets in the project. The asset management system may, for example, determine the state or status of the assets associated with the project and present statistical information regarding the number or percentage of assets in the project that are in a particular state or status. For example, the asset management system may determine whether each of the devices or assets associated with a commissioning project is in either a commissioning or non-commissioning state, and present a screen showing the number and / or percentage of each of the devices associated with the project that are in each state. The system allows the user to use this information to determine the progress or completion percentage of the overall project. In another example, the asset management system may determine and present statistical information regarding the health of each of the devices in a particular project to allow the user to determine the overall health of the devices associated with the project, and also to allow the user to determine the work completed or that still needs to be completed for the project.

[0015] Additionally, the asset management system may determine statistics regarding the status and / or health of plant assets that are not within a particular project or within any defined project, and may present to a user, for example, via a user interface, various statistics indicating various statistics regarding plant assets that are not associated with any project. This allows the system to allow a user to view or determine the operational status or health of portions of a plant that are in operation (or expected to be in operation) in the form of statistics collected only for plant assets that are not within any project. This system prevents a user from getting a false impression of the overall state of operational plant status presented by a system that does not exclude devices or assets in the plant that are not expected to be in operation, such as devices involved in upgrade, expansion, or maintenance projects.

[0016] Similarly, the asset management system may store historical data regarding various asset or device states and health states of assets within a project at different times associated with or over the life of the project, and the asset management system may provide information to the user, such as graphs showing statistical changes or transitions in device states or device health over various time periods. This information may be stored for completed projects, allowing the user to determine the expected time required to complete a new or proposed project, and to view project time trends in terms of device states or health states over the course of the project, thereby allowing the user to determine whether new or similar projects are being tracked or are completing as expected. The information may be used in relation to future projects (e.g., projects of a similar nature and / or size) to enable:

[0017] Similarly, the asset management system may include a report generator that may generate one or more reports for a project, such as a commissioning report for a commissioning project or other project in which assets must be commissioned. The commissioning report may include information regarding the number of devices in the project that are in various different commissioning states (or for which various different commissioning activities associated with the commissioning of the devices need to be performed). Again, such reports may be used to provide or direct further commissioning activities to be performed in the commissioning project, as the report may list various devices in various commissioning states, the number of devices for which various commissioning activities have been performed, etc. [Brief description of the drawings]

[0018] [Figure 1] 1 depicts a block diagram of an exemplary process plant and its components, as well as an asset management system disposed within the process plant that collects asset data and provides statistical information regarding a set of device assets associated with one or more projects within the plant. [Diagram 2] FIG. 1 illustrates a block diagram of an asset management device configured to acquire, store, and analyze data and parameters related to various plant assets associated with one or more projects within a process plant. [Diagram 3] 1 illustrates an example user interface that may be generated by an asset management system that depicts various statistical information regarding devices or assets in a process plant without including data from devices in any projects within the plant. [Figure 4] 1 illustrates an example user interface that may be generated by an asset management system to view or create one or more projects tracked within the asset management system. [Diagram 5]5 illustrates an example user interface that may be used to create or edit a project, such as any of the projects illustrated in FIG. 4, including a list of devices within the project. [Figure 6] 1 illustrates an example user interface that may be generated by an asset management system to depict current and historical statistics regarding device status and device health information for assets within a particular project. [Figure 7] 1 illustrates an example user interface that may be generated by an asset management system to depict current and historical statistics regarding device status and device health information for a filtered or subset of assets within a particular project. [Figure 8] 8 illustrates an example user interface that may be generated by an asset management system to depict additional information about an asset that is in one of the device sub-states of FIG. 7. [Figure 9] 8 illustrates an example user interface that may be generated by an asset management system to depict additional information about an asset that is in two of the device sub-states of FIG. 7. [Figure 10] As illustrated in the screen of FIG. 7, an example user interface that may be generated by an asset management system to depict additional information regarding an asset that is in a further configuration or commissioning device state is illustrated. [Figure 11] 11 illustrates an exemplary user interface that may be generated by an asset management system to render additional information about a particular asset within the screen of FIG. 10. [Figure 12] 8 depicts an exemplary user interface that may be generated by an asset management system to depict additional information regarding one or more assets in one of the health categories depicted in the screen of FIG. 7. [Figure 13]Illustrates an example commissioning report that may be generated by an asset management system to indicate the state or status of a commissioned project, including activities performed to complete the project. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] FIG. 1 depicts a block diagram of an exemplary process plant, process control system, or process control environment 5 in which an asset management system is located that performs activities based on a project definition within the plant 5. Generally speaking, the process plant 5 includes one or more process controllers that, during operation, may receive signals indicative of process measurements made by field devices, process this information to implement control routines, and generate control signals that may be transmitted to the same or other field devices via wired or wireless process control communication links or networks to control the operation of a process within the plant 5. Typically, at least one field device performs a physical function (e.g., opening or closing a valve, increasing or decreasing a temperature, etc.) to control the operation of a process, and some types of field devices communicate with a controller by using I / O devices. The process controllers, field devices, and I / O devices may be wired or wireless, and any number and combination of wired and wireless process controllers, field devices, and I / O devices may be included within the process plant environment or system 5.

[0020] 1 includes a process controller 11 communicatively connected to wired field devices 15-22 via input / output (I / O) cards 26 and 28, and to wireless field devices 40-46 via a wireless gateway 35 and a process control data highway or backbone 10 (which may include one or more wired and / or wireless communication links and may be implemented using any desired or suitable communication protocol, such as, for example, an Ethernet protocol). In some cases, the controller 11 may be communicatively connected to the wireless gateway 35 using one or more communication networks other than the backbone 10, such as by using any number of other wired or wireless communication links supporting one or more communication protocols, such as, for example, Wi-Fi or other IEEE 802.11 compliant wireless local area network protocols, mobile communication protocols, mobile communication protocols (e.g., WiMAX, LTE, or other ITU-R compatible protocols), Bluetooth®, HART®, WirelessHART®, Profibus, FOUNDATION® Fieldbus, etc.

[0021] The controller 11, which may be, by way of example, a DeltaV™ controller sold by Emerson Process Management, may operate to implement a batch or continuous process using at least some of the field devices 15-22 and 40-46. Additionally, the controller 11, in addition to being communicatively connected to the process control data highway 10, is also communicatively connected to at least some of the field devices 15-22 and 40-46 using any desired hardware and software associated with, for example, standard 4-20 mA devices, I / O cards 26, 28, and / or any smart communication protocol, such as FOUNDATION® Fieldbus protocol, HART® protocol, WirelessHART® protocol, CAN protocol, Profibus protocol, etc. In FIG. 1, the controller 11, the field devices 15-22, and the I / O cards 26, 28 are wired devices, and the field devices 40-46 are wireless field devices. Of course, the controller 11 may be ... The wired field devices 15-22 and the wireless field devices 40-46 may conform to any other desired standard(s) or protocol, such as any wired or wireless protocol, including any standard or protocol developed in the future.

[0022] The process controller 11 of FIG. 1 includes a processor 30 that implements or oversees one or more process control routines 38 (e.g., stored in memory 32). The processor 30 is configured to communicate with the field devices 15-22 and 40-46, as well as other process control devices communicatively connected to the controller 11. It should be noted that any control routines or modules described herein may be implemented or executed in part by different controllers or other devices, if so desired. Similarly, the control routines or modules 38 described herein implemented within the process control system 5 may take any form, including software, firmware, hardware, etc. The control routines may be implemented in any desired software format, such as using object-oriented programming, ladder logic, sequential function charts, function block diagrams, or any other software programming language or design paradigm. The control routines 38 may be stored in any desired type of memory 32, such as random access memory (RAM) or read-only memory (ROM). Similarly, the control routines 38 may be hard-coded, for example, into one or more EPROMs, EEPROMs, application specific integrated circuits (ASICs), or any other hardware or firmware elements. Thus, the controller 11 can be configured to implement the control strategies or control routines in any desired manner.

[0023] In some cases, the controller 11 implements control strategies using what are generally referred to as function blocks, where each function block is an object or other portion (e.g., a subroutine) of an overall control routine and may work with other function blocks (through communications called links) to implement a process control loop within the process control system 5. A control-based function block typically performs one of the following functions: an input function associated with a transmitter, sensor or other process parameter measurement device; a control function associated with a control routine that controls PID, fuzzy logic, etc.; or an output function that controls the operation of some device, such as a valve, to perform some physical function within the process control system 5. Of course, hybrid and other types of function blocks exist. The function blocks may be stored within and executed by the controller 11, which is typically the case when these function blocks are used for or associated with some types of smart field devices, such as standard 4-20 mA devices and HART® devices, or the function blocks may be stored within and implemented by the field device itself, which may be the case for FOUNDATION® Fieldbus devices. The controller 11 may include one or more control routines 38 that may implement one or more control loops, which may be implemented by executing one or more of the functional blocks.

[0024] Wired field devices 15-22 may be any kind of device, such as sensors, valves, transmitters, positioners, etc., while I / O cards 26 and 28 may be any type of I / O device conforming to any desired communication or controller protocol. In FIG. 1, field devices 15-18 are standard 4-20 mA or HART® devices that communicate with I / O card 26 (also referred to herein as "non-smart" or "dumb" devices) over analog or combined analog-digital lines, while field devices 19-22 communicate over a digital bus using the FOUNDATION® Fieldbus communication protocol. The wired field devices 15, 16 and 18-21 and / or at least some of the I / O cards 26, 28 may additionally or alternatively communicate with the controller 11 using the process control data highway 10 and / or by using other suitable control system protocols (e.g., Profisbus, DeviceNet, Foundation Fieldbus, ControlNet, Modbus, HART, etc.).

[0025] In the example process plant 5 of FIG. 1 , the wireless field devices 40-46 communicate over a wireless process control communication network 70 using a wireless protocol such as the WirelessHART® protocol. Such wireless field devices 40-46 may communicate directly with one or more other devices or nodes of the wireless network 70 that are also configured to communicate wirelessly (e.g., using the wireless protocol or another wireless protocol). To communicate with one or more other nodes not configured to communicate wirelessly, the wireless field devices 40-46 may utilize a wireless gateway 35 that is connected to the process control data highway 10 or another process control communication network. The wireless gateway 35 provides access to the various wireless devices 40-58 of the wireless communication network 70. In particular, the wireless gateway 35 provides a communicative coupling between the wireless devices 40-58, the wired devices 11-28, and / or other nodes or devices of the process control plant 5. For example, the wireless gateway 35 provides a communicative coupling by using the process control data highway 10 and / or by using one or more other communication networks of the process plant 5.

[0026] Similar to the wired field devices 15-22, the wireless field devices 40-46 of the wireless network 70 perform physical control functions within the process plant 5, such as opening or closing a valve or taking a measurement of a process parameter. However, the wireless field devices 40-46 are configured to communicate using the wireless protocol of the network 70. In this manner, the wireless field devices 40-46, the wireless gateway 35, and the other wireless nodes 52-58 of the wireless network 70 are producers and consumers of wireless communication packets.

[0027] In some configurations of the process plant 5, the wireless network 70 includes non-wireless devices. For example, in FIG. 1, the field device 48 is a conventional 4-20 mA device and the field device 50 is a wired HART® device. To communicate within the network 70, the field devices 48 and 50 are connected to the wireless communication network 70 via wireless adapters 52a, 52b. The wireless adapters 52a, 52b support wireless protocols such as WirelessHART, and may also support one or more other communication protocols such as Foundation® Fieldbus, Profibus, DeviceNet, etc. Additionally, in some configurations, the wireless network 70 includes one or more network access points 55a, 55b, which may be separate physical devices in wired communication with the wireless gateway 35 or may be provided within the wireless gateway 35 as an integrated device. The wireless network 70 may also include one or more routers 58 for forwarding packets from one wireless device to another within the wireless communication network 70. 1, the wireless devices 40-46 and 52-58 communicate with each other and with the wireless gateway 35 via wireless links 60 of the wireless communication network 70 and / or through the process control data highway 10. Additionally, in some cases, a handheld communication device 69 may be used to communicate with one or more of the field devices 15-22, 40-58 or other devices (e.g., The handheld device 69 communicates directly with the field devices or other plant assets (e.g., gateway 35, controller 11, I / O devices 26, 28, etc.), thereby enabling a maintenance person or other user to directly communicate with the devices, change the configuration of the devices, and directly commission the devices. The handheld device 69 may communicate directly with other process plant assets via a direct wired or wireless communication link established temporarily between the installed plant device and the handheld device 69, or the handheld device 69 may communicate with the plant assets via an access point on a network or other communication link established as part of a permanent or operational plant communication network. A user may use the handheld device 69 to perform some activity on the field devices or other plant assets, store information, such as device information, related to this activity, and later download the information to one or more databases, such as a configuration database or an asset management database described below.

[0028] As illustrated in FIG. 1 , the process control system 5 also includes one or more operator and / or maintenance workstations 71 communicatively connected to the data highway. Using the operator and maintenance workstations 71, an operator or maintenance personnel can view and monitor the real-time operation of the process plant 5 as well as take any diagnostic, corrective, maintenance, and / or other actions that may be necessary. Generally speaking, an operator takes actions to change the ongoing operation of the plant during operation to better operate the plant control system. Meanwhile, maintenance personnel generally view data regarding the state or status of operation of various devices within the plant and take steps to maintain, repair, calibrate, etc. the devices to ensure that the devices are operating in a manner that can be adequately implemented by the control system. At least some of the operator and maintenance workstations 71 may be located within various protected areas within or near the plant 5, and in some situations, at least some of the operator and maintenance workstations 71 may be located remotely but still communicatively connected to the plant 5. The operator and maintenance workstations 71 may be wired or wireless computing devices.

[0029] The example process control system 5 is further shown as including a configuration application 72a and a configuration database 72b, each of which is also communicatively connected to the data highway 10. Various instances of the configuration application 72a may run on one or more computing devices (not shown) to enable users to create or modify process control modules and download those modules to the controller 11 via the data highway 10, as well as to enable users to create or modify operator interfaces through which an operator can view data and change data settings within a process control routine. The configuration database 72b stores the created (e.g., configured) modules and / or operator interfaces. In addition, the configuration database 72b stores a set of defined or baseline commissioning parameters associated with any of the field devices 15-22, 40-46. In general, the configuration application 72a and configuration database 72b may be centralized and have a single logical appearance to the process control system 5 even though multiple instances of the configuration application 72a may be running simultaneously within the process control system 5, and the configuration database 72b may be implemented across multiple data storage devices. Thus, the configuration application 72a, configuration database 72b, and the user interface thereto (not shown) comprise a configuration or development system 72 for the control and / or display module. Typically, the user interface of the configuration system 72 is utilized by configuration and development engineers whether or not the plant 5 is operating in real time, and therefore the user interface of the configuration system 72 is utilized by operators and The operator and maintenance workstation 71 , which is distinct from, but not necessarily limited to, the maintenance workstation 71 , is typically utilized by an operator during real-time operation of the process plant 5 .

[0030] The example process control system 5 also includes a data history application 73a and a data history database 73b, each of which are also communicatively connected to the data highway 10. The data history application 73a operates to collect some or all of the data provided across the data highway 10 and to historize or store the data in the history database 73b for long-term storage. Like the configuration application 72a and configuration database 72b, the data history application 73a and history database 73b are typically centralized and may have a single logical appearance to the process control system 5, although multiple instances of the data history application 73a may be running simultaneously within the process control system 5, and the data history database 73b may be implemented across multiple physical data storage devices.

[0031] In some configurations, the process control system 5 includes one or more other wireless access points 74 that communicate with other devices using other wireless protocols, such as Wi-Fi or other IEEE 802.11 compliant wireless local area network protocols, mobile communication protocols, such as Worldwide Interoperability for Microwave Access (WiMAX), Long Term Evolution (LTE) or other ITU-R (International Telecommunication Union Radio Communication Sector) compatible protocols, shortwave wireless communications, such as Near Field Communication (NFC) and Bluetooth, or other wireless communication protocols. Typically, such wireless access points 74 enable communication by handheld or other portable computing devices (e.g., user interface devices 75) over a respective wireless process control communication network that is different from the wireless network 70 and supports a different wireless protocol than the wireless network 70. For example, the wireless or portable user interface devices 75 may be mobile workstations or may be diagnostic test equipment utilized by operators or maintenance personnel (e.g., one instance of the operator and maintenance workstations 71) within the process plant 5. In some scenarios, in addition to the portable computing device, one or more process control devices (e.g., controller 11, field devices 15-22, I / O devices 26, 28, or wireless devices 35, 40-58) also communicate using a wireless protocol supported by the access point 74.

[0032] The example process control system 5 may also include one or more commissioning tools 135a, 135b that are used in the field environment 122 to commission the process control devices of the process plant 5. The commissioning tools 135a, 135b may be portable computing devices, such as laptop computers, tablets or handheld smart devices, wearable computing devices, etc. The commissioning tool 135a may be used to commission the non-smart field devices 15-18, the smart field devices 19-22, and / or other devices disposed in the field environment 122 of the process plant 5. To commission the non-smart field devices 15-18, the commissioning tool 135a may communicate via a wireless link 76a (e.g., via RFID, NFC, etc.) with the I / O card 26 or any other suitable component connected to the non-smart field devices 15-18. In this manner, the commissioning tool 135 a may transfer the commissioning data (e.g., device tags) of the non-smart field devices 15-18 to the corresponding I / O cards 26 or electronic marshalling components electrically connected to the I / O cards 26. To commission the smart field devices 19-22, the commissioning tool 135b may communicate directly with the smart field devices 19-22 via the wireless link 76b. In this manner, the commissioning tool 135b may transfer the commissioning data (e.g., device tags) directly to the smart field devices 19-22.

[0033] In some embodiments, a process control device may be pre-configured, such as while at the factory, and as such, default commissioning data is stored before being installed or commissioned. In other embodiments, a process control device may arrive from the factory without any commissioning data stored therein. For example, if an I / O device is communicatively connected to a non-smart field device, the I / O device will not store commissioning data for the non-smart field device until the commissioning tool 135 transfers the commissioning data to the I / O device.

[0034] 1 only shows a single wireless controller 11 along with a finite number of field devices 15-22 and 40-46, wireless gateway 35, wireless adapter 52, access point 74, router 58, and process control communications network 70 included within the exemplary process plant 5, it is noted that this is an exemplary and non-limiting embodiment only. Any number of controllers 11 may be included within the process control plant or system 5, and any of the controllers 11 may communicate with any number of wired or wireless devices and networks 15-22, 40-46, 35, 52, 55, 58, and 70 to control processes within the plant 5.

[0035] It is further noted that the process plant or control system 5 of FIG. 1 includes a field environment 122 (e.g., “process plant floor 122”) and a back-end environment 125 that are communicatively connected by the data highway 10. As shown in FIG. 1, the field environment 122 includes physical components (e.g., process control devices, networks, network elements, etc.) that are disposed, installed and interconnected therein and operate to control the process during operation. For example, the controller 11, I / O cards 26, 28, field devices 15-22, and other devices and network components 40-46, 35, 52, 55, 58 and 70 are located, disposed or otherwise included in the field environment 122 of the process plant 5. Generally speaking, in the field environment 122 of the process plant 5, raw materials are received and processed using the physical components disposed therein to produce one or more products.

[0036] The back-end environment 125 of the process plant 5 includes various components, such as computing devices, operator workstations, databases or data banks, that are shielded and / or protected from the harsh conditions and materials of the field environment 122. With reference to FIGURE 1, the back-end environment 125 includes, for example, operator and maintenance workstations 71, configuration or development systems 72 for controlling modules and other executable modules, data historian systems 73, and / or other centralized control systems, computing devices, and / or functionality that support operational operations of the process plant 5. In some configurations, the various computing devices, databases, and other components and equipment included in the back-end environment 125 of the process plant 5 may be physically located at different physical locations, some of which may be local to the process plant 5 and some of which may be remote.

[0037] As described herein, the configuration database(s) 72b may be disposed in the back-end environment 125 of the process plant 5 and used for commissioning purposes. The configuration database(s) 72b may store, among other things, data and other information that specifically identifies and / or addresses various devices or components and their interconnections that are planned or desired to be implemented on the process plant floor or in the field environment 122. Some of this commissioning data may be provided to components in the field environment 122 for use in commissioning the devices and loops therein, and some of this data may be utilized in the back-end environment 125, for example, for design, development, and preparation of control modules and / or operator interface modules that operate in conjunction with the field environment 122 during operational operation of the process plant 5.

[0038] 1, the asset maintenance system 180 provides one or more users, such as maintenance personnel, with various information relating to the state or status of various of the field devices, controllers, I / O devices, or other assets in the front-end or field environment 122 of the plant 5, for example, via one or more of the maintenance interface 71 or other dedicated interfaces. More specifically, the asset management system 180 may include a dedicated asset management computer or server 182, one or more asset management databases 184, one or more remote asset management servers 186 in communication with the asset management computers 182 via communication link 10 to transmit data to and receive data from a remote asset management user interface device 188 (which may be a thin client device with respect to the remote server 186, if desired). The remote asset management server 186 may also include an asset management database 190 that may store project data, as described in more detail herein.

[0039] In some cases, the asset management server 182 includes memory and computer processors implementing programming or program modules to access the asset management database 184 and obtain information stored in the database 184 related to the status and health of devices or assets in the plant 5. As illustrated in FIG. 1, the asset management device 182 may interface with a user interface 191 connected to the device 182, or with one or a maintenance workstation 71, or other user interface, and may store and execute a device manager software routine 192 that operates to access data related to assets (i.e., devices) in the plant 5 stored in the asset database 184. The device manager routine 192 may enable a user to view device data related to various devices or assets in the plant 5 and make changes to the devices or assets in the plant 5 by sending and receiving messages to the devices, such as via the network 10 and the controller 11 or gateway 35. In some cases, the device manager application 192 may access device parameters in the devices of the plant 5, may change parameters, may access information stored in the devices, may configure the devices, may calibrate the devices, etc. The device manager routine or application 192 may perform these activities in response to user input, for example, via the user interface 191, or may perform them automatically, periodically, or at some scheduled time or frequency. The device manager routine or application 192 may store device data from or related to the devices in the plant 5 in the database 184 for later access and use. In particular, the database 184 may store individual device files 193 (e.g., one for each device in the plant) that contain current data about the devices, including device name, tag, manufacturer, location, calibration data, health data, communication connections or routes, etc. The device files 193 may include, but are not limited to, the device manager routine or application 192, which may be configured to perform the operations described in more detail herein. It is contemplated that the device file or device information 193 may include other information, including one or more project parameters 193a, or device parameters. Of course, the device file or device information 193 may also or instead be stored in other databases, including, for example, the configuration database 72b, the history database 73b, etc.

[0040] Additionally, a device viewing application 194 may execute within the server 182, or, as illustrated in FIG. 1, within a remote asset management server 186 (which, in turn, includes memory and a computer processor for storing and executing the application 194) to access and invoke the asset management device manager software 192, which in turn retrieves information about various devices or plant assets from the asset database 184. The device viewer application 194 may provide data and statistics about various ones or groups of devices or assets in the plant 5 in any of the manners described below, and may communicate with the thin client device 188 (or with an attached user interface device not shown in FIG. 1), with an operator / maintenance workstation 71 or computer 75 connected via an access point 74, or with any other user interface device to provide raw and statistical asset and device information to a user.

[0041] Specifically, according to one example, the device viewing application 194 allows a user to create one or more projects 196, where each project may include a listing of a set of plant devices or assets associated with the plant environment 122 of FIG. 1, as well as other information such as the project's name, description, duration, location, etc. The project definitions 196 (e.g., a list of devices associated with each project, and general project information) may be stored in the memory of the remote server device 186, the remote server database 190, the asset management device 182, the asset management database 184, or any other device or combination of devices. Generally speaking, the device viewing application 194 allows a user to create a project (e.g., via one of the thin client devices 188) by providing a name and other information about the project and by selecting the devices or plant assets associated with the project. The application 194 may then store the project list or project data in a database or memory, as described above. The user may then access statistical or other device information collected from or about devices in a particular project in a manner separate from and not including information about devices or plant assets not in the project. Further, the user may additionally access statistical or other device information collected from or about operational devices that are not associated with and do not belong to any defined project in a manner separate from and not including information about devices or plant assets in the project, thereby having statistical information about operational devices that is not mixed with, and not corrupted or damaged by, device information about devices in the project that are not expected to be in operational modes or situations.

[0042] Depending on the definition of a project, the device viewing application 194 may provide the user with highly detailed information, including device and statistical information, allowing the user to view or understand the current state of a project, as the user may view compiled device status and health information and statistics regarding device status and / or device health of only those devices in or associated with a particular project. Additionally, the device viewing application 194 may compile and store device statistics for all devices in a project over time, allowing the user to view or understand the current state of a project. , may allow a user to view how the state and / or health status or other statistical information has changed over the life of the project using various graphs and charts, lists, etc. Upon completion of a project, the device viewing application 194 may allow a user to designate the project as completed, and historical data about the project may be stored, for example, in database 184.

[0043] The user may then view the project's historical data in an attempt to compare changes in device status and health information over time to new or current projects, thereby tracking the progress of a new project compared to previously completed projects, or estimating the length of time it will take to complete a new project. Additionally, the device viewing application 194, or another application such as a commissioning application (not shown), may use the project list to access device data for devices in the project and prepare and provide reports about the project (such as the current status of the project, the expected end date of the project, the percentage of completion of the project, or other information) based on the device data for devices only in the project. In the past, such reports, e.g., commissioning reports, were not easy to produce because the commissioning software had no way of knowing which devices were included in the project.

[0044] As mentioned above, the defined projects may be commissioning projects, maintenance projects, or any other projects where a particular activity needs to be taken or performed on a group of devices or assets in a plant. Generally speaking, each project defines or includes devices that are removed from or added to a working system or operation during the life of the project. Thus, a project may define or include devices that are already installed in the plant (which may or may not be commissioned), devices that are installed or added to the plant but are not yet in working operation or status (e.g., not yet commissioned), and virtual devices that are not yet physically in the plant but are intended or planned to be installed in the plant at some point in the future, thus devices that are not installed or commissioned in the plant.

[0045] Thus, the user interface and data storage capabilities of the device viewer and device manager applications 194, 192 provide the ability to create groups of devices defined by device tags that are planned to undergo a particular process together. The groups may be independent of location, device type, or other commonly available methods for filtering device lists based on the physical characteristics or control parameters of the devices. Additionally, the applications 192, 194 have the ability to add or remove devices to / from a project after the project is created, to rename a project after the project is created while maintaining the original group along with any additions or removals associated with the name(s) of the previous project, to maintain a history of each device included or removed from the project for later auditing of events related to the participation of devices in the project, and to notify the user of situations of interest related to devices in the project before completing the project. If desired, this project can be created and stored entirely within a thin client version of the device manager and / or device viewer applications 192, 194.

[0046] Additionally, as discussed above, there are times during operational operation of a plant when a user, such as a maintenance person, operator, etc., would be able to know when the plant or a portion of the plant will be down for a period of time. During this time, the user does not need to pay attention to alerts arising from smart field device equipment associated with the non-operating portion of the plant because these alerts may distract the user from more important smart field devices that are still operating in operational mode within the plant. Also, when a new portion of the plant comes online or is initially commissioned, the end user may want to know about the alerts these field devices have, but may not necessarily want to address the alerts with the same priority or manner that they would handle field devices that are actively controlling the process during operation. As described herein, with the use of project breakouts, the device manager application 192 and the device viewer application 194 operate to allow a user to define which field devices or other assets are part of a commissioning or plant turnaround project and group these devices separately from the devices in the remaining operational plant. While the device is part of an active project, all device alerts and health information is removed or separated from the information (raw data and statistical data based on raw data) collected and generated about the overall health of the plant, plant alerts, etc. What is important is that the health and device data of the devices in a project are grouped under that project to show the overall health and alerts of all devices in a given project. Additionally, heath and device data regarding the overall health of the operational parts of the plant (i.e., devices not involved in a current or ongoing project), both raw data and statistical data, will be grouped without data from devices in ongoing projects, so that this operational data will be correct for all operational devices.This functionality prevents devices in a project from skewing statistics about the overall status or health of the operational portion of the plant. Once a project is completed and the devices in the project are ready to be returned to operation or operational systems, the project will be marked as complete, at which point all alert and health information from those devices will begin to roll up in the operational plant metrics.

[0047] Thus, the device manager and device viewer applications 192 and 194 described herein allow a user to define a set of devices (e.g., plant assets) that are part of a project, and these applications group those devices together to keep track of the health and device status of those devices separately in the project, and further remove the health and other device data of the devices in the project from the operational data. The user can also notify the applications 192, 194 when the project is completed, at which point the applications 192, 194 will bring all devices of that project back into the operational or online health calculations. However, the applications 192, 194 may store information about the project in the asset database 184 or other databases to allow a customer to go back and see how the overall health or device status for the project progressed through the project lifecycle. Thus, by allowing a set of devices to be grouped together as part of a project, the asset management system recognizes the devices that are part of an active project and ceases to count alerts, health, and calibration information into the operational health of the plant, but instead determines individual statistics related to the overall health of the project. Then, when the project is marked complete, the system returns the devices to the overall health of the operational system. Of course, the devices associated with a project can be any plant device, such as field devices, controllers, I / O devices, etc. It can be an asset.

[0048] Additionally, in the past, during the commissioning or plant turnaround phase of a plant project, equipment technicians and engineers did not have an organized manner to view statistics and data for only those devices involved in the project. Complicating matters, since multiple such projects may be ongoing simultaneously, all statistics and information collected typically reflected only aggregated data and may not be focused on a particular project. The asset management applications, particularly the asset manager application 192 and the asset device viewer application 194, either alone or in some combination (and collectively referred to herein as asset management applications), may operate to provide a user with the ability to identify which devices are part of a project and then obtain information and statistics about only those devices that are related to the project, without having other data about the plant that would compromise the results. The equipment engineer can then obtain statistics and information about the devices in the project, such as health, alerts, progress, availability, or activity, that is specific and applicable to the project to which those devices are isolated. Since there can be multiple projects happening simultaneously in a plant, you can segment the information based on the project, if any, that the device belongs to.

[0049] In operation, the asset management applications 192, 194 may execute on one or more processors of one or more installed devices (computing devices) to allow a user to define which field devices or other plant assets are part of a commissioning, plant turnaround, or other project, and group such devices in that fashion. Once this grouping is complete, the asset management applications 192, 194 allow an equipment engineer to view summaries, charts, statistics, and trends of device health, device status, and other important information about the project and about the devices within the project. The user can also add or remove devices from the list of devices in the project.

[0050] This project grouping is beneficial when certain conditions and alerts tend to cause alarms and require attention in the normal "day-to-day" operation of the plant, but the same information will be meaningless for devices in a commissioning or plant turnaround process and will only hinder users from making the right decisions in these phases. As an example, the commissioning process includes the purchase, setup, and integration of devices into the plant. These steps are specific to the commissioning process and are not typically performed in the normal operation of the plant. It is beneficial to collect and display device and project information in a manner that reflects the progress of the commissioning project and allows the equipment engineer insight into the project's trajectory. As devices go through various stages (e.g., device status and health status) during a project, once-irrelevant alerts and notifications may now be important and useful to the equipment engineer, such as those devices nearing completion. By considering the progress of the project, the most relevant data can be communicated to the engineer. Thus, the asset management application 192, 194 can use the project definition to review and display the health of devices (within the project) and can obtain individual health for specific groups of devices for a period of time that coincides with the duration of the commissioning and turnaround project. The asset management application 192, 194 can also track the progress of devices through a commissioning or plant turnaround and can also calculate the overall progress of the entire project. Additionally, the project definition allows the asset management application to The applications 192, 194 can not only track devices currently in the plant, but can also track and display devices at the earliest stages of a commissioning project, for example, when the devices have not yet been introduced to the plant. This capability allows the asset management applications 192, 194 to determine (compute) and provide useful statistics that cannot be inferred by considering only the devices currently installed in the plant. An example of such a situation occurs when an equipment engineer knows that a project is underway with 500 devices, but that 400 devices have still been shipped to the field. In this case, the asset management applications 192, 194 may assume that there are 500 devices and can only report that 100% (100 out of 100) of the known devices have been delivered or commissioned in the plant, but may determine statistics knowing that only 20% of those devices have been delivered or commissioned.

[0051] Additionally, using the project definition, the asset management application 192, 194 may use various measurements or device parameters stored for the devices to determine if the project should be considered complete rather than relying on traditional checklist-style methods for determining if the project is complete. Such measurements may include, for example, the total number of device alerts for the devices in the project, the length of time of those alerts, the total number of devices in the project that have gone through calibration, the average length of time after a configuration change is made on any of the devices in the project, etc. Any or all of these or other measurements may be used to determine the completion status of the project. Additionally, statistics and data collected from a group of devices undergoing a plant turnaround or other project can provide actual values ​​that can be compared to existing metrics and targets that define the process plan for moving the project forward. In this manner, using the project definition, the asset management system can generate highly accurate requirements data that must be accomplished before continuing through the gates in the project process timeline.

[0052] Of course, the project definition concept can be applied beyond commissioning and plant turnaround projects and can instead or additionally be used for other project types or any time a group of devices or assets require special attention during a period of time where specific metrics can be collected for only those devices or assets that are useful to the process taking place during that time. Additionally, project definitions can be used to track assets in any plant.

[0053] As another example, the asset management application 192, 194 may use project-based information (both raw and statistical device data) to provide information to the user that allows the user to determine the overall status and progress of the project. As an example, in a commissioning project, the user may be able to see percent completion statistics calculated based on the number of devices in the project that are in the completion stage or some other stage of commissioning. More specifically, commissioning is the phase of plant operation between the completion of plant construction and commercial operation. In this phase, equipment needs to be configured, tested, and verified in preparation for the plant operation to begin. Since the commissioning phase of a project is at the end of construction and immediately prior to operation, this phase is almost always on the critical path to an on-time start-up. Current research indicates that 65% of projects over $1 billion and 35% of projects under $500 million have delayed or over-budget start-ups. Therefore, it is important to provide visibility and planning information on current projects and provide insight for the planning and execution of future projects.

[0054] The asset management application 192, 194 described herein can also provide accurate estimates of project duration using actual information collected by the asset management system. Using the concept of projects within the asset management system allows, for example, tracking of devices / equipment that must be commissioned for a project to be completed. Tracking of the completion of individual devices / equipment can be performed manually or algorithmically by the asset management system depending on the device and the required task to be accomplished. Using this information, current and future projects can be confidently planned and schedules can be improved by applying the right resources where they are needed at the right time. As part of this planning and scheduling information, the asset management software or application 192, 194 can create and display trend graphs showing project progress to completion and reports showing overall project progress. Additionally, the asset management software 192, 194 can implement methods to track commissioning or other project tasks to completion, historize all data, store this data for future analysis and use, and generate analysis planning reports showing the manner in which future projects can be expected to progress based on asset type, number and implementation compared to past or completed projects.

[0055] Similarly, the asset management applications 192, 194 described herein may generate various reports that are useful or helpful in completing a project. As an example, the system described in U.S. patent application Ser. No. 14 / 477,266, entitled "Bulk Field Device Operations," allows a user to map user configurations to operational devices, allowing the user to bulk transfer a set of device parameters to a list of operational devices, thereby reducing the time it takes to commission a plant. However, in doing this, a new problem arises in that the customer does not have the ability to see the results of the bulk transfer for each device. However, it needs to be possible to quickly determine whether the user configuration sent to the device during the bulk configuration process was successful or failed, and see which transfers failed and why. The asset management applications 192 and 194 described herein can use the device data for a project to generate reports that would show such information, including whether each device received the bulk transfer configuration, whether the transfer was successful, and if not, the reason for failure. This functionality eliminates the need for a user to get a complete report of all devices in the system and pull a report looking only at the devices involved in a particular project. These reports can be run, for example, from the thin client asset management application 194 and can be in a format suitable for both PCs and mobile devices, so that users will be able to run, view, and make timely decisions regardless of the platform they are using to view plant or project data. Reports created can include, for example, reports showing the overall configuration and commissioning status of each device in a project, and reports can be run or created in the context of what the user thinks is going on, per project, one global report that the user will need to decipher to get the key information needed for the group of devices that the user is interested in.Additionally, reports can be generated in a format that is easily usable by the user, so that the user can navigate the list and quickly get to the particular device in which they are interested.

[0056] FIG. 2 illustrates an example asset management device 212 (also referred to herein as a system or apparatus 212) that is specifically configured to acquire, store, analyze, and present data (both statistical and raw) and parameters related to one or more projects, such as the commissioning of a portion of a process plant, maintenance procedures performed in a process plant, etc. 1 illustrates a simplified block diagram of a device 212. The device 212 may be a computer or computing device, or another system, apparatus, or device that is specifically configured to support the techniques, methods, and systems of the present disclosure, including, but not limited to, a mobile phone, a smart phone, a tablet, or other wireless device, a personal digital assistant, a media player, a consumer electronics device, to name a few. The device 212 may be incorporated into one or more components of the process plant 5 (e.g., operator workstation(s) 71, configuration application(s) 72a, user interface device 75, etc.), asset management server 182, remote asset management server 186, asset management database 184, etc., as described with respect to FIG. 1. However, for ease of explanation and not by way of limitation, the device 212 is referred to herein as a computing device 212 and, in possible combination with the asset management database 184 and remote server 186, is described as an asset management device 182.

[0057] An exemplary computing device 212 includes a processor 215 for executing computer-executable instructions, a program memory 218 for permanently storing data associated with the computer-executable instructions, a random access memory (RAM) 220 for temporarily storing data associated with the computer-executable instructions, and input / output (I / O) circuitry 222, all of which may be interconnected via an address / data bus 225. In some configurations, the processor 215 is a multi-core processor or processors with co-processing capabilities (e.g., quantum, cellular, chemical, photonic, biochemical, biological processing technologies and / or other suitable co-processing technologies). In some configurations, the memory 218 and / or the RAM 220 are implemented using high density memory technologies, such as solid state drive memory, flash memory, semiconductor memory, optical memory, molecular memory, biological memory or any other suitable high density memory technology. In an exemplary configuration, the computing device 212 includes a multi-core processor and / or high density memory technologies.

[0058] Although only one processor 215 is illustrated in FIG. 2, it should be understood that the computing device 212 may include multiple processors 215. Similarly, the memory of the computing device 212 may include multiple RAMs (random access memories) 220 and / or multiple program memories 218. The RAM 220(s) and / or program memories 218 may be implemented, for example, as one or more semiconductor memories, flash memories, magnetically readable memories, optically readable memories, biological memories, and / or other tangible non-transitory computer readable storage media. In addition, while the I / O circuitry 222 is illustrated as a single block, it should be understood that the I / O circuitry 222 may include several different types of I / O circuits. For example, a first I / O circuit may correspond to a display device 228 of the device 212, and a first or second I / O circuit may correspond to a user interface 230 of the device 212. The user interface 230 may include, for example, a keyboard, a mouse, a touch screen, a voice-activated device, and / or any other known user interface device. In some embodiments, the display device 228 and the user interface 230 may be jointly incorporated in a single physical device, e.g., a touch screen. Additionally or alternatively, the display device 228 and / or the user interface 230 may be incorporated in a device separate from the computing device 212. For example, the computing device 212 may be implemented within an operator or maintenance workstation 71, and the display device 228 and / or the user interface 230 may be implemented in the user interface device 75 of FIG. 1, one of the thin client devices 188, etc.

[0059] The computing device 212 may include one or more network or communication interfaces. The computing device 212 includes a communication interface 232 and is accessed via one or more respective links 235 to one or more respective communication or data networks. The communication interface 232 may include an interface to one or more process control specific communication and / or data networks, such as Fieldbus, Profibus, HART, 4-20 mA loop, WirelessHART, process control big data, etc. For example, the computing device 212 may include an interface to a process control big data network. Additionally or alternatively, the communication interface 232 may include one or more interfaces to general purpose communication and / or data networks, such as Ethernet, NFC, RFID, Wi-Fi, etc. The links 235 to the communication or data networks may be used as a memory access function (e.g., to access data in a database, such as the asset management database 184), and / or the links 235 may be wired, wireless, or multi-stage. Many types of interfaces 232 and links 235 are known in the art of networking and may be used with the computing device 212.

[0060] The computing device 212 includes one or more sets of specific computer-executable instructions 240 stored thereon, and as such, the computing device 212 is specifically configured with at least a portion of the set of specific one or more instructions 240 stored thereon. As used herein, the terms “computer-executable instructions”, “computer executable instructions” and “instructions” are used interchangeably. As shown in FIG. 2 , the instructions 240 are stored in the memory 218 and are executable by the processor 215 to implement any part or all of the methods and / or techniques described herein. The set of one or more instructions 240 may include one or more engines, routines, applications or programs, including an operating system. A set of applications 248 may be included as part of the set of one or more instructions 240. In an embodiment, the set of applications 248 may include asset manager software or application 192 and / or device viewing software or application 194. Applications 192 and 194 may be combined into a single application or a single device (as illustrated in FIG. 2) or may be provided, stored, and executed on separate or different computing devices (as illustrated in FIG. 1). In addition, if desired, a separate commissioning analysis application 252 may be provided that is configured to obtain and analyze commissioning data of the field devices, compare the commissioning data to stored parameters, and determine information for presenting via the display device 228 and / or the user interface 230. The set of applications 248 may include other sets of applications 254 or other sets of instructions 240 and / or other elements or components.

[0061] By way of background, one type of project that may be implemented using the systems of Figures 1 and 2 includes a commissioning project. Generally speaking, a process plant is commissioned prior to operation in an operational mode to ensure that the plant's systems and components are designed, tested, installed, operated, and maintained in accordance with the owner's or customer's operational requirements, thereby ensuring the process plant's feasibility, performance, reliability, safety, and traceability of information. As is well known, commissioning of plant devices can occur on a large scale when a plant is initially built or constructed, when a plant is retrofitted with new equipment, or when a plant is expanded to include new capacities, process lines, areas, etc.

[0062] The commissioning of a process control system and / or plant is Commissioning includes various techniques, systems, apparatus, components and / or methods that enable at least some portions of a commissioning process to be performed locally, automatically and / or in a distributed manner, such that devices and / or other portions of a process plant may be partially or even entirely commissioned before the devices are powered on, before being incorporated or integrated into the plant or system as a whole. Commissioning allows, for example, various portions of a process control system to be built and at least partially commissioned in different geographic locations (e.g., in different "mod yards") before being brought together and integrated at a permanent location or site of the process plant. As a result, commissioning allows for parallel commissioning activities and actions to be taken.

[0063] A process plant may be commissioned according to a baseline or a set of defined parameters that specify how each field device in the process plant should be commissioned. However, during operation, a field device may not be commissioned according to its respective parameters, which may result in error conditions and alarms and / or require additional repairs and maintenance. More specifically, a device or other plant asset may have to go through multiple steps or stages during a commissioning project (i.e., to be ready for use in an operational plant). In the simplest case, each device or plant asset associated with a commissioning project may be considered to be in one of two states, including a commissioned state and a state that has not yet been commissioned (e.g., a non-commissioned state). In some examples, the non-commissioned state may include sub-states through which the device progresses as it is commissioned. Such sub-states (which may or may not need to be progressed sequentially) may include being installed in the plant, being configured in bulk, being tested (following one or more test procedures that may depend on the type of device), being a virtual device, etc. Thus, a device in a commissioning project may have two or more commissioning states. In this case, a device may be in a fully uncommissioned state and on its way to a commissioned state may progress through various different or distinct commissioning procedures or activities of the device being in a virtual state (meaning that the device is known to be needed in the project or plant but has not yet arrived at the plant and is therefore still a virtual device), an inventory state, an installed state, a configuration state, a test state, etc.Of course, a device may be in multiple uncommissioned or pre-commissioned states simultaneously (e.g., a device may be in an installed and configured, but not yet tested, state). In other cases, a device may be considered to be in one of two states, including a commissioned state and an uncommissioned state, one or more of which may have various attributes or parameters that may need to be met or tested before the device transitions to the other state. Thus, the uncommissioned state may include sub-states that are defined by values ​​of parameters associated with or that define various commissioning procedures (e.g., installation, configuration, test, etc. procedures) that have been or need to be applied to the uncommissioned device.

[0064] Thus, as described above, commissioning a process plant may include configuring field devices with a set of parameters, which may be default parameters or may be modifiable by a process plant administrator. In certain aspects, the field devices may be bulk configured using configuration templates or similar techniques, such as those disclosed in the aforementioned U.S. patent application Ser. No. 14 / 477,266. Before, at the same time, or after the field devices are configured, the process control may be configured. The control system may facilitate additional commissioning actions, including verifying the identity of installed process control devices (e.g., field devices) and their connections, determining and providing tags that uniquely identify the process control devices within a process control system or plant, verifying the validity of device installation by manipulating signals provided to the devices, and generating an as-built I / O list to indicate the actual physical connections of the devices implemented within the plant.

[0065] Typically, a template, requirements document, or the like may include a set of defined commissioning parameters that specify how the field devices of a process plant should be commissioned. Additionally, the actual commissioning state, status, or condition of the field device may be incorporated into the commissioning status data of the field device. The systems and methods described herein obtain the commissioning status data associated with the field device (the data may be stored as part of the device or as device parameters for the device in the asset management database 184, configuration database 72b, or the like) and compare the commissioning status data to the set of defined commissioning parameters to determine (i) which, if any, field devices have not been commissioned according to the defined parameters, and (ii) how far the determined field devices deviate from the defined parameters.

[0066] The systems and methods may further generate a set of interfaces that may show the determined field devices and how far they deviate from the defined parameters, the device state in which the devices are currently located, the device health status, etc. A user or administrator associated with the process plant may access the set of interfaces to review information, make selections, and initiate certain functions. In particular, the user or administrator may select to modify the defined parameter(s), may select to reconfigure or recommission the field devices to conform to their respective defined parameter(s), and / or may initiate other functions.

[0067] In a similar manner, maintenance procedures may be applied to groups of devices in a plant (e.g., units, areas, etc. of a process plant, in the sense that these terms are used in the S88 plant hierarchy standard) as part of a maintenance project. As an example, a maintenance project may require various devices of a unit (such as a refinery cracker) to be taken offline and cleaned and calibrated as part of the maintenance of the unit. In many such cases, several field devices or assets are removed and various maintenance procedures are applied to the devices to perform the maintenance. In a similar manner, devices or assets undergoing or involved in a maintenance project may go through various states or stages as the maintenance project is ongoing (and these states may change depending on the type of devices involved). These states or stages are referred to herein as device states.

[0068] Additionally, as is known, devices in an operational system may have various health characteristics or states associated with them. For example, in known asset management systems, devices or other plant assets may have health parameters that may indicate the health status of the device or asset. In some cases, the heath status of a device or other asset may be in one of the following states: (1) a good state, meaning the device is healthy and operational; (2) an unresponsive state, meaning the device is not responding to communication requests, which may occur if the device is shut down, disconnected from a communication network, disconnected from a power source, or is experiencing some other serious operational problem; (3) a bad state, meaning the device itself indicates that it has a problem that it has determined; (4) a faulty state, meaning the device is not responding to communication requests, which may occur if the device is shut down, disconnected from a communication network, disconnected from a power source, or is experiencing some other serious operational problem; (5) a faulty state, meaning the device itself indicates that it has a problem that it has determined; (6) a faulty state, meaning the device is not responding to communication requests, which may occur if the device is shut down, disconnected from a communication network, disconnected from a power source, or is experiencing some other serious operational problem; (7) a faulty state, meaning the device is not responding to communication requests, which may occur if the device is shut down, disconnected from a communication network, 4) a degraded state (meaning the device is degraded in some way, but still operational to some degree), and (5) an unknown state. Of course, these are only one example of a potential set of health states for a device or asset, and other health states may exist or be used in various other systems.

[0069] While typical plant asset management systems may allow users to view a listing of devices based on physical characteristics (e.g., device location, device type, etc.) or behavioral parameters (safety equipment, alert status) and view the health status of those devices, these current systems are unable to create groups that contain a list of devices related to a planned commissioning, maintenance or installation process that the devices will function together in. Examples of planned processes (referred to herein as projects) include, for example, plant expansions, plant start-ups, plant turnarounds, product changeovers, major maintenance processes, or other significant plant actions that affect multiple devices.

[0070] However, the device viewer application 194, in conjunction with the device manager application 192 and the asset database 184, is configured to allow a process control system user to easily define a group of devices in relation to a planned process, also referred to as a project. The device manager application 192 and / or the device viewer application 194 allow a user to define which devices will be part of a project and store a list of devices as a project with a group of associated devices. It should be noted that the list of devices can include any device or plant asset that is associated with a project and is not operated in an operational state or configuration during the project, for example, but is not limited to devices in a particular area or region of the plant, devices of a particular device type or status, devices that are in a particular health or status state, etc. Additionally, at the time that a device is shown to be part of an ongoing or open project, all available device information in that project can be viewed together and the status of each of the devices included in the project can be shown, and the asset management application 192, 194 can compute and provide statistical information regarding the progress or status of the project based on the state or status of the devices in the project. When a project is completed, the device manager and / or viewer applications 192, 194 may close the project and return the devices in the project to an active operating state. However, even after a device is no longer part of an active project, the asset database 184 may still store, and the device manager and device viewer applications 192, 194 may access and present historical information about the project or devices in the project for reference purposes.This historical information may include the name of the project, the number of devices included in the project, the date the project was created, the date the project was completed, historical and / or statistical device status data, and health status data at various times or points in time within the project, etc.

[0071] 3 illustrates an example user interface screen 300 that may be generated by the asset manager application 192 or device viewer application 194 of FIGS. 1 and 2 based on device or asset data 193 or 196 stored in database 184 and showing, for example, some statistical information regarding the health of devices in an operational portion or configuration of a plant. In this case, user interface screen 300 presents statistical information regarding the health of devices in the plant, and more specifically, regarding the health of devices operating within the operational system of the plant. As indicated by graphic 302 in the upper left corner of screen 300, the total number of devices in the operational system of the plant is 29,260. where 396 devices are in an unhealthy state, 3,456 devices are in an unmonitored health state, and 25,508 devices are in a healthy state. As can be seen, the individual icons 304 indicate the number of devices in each of these health states. Further, in this case, the unhealthy icon 304 is selected, so that the top right graphic 306 provides a breakdown of the specific health states of each of the 396 unhealthy devices. Again, as illustrated by graphic 308, a circle with various portions colored or otherwise marked according to the different health states defined by icons 310 illustrates a summary of the specific health states of the 396 unhealthy devices.

[0072] As shown above, icons 310 indicate the various types of unhealthy status conditions associated with the 396 unhealthy devices and the number of devices in each of these states, including 111 devices being "unresponsive," 82 devices being "bad," 100 devices being "degraded," and 103 devices being "unknown." Additionally, graph 312 in the bottom half of user interface 300 indicates the number of devices in each of the unresponsive, bad, degraded, and unknown states over a seven day period from 13 April 2017 to 19 April 2017. Graph 312 indicates that, generally speaking, the number of unhealthy devices has decreased over the selected period of time, likely due to activity by operators or device maintenance personnel, for example, in correcting the conditions resulting in the unhealthy devices.

[0073] It should be noted here that the information and statistics illustrated in the user interface 300 of FIG. 3 relate only to devices or plant assets in an operational system, i.e., those that do not belong to any project. In practice, to create the interface 300, the graphics and statistical data therein, the applications 192, 194 may extract the device data 193 stored in the asset database 184 and remove or use device data for any devices that are marked (i.e., have a project parameter 193a) indicating that the device is in a currently open or running project. In this way, the asset management system 192, 194 may provide raw and statistical device data only for operating or operational parts of the plant, without including data for devices involved in projects, which may distort plant health statistics to make the operating or actual operating part of the plant appear worse than it is.

[0074] To create a project, the device viewer application 194 or device manager application 192 may allow a user to add a list of device tags to be included in a named project to a spreadsheet or other data structure, thereby defining the project. The process control system, e.g., device manager application 192, configuration system application 72a, etc., may then verify that the device tags listed in the spreadsheet are available for project inclusion (e.g., that the devices exist in the system database(s) and have device information stored for them) and may notify the user of any issues with the project creation defined in the spreadsheet. After the spreadsheet is filled out and any issues are resolved, the device manager application 192 may group these devices together with the name of the defined project, and project and device statistics for the project may then be displayed to all control system users with access to the plant control system. At this point, an asset management system, such as the device manager application 192, may fill out or store device parameters 193a (referred to herein as project fields or project parameters) in the asset management database 184 and / or configuration database 72b for each device file 193 in the project 196. The project parameters 193a of each device file 193 may indicate whether the device is part of an ongoing project, and if so, the name or other identifier of the project. This parameter may refer to or identify the project 196 to which the device is currently associated. If the project parameters 193a of the device file 193 indicate that the associated plant device is part of an ongoing project 196, the device is not part of a running or operational system. The project-related device parameters 193a may also include the name of the project and / or any other project identifier that defines the project 196 to which the device is associated, information about the nature of the project 196, as well as any other desired project-related information. In some cases, the user may be able to add virtual devices (e.g., devices that are not yet installed or present in the plant) to a list of devices for the project 196. In this case, the user may be asked to provide information about the virtual device, such as the device name, type, tag, manufacturer, configuration parameters, location, etc. for the virtual device. By allowing a user to define or add virtual devices within the project list, the device manager application 192 may cause a device data holder 193 to be created in the asset management database 184 and / or configuration database 72b associated with the virtual device to inform the control system that the virtual device exists in some manner (e.g., as a planned part of a project) before the physical device actually exists or is installed in the plant 5. In this manner, the device viewer application 194 may provide information about all devices that are part of the project (including virtual devices that are not yet in the plant) and may include these virtual devices in statistics associated with the created project.

[0075] Of course, whenever a project is completed, the user can use the device viewer application 194 or the device manager application 192 to mark the project as complete. At this point, the device manager application 192 can modify the project parameters of the devices in the project (e.g., in databases 184, 72b, etc.) of the project that are not associated with the ongoing project, thereby returning the devices of the now completed project to the operational system of the process plant. The device manager application 192 or device viewer application 194 can then archive (store) the relevant project information in the asset database 184 or other database for future use. In other cases, the device manager or viewer application 192, 194 can automatically recognize the completion of the project based on statistical information regarding the devices in the project (e.g., all devices in the project are in a commissioning state or have undergone a maintenance procedure associated with the project, or any of the actions described above) and can mark the device project parameters 193a for each of the devices in the completed project as no longer associated with the ongoing project.

[0076] Additionally, once a project 196 is created, other applications in the operational system may view the project-related device parameters 193a in the device file 193 for the device to determine if the device is currently associated with the project 196, and if so, may ignore or treat the device differently than if the device were in the operational system (i.e., not associated with an ongoing project). For example, an alarm viewing application may not be aware that the device is involved in an ongoing project (and thus typically expects that the device will be in various alarm or alert states during the project) or may not be aware that the device is currently associated with the project. The configuration application may ignore or filter alarms from devices in ongoing projects based on a project status parameter of the device generating the alarm or alert because the device is not involved in the operational operation of the plant and knows that the device alarm or alert is not important to a plant operator using the alarm viewing application, regardless of the priority of the actual alarm or alert being generated by the device. In another example, the configuration application may operate differently with respect to devices that are in ongoing projects and devices that are not in ongoing projects. Still further, as illustrated in FIG. 3, the device manager application 194 may ignore or filter device information from devices that are involved in projects when presenting general statistical information about plant assets (e.g., device status and device health information), thereby providing accurate statistical device status and health information for operational devices without including or considering information associated with devices in projects that are not expected to be in operational status.

[0077] FIG. 4 depicts a user interface screen 400 that may be generated by the device viewing application 194 and / or device manager application 192 to show a user the projects 196 that currently exist and / or have been completed within the plant. The device viewing application 194 may generate the screen 400 on any suitable user interface, including any of the thin client devices 188 of FIG. 1, the operator or maintenance workstations 71, the user interface devices 75 of FIG. 1, and the like. In any event, the exemplary screen display 400 depicts a list of projects that have been created, in this case including six projects that are in various stages of completion. The first five projects are projects that are still in progress and the last project is a completed project. The list of projects includes a first column 402 that includes an icon or graphic that indicates the percent completion of the project, a second column 404 that indicates the name given to the project, a third column 406 that indicates the creation date and expected completion date of the project, and a fourth column 408 that includes an icon in the form of three vertical dots (referred to as the further details icon). The more details icon 408 may be used or selected to allow a user to view more details about or take actions regarding the project, such as, for example, renaming the project, deleting the project, marking the project as complete, triggering a configuration validation report as described in more detail herein, adding devices to the project, removing devices from the project, etc. As described in more detail below, the percent completion of the projects as provided or displayed in the first column 402 may be determined by the asset management application 192, 194 based on the status or other information regarding the individual devices in each project, and the asset management application 192, 194 may automatically calculate these completion numbers based on the individual device statuses of the project and various rules defined or stored for calculating the completion percentage of the project.4, the last project is complete as icon 402 indicating a completed project is grayed out. If desired, screen 400 includes an icon 410 that allows the user to export the list for processing in, for example, Microsoft Excel or for printing.

[0078] 5 illustrates an exemplary project creation user interface screen 500 that may be accessed by selecting icon 410 of screen 400 of FIG. 4 and used to enable a user to create a new project or change the status, state, description, name, etc. of an existing project, and to add or remove devices from a project. In particular, FIG. 5 illustrates the project creation screen 500. 5 illustrates an example project creation / modification user interface screen 500 that includes a device information or hierarchy section 502 on the left side of the screen 500 and a project configuration section 504 on the right side of the screen 500. In particular, the device information section 502 may include a hierarchy or other listing of devices currently in the plant, organized in any desired manner. This information may come from the asset management database 184, the configuration database 72b, or any other database or source in the plant where device tags or other device information is stored. This information may be imported or obtained by the device manager or device viewer application 192, 194, for example, from the asset or configuration database 184, and this data is used to populate the hierarchy section 502. 5, the hierarchy section 502 includes devices organized by device type, including valves, boilers, balancers, crackers, etc., and includes device tags for devices within those device types. However, any other type of hierarchy or organization of devices within a plant can be used as well to provide a user with a list of devices that can be added to a project.

[0079] As illustrated in FIG. 5, the plant devices in the hierarchy may include virtual devices, and the virtual device icon 505 may be selected by a user to add one or more virtual devices that are associated with the project but are not yet present in the plant hierarchy configuration database 72b, or the asset management database 184. In some cases, the user may select the virtual device icon 505 and obtain a pop-up screen from the application 192, 194 that allows the user to define and enter virtual device information, including device type, manufacturer, tag name, device location, device configuration parameters, etc. When such a virtual device is created, the device may then appear under a different device type in the hierarchy section 502 based on the device type stored for the virtual device, and the application 192, 194 may save the device as a new device file 193 in the asset database 184 with the device state parameters set to the virtual device. When an actual device corresponding to the newly created virtual device is installed in the plant, the application 192, 194 may change the device state of the device to a different device state, such as the other state or bulk configuration state as illustrated in FIG. 6.

[0080] To create a project, the user may enter or provide a name for the project in screen section 510 and a description of the project in screen section 512. Other input fields, not shown in screen 500, may be provided to provide the user with other information about the project. Additionally, the user may select individual devices in the hierarchy or device list 502 and drag those devices to section 514 to add the devices associated with the project to the list in section 514. In this case, the user may select the valve 101 icon, drag the icon onto the configuration section 514, and drop the icon into section 514 (using a mouse or other input device), at which point the application 192, 194 will recognize that the device with the device tag valve 101 is added to the device list for the project. The application 192, 194 may then add information about the device associated with the device tag valve 101 to a line in the configuration section 514. At this point, the system (e.g., one of the applications 192, 194) may determine that the device with the tag valve 101 is A determination may actually be made as to whether or not it can be placed into a project based on data about the device, for example, in the asset management database 184. For example, if the configuration information for a device with a tag valve 101 is not configured or does not exist in the plant, the device valve 101 may be associated with a different project or may be marked as somehow not capable of being associated with a new project, and the applications 192, 194 may indicate issues that need to be addressed before the device can be associated with a project.

[0081] Of course, the user may drag and drop or otherwise select other devices to be placed in the project list defined by the configuration screen section 514 until all devices for the project have been added to the list displayed in the configuration section 514. Additionally, if desired, a graphic 516 on the screen 500 may indicate the number of devices currently in the project, which may increase or decrease as devices are added to or removed from the list of devices in the configuration screen section 514. Of course, the user may remove or erase a device from the project list by selecting the device in the configuration list 514 and dragging it off the list, or otherwise erasing it (e.g., via a pop-up screen, a right-click action with the mouse, or other user interface action).

[0082] Similarly, if desired, additional icons (e.g., radial buttons) 530, 532, 534, and 536 may be used to change or modify the number or identity of devices in the list of devices for the project, or to otherwise mark the project as either in progress or complete. For example, icon 530 may be used to remove a device. A user may select icon or button 530 to indicate that a device selected in device list 514 should be cleared. Icon 532 may be used to add a new device or to indicate that the user wants to move a new device (e.g., a device illustrated in hierarchy 502) to device list 514. Icon 534 may be used (e.g., selected) to clear an entire project, while icon 536 may be used to manually mark a project as completed. Thus, user interface screen 500 may be used to create new projects, change the status of existing projects, add or remove devices from new or existing projects, change the name of a project or details about a project, etc. Of course, the user may enter other information into screen 500, or into pop-up screens associated with screen 500, to further define the project or make other changes to the project. Upon entering information into configuration screen 500, device viewing application 194 or device manager application 192 may store this information as project data 196 and device data 193a in database 184, thereby defining the project, and the particular device files 193 associated with the defined project. As an example, application 192, 194 may modify the project parameters field 193a of the device (stored in database 184) for each device in the project list to indicate that the device is associated with project 196.

[0083] Additionally, the applications 192, 194 may process device data for devices in one or more projects to provide the user with additional information, including project-specific device information and statistical information about the devices in the project by project (commonly referred to as project metrics). In particular, when a user clicks on one of the project's names or other icons for a particular project in the user interface screen 400 of FIG. Upon selection of either, the asset management system (e.g., applications 192, 194) may obtain device data from the asset management database 184 to provide more detailed information about the project and the devices (assets) within the project. As an example, the asset management system may provide a project status screen 600 such as that illustrated in FIG. 6 to show various statistics and more detailed device information, including device status and health information, for the devices within the project. In particular, in the example screen 600 of FIG. 6, device status and device health information is provided for all devices within the first project listed in screen 400 of FIG. 4. The user interface screen 600, which may be created by the device viewing application 194 or device manager application 182 based on device data for only the devices within the first project listed in FIG. 4, includes three sections 602, 604, and 608. Section 602 provides statistical information regarding the status of devices in the project, section 604 provides statistical information regarding the health of devices in the project, and section 608 provides or plots historical trend graphs illustrating the statistical device status and device health information for the project over a period of time.

[0084] As illustrated in FIG. 6, section 602 includes a pie chart 610 illustrating the total number of devices in the project (120 in this case), with the pie 610 having a section of icons 612 associated with number devices that are in each of a set of possible device states, also indicated by icons 612. In this case, the project itself is an extended project, which includes various commissioning activities or states in which there may be devices that need to be commissioned. The commissioning related device states illustrated by icons 612 may include two high level commissioning states defined as a To Do state 612A (meaning the device has not yet been commissioned), and a Finished state 612B (meaning the device has been commissioned). As noted, each of the devices in the project of FIG. 6 belongs to one of these two high level device states.

[0085] Still further, as illustrated by icon 614, To Do state 612A includes three substates that indicate various different substates, in this case not commissioned. Such substates may indicate activities, processes or other that have been completed or need to be completed for the uncommissioned devices to be in an end commissioning state, or may indicate various different states to which the uncommissioned devices may be in. In the example of FIG. 6, thirteen of the uncommissioned devices are in a bulk configuration state (which is an uncommissioned state), six are in another state (which may mean that these devices are in a different state than bulk configuration but have not yet been commissioned), and five devices are in a virtual state (meaning that these devices are still virtual devices and therefore not yet in the plant or installed in order to perform other commissioning activities on them). The sub-states or sub-information associated with icon 614 provide further information regarding activities that have been performed on devices in the To Do commissioning state (also referred to as the non-commissioning state) or that may need to be performed on devices to move these devices to the To Do commissioning state. These sub-states thus provide some information regarding where devices in these states are in the overall commissioning process, which may be used to determine when a project may be completed, the amount of work to do within the project to complete the project, the types of commissioning activities that need to be performed on devices within the project to complete the project, the percentage completion of the project, etc.

[0086] Of course, device state 612 can include more states (e.g., three or more), which may indicate sequential or non-sequential (e.g., multiple different) activities that need to be performed on a non-commissioned device to bring the device into a further or completed device state, such as a commissioning state. For example, it would be possible to define a device state as including three or more different states, and a device may transition from one device state to another based on one or more of a set of commissioning processes or procedures being performed on or for the device. Any particular device may need to go through each state to reach a final commissioning state, or each device may not need to go through each state to reach a final commissioning state. Still further, any device state may have multiple sub-states associated with it to further define the possible manner in which a device needs to be processed to reach a final or next device state. A device may or may not need to traverse each sub-state of a device state to transition from one device state to another. Thus, in some cases, the sub-states of a device may define a sequence of actions that need to be performed on the device in a particular order in order to transition to the next device state. In other cases, the sub-states may define or indicate different actions that need to be performed on the device in order to transition the device to the next state, but the device may not require every action defined by every sub-state to be performed on the device to transition the device to the next device state. Additionally, while FIG. 6 illustrates an example and use of a fairly simple set of device states associated with a commissioning project, other types of projects, such as installation projects, maintenance projects, etc., may have other states, other sub-states, and other states and sub-states defined or used therefor.Furthermore, device states and device sub-states may be mutually exclusive (meaning that a device can only be in one state or sub-state at a time) or may overlap (meaning that a device can be in multiple states or sub-states simultaneously). Although device states and sub-states are typically mutually exclusive states, it is possible that device states may be mutually exclusive while device sub-states are not, and vice versa.

[0087] Still further, as seen in the example of FIG. 6, the asset management applications 192, 194 may use the device states, and in some instances the device sub-states, to calculate or determine activities that need to be performed or complete for various devices in the project, and the applications 192, 194 may use the number of devices in each state and / or sub-state to determine or calculate the percentage of completion of the project. The applications 192, 194 may store and use any desired formula or set of rules to calculate the percentage of completion of the project based on the device states and sub-states and the number of devices in each, and / or based on other measured information, as described above. In the example of FIG. 6, the applications 192 and 194 use a simple percentage calculation based on the number of devices in each of two mutually exclusive device states, To Do and Done. Because there are 120 devices in the project and 96 of these devices are in a finished state while 24 devices are in a To Do state, the system calculates the project completion percentage (as indicated by icon 620) as 80% complete (i.e., 96÷(96+24)). However, other types of calculations, formulas and / or rules can be used to determine the percentage completion as illustrated by icon 620 using any combination of device states, sub-states, and the number of devices in the project that are in the device states and / or sub-states, and / or any other information. Thus, for example, device sub-states, or various The number of devices in various sub-states associated with various device states 612 may be used to modify the percentage completion calculation of the project. For example, the percentage completion calculation application may consider virtual devices to be 0% commissioned, devices in a bulk configuration sub-state to be 50% commissioned (and thus count as devices that are 50% commissioned or 50% of the way to reaching the end device state), and devices in other sub-states to be 25% commissioned (and thus count as devices that are 25% commissioned or 25% of the way to reaching the end device state). The calculation may use these percentages as weights in calculating the overall percentage completion of the project. Of course, other manners of calculating the percentage completion of a project based on device statistics and device states and sub-states may be used.

[0088] In addition, the asset management application 192, 194 may use the screen 600 to provide or illustrate the health status of devices in a project, specifically the number of devices that are healthy or unhealthy, and / or the number of devices in each of a set of different integrity states. In the example of FIG. 6, the screen section 604 of the screen 600 graphically illustrates the health of devices in a project, specifically using a circular shape 630 to indicate that there are 19 unhealthy devices out of a total of 120 devices in the project, and using an icon or shape 632 to indicate the number of devices in each of a set of four different (mutually exclusive) heath categories. In this example, the four unhealthy states or statuses include an unresponsive state, a bad state, a degraded state, and an unknown state. However, any other number and type of health statuses or states may be used. Additionally, the circular graphic 630 has different sized sections (e.g., differently colored or hatched) associated with each unhealthy category depicted by an icon 632, with the size of each section being proportional to the number of devices in each of the unhealthy categories with respect to the total number of unhealthy devices. While the graphic section 604 may illustrate the health status of all devices in the project, the graphic may also be used to illustrate the health status of only devices in one of the device states or sub-states illustrated in section 602. Thus, for example, the 17 unhealthy devices for which statistical information is provided in the screen 600 could be all unhealthy devices in the project, all unhealthy devices in the Ended device state, all unhealthy devices in the Bulk Configuration sub-state, etc. Of course, the device health status information provided in section 604 may indicate further work that needs to be completed on commissioned devices to complete the project or to ensure that a project once completed has devices ready for production operation.

[0089] Still further, the asset management application 192, 194 may use the screen section 608 of the screen 600 to show historical information about the project, particularly historical statistical information about device states and device health states at different times in the project. The exemplary screen 600 includes graphs or line plots 650, 652 that plot the number of devices in the end device state 612B and the number of devices in any unhealthy state or status, respectively, over the five month period of the project. As illustrated by the exemplary plots 650 and 652, as would be expected, the total number of devices in the end state increases over time, while the total number of devices having an unhealthy status decreases over time during the life of the project. However, because various different devices in the project may go through various stages or sub-states of configuration or commissioning, unhealthy device statuses may increase or decrease over a short period of time based on the particular activity being performed on the devices. In any event, the asset management application 192, 194 may use, for example, the section 608 of the screen 600 or Or, separate screens may be used as needed to present the user with any historical statistical device data that is useful to the user. Thus, for example, the user may be able to view a plot of the number of devices in each of the different unhealthy states or statuses over time, where the application 192, 194 may present the user with a different trend line for each of the health statuses over time of Unresponsive, Bad, Degraded, and Unknown. Similarly, the application 192, 194 may present the user with a plot of the number of devices in a project in each of the device states and / or substates over time. In this case, the plot or graph may include a separate line for each device state or substate, such as for Bulk Configuration substates, Other substates, Virtual substates, etc. In either case, this information provides the user with a historical view to allow the user to see what is typical or generally occurs within a project over time based on the manner in which devices within the project move through various different device states and the manner in which devices within the project move through various different health states over the course of the project. This information also allows the user to analyze current or future projects based on the statistical data of completed projects to see if a current project is on track, or to predict the time it will take to complete a future project. Furthermore, the asset management application 192, 194 creating the interface 600 may provide one or more navigation controls through the interface screen 600 to allow the user to review different time periods associated with the project and to take other actions, such as obtaining more information about a device that is in any of the device states, sub-states, or health states illustrated in FIG.

[0090] However, the statistical information illustrated in Figure 6 relates only to devices in a particular project, and the asset management application can determine, calculate, and provide the information depicted in screen 600 by accessing device data 193 (e.g., device state and sub-state, and health data) for only those devices marked in the asset management database 184 that are associated with the project (either via project parameter data 193 for each of the devices, or via a project data file 196 that specifies a list of devices for the projects stored in the database 184). Thus, for example, an asset management application 192, 194 creating an interface like Figure 6 can scroll through a list of devices for projects stored in the database 184 and select or retrieve (from the asset management database 184) device data for only those devices that are associated with or within a particular project's device list. In another example, an asset management application 192, 194 creating an interface like that of FIG. 6 can scroll through the device parameters of each device file 193 in the asset management database 184 and select or retrieve (from the asset management database 184) device data for only those devices that have a project parameter 193 associated with them that indicates the device is in a particular project or in a project device list for a particular project.

[0091] Furthermore, the asset management applications 192, 194 may allow a user to filter on devices in a project and obtain statistical information regarding a filtered list or subset of devices in the project. Thus, for example, the device viewing application 194 may allow a user to select filtered criteria (not shown) that filter devices in a project based on, for example, device type, device status, device parameter information, device manufacturer, or other types of filtering criteria. FIG. 7 is similar to screen 600, but shows a screen of filtered devices in a project as illustrated in FIG. 6. 7 illustrates a screen 700 that may be generated by application 194 (for example) that provides statistical data for a set. In this case, for example, the devices may be filtered for device type and screen 700 may illustrate statistical information for devices in a project having a device type of valve. Due to the filtering performed by application 194 (for example), screen section 702 includes only the 49 devices, which is shown to be a filtered list informing the user that this set of devices is not a complete list of devices in the project. In any event, screen section 702 provides or displays device status information for the 49 devices in the filtered list. Still further, screen section 704 of screen 700 provides heath status data for the 49 filtered devices that indicates, via a set of circular shapes and icons 732, the number of those devices in each of four health categories. Similarly, graph 708 of screen 700 may provide historical statistical information regarding the device status and health status of the 49 devices over a selected time period.

[0092] If desired, the asset management application 192, 194 may allow a user to easily obtain or view additional information about specific devices in a project in other manners. For example, selecting the bulk configuration icon 714B of FIG. 7 may cause the asset management application 194 to present screen 800 of FIG. 8 illustrating additional information about devices in different sub-states of the To Do device state. The devices associated with the device sub-states are illustrated in summary form as icons or tabs 802 at the top of the screen 800, and the devices illustrated in screen section 804 of screen 800 are the devices associated with the highlighted or selected tab(s) 802. In the example of FIG. 8, screen section 804 lists device information for the 11 actual devices and devices belonging to the bulk configuration sub-state of the To Do device state for a filtered group of 49 devices of the project illustrated in FIG. 7. The screen section 804 provides additional information for a particular device within the selected tab 802, such as the name of the tag 806, an icon 808 associated with or indicative of the device manufacturer or device type, status information for the device 812, including dates when a particular activity or device state or sub-state was achieved, and health information 814 for the device. The health information in this example is illustrated using icons with a different icon associated with each of the different health states (e.g., unresponsive, bad, degraded, unknown, or good). In this manner, the application 194 can provide, for example, for a user to view specific device information for a particular device within the statistics categories illustrated in the previous screens of FIGS. 6 and 7.

[0093] As a further example, the user may, if desired, select a further tab 802 of FIG. 8, such as an intermediate tab, to view information about devices associated with that tab (or sub-state of devices). A further screen 900 is illustrated in FIG. 9 that may be generated by the application 194 upon selection of the intermediate tab 802 of FIG. 8 (also shown as tab 902 of FIG. 9), which includes device information for devices in both the bulk configuration sub-state (11 devices) and the virtual sub-state (4 devices). Thus, the screen 900 of FIG. 9 includes a list of the bulk configured devices and virtual devices in the filtered list of FIG. 7, but does not include devices in other sub-states of the To Do configuration state of the 49 filtered devices in the project. Of course, some of the devices belonging to these sub-states may not be visible from the user's view or provided to the user in screen section 804 or 904, based on the particular user's permission (security level) to view the information. Thus, if a user does not have permission to view state or status information for a particular device in one of the selected statistical categories, the user will not see that device information. Additionally, the filter icons at the top of screens 800 and 900 in FIGS. 8 and 9 allow the user to easily view and view the state or status information for that device. Cons 820 and 920 may be used to indicate to the user that they are viewing a filtered list of devices rather than a list of all devices in the project. Similarly, tabs 830 and 930 of screens 800 and 900 may be used to run reports, such as a commissioning report, remove or add device tags to a project, or otherwise modify project definitions or information. Also, the information in the screens of FIGS. 8 and 9 may be sorted by the user (e.g., by tag, device type, device status, health status), and screens 800 and 900 may provide the user with additional information upon a hover or click event (e.g., the name of the health status when the user pauses over a health status icon in column 814).

[0094] As another example, FIG. 10 illustrates a user interface screen 1000 that may be generated by an asset management application 192, 194 used to provide a user with device information regarding 29 devices that are in a finished device state (as illustrated in FIG. 7). Specifically, a user may use link 1002 in FIG. 10 (or similar links in FIGS. 8 and 9) to select between viewing device information for devices that are in a to-do device state and those that are in a finished device state. In the example screen 1000 in FIG. 10, the listed device information includes information regarding the 29 devices that are in the finished device state of FIG. 7, limited by the user's permission. Of course, the asset management system or application 192, 194 may provide device information for a particular device that may be filtered or unfiltered within a project in any other desired manner for the user to view. Similarly, a user may obtain further information regarding a particular device by selecting the name or row of the device in one of the screens of FIGS. 8-10. Such an example screen 1100 is illustrated in Figure 11, where the top device of Figure 10 has been selected to obtain more information regarding the specifications of that device, including health information, alerts associated with the device, calibration information for the device, the location of the device, the network to which the device is connected, communication paths, etc. The details screen of Figure 11 illustrates operating device information for a project device, and a message may be provided to the user indicating that the device information pertains to a device in a project and is not associated with an operational device.

[0095] Additionally, in other situations, a user may be presented with specific health information about devices based on their health status. Thus, for example, a user may select the bad health status icon 732B in one of the screens of FIGS. 6-10, such as the screen of FIG. 7, to obtain a list (which may be a filtered list) of all project devices that belong to a bad health status. As illustrated in screen 1200 of FIG. 12, any of the heath state or status icons 1202 may be selected or deselected to add or remove devices presented in the device list of FIG. 12. In the case of FIG. 12, only the bad health status icon 1202 has been selected and only one device is illustrated because there is only one device in a bad health status in the filtered device set associated with the information in FIG. 7. Of course, any desired device information may be provided for devices in any of these categories to allow a user to view specific information about devices in a project based on their health status.

[0096] Of course, similar screens may be provided for any other devices in a project, such as any of the projects listed in FIG. 4. Additionally, information regarding the status of different devices at different dates or times within a particular project, particularly historical information, may be stored for completed projects, such as screen 40 of FIG. 12. The project status may be viewed by selecting a completed project, such as by selecting a completed project at the bottom of the project list. In this case, operational device information is not provided for the devices in the project since the project is completed and the devices have been returned to operation (e.g., by changing one or more project device parameters 193a for the devices in the asset management database 184). However, historical information (as well as other device information) regarding the number of devices in each device state and health state over time, particularly historical statistical information, may be stored and provided to the user to allow the user to view what is occurring with respect to different device states and health states in the project over the life of the project. Of course, the screen displays of FIGS. 4-12 are merely exemplary screen displays, and data including device state data, health state data, data about the project, specific device data, and other raw and statistical device information may be illustrated, displayed, or provided to the user in any other form or manner based on the project definition as described herein.

[0097] Still further, the user may also prepare or obtain reports on the status of the project, including any relevant information regarding the status of the project, such as device status and health status, within the project. For example, during a commissioning project, the user may ask for, and the asset management application 192, 194 may generate, a commissioning report that includes device statistics and device status, health status related only to the devices in the project. Because the report is limited to the devices in the project, this makes it easier for the user to make decisions, for example, on how to best complete the project, what actions need to be taken to complete the project, etc. Of course, the specific device information provided in the report may vary depending on the type of report, such as if it is a commissioning report or a maintenance report. An example commissioning report is illustrated in FIG. 13, which provides the user with a variety of different commissioning information regarding the devices in the project in a comprehensive, yet easy to read format. In the example of Figure 13, there is a report listing the set of devices or device tags associated with the project (in this case a commissioning project), a status (which may be a summary or shortened version of the device status or state of each device as illustrated in Figure 6), a user configuration field indicating the user configuration applied to the device to commission the device, a user configuration applied field indicating whether the user configuration for the device succeeded, failed or had other results or states, an applied date field indicating when the user configuration was applied or attempted, as well as a problem field indicating information about the configuration application such as the reason for failure, etc. Of course, all of the information in the report of Figure 13 can be stored as values ​​of device parameters in the device file 193 in the asset database 184 or other database.Additionally, the configuration or commissioning report of FIG. 13 may include other or different information and other types of reports may be generated automatically by the device viewing application 194 or the device manager application 192.

[0098] The techniques, systems, apparatus, components, devices, and methods as described herein may be applied to industrial process control systems, environments, and / or plants, which are also referred to interchangeably herein as "industrial control," "process control," or "process" systems, environments, and / or plants. Typically, such systems and plants provide control of one or more processes that operate to manufacture, refine, transform, create, or produce a physical substance or product in a distributed manner.

[0099] The following additional considerations apply to the above discussion: Throughout this specification, the operations described as being performed by any device or routine generally refer to the operation or process of a processor that manipulates or transforms data according to machine-readable instructions. The machine-readable instructions may be stored on and retrieved from a memory device communicatively coupled to the processor. In other words, the methods described herein may be embodied by a series of machine-executable instructions stored on a computer-readable medium (i.e., on a memory device). The instructions, when executed by one or more processors of a corresponding device (e.g., an operator workstation, a commissioning tool, etc.), cause the processor to perform the method. When instructions, routines, modules, processes, services, programs, and / or applications are referred to herein as being stored or saved on a computer-readable memory or a computer-readable medium, the terms "stored" and "saved" are intended to exclude transitory signals.

[0100] Additionally, the terms "operator," "personnel," "person," "user," "technician," "administrator," and other similar terms are used to describe persons within a process plant environment who may use or interact with the systems, apparatus, and methods described herein, but these terms are not intended to be limiting. Where particular terms are used in the description, the terms are used in part due to traditional activities engaged in by plant employees, but are not intended to limit the employees who may engage in a particular activity.

[0101] In addition, throughout this specification, multiple instances may implement components, operations, or structures described as a single instance. Although individual operations of one or more methods have been illustrated and described as separate operations, one or more of the individual operations may be performed simultaneously, and the operations need not be performed in the order illustrated. Structures and functions presented as separate components in an example configuration may be implemented as a combined structure or component. Similarly, structures and functions presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements are within the scope of the subject matter of this specification.

[0102] Unless specifically noted otherwise, discussions herein using words such as "processing," "computing," "calculating," "determining," "identifying," "presenting," "causing to be presented," "causing to be displayed," "displaying," etc. may refer to machine (e.g., computer) operations or processes that manipulate or transform data represented as physical (e.g., electrical, magnetic, biological, or optical) quantities in one or more memories (e.g., volatile memory, non-volatile memory, or a combination thereof), registers, or other machine components that receive, store, transmit, or display information.

[0103] If implemented in software, any of the applications, services, and engines described herein may be stored in any tangible, non-transitory computer-readable memory, such as a magnetic disk, laser disk, solid-state memory device, molecular memory storage device, or other storage medium, such as in the RAM or ROM of a computer or processor. It should be noted that while the exemplary systems disclosed herein are disclosed as including, among other components, software and / or firmware running on hardware, such systems are merely exemplary and should not be considered limiting. For example, the hardware, software, and firmware may be implemented in a variety of different configurations, including, but not limited to, any particular embodiment. It is contemplated that any or all of the software components may be embodied solely in hardware, solely in software, or in any combination of hardware and software, and thus, those skilled in the art will readily appreciate that the examples provided are not the only ways to implement such a system.

[0104] Furthermore, although the above text describes detailed descriptions of many different embodiments, it should be understood that the scope of this patent is defined by the words of the claims set forth at the end of this patent. The detailed description should be construed as merely exemplary and does not describe every possible embodiment, as describing every possible embodiment would be impractical, if not impossible. Many alternative embodiments could be implemented using either current technology or technology developed after the filing date of this patent, which would still fall within the scope of the claims.

Claims

1. 1. A computer-implemented method for tracking device information for devices in a plant having a plurality of plant assets, at least some of the plant assets being communicatively connected to operatively control a process while operating within the plant, the method comprising: obtaining, at a computing device, project definitions for one or more projects in the plant, each of the project definitions including a list of plant assets that are associated with the project and that are not associated with an operational system of the plant when the project is in progress; storing the project definition for each of the one or more projects in a computer readable memory; obtaining and storing in a database a set of device data for each of a number of plant assets within the plant, the device data for a particular plant asset defining device information for the particular plant asset; accessing the device data stored in the database for each of the plant assets not associated with any ongoing projects, and thus for each plant asset associated with the operational system; determining one or more plant asset metrics using the accessed device data for the plant assets without including device data for the plant assets in any of the ongoing projects; and presenting the one or more plant asset metrics to a user via a user interface device.

2. 2. The computer-implemented method of tracking device information of claim 1, further comprising: enabling a user to indicate that a defined project is completed; and moving the plant assets associated with the completed project to the operational system.

3. Determining one or more plant asset metrics may include determining the health of two or more different devices.

3. The computer-implemented method of tracking device information of claim 1 or 2, further comprising determining a number of plant assets in the operational system that are in each of the operational states.

4. 4. The computer-implemented method of tracking device information of any one of claims 1 to 3, further comprising storing in a database plant asset information relating to one or more plant asset states over different times, and presenting to the user via the user interface device historical information related to the plant asset states of the plant assets in the operational system over a period of time.

5. The computer-implemented method for tracking device information of claim 4 , wherein the one or more plant asset conditions include a device health condition.

6. 6. The computer-implemented method for tracking device information of any one of claims 1 to 5, further comprising: accessing the device data stored in the database for each of the plant assets associated with a particular ongoing project; determining one or more project asset metrics using the accessed device data for the plant assets in the particular ongoing project without including device data for plant assets in the operational system; and presenting the one or more project asset metrics to a user via the user interface device.

7. 1. An asset management system for use in a process plant for accessing data associated with a set of devices within the process plant, comprising: a user interface for presenting content; a memory for storing a set of device data for each of the set of devices; one or more processors interfacing with the set of devices, the user interface, and the memory, receiving device data for each device from each of the set of devices via a communications link; storing in the memory the device data associated with the set of devices; receiving, via the user interface, a project definition for a project within the process plant, the project definition including a list of devices associated with the project within the process plant; storing said project definition in said memory; storing an indication of whether said project is in progress or completed; storing and executing further applications that access the device data stored in the memory to perform functions; and one or more processors configured to: enable the further application to access the device information for all of the devices in the project definition without accessing device information for the devices that are not in the project definition; or enable the further application to access the device information for all of the devices that are not in the project definition without accessing the device information for the devices in the project definition to perform the function.

8. The further application determines one or more project metrics for the project by accessing the device information for all of the devices in the project definition without accessing the device information for the devices not in the project definition, and transmits the one or more project metrics to a user. The asset management system according to claim 7 , wherein the asset management system displays the asset information via the user interface.

9. The asset management system of claim 7 or 8, wherein the further application is an alarm application that accesses the device information for all of the devices that are not in the project definition without accessing the device information for the devices in the project definition to determine alarm information for operating systems of the process plant.

10. 10. The asset management system of claim 7, wherein the further application accesses the device information for all of the devices in the project definition when the project is indicated as being in progress without accessing the device information for the devices that are not in the project definition, or the further application accesses the device information for all of the devices that are not in the project definition without accessing the device information for the devices in the project definition when the project is indicated as being in progress, and the further application accesses the device information for all of the devices in the project definition and the device information for the devices that are not in the project definition when the project is indicated as being completed.

Citation Information

Patent Citations

  • Production line monitoring system

    JP2004133620A

  • Personalized plant asset data display and search system

    JP2010539596A

  • Instrument monitoring unit

    JP2012208697A