Automatic judgment device, automatic judgment method, and automatic judgment program
The automatic determination device automates the evaluation of subrogated payment requests by comparing request data against predefined criteria, enhancing the speed and efficiency of response to financial institutions.
Patent Information
- Application Number
- JP2022012326
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-01-28
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2042-01-28
AI Technical Summary
Guarantee companies face a significant burden and time-consuming process in manually determining whether subrogated payment requests from financial institutions are executable, leading to inefficiencies in responding to these requests.
An automatic determination device and method that includes a control unit to analyze subrogation payment request data, comparing it against predefined criteria such as deadlines and maximum amounts stored in a management master, to automate the determination process.
Streamlines the process of determining subrogated payment requests, improving response speed and efficiency, and reducing manual workload.
Smart Images

Figure 0007561784000001 
Figure 0007561784000002 
Figure 0007561784000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an automatic determination device, an automatic determination method, and an automatic determination program. [Background technology]
[0002] Patent Document 1 discloses a technology for determining whether or not to enter into a paid contract, which reduces the burden required for determining whether or not to enter into a paid contract by carrying out an examination prior to the judgment, and which accurately determines the risk of default, the risk of incurring administrative burdens, the risk of non-recovery, the risk of making subrogation payments, etc. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6333431 Summary of the Invention [Problem to be solved by the invention]
[0004] However, when a guarantee company receives a subrogation claim from a financial institution, the guarantee company manually determines whether or not to execute each claim. This creates a workload for the guarantee company as well as the time it takes to respond to financial institutions.
[0005] The present invention has been made in consideration of the above, and aims to provide an automatic judgment device, an automatic judgment method, and an automatic judgment program that can streamline the process of determining whether or not a subrogation claim from a financial institution can be executed, and can improve the speed of responding to financial institutions. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, the automatic judgment device of the present invention is an automatic judgment device equipped with a control unit, and is capable of accessing a subrogation management master that corresponds, for each service, the number of days until the substitute claim deadline and the maximum amount check rate, screening data that corresponds, for each service, the maximum amount and the screening result, and subrogation claim data that corresponds, for each service number, the service code, the subrogation claim amount, the loan balance, the date of default, and the subrogation claim date, and the control unit is characterized in having a judgment unit that refers to the subrogation management master, the screening data, and the subrogation claim data, and determines whether or not at least one of the substitute claim deadline and the maximum amount has been exceeded for each service.
[0007] In addition, the automatic judgment method of the present invention is an automatic judgment method executed by an automatic judgment device equipped with a control unit, which has access to a subrogation management master that corresponds, for each service, the number of days until the substitute claim deadline and a maximum amount check rate, screening data that corresponds, for each service, the maximum amount and the screening result, and subrogation claim data that corresponds, for each contract number, the service code, the subrogation claim amount, the loan balance, the date of default, and the subrogation claim date, and is characterized in that it includes a judgment step executed by the control unit that refers to the subrogation management master, the screening data, and the subrogation claim data to determine whether or not at least one of the substitute claim deadline and the maximum amount has been exceeded for each service.
[0008] In addition, the automatic judgment program of the present invention is an automatic judgment program to be executed by an automatic judgment device equipped with a control unit, and is capable of accessing a subrogation management master that corresponds, for each service, the number of days until the substitute claim deadline and a maximum amount check rate, screening data that corresponds, for each service, the maximum amount and the screening result, and subrogation claim data that corresponds, for each contract number, the service code, the subrogation claim amount, the loan balance, the date of default, and the subrogation claim date, and is characterized in that it includes a judgment step for causing the control unit to execute the program, which refers to the subrogation management master, the screening data, and the subrogation claim data, and determines whether or not at least one of the substitute claim deadline and the maximum amount has been exceeded for each service. Effect of the Invention
[0009] According to the present invention, it is possible to improve the efficiency of the process of determining whether or not a subrogation claim from a financial institution can be made feasible, and to improve the speed of responses to financial institutions. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a schematic diagram showing an overview in a block diagram of an example of the configuration of an automatic determination device according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of a subrogation management master data table in the subrogation management master of the automatic judgment device according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing an example of an examination data table in the examination data of the automatic judgment device according to the embodiment. [Figure 4] FIG. 4 is a diagram showing an example of a subrogation claim data table in the subrogation claim data of the automatic judgment device according to the embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a schematic overview of the guarantee process. [Figure 6] FIG. 6 is a flowchart showing an outline of the processing executed by the automatic determination device according to the embodiment. [Figure 7]FIG. 7 is a diagram showing an example of a subrogation performance availability determination data table in the subrogation performance availability determination data generated by the determination unit of the automatic determination device according to the embodiment. [Figure 8] FIG. 8 is a diagram showing an example of a subrogation judgment result list output screen displayed on the monitor of the automatic judgment device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of an automatic judgment device, an automatic judgment method, and an automatic judgment program according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiment.
[0012] [1. Configuration] An example of the configuration of an automatic determination device according to this embodiment will be described with reference to Fig. 1 etc. Fig. 1 is a schematic diagram showing an overview in a block diagram of an example of the configuration of an automatic determination device.
[0013] The automatic determination device 100 shown in Fig. 1 is a commercially available desktop personal computer. Note that the automatic determination device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.
[0014] The automatic judgment device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the automatic judgment device 100 is connected to each other so as to be able to communicate with each other via an arbitrary communication path.
[0015] The communication interface unit 104 communicatively connects the automatic determination device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the automatic determination device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). The data stored in the memory unit 106 may be stored in the server 200, for example.
[0016] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.
[0017] The storage unit 106 stores various databases, tables, files, etc. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 stores a subrogation management master 106a, screening data 106b, and subrogation payment claim data 106c.
[0018] The subrogation management master 106a stores, for each service, the number of days until the substitute claim deadline and the maximum amount check rate in association with each other.
[0019] Fig. 2 is a diagram showing an example of a subrogation management master data table in the subrogation management master 106a. In the first row of the subrogation management master data table T1 shown in Fig. 2, the service code "1001" is stored in association with the number of days until the subrogation claim deadline "30" and the maximum amount check rate "118%". Note that in the subrogation management master data table T1, the number of days until the subrogation claim deadline and the maximum amount check rate are stored in association with each other for each service, but this is not limited thereto, and the number of days until the subrogation claim deadline and the maximum amount check rate may be stored in association with each other for each company and service.
[0020] The screening data 106b stores the contract number, the maximum amount, and the screening result in association with each other.
[0021] 3 is a diagram showing an example of a screening data table in the screening data 106b. In the first row of the screening data table T2 shown in FIG. 3, the contract number "10" is stored in association with the maximum amount "1,500,000" and the screening result "OK".
[0022] The subrogation claim data 106c stores the contract number, the service code, the subrogation claim amount, the loan balance, the interest, the late payment charge, the default date, and the subrogation claim date in association with the contract number.
[0023] 4 is a diagram showing an example of a subrogation claim data table in the subrogation claim data 106c. In the first row of the subrogation claim data table T3, the contract number "10" is stored in association with the service code "1001", the subrogation claim amount "1,110,000", the loan balance "1,000,000", the interest "100,000", the late payment damages "10,000", the default date "2021 / 10 / 1", and the subrogation claim date "2021 / 11 / 1".
[0024] Returning to FIG. 1, the description of the configuration of the automatic determination device 100 will continue. The control unit 102 is a CPU or the like that performs overall control of the automatic judgment device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs. The control unit 102 includes an acquisition unit 102a, a judgment unit 102b, and an output control unit 102c.
[0025] The acquiring unit 102a acquires the subrogation claim data 106c from the storage unit 106 or the financing company (bank).
[0026] The judgment unit 102b refers to the subrogation management master 106a, the examination data 106b, and the subrogation claim data 106c, and judges, for each service, whether or not at least one of the subrogation claim deadline and the maximum amount has been exceeded.
[0027] The output control unit 102c outputs a subrogation payment availability determination result of the determination unit 102b.
[0028] [2. Overview of guarantee services] Next, an overview of the guarantee process will be described with reference to Fig. 5.
[0029] As shown in FIG. 5, a financing company (bank) applies for a guarantee examination of a debtor to a guarantor company (step S1).
[0030] Next, the guarantor company reviews the loan company's (bank's) application for a guarantee for the debtor, transmits the results of the review to the loan company (bank), and executes the debtor's guarantee (step S2).
[0031] Thereafter, the financing company (bank) cooperates with the guarantor company in providing monthly reports on contracts, balance information, etc. (step S3).
[0032] Next, if the debtor delays payment, the financing company (bank) requests the guarantor to make a subrogation claim (step S4).
[0033] Thereafter, the guarantor company judges whether or not the subrogation payment can be executed in response to the subrogation payment request from the financing company (bank), transmits the result of the subrogation payment judgment to the financing company (bank), and executes the subrogation payment to the debtor (step S5). In this case, in the conventional guarantor company, when a subrogation payment request was received from a financial institution, the execution possibility was judged manually one by one, so that the work load was increased by judging the execution possibility of the subrogation payment request from the financial institution one by one, and it took time to reply to the financial institution. Details of the execution possibility of the subrogation payment by the automatic judgment device 100 will be described later.
[0034] [3. Processing Executed by the Automatic Judgment Device 100] Next, a description will be given of the processing executed by the automatic determination device 100. FIG 6 is a flowchart showing an outline of the processing executed by the automatic determination device 100.
[0035] As shown in FIG. 6, the acquisition unit 102a acquires the subrogation claim data 106c (Step S101).
[0036] Next, the judgment unit 102b refers to the subrogation management master 106a, the screening data 106b, and the subrogation claim data 106c, and judges whether or not at least one of the subrogation claim deadline and the maximum amount has been exceeded for each service (step S102).
[0037] First, the determination of whether or not subrogation can be performed in the case of contract number "10" will be explained. As shown in the first row of the subrogation claim data table T3 in FIG. 4, in the case of contract number "10", the judgment unit 102b checks the substitute claim deadline and judges whether the number of days obtained by subtracting the subrogation claim date "2021 / 11 / 1" from the deadline forfeiture date "2021 / 10 / 1" (31 ((2021 / 11 / 1)-(2021 / 10 / 1)=31)) exceeds the number of days until the substitute claim deadline (30). In other words, the judgment unit 102b judges that contract number "10" is not eligible for subrogation payment (NO).
[0038] Next, the determination of whether or not subrogation of contract number "20" can be performed will be explained. As shown in the second row of the subrogation claim data table T3 in Fig. 4, the judgment unit 102b judges whether the contract number "20" corresponds to the limit amount excess check and whether the loan balance "2,000,000" exceeds the value (1,600,000 x 1.18 = 1,888,000) obtained by multiplying the limit amount "1,600,000" by the limit amount check rate "118%". In this case, it is judged that the loan balance "2,000,000" exceeds the value (1,600,000 x 1.18 = 1,888,000) obtained by multiplying the limit amount "1,600,000" by the limit amount check rate "118%" (2,000,000>1,888,000). That is, the judgment unit 102b judges that subrogation is not possible for the contract number "20" (NO).
[0039] Finally, we will explain the determination of whether or not the subrogation payment for contract number "30" can be performed. As shown in the third row of the subrogation claim data table T3 in Figure 4, when the contract number is "30", the judgment unit 102b checks the substitute claim deadline and judges whether the number of days obtained by subtracting the deadline forfeiture "10 / 20 / 2021" from the subrogation claim date "11 / 1 / 2021" is 31 ((11 / 1 / 2021)-(10 / 20 / 2021)=21) exceeds the number of days for the substitute claim deadline (30). In this case, the judgment unit 102b judges that it is less than or equal to the number of days for the substitute claim deadline (30) (30≦21).
[0040] Furthermore, as shown in the third row of the subrogation claim data table T3 in Fig. 4, in the case of contract number "30", the judgment unit 102b judges whether the limit amount excess check is applicable and whether the loan balance "3,000,000" exceeds the value (3,000,000 x 1.15 = 3,450,000) obtained by multiplying the limit amount "3,000,000" by the limit amount check rate "115%". At this time, it is judged that the loan balance "3,000,000" is equal to or less than the value (3,000,000 x 1.15 = 3,450,000) obtained by multiplying the limit amount "3,000,000" by the limit amount check rate "115%" (3,000,000 x 1.15 = 3,450,000) (3,000,000 ≦ 3,450,000).
[0041] In other words, in the case of contract number "30," the judgment unit 102b judges that subrogation payment is OK (OK) because the number of days obtained by subtracting the date of subrogation payment claim from the date of forfeiture of the benefit of the term is less than or equal to the number of days until the subrogation claim deadline, and the loan balance is less than or equal to the maximum amount multiplied by the maximum amount check rate.
[0042] In this way, the judgment unit 102b generates subrogation performance judgment data, which is the judgment result for each contract number, by making a judgment for each contract number. Fig. 7 is a diagram showing an example of a subrogation performance judgment data table in the subrogation performance judgment data generated by the judgment unit 102b. In the subrogation performance judgment data table T4 shown in Fig. 7, the contract number is stored in association with the subrogation performance amount and the subrogation performance judgment result. Specifically, in the first row of the subrogation performance judgment data table T4, the contract number "10" is stored in association with the subrogation performance amount "1,110,000" and the subrogation performance judgment result "NG".
[0043] Returning to FIG. 6, in step S103, the output control unit 102c outputs the subrogation performance judgment result of the judgment unit 102b. FIG. 8 is a diagram showing an example of a subrogation performance judgment result list output screen displayed by the monitor 114. As shown in FIG. 8, the subrogation performance judgment result list output screen P1 includes input forms B1 and B2 for the subrogation performance request date and an output icon A1 that instructs the output of the subrogation performance judgment result of the judgment unit 102b. When the user inputs the subrogation performance request date, for example, "2021 / 11 / 1" to "2021 / 11 / 1" into the input forms B1 and B2 using the input device 112 and presses the output icon A1, the output control unit 102c outputs the subrogation performance judgment result of the judgment unit 102b to the monitor 114. Specifically, the output control unit 102c outputs the subrogation performance determination data table T4 of Fig. 7 described above to the monitor 114. After step S103, the automatic determination device 100 ends this process.
[0044] According to the embodiment described above, the judgment unit 102b refers to the subrogation management master 106a, the examination data 106b, and the subrogation payment claim data 106c, and judges for each service whether or not at least one of the subrogation claim deadline and the maximum amount has been exceeded, thereby making it possible to streamline the work of judging whether or not a subrogation payment claim from a financial institution can be executed and to improve the speed of responses to financial institutions.
[0045] Furthermore, according to the embodiment, the output control unit 102c outputs the subrogation performance determination result of the determination unit 102b, so that the user can intuitively grasp whether or not a subrogation payment claim from a financial institution can be executed.
[0046] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.
[0047] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.
[0048] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.
[0049] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.
[0050] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.
[0051] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.
[0052] Moreover, with regard to the automatic determination device 100, each of the components shown in the figures is merely a functional concept, and does not necessarily have to be physically configured as shown in the figures.
[0053] For example, the processing functions of the automatic judgment device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium that includes programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the automatic judgment device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.
[0054] In addition, this computer program may be stored in an application program server connected to the automatic decision-making apparatus 100 via any network, and it is also possible to download all or part of it as necessary.
[0055] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.
[0056] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.
[0057] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.
[0058] The automatic judgment device 100 may be configured as an information processing device such as a known personal computer or a workstation, or may be configured as the information processing device to which any peripheral device is connected. The automatic judgment device 100 may be realized by installing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.
[0059] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]
[0060] The present invention is useful in non-banks such as guarantee companies that guarantee debtors, and in the credit guarantee industry. [Explanation of symbols]
[0061] 100 Automatic judgment device 102 Control section 102a Acquisition Department 102b Judgment section 102c Output control section 104 Communication interface section 106 Storage section 106a Subrogation Management Master 106b Examination Data 106c Subrogation Claim Data 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network
Claims
1. An automatic determination device including a control unit, A subrogation management master in which the number of days until the subrogation claim deadline and the maximum amount check rate are associated with each other for each service; Screening data in which the contract number is associated with the maximum amount and the screening result; Subrogation claim data in which the contract number is associated with a service code, a subrogation claim amount, a loan balance, a default date, and a subrogation claim date; is accessible to The control unit is a determination unit that refers to the subrogation management master, the examination data, and the subrogation claim data and determines, for each service, at least one of whether the substitute claim deadline has passed and whether the loan balance has exceeded a value obtained by multiplying the maximum amount by a maximum amount check rate; An automatic judgment device comprising:
2. The automatic judgment device according to claim 1, The control unit is Further comprising an output control unit that outputs a determination result of the determination unit; An automatic judgment device comprising:
3. An automatic determination method executed by an automatic determination device having a control unit, A subrogation management master in which the number of days until the subrogation claim deadline and the maximum amount check rate are associated with each other for each service; Screening data in which the contract number is associated with the maximum amount and the screening result; Subrogation claim data in which the contract number is associated with a service code, a subrogation claim amount, a loan balance, a default date, and a subrogation claim date; is accessible to Executed by the control unit, a determination step of determining, for each service, at least one of whether or not the substitute claim deadline has passed and whether or not the loan balance has exceeded a value obtained by multiplying the maximum amount by a maximum amount check rate, by referring to the subrogation management master, the examination data, and the subrogation claim data; The automatic determination method is characterized by the above.
4. An automatic judgment program to be executed by an automatic judgment device having a control unit, A subrogation management master in which the number of days until the subrogation claim deadline and the maximum amount check rate are associated with each other for each service; Screening data in which the contract number is associated with the maximum amount and the screening result; Subrogation claim data in which the contract number is associated with a service code, a subrogation claim amount, a loan balance, a default date, and a subrogation claim date; is accessible to To cause the control unit to execute a determination step of determining, for each service, at least one of whether or not the substitute claim deadline has passed and whether or not the loan balance has exceeded a value obtained by multiplying the maximum amount by a maximum amount check rate, by referring to the subrogation management master, the examination data, and the subrogation claim data; An automatic judgment program characterized by:
Citation Information
Patent Citations
Synthetic polymer promoter system
JP1988033431A
Total financing managing system, credit scoring deciding system and credit guarantee managing system
JP2003016261A
Guarantee obligation immunity system and method
JP2004171219A
