Delivery plan optimization device, delivery plan optimization method, and program

The collection and delivery plan optimization device optimizes delivery routes by grouping points and using annealing to minimize resources and adapt to changing conditions, addressing inefficiencies in existing technologies.

JP7563037B2Active Publication Date: 2024-10-08NEC CORP
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2020136717
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-08-13
Publication Date
2024-10-08
Estimated Expiration
2040-08-13

AI Technical Summary

Technical Problem

Existing delivery planning technologies fail to minimize the number of vehicles and personnel required for efficient delivery, leading to suboptimal plans that cannot be adjusted for unforeseen events or changing conditions.

Method used

A collection and delivery plan optimization device that uses a point dividing unit to allocate points into groups, an annealing processing unit to calculate the shortest routes, and a tour route search unit to determine travel times within shift limits, iteratively adjusting group numbers to minimize the number of groups and optimize routes.

Benefits of technology

Enables the creation of optimal delivery plans that minimize resources while accommodating changing conditions, reducing manual dependence and improving accuracy and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007563037000001
    Figure 0007563037000001
  • Figure 0007563037000002
    Figure 0007563037000002
  • Figure 0007563037000003
    Figure 0007563037000003
Patent Text Reader

Abstract

To create an optimal collection and delivery plan.SOLUTION: A collection and delivery plan optimization device includes a point division unit that distributes a plurality of collection and delivery destination spots to a plurality of groups, an annealing processing unit that calculates the shortest patrol route for patrolling the plurality of collection and delivery destination spots included in each group using annealing, and a patrol route search unit that calculates the patrol time required to patrol the plurality of collection and delivery destination spots on the patrol route, and determines whether or not the patrol time falls within the shift time. The number of groups is deceased if it is determined that the patrol time falls within the shift time, the processes by the point division unit, the annealing processing unit, and the patrol route search unit are repeated, the number of groups is increased if it is determined that the patrol time does not fall within the shift time, the processes by the point division unit, the annealing processing unit, and the patrol route search unit are repeated, and as a result, the number of groups is minimized.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program. [Background technology]

[0002] An optimal block division method for delivery planning is described in Patent Document 1. In the technology described in Patent Document 1, a delivery area is divided into multiple block areas in advance, and an overall delivery plan is created based on a delivery plan within each block.

[0003] Patent Document 2 describes a route generation device that generates a route for visiting facilities installed at multiple locations. The technology described in Patent Document 2 generates a route for multiple route workers that keeps the total travel distance as short as possible and prioritizes visiting vending machines that require urgent maintenance. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 9-311702 [Patent Document 2] JP 2019-096100 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology described in Patent Document 1 does not attempt to minimize the number of vehicles used for delivery. Therefore, the technology described in Patent Document 1 cannot create an optimal delivery plan. In addition, the technology described in Patent Document 2 does not attempt to minimize the number of route men who visit multiple vending machines. Therefore, the technology described in Patent Document 2 cannot create an optimal route plan. "Optimal" here means making deliveries within a certain time with as few people and vehicles as possible.

[0006] SUMMARY OF THE PRESENTLY PREFERRED EMBODIMENTS An object of the present invention is to provide a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program that solve the above-mentioned problems. [Means for solving the problem]

[0007] According to a first aspect of the present invention, in a collection and delivery plan optimization device including a point division unit that divides a plurality of collection and delivery destination points to be allocated into a plurality of allocation destination groups, an annealing processing unit that calculates the shortest route for visiting a plurality of collection and delivery destination points included in each of the plurality of allocation destination groups by using annealing, and a route search unit that calculates, for each of the plurality of allocation destination groups, a required route for visiting a plurality of collection and delivery destination points included in each of the plurality of allocation destination groups along the route calculated by the annealing processing unit, and determines whether or not the required route for visiting each of the plurality of allocation destination groups is within a shift time, when it is determined by the route search unit that the required route for visiting each of the plurality of allocation destination groups is within the shift time, the number of the plurality of allocation destination groups is reduced. The location division unit allocates the multiple collection and delivery destination points to be allocated, the annealing processing unit calculates the shortest route, and the route search unit calculates the required route for the route, and if the route search unit determines that the required route for any of the multiple groups to be allocated does not fall within the shift time, the number of the multiple groups to be allocated is increased, and the location division unit allocates the multiple collection and delivery destination points to be allocated, the annealing processing unit calculates the shortest route, and the route search unit calculates the required route for the route, and if the shift time is within the shift time and the number of the multiple groups to be allocated is a minimum, the route search unit determines the shortest route calculated by the annealing processing unit as the optimal route.

[0008] According to a second aspect of the present invention, in a collection and delivery plan optimization method including a point division step of dividing a plurality of destination points to be allocated into a plurality of allocation destination groups, an annealing processing step of calculating the shortest route for visiting a plurality of destination points included in each of the plurality of allocation destination groups by using annealing, and a route search step of calculating, for each of the plurality of allocation destination groups, a required route for visiting a plurality of destination points included in each of the plurality of allocation destination groups along the route calculated in the annealing processing step, and determining whether or not the required route for visiting each of the plurality of allocation destination groups is within a shift time, when it is determined in the route search step that the required route for visiting each of the plurality of allocation destination groups is within the shift time, the number of the plurality of allocation destination groups is reduced, and the point division is performed. The allocation of the multiple collection and delivery destination points to be allocated in the allocation step, the calculation of the shortest circular route in the annealing processing step, and the calculation of the required circular time in the circular route search step are repeated, and if it is determined in the circular route search step that the required circular time of any of the multiple groups to be allocated is not within the shift time, the number of the multiple groups to be allocated is increased, and the allocation of the multiple collection and delivery destination points to be allocated in the point division step, the calculation of the shortest circular route in the annealing processing step, and the calculation of the required circular time in the circular route search step are repeated, and in the circular route search step, if the required circular time of each of the multiple groups to be allocated is within the shift time and the number of the multiple groups to be allocated is minimum, the shortest circular route calculated in the annealing processing step is determined to be the optimal circular route.

[0009] According to a third aspect of the present invention, a program for causing a computer to execute a point division step of allocating a plurality of destination points to be allocated to a plurality of allocation destination groups, an annealing processing step of calculating the shortest route for visiting a plurality of destination points included in each of the plurality of allocation destination groups by using annealing, and a route search step of calculating, for each of the plurality of allocation destination groups, a required route for visiting a plurality of destination points included in each of the plurality of allocation destination groups along the route calculated in the annealing processing step, and determining whether or not the required route for visiting each of the plurality of allocation destination groups is within a shift time, the number of the plurality of allocation destination groups is reduced, and the previous group is selected. The allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest circular route in the annealing processing step, and the calculation of the required circular time in the circular route search step are repeated, and if it is determined in the circular route search step that the required circular time of any of the multiple groups to be assigned is not within the shift time, the number of the multiple groups to be assigned is increased, and the allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest circular route in the annealing processing step, and the calculation of the required circular time in the circular route search step are repeated, and in the circular route search step, if the required circular time of each of the multiple groups to be assigned is within the shift time and the number of the multiple groups to be assigned is minimum, the shortest circular route calculated in the annealing processing step is determined to be the optimal circular route. Effect of the Invention

[0010] According to the present invention, it is possible to provide a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program that are capable of creating an optimal collection and delivery plan. [Brief description of the drawings]

[0011] [Figure 1] FIG. 2 is a diagram showing an example of a route or the like calculated by the collection and delivery plan optimization device of the first embodiment. [Diagram 2] 1 is a diagram illustrating an example of a configuration of a collection and delivery plan optimization device according to a first embodiment. [Diagram 3] 13 is a flowchart illustrating an example of a process executed by a travel route searching unit. [Figure 4] 13 is a flowchart showing an example of a specific process executed by a point dividing unit. [Diagram 5] 13 is a flowchart showing an example of a specific process executed by an annealing processing unit. [Figure 6] FIG. 11 is a diagram illustrating an example of a configuration of a collection and delivery plan optimization device according to a second embodiment. [Figure 7] 13 is a flowchart illustrating an example of a process executed by a group number optimization unit. [Figure 8] FIG. 13 is a diagram illustrating an example of the configuration of a delivery plan optimization device according to a third embodiment. [Figure 9] FIG. 13 is a diagram illustrating an example of the configuration of a collection and delivery plan optimization device according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, an embodiment of a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program according to the present invention will be described with reference to the drawings.

[0013] First Embodiment Fig. 1 is a diagram showing an example of routes R01, R02, R03, etc. calculated by a collection and delivery plan optimization device 101 of the first embodiment. In detail, Fig. 1(A) shows routes R11, R12, R13 calculated by a collection and delivery plan optimization device of a comparative example, and Fig. 1(B) shows an example of routes R01, R02, R03 calculated by the collection and delivery plan optimization device 101 of the first embodiment.

[0014] In the example shown in FIG. 1(A), parcels are collected and delivered from a collection and delivery base BS to collection and delivery destination points P1 to P11 according to predetermined shifts and routes R11, R12, and R13. The collection and delivery points P1, P2, P3, and P8 are assigned to a first group where collection and delivery is performed by a first vehicle, the collection and delivery points P4, P5, and P6 are assigned to a second group where collection and delivery is performed by a second vehicle, and the collection and delivery points P7, P9, P10, and P11 are assigned to a third group where collection and delivery is performed by a third vehicle. The first vehicle collects and delivers packages along a circular route R11 from the collection and delivery base BS to the collection and delivery destination point P1 to the collection and delivery destination point P8 to the collection and delivery destination point P2 to the collection and delivery destination point P3 to the collection and delivery base BS. In the circular route R11, the route from the collection and delivery base BS to the collection and delivery destination point P1 intersects with the route from the collection and delivery destination point P8 to the collection and delivery destination point P2, making the circular route R11 an inefficient circular route. The second vehicle collects and delivers packages along a circular route R12 from the collection and delivery base BS to the collection and delivery destination point P5 to the collection and delivery destination point P6 to the collection and delivery destination point P4 to the collection and delivery base BS. The route R12 includes a bad road on the route from the collection and delivery destination point P6 to the collection and delivery destination point P4, making the route R12 an inefficient route. The third vehicle collects and delivers packages on a circular route R13 from the collection and delivery base BS to the collection and delivery destination point P7 to the collection and delivery destination point P9 to the collection and delivery destination point P10 to the collection and delivery destination point P11 to the collection and delivery base BS. In the circular route R13, the route from the collection and delivery destination point P7 to the collection and delivery destination point P9 intersects with the route from the collection and delivery destination point P10 to the collection and delivery destination point P11, making the circular route R13 an inefficient circular route.

[0015] In the example shown in FIG. 1(B), parcels are collected and delivered from a collection and delivery base BS to collection and delivery destination points P1 to P11 according to predetermined shifts and circular routes R01, R02, and R03 calculated by the collection and delivery plan optimization device 101 of the first embodiment. The collection and delivery points P1, P2, P3, and P4 are assigned to a first group where collection and delivery is performed by a first vehicle, the collection and delivery points P5, P6, and P7 are assigned to a second group where collection and delivery is performed by a second vehicle, and the collection and delivery points P8, P9, P10, and P11 are assigned to a third group where collection and delivery is performed by a third vehicle. The first vehicle collects and delivers packages along a circular route R01 from the collection and delivery base BS to the collection and delivery destination point P1 to the collection and delivery destination point P2 to the collection and delivery destination point P3 to the collection and delivery destination point P4 to the collection and delivery base BS. Since the circular route R01 does not include any points where multiple routes intersect, it can be said that the circular route R01 is a more efficient circular route than the circular route R11. The second vehicle collects and delivers packages along a circular route R02 from the collection and delivery base BS to the collection and delivery destination point P5 to the collection and delivery destination point P6 to the collection and delivery destination point P7 to the collection and delivery base BS. Since the circular route R02 does not include any rough roads, it can be said that the circular route R02 is a more efficient circular route than the circular route R12. The third vehicle collects and delivers packages along the circular route R03 of collection and delivery base BS → destination point P8 → destination point P9 → destination point P10 → destination point P11 → collection and delivery base BS. Since the circular route R03 does not include any points where multiple routes intersect, it can be said that the circular route R03 is a more efficient circular route than the circular route R13.

[0016] In the example shown in Fig. 1, information on the collection and delivery base BS, the collection and delivery points P1 to P11, and the packages to be collected and delivered is given in advance, and the number of delivery personnel (vehicles) and the route are determined so that packages can be collected and delivered from the collection and delivery base BS to all of the collection and delivery points P1 to P11 within a limited shift time, for example, in one day. Also, the collection and delivery shifts (shift times) need to be as equal as possible for each delivery personnel (each vehicle). In recent years, due to the decline in the working population and the need for work style reform and cost reduction, there is a demand for the creation of efficient delivery plans that enable delivery with fewer delivery personnel (vehicles).

[0017] FIG. 2 is a diagram showing an example of the configuration of the delivery plan optimization device 101 according to the first embodiment. In the example shown in FIG. 2, a collection and delivery plan optimization device 101 includes a control unit 102, a display unit 103, an operation / input unit 105, a map data storage unit 106, a collection and delivery data storage unit 107, a road network database 108, a guidance database 109, a tour route search unit 110, and a route search unit 121. The control unit 102 controls the operations (e.g., reading, writing, displaying data, etc.) of other components included in the collection and delivery plan optimization device 101. The display unit 103 displays, for example, a route (e.g., routes R01, R02, R03 (see FIG. 1(B))) calculated by the route search unit 110. The operation / input unit 105 accepts input operations by, for example, a user of the collection and delivery plan optimization device 101. The map data storage unit 106 stores map data, which is information related to the map to be displayed by the display unit 103, together with route maps R01, R02, R03, etc. calculated by the route search unit 110, for example. The collection and delivery data storage unit 107 stores collection and delivery data, which is information related to collection and delivery, such as the number of parcels at the collection and delivery destination points P1 to P11 (see FIG. 1(B)) and the collection and delivery time required at the collection and delivery destination points P1 to P11.

[0018] In the map data stored in the map data storage unit 106, the nodes and bends of the roads (routes) included in the map are treated as nodes, and the routes connecting the nodes are treated as links. The road network database 108 stores cost information (e.g., distance, required time, energy consumption, etc.) of all links as road network data. The road network database 108 also stores weighting information for costs that changes from moment to moment depending on the time of day, weather, event occurrence (construction, etc.), etc. The guidance database 109 stores voice data for guiding the driving direction at intersections and the like, guidance display image data, and the like. The route search unit 110 calculates an optimal route such as routes R01, R02, R03 (see FIG. 1(B)). In detail, the route search unit 110 searches for the optimal route by referring to the map data storage unit 106, the collection and delivery data storage unit 107, and the road network database 108. After the optimal tour route is calculated by the tour route search unit 110, the route search unit 121 performs a normal route search by referring to the road network data stored in the road network database .

[0019] The travel route search unit 110 includes a location division unit 111 and an annealing processing unit 112 . The point division unit 111 divides the multiple collection and delivery destination points to be allocated (in the example shown in FIG. 1(B), collection and delivery destination points P1 to P11) into multiple groups to be allocated (in the example shown in FIG. 1(B), a first group where collection and delivery is performed by a first vehicle, a second group where collection and delivery is performed by a second vehicle, and a third group where collection and delivery is performed by a third vehicle). The annealing processing unit 112 uses annealing to calculate the shortest route to visit the multiple collection and delivery destination points included in each of the multiple groups of destinations assigned by the point division unit 111. The annealing used by the annealing processing unit 112 is quantum annealing executed on a quantum computer or simulated annealing executed on a classical computer. In the example shown in FIG. 1(B), the annealing processing unit 112 uses annealing to calculate the shortest route R01 to travel around the collection and delivery points P1, P2, P3, and P4 included in the first group of allocation destinations assigned by the point division unit 111, the shortest route R02 to travel around the collection and delivery points P5, P6, and P7 included in the second group of allocation destinations, and the shortest route R03 to travel around the collection and delivery points P8, P9, P10, and P11 included in the third group of allocation destinations. In the example shown in FIG. 2, the location division unit 111 uses far-first-clustering to divide the multiple collection and delivery destination points to be allocated into multiple groups of allocation destinations, but in other examples, the location division unit 111 may use a clustering method other than far-first-clustering to divide the multiple collection and delivery destination points to be allocated into multiple groups of allocation destinations.

[0020] In the example shown in Figure 2, the route search unit 110 calculates the travel time required for each of the multiple groups of destinations assigned by the location division unit 111 to travel around the multiple collection and delivery destination points included in each of the multiple groups of destinations, using the route calculated by the annealing processing unit 112. In the example shown in Figure 1 (B), the route search unit 110 calculates the travel time required to travel around the collection and delivery points P1, P2, P3, and P4 included in the first group using the route R01 calculated by the annealing processing unit 112, the travel time required to travel around the collection and delivery points P5, P6, and P7 included in the second group using the route R02 calculated by the annealing processing unit 112, and the travel time required to travel around the collection and delivery points P8, P9, P10, and P11 included in the third group using the route R03 calculated by the annealing processing unit 112.

[0021] In the example shown in FIG. 2, the route searching unit 110 determines whether or not the required travel time for each of the multiple groups allocated by the location dividing unit 111 falls within the shift time. In the example shown in FIG. 1(B), the tour route search unit 110 determines whether the tour time of the first group falls within the shift time, determines whether the tour time of the second group falls within the shift time, and determines whether the tour time of the third group falls within the shift time.

[0022] 2, when the route search unit 110 determines that the required travel time for each of the multiple groups assigned by the location division unit 111 falls within the shift time, the number of groups assigned by the location division unit 111 is reduced. Furthermore, the allocation of the multiple collection and delivery destination points to be assigned by the location division unit 111, the calculation of the shortest route by the annealing processing unit 112, and the calculation of the required travel time by the route search unit 110 are repeated. In the example shown in FIG. 1(B), when the route search unit 110 determines that the travel time required for the first group is within the shift time, the travel time required for the second group is within the shift time, and the travel time required for the third group is within the shift time, the number of groups is reduced from 3 to 2. Furthermore, the allocation of the multiple collection and delivery destination points to be allocated by the point division unit 111, the calculation of the shortest route by the annealing processing unit 112, and the calculation of the required time for the route by the route search unit 110 are repeated. That is, the collection and delivery destination points P1 to P11 to be allocated are allocated into two groups by the point division unit 111. Furthermore, the shortest route for each of the two groups is calculated by the annealing processing unit 112. Furthermore, the required time for each of the two groups is calculated by the route search unit 110.

[0023] 2, when the route search unit 110 determines that the travel time required for any of the multiple groups allocated by the location division unit 111 is not within the shift time, the number of groups allocated by the location division unit 111 is increased. Furthermore, the allocation of the multiple collection and delivery destination points to be allocated by the location division unit 111, the calculation of the shortest route by the annealing processing unit 112, and the calculation of the travel time required by the route search unit 110 are repeated. In the example shown in FIG. 1(B), when the route search unit 110 determines that any one of the first group's travel time, the second group's travel time, and the third group's travel time is not within the shift time, the number of groups is increased from 3 to 4. Furthermore, the location division unit 111 divides the multiple destination locations to be divided, the annealing processing unit 112 calculates the shortest route, and the route search unit 110 calculates the travel time. That is, the destination locations P1 to P11 to be divided are divided into four groups by the location division unit 111. The annealing processing unit 112 calculates the shortest route for each of the four groups. Furthermore, the route search unit 110 calculates the travel time for each of the four groups.

[0024] In the example shown in FIG. 2, the tour route search unit 110 determines the shortest tour route calculated by the annealing processing unit 112 as the optimal tour route when the tour time required for each of the multiple groups assigned by the location division unit 111 falls within the shift time and when the number of multiple groups assigned by the location division unit 111 is minimized. In the example shown in FIG. 1(B), the required travel time for each of the three groups assigned by the location division unit 111 falls within the shift time, and the number of groups assigned by the location division unit 111 is "3", which is the smallest. In other words, if the number of groups assigned by the location division unit 111 were "2", the required travel time for at least one of the groups would not fall within the shift time. Therefore, the route search unit 110 determines the shortest route R01, R02, R03 calculated by the annealing processing unit 112 as the optimal route.

[0025] In the example shown in FIG. 2, as described above, the tour route search unit 110 determines the shortest tour route calculated by the annealing processing unit 112 as the optimal tour route when the tour time required for each of the multiple groups assigned by the location division unit 111 falls within the shift time and when the number of multiple groups assigned by the location division unit 111 is minimized. In another example, when the travel time required for each of the multiple groups assigned by the location division unit 111 falls within the shift time, when the number of multiple groups assigned by the location division unit 111 is minimized, and other conditions are satisfied, the route search unit 110 may determine the shortest route calculated by the annealing processing unit 112 as the optimal route. Examples of the above-mentioned "other conditions" include, for example, the third vehicle departing from the collection / delivery base BS (see Figure 1(B)) arriving at the collection / delivery point P8 (see Figure 1(B)) before the collection / delivery point P11 (see Figure 1(B)), and the load capacity of all cargo in the first, second and third vehicles being 90% or less of the maximum load capacity. In the delivery plan optimization device 101 of the first embodiment, even when the above-mentioned "other conditions" are added, the optimal tour route can be appropriately determined by basically the same method as the example shown in FIG. 2.

[0026] FIG. 3 is a flowchart showing an example of the process executed by the route search unit 110. As shown in FIG. In the example shown in FIG. 3, the traveling route search unit 110 determines the initial number N of groups in step S101. Next, in step S102, the point division unit 111 executes point division. That is, the point division unit 111 divides the multiple collection / delivery destination points to be allocated into the N groups determined in step S101. Next, in step S103, the annealing processing unit 112 executes an annealing process. That is, the annealing processing unit 112 calculates the shortest route for visiting the multiple collection and delivery destination points included in each of the N groups sorted in step S102, by using annealing. Next, in step S104, the tour route search unit 110 determines whether or not to end the routine shown in Fig. 3. In particular, the tour route search unit 110 determines whether or not the above-mentioned optimal tour route has been obtained. If the optimal tour route has been obtained, the process proceeds to step S105, and if the optimal tour route has not been obtained, the number of groups is increased, for example, to (N+1) or decreased, for example, to (N-1), and the process returns to step S102. In step S105, the tour route search unit 110 outputs the optimal tour route to the display unit 103, for example.

[0027] FIG. 4 is a flowchart showing an example of a specific process executed by the point division unit 111. In the example shown in Fig. 4, in step S107, the point division unit 111 sets all of the multiple collection and delivery destination points to be allocated as multiple candidate points. Specifically, in the example shown in Fig. 1(B), the point division unit 111 sets all of the multiple collection and delivery destination points P1 to P11 to be allocated as multiple candidate points. Next, in step S108, the location division unit 111 creates a new group (specifically, an empty new group) as one candidate of the multiple groups to which the location will be assigned. Specifically, in the example shown in FIG. 1(B), the location division unit 111 creates a new group (third group) as one candidate of the first to third groups to which the location will be assigned. Next, in step S109, the point division unit 111 includes the farthest point, which is the point farthest from the collection and delivery base among the multiple candidate points, in the new group, and excludes the farthest point from the multiple candidate points. Specifically, in the example shown in Fig. 1(B), the point division unit 111 includes the farthest point P10, which is the point farthest from the collection and delivery base BS among the multiple candidate points P1 to P11, in the new group (third group), and excludes the farthest point P10 from the multiple candidate points P1 to P11.

[0028] Next, in step S110, the point division unit 111 provisionally includes in the new group the closest point, which is the point closest to the farthest point among the multiple candidate points after the farthest point P10 has been excluded. Specifically, in the example shown in Fig. 1(B), the point division unit 111 provisionally includes in the new group (third group) the closest point P7, which is the point closest to the farthest point P10 among the multiple candidate points P1 to P11 (excluding the farthest point P10) after the farthest point P10 has been excluded.

[0029] Next, in step S111, the point division unit 111 judges whether or not the collection and delivery time required for collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point has been provisionally included is within a first threshold value. If the collection and delivery time required for collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point has been provisionally included is not within the first threshold value, the process proceeds to step S112. On the other hand, if the collection and delivery time required for collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point has been provisionally included is within the first threshold value, the process proceeds to step S113. Specifically, in the example shown in FIG. 1(B), the point division unit 111 determines that the collection and delivery time required to collect and deliver to the multiple collection and delivery destination points P7 and P10 included in the new group (third group) after the nearest point P7 is provisionally included is not within the first threshold value, and proceeds to step S112.

[0030] In step S112, the location division unit 111 saves the new group before the nearest location P7 is provisionally included as one of the multiple groups to which the location is to be assigned. Specifically, in the example shown in Fig. 1(B), the location division unit 111 saves the new group (the group including the collection / delivery destination location P10) (third group) before the nearest location P7 is provisionally included as one of the multiple groups to which the location is to be assigned (first to third groups). Next, in step S114, the point division unit 111 determines whether or not there is one or more candidate points. If there is one or more candidate points, the process returns to step S108, and if there is not one or more candidate points, the routine shown in Fig. 4 ends. Specifically, in the example shown in Fig. 1(B), in step S114, the point division unit 111 determines that there is one or more candidate points (e.g., candidate point P9, etc.), and returns to step S108, where the process of adding a collection / delivery destination point included in the new group (third group) continues.

[0031] In step S113, the point division unit 111 includes the closest point in the new group. Then, the process returns to step S110.

[0032] In the collection and delivery plan optimization device 101 of the first embodiment, an approximate value is used as the collection and delivery required time required for collection and delivery within a group when step S102 in Fig. 3 is first executed. When step S102 in Fig. 3 is executed for the second or subsequent times, the annealing processing result obtained when step S103 in Fig. 3 is first executed is used as the collection and delivery required time required for collection and delivery within a group.

[0033] FIG. 5 is a flowchart showing an example of a specific process executed by the annealing processing unit 112. 5, in step S115, the annealing processing unit 112 selects one of the multiple groups assigned by the point division unit 111 as a group to be processed by the annealing processing unit 112. In the example shown in FIG. 1(B), the annealing processing unit 112 selects the third group to be processed as shown in FIG. Next, in step S116, the annealing processing unit 112 performs Hamiltonian formulation on the group selected in step S115. In the example shown in Fig. 1(B), the annealing processing unit 112 performs Hamiltonian formulation on the third group. Next, in step S117, the annealing processing unit 112 performs annealing on the group on which the Hamiltonian formulation was performed in step S116, and calculates an optimal solution. In the example shown in Fig. 1(B), the annealing processing unit 112 performs annealing on the third group on which the Hamiltonian formulation was performed, and calculates an optimal solution.

[0034] Next, in step S118, the annealing processing unit 112 determines whether or not a valid solution has been obtained for the optimal solution calculated by performing annealing in step S117. If a valid solution has been obtained, the process proceeds to step S119, and if a valid solution has not been obtained, the process returns to step S117 and repeats the process of performing annealing to calculate the optimal solution until a valid solution is obtained. When returning to step S117, parameters are changed, etc., compared to when step S117 was previously executed, so that a valid solution can be found in the next execution of step S117.

[0035] In step S119, the annealing processing unit 112 judges whether or not a valid solution has been found for all of the multiple groups to which the points have been assigned by the point division unit 111. If a valid solution has been found for all of the multiple groups to which the points have been assigned, the routine shown in Fig. 5 is terminated. On the other hand, if a valid solution has not been found for all of the multiple groups to which the points have been assigned, the process returns to step S115, and the processes of step S116 (implementing a Hamiltonian formulation), step S117 (calculating an optimal solution), and step S118 (determining whether or not a valid solution has been found) are repeatedly executed until a valid solution has been found for all of the multiple groups to which the points have been assigned. In the example shown in FIG. 1(B), the processes of steps S116 to S118 are repeatedly executed until the shortest circular routes R01, R02, and R03 (that is, optimal routes) for the first, second, and third groups are determined.

[0036] When delivery plans are created based on human experience and intuition, they are highly dependent on the individual. Also, there is a limit to the accuracy of delivery plans that can be created based on human experience and intuition. Furthermore, delivery plans created based on human experience and intuition have difficulty responding to ever-changing road conditions and unexpected events that occur suddenly. Automating the creation of collection and delivery plans involves the following challenges (1) to (3).

[0037] (1) Increase in the amount of calculations In general, the problem of optimizing delivery plans is considered to be a nondeterministic polynomial time (NP) hard problem, known as the traveling salesman problem, and has the problem that the amount of calculation is enormous and it is not possible to obtain an answer within real time. In addition, as the number of delivery points and the number of items to be considered (driver status, road conditions, etc.) increase, the amount of calculation increases exponentially, and there is also the problem that it is not possible to obtain an answer within real time. (2) Hardware limitations In recent years, there have been known cases where problem (1) above can be solved by annealing or simulated annealing using so-called quantum computers. However, current quantum computers and simulated annealing can only handle a maximum of several hundred qubits simultaneously, and the problems that can be applied are limited due to resource constraints. In addition, the accuracy of the solution decreases as the problem becomes larger. (3) Difficulty in dividing Generally, when the amount of calculation becomes enormous, it is possible to reduce the amount of calculation by "dividing the calculation target" or to shorten the calculation time by assigning the divided units to multiple computers and performing the calculations in parallel. However, when dividing elements that are mutually related, such as in NP problems, simply dividing it will not give the correct result.

[0038] Therefore, in the collection and delivery plan optimization device 101 of the first embodiment, as described above, the point division unit 111 divides the collection and delivery destination points to be allocated into a plurality of groups. In addition, the shortest route for visiting the collection and delivery destination points included in each group is calculated by using annealing. Furthermore, it is determined whether the required time for each group to visit falls within the shift time. If the required round trip time for each group falls within the shift time, the number of groups assigned by the point division unit 111 is reduced, and the allocation of the multiple collection and delivery destination points to be assigned by the point division unit 111, the calculation of the shortest round trip route by the annealing processing unit 112, and the calculation of the required round trip time by the round trip route search unit 110 are repeated. If the travel time of each group does not fall within the shift time, the number of groups assigned by the location division unit 111 is increased, and the allocation of the multiple collection and delivery destination points to be assigned by the location division unit 111, the calculation of the shortest travel route by the annealing processing unit 112, and the calculation of the travel time by the travel route search unit 110 are repeated. When the travel time required for each of the multiple groups assigned by the location division unit 111 falls within the shift time, and when the number of the multiple groups assigned by the location division unit 111 is minimized, the travel route search unit 110 determines the shortest travel route calculated by the annealing processing unit 112 as the optimal travel route. According to the delivery plan optimization device 101 of the first embodiment, even if the problem is large-scale with a large number of delivery destination points and items to be considered, an optimal delivery plan can be automatically created in real time.

[0039] The collection and delivery plan optimization device 101 of the first embodiment can automatically output collection and delivery plans that have previously been created manually, eliminating dependency on individuals and improving the accuracy of collection and delivery plans. Specifically, in the collection and delivery plan optimization device 101 of the first embodiment, the problem of the calculation time increasing exponentially as the number of collection and delivery destination points and items to be considered increase can be solved by alternately repeating point division by the point division unit 111 and annealing by the annealing processing unit 112. Also, in the collection and delivery plan optimization device 101 of the first embodiment, it is possible to create a collection and delivery plan that takes into account detailed items that could not be considered before, such as the state of the driver (the person driving the vehicle) and the road conditions. Furthermore, in the case of an unexpected situation such as road conditions that change from moment to moment or an event that occurs suddenly, a person had to rethink the plan from scratch or rethink the modeling, but in the collection and delivery plan optimization device 101 of the first embodiment, it is possible to flexibly recreate a collection and delivery plan by simply changing some parameters.

[0040] In the collection and delivery plan optimization device 101 of the first embodiment, by using annealing to calculate the optimal solution in step S117, it is possible to automatically create an optimal collection and delivery plan in real time. Furthermore, in the delivery plan optimization device 101 of the first embodiment, by using the location division unit 111 and the annealing processing unit 112 in combination, it is possible to apply annealing even if the problem is large-scale, without reducing the accuracy of the solution. 1(B), in the case where multiple collection and delivery points P1 to P11 are divided into multiple groups (first group, second group, and third group) and the delivery cost of each group is determined only after the optimal routes R01, R02, and R03 are calculated, the delivery cost of each group cannot be equalized by simply dividing the problem in advance. Therefore, in the collection and delivery plan optimization device 101 of the first embodiment, this problem can be solved by alternately performing point division by the point division unit 111 and annealing by the annealing processing unit 112.

[0041] In the technology described in Patent Document 1, annealing is used in the process of dividing blocks, whereas in the delivery plan optimization device 101 of the first embodiment, the location division unit 111 does not use annealing, but uses annealing in the process of determining the tour routes within each group assigned by the location division unit 111. In addition, in the technology described in Patent Document 1, a collection and delivery plan is created with the number of vehicles given in advance, whereas in the collection and delivery plan optimization device 101 of the first embodiment, it is not necessary to determine in advance the number of vehicles (number of groups) in order to calculate a route, and it is possible to create a collection and delivery plan with the number of vehicles (number of groups) as small as possible. In the technology described in Patent Document 1, division is performed using past collection and delivery cases and a collection and delivery plan is created, whereas in the technology described in Patent Document 1, it is not necessary to use past collection and delivery cases to calculate the route. The technology described in Patent Document 1 cannot respond to newly occurring events (traffic jams, road construction, personnel changes, etc.), whereas the technology described in Patent Document 1 can appropriately respond to newly occurring events and calculate an appropriate route that reflects the newly occurring events.

[0042] In the technology described in Patent Document 2, a collection and delivery plan is created with the number of passengers given in advance, whereas in the collection and delivery plan optimization device 101 of the first embodiment, it is not necessary to determine the number of passengers (number of groups) in advance in order to calculate a route, and it is possible to create a collection and delivery plan with the number of passengers (number of groups) as small as possible.

[0043] <Second embodiment> A second embodiment of a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program according to the present invention will be described below. Except for the points described below, the collection and delivery plan optimization device 101 of the second embodiment is configured similarly to the collection and delivery plan optimization device 101 of the above-mentioned first embodiment. Therefore, the collection and delivery plan optimization device 101 of the second embodiment can achieve the same effects as the collection and delivery plan optimization device 101 of the above-mentioned first embodiment, except for the points described below.

[0044] FIG. 6 is a diagram showing an example of the configuration of a delivery plan optimization device 101 according to the second embodiment. In the example shown in FIG. 6 , a collection and delivery plan optimization device 101 includes a control unit 102, a display unit 103, an operation / input unit 105, a map data storage unit 106, a collection and delivery data storage unit 107, a road network database 108, a guidance database 109, a tour route search unit 110, and a route search unit 121. The travel route search unit 110 includes a location division unit 111 , an annealing processing unit 112 , and a group number optimization unit 113 . The number of groups optimization unit 113 determines whether or not the shift time used in determining the required travel time for each of the multiple groups to which the routes are assigned, performed by the travel route search unit 110, is equal to or less than a second threshold value.

[0045] FIG. 7 is a flowchart showing an example of a process executed by the group number optimization unit 113. As shown in FIG. In the example shown in FIG. 7, in step S120, the group number optimization unit 113 selects one of the multiple groups assigned by the location division unit 111 as a group to be processed by the group number optimization unit 113. Next, in step S121, it is determined whether the shift time is equal to or less than the second threshold value. If the shift time is not equal to or less than the second threshold value, the process proceeds to step S122, and if the shift time is equal to or less than the second threshold value, the process proceeds to step S123.

[0046] In step S122, the group number optimization unit 113 divides the allocation destination groups to increase the number of allocation destination groups, and the process proceeds to step S125. In step S123, the group number optimization unit 113 reduces the number of groups to which the data is to be allocated by combining the groups to which the data is to be allocated, and the process proceeds to step S125.

[0047] In step S125, the group number optimization unit 113 judges whether the transition of the number of groups to which the allocation is made has converged. If the transition of the number of groups to which the allocation is made has converged, the process proceeds to step S126. On the other hand, if the transition of the number of groups to which the allocation is made has not converged, the process returns to step S120 and repeats the above-mentioned process. In step S126, the tour route search unit 110 calculates optimal tour routes for all groups, such as tour routes R01, R02, R03 (see FIG. 1B), and outputs the optimal tour routes to the display unit 103, for example.

[0048] <Third embodiment> A third embodiment of a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program according to the present invention will be described below. The collection and delivery plan optimization device 101 of the third embodiment is configured similarly to the collection and delivery plan optimization device 101 of the above-mentioned first embodiment, except for the points described below. Therefore, the collection and delivery plan optimization device 101 of the third embodiment can achieve the same effects as the collection and delivery plan optimization device 101 of the above-mentioned first embodiment, except for the points described below.

[0049] FIG. 8 is a diagram showing an example of the configuration of a delivery plan optimization device 101 according to the third embodiment. In the example shown in FIG. 8, a collection and delivery plan optimization device 101 includes a control unit 102, a display unit 103, an operation / input unit 105, a map data storage unit 106, a collection and delivery data storage unit 107, a road network database 108, a guidance database 109, a tour route search unit 110, a route search unit 121, a truck database 131, and a driver database 132. The truck database 131 accumulates and stores information such as the load capacity and driving distance of the vehicle (truck). The driver database 132 accumulates and stores information such as the regional experience and physical strength of the driver (driver of the vehicle).

[0050] <Fourth embodiment> A fourth embodiment of a collection and delivery plan optimization device, a collection and delivery plan optimization method, and a program according to the present invention will be described below. Except for the points described below, the collection and delivery plan optimization device 101 of the fourth embodiment is configured similarly to the collection and delivery plan optimization device 101 of the above-mentioned first embodiment. Therefore, the collection and delivery plan optimization device 101 of the fourth embodiment can achieve the same effects as the collection and delivery plan optimization device 101 of the above-mentioned first embodiment, except for the points described below.

[0051] FIG. 9 is a diagram showing an example of the configuration of a collection and delivery plan optimization device 101 according to the fourth embodiment. In the example shown in FIG. 9, a collection and delivery plan optimization device 101 includes a travel route search unit 110, a location division unit 111, and an annealing processing unit 112. The location division unit 111 divides the multiple destination locations to be allocated into multiple groups. The annealing processing unit 112 calculates the shortest route to visit the multiple destination locations included in each of the multiple groups allocated by the location division unit 111, by using annealing. The route search unit 110 calculates, for each of the multiple groups to which the vehicles are assigned, a required round trip time, which is the time required to travel to multiple collection and delivery destination points included in each of the multiple groups to which the vehicles are assigned, along the route calculated by the annealing processing unit 112. The route search unit 110 also determines whether the required round trip time for each of the multiple groups to which the vehicles are assigned falls within the shift time. When the route search unit 110 determines that the required round trip time for each of the multiple groups to which the vehicles are assigned falls within the shift time, the number of groups to which the vehicles are assigned is reduced, and the process of allocating the multiple collection and delivery destination points to be assigned by the point division unit 111, the calculation of the shortest route by the annealing processing unit 112, and the calculation of the required round trip time by the route search unit 110 are repeated. If the route search unit 110 determines that the travel time of any of the multiple groups to which the vehicles are assigned is not within the shift time, the number of groups to which the vehicles are assigned is increased, and the allocation of the multiple collection and delivery destination points to be assigned by the point division unit 111, the calculation of the shortest route by the annealing processing unit 112, and the calculation of the travel time by the route search unit 110 are repeated. The tour route search unit 110 determines the shortest tour route calculated by the annealing processing unit 112 as the optimal tour route when the tour time required for each of the multiple groups to be assigned falls within the shift time and when the number of the multiple groups to be assigned is minimized.

[0052] In the collection and delivery plan optimization device 101 of the first to fourth embodiments, a collection and delivery plan can be automatically created when the coordinates of the collection and delivery base BS and the collection and delivery destination points P1 to P11, the travel distance or travel time between the collection and delivery destination points P1 to P11, the time required for collection and delivery at each of the collection and delivery destination points P1 to P11, and the daily shift time are given in advance.

[0053] When creating a delivery plan using annealing, the scale of the problem that can be solved is limited due to constraints such as hardware, and even if the problem can be run on hardware, the accuracy of the solution usually decreases as the scale becomes larger. Therefore, the collection and delivery plan optimization device 101 of the first to fourth embodiments is characterized by a problem division function specialized for annealing. Specifically, in the collection and delivery plan optimization device 101 of the first to fourth embodiments, annealing is used not in the point division unit 111 but in the annealing processing unit 112. Therefore, even if the problem is large-scale with a large number of collection and delivery destination points and items to be considered, an optimal collection and delivery plan can be automatically created quickly in real time.

[0054] The above-mentioned collection and delivery plan optimization device 101 has a computer system inside. Each process of the above-mentioned collection and delivery plan optimization device 101 is stored in a computer-readable recording medium in the form of a program, and the above-mentioned processes are performed by the computer reading and executing this program. Here, the computer-readable recording medium refers to a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, a semiconductor memory, etc. Also, the computer program may be distributed to a computer via a communication line, and the computer that receives the distribution may execute the program.

[0055] In addition, the whole or part of the functions of each unit of the collection and delivery plan optimization device 101 in the above-mentioned embodiment may be realized by recording a program for realizing these functions in a computer-readable recording medium, reading the program recorded in the recording medium into a computer system, and executing it. In addition, the term "computer system" as used herein includes hardware such as an OS and peripheral devices. In addition, the term "computer system" also includes a WWW system equipped with a homepage providing environment (or display environment). In addition, the term "computer-readable recording medium" refers to portable media such as a flexible disk, a magneto-optical disk, a ROM, a CD-ROM, and a storage device such as a hard disk built into a computer system. In addition, the term "computer-readable recording medium" also refers to a storage device that holds a program for a certain period of time, such as a volatile memory (RAM) inside a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line.

[0056] The above program may also be transmitted from a computer system in which the program is stored in a storage device or the like to another computer system via a transmission medium, or by transmission waves in the transmission medium. Here, the "transmission medium" that transmits the program refers to a medium that has the function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line. The above program may also be for realizing part of the above-mentioned functions. Furthermore, it may be a so-called difference file (difference program) that can realize the above-mentioned functions in combination with a program already recorded in the computer system.

[0057] In addition, the components in the above-described embodiment may be replaced with known components as appropriate without departing from the spirit of the present invention. Furthermore, the technical scope of the present invention is not limited to the above-described embodiment, and various modifications may be made without departing from the spirit of the present invention.

[0058] A part or all of the above-described embodiments can be described as, but is not limited to, the following supplementary notes.

[0059] (Note 1) The method includes a point division unit that divides a plurality of destination points to be allocated into a plurality of groups of allocation destinations, an annealing processing unit that calculates the shortest route around the plurality of destination points included in each of the plurality of groups of allocation destinations by using annealing, and a route search unit that calculates a required route for each of the plurality of groups of allocation destinations, which is a time required to travel around the plurality of destination points included in each of the plurality of groups of allocation destinations along the route calculated by the annealing processing unit, and determines whether or not the required route for each of the plurality of groups of allocation destinations falls within a shift time. When it is determined by the route search unit that the required route for each of the plurality of groups of allocation destinations falls within the shift time, the number of the plurality of groups of allocation destinations is reduced, and the previous time by the point division unit is calculated. a route division unit that divides the plurality of collection and delivery destination points to be assigned, a route calculation unit that calculates the shortest route by the annealing processing unit, and a route calculation unit that calculates the required route for a route by the annealing processing unit are repeated, and when the route search unit determines that the required route for a route of any of the plurality of groups to be assigned is not within the shift time, the number of the plurality of groups to be assigned is increased, and the route division unit that divides the plurality of collection and delivery destination points to be assigned, a route calculation unit that calculates the shortest route by the annealing processing unit, and a route calculation unit that calculates the required route for a route by the annealing processing unit are repeated, and when the required route for a route of each of the plurality of groups to be assigned is within the shift time and the number of the plurality of groups to be assigned is a minimum, the route search unit determines the shortest route calculated by the annealing processing unit as an optimal route.

[0060] (Supplementary Note 2) The delivery plan optimization device according to Supplementary Note 1, wherein the annealing used by the annealing processing unit is quantum annealing executed on a quantum computer or simulated annealing executed on a classical computer.

[0061] (Supplementary Note 3) The collection and delivery plan optimization device described in Supplementary Note 1, wherein the point division unit sets all of the multiple collection and delivery destination points to be allocated as multiple candidate points, creates a new group as one candidate of the multiple groups of allocation destinations, includes in the new group an farthest point that is the point farthest from a collection and delivery center among the multiple candidate points, and excludes the farthest point from the multiple candidate points.

[0062] (Appendix 4) The delivery plan optimization device according to Appendix 3, wherein the location division unit provisionally includes in the new group a closest location that is a location closest to the farthest location among the plurality of candidate locations after the farthest location has been excluded.

[0063] (Appendix 5) The collection and delivery plan optimization device described in Appendix 4, wherein the location division unit determines whether a collection and delivery required time, which is the time required to collect and deliver to multiple collection and delivery destination locations included in the new group after the nearest location has been provisionally included, is within a first threshold value.

[0064] (Appendix 6) The collection and delivery plan optimization device described in Appendix 5, wherein the location division unit formally includes the nearest location in the new group if the collection and delivery required time when performing collection and delivery to a plurality of collection and delivery destination locations included in the new group after the nearest location has been provisionally included is within the first threshold value.

[0065] (Appendix 7) The collection and delivery plan optimization device described in Appendix 5, wherein, when the collection and delivery time required for collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point is provisionally included is not within the first threshold, the location division unit formally saves the new group in a state before the nearest point is provisionally included as one of the multiple groups to be assigned to.

[0066] (Appendix 8) The delivery plan optimization device according to appendix 1, wherein the annealing processing unit performs a Hamiltonian formulation for any of the multiple groups of destinations assigned by the location division unit, and performs annealing to calculate an optimal solution.

[0067] (Supplementary Note 9) The delivery plan optimization device according to Supplementary Note 8, wherein the annealing processing unit determines whether or not a valid solution has been obtained for the optimal solution calculated by performing annealing, and if the valid solution has not been obtained, repeats the process of performing annealing to calculate the optimal solution.

[0068] (Supplementary Note 10) The delivery plan optimization device according to Supplementary Note 9, wherein the annealing processing unit repeats implementing the Hamiltonian formulation, calculating the optimal solution, and determining whether or not the valid solution has been found, until the valid solution is found for all of the multiple groups of destinations assigned by the location division unit.

[0069] (Supplementary Note 11) The delivery plan optimization device according to Supplementary Note 1, further comprising a group number optimization unit that determines whether the shift time used in determining the travel time required for each of the multiple groups to be assigned to, performed by the travel route search unit, is equal to or less than a second threshold, and the group number optimization unit reduces the number of the multiple groups to be assigned to by combining the multiple groups to be assigned to when the shift time is equal to or less than the second threshold, and increases the number of the multiple groups to be assigned to by dividing the multiple groups to be assigned to when the shift time is not equal to or less than the second threshold.

[0070] (Appendix 12) A method for calculating a plurality of destination points to be allocated to a plurality of groups of allocation destinations, comprising: a point division step of allocating a plurality of destination points to be allocated to a plurality of groups of allocation destinations; an annealing processing step of calculating the shortest route around the plurality of destination points included in each of the plurality of groups of allocation destinations by using annealing; and a route search step of calculating a required route for each of the plurality of groups of allocation destinations, which is a time required for travelling around the plurality of destination points included in each of the plurality of groups of allocation destinations along the route calculated in the annealing processing step, and determining whether or not the required route for each of the plurality of groups of allocation destinations falls within a shift time. When it is determined in the route search step that the required route for each of the plurality of groups of allocation destinations falls within the shift time, the number of the plurality of groups of allocation destinations is reduced, and the number of the groups of allocation destinations in the point division step is reduced. a plurality of groups to be assigned to, the calculation of the shortest route in the annealing processing step, and the calculation of the required time for the tour in the tour route search step are repeated, and if it is determined in the tour route search step that the required time for the tour of any of the plurality of groups to be assigned to is not within the shift time, the number of the plurality of groups to be assigned to is increased, and the allocation of the plurality of collection and delivery points to be assigned to in the location division step, the calculation of the shortest route in the annealing processing step, and the calculation of the required time for the tour in the tour route search step are repeated, and in the tour route search step, if the required time for the tour of each of the plurality of groups to be assigned to is within the shift time and the number of the plurality of groups to be assigned to is minimum, the shortest route calculated in the annealing processing step is determined as the optimal tour route.

[0071] (Appendix 13) A program for causing a computer to execute a point division step of allocating a plurality of destination points to be allocated to a plurality of groups of allocation destinations, an annealing processing step of calculating the shortest route around the plurality of destination points included in each of the plurality of groups of allocation destinations by using annealing, and a route search step of calculating, for each of the plurality of groups of allocation destinations, a required route time, which is a time required to travel around the plurality of destination points included in each of the plurality of groups of allocation destinations along the route calculated in the annealing processing step, and determining whether or not the required route time for each of the plurality of groups of allocation destinations falls within a shift time, and when it is determined in the route search step that the required route time for each of the plurality of groups of allocation destinations falls within the shift time, the number of the plurality of groups of allocation destinations is reduced, and the point division step is performed. and if it is determined in the route search step that the required round trip time of any of the plurality of groups to be assigned is not within the shift time, the number of the plurality of groups to be assigned is increased, and the allocation of the plurality of collection and delivery points to be assigned in the location division step, the calculation of the shortest round trip route in the annealing processing step, and the calculation of the required round trip time in the route search step are repeated. In the route search step, if the required round trip time of each of the plurality of groups to be assigned is within the shift time and the number of the plurality of groups to be assigned is minimum, the shortest round trip route calculated in the annealing processing step is determined as the optimal round trip route. [Industrial Applicability]

[0072] The collection and delivery plan optimization device, collection and delivery plan optimization method, and program of the present invention are applicable to, for example, the logistics industry. [Explanation of symbols]

[0073] 101 Delivery Plan Optimizer 102 Control section 103 Display section 105 Operation / input section 106 Map data storage unit 107 Collection and delivery data storage unit 108 Road Network Database 109 Guidance Database 110 Patrol Route Search Unit 111 Location division 112 Annealing processing section 113 Group Number Optimization Department 121 Route Search Unit 131 Track Database 132 Driver Database

Claims

1. A location division unit that divides a plurality of destination locations to be distributed into a plurality of groups of destination locations; an annealing processing unit that uses annealing to calculate the shortest route that travels around a plurality of collection and delivery destination points included in each of the plurality of groups of the allocation destinations; a route search unit that calculates a required round trip time for each of the multiple groups of allocation destinations, the required round trip time being a time required to travel around a plurality of collection and delivery destination points included in each of the multiple groups of allocation destinations along the route calculated by the annealing processing unit, and determines whether or not the required round trip time for each of the multiple groups of allocation destinations falls within a shift time; When the traveling route search unit determines that the travel time required for each of the multiple groups to be assigned is within the shift time, the number of the multiple groups to be assigned is reduced, and the allocation of the multiple collection and delivery destination points to be assigned by the point division unit, the calculation of the shortest traveling route by the annealing processing unit, and the calculation of the traveling time required by the traveling route search unit are repeated. When the traveling route search unit determines that the travel time required for any of the multiple groups to which the vehicles are assigned is not within the shift time, the number of the multiple groups to which the vehicles are assigned is increased, and the allocation of the multiple collection and delivery destination points to be assigned by the point division unit, the calculation of the shortest traveling route by the annealing processing unit, and the calculation of the traveling time required by the traveling route search unit are repeated. The travel route search unit is When the required travel time for each of the plurality of groups to be assigned falls within the shift time and the number of the plurality of groups to be assigned is minimized, the shortest travel route calculated by the annealing processing unit is determined as an optimal travel route. Delivery plan optimization device.

2. The annealing used by the annealing processing unit is quantum annealing performed on a quantum computer or simulated annealing performed on a classical computer. The delivery plan optimization device according to claim 1 .

3. The point division unit includes: All of the plurality of collection and delivery destination points to be allocated are set as a plurality of candidate points, creating a new group as one of the plurality of groups to which the data is to be allocated; A farthest point, which is a point among the plurality of candidate points that is the farthest from a collection and delivery center, is included in the new group, and the farthest point is excluded from the plurality of candidate points; a closest point that is a point that is closest to the farthest point among the plurality of candidate points after the farthest point has been excluded is provisionally included in the new group; determining whether a collection / delivery required time, which is a time required to perform collection / delivery to the plurality of collection / delivery destination points included in the new group after the nearest point has been provisionally included, is within a first threshold value; The delivery plan optimization device according to claim 1 .

4. The point division unit includes: If the required collection and delivery time when performing collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point is provisionally included is within the first threshold value, the nearest point is included in the new group. The delivery plan optimization device according to claim 3.

5. The point division unit includes: When the required collection and delivery time when performing collection and delivery to the multiple collection and delivery destination points included in the new group after the nearest point is provisionally included is not within the first threshold value, the new group in a state before the nearest point is provisionally included is stored as one of the multiple groups to be assigned to. The delivery plan optimization device according to claim 3.

6. The annealing treatment section includes: A Hamiltonian formulation is performed for any one of the plurality of groups allocated by the location division unit, and an optimal solution is calculated by performing annealing; determining whether a valid solution has been obtained from the optimal solution calculated by performing annealing; If the valid solution has not been found, repeating the process of calculating an optimal solution by performing annealing. The delivery plan optimization device according to claim 1 .

7. The annealing treatment section includes: repeating the execution of the Hamiltonian formulation, the calculation of the optimal solution, and the determination of whether or not the valid solution has been obtained until the valid solution is obtained for all of the multiple groups assigned by the location division unit. The delivery plan optimization device according to claim 6.

8. a group number optimization unit that determines whether the shift time used in determining a required travel time for each of the plurality of groups to be assigned, which is performed by the travel route search unit, is equal to or less than a second threshold value; The group number optimization unit When the shift time is equal to or less than the second threshold value, the number of the groups to be allocated is reduced by combining the groups to be allocated, When the shift time is not equal to or less than the second threshold, the number of the groups to which the data is to be allocated is increased by dividing the groups to which the data is to be allocated. The delivery plan optimization device according to claim 1 .

9. A point division step in which the computer divides a plurality of collection and delivery destination points to be distributed into a plurality of groups of distribution destinations; an annealing process step in which the computer uses annealing to calculate the shortest route that travels around a plurality of collection and delivery destination points included in each of the plurality of groups of the allocation destinations; a route search step in which the computer calculates a required round trip time for each of the multiple groups of allocation destinations, the required round trip time being a time required for the computer to travel around a plurality of collection and delivery destination points included in each of the multiple groups of allocation destinations along the route calculated in the annealing processing step, and determines whether or not the required round trip time for each of the multiple groups of allocation destinations falls within a shift time; When it is determined in the travel route search step that the travel time required for each of the multiple groups to be assigned is within the shift time, the number of the multiple groups to be assigned is reduced, and the allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest travel route in the annealing processing step, and the calculation of the travel time required in the travel route search step are repeated; When it is determined in the travel route search step that the travel time required for any of the multiple groups to which the vehicles are assigned is not within the shift time, the number of the multiple groups to which the vehicles are assigned is increased, and the allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest travel route in the annealing processing step, and the calculation of the travel time required in the travel route search step are repeated; In the travel route search step, When the required travel time for each of the plurality of groups to be assigned falls within the shift time and the number of the plurality of groups to be assigned is minimized, the shortest travel route calculated in the annealing process step is determined as an optimal travel route. A method for optimizing collection and delivery plans.

10. On the computer, A point division step of dividing a plurality of destination points to be distributed into a plurality of groups of destination points; an annealing process step of calculating the shortest route around a plurality of collection and delivery destination points included in each of the plurality of groups of the allocation destinations by using annealing; a route search step of calculating a required round trip time for each of the multiple allocation groups, the required round trip time being a time required to travel around a plurality of collection and delivery destination points included in each of the multiple allocation groups along the route calculated in the annealing processing step, and determining whether or not the required round trip time for each of the multiple allocation groups is within a shift time, When it is determined in the travel route search step that the travel time required for each of the multiple groups to be assigned is within the shift time, the number of the multiple groups to be assigned is reduced, and the allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest travel route in the annealing processing step, and the calculation of the travel time required in the travel route search step are repeated; When it is determined in the travel route search step that the travel time required for any of the multiple groups to which the vehicles are assigned is not within the shift time, the number of the multiple groups to which the vehicles are assigned is increased, and the allocation of the multiple collection and delivery destination points to be assigned in the point division step, the calculation of the shortest travel route in the annealing processing step, and the calculation of the travel time required in the travel route search step are repeated; In the travel route search step, When the required travel time for each of the plurality of groups to be assigned falls within the shift time and the number of the plurality of groups to be assigned is minimized, the shortest travel route calculated in the annealing process step is determined as an optimal travel route. program.

Citation Information

Patent Citations

  • Optimum block division system in delivery plan

    JP1997311702A

  • Method and system for optimum delivery planning

    JP2001188984A

  • Route control device

    JP2004062363A

  • N division patrol path search system, route search server, and n division patrol path search method

    JP2007241340A

  • Method, device, and program for obtaining delivery route of a plurality of vehicles

    JP2010111452A