Coordination system and coordination control method
The cooperation system integrates building management systems with general IoT environments, addressing the independence issue by enabling coordinated control and management of devices, thereby improving user convenience and comfort.
Patent Information
- Application Number
- JP2020155839
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-03-24
- Filing Date
- 2020-09-16
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2040-09-16
AI Technical Summary
The building management system and general IoT environment used by users within buildings are independent and not directly linked, leading to a lack of convenience and comfort in buildings.
A cooperation system and method that integrates a cooperation control device within the building management system to facilitate communication and coordination between building management systems and general IoT environments, enabling seamless interaction and control of devices and applications across different systems.
Enables building managers to effectively coordinate building management systems with general IoT environments, enhancing user convenience and comfort by allowing integrated control and management of various devices and applications.
Smart Images

Figure 0007563924000001 
Figure 0007563924000002 
Figure 0007563924000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a linkage system and a linkage control method. [Background technology]
[0002] 2. Description of the Related Art A data linking support system that is configured to enable data transfer between SaaS (Software as a Service) is known. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-224578 A Summary of the Invention [Problem to be solved by the invention]
[0004] For example, in buildings that house offices or commercial facilities, the building management system operated by the building manager controls and monitors the status of building equipment such as air conditioning and lighting, and performs general management of the building. . one Meanwhile, in recent years, general users in buildings, including building managers, have begun to use various IoT (Internet of Things) systems that are not directly related to the building. The environment in which general users use IoT systems within a building is called the general IoT environment. Currently, the general IoT environment is not directly related to buildings, and the building management system and the general IoT environment are independent of each other. If the building management system could be linked to the IoT environment used by general users (general IoT environment), it would be desirable to improve the convenience and comfort of the building.
[0005] The present invention has been made in consideration of these circumstances, and aims to enable building managers to manage buildings by linking a building management system with a general IoT environment provided to general users. [Means for solving the problem]
[0006] One aspect of the present invention that solves the above-mentioned problems is a collaboration system that includes a collaboration control device that controls collaboration of specified functions between an equipment-compatible device provided in a building management system that manages the equipment of a building under the management of a building manager, and a general device in the building that is connected to a network and executes functions corresponding to a specified application.
[0007] Another aspect of the present invention is an coordination control method in which a coordination control device provided in a coordination system controls the coordination of specified functions between an equipment-compatible device provided in a building management system that manages the equipment of a building managed by a building manager, and a general device in the building that is connected to a network and executes functions corresponding to a specified application. Effect of the Invention
[0008] As described above, according to the present invention, it is possible to obtain the effect of enabling a building management system for a building manager to manage a building to be linked with a general IoT environment provided to general users. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram illustrating an example of a linkage system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram illustrating an example of a functional configuration of each cooperative control device in the present embodiment. [Diagram 3] 6 is a flowchart illustrating an example of a processing procedure executed by the cooperation control device in the present embodiment in relation to application cooperation. [Figure 4] 4 is a diagram showing an example of collaboration procedure information according to the present embodiment. FIG. [Diagram 5] 4 is a diagram showing an example of collaboration procedure information according to the present embodiment. FIG. [Figure 6] 4 is a diagram showing an example of collaboration procedure information according to the present embodiment. FIG. [Figure 7] FIG. 2 is a diagram illustrating an example of the configuration of a building unit management system that supports standardization of map processing in this embodiment. [Figure 8] FIG. 2 is a diagram illustrating an example of the configuration of a common map server according to the present embodiment. [Figure 9] FIG. 11 is a diagram showing an example of position-added map information in which a specific area is set in the embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] 1 shows an example of a linkage system according to the present embodiment. The linkage system according to the present embodiment includes a cloud environment 10 and a building environment 20.
[0011] The cloud environment 10 is an environment constructed to manage buildings and control IoT-enabled devices used in the buildings by cloud computing. The cloud environment 10 includes a building integrated management system 11 and a general IoT control system 12.
[0012] The integrated building management system 11 is an environment constructed so that a building manager can perform integrated management of buildings BL that are to be managed. The integrated building management system 11 includes a building integrated management device SY1 and a linkage control device 100. The building BL to be integratedly managed by the integrated building management system 11 may be one building or multiple buildings. The building integrated management device SY1 includes, for example, a server, a database, and the like for building integrated management. The building integrated management device SY1 may also be configured as a composite combination of multiple physically independent devices. In this case, the building integrated management device SY1 manages multiple buildings BL in an integrated manner via the cooperative control device 100.
[0013] The function of the building integrated management device SY1 is realized by the building integrated management device SY1 executing an application program that provides a function corresponding to the building integrated management. In this respect, the building integrated management device SY1 can be regarded as an application having a function corresponding to the building integrated management. Also, the building integrated management device SY1 can be regarded as a device (equipment-compatible device) in which an application having a function corresponding to the building integrated management is implemented.
[0014] The coordination control device 100 performs control so that application coordination is performed among the building integrated management system 11, the building unit management system 21 of each building BL, and the general IoT environment 22 of each building BL, in which applications coordinate among a specified number of devices to provide specified functions. An example of the function of the cooperative control provided by the cooperative control device 100 may be, for example, inter-device cooperation between the building integrated management system 11 and a building unit management system 21 of a specific building BL and the general IoT environment 22 of the same building BL. Also, for example, device information of the building unit management systems 21 in different buildings BL may be cross-sectionally compared to implement inter-device cooperation according to the conditions.
[0015] Although not shown in the figure, the building integrated management device SY1 and the linkage control device 100 may be connected to a predetermined network service IS. For example, the building integrated management device SY1 can formulate an air conditioning operation plan for each building BL based on weather forecast information for the area corresponding to the building BL, obtained from a network service IS that provides weather information. In addition, the network service IS may be a social networking service (SNS) provided on the cloud or a cloud service for data provision and data linkage.
[0016] The general IoT control system 12 performs control so that various IoT functions used by general users are realized in each of the general IoT environments 22 of each building BL. The general user here includes a person who works at a company, a commercial facility, etc. in the building BL. The general user also includes a person who visits a company, etc. in the building BL as a visitor, or a customer who visits a commercial facility, etc. in the building BL.
[0017] The general IoT control system 12 includes a cooperation control device 200. The cooperation control device 200 is connected to a general device DV in a general IoT environment 22 of each building BL via a router RT. The cooperation control device 200 is also connected to various network services IS. The network services IS may be, for example, an SNS, an email service, a memo pad application service, or the like. Such a general device DV is regarded as one of the devices corresponding to the application cooperation of this embodiment. The network service IS is realized by installing an application program in a device such as a server that provides the network service IS. In this respect, in this embodiment, the network service IS can be regarded as one of the devices that support the application cooperation of this embodiment.
[0018] The cooperation control device 200 has a function of managing connections between general devices DV, network services IS, etc. corresponding to the general IoT environment 22 of each building BL. The cooperation control device 200 can also execute predetermined application cooperation including applications corresponding to the general device DV, the network service IS, and the like connected to the cooperation control device 200 .
[0019] In the same figure, the general device DV is shown to be connected to the network service IS from the router RT via the cooperation control device 200, but the general device DV and the network service IS may be connected to each other without going through the router RT or the cooperation control device 200.
[0020] The building environment 20 is an environment formed by including a plurality of buildings BL managed by the cloud environment 10. One building BL in the building environment 20 includes a building unit management system 21 and a general IoT environment 22.
[0021] The building unit management system 21 performs management for each building BL under the supervision of a building manager. The building unit management system 21 includes a building unit management device SY2, building equipment FC, and a linkage control device 300 (an example of an auxiliary linkage control device).
[0022] The functions of the building unit management device SY2 and the building facility FC are realized by the building unit management device SY2 and the building facility FC executing application programs corresponding to the respective functions. In this respect, the building unit management device SY2 and the building facility FC can each be considered as applications implemented in the building unit management system 21. Furthermore, the building unit management device SY2 and the building facility FC can be considered as devices in which applications are implemented (facility-compatible devices). In addition, the building unit management device SY2 and building equipment FC can be understood as a general term for an integrated system including multiple devices with certain specified functions and a server function that manages and controls these devices.
[0023] The building unit management device SY2 includes, for example, a server, a database, etc. for managing the corresponding building BL. The building unit management device SY2 may also be configured as, for example, a composite combination of a plurality of physically independent devices. The building unit management device SY2 is connected to various building facilities FC. The building facilities FC include, for example, air conditioners, lighting devices, various sensors, terminal devices used by the building manager, guide robots, etc. in the building BL. The building unit management device SY2 can manage the building BL based on, for example, sensor output output from the building facilities FC as a sensor, as a basic management completed within the building BL. As an example, the building unit management device SY2 can perform dimming control of lighting devices and air conditioning control by air conditioners in the building BL based on the output of a sensor installed to detect the presence or absence of people in the building BL. In this case, the sensors, lighting devices, air conditioners, etc. are building facilities FC provided in the building BL.
[0024] Although not shown in the figure, the building unit management device SY2 may be connected to a predetermined network service IS. The building unit management device SY2 can control a predetermined building facility FC based on information acquired from the network service IS.
[0025] Furthermore, when the building integrated management device SY1 controls multiple buildings BL in an integrated manner, it issues appropriate instructions to the building unit management device SY2 of each building BL. The building unit management device SY2 can control, for example, a specific building facility FC in response to an instruction from the building integrated management device SY1. This realizes integrated management of multiple buildings BL.
[0026] The linkage control device 300 of the building unit management system 21 is connected to the linkage control device 100 of the integrated building management system 11 .
[0027] The coordination control device 300 can execute specified application coordination between devices (building unit management device SY2, building equipment FC, etc.) provided in the building unit management system 21 of the same building BL and devices provided in the building unit management systems 21, general IoT control systems 12, network services IS, etc. of other buildings BL.
[0028] Furthermore, the linkage control device 300 can execute a predetermined application linkage between devices (such as the building unit management device SY2, building equipment FC, etc.) provided in the building unit management system 21 of the same building BL. That is, the cooperation control device 300 can execute application cooperation completed in the building unit management system 21. For example, the cooperation control device 300 can control multiple building facilities FC in the same building BL to cooperate with each other to execute a predetermined operation. Also, for example, the cooperation control device 300 can control multiple building facilities FC in different buildings BL to cooperate with each other to execute a predetermined operation. There may be cases where communication between the linkage control device 300 of the building unit management system 21 and the linkage control device 100 of the building integrated management system 11 becomes impossible due to a communication failure or the like. In this case, application linkage between the building unit management system 21 and the building integrated management system 11 and application linkage between the building unit management system 21 and the general IoT environment 22 will not function. However, even in such a case, by providing the linkage control device 300, application linkage that is completed within the building unit management system 21 can be made to function auxiliary in the entire linkage system, so that comfort, convenience, etc. in the building BL are not significantly impaired.
[0029] The general IoT environment 22 is an environment in which general IoT functions are realized in the building BL. The general IoT environment 22 includes a plurality of general devices DV. The general device DV is a collective term including various IoT devices used by general users in the building BL and a server function for managing and controlling the IoT devices. The general device DV includes, for example, a personal computer, a smartphone, a tablet terminal, etc., used by individual general users in the building BL. It also includes general home appliances used in the building BL. The general device DV may also include an AI speaker, a digital signage-compatible display device, a navigation device for vehicles entering and leaving the building BL, etc., used in the building BL. The general device DV may also include a device that performs IoT sensing, such as a temperature sensor, a human sensor, or a vibration sensor.
[0030] The general device DV is connected to other general devices DV in the same general IoT environment 22 via the router RT so as to be able to communicate wirelessly or wired. Note that a plurality of routers RT may be arranged in the building BL as appropriate. The router RT is connected to the cooperative control device 200 in the general IoT control system 12. As a result, the general device DV is connected to the network service IS. The general device DV is also connected to general devices DV in other general IoT environments 22.
[0031] With reference to Fig. 2, examples of functional configurations of the linkage control device 100 in the building integrated management system 11, the linkage control device 200 in the general IoT control system 12, and the linkage control device 300 in the building unit management system 21 will be described. Note that the same parts as in Fig. 1 are given the same reference numerals and their explanations will be omitted. The functions of the linkage control devices 100, 200, 300 shown in the figure are realized by a central processing unit (CPU) included in the linkage control devices 100, 200, 300 executing a program.
[0032] The linkage control device 100 in the building integrated management system 11 includes a communication unit 101 , a control unit 102 , and a storage unit 103 .
[0033] The communication unit 101 is communicably connected to a building integrated management device SY1 in the same building integrated management system 11 in which the cooperative control device 100 is provided. The communication unit 101 may be connected to a predetermined network service IS. Note that, in the case where the same building integrated management system 11 is provided with devices other than the building integrated management device SY1, the communication unit 101 may be communicably connected to these other devices as well.
[0034] The control unit 102 executes control in the cooperation control device 100. The control unit 102 includes a cooperation control unit 121. The cooperation control unit 121 controls the cooperation control device 100 so that an operation according to a predetermined application cooperation function is executed among a plurality of devices connected to the cooperation control device 100. A specific example of "operation according to a specified application linkage function among multiple devices" here includes changing and controlling the operation or state of one or more other devices according to predetermined logic when the state, measurement value, calculation value, etc. of one or more devices satisfy a pre-set condition. Here, the devices connected to the coordination control device 100 include devices (such as the building integrated management device SY1) that are directly connected to the coordination control device 100 in the same building integrated management system 11. The devices connected to the coordination control device 100 also include devices (such as the general device DV and the network service IS) that are indirectly connected via, for example, the coordination control device 200. The devices connected to the coordination control device 100 also include devices (such as the building unit management device SY2 and building equipment FC) that are indirectly connected via the coordination control device 300 in the building unit management system 21 of a certain building BL.
[0035] The storage unit 103 stores various types of information corresponding to the cooperation control device 100. As shown in the figure, the storage unit 103 stores N (N is a natural number equal to or greater than 1) pieces of cooperation procedure information 131 (131-1 to 131-N). Each piece of interaction procedure information 131 is information indicating a procedure (rule) for realizing a predetermined application interaction. The collaboration control unit 121 performs control such as outputting commands so that a procedure for realizing the requested application collaboration function is executed, for example, by referring to collaboration procedure information corresponding to an application collaboration request received from an application of a specific device. For example, the linkage procedure information 131 may have content that, if a certain condition is satisfied based on a request from an application of one or more devices, instructs an application of one or more other devices to execute a predetermined procedure, in accordance with an IF-THEN statement. This also applies to the linkage procedure information 231 and 331 described below.
[0036] The cooperative control device 200 in the general IoT control system 12 includes a communication unit 201, a control unit 202, and a storage unit 203.
[0037] The communication unit 201 is connected to the network service IS, and is communicatively connected via a router RT to general devices DV and the like in each of the subordinate general IoT environments 22. Note that, for the sake of simplicity, the illustration of the router RT is omitted in the figure, and the general devices DV and the communication unit 201 are shown as being connected to each other.
[0038] The control unit 202 executes control in the cooperation control device 200. The control unit 202 includes a cooperation control unit 221. The cooperation control unit 221 controls the cooperation control device 200 so that an operation according to a predetermined application cooperation is executed among a plurality of devices connected to the cooperation control device 200. A specific example of "operation according to a specified application linkage function among multiple devices" here includes changing and controlling the operation or state of one or more other devices according to predetermined logic when the state, measurement value, calculation value, etc. of one or more devices satisfy a pre-set condition. The devices connected to the coordinated control device 200 are a network service IS, devices in the general IoT environment 22 (general device DV, etc.), devices in the building integrated management system 11 (building integrated management device SY1, network service IS (not shown), etc.), and devices in the building unit management system 21 (building unit management device SY2, building equipment FC, network service IS (not shown), etc.).
[0039] The storage unit 203 stores various types of information corresponding to the cooperation control device 200. The storage unit 203 stores n (n is a natural number equal to or greater than 1) pieces of cooperation procedure information 231 (231-1 to 231-n). Each piece of cooperation procedure information 131 is information indicating a procedure for realizing a predetermined application cooperation function. The cooperation control unit 221 executes control such as output of a command so that the procedure for realizing the requested application cooperation function is executed by referring to cooperation procedure information corresponding to an application cooperation request received from an application of a predetermined device, for example.
[0040] The linkage control device 300 in the building unit management system 21 includes a communication unit 301 , a control unit 302 , and a storage unit 303 .
[0041] The communication unit 301 is communicably connected to the building unit management device SY2 and building facilities FC in the same building unit management system 21 in which the cooperative control device 300 is provided. The communication unit 301 may be connected to a predetermined network service IS. Furthermore, if the same building integrated management system 11 is provided with devices other than the building unit management device SY2 and building facilities FC, the communication unit 301 may be communicably connected to these other devices as well.
[0042] The control unit 302 executes control in the cooperation control device 300. The control unit 302 includes a cooperation control unit 321. The cooperation control unit 321 controls the cooperation control device 300 so that an operation according to a predetermined application cooperation function is executed among a plurality of devices connected to the cooperation control device 300. A specific example of "operation according to a specified application linkage function among multiple devices" here includes changing and controlling the operation or state of one or more other devices according to predetermined logic when the state, measurement value, calculation value, etc. of one or more devices satisfy a pre-set condition. The devices connected to the coordination control device 300 include devices (such as the building unit management device SY2 and building equipment FC) that are directly connected in the same building unit management system 21. The devices connected to the coordination control device 300 also include devices (such as the building integrated management device SY1) of the building integrated management system 11 that are indirectly connected via the coordination control device 100, and devices (such as the building unit management device SY2 and building equipment FC) in the building unit management systems 21 of other buildings BL. The devices connected to the coordination control device 300 also include devices (such as the network service IS and general device DV) that are indirectly connected via the coordination control device 100 and the coordination control device 200.
[0043] The storage unit 303 stores various types of information corresponding to the cooperation control device 300. The storage unit 303 stores M (M is a natural number equal to or greater than 1) pieces of cooperation procedure information 331 (331-1 to 331-M). Each piece of interaction procedure information 331 is information indicating a procedure for realizing a predetermined application interaction. Each piece of interaction procedure information includes information (corresponding command information) indicating a command (application interaction request (interaction command)) requesting the corresponding application interaction, and information (procedure instruction information) instructing a procedure for realizing the corresponding application interaction. The collaboration control unit 321 executes control such as command output so that a procedure for realizing the requested application collaboration is executed, for example, by referring to collaboration procedure information corresponding to a collaboration command received from an application of a specified device.
[0044] The linkage system of this embodiment having the above configuration is capable of linking the following applications. First, the collaboration system is capable of performing application collaboration between a device in the building integrated management system 11 (such as the building integrated management device SY1) and one or more devices in one or more building unit management systems 21 (such as the building unit management device SY2, building equipment FC, etc.) triggered by a collaboration command sent from the device in the building integrated management system 11. In this case, the coordination control device 100 may receive a coordination command transmitted by a device in the building integrated management system 11, and transmit a procedure instruction command to a coordination destination device to instruct the coordination destination device to execute a procedure indicated in the procedure instruction manual based on the procedure instruction information indicated in the coordination procedure information 131 corresponding to the received coordination command. At this time, the procedure instruction command is relayed by the coordination control device 300 and transferred to the coordination destination device. The coordination destination device that receives the procedure instruction command executes a process in response to the procedure instruction command. In this manner, application coordination is performed between the device in the building integrated management system 11 and one or more devices in the building unit management system 21.
[0045] In addition, the collaboration system can perform application collaboration between a device in a certain building unit management system 21 (such as the building integrated management device SY1) and a device in the building integrated management system 11 (such as the building integrated management device SY2, building equipment FC, etc.) using a collaboration command sent from the device in the certain building unit management system 21 as a trigger. In this case, the coordination command transmitted from the device in the building unit management system 21 is transmitted to the coordination control device 100 via the coordination control device 300. Based on the procedure instruction information indicated by the coordination procedure information 131 corresponding to the received coordination command, the coordination control device 100 transmits a procedure instruction command to the device in the integrated building management system 11 as the coordination destination to instruct the device to execute the procedure indicated by the procedure instruction information. The coordination destination device that receives the procedure instruction command executes processing in response to the procedure instruction command. In this manner, application coordination is performed between the devices in the building unit management system 21 and the devices in the integrated building management system 11.
[0046] In addition, the collaboration system of this embodiment can, for example, trigger application collaboration between other devices in one or more general IoT environments 22 (which may include a general IoT environment 22 having the device that sent the collaboration command) and a network service IS, using a collaboration command sent from a device such as a general device DV in a certain general IoT environment 22 as a trigger. In this case, for example, a collaboration command transmitted from a device in one general IoT environment 22 is received by the collaboration control device 200 of the general IoT control system 12. Based on the procedure instruction information indicated by the collaboration procedure information 231 corresponding to the received collaboration command, the collaboration control device 200 transmits a procedure instruction command to a collaboration destination device (such as a general device DV or a network service IS in the general IoT environment 22) to instruct the device to execute a procedure indicated by the procedure instruction information. The collaboration destination device that receives the procedure instruction command executes a process in response to the procedure instruction command. In this manner, application collaboration between devices in one or more general IoT environments 22 is performed.
[0047] In addition, in the linkage system of this embodiment, the linkage control device 100 of the building integrated management system 11 and the linkage control device 200 of the general IoT control system 12 are connected. As a result, the linkage system of this embodiment enables application linkage between devices of the building management systems (the building integrated management system 11, the building unit management system 21) corresponding to building management and devices of the general IoT environment 22.
[0048] One aspect of application collaboration between devices between a building management system and a general IoT environment 22 is that application collaboration can be triggered by a collaboration command sent from a device of the building integrated management system 11, with the device of the building integrated management system 11 and one or more specified devices in each of one or more general IoT environments 22 as the collaboration destinations. In this case, the coordination control device 100 of the building integrated management system 11 may transmit a procedure instruction command to a device in the general IoT environment 22 as a coordination destination, based on the coordination procedure information 131 corresponding to the received coordination command. Alternatively, the coordination control device 100 of the building integrated management system 11 may transfer a coordination command transmitted from a device of the building unit management system 21 to the coordination control device 200 of the general IoT control system 12. Then, the coordination control device 200 may transmit a procedure instruction command to a device of the coordination destination general IoT environment 22 based on the coordination procedure information 231 corresponding to the transferred coordination command.
[0049] In addition, as another form of application collaboration between devices between the building management environment and the general IoT environment 22, a collaboration command sent from a device of a certain building unit management system 21 can be used as a trigger to enable application collaboration between the device of the building unit management system 21 and one or more specified devices in one or more general IoT environments 22. In this case, the coordination control device 100 of the building integrated management system 11 may be configured to transmit a procedure instruction command to a device in the general IoT environment 22 with which it is to coordinate, based on coordination procedure information 131 corresponding to the coordination command transmitted from the device of the building unit management system 21. Alternatively, the coordination control device 100 of the building integrated management system 11 may transfer the coordination command transmitted from the device of the building unit management system 21 to the coordination control device 200 of the general IoT control system 12. Then, the coordination control device 200 may transmit a procedure instruction command to the device of the coordination destination general IoT environment 22 based on the coordination procedure information 231 corresponding to the transferred coordination command.
[0050] In addition, as another form of application collaboration between devices between a building management system and the general IoT environment 22, a collaboration command sent from a device in one of the general IoT environments 22 can be used as a trigger to enable application collaboration between a device in the general IoT environment 22 and a device in the building integrated management system 11, or one or more specified devices in one or more building integrated management systems 11.
[0051] In addition, as a form of application collaboration between devices in the building management environment and the general IoT environment 22, it is also possible to trigger application collaboration in which a collaboration command sent from a device in either the building integrated management system 11, the building unit management system 21, or the general IoT environment 22 is used as the collaboration destination for specified devices in the other two systems or environments.
[0052] An example of a processing procedure executed by the cooperation control device (100, 200, 300) in relation to application cooperation will be described with reference to the flowchart of Fig. 3. In the following description, a case where the subject of processing is the cooperation control device 100 will be taken as an example.
[0053] Step S101: In the cooperation control device 100, the cooperation control unit 121 waits for reception of a cooperation command. Step S102: When a collaboration command is received, the collaboration control unit 121 judges whether or not the collaboration control unit 121 should respond to the received collaboration command. The collaboration control unit 121 may make the judgment in step S102, for example, depending on whether specific information (for example, a command identifier, etc.) described in the received collaboration command is included in the collaboration command to be processed by the collaboration control unit 121. Alternatively, the collaboration control unit 121 may execute a process of searching for collaboration procedure information 131 associated with the received collaboration command from the storage unit 103, and may make the judgment in step S102 depending on whether or not the information is found. Alternatively, when the collaboration command includes device information indicating a collaboration control device that should execute the corresponding process, the collaboration control unit 121 may make the judgment in step S102 depending on whether or not the device information indicates the collaboration control unit 121. Alternatively, the collaboration control unit 121 may make the judgment in step S102 by, for example, comparing the address of the collaboration destination device indicated in the collaboration command with its own address.
[0054] Step S103: If it is determined in step S102 that the received cooperation command is not something that the cooperation control unit 121 should handle, the cooperation control unit 121 transfers the received cooperation command to the other cooperation control units (200, 300). In this case, the cooperation control unit 121 may transfer the cooperation command to each of the other cooperation control units (200, 300) by multicast. Alternatively, the cooperation control unit 121 may identify a cooperation control unit to be the transfer destination based on predetermined information indicated in the received cooperation command, and transfer the cooperation command to the identified cooperation control unit.
[0055] Step S104: If it is determined in step S102 that the cooperation control unit 121 should respond to the received cooperation command, the cooperation control unit 121 acquires procedure instruction information from the cooperation procedure information 131 that corresponds to the received cooperation command.
[0056] Step S105: The cooperation control unit 121 generates a procedure instruction command based on the procedure instruction information acquired in step S104, and transmits the generated procedure instruction command to the cooperation destination device.
[0057] In the coordination system of this embodiment, by storing coordination procedure information corresponding to a certain application coordination function in the coordination control devices 100, 200, and 300, a new application coordination function can be easily and flexibly added.
[0058] In addition, in order to realize one application cooperation operation, a plurality of pieces of cooperation procedure information may be used between the cooperation control devices. As an example, while the cooperation control device 100 executes a process according to the predetermined cooperation procedure information 131 corresponding to the cooperation command from a predetermined device, the cooperation control device 100 transmits a predetermined cooperation command to the cooperation control device 200. The cooperation control device 200 executes a process according to the predetermined cooperation procedure information 131 corresponding to the received cooperation command. In this manner, one application cooperation operation may be obtained.
[0059] [First example of application integration adjustment] The collaboration system of this embodiment, configured as described above, may be triggered when an application on a certain device issues (sends) a collaboration command, and may execute application collaboration corresponding to the collaboration command (instruction) according to appropriate procedures, individually, in accordance with corresponding collaboration procedure information. However, there are cases where the operations of application cooperation corresponding to a plurality of cooperation commands issued in the cooperation system are in a conflicting relationship with each other. In this case, it may be preferable to adjust the application cooperation corresponding to each of these cooperation commands (application cooperation adjustment). Such application cooperation adjustment will be described below.
[0060] First, a first example of application cooperation adjustment will be described. For example, there are cases where multiple coordination commands are issued within a short period of time with the same device as the control target (coordination destination). In such cases, control of the application coordination corresponding to each of the multiple coordination commands is executed in the order in which they were issued, which may result in undesirable operation of the controlled device. As a specific example, for example, a terminal (e.g., a smartphone, a personal computer, etc.) serving as a general device DV of user A issues a cooperation command (cooperation command A) of a command to "increase the illuminance of the lighting device in the third area on the second floor of the building" in response to an operation by user A or in accordance with a predetermined lighting control schedule. Also, after the issuance of cooperation command A, a short time, for example within a few seconds, a terminal serving as a general device DV of user B issues a cooperation command (cooperation command B) of the same command to "increase the illuminance (or decrease the illuminance) of the lighting device in the third area on the second floor of the building." In such a case, the coordinated control device that controls the lighting devices in the third area on the second floor of the building increases the illuminance of the lighting devices in response to coordinated command A according to the order and timing of issuance of coordinated command A, and then increases (or decreases) the illuminance of the lighting devices in response to coordinated command B. This results in unnatural behavior in which the lighting devices change their illuminance twice in succession within a short period of time.
[0061] Therefore, in the coordination system of this embodiment, when a coordination command instructing a change in illuminance of a lighting device is issued, the coordination control device sets a coordination command unacceptable period (e.g., about 30 seconds) from the time the coordination command is issued. During the unacceptable period, the coordination control device does not accept a coordination command instructing a change in illuminance of the same lighting device. In this case, the coordination control device may send an error notification to a device that issued a coordination command during the unacceptable period, indicating that the coordination command was rejected because it was issued during the unacceptable period.
[0062] In addition, in the first example of application interaction adjustment, if there are three or more competing application interactions, the interaction control device may execute the application interaction of the interaction command received first, and not accept interaction commands corresponding to the other two or more competing application interactions received during the non-acceptable period. The cooperation control device may execute the application cooperation of the cooperation command received first, and temporarily store (store) in a buffer provided for commands cooperation commands corresponding to two or more other conflicting application cooperations received during the unacceptable period.The cooperation control device may then execute the application cooperation corresponding to all or part of the commands stored in the buffer after the unacceptable period ends.
[0063] In this first example of application interaction adjustment, it can be understood that, among multiple interaction commands corresponding to conflicting application interactions, the application interaction of the interaction command received first by the interaction control device is executed in priority over the application interaction of a competing interaction command received during the unacceptable period.
[0064] Fig. 4 shows an example of cooperation procedure information stored by the cooperation control device in response to the above-mentioned application cooperation adjustment. Fig. 4(A) is an example of cooperation procedure information stored by the cooperation control device in response to cooperation command A, and Fig. 4(B) is an example of cooperation procedure information stored by the cooperation control device in response to cooperation command B. The cooperation procedure information shown in Fig. 4(A) and Fig. 4(B) may be stored, for example, by the cooperation control device 300 in the same building BL as the lighting device to be controlled is provided.
[0065] First, the linkage procedure information includes corresponding command information, procedure instruction information, and adjustment control information. The corresponding command information is information indicating a linkage command that requests linkage of a corresponding application. In Fig. 4(A), a linkage command ID of ID0001 is stored as the corresponding command information. The linkage command ID of ID0001 indicates linkage command A. In Fig. 4(B), a linkage command ID of ID0002 is stored as the corresponding command information. ID0002 indicates linkage command B.
[0066] The procedure instruction information is information that instructs the procedure for realizing the corresponding application cooperation. Fig. 4 (A) and Fig. 4 (B) show an example of procedure instruction information having a structure including each information of "instruction subject", "condition action", "execution subject", and "execution content". Such procedure instruction information has contents that instruct the operation of the corresponding application cooperation, such as if the "instruction subject" performs the "condition action", the "execution subject" executes the "execution content". Specifically, the procedure instruction information corresponding to the collaborative command A in Figure 4 (A) indicates that if the "user's terminal" instructs "to increase the illuminance of the lighting device in the third area on the second floor," then the "lighting device in the third area on the second floor" will execute the "increase in illuminance." In addition, the procedure instruction information corresponding to collaboration command B in Figure 4 (B) indicates that if the "user's terminal" instructs "to reduce the illuminance of the lighting device in the third area on the second floor," then the "lighting device in the third area on the second floor" will execute the "reduction in illuminance."
[0067] The adjustment control information indicates the content of application coordination adjustment to be performed in response to other coordination commands when executing control of the procedure instruction information in response to the issuance of the corresponding coordination command. The adjustment control information corresponding to the linked command A in Figure 4 (A) indicates that a non-acceptable period should be set for the linked command B indicated by the linked command ID of ID0002 for T seconds from the time when the control corresponding to the linked command A is started. In addition, the adjustment control information corresponding to the linked command B in Figure 4 (B) indicates that a non-acceptable period should be set for the linked command A indicated by the linked command ID of ID 0001 for T seconds from the timing at which control corresponding to the linked command B is started.
[0068] For example, in response to receiving cooperation command A transmitted from the terminal of user A, the cooperation control device 300 increases the illuminance of the lighting device in the third area on the second floor in accordance with the cooperation procedure information in Fig. 4(A). Then, the cooperation control device 300 sets a non-reception period of T seconds from the timing of executing control to increase the illuminance of the lighting device in the third area on the second floor, so that even if cooperation command B is transmitted during the non-reception period, the cooperation control device 300 is able to not execute control according to cooperation command B. Conversely, in response to receiving cooperation command B transmitted from the terminal of user B, the cooperation control device 300 reduces the illuminance of the lighting device in the third area on the second floor in accordance with the cooperation procedure information in Fig. 4(B). Then, the cooperation control device 300 sets a non-reception period of T seconds from the timing of executing control to reduce the illuminance of the lighting device in the third area on the second floor, so that even if cooperation command A is transmitted during the non-reception period, control according to cooperation command A is not executed.
[0069] Note that the adjustment of application cooperation by setting such an unacceptable period is not limited to changing the illuminance of the lighting device as described above, and may also be applied to other application cooperation. Moreover, such application cooperation adjustment may be controlled by the cooperation control device 300 as described above, or may be controlled by the cooperation control devices 100 and 200, for example.
[0070] [Second example of application integration adjustment] As a second example, the collaboration system of this embodiment may be configured to perform application collaboration adjustment as follows. For example, a transport robot that transports materials is operated as a general device DV or building facility FC in a building BL. The transport robot is controlled by a robot control system constructed in the building BL. The robot control system is configured so that, for example, a building unit management device SY2 or a specific building facility FC in the building BL can remotely control the transport robot. Also, a user can remotely control the transport robot. When a user remotely controls the transport robot, the user operates a terminal as a general device DV to issue a link command.
[0071] Here, the terminal of user A as the general device DV issues a collaboration command C to "press the up button of elevator No. 1" with the transport robot as the control target. At almost the same time as the issuance of collaboration command C, the robot control system issues a collaboration command D to "press the down button of elevator No. 1." As a result, the collaboration control device that controls the transport robot stores collaboration command C and collaboration command D in a buffer. In such a case, if the coordination control device controls the transport robot according to each of the coordination commands C and D in the order in which they are stored in the buffer, a malfunction may occur in which the transport robot performs an action such as, for example, pressing the upward button on elevator No. 1 and then immediately pressing the downward button on elevator No. 2.
[0072] For example, when controlling a transport robot, commands from the robot control system are considered to be more important than commands from a user. Therefore, when the coordination commands C and D corresponding to the robot control system and the user are stored in the buffer as described above, the coordination control device prioritizes the coordination command D corresponding to the robot control system out of the coordination commands C and D. Specifically, the coordination control device may control the transport robot in response to coordination command D out of coordination commands C and D stored in the buffer, and discard coordination command C. As a result, the transport robot performs an operation of pressing the downward button of elevator No. 1 in response to coordination command D, but does not perform an operation of pressing the upward button of elevator No. 1 in response to coordination command C. Alternatively, the coordination control device may first control the transport robot in response to coordination command D, which has a higher priority, out of the coordination commands C and D stored in the buffer. Next, the coordination control device may control the transport robot in response to coordination command C after a certain time has elapsed since the control of the transport robot in response to coordination command D, or at the timing when the operation of elevator No. 1 corresponding to the operation of the transport robot in response to coordination command D is completed. In this case, the transport robot first performs an operation to press the downward button of elevator No. 1 in response to coordination command D, and thereafter performs an operation to press the upward button of elevator No. 1 in response to coordination command C.
[0073] Fig. 5 shows an example of cooperation procedure information stored by the cooperation control device in response to the above-mentioned application cooperation adjustment. Fig. 5(A) is an example of cooperation procedure information stored by the cooperation control device in response to cooperation command C, and Fig. 5(B) is an example of cooperation procedure information stored by the cooperation control device in response to cooperation command D. The cooperation procedure information shown in Fig. 5(A) and Fig. 5(B) may be stored, for example, by the cooperation control device 300 in the same building BL as the lighting device to be controlled is provided.
[0074] The linkage procedure information shown in FIG. 5(A) and FIG. 5(B) includes corresponding command information, procedure instruction information, priority setting information, and priority control information. ID0011 stored as the corresponding command information in Fig. 5(A) indicates the cooperative command C. Also, the procedure instruction information in Fig. 5(A) indicates that if the "user terminal" issues an "instruction to operate the button of elevator No. 1 (in this case, the upward button operation is specified)", then the "transport robot" will "operate the button of elevator No. 1 in the specified direction (in this case, the upward button operation)". ID0012 stored as the corresponding command information in Fig. 5(B) indicates the cooperative command D. Also, the procedure instruction information in Fig. 5(A) indicates that if the "robot control system" issues an "instruction to operate the button of elevator No. 1 (in this case, the downward button operation is specified)", then the "transport robot" will "operate the button of elevator No. 1 in the specified direction (in this case, downward)."
[0075] The priority setting information indicates the contents related to the priority setting for application cooperation by executing the corresponding procedure instruction information. Moreover, the priority control information indicates control that should be executed in response to the setting of a priority for the corresponding application interaction. The priority setting information in the collaboration procedure information of FIG. 5A corresponding to collaboration command C indicates that the corresponding application collaboration is set to have a lower priority than the application collaboration corresponding to collaboration command D of ID0012. 5(B) corresponding to cooperation command D indicates that the corresponding application cooperation is set to have a higher priority than the application cooperation corresponding to cooperation command C of ID0011. Furthermore, the priority control information in the cooperation procedure information in FIG. 5(B) indicates that when cooperation command C of ID0011 is stored in the buffer of the cooperation control device 300 together with the corresponding cooperation command D of ID0012, cooperation command C of ID0011 should be discarded.
[0076] As shown in Figures 5(A) and 5(B), by describing the collaboration procedure information corresponding to collaboration commands C and D, when collaboration commands C and D are stored in the buffer of the collaboration control device 300, the collaboration control device 300 can execute the application collaboration operation corresponding to collaboration command D and not execute the application collaboration operation corresponding to collaboration command C. In other words, the transport robot operates the buttons on elevator No. 1 in response to collaborative command C from the robot control system, but can be configured not to operate the buttons on elevator No. 1 in response to collaborative command D from the user's terminal.
[0077] Note that the adjustment of application cooperation by setting priorities for cooperation commands in this manner is not limited to the control of the transport robot as described above, and may also be applied to other application cooperation. The priority of the priority setting information may be expressed by characters as shown in FIG. 5, or by numerical values (e.g., 100, 50, 10, 1, 0, -10, etc.), or by letters of the alphabet such as A, B, and C, or by symbols, etc. Moreover, such application cooperation adjustment may be controlled by the cooperation control device 300 as described above, or may be controlled by the cooperation control devices 100 and 200, for example.
[0078] [Application integration procedure (rule) division] Furthermore, when realizing application integration in accordance with the integration procedure information of 1, depending on the content of the procedure (rule) indicated by the procedure instruction information stored in the integration procedure information, it may be preferable in terms of effectiveness (feasibility), control efficiency, ease of equipment implementation, etc. to divide the procedure into multiple procedure instruction information and then execute the procedure rather than executing it with a single procedure instruction information. As an example, a human detection system is introduced in a certain building BL. The human detection system may be configured to include, for example, beacons (which may be surveillance cameras or the like) installed in various locations in the building BL as a type of building facility FC, and a building unit management device SY2 configured to execute processing related to human detection based on signals transmitted from the beacons.
[0079] Here, as an example of application cooperation corresponding to a human detection system, a case where a security operation is executed in which "if a person is detected in the third area on the second floor, an audio alert is issued from a security AI speaker (which may be used by a security guard for monitoring, for example) to notify the intrusion of a suspicious person" is taken. When executing such a security operation, for example, in order to ensure security, it is preferable that an alarm be first issued in the third area on the second floor in response to the detection of a person in the third area on the second floor. Taking these things into consideration, the procedure corresponding to the application collaboration as the above security operation may be divided into a first procedure of "if a person is detected in the third area on the second floor, issue an alarm of a suspicious intrusion via the entrance / exit system for the third area on the second floor," and a second procedure of "if an alarm of a suspicious intrusion is issued by the entrance / exit system for the third area on the second floor, have the security AI speaker issue an audio alert to confirm the identity of the suspicious intruder."
[0080] FIG. 6 shows an example of cooperation procedure information stored in the cooperation control device 300 in response to the division of application cooperation procedures as described above. When the above-mentioned division of application interaction procedures is supported, the interaction control device 300 is configured to store main interaction procedure information shown in FIG. 6(A) and sub interaction procedure information shown in FIG. 6(B) and FIG. 6(C). In the main linkage procedure information shown in Fig. 6(A), a linkage command ID of ID0021 is stored as corresponding command information. Also, the main linkage procedure information procedure instruction information shown in Fig. 6(A) indicates the overall flow of application linkage, that is, if the "human detection system" "detects a human in the third area on the second floor", the "SI speaker with device ID=XXXX" "will issue a voice alert of the intrusion of a suspicious person".
[0081] In addition, the main linkage procedure information shown in Fig. 6(A) includes an area for related sub-command IDs. The area for related sub-command IDs stores linkage command IDs associated with the sub-linkage procedure information corresponding to the main linkage procedure information shown in Fig. 6(A). In the figure, ID0022 and ID0023 are stored as linkage command IDs. In the sub-coordination procedure information shown in Fig. 6(B), ID0022 is stored as the corresponding command information, and in the sub-coordination procedure information shown in Fig. 6(C), ID0023 is stored as the corresponding command information. In this way, the main coordination procedure information and the sub-coordination procedure information are associated with each other by the coordination command ID stored in the related sub-command ID of the main coordination procedure information and the coordination command ID stored in the corresponding command information of the sub-coordination procedure information.
[0082] Depending on the procedure instruction information of the sub-coordination procedure information shown in Figure 6 (B), if the "human detection system" "detects a human in the third area on the second floor," the "entrance / exit equipment in the third area on the second floor" will "alert the intrusion of a suspicious person," indicating an application coordination operation. Furthermore, depending on the procedure instruction information of the sub-coordination procedure information shown in Figure 6 (C), if the "entrance / exit equipment in the third area on the second floor" has issued a "suspicious person intrusion alarm," then the "SI speaker with device ID = XXXX" will issue a "suspicious person intrusion alarm by audio," indicating an application coordination operation.
[0083] When the cooperation control device 300 receives a cooperation command having a cooperation command ID of ID0021, it first accesses the cooperation procedure information of Fig. 6(A) which stores ID0021 as corresponding command information. In this case, the cooperation control device 300 recognizes that ID0022 and ID0023 are stored as related subcommand IDs in the cooperation procedure information of Fig. 6(A) that it has referred to. Therefore, the cooperation control device 300 accesses the cooperation procedure information of Fig. 6(B) and Fig. 6(C) which stores the cooperation command IDs of ID0022 and ID0023 as corresponding command information. In this case, the cooperation control device 300 first accesses the cooperation procedure information of Fig. 6(B) in which the instruction subject and the condition action in the procedure instruction information of the cooperation procedure information of Fig. 6(A) are the same. The cooperation control device 300 controls the entrance / exit equipment in the third area on the second floor to issue a suspicious person intrusion notification in accordance with the procedure instruction information in the cooperation procedure information of Fig. 6(B). In addition, in response to the control in accordance with the procedure instruction information in the cooperation procedure information of Fig. 6(B) in which the corresponding instruction subject performs the action indicated by the condition action in accordance with the procedure instruction information in the cooperation procedure information of Fig. 6(C), the cooperation control device 300 executes control corresponding to the execution subject and execution content of the procedure instruction information in the cooperation procedure information of Fig. 6(C). As a result, when the human detection system detects a person in the third area on the second floor, an alert of a suspicious intruder is issued by the entrance / exit equipment in the third area on the second floor, and further, an audio alert of a suspicious intruder is issued by the security AI speaker, thereby executing application linkage operations. In the above example, by executing the operation of application cooperation according to the procedure instruction information of the sub-cooperation procedure information shown in Fig. 6(B) and Fig. 6(C), the operation of application cooperation according to the main cooperation procedure information shown in Fig. 6(A) is obtained. When the operation of application cooperation is executed according to the procedure instruction information of the sub-cooperation procedure information shown in Fig. 6(B) and Fig. 6(C), a suspicious person intrusion notification by the entrance / exit equipment in the third area on the second floor is added. In this case, the cooperation control device 300 may determine whether or not to execute the control according to the related subcommand ID based on, for example, a preset setting or a situation judgment. In other words, the cooperation control device 300 may be able to switch between the control of application cooperation according to the procedure instruction information of Fig. 6(A) and the control of application cooperation according to the two procedure instruction information of Fig. 6(B) and Fig. 6(C) as the control according to the main cooperation procedure information shown in Fig. 6(A). This makes it possible to provide variation in the operation of one main application linkage depending on, for example, the operation of the building BL and various conditions, thereby increasing the flexibility of application linkage.
[0084] [Regarding standardization of map processing] For example, a location information processing system can be constructed in one building BL that acquires location information indicating the locations of people and objects and uses the acquired location information for a specific purpose to perform application linkage. In this case, multiple location information processing systems that acquire location information by different methods or have different purposes for using the location information may be provided in the same building BL.
[0085] Each of the multiple location information processing systems is required to output information regarding the acquired location information by plotting and displaying the coordinates indicated by the acquired location information, for example, on a map of the building BL (such as a floor plan of each floor). In this case, map information corresponding to the multiple position information processing systems is for the same building BL. Considering this, it is preferable that the process of reflecting the coordinates of the position information on the map of the building BL (map processing) be common to the multiple position information processing systems, rather than each of the multiple position information processing systems individually preparing map information and executing the map processing. In other words, it is preferable that the map processing be performed centrally using common map information for each of the multiple position information processing systems. Therefore, a configuration for standardizing map processing in a building BL equipped with a plurality of position information processing systems will be described below.
[0086] 7 shows an example of the configuration of a building unit management system 21 corresponding to the commonization of map processing in one building BL. The building unit management system 21 in the figure has a configuration in which a plurality of position information processing systems 400 (400-1 to 400-N) and a common map server 500 are connected to a cooperative control device 300. The location information processing system 400 may be configured to include at least one of a building facility FC and a general device DV provided in a building BL. The common map server 500 is provided as one of the building facilities FC. The common map server 500 may be provided as a general device.
[0087] The position information processing system 400 is a system that acquires position information by a predetermined method and realizes an application that uses the acquired position information for a predetermined purpose. The multiple position information processing systems 400 each have different applications according to the method of acquiring the position information, the purpose of the position information, etc. A certain position information processing system 400 can acquire the position information of a user based on communication between a beacon-compatible communication device carried by the user and beacons installed in various places in a building BL. Also, a certain position information processing system 400 can acquire the position information of a user by receiving the position information transmitted from a terminal such as a smartphone carried by the user. In addition, a certain location information processing system 400 can install wireless LAN access points in various places within a building BL and obtain user location information based on the location of the wireless LAN access point to which the user's terminal (e.g., a smartphone, etc.) is connected. Furthermore, a certain position information processing system 400 can acquire the user's position information by installing cameras at various locations within a building BL and analyzing images captured by the cameras. In addition, a certain location information processing system 400 can install tag readers corresponding to RFID (Radio Frequency IDentifier) tags in various locations within a building BL, and obtain user location information based on the location of the tag reader to which the RFID tag carried by the user is connected. Furthermore, the position information processing system 400 may be configured to acquire position information not only for people but also for objects within the building BL using each of the above-mentioned position information acquisition techniques.
[0088] For example, the multiple position information processing systems 400 may be adapted to correspond to different applications, respectively. For example, one position information processing system 400 may be adapted to obtain position information about people in a building BL for security against intruders. Furthermore, one location information processing system 400 may be configured to obtain location information about people in a building BL in order to provide a predetermined service to a user staying in the building BL. Furthermore, a certain position information processing system 400 may acquire position information about a predetermined object in the building BL in order to manage a moving object operating in the building BL. The moving object may be, for example, an object that moves as a person carries it, or may be, for example, an object that moves autonomously, such as a robot. The method of acquiring location information, the purpose of use of location information, the purpose of use, and applications, etc., supported by one location information processing system 400 are not limited to the above examples, and may be other modes.
[0089] When the position information processing system 400 requires information on a map of the building BL on which coordinates indicated by the position information are plotted (located map information), each of the position information processing systems 400 (400-1 to 400-N) does not have a map processing function individually, but transmits a map processing request as a coordination command to the coordination control device 300. The map processing request includes the position information that the position information processing system 400 has acquired, for example, at the current time.
[0090] The common map server 500 executes map processing in response to a map processing request transmitted from the position information processing system 400. In other words, the common map server 500 generates positioned map information by plotting on a map the coordinates indicated by the position information contained in the received map processing request. The common map server 500 can generate positioned map information by plotting only the coordinates of position information acquired by one position information processing system 400. The common map server 500 can also generate positioned map information by integrating and plotting the coordinates of position information acquired by two or more predetermined position information processing systems 400 designated in advance according to, for example, an application. The common map server 500 may determine which of the position information processing systems 400 should plot the position information acquired by the one position information processing system 400 in the one position-assigned map information based on, for example, the instruction contents of the map processing request transmitted from the one position information processing system 400, or on a preset setting of the cooperation relationship between the one position information processing system 400 and the other position information processing systems 400. Therefore, the common map server 500 may generate position-assigned map information in which position information corresponding to only one position information processing system 400 is plotted, or in which position information corresponding to a predetermined number of position information processing systems 400 is plotted. The common map server 500 can output the generated positioned map information as follows. The common map server 500 may, for example, transmit the positioned map information to the corresponding position information processing system 400 and display the positioned map information on a display device (for example, a monitor, signage, digital signage, etc.) connected to the position information processing system 400. The positioned map information displayed on the display device may be in a form in which marks, icons, etc. corresponding to the position information are arranged on a plan view or in a three-dimensional space. The common map server 500 may display predetermined positioned map information on a display device connected to the common map server 500. The common map server 500 may display predetermined positioned map information on a display device of a predetermined cooperative control device 300 or a subordinate of the cooperative control device 300. In addition, the common map server 500 can also provide the generated positioned map information to the building unit management systems 21 in the other buildings BL via the cooperative control device 300, for example.
[0091] The location information processing system 400 may transmit a map processing request, for example, each time location information is newly acquired, or at regular time intervals, or each time the number of newly acquired location information or the number of unacquired location information satisfies a predetermined condition, or each time the number of newly acquired location information reaches a certain value. The common map server 500 may generate corresponding positioned map information each time a map processing request is received, and output and transmit the positioned map information to be displayed on a predetermined display device, for example, as described above. In this case, the location information processing system 400 can display the positioned map information by updating it successively. As an example of the form of the positioned map information displayed on the display device connected to the position information processing system 400, when based on the positioned map information shown in Fig. 9(A) described later, the building BL shown in the figure may be appropriately displayed as a three-dimensional map, an elevation map, a planar map, etc. Also, a specific area, etc. described later, set in the building BL may be displayed so as to be reflected on each of the above maps.
[0092] 8 shows an example of the configuration of the common map server 500. The common map server 500 in the figure includes a communication unit 501, a control unit 502, and a storage unit 503.
[0093] The communication unit 501 communicates with the cooperative control device 300, the position information processing system 400, etc. via a network. The communication unit 501 may also be capable of communicating with building facilities FC, the building unit management device SY2, etc. other than the position information processing system 400 in the building BL.
[0094] The control unit 502 executes various controls in the common map server 500. The functions of the control unit 502 are realized by executing a program by a CPU provided in the common map server 500. The control unit 502 includes a map processing unit 521, a map information output unit 522, and an area control unit 523.
[0095] The map processing unit 521 executes map processing in response to a map processing request transmitted from the position information processing system 400. That is, the map processing unit 521 plots the coordinates of the position information included in the map processing request on the map of the building BL indicated by the map information stored in the map information storage unit 531 of the storage unit 503. The map of the building BL indicated by the map information has, for example, a two-dimensional or three-dimensional space corresponding to each floor of the building BL.
[0096] The map information output unit 522 transmits the positioned map information generated by the map processing of the map processing unit 521 to the position information processing system 400 which is the source of the map processing request.
[0097] The area control unit 523 can execute application linkage related to map processing by issuing a linkage command based on the area control information stored in the area control information storage unit 532. The areas related to the control of the area control unit 523 will be described later.
[0098] The storage unit 503 stores various information related to the common map server 500. The storage unit 503 includes a map information storage unit 531 and an area control information storage unit 532. The map information storage unit 531 stores map information of the building BL. The map information of the building BL may be two-dimensional data such as a plan view of the building BL, or may be three-dimensional data that represents the structure of the building BL in three dimensions.
[0099] As for the map information as two-dimensional data, if the building BL has a multi-story structure, two-dimensional data is prepared for each floor, and when displayed, the two-dimensional data for each floor may be arranged on the same screen or may be made switchable by page turning for each floor. Furthermore, the map information as two-dimensional data may be image data in a predetermined format, such as JPEG format, associated with coordinates. Alternatively, the map information as two-dimensional data may be generated based on two-dimensional CAD data or the like. Alternatively, the map information as two-dimensional data may be data obtained by two-dimensionalizing a model generated by BIM (Building Information Modeling).
[0100] Furthermore, the map information as three-dimensional data may be created based on a predetermined three-dimensional model, for example. The three-dimensional model may be a model created by three-dimensional CAD or a model created by BIM, for example.
[0101] For map information, for example, in the case of two-dimensional data, image data of a specified format can be used, and in the case of three-dimensional data, a three-dimensional model generated by a simple modeling technique can be used, thereby reducing the map processing load in the common map server 500 and the processing load of displaying positioned map information in display devices (monitors, signage, digital signage, etc.) connected to the position information processing system 400, the common map server 500, the coordinated control device, etc.
[0102] The area control information storage unit 532 stores area control information. The area control information is information for controlling execution of a predetermined application link in response to a predetermined condition being satisfied for a predetermined area (specific area) defined in a map. As an example of the use of the specific area, as shown in Fig. 9(A), a specific part of the second floor of a building BL may be defined as the specific area AR, and when a person enters the specific area AR, the lighting devices in the specific area AR may be turned on. The area control information will be described using such an example. In such an example, depending on the area control information, it is possible to execute application linkage such as "if a person's coordinates CD are plotted relative to a specific area AR based on the location information transmitted from the location information processing system 400-1, turn on the lighting device installed in the specific area."
[0103] The area control information corresponding to the execution of one application cooperation may include, for example, area designation information and a cooperation command, as shown in FIG. 9(B). The area designation information is information that indicates the range of the specific area in the map information. In correspondence with the above example, it indicates the coordinate range of the specific area AR on the second floor of the building BL shown in Figure 9 (A). By specifying a specific area using the area designation information in this manner, it becomes possible to write, as a conditional action of the collaboration procedure information described in Figures 4 to 6, "A person's coordinates CD are plotted relative to the specific area AR (a person has entered the specific area)." The collaboration command may be used to specify collaboration procedure information that uses information about a specific area to describe a conditional operation, and may indicate, for example, a collaboration command ID corresponding to the corresponding collaboration procedure information. Alternatively, information specifying the corresponding collaboration procedure information may be included in the area control information instead of the collaboration command.
[0104] When the area control unit 523 of the common map server 500 executes map processing, it determines whether or not there is any area control information stored in the area control information storage unit 532 that satisfies the condition indicated by the condition information. If there is area control information that satisfies the condition, the area control unit 523 transmits a cooperation command included in the area control information to the cooperation control device 300. The cooperation control unit 321 of the cooperation control device 300 refers to cooperation procedure information corresponding to the received cooperation command, and controls so that the procedure indicated in the referred cooperation procedure information is executed. In the case of the above example, the cooperation control unit 321 controls so that the lighting device installed in the specific area A as the building facility FC is turned on.
[0105] In addition, the area control information may also have content that issues a linkage command to perform a specified application linkage in response to a change, such as when the coordinates of a person that was plotted in a specific area of the map become such that the person moves and is no longer plotted in the specific area.
[0106] 7 shows an example in which the position information processing system 400 and the common map server 500 are combined with the cooperative control device 300 in the building unit management system 21, but the present invention is not limited to this. For example, the building integrated management system 11 may have a configuration in which the cooperative control device 100, the position information processing system 400, and the common map server 500 are combined. Also, the general IoT control system 12 may have a configuration in which the cooperative control device 200, the position information processing system 400, and the common map server 500 are combined.
[0107] 8, an example is given in which the building unit management system 21 corresponding to one building BL is provided with the position information processing system 400 and the common map server 500. In this case, map processing by the common map server 500 is completed for one building BL. However, the map processing of this embodiment may be applicable to a plurality of buildings BL. For example, the map processing may be such that the coordinates of the position information acquired by a predetermined (one or more) position information processing system 400 for each of the multiple buildings BL are integrated into one piece of map information and plotted to generate positioned map information. In this case, the generation of the positioned map information may be executed by, for example, the cooperative control device 100 in the building integrated management system 11. Furthermore, the map processing may generate positioned map information in which the coordinates of position information acquired by (one or more) position information processing systems 400 installed in each building BL, street, etc. are plotted on a map of a town including a plurality of buildings BL. In this case, too, the generation of the positioned map information may be executed by, for example, the cooperative control device 100 in the building integrated management system 11.
[0108] In the coordination system of this embodiment, the coordination control device that executes control for application coordination in devices between the building management system and the general IoT environment 22 may be only the coordination control device 100 among the coordination control devices 100, 200, and 300. In this case, the coordination control device 300 may be configured to perform control limited to application coordination in the building unit management system 21 in which it is included. Alternatively, in this case, the coordination control device 300 may not be provided. In addition, the coordination control device 200 in this case may be limited to a function of managing connections of the general device DV, the network service IS, etc.
[0109] In addition, a program for realizing the functions of the above-mentioned cooperation control devices 100, 200, 300, etc. may be recorded in a computer-readable recording medium, and the program recorded in the recording medium may be read into a computer system and executed to perform the processing of the above-mentioned cooperation control devices 100, 200, 300, etc. Here, "reading a program recorded in a recording medium into a computer system and executing it" includes installing the program into a computer system. The "computer system" here includes hardware such as an OS and peripheral devices. In addition, the "computer system" may include multiple computer devices connected via a network including a communication line. The recording medium also includes a recording medium provided inside or outside and accessible from a distribution server to distribute the program. [Explanation of symbols]
[0110] 10 Cloud environment, 11 Building integrated management system, 12 General IoT control system, 20 Building environment, 21 Building unit management system, 22 General IoT environment, 100 Coordination control device, 101 Communication unit, 102 Control unit, 103 Memory unit, 121 Coordination control unit, 131 Coordination procedure information, 200 Coordination control device, 201 Communication unit, 202 Control unit, 203 Memory unit, 221 Coordination control unit, 231 Coordination procedure information, 300 Coordination control device, 301 Communication unit, 302 Control unit, 303 Memory unit, 321 Coordination control unit, 331 Coordination procedure information, 400 Location information processing system, 500 Common map server
Claims
1. a linkage control device that controls to realize linkage of a predetermined function between an equipment-compatible device, which is a device provided in a building management system that manages equipment in a building managed by a building manager, and a general device, which is a device connected to a network in the building and executes a function corresponding to a predetermined application; The cooperative control device includes: A storage unit that stores linkage procedure information indicating a procedure for realizing linkage of a predetermined function; a cooperation control unit that controls the cooperation of the predetermined functions to be realized based on the cooperation procedure information stored in the storage unit, The collaboration procedure information includes corresponding command information indicating a command requesting a corresponding collaboration, and procedure instruction information indicating an instruction subject, a condition action, an execution subject, and an execution content, and is information for causing the collaboration control unit to execute control so that the device designated as the execution subject executes the process designated as the execution content if the device designated as the instruction subject satisfies the condition action. Collaborative system.
2. The cooperative control device is provided in a building integrated management system that integrates and manages facilities of a plurality of buildings in the building management system. The linkage system according to claim 1 .
3. In the building management system, a building unit management system that manages equipment on a building unit basis further includes an auxiliary linkage control device that controls devices included in the building unit management system so that linkage of predetermined functions is realized. The linkage system according to claim 1 or 2.
4. When the cooperative control device is instructed to execute a plurality of functions that are in a conflicting relationship, the cooperative control device executes a predetermined function among the plurality of functions in priority to the other functions. The linkage system according to claim 1 .
5. The cooperative control device does not accept an instruction to execute one of a plurality of functions that are in a conflicting relationship with each other for a certain period of time from the timing of starting execution of the other function in response to an instruction. The linkage system according to claim 4.
6. When the cooperative control device receives an instruction to execute each of a plurality of functions that are in a conflicting relationship within a predetermined time, the cooperative control device executes a predetermined function among the plurality of functions and controls so as not to execute functions other than the predetermined function. The linkage system according to claim 4.
7. When the cooperative control device receives an instruction to execute each of a plurality of functions that are in a conflicting relationship within a predetermined time, the cooperative control device executes a predetermined function among the plurality of functions, and then controls the execution of a function other than the predetermined function. The linkage system according to claim 4.
8. A plurality of location information processing systems including at least one of the facility-related device and the general device, and acquiring location information indicating the location of a predetermined object corresponding to the building; a map processing unit that is provided as the facility-compatible device or the general device, has map information common to the plurality of position information processing systems, and generates positioned map information in which coordinates indicated by position information acquired by the position information processing system are plotted on the map information. The linkage system according to any one of claims 1 to 7.
9. A coordination control method in a coordination system including a coordination control device, a linkage control step in which the linkage control device performs control so as to realize linkage of a predetermined function between an equipment-compatible device, which is a device provided in a building management system that manages equipment in a building managed by a building manager, and a general device, which is a device connected to a network in the building and executes a function corresponding to a predetermined application, based on linkage procedure information indicating a procedure for realizing linkage of a predetermined function stored in a storage unit; The collaboration procedure information includes corresponding command information indicating a command requesting a corresponding collaboration, and procedure instruction information indicating an instruction subject, a condition action, an execution subject, and an execution content, and is information for causing the collaboration control step to execute control so that the device designated as the execution subject executes the process designated as the execution content if the device designated as the instruction subject satisfies the condition action. Coordinated control methods.
Citation Information
Patent Citations
Content distribution device and content distribution method
JP2015039082A
Between saas data cooperation support system and between saas data cooperation support method
JP2016224578A
Control device, control method, and program
WO2012101762A1
Information processing device, communication device, and linkage control method
WO2019202697A1
