Plant Optimal Operation Planning System

The plant optimal operation planning device addresses the inefficiencies in plants with hierarchical structures by planning startup/stop status and input/output operations, optimizing energy costs and output patterns through operation mode discrimination and pattern constraints.

JP7565894B2Active Publication Date: 2024-10-11MITSUBISHI ELECTRIC CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2021161282
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-10-11
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

Existing plant operation schedule optimization methods fail to consider the input-output relationship during startup and shutdown transitions in plants with hierarchical structures, and they are limited in handling multiple energy outputs, leading to inefficiencies in energy cost management.

Method used

A plant optimal operation planning device that includes operation mode discrimination constraints, output-side and input-side operation pattern constraints, and an optimization calculation unit to plan the startup/stop status and input/output of each plant component equipment, considering the hierarchical structure and chronological operation modes.

Benefits of technology

Enables efficient planning of input and output operations during startup and shutdown transitions in plants with hierarchical structures, optimizing energy costs and output patterns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007565894000079
    Figure 0007565894000079
  • Figure 0007565894000080
    Figure 0007565894000080
  • Figure 0007565894000081
    Figure 0007565894000081
Patent Text Reader

Abstract

To make a plan of a startup / shutdown state and input / output for each of plant constituent installations while considering operation patterns on input and output sides during transition of startup or shutdown matched with a time-series operation mode in a planning period of time, in a plant having a hierarchical structure of plant constituent installations.SOLUTION: A plant optimal-operation planning apparatus 101A, to be applied for a plant having a hierarchical structure of plant constituent installations as a target plant 102, comprises: an operation-mode determination restricting-condition setting section 209 that sets up an operation-mode determination restricting condition; an output-side operation pattern restricting-condition setting section 210 that sets up an output-side operation pattern restricting condition; an input-side operation pattern restricting-condition setting section 211 that sets up an input-side operation pattern restricting condition; and an optimization operating section 213 that makes an optimal-operation plan based on the operation-mode determination restricting condition, the output-side operation pattern restricting condition and the input-side operation pattern restricting condition.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an optimal plant operation planning device. [Background technology]

[0002] In plant operation, reducing the total energy cost is an important issue. To address this issue, research is being conducted on plant operation planning problems, which involves planning the start / stop states and input / output of equipment with the aim of minimizing the total energy cost. In the past, from the perspective of simplifying calculations, operation patterns during start / stop transitions were rarely taken into account. However, with the introduction of the principle of competition in recent power system reforms, it has become an issue to create a model that is closer to reality in order to produce energy efficiently. Therefore, several methods have been proposed for calculating the optimum operation schedule of a plant that takes into account operation patterns during start / stop transitions.

[0003] The plant operation schedule optimization method described in Patent Document 1 discloses a method in which the type of operation mode is included as an integer operation mode variable as one of the independent variables in the operation schedule optimization calculation, a predetermined operation pattern is assigned as an operation constraint condition according to the operation mode variable, and an operation schedule optimization calculation for the controlled plant is performed so that the operation cost for each operation mode or the operation cost when changing modes is minimized within a cost evaluation function. This method makes it possible to optimize the plant operation schedule taking into account the operation pattern during the near future start-up transition or shutdown transition according to the current state of the plant, such as the duration of the previous shutdown.

[0004] In the operational planning method for a thermal power plant described in Non-Patent Document 1, a formulation method using Mixed Integer Linear Programming (MILP) is disclosed that takes into account the operation pattern during the start-up transition or the stop transition by introducing a time-series binary variable for each type of operation mode or a constraint condition that discriminates the time-series operation mode, and a constraint condition that expresses the operation pattern according to the operation mode. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2005-284388 A [Non-patent literature]

[0006] [Non-Patent Document 1] Applied Mechanics and Materials, Vols.672-674, pp.493-498, An MILP Formulation for the Thermal Unit Commitment Problem Considering Start-up and Shut-down Power Trajectories”, Jun Deng, Hua Wei Summary of the Invention [Problem to be solved by the invention]

[0007] The plant operation schedule optimization method disclosed in Patent Document 1 has no constraints for distinguishing between time-series operation modes in the planning period, such as hot start, warm start, or cold start, which are determined by the duration of a prior shutdown, and therefore has difficulty in considering operation patterns during startup or shutdown transitions according to the time-series operation modes in the planning period. Here, hot start refers to an operation mode in which the startup transition period is relatively short, warm start refers to an operation mode in which the startup transition period is longer than that of a hot start, and cold start refers to an operation mode in which the startup transition period is longer than that of a warm start.

[0008] The operation planning method for a thermal power plant disclosed in Non-Patent Document 1 plans the power generation amount, which is the output of the thermal power plant, but does not plan the fuel consumption amount, which is the input of the thermal power plant. Therefore, it is only possible to consider the operation pattern on the output side during startup or shutdown depending on the operation mode of the thermal power plant. A method of determining the operation pattern on the input side using a linear function that expresses the relationship between input and output is generally known. However, since it is difficult to express the relationship between input and output during startup or shutdown of a thermal power plant using a linear function, it is difficult to consider the operation pattern on the input side during startup or shutdown depending on the operation mode of the thermal power plant.

[0009] Furthermore, the methods disclosed in Patent Document 1 and Non-Patent Document 1 are both intended for plants that consume fuel and supply one type of energy, but are difficult to apply to cases where multiple forms of energy, such as electricity and low-pressure steam, are supplied, or to plants having hierarchically configured equipment. Here, a plant having hierarchically configured equipment refers to, for example, a plant in which multiple devices consume fuel to output steam, and other multiple devices consume that steam to supply electricity.

[0010] The present disclosure has been made in consideration of the above-mentioned circumstances, and aims to provide a plant optimal operation planning device that, in a plant having hierarchically configured constituent equipment, plans the startup and shutdown states and input / output for each piece of plant constituent equipment while taking into consideration the operating patterns of the input and output sides during startup transition and shutdown transition in accordance with the time-series operation mode over a planning period. [Means for solving the problem]

[0011] The present disclosure relates to a plant optimal operation planning apparatus, and a plant optimal operation planning apparatus for a target plant having hierarchically configured plant configuration equipment, Contains the startup pattern, either hot start, warm start, or cold start The system includes an operation mode discrimination constraint condition setting unit that sets operation mode discrimination constraint conditions which are constraint conditions for discriminating between operation modes in a time series; an output side operation pattern constraint condition setting unit that sets output side operation pattern constraint conditions which are constraint conditions expressing an output side operation pattern during startup transition and shutdown transition of the target plant; an input side operation pattern constraint condition setting unit that sets input side operation pattern constraint conditions which are constraint conditions expressing an input side operation pattern during startup transition and shutdown transition of the target plant; and an optimization calculation unit that creates an optimal operation plan including startup / shutdown states and input / output plans for each piece of plant constituent equipment of the target plant based on the operation mode discrimination constraint conditions, the output side operation pattern constraint conditions, and the input side operation pattern constraint conditions. Effect of the Invention

[0012] According to the plant optimal operation planning device disclosed herein, in a target plant having hierarchically configured plant constituent equipment, it is possible to plan the startup / shutdown states and input / output plans for each plant constituent equipment while taking into consideration the operation patterns of the input and output sides during startup transition and shutdown transition in accordance with the time-series operation mode over a planning period. [Brief description of the drawings]

[0013] [Figure 1] 1 is a diagram showing an example of a target plant targeted by a plant optimal operation planning device according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of the operation of a boiler. [Diagram 3] FIG. 2 is a diagram showing an example of a hot start of a boiler. [Figure 4] FIG. 2 is a diagram showing an example of a warm start of a boiler. [Diagram 5] FIG. 2 is a diagram showing an example of a cold start of a boiler. [Figure 6] FIG. 1 is a diagram illustrating an example of boiler shutdown. [Figure 7] 1 is a diagram illustrating a functional configuration of a plant optimal operation planning device according to a first embodiment. [Figure 8] FIG. 4 is a diagram showing an example of data on output side operation patterns for different boiler operation modes. [Figure 9] FIG. 4 is a diagram showing an example of data on input side operation patterns for different boiler operation modes. [Figure 10] FIG. 4 is a diagram showing an example of basic data for each operation mode of a boiler. [Figure 11] FIG. 2 is a diagram illustrating an example of demand forecast data. [Figure 12] FIG. 4 is a diagram showing an example of a power supply plan in which plans for power generation and purchased power are integrated for a first turbine and a second turbine. [Figure 13] FIG. 4 is a diagram showing an example of a low-pressure steam supply plan in which plans for low-pressure steam amounts are integrated for a first turbine and a second turbine. [Figure 14] 1 is a diagram illustrating a hardware configuration of a plant optimal operation planning device according to a first embodiment. [Figure 15] 3 is a flowchart showing an operation of the plant optimal operation planning device according to the first embodiment. [Figure 16] FIG. 11 is a diagram illustrating a functional configuration of an optimal plant operation planning device according to a second embodiment. [Figure 17] 10 is a flowchart showing an operation of an optimal plant operation planning device according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Embodiments will be described below with reference to the accompanying drawings. In the following embodiments, detailed features and the like are also shown for the purpose of explaining the technology, but these are examples and not all of them are necessarily essential features for the embodiments to be practicable. The drawings are schematically shown, and for convenience of explanation, omissions or simplifications of configurations are made in the drawings as appropriate. Also, the mutual relationships of the sizes and positions of the configurations shown in different drawings are not necessarily accurately described and can be changed as appropriate. Further, in the descriptions shown below, the same reference numerals are attached to and illustrated for the same components, and their names and functions are also assumed to be the same. Therefore, detailed descriptions thereof may be omitted to avoid duplication. Also, in the descriptions described in the present specification, when a certain component is described as "including", "comprising", or "having", etc., these expressions are not exclusive expressions that exclude the existence of other components unless otherwise specified.

[0015] <A. Embodiment 1> <A-1. Configuration> First, an example of a target plant 102 targeted by the plant optimal operation planning device 101A will be described. FIG. 1 shows an example of the target plant 102. The target plant 102 is configured to include two boilers 11, 12 and two turbine generators 21, 22 (hereinafter, turbines) for supplying electric power and low-pressure steam. Here, the boilers 11, 12 and the turbines 21, 22 are plant configuration equipment that configure the target plant 102. The boilers 11, 12 consume fuel such as city gas to generate high-pressure steam. The high-pressure steam generated by the boilers 11, 12 is collected in a high-pressure steam header. The turbines 21, 22 consume high-pressure steam in the high-pressure steam header to generate low-pressure steam and electric power. The amount of low-pressure steam generated can be adjusted by operating the extraction valves of the turbines 21, 22. When the supply of electric power is insufficient for a reason such as the amount of electric power generated by the turbines 21, 22 being less than the electric power demand, the target plant 102 can receive electric power based on a contract concluded with a retail electric power supplier. When there is an excess supply of low-pressure steam because the amount of low-pressure steam generated by the turbines 21, 22 is greater than the demand for low-pressure steam, the target plant 102 can release the low-pressure steam into the atmosphere. When there is an excess supply of high-pressure steam because the amount of high-pressure steam consumed by the turbines 21, 22 is less than the amount of high-pressure steam generated by the boilers 11, 12, the target plant 102 can release the high-pressure steam into the atmosphere. Note that the release of low-pressure steam and high-pressure steam into the atmosphere is not shown in FIG.

[0016] The operator of the target plant 102 is required to operate the target plant 102 in a way that reduces total energy costs in order to produce energy efficiently, and must operate the target plant 102 by planning the start-up and shutdown states and input / output of the plant's component equipment.

[0017] Fig. 2 shows an example of the operation of boilers 11 and 12, which are plant constituent equipment. In Fig. 2, boilers 11 and 12 go from operating to stopped and then back to operating. The horizontal axis of the graph in Fig. 2 indicates time, and the vertical axis indicates physical quantities. In Fig. 2, the solid line graph indicates the fuel consumption of boilers 11 and 12, and the dashed line graph indicates the amount of high-pressure steam generated by boilers 11 and 12.

[0018] The operation modes of the boilers 11 and 12 are broadly divided into four: operating, transitioning to shutdown, shutting down, and transitioning to startup. Operating is an operation mode in which the boilers 11 and 12 are operated in a range from the minimum input / output to the maximum input / output. Transitioning to shutdown is an operation mode in which the input and output of the boilers 11 and 12 are reduced according to a certain input pattern and output pattern in order to transition the boilers 11 and 12 from operating to shutting down. Shutting down is an operation mode in which the boilers 11 and 12 are stopped with no input or output. Transitioning to startup is an operation mode in which the input and output of the boilers 11 and 12 are increased according to a certain input pattern and output pattern in order to transition the boilers 11 and 12 from shutting down to operating.

[0019] The operation modes of the turbines 21 and 22 are the same as the operation modes of the boilers 11 and 12.

[0020] The start-up transition period can be divided into three operating modes depending on the duration of the previous shutdown: hot start, warm start, and cold start. A hot start is an operating mode in which the start-up transition period is relatively short. A warm start is an operating mode in which the start-up transition period is longer than a hot start. A cold start is an operating mode in which the start-up transition period is longer than a warm start.

[0021] FIG. 3 shows an example of a hot start of boilers 11, 12. The horizontal axis of the graph in FIG. 3 indicates time, and the vertical axis indicates physical quantities. The scale on the horizontal axis represents frames. A frame is a certain period of time. The solid line graph indicates the fuel consumption of boilers 11, 12, and the dashed line graph indicates the amount of high-pressure steam generated by boilers 11, 12. In the case of the hot start shown in FIG. 3, the period during the startup transition is three frames.

[0022] The hot start of the turbines 21 and 22 is similar to the hot start of the boilers 11 and 12.

[0023] Figure 4 shows an example of a warm start of the boilers 11 and 12. The horizontal axis of the graph in Figure 4 indicates time, and the vertical axis indicates physical quantities. The scale on the horizontal axis indicates frames. The solid line graph indicates the fuel consumption of the boilers 11 and 12, and the dashed line graph indicates the amount of high-pressure steam generated by the boilers 11 and 12. In the case of the warm start shown in Figure 4, the period during the startup transition is four frames.

[0024] A warm start of the turbines 21,22 is similar to a warm start of the boilers 11,12.

[0025] Figure 5 shows an example of a cold start of the boilers 11 and 12. The horizontal axis of the graph in Figure 5 indicates time, and the vertical axis indicates physical quantities. The scale on the horizontal axis indicates frames. The solid line graph indicates the fuel consumption of the boilers 11 and 12, and the dashed line graph indicates the amount of high-pressure steam generated by the boilers 11 and 12. In the case of the cold start shown in Figure 5, the period during the startup transition is five frames.

[0026] The cold start of the turbines 21,22 is similar to the cold start of the boilers 11,12.

[0027] The operation modes during the transition to shutdown may be classified according to the duration of the previous operation and the transition to startup. However, the operation modes during the transition to shutdown are not classified according to the duration of the previous operation and the transition to startup here. Shutdown is an operation mode during the transition to shutdown.

[0028] Figure 6 shows an example of a shutdown of boilers 11 and 12. The horizontal axis of the graph in Figure 6 indicates time, and the vertical axis indicates physical quantity. The scale on the horizontal axis indicates frames. The solid line graph indicates the fuel consumption of boilers 11 and 12, and the dashed line graph indicates the amount of high-pressure steam generated by boilers 11 and 12. In the case of the shutdown shown in Figure 6, the period during the transition to shutdown is three frames.

[0029] Shutting down the turbines 21,22 is similar to shutting down the boilers 11,12.

[0030] The above is an example of the target plant 102 targeted by the plant optimal operation planning system 101A.

[0031] Next, an example of the functional configuration of the optimal plant operation planning device 101A will be described.

[0032] 7 is a functional configuration diagram of the plant optimal operation planning device 101 A. The plant optimal operation planning device 101 A is configured to include an output side operation pattern database (hereinafter, database is referred to as DB) 201, an input side operation pattern DB 202, an equipment characteristic DB 203, a demand forecast DB 204, a contract information DB 205, a plan result DB 206, an actual value DB 207, a basic constraint condition setting unit 208, an operation mode discrimination constraint condition setting unit 209, an output side operation pattern constraint condition setting unit 210, an input side operation pattern constraint condition setting unit 211, an evaluation function setting unit 212, an optimization calculation unit 213, and a data input / output unit 214.

[0033] The output side operation pattern DB 201 holds data on the output side operation pattern for each operation mode of each piece of plant constituent equipment.

[0034] The input side operation pattern DB 202 holds data on the input side operation pattern for each operation mode of each piece of plant constituent equipment.

[0035] The equipment characteristic DB203 holds basic data for each plant component equipment operation mode, data on input / output characteristics during operation for each plant component equipment, data on the change rate limit for each plant component equipment, data on maximum input / output during operation for each plant component equipment, data on minimum input / output for each plant component equipment, data on upper and lower limits of the turbine low pressure steam extraction amount, data on the period during the transition to startup for each operation mode, and data on the period during the transition to shutdown for each operation mode.

[0036] The demand forecast DB 204 holds data on predicted values ​​of electric power demand and data on predicted values ​​of low-pressure steam demand.

[0037] The contract information DB 205 holds data on the contracted power, data on the unit price of electricity based on the contract concluded with the retail electricity supplier, and data on the unit price of city gas.

[0038] The plan result DB 206 holds data of the optimal operation plan result of the plant. Specifically, the plan result DB 206 holds data of the plan of the power generation amount for each of the turbines 21 and 22, data of the plan of the low-pressure steam generation amount for each of the turbines 21 and 22, data of the plan of the high-pressure steam consumption amount for each of the turbines 21 and 22, data of the plan of the high-pressure steam generation amount for each of the boilers 11 and 12, data of the plan of the fuel consumption amount for each of the boilers 11 and 12, data of the plan of the start / stop state flag for each of the plant constituent facilities, data of the plan of the purchased power, and data of the plan of the fuel consumption.

[0039] The actual value DB207 holds data on past actual values ​​of high-pressure steam consumption for each turbine 21, 22, data on past actual values ​​of fuel consumption for each boiler 11, 12, data on past actual values ​​of the start-up / shutdown state flag for each plant component equipment, data on past actual values ​​of the start-up flag for each plant component equipment, data on past actual values ​​of the start-up flag (hot start) for each plant component equipment, data on past actual values ​​of the start-up flag (warm start) for each plant component equipment, data on past actual values ​​of the start-up flag (cold start) for each plant component equipment, and data on past actual values ​​of the immediately after shutdown flag for each plant component equipment.

[0040] The basic constraint condition setting unit 208 sets input change rate constraints for each plant component equipment, upper and lower limit constraints on output during operation, upper and lower limit constraints on input during operation, electricity supply and demand balance constraints, high-pressure steam supply and demand balance constraints, low-pressure steam supply and demand balance constraints, and upper and lower limit constraints on variables.

[0041] The operation mode discrimination constraint condition setting unit 209 sets a constraint expressing the relationship between the startup flag and the immediately after stopping flag, a constraint expressing the relationship between the startup flag, the immediately after stopping flag, and the operating flag, and a constraint expressing the selection of a startup pattern, i.e., which startup pattern is to be selected from hot start, warm start, or cold start.

[0042] The output side operation pattern constraint condition setting unit 210 sets output side operation pattern constraints during the transition to start-up and the transition to stop.

[0043] The input side operation pattern constraint condition setting unit 211 sets input side operation pattern constraints during the transition to start-up and the transition to stop.

[0044] The evaluation function setting unit 212 sets the evaluation function.

[0045] The optimization calculation unit 213 solves the optimal operation plan problem for the target plant 102 and obtains the optimal operation plan result for the target plant 102 .

[0046] The data input / output unit 214 displays the data held in the output side operation pattern DB201, the input side operation pattern DB202, the equipment characteristics DB203, the demand forecast DB204, the contract information DB205, the planning results DB206, and the actual value DB207, and sets the data held in the output side operation pattern DB201, the input side operation pattern DB202, the equipment characteristics DB203, the demand forecast DB204, and the contract information DB205 that are necessary to formulate an optimal operation plan for the target plant 102.

[0047] One plant optimum operation planning device 101A is installed for each demand site. The demand site includes the electricity consumption site and refers to the entire premises where electricity is consumed.

[0048] The above is a description of an example of the functional configuration of the plant optimal operation planning device 101A.

[0049] Next, an example of data held in various DBs of the plant optimum operation planning device 101A will be described.

[0050] FIG. 8 shows an example of data of output side operation patterns for each operation mode of a boiler, which is a plant component equipment. The data shown in FIG. 8 is held in the output side operation pattern DB 201. In FIG. 8, outputs 1, 2, 3, 4, and 5 respectively represent the first, second, third, fourth, and fifth frames during startup transition or shutdown transition. In the case of a hot start, the amount of high-pressure steam, which is the output of the boiler in the first frame during startup transition, is 0.0%. 0.0% means that the amount of high-pressure steam is 0.0% when the amount of high-pressure steam when operated at rated is 100%. Similarly, in the case of a hot start, the amount of high-pressure steam in the second and third frames during startup transition is 25.0% and 50.0%, respectively. In the case of a warm start, the amount of high-pressure steam in the first, second, third, and fourth frames during startup transition is 0.0%, 16.7%, 33.3%, and 50.0%, respectively. In the case of a cold start, the amount of high-pressure steam in the first, second, third, fourth, and fifth frames during the start-up transition is 0.0%, 12.5%, 25.0%, 37.5%, and 50.0%, respectively. In the case of a shutdown, the amount of high-pressure steam in the first, second, and third frames during the stop transition is 50.0%, 25.0%, and 0.0%, respectively.

[0051] The data on the output side operation pattern for each turbine operation mode is similar to the data on the output side operation pattern for each boiler operation mode.

[0052] FIG. 9 is an example of data of input side operation patterns for each operation mode of a boiler, which is a plant component equipment. The data shown in FIG. 9 is held in the input side operation pattern DB 202. In FIG. 9, inputs 1, 2, 3, 4, and 5 respectively represent the first, second, third, fourth, and fifth frames during startup transition or shutdown transition. In the case of a hot start, the fuel consumption, which is the input of the boiler in the first frame during startup transition, is 16.7%. 16.7% means that the fuel consumption is 16.7% when the fuel consumption when operated at rated is 100%. Similarly, in the case of a hot start, the fuel consumption in the second and third frames during startup transition is 33.3% and 50.0%, respectively. In the case of a warm start, the fuel consumption in the first, second, third, and fourth frames during startup transition is 12.5%, 25.0%, 37.5%, and 50.0%, respectively. In the case of a cold start, the fuel consumption during the start-up transition in the first, second, third, fourth, and fifth frames is 10.0%, 20.0%, 30.0%, 40.0%, and 50.0%, respectively. In the case of a shutdown, the fuel consumption during the stop-down transition in the first, second, and third frames is 50.0%, 33.3%, and 16.7%, respectively.

[0053] For a certain plant component equipment, the period (number of frames) of the data of the input side operation pattern by operation mode, the period (number of frames) of the data of the output side operation pattern by operation mode, the period during the transition to startup by operation mode, and the period during the transition to shutdown by operation mode in the equipment characteristic DB 203 are the same. For example, in the examples of Figures 8 and 9, the period of hot start is three frames, so the period during the transition to startup of hot start in the equipment characteristic DB 203 is also three frames.

[0054] The data on the input side operation pattern for each turbine operation mode is similar to the data on the input side operation pattern for each boiler operation mode.

[0055] FIG. 10 is an example of basic data for each operation mode of a boiler, which is a plant component equipment. The basic data shown in FIG. 10 is held in the equipment characteristic DB 203. A hot start means an operation mode selected at startup when the duration of a prior stop is 1 frame or more and less than 3 frames. A warm start means an operation mode selected at startup when the duration of a prior stop is 3 frames or more and less than 5 frames. A cold start means an operation mode selected at startup when the duration of a prior stop is 5 frames or more. A shutdown means an operation mode selected at shutdown when the duration of a prior operation and a transition to startup is 1 frame or more. The startup (shutdown) cost is the cost at startup or shutdown. The startup cost of a hot start is 10,000 yen. The startup cost of a warm start is 20,000 yen. The startup cost of a cold start is 30,000 yen. The shutdown cost of a shutdown is 20,000 yen.

[0056] The basic data for each operation mode of the turbine is similar to the basic data for each operation mode of the boiler.

[0057] FIG. 11 is an example of demand forecast data. The demand forecast data is held in the demand forecast DB 204. The demand forecast data in FIG. 11 is data of predicted values ​​of the electric power demand and low-pressure steam demand of the target plant 102. The electric power demand predicted values ​​are 100 kWh / h, 110 kWh / h, 120 kWh / h, 130 kWh / h, 125 kWh / h, and 120 kWh / h in the first, second, third, fourth, fifth, and sixth frames in the near future, respectively. The low-pressure steam demand predicted values ​​are 60 MJ / h, 65 MJ / h, 70 MJ / h, 60 MJ / h, 50 MJ / h, and 40 MJ / h in the first, second, third, fourth, fifth, and sixth frames in the near future, respectively.

[0058] Fig. 12 shows an example of a power supply plan that integrates plans for power generation and purchased power for turbines 21, 22. The data in Fig. 12 is held in the plan result DB 206. The horizontal axis of the graph in Fig. 12 indicates time, and the vertical axis indicates the amount of power. The satin hatching indicates the amount of purchased power, the cross hatching indicates the amount of power generated by turbine 21 (referred to as the first turbine), and the diagonal hatching indicates the amount of power generated by turbine 22 (referred to as the second turbine). For example, in the first frame in the near future, the amount of purchased power is 20 kWh / h, the amount of power generated by the first turbine is 40 kWh / h, and the amount of power generated by the second turbine is 40 kWh / h.

[0059] Fig. 13 shows an example of a low-pressure steam supply plan in which plans for low-pressure steam volumes are integrated for turbines 21 and 22. The data in Fig. 13 is held in the plan result DB 206. The horizontal axis of the graph in Fig. 13 indicates time, and the vertical axis indicates low-pressure steam volume. The cross hatching indicates the low-pressure steam volume of turbine 21 (referred to as the first turbine), and the diagonal hatching indicates the low-pressure steam volume of turbine 22 (referred to as the second turbine). For example, for the first frame in the near future, the low-pressure steam volume of the first turbine is 30 MJ / h, and the low-pressure steam volume of the second turbine is 30 MJ / h.

[0060] The above are examples of data held in the output side operation pattern DB 201, the input side operation pattern DB 202, the facility characteristic DB 203, the demand forecast DB 204, and the planning result DB 206 of the plant optimal operation planning device 101A.

[0061] Next, an example of a hardware configuration of the plant optimum operation planning apparatus 101A will be described.

[0062] FIG. 14 is a hardware configuration diagram of the plant optimal operation planning device 101A. The plant optimal operation planning device 101A includes an input device 301, an output device 302, a CPU (Central Processing Unit) 303, a main memory device 304, a secondary storage device 305, and a communication device 306. The communication device 306 is for connecting the plant optimal operation planning device 101A to the communication network 307. The data input / output unit 214 in FIG. 7 is realized by the input device 301 and the output device 302. The output-side operation pattern DB 201, the input-side operation pattern DB 202, the facility characteristic DB 203, the demand prediction DB 204, the contract information DB 205, the plan result DB 206, and the actual value DB 207 in FIG. 7 are realized by the main memory device 304 or the secondary storage device 305. The basic constraint condition setting unit 208, the operation mode discrimination constraint condition setting unit 209, the output-side operation pattern constraint condition setting unit 210, the input-side operation pattern constraint condition setting unit 211, the evaluation function setting unit 212, and the optimization calculation unit 213 in FIG. 7 are realized by the CPU 303 executing a software program stored in the main memory device 304 or the secondary storage device 305. The acquisition of information from the target plant 102 in FIG. 7 is realized by the communication device 306.

[0063] <A-2. Operation> Define each value used in the optimal operation planning problem of the target plant 102 as follows. Note that values with lowercase initials are variables, and values with uppercase initials are constants or functions. (Set) [Common system]

[0064] [Number]

[0065] [Boiler system]

[0066] [Number]

[0067] [Turbine system]

[0068]

number

[0069] (variable) [Boiler system]

[0070]

number

[0071]

number

[0072] [Turbine system]

[0073]

number

[0074]

number

[0075] [others]

[0076]

number

[0077] (Constants and Functions) [Boiler system]

[0078]

number

[0079]

number

[0080]

number

[0081]

number

[0082]

number

[0083]

number

[0084]

number

[0085]

number

[0086]

number

[0087] [Turbine system]

[0088]

number

[0089]

number

[0090]

number

[0091]

number

[0092]

number

[0093]

number

[0094] [others]

[0095]

number

[0096] If the time of each value, the past time, the set of times during the period of transition to startup, or the set of times during the period of transition to shutdown is outside the range of the defined set, it means that the value does not exist. The above is the definition of each value used in the optimal operation planning problem of the plant.

[0097] 15 is a flowchart showing the operation of the plant optimal operation planning device 101A. First, the basic constraint condition setting unit 208 sets basic constraint conditions (step S101). The basic constraint condition setting unit 208 acquires data required for setting constraint conditions from the equipment characteristic DB 203 and the performance value DB 207, and sets change rate constraints of inputs for each piece of plant equipment shown in the following formulas (1) to (4).

[0098]

number

[0099]

number

[0100]

number

[0101]

number

[0102] Furthermore, the basic constraint condition setting unit 208 acquires data necessary for setting constraint conditions from the facility characteristics DB 203, and sets upper and lower limit constraints on output during operation shown in the following equations (5) and (6).

[0103]

number

[0104]

number

[0105] Furthermore, the basic constraint condition setting unit 208 acquires data necessary for setting constraint conditions from the equipment characteristic DB 203, and sets the input upper and lower limit constraints during operation shown in the following equations (7) and (8).

[0106]

number

[0107]

number

[0108] Furthermore, the basic constraint condition setting unit 208 sets the power supply and demand balance constraint shown in the following equation (9).

[0109]

number

[0110] Moreover, the basic constraint condition setting unit 208 sets the high-pressure steam supply and demand balance constraint shown in the following equation (10).

[0111]

number

[0112] Moreover, the basic constraint condition setting unit 208 sets the low-pressure steam supply and demand balance constraint shown in the following equation (11).

[0113]

number

[0114] Furthermore, the basic constraint condition setting unit 208 acquires data required for setting constraint conditions from the facility characteristics DB 203 and the contract information DB 205, and sets upper and lower limit constraints on variables shown in the following equations (12) and (13).

[0115]

number

[0116]

number

[0117] Next, the operation mode discrimination constraint condition setting unit 209 sets the operation mode discrimination constraint condition (step S102). Specifically, the operation mode discrimination constraint condition setting unit 209 acquires data necessary for setting the constraint condition from the performance value DB 207, and sets the constraint expressing the relationship between the start-up start flag and the immediately-after-shutdown flag shown in equations (14) to (19).

[0118]

number

[0119]

number

[0120]

number

[0121]

number

[0122]

number

[0123]

number

[0124] In addition, the operation mode discrimination constraint condition setting unit 209 acquires data necessary for setting constraint conditions from the equipment characteristic DB 203 and the actual value DB 207, and sets constraints expressing the relationship between the startup start flag, the immediately after shutdown flag, and the operating flag as shown in the following equations (20) to (23).

[0125] In addition, in equation (21),

[0126]

number

[0127] A set of times defined by

[0128]

number

[0129] If it is outside the range, it means that the value does not exist.

[0130]

number

[0131] A set of past times defined by

[0132]

number

[0133] Anything outside this range means the value is not present, and similarly for each of the other values.

[0134]

number

[0135]

number

[0136]

number

[0137]

number

[0138] Furthermore, the operation mode discrimination constraint condition setting unit 209 acquires data necessary for setting constraint conditions from the equipment characteristic DB 203 and the performance value DB 207, and sets constraints expressing the selection of the startup pattern shown in equations (24) to (41). In this manner, the operation mode discrimination constraint conditions express the constraint expressing the relationship between the startup flag and the immediately after shutdown flag of the target plant 102, the constraint expressing the relationship between the startup flag, the immediately after shutdown flag, and the operating flag of the target plant 102, and the constraint expressing the selection of the startup pattern of the target plant 102, as inequality constraints or equality constraints including time-series binary variables for each operation mode of the target plant 102.

[0139]

number

[0140]

number

[0141]

number

[0142]

number

[0143]

number

[0144]

number

[0145]

number

[0146]

number

[0147]

number

[0148]

number

[0149]

number

[0150]

number

[0151]

number

[0152]

number

[0153]

number

[0154]

number

[0155]

number

[0156]

number

[0157] Next, the output side operation pattern constraint condition setting unit 210 acquires data necessary for setting constraint conditions from the output side operation pattern DB 201, the equipment characteristic DB 203, and the performance value DB 207, and sets the output side operation pattern constraint conditions shown in the following equations (42) to (45) (step S103). In this way, the output side operation pattern constraint conditions are expressed by equality constraints including time-series binary variables for each operation mode of the target plant and data on the output side operation pattern for each operation mode of the target plant.

[0158]

number

[0159]

number

[0160]

number

[0161]

number

[0162] Next, the input side operation pattern constraint condition setting unit 211 acquires data necessary for setting constraint conditions from the input side operation pattern DB 202, the equipment characteristic DB 203, and the performance value DB 207, and sets the output side operation pattern constraints shown in equations (46) to (49). In this way, the input side operation pattern constraint conditions are expressed as equality constraints including time-series binary variables for each operation mode of the target plant and data on the input side operation pattern for each operation mode of the target plant.

[0163]

number

[0164]

number

[0165]

number

[0166]

number

[0167] Next, the evaluation function setting unit 212 acquires data necessary for setting the evaluation function from the equipment characteristic DB 203 and the contract information DB 205, and sets the evaluation function shown in the following formula (50).

[0168]

Number

[0169] Next, the optimization calculation unit 213 solves the optimal operation planning problem of the target plant 102 that minimizes the evaluation function set by the evaluation function setting unit 212 under the constraint conditions set by the basic constraint condition setting unit 208, the operation mode discrimination constraint condition setting unit 209, the output-side operation pattern constraint condition setting unit 210, and the input-side operation pattern constraint condition setting unit 211, using a solver that can solve a mixed-integer linear programming problem (MILP), to obtain the optimal operation planning result of the target plant 102 (step S106).

[0170] Finally, the optimization calculation unit 213 writes into the plan result DB206 the data of the power generation amount plan for each of the turbines 21, 22, which is the optimal operation plan result data of the target plant 102, the data of the low-pressure steam generation amount plan for each of the turbines 21, 22, the data of the high-pressure steam consumption amount plan for each of the turbines 21, 22, the data of the high-pressure steam generation amount plan for each of the boilers 11, 12, the data of the fuel consumption amount plan for each of the boilers 11, 12, the data of the start-stop state flag plan for each of the plant configuration facilities, the data of the purchased power plan, and the data of the fuel consumption plan.

[0171] <A-3. Effect> The plant optimal operation planning device 101A according to Embodiment 1 targets a plant 102 having hierarchically configured plant constituent facilities. The plant optimal operation planning device 101A includes an operation mode discrimination constraint condition setting unit 209 that sets operation mode discrimination constraint conditions, which are constraint conditions for discriminating the time-series operation modes of the target plant; an output-side operation pattern constraint condition setting unit 210 that sets output-side operation pattern constraint conditions, which are constraint conditions for expressing the output-side operation patterns during startup transition and shutdown transition of the target plant 102; an input-side operation pattern constraint condition setting unit 211 that sets input-side operation pattern constraint conditions, which are constraint conditions for expressing the input-side operation patterns during startup transition and shutdown transition of the target plant 102; and an optimization calculation unit 213 that formulates an optimal operation plan including startup / shutdown states and input / output plans for each plant constituent facility of the target plant 102 based on the operation mode discrimination constraint conditions, the output-side operation pattern constraint conditions, and the input-side operation pattern constraint conditions. Therefore, according to the plant optimal operation planning device 101A, in a plant having hierarchically configured plant constituent facilities, an optimal operation plan for the plant can be formulated while considering the input-side and output-side operation patterns during startup transition and shutdown transition according to the time-series operation modes during the planned period, and formulating startup / shutdown states and input / output plans for each plant constituent facility.

[0172] <B. Embodiment 2> In Embodiment 2, a plant optimal operation planning device 101B will be described, which targets the plant shown in FIG. 1 as the target plant 102. In the following description, components similar to those described in the above-described embodiment will be denoted by the same reference numerals and illustrated, and detailed descriptions thereof will be omitted as appropriate.

[0173] <B-1. Configuration> FIG. 16 is a functional configuration diagram of the plant optimal operation planning device 101B. The plant optimal operation planning device 101B has the same configuration as the plant optimal operation planning device 101A of Embodiment 1.

[0174] The optimization calculation unit 213 solves the optimal operation planning problem of the target plant 102, obtains the optimal operation planning result of the target plant 102, and transmits the optimal operation planning result of the target plant 102 in the near future to the plant control device 103.

[0175] The plant control device 103 is a device that controls the target plant 102.

[0176] <B-2. Operation> FIG. 17 is a flowchart showing the operation of the plant optimal operation planning device 101B. Steps S101 to S107 in the flowchart of FIG. 17 are the same as steps S101 to S107 in the flowchart of FIG. 15, so the description is omitted.

[0177] After step S107, the optimization calculation unit 213 transmits the planned data of the power generation amount for each turbine, the planned data of the low-pressure steam generation amount for each turbine, the planned data of the high-pressure steam consumption amount for each turbine, the planned data of the high-pressure steam generation amount for each boiler, and the planned data of the fuel consumption amount for each boiler to the plant control device 103 as the planned results (control target values) in the near future (step S108).

[0178] <B-3. Effect> The plant optimal operation planning device 101B of the second embodiment transmits the optimal operation plan of the target plant 102 formulated by the optimization calculation unit 213 to the plant control device 103 that controls the target plant 102. Therefore, according to the plant optimal operation planning device 101B, in addition to the effects of the first embodiment, the target plant 102 can be controlled based on the optimal operation planning result of the target plant 102.

[0179] It should be noted that the respective embodiments can be freely combined, or the respective embodiments can be appropriately modified or omitted.

Description of Reference Numerals

[0180] 11,12 boiler, 21,22 turbine generator, 101A,101B plant optimal operation planning device, 102 target plant, 103 plant control device, 208 basic constraint condition setting unit, 209 operation mode discrimination constraint condition setting unit, 210 output side operation pattern constraint condition setting unit, 211 input side operation pattern constraint condition setting unit, 212 evaluation function setting unit, 213 optimization calculation unit, 214 data input / output unit, 301 input device, 302 output device, 303 CPU, 304 main memory device, 305 secondary memory device, 306 communication equipment, 307 communication network, 201 output side operation pattern DB, 202 input side operation pattern DB, 203 equipment characteristic DB, 204 demand forecast DB, 205 contract information DB, 206 planning result DB, 207 actual value DB.

Claims

1. A plant operation optimum planning device for a plant having hierarchically configured plant configuration equipment, an operation mode discrimination constraint condition setting unit that sets an operation mode discrimination constraint condition, which is a constraint condition for discriminating a time-series operation mode including any one of a hot start, a warm start, and a cold start start pattern of the target plant; an output side operation pattern constraint condition setting unit that sets an output side operation pattern constraint condition which is a constraint condition expressing an output side operation pattern during a start-up transition and a stop transition of the target plant; an input side operation pattern constraint condition setting unit that sets an input side operation pattern constraint condition which is a constraint condition expressing an input side operation pattern during a start-up transition and a stop transition of the target plant; an optimization calculation unit that develops an optimal operation plan including a start-up / shutdown state and an input / output plan for each of the plant constituent facilities of the target plant based on the operation mode discrimination constraint condition, the output side operation pattern constraint condition, and the input side operation pattern constraint condition; Optimal plant operation planning device.

2. The driving mode discrimination constraint condition is: A constraint expressing a relationship between a start-up start flag and an immediately-shutdown flag of the target plant; A constraint expressing a relationship between a start-up start flag, a just-shutdown flag, and an operating flag of the target plant; A constraint expressing a selection of a start-up pattern of the target plant. The operation mode of the target plant is expressed by an inequality constraint or an equality constraint including a time-series binary variable for each operation mode of the target plant.

2. The plant optimum operation planning system according to claim 1.

3. The output side operation pattern constraint condition is expressed by an equality constraint including a time series binary variable for each operation mode of the target plant and data on the output side operation pattern for each operation mode of the target plant.

3. The plant optimum operation planning device according to claim 1 or 2.

4. the input side operation pattern constraint condition is expressed by an equality constraint including a time series binary variable for each operation mode of the target plant and input side operation pattern data for each operation mode of the target plant; The plant optimum operation planning device according to any one of claims 1 to 3.

5. Transmitting the optimal operation plan for the target plant formulated by the optimization calculation unit to a plant control device that controls the target plant. The plant optimum operation planning device according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Method and device for operating plant

    JP1994236202A

  • Method and system for optimizing plant operation schedule

    JP2005284388A