Information processing system, information processing device, and information processing program

The information processing system automates the collection and analysis of operational and environmental data to efficiently detect and respond to abnormalities in power distribution systems, improving disaster response by reducing costs and enhancing efficiency.

JP7566646B2Active Publication Date: 2024-10-15KK TOSHIBA
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021007097
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-20
Publication Date
2024-10-15
Estimated Expiration
2041-01-20

AI Technical Summary

Technical Problem

Conventional information collection methods for abnormalities in power distribution systems during disasters are inefficient, requiring manual notification or inquiry, which can lead to delays and inefficiencies in addressing facility maintenance needs.

Method used

An information processing system that includes a storage unit for operational and environmental data, a determination unit to identify abnormalities, and a communication network to automatically collect and analyze data from monitored devices, enabling rapid detection and response to facility issues.

Benefits of technology

The system enables efficient and automated collection of operational and environmental data to quickly identify and respond to abnormalities, reducing costs and enhancing disaster response efficiency by providing timely countermeasures and resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007566646000001
    Figure 0007566646000001
  • Figure 0007566646000002
    Figure 0007566646000002
  • Figure 0007566646000003
    Figure 0007566646000003
Patent Text Reader

Abstract

To provide an information processing system capable of handling information collection about abnormality of a monitoring object device such as a power receiving and transforming system of a facility more efficiently than a conventional one at a maintenance base side, an information management server and an information processing program.SOLUTION: An information processing system includes at least one monitoring object device provided in a facility, a monitoring device for acquiring operation information representing an operation state about at least one monitoring object device and environment information being information on an environment in which the at least one monitoring object device is provided, and an information management server for determining whether abnormality occurs or whether there is a possibility that abnormality occurs in at least one monitoring object device on the basis of the operation information and the environment information acquired from the monitoring device.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The embodiment of the present invention relates to an information processing system, Processing Equipment and information processing programs. [Background technology]

[0002] Conventionally, when an abnormality occurs in a facility's power receiving and transforming system due to a disaster such as heavy rain, flood, typhoon, or lightning, in order for a maintenance worker at a maintenance base to collect information about the abnormality, the maintenance worker must be notified by the facility manager that an abnormality has occurred, or the maintenance base must inquire of the facility manager whether or not an abnormality has occurred. For this reason, conventional information collection methods when an abnormality occurs can be inefficient. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-27519 A Summary of the Invention [Problem to be solved by the invention]

[0004] In order to solve such problems, the present invention provides an information processing system and an information processing method that can collect and deal with information on abnormalities in monitored devices such as a facility's power receiving and transforming system more efficiently than ever before, for example, at a maintenance base. Processing Equipment and an information processing program. [Means for solving the problem]

[0005] An information processing system according to an embodiment includes a memory unit that stores status information representing the status of a monitored device and external information related to the environment in which the monitored device is installed, and a determination unit that determines an abnormality in the operation of the monitored device from the status information stored in the memory unit and the external information. [Brief description of the drawings]

[0006] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of an information processing system according to an embodiment. [Diagram 2] FIG. 2 is a block diagram showing an example of the configuration of the monitored device. [Diagram 3] FIG. 3 is a block diagram illustrating an example of the configuration of a monitoring device. [Figure 4] FIG. 4 is a diagram showing an example of the weather information management table. [Diagram 5] FIG. 5 is a diagram showing an example of the disaster information management table. [Figure 6] FIG. 6 is a diagram showing an example of the disaster details management table. [Figure 7] FIG. 7 is a block diagram showing an example of the configuration of an information management server as an information processing device according to the embodiment. [Figure 8] FIG. 8 is a diagram showing an example of the first handling information management table. [Figure 9] FIG. 9 is a diagram showing an example of the second handling information management table. [Figure 10] FIG. 10 is a diagram showing an example of the monitoring target device management table. [Figure 11] FIG. 11 is a block diagram showing an example of the configuration of a maintenance-side information processing device. [Figure 12] FIG. 12 is a flowchart showing the flow of processing executed by the information processing system according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0007] Hereinafter, an information processing system and an information Processing Equipment An embodiment of the information processing program will be described in detail.

[0008] 1 is a configuration diagram of an information processing system S according to an embodiment. The information processing system S includes a plurality of monitored devices 10-1 to 10-N and a plurality of monitoring devices 20-1 to 20-N provided at each facility (site), an information management server 15 as an information processing device according to the embodiment, and a maintenance-side information processing device 25 provided at a maintenance company. The information processing system S may further include a plurality of facility-side information processing devices 26-1 to 26-N, which are computers, mobile phones, smartphones, tablet computers, etc., managed by each facility.

[0009] The branch numbers of the monitored device and the monitoring device indicate the numbers of the facilities in which they are installed. For example, the monitored device 10-1 and the monitoring device 20-1 are installed in the facility SI1. In the following description, when the multiple monitored devices 10-1 to 10-N are not differentiated from each other, they are simply referred to as the monitored device 10. When the multiple monitoring devices 20-1 to 20-N are not differentiated from each other, they are simply referred to as the monitoring device 20. When the multiple facilities SI1 to SIN are not differentiated from each other, they are simply referred to as the facility SI. When the multiple facility side information processing devices 26-1 to 26-N are not differentiated from each other, they are simply referred to as the facility side information processing device 26.

[0010] The information management server 15 is installed outside the facility SI where the monitored device 10 is installed. The information management server 15 can also be installed in, for example, a maintenance facility. In this embodiment, for the sake of concrete explanation, it is assumed that the information management server 15 is installed in a predetermined remote location outside the facility SI where the monitored device 10 is installed and the maintenance facility.

[0011] The monitoring device 20 and the monitored device 10 are communicatively connected to each other via a communication network such as a LAN (Local Area Network). The information management server 15, the monitoring device 20, and the maintenance side information processing device 25 are communicatively connected to each other via a communication network such as the Internet.

[0012] The monitored device 10 is a substation equipment, a power supply equipment, an emergency generator, etc., installed in a facility. The monitored device 10 includes, for example, a metal rectangular parallelepiped housing, and power devices such as a switch, a disconnector, and a transformer installed in the housing. For the sake of simplicity, FIG. 1 illustrates a case in which one monitored device 10 is installed in each facility. However, there are also cases in which a plurality of monitored devices 10, including substation equipment, an emergency generator, etc., are installed in each facility SI.

[0013] Fig. 2 is a diagram showing an example of the configuration of the monitored device 10. As shown in Fig. 2, the monitored device 10 includes a first acquisition unit 10a, a first storage unit 10b, and a first transmission unit 10c.

[0014] The first acquisition unit 10a acquires operation information of the monitored device 10 successively.

[0015] Here, the operation information is information for monitoring the operation state of the monitored device 10, and includes, for example, at least one of the current value, voltage value, power value, the presence or absence of a fault (e.g., short circuit), operation time, device temperature, etc. of the monitored device 10. The operation information also includes information for identifying the monitored device 10 (e.g., panel information) and time information when the current value, etc. was acquired.

[0016] The first storage unit 10b sequentially stores the operation information of the monitored device 10 acquired by the first acquisition unit 10a.

[0017] The first transmission unit 10c sequentially transmits the operation information stored in the first storage unit 10b to the monitoring device 20. Note that the monitored device 10 may not have the first storage unit 10b, and the first transmission unit 10c may sequentially transmit the operation information acquired by the first acquisition unit 10a to the monitoring device 20.

[0018] The monitoring device 20 monitors the operating status of the monitored device 10. The monitoring device 20 is, for example, a computer equipped with a CPU (Central Processing Unit) as a control circuit, a communication interface, an HDD (Hard Disk Drive) as a storage circuit, a ROM (Read Only Memory), a RAM (Read Access Memory), a flash memory or an SSD (Solid State Drive), a display, an input circuit, and the like.

[0019] Fig. 3 is a diagram showing an example of the configuration of the monitoring device 20. As shown in Fig. 3, the monitoring device 20 includes a second acquisition unit 20a, a second storage unit 20b, a second transmission unit 20c, and an information processing unit 20d. Each component of the monitoring device 20 can be realized by starting a dedicated program stored in the second storage unit 20b and causing software and hardware to work together.

[0020] The second acquisition unit 20a sequentially acquires the operation information transmitted by the first transmission unit 10c of the monitored device 10. In addition, the second acquisition unit 20a sequentially acquires environmental information related to the environment in which the monitored device 10 is installed.

[0021] Here, the environmental information is information for monitoring the state of the environment in which the monitored device 10 is installed, and includes at least one of the following: weather in the area where the facility in which the monitored device 10 is installed is located, temperature and humidity in the area, wind speed and precipitation around the facility in which the monitored device 10 is installed, video (image data) around the facility in which the monitored device 10 is installed, and video (image data) of the room in which the monitored device 10 is installed (e.g., an electrical room). The environmental information also includes information for identifying which monitored device 10 the information is about (e.g., panel information) and time information. In addition, if the monitored device 10 is provided with a separate sensor for monitoring the operating state, for example, the environmental information may also include information detected by the sensor. In addition, if a separate sensor for monitoring the flooding state of the room in which the monitored device 10 is installed is provided, the environmental information may also include information detected by the sensor.

[0022] The environmental information such as weather can be obtained, for example, from weather information for each region published on a website on the Internet, various measuring instruments installed in the facility SI, surveillance cameras, etc.

[0023] The second storage unit 20b sequentially stores the operation information and the environmental information acquired by the second acquisition unit 20a. The second storage unit 20b also stores a weather information management table 31, a disaster information management table 32, and a disaster detail management table 33.

[0024] Fig. 4 is a diagram showing an example of the weather information management table 31. As shown in Fig. 4, the weather information management table 31 is a table for managing weather information such as sunny, cloudy, etc., in association with its identification number.

[0025] Fig. 5 is a diagram showing an example of the disaster information management table 32. As shown in Fig. 5, the disaster information management table 32 is a table for managing disaster information such as heavy rain, floods, etc. in association with its identification number.

[0026] Fig. 6 is a diagram showing an example of the disaster details management table 33. As shown in Fig. 6, the disaster details management table 33 is a table for managing details of disasters that have occurred due to disasters such as flooding and electric leakage, in association with their identification numbers.

[0027] The information processing unit 20d converts the environmental information stored in the second storage unit 20b into information including an identification number using the weather information management table 31, the disaster information management table 32, and the disaster detail management table 33. For example, when the environmental information includes information such as "rain", "heavy rain", and "typhoon", the information processing unit 20d converts this information into the corresponding identification information "31-3", "32-1", and "32-3", respectively.

[0028] The second transmission unit 20c sequentially transmits to the information management server 15 the operational information and the environmental information including the information converted by the information processing unit 20d.

[0029] The information management server 15 is an information processing device capable of communicating with the monitoring device 20 and the maintenance-side information processing device 25. The information management server 15 is, for example, a computer equipped with a CPU as a control circuit, a communication interface, an HDD as a memory, a ROM, a RAM, a flash memory, an SSD, a display, an input circuit, and the like.

[0030] Fig. 7 is a block diagram showing an example of the configuration of the information management server 15. As shown in Fig. 7, the information management server 15 includes a third acquisition unit 15a, a third storage unit 15b, a third transmission unit 15c, and a determination unit 15d. Each component of the information management server 15 can be realized by starting a dedicated program stored in the third storage unit 15b and having software and hardware work together.

[0031] The third acquisition unit 15a sequentially acquires the operation information and the environmental information transmitted from the monitoring device 20 via the network.

[0032] The third storage unit 15b sequentially stores the operation information and the environmental information acquired by the third acquisition unit 15a. The third storage unit 15b also stores a weather information management table 31, a disaster information management table 32, a disaster detail management table 33, a first response information management table, and a second response information management table.

[0033] Fig. 8 is a diagram showing an example of the first handling information management table 41. As shown in Fig. 8, the first handling information management table 41 is a table that associates information corresponding to an abnormality in the monitored device 10 among information included in the operation information or environmental information with handling information indicating what handling should be done when that information is included in the operation information or environmental information.

[0034] Incidentally, "current value abnormality 1" in the first handling information management table 41 means, for example, a situation in which the current value included in the operation information is significantly outside the allowable range. Also, "current value abnormality 2" in the first handling information management table 41 means a situation in which the current value included in the operation information is not as far off as "current value abnormality 1", but is outside the allowable range, for example. The same applies to the voltage value and the power value. This first handling information management table 41 makes it possible to determine what kind of handling should be done when specific information is included in the operation information or environmental information.

[0035] Fig. 9 is a diagram showing an example of the second response information management table 42. As shown in Fig. 9, the second response information management table 42 is a table that manages the number of maintenance personnel required to restore each facility SI (i.e., to respond to an abnormality in the monitored device 10 of each facility SI) and the time it takes for the maintenance personnel to arrive at the facility SI from the maintenance base. Note that in Fig. 9, the sub-numbers of the identification number correspond to the facility SI number.

[0036] This second countermeasure information management table 42 is generated and managed, for example, for each countermeasure work executed to restore the monitored device 10 in which an abnormality has occurred. The number of maintenance personnel required for restoration can be determined based on the size of the facility SI, the type of abnormality, and past cases.

[0037] The determining unit 15d generates a monitoring target device management table for each monitoring target device 10 by using the operation information and the environment information stored in the third storage unit 15b.

[0038] Fig. 10 is a diagram showing an example of the monitored device management table 43. As shown in Fig. 10, the monitored device management table 43 is a table that arranges and manages operation information and environmental information (i.e., weather information, disaster information, disaster details, image data, etc.) in chronological order.

[0039] The determination unit 15d determines whether an abnormality has occurred or is likely to occur in at least one monitored target device 10, based on the operation information and environmental information acquired from the monitoring device 20. Specifically, the determination unit 15d determines whether an abnormality has occurred or is likely to occur in the corresponding monitored target device 10, based on the monitored target device management table 43. In addition, the determination unit 15d generates abnormality information for the monitored target device 10, based on the determination result.

[0040] Here, the abnormality information of the monitored device 10 is information for informing the user that an abnormality has occurred in the monitored device 10, that an abnormality may occur in the future, the location where the abnormality has occurred, the location where an abnormality is predicted to occur in the future, etc. The response information may also include guide information. The guide information is information for minimizing damage caused by a predicted abnormality (predicted failure) in the monitored device 10, such as information recommending tripping a circuit breaker of an upstream feeder to prevent the failure from spreading to other equipment when the monitored device 10 fails. Such guide information can be determined based on the operation information and the environmental information.

[0041] For example, in the row of "2020 / 12 / 8 / 14:08" in the monitored device management table 43 shown in FIG. 10, the operation information includes "current value abnormality 2," "power value abnormality 2," and "no equipment failure," and the environmental information includes "flood (32-2)," "typhoon (32-3)," and "flooding (33-1)." Because the operation information and environmental information include these pieces of information, the determination unit 15d determines that at "2020 / 12 / 8 / 14:08," the corresponding monitored device 10 "may have an abnormality." The determination unit 15d generates abnormality information for the monitored device 10 based on the determination result.

[0042] Also, for example, in the row of "2020 / 12 / 8 / 14:32" in the monitored device management table 43 shown in FIG. 10, the operation information includes "current value abnormality 1", "voltage value abnormality 1", "power value abnormality 1", and "short circuit occurring", and the environmental information includes "flood (32-2)", "typhoon (32-3)", "lightning strike (32-5)", "flooding (33-1)", and "electric leakage (33-2)". Since the operation information and the environmental information include these pieces of information, the determination unit 15d determines that the corresponding monitored device 10 is "abnormal" at "2020 / 12 / 8 / 14:32". The determination unit 15d generates abnormality information of the monitored device 10 based on the determination result.

[0043] Furthermore, the determining unit 15d references the monitored device management table 43 and the first handling information management table 41 to generate handling information corresponding to an abnormality that may occur or an abnormality that has occurred.

[0044] Here, the countermeasure information in response to an abnormality is information that informs the maintenance company or facility side of what countermeasure to take in response to an abnormality that has occurred or may occur.

[0045] For example, in the row of "2020 / 12 / 8 / 14:08" in the monitored device management table 43 shown in Fig. 10, the operation information includes "current value abnormality 2" and "power value abnormality 2", and the environmental information includes "typhoon (32-3)". Since the operation information and the environmental information include these pieces of information, the determination unit 15d generates handling information including the content "Stay (41-2)" for the abnormality determined at "2020 / 12 / 8 / 14:08", as shown in Fig. 8.

[0046] 10, the operation information includes "current value abnormality 1," "voltage value abnormality 1," "power value abnormality 1," and "short circuit occurring," and the environmental information includes "electric leakage (33-2)." Since the operation information and environmental information include these pieces of information, the determination unit 15d generates handling information including the content "Go to the site (41-1)" for the abnormality determined at "2020 / 12 / 8 / 14:32," as shown in FIG.

[0047] Furthermore, when the determining unit 15d determines the countermeasure information to be, for example, "Go to the site (41-1)", it determines the number of maintenance personnel to be dispatched to the facility SI in which the monitored device 10 is installed, and the time required for the maintenance personnel to arrive at the facility SI. Note that the time required for the maintenance personnel to arrive at the facility SI does not necessarily need to be determined using the second countermeasure information management table 42. For example, it may be calculated for each maintenance personnel based on the current location of each maintenance personnel identified using a GPS function or the like and the location of the target facility SI.

[0048] Furthermore, when the handling information for a plurality of facility SIs is determined, the determining unit 15d determines the priority among the plurality of facility SIs. This priority is determined based on the result of determining the social role of each facility SI using the information of each facility SI pre-stored in the third storage unit 15b.

[0049] For example, assume that one of multiple facility SIs is a telephone company's base station. The impact on social infrastructure caused by the failure of the telephone company's base station is large, and therefore the social role played by the telephone company's base station is large. The determination unit 15d determines the social role of each facility SI using the information of each facility SI pre-stored in the third storage unit 15b, and assigns a priority of, for example, "1" to the telephone company's base station that has a larger social role than other facilities.

[0050] The third transmission unit 15c transmits the abnormality information and the handling information generated by the determination unit 15d to the maintenance-side information processing device 25. In addition, the third transmission unit 15c can also transmit the abnormality information and the handling information generated by the determination unit 15d to the facility-side information processing device 26.

[0051] The maintenance-side information processing device 25 is provided at a maintenance base. The maintenance-side information processing device 25 is, for example, a computer including a CPU as a control circuit, a communication interface, a HDD as a memory, a ROM, a RAM, a flash memory, an SSD, a display, an input circuit, and the like.

[0052] Fig. 11 is a block diagram showing an example of the configuration of the maintenance-side information processing device 25. As shown in Fig. 11, the maintenance-side information processing device 25 includes a fourth acquisition unit 25a, a fourth storage unit 25b, a fourth transmission unit 25c, and a display unit 25d. Each component of the maintenance-side information processing device 25 can be realized by starting a dedicated program stored in the fourth storage unit 25b and making software and hardware work together.

[0053] The fourth acquiring unit 25a acquires the abnormality information and the handling information transmitted by the third transmitting unit 15c of the information management server 15.

[0054] The fourth storage unit 25b stores the abnormality information and the handling information acquired by the fourth acquisition unit 25a.

[0055] The fourth transmission unit 25c transmits various information to the monitoring device 20 and the facility side information processing device 26 of the facility SI.

[0056] The display unit 25d displays the abnormality information and the handling information acquired by the fourth acquisition unit 25a.

[0057] Next, the operation of the information processing system will be described. In the following, for the sake of concreteness, it is assumed that the monitored device 10 has failed due to flooding caused by a typhoon or other such cause.

[0058] Fig. 12 is a flowchart showing a flow of processing executed by the information processing system according to the embodiment. In Fig. 12, steps S1 to S3 are processing by the monitored device 10, steps S4 to S7 are processing by the monitoring device 20, steps S8 to S12 are processing by the information management server 15, steps S13 to S15 are processing by the maintenance-side information processing device 25, and steps S16 to S18 are processing by the facility-side information processing device 26.

[0059] The first acquisition unit 10a of the monitored device 10 acquires operation information of the monitored device 10 (step S1). The first storage unit 10b of the monitored device 10 stores the operation information acquired by the first acquisition unit 10a (step S2). The first transmission unit 10c of the monitored device 10 transmits the operation information to the monitoring device 20 (step S3). Note that if the monitored device 10 issues fault information, the first transmission unit 10c can also include fault information notifying of the fault in the operation information.

[0060] The second acquisition unit 20a of the monitoring device 20 acquires the operation information transmitted from the monitored device 10 (step S4). The second acquisition unit 20a of the monitoring device 20 also acquires environmental information from a monitoring camera of the facility SI, a website on the Internet, etc. (step S5). The second storage unit 20b of the monitoring device 20 stores the operation information and environmental information acquired by the second acquisition unit 20a (step S6). The second transmission unit 20c transmits the environmental information including the operation information and the information converted by the information processing unit 20d to the information management server 15 (step S7).

[0061] The third acquisition unit 15a of the information management server 15 acquires the operation information and the environmental information transmitted from the monitoring device 20 (step S8). The third storage unit 15b of the information management server 15 stores the operation information and the environmental information acquired by the third acquisition unit 15a (step S9).

[0062] The determination unit 15d of the information management server 15 determines whether an abnormality has occurred in the monitored device 10 or there is a possibility that an abnormality will occur based on the operation information and the environmental information (step S10). If the determination unit 15d of the information management server 15 determines that "an abnormality has not occurred" or that "there is no possibility that an abnormality will occur" (No in step S10), the processing of steps S1 to S9 is repeatedly executed. On the other hand, if the determination unit 15d of the information management server 15 determines that "an abnormality has occurred" or that "there is a possibility that an abnormality will occur" (Yes in step S10), the processing proceeds to step S11.

[0063] The determination unit 15d of the information management server 15 generates abnormality information and handling information based on the operation information and the environmental information (step S11). The third transmission unit 15c of the information management server 15 transmits the abnormality information and handling information generated by the determination unit 15d to the maintenance-side information processing device 25 and the facility-side information processing device 26 (step S12).

[0064] The fourth acquisition unit 25a of the maintenance-side information processing device 25 acquires the abnormality information and the handling information transmitted by the information management server 15 (step S13). The fourth storage unit 25b of the maintenance-side information processing device 25 stores the abnormality information and the handling information acquired by the fourth acquisition unit 25a (step S14). The display unit 25d of the maintenance-side information processing device 25 displays the abnormality information and the handling information in a predetermined format (step S15).

[0065] By observing the abnormality information and response information displayed on the display unit 25d of the maintenance side information processing device 25, the maintenance company can quickly and efficiently grasp the facility SI or monitored device 10 where the abnormality occurred, abnormalities predicted to occur in the future, the number of maintenance personnel required for recovery, facilities that should be prioritized for recovery, the time to reach the facilities, etc.

[0066] The facility-side information processing device 26 acquires the abnormality information and the handling information transmitted by the information management server 15 (step S16). The facility-side information processing device 26 stores the acquired abnormality information and handling information (step S17). The facility-side information processing device 26 displays the acquired abnormality information and handling information in a predetermined format (step S18).

[0067] By observing the displayed abnormality information and response information, the facility SI manager can quickly and efficiently grasp which monitored device 10 in his / her facility has an abnormality, which abnormalities are predicted to occur in the future, the number of maintenance personnel to be dispatched for recovery, the responses that he / she should prioritize as the manager, the time until the maintenance personnel arrive, etc.

[0068] The information processing system S according to the embodiment described above includes at least one monitored device 10 installed in a facility, a monitoring device 20, and an information management server 15. The monitoring device 20 acquires operation information indicating an operation state of the at least one monitored device 10, and environmental information which is information on the environment in which the at least one monitored device is installed. The information management server 15 determines whether an abnormality has occurred or is likely to occur in the at least one monitored device 10, based on the operation information and environmental information acquired from the monitoring device 20.

[0069] Therefore, it is possible to automatically collect and store the operation information and the environmental information of at least one monitored device 10. In addition, it is possible to automatically and quickly determine whether an abnormality has occurred or there is a possibility that an abnormality will occur in the monitored device 10 based on the automatically collected operation information and environmental information. As a result, it is possible to realize more efficient information collection regarding abnormalities in the monitored device 10 than the conventional manual information collection. In particular, in the event of a major disaster such as a large-scale disaster, it is possible to quickly and without confusion grasp the current state of the monitored device 10 and any abnormalities that may occur in the future.

[0070] On the other hand, in the case of technology that detects damage such as flooding by attaching sensors to the monitored device 10 or to an electrical room, it is necessary to attach a huge number of sensors to each panel or electrical room and build a new system to collect the sensor status. This tends to result in relatively high costs. In contrast, in the information processing system S according to the embodiment, the information used by the information management server 15 is information (central monitoring equipment signal) collected by the monitoring device 20. Therefore, the information processing system S according to the embodiment can be realized by simply installing a new information management server 15 and modifying the software of the monitoring device 20. As a result, it can be implemented at a low cost compared to technologies that use sensors, etc.

[0071] The information processing system S according to the embodiment further includes a maintenance-side information processing device 25 as a first information processing device managed by a maintenance base side that maintains at least one monitored device 10. The information management server 15 transmits anomaly information based on the determination result to the maintenance-side information processing device 25. The information processing system according to the embodiment further includes a facility-side information processing device 26 managed by an administrator that manages at least one monitored device 10. The information management server 15 transmits anomaly information based on the determination result to the facility-side information processing device 26.

[0072] Therefore, even if the maintenance company does not directly contact the facility SI manager, the information management server 15 can quickly communicate abnormality information to the maintenance company and the facility SI manager informing them that an abnormality has occurred or there is a possibility that an abnormality may occur due to damage caused by a disaster such as a typhoon (such as flooding of a panel).

[0073] In addition, in the information processing system S according to the embodiment, the information management server 15 generates handling information regarding handling of an abnormality that has occurred or may occur in at least one monitored device 10, and transmits the information together with the abnormality information.

[0074] Therefore, the maintenance company and the facility SI administrator can quickly deal with secondary disasters caused by failures in the monitored device 10, secondary disasters such as ground faults caused by flooding, and further failures that may occur, based on the received abnormality information and response information. For example, it is possible to avoid the risk of running out of fuel or overloading and causing a breakdown even after the emergency generator operates during a power outage. In addition, even if there is no problem at the time of the disaster, it is possible to quickly and efficiently deal with difficult abnormalities such as the inability of the substation equipment to restore normal after power is restored.

[0075] In addition, in the information processing system S of the embodiment, the response information can include at least one of the personnel required for response, the priority compared to other facilities, and the time it takes for personnel from the maintenance base to arrive at the facility SI.

[0076] Therefore, the maintenance company can appropriately allocate resources to recovery based on the response information and efficiently dispatch maintenance personnel to the facility SI, which results in rapid recovery from failures.

[0077] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents described in the claims, as well as in the scope and spirit of the invention. [Explanation of symbols]

[0078] 10 monitored device, 10a first acquisition unit, 10b first storage unit, 10c first transmission unit, 15 information management server, 15a third acquisition unit, 15b third storage unit, 15c third transmission unit, 15d determination unit, 20 monitoring device, 20a second acquisition unit, 20b second storage unit, 20c second transmission unit, 20d information processing unit, 25 maintenance side information processing device, 26 facility side information processing device, SI facility

Claims

1. At least one monitored device installed in the facility; a monitoring device that acquires operation information that indicates an operation state of the at least one monitored device and environmental information that is information about an environment in which the at least one monitored device is installed; an information management server that determines whether an abnormality has occurred or there is a possibility that an abnormality will occur in the at least one monitored device based on the operation information and the environmental information acquired from the monitoring device; The environmental information includes an image of the surroundings of a facility in which the at least one monitored device is installed, the information management server generates handling information regarding handling of an abnormality that has occurred or is likely to occur in the at least one monitored device, and transmits the handling information together with anomaly information based on a determination result of whether an abnormality has occurred or is likely to occur in the at least one monitored device; Information processing system.

2. A first information processing device managed by a maintenance base that maintains the at least one monitored device, the information management server transmits anomaly information based on the determination result to the first information processing device. The information processing system according to claim 1 .

3. a second information processing device managed by an administrator who manages the at least one monitoring target device; the information management server transmits anomaly information based on the determination result to the second information processing device. The information processing system according to claim 2 .

4. The response information includes at least one of the following: personnel required for the response, priority compared with other facilities, and time required for personnel from the maintenance base to arrive at the facility. The information processing system according to claim 2 .

5. an acquisition unit that acquires operation information indicating an operation state of at least one monitored device installed in a facility and environmental information that is information regarding an environment in which the at least one monitored device is installed; a determination unit that determines whether an abnormality has occurred or there is a possibility that an abnormality will occur in the at least one monitored device based on the operation information and the environmental information acquired by the acquisition unit, The environmental information includes an image of the surroundings of a facility in which the at least one monitored device is installed, the determination unit generates handling information regarding handling of an abnormality that has occurred or is likely to occur in the at least one monitored device, and transmits the handling information together with abnormality information based on a determination result of whether an abnormality has occurred or is likely to occur in the at least one monitored device; Information processing device.

6. On the computer, an acquisition function for acquiring operation information representing an operation state of at least one monitored device installed in a facility and environmental information which is information relating to an environment in which the at least one monitored device is installed; a determination function that determines whether an abnormality has occurred or there is a possibility that an abnormality will occur in the at least one monitored device based on the operation information and the environmental information acquired by the acquisition function; The environmental information includes an image of the surroundings of a facility in which the at least one monitored device is installed, the determination function generates handling information regarding handling of an abnormality that has occurred or is likely to occur in the at least one monitored device, and transmits the handling information together with anomaly information based on a determination result of whether an abnormality has occurred or is likely to occur in the at least one monitored device; An information processing program that realizes this.

Citation Information

Patent Citations

  • Fault diagnosis method, fault diagnosis device, in-shop equipment management system, and recording medium

    JP2003172567A

  • Plant operation system

    JP2004199298A

  • Method for operating plant, and operation apparatus thereof

    JP2004227298A

  • System for managing facility

    JP2005122541A

  • Maintenance support system

    JP2006209594A