Method and apparatus for power distribution - Patents.com
The power distribution apparatus efficiently distributes solar electricity between local loads and the grid, addressing the limitations of remote solar farms and rooftop systems by enabling market participation and reducing land use impacts, thereby enhancing power system stability and utilization.
Patent Information
- Application Number
- JP2022515095
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-09-05
- Filing Date
- 2020-09-04
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-09-04
AI Technical Summary
Large-scale solar farms in remote rural areas face significant energy transmission losses and socio-economic impacts, while rooftop solar systems in urban areas are limited in size and unable to efficiently sell excess electricity to the grid, underutilizing large rooftops.
A power distribution apparatus and method that decouples a building's electrical consumption from the size of the solar system, allowing efficient distribution of electricity between local loads and the grid, enabling participation in national energy markets and reducing land use impacts.
Enhances power system stability, reduces transmission losses, and allows urban-based rooftop solar farms to participate in energy markets, overcoming limitations of remote solar farms and maximizing rooftop utilization.
Smart Images

Figure 0007566887000001 
Figure 0007566887000002 
Figure 0007566887000003
Abstract
Description
[Technical field]
[0001] FIELD OF THE DISCLOSURE The present disclosure relates to an apparatus and method for distributing electrical power, and in particular solar electrical power generated by multiple solar generators. [Background technology]
[0002] In recent years, the majority of non-residential solar power generation has been provided by large solar farms built on low-cost land in remote rural areas. These farms can generate large amounts of energy, but because they are far from where the energy is needed, the electricity generated at these sites must be transmitted long distances over overhead lines, resulting in significant losses. Furthermore, the conversion of agricultural and other land to solar power generation can have negative socio-economic impacts on local communities and flora and fauna.
[0003] With the increasing availability of cheap and efficient solar cells, solar photovoltaic technology is becoming more widely adopted near cities, where commercial building owners are installing "behind-the-meter" solar systems on the roofs of their buildings, which diverts the amount of electricity consumed by the building from the grid. While these systems can provide a small revenue stream for the landlord or system operator, it has historically been difficult to selectively sell energy on the National Energy Market (NEM) or wholesale electricity markets, as any excess solar electricity generated by these systems is sent through the tenant's meters, which are outside the system operator's jurisdiction. Thus, rooftop solar systems are typically limited in size to match the solar system's output with the building's daytime electricity consumption, even on very large roofs. For this reason, large rooftops on industrial buildings in urban areas have historically been underutilized for solar power generation.
[0004] Any discussion of documents, acts, materials, devices, articles or the like contained in this specification should not be deemed to be an admission that any or all of such matters form part of the prior art substrate existing before the priority date of each claim of the appended claims, or were common general knowledge in the art relevant to the present disclosure. Summary of the Invention
[0005] According to a first aspect of the present disclosure, there is provided a power distribution apparatus comprising: a plurality of switches, each operable to switch a respective one of a plurality of power sources between a first input node of a first load and a second input node of a second load; a first power meter configured to determine a first power supplied from the plurality of power sources to the first input node via the plurality of switches; a second power meter configured to determine a power consumption of the first load; and a control module configured to control the switches to distribute power between the first load and the second load in response to the determined first power and the determined power consumption for the first load.
[0006] Each of the multiple switches may be configured to mechanically isolate a respective power source from one of the first load and the second load.
[0007] Each power source may include one or more solar cells and / or one or more power storage devices.
[0008] In some embodiments, the first load is a local load. For example, the local load may be a warehouse or other commercial building in close proximity to multiple power sources. In some embodiments, the second load is a power grid, or the like. In some embodiments, the first load is connected to the power grid through a third node.
[0009] In some embodiments, the power distribution apparatus may further include a first electric meter connected between the third node and the power grid. Additionally or alternatively, the power distribution apparatus may include a second electric meter connected between the second input node and the power grid. In some embodiments, the first electric meter and the second electric meter may be connected to the power grid via a common transformer. In another embodiment, the first electric meter and the second electric meter are connected to the power grid via separate transformers.
[0010] In some embodiments, the power distribution equipment may further include a first electric meter connected between the second input node and the third node, and a second electric meter connected between the third node and the power grid.
[0011] In some embodiments, the power consumption of the first load determined by the second power meter is the total power consumption of the first load, while in other embodiments, the power consumption determined by the second power meter is the power consumed by the first load from a second load (e.g., a power grid), e.g., as measured at a third node.
[0012] Control Module is input to the first input node. supply Will be Identified No. 1 Electricity The force of the first load Identified The multiple switches may be configured to be controlled to be equal to or greater than the power consumption.
[0013] Control Module is input to the first input node. supply Will be Identified No. 1 Electricity The force of the first load Identified The plurality of switches may be configured to control a power consumption substantially in line with the power consumption.
[0014] The power distribution apparatus further includes a power supply provided by a plurality of power sources via a plurality of switches to a second input node. SecondThe control module may include a third power meter configured to measure the power supplied to the second input node. The second Depending on the power, the switch may be configured to control to distribute the power between the first load and the second load.
[0015] The multiple power sources may be direct current (DC) power sources. The apparatus may further include an inverter connected between each power source and each of the multiple switches to convert the DC to alternating current (AC).
[0016] According to another aspect of the present disclosure, there is provided a system comprising a power distribution apparatus as described above and a plurality of power sources.
[0017] According to another aspect of the present disclosure, there is provided a method of distributing power between a first load and a second load from a plurality of power sources, each of the plurality of power sources being switchable between the first load and the second load by a respective switch of a plurality of switches, the method comprising: First load Determining a first power supplied to a first input node; determining a power consumption of a first load; determining the first power for the first load; and Power consumption and controlling the plurality of switches to distribute power between the first load and the second load in response to the identification.
[0018] Each of the plurality of switches is configured to mechanically isolate a respective power source from one of the first load and the second load.
[0019] Each power source may include one or more solar cells and / or one or more batteries.
[0020] In some embodiments, the first load is a local load. For example, the local load may be a warehouse or other commercial building in close proximity to multiple power sources. In some embodiments, the second load is a power grid, or the like. In some embodiments, the first load is connected to the power grid through a third node.
[0021] In some embodiments, the power consumption of the first load determined by the second power meter is the total power consumption of the first load, while in other embodiments, the power consumption determined by the second power meter is the power consumed by the first load from a second load (e.g., a power grid), e.g., as measured at a third node.
[0022] Determining the power consumption of the first load may include measuring power delivered to the first load via the third node.
[0023] The method further comprises: Second load Provided to the second input node Second The switch may include measuring the power supplied to the second input node. The second It can be controlled according to the power.
[0024] On the first input node supply Will be Identified No. 1 Electricity The force of the first load Identified The switches may be controlled to be equal to or greater than the power dissipation.
[0025] On the first input node supply Will be Identified No. 1 Electricity The force of the first load Identified The switches may be controlled to substantially match the power consumption.
[0026] It will be understood that throughout this specification the word "comprise", or variations such as "comprises" or "comprising", are meant to imply the inclusion of a stated element, integer, or step, or group of elements, integers, or steps, but not the exclusion of any other element, integer, or step, or group of elements, integers, or steps. [Brief description of the drawings]
[0027] [Figure 1] 1 is a schematic diagram of a system including a power distribution arrangement according to an embodiment of the present disclosure. [Diagram 2] 2 is a schematic diagram illustrating a switch bank of the power distribution apparatus of FIG. 1 in greater detail, according to an embodiment of the present disclosure. [Diagram 3] 2 is a schematic diagram illustrating a switch bank of the power distribution apparatus of FIG. 1 in greater detail, according to an embodiment of the present disclosure. [Figure 4] 2 is a schematic diagram illustrating a control module of the power distribution apparatus of FIG. 1 in greater detail, according to an embodiment of the present disclosure. [Diagram 5] 2 is a detailed schematic diagram of an example power system connection to the power distribution apparatus of FIG. 1, according to an embodiment of the present disclosure. [Figure 6] 2 is a detailed schematic diagram of another example of a power grid connection to the power distribution apparatus of FIG. 1 in accordance with an embodiment of the present disclosure. [Figure 7] 2 is a schematic diagram illustrating another example of a power grid connection to the power distribution apparatus of FIG. 1 in further detail, in accordance with an embodiment of the present disclosure. [Figure 8] 2 is a flow diagram of a process performed by the power distribution device of FIG. 1. [Figure 9] 2 is a flow diagram of a process performed by the power distribution device of FIG. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] The embodiments of the present disclosure address or at least ameliorate one or more of the aforementioned problems by decoupling a building's electricity consumption from the size of the solar system that can be installed on the roof. By enabling solar system operators to efficiently distribute electricity generated by the solar array among buildings, offset local electricity consumption, and tap into the national energy market as registered market participants, the entire roof area of industrial and commercial buildings and surrounding land can be transformed into market-participating local solar power plants. Industrial warehouses located in urban areas near distribution network demands may improve overall power system stability and reduce potential risks due to lower marginal transmission loss factor (MLF) when compared to remote solar power farms. This advantage distinguishes urban-based "rooftop farms" from large-scale solar power farms in remote rural areas. Furthermore, solar power generated via such rooftop farms does not require any additional land, thereby reducing social or environmental impacts.
[0029] Embodiments of the present disclosure enable dynamic distribution of electricity generated by a solar system between a building (e.g., "behind-the-meter") and a registered network meter (NEM meter). This separation of generated electricity into two separate nodes allows the solar system to comply with any grid connection constraints of a distribution network service provider (DNSP) such as Endeavour Energy in Australia as well as the Australian Energy Market Operator (AEMO).
[0030] FIG. 1 is a schematic diagram of a system 100 including a solar array 104 including multiple solar panels 104a-104n, a first load 106 such as a local load to the solar array 104, and a second load 108 such as a power grid via a power grid connection 109, as well as a power distribution apparatus 102 according to various embodiments of the present disclosure. The first load 106 and / or the second load 108 may be configured not only to consume power but also to supply power depending on the state of the system. For example, if the second load 108 is a power grid, power may be consumed from the second load and / or supplied back to the second load 108. The power distribution apparatus 102 is configured to distribute power generated from multiple solar arrays (or batteries) to a first output node 111 that may be connected to an input node of the first load 106 and a second output node 113 that may be connected to an input node of the second load 108.
[0031] In some embodiments, the first load 106 may include substantially all of the load of the building on which the solar array 104 is located. For example, the solar array 104 may be fixed to the roof of a building and the first load 106 may represent some or all of the electricity used by the building. In another embodiment, the first load 106 may include loads from multiple buildings or electrical devices in the vicinity of the solar array 104.
[0032] The power distribution apparatus 102 includes a switch bank 110 and a control module 112. In addition, one or more power meters 114, 116, 118, 120 may be provided to measure power (i.e., voltage or current) provided to various nodes in the system 100. For example, a first power meter 114 may be provided to measure power provided from the solar array 104 through the switch bank 110 to a first output node 111. For example, a second power meter 116 may be provided to measure the power demand of a first load 106. For example, a third power meter 118 may be provided to measure power provided to a second output node 113. For example, a fourth power meter 120 may be provided to measure power provided from a second load 108 (e.g., a power grid) to the first load 106.
[0033] The switch bank 110 may be operable to switch the electrical output of each panel 104a-104n in the solar array 104 between the first load 106 and the second load 108 upon receiving one or more control signals 122 from the control module 112. The control signals 122 may be applied directly or indirectly to each switch in the switch bank 110. Measured power from one or more of the power meters 114, 116, 118, 120 may be provided to the control module 112, which may then use this information to control the distribution of power from the solar array 104 between the first load 106 and the second load 108 using the switch bank 110.
[0034] Figure 2 is a more detailed schematic diagram of the switch bank 110 shown in Figure 1. The switch bank 110 includes a number of switches 124, each of which may be operable to mechanically isolate a respective power source from one of the first load and the second load. In some embodiments, the number of switches are mechanical interlock switches or other similar switches, allowing complete electrical isolation between the first load 106 and the second load 108 at any one time.
[0035] The switch bank 110 of FIG. 2 is configured to switch alternating current (AC) between a first node 111 and a second node 113. The inventors have discovered that switching AC power (as opposed to direct current (DC) power) provides improved switch control and reduced wear on switch gear compared to DC switching. Thus, the switch bank 110 further comprises a plurality of inverters 126, each configured to convert a direct current (DC) power signal received from a respective solar panel 104a-104n of the array 104 to an alternating current (AC) power signal. In the illustrated embodiment, the inverters 126 are implemented as part of the power distribution apparatus 110. In an alternative embodiment, the inverters 126 may be integrated with the solar panels 104a-104n of the solar array.
[0036] The AC power signal output from each inverter 126a-126n is then provided to an input node of a respective one of the switches 124, optionally via a disconnect switch 128. The disconnect switches 128a-128n may be provided to allow each of the solar panels 104a-104n to be electrically isolated from the rest of the system 100. The disconnect switches 128a-128n may be manual switches that may be located near the solar array 124. Alternatively, the disconnect switches 128a-128n may be controlled by the control module 112.
[0037] Each of the switches 124 is switchable between a first switch bus 130 and a second switch bus 132 connected to a first node 111 and a second node 113, respectively, of the power distribution apparatus 102. Thus, each switch 124 is configurable to send AC power received from its respective inverter 126 to either the first node 111 via the first switch bus 130 or the second node 113 via the second switch bus 132. In doing so, the switch bank 110 provides an efficient way to distribute power generated from the solar array 104 among multiple loads. Furthermore, the distribution of power provided to each of the first node 111 and the second node 113 is fully electrically isolated through the use of mechanical interlock switches.
[0038] FIG. 3 is a schematic diagram of a switch bank 210, which is a variation of the switch bank 110 shown in FIG. 2. In contrast to the switch bank 110 described above, the switch bank 210 of FIG. 3 is operable to switch DC. The switch bank 210 comprises a number of switches 224, a first inverter 226a and a second inverter 226b, and optionally a number of disconnect switches 228. The DC output from each solar panel 104a-104n in the array 104 is provided to a respective input node of the switch 224 via an optional disconnect switch 228. Similar to the disconnect switch 128 of the switch bank 110 of FIG. 2, the disconnect switch 228 is provided to allow each of the solar panels 104a-104n to be electrically isolated from the switch bank 210. Each of the switches 224 is switchable between a first switch bus 230 and a second switch bus 232 connected to the DC inputs of the first inverter 226a and the second inverter 226b, respectively. The first inverter 226a and the second inverter 226b then convert the aggregated DC power signals on the first switch bus 230 and the second switch bus 232, respectively, to AC output signals, which are provided to the first output node 111 and the second output node 113, respectively, of the power distribution apparatus 102. Thus, each switch 224 is configurable to send DC power received from a respective solar panel 104a-104n to either the first output node 111 via the first inverter 226a or the second output node 113 via the second inverter 226b. Again, like the switch bank 110 shown in FIG. 2, the first output node 111 and the second output node 113 are completely electrically isolated from each other by the nature of the switch 224 .
[0039] An exemplary configuration of the control module 112 according to an embodiment of the present disclosure is shown in FIG. 4. The control module 112 may include a central processing unit (CPU) 402, a memory 404, and an input / output (I / O) bus 406 communicatively coupled to one or more of the CPU 402 and the memory 404. The control module 112 is configured to receive signals from each of the first power meter 114, the second power meter 116, the third power meter 118, and the fourth power meter 120 on the I / O bus, and generate switching signals 122 based on the received signals to control switches in the switch bank 110 to switch each of the solar panels 104a-104n between the first load 106 and the second load 108. Each of the power meters 114, 116, 118, 120 may include one or more amplifiers and digital signal processing circuits to measure and / or analyze the power signals. In some embodiments, some or all elements of the power meters 114, 116, 118, 120 may be integrated within the processing unit 402. Communication between the power meters 114, 116, 118, 120 and the I / O ports may be wired or may be via a wireless link, such as inductive coupling, WiFi (RTM), or Bluetooth (RTM), etc.
[0040] The control module 112 may be connected to one or more input devices 408 and / or one or more output devices 410. The input devices 408 may include, but are not limited to, one or more of a keyboard, a mouse, a touchpad, and a touchscreen. Examples of output devices include a display, a touchscreen, a light indicator (e.g., a light-emitting diode (LED)), a sound generator, and a haptic generator. The input devices 408 and / or the output devices 410 may be configured to provide information or feedback (e.g., visual, audio, or haptic feedback) to a user, for example, regarding the current power status and power consumption of the first load 106 at each of the first node 111 and the second node 113. To that end, one or more of the input devices 408 may also be an output device 410, for example, a touchscreen. The input devices 408 and the output devices 410 may also be connected to the control module 112 by wire or wirelessly. The input device 408 and the output device 410 may be configured to provide a user of the system 100 with control of the power distribution between the first load 106 and the second load 108 .
[0041] The control module 112 may be operable to control the switch 124 in a number of ways depending on the desired operation of the system operator. In some embodiments, the control module 112 may operate to maximize the amount of energy provided from the solar array 104 to the first load 106, and send power to the second load 108 only if it is determined that the solar array is fully meeting the energy requirements of the first load 106. For example, the control module 112 may use the first power meter 114 and the second power meter 116 to compare the power provided by the solar array 104 to the first input node 111 with the power consumption of the first load 106, and control the switch to substantially match the power consumption of the first load 106 to the power provided to the first input node 111. If the power consumption of the first load 106 increases as measured by the second power meter 116, the control module 112 may increase the number of solar panels 104a-104n supplying power to the first input node 111 by switching one or more of the plurality of switches 124. Additionally or alternatively, if there is a connection between the second load 108 and the first load 106 via the third node 115, the control module 112 may control the switching of the solar panels 104a-104n in the solar array by measuring the power provided by the second load 108 to the first load 106 using the fourth power meter 120. For example, if the measured power provided at the third node 115 exceeds a certain threshold T, e.g., zero, the control module 112 may be configured to increase the number of solar panels 104a-104n switched to the first input node 111 to increase the power provided by the solar array 104 to the first load 106, and thus reduce the power provided from the second load 108 to the first load 106. In the above example, the third power meter 118 may be used to measure the energy provided by the solar array 104 to the second load 108.
[0042] In addition to or instead of using the measured power received from one or more of the power meters 114, 116, 118, 120, the control module 112 may receive information regarding the current wholesale market price of energy and / or residential generation market price. In this case, the control module 112 may decide to send energy to either the first load 106 or the second load 108 depending on the cost-benefit of trading energy with the second load 108, especially if the second load 108 is a power grid. For example, the system operator may choose to use the solar array 104 to meet a portion of the energy demand of the first load 106 and sell the remaining energy generated by the solar array 104 through the second load 108, so that the first load 106 needs to take its energy deficit from the second load 108 through the third node 115.
[0043] Referring again to FIG. 1, the power distribution apparatus 102 is shown distributing power via a second output node 113 to a second load 108, such as a power grid, via a power grid connection 109. It will be appreciated that a national or regional power grid will typically have certain regulations governing connections to the power grid connection. These may include, for example, connection via a registered network meter operable to measure and / or regulate power entering or leaving the power grid via the power grid connection. It will also be appreciated that different power grids may have different governing rules for such connections. Thus, the power grid connection 109 may take various forms depending on these regulations. FIGS. 5-7 provide several example configurations of the power grid connection 109 according to embodiments of the present disclosure. For clarity, the connections of the power meters 114, 116, 118, 120 of the power distribution apparatus 102 have been omitted from these figures.
[0044] Referring to FIG. 5, in some embodiments, the power grid connection 109 between each of the second load 108 and the first load 106 and the solar array 104 may include a first electric meter 502, a second electric meter 504, a first transformer 506, and a second transformer 508.
[0045] The second load 108 is connected to the first load 106 via a first (step-down) transformer 506 and a first electric meter 502. The first electric meter 502 may be a conventional retail electric meter for metering energy provided from the second load 108 to the first load 106. In other words, the first electric meter 502 may be a zero-emission meter. Thus, the connection between the second load 108 and the first load 106 may be a conventional connection in which power is supplied (unidirectionally) to the first load 106.
[0046] The solar array 104 may be connected to a second load 108 via the power distribution equipment 102, a second electric meter 504, and then a second (step-up) transformer 508. The second electric meter 504 is configured to meter the amount of electricity provided from the solar array 104 to the second load 108.
[0047] The connection from the solar array 104 to the first load 106 is made "behind the meter." If the owner of the solar array 104 and the person responsible for the first load 106 are different, the energy provided by the solar array 104 to the first load 106 may be sold to the person responsible for the first load 106 via one or more power purchase agreements (PPAs).
[0048] FIG. 6 shows another embodiment of the power grid connection 109 between each of the second load 108 and the first load 106 and the solar array 104, the power grid connection 109 comprising a first electric meter 602, a second electric meter 604, and a first transformer 606. As in the embodiment shown in FIG. 5, the first load 106 is connected to the second load 108 via the first electric meter 602, and the solar array 104 is connected to the second load 108 via the second electric meter 604. However, in contrast to the embodiment shown in FIG. 5, the first electric meter 602 and the second electric meter 604 are sent to a common transformer, the first transformer 606, which is connected to the second load 108. If the first load 106 is a local load associated with a building or group of buildings, the transformer 606 may be the same as the transformer used to connect the building to a retail electricity network. Thus, a first electricity meter 602 and a second electricity meter 604 are provided that may each participate in the market while using the same transformer for electricity transmission.
[0049] FIG. 7 shows yet another embodiment of the grid connection 109 between each of the second load 108 and the first load 106 and the solar array 104, the grid connection 109 comprising a first electricity meter 702, a second electricity meter 704, and a transformer 706. In this embodiment, the first electricity meter 702 and the second electricity meter 704 are connected in series. The first load 106 is connected to the second load 108 via the second electricity meter 704 and the transformer 706. The solar array 104 is connected to the second load 108 via the first electricity meter 702, the second electricity meter 704, and the same transformer 706. Thus, from the perspective of the second load 108, the system 100 can be considered as a single participant, and the second electricity meter 704 monitors the net consumption of electricity of the second load 108, i.e. the net output of electricity to the second load 108. A first electricity meter 702 may then be provided to meter the electricity provided from the solar array 104 to the second load 108 as a market participant (eg, if the second load 108 is a power grid).
[0050] An exemplary process 800 implemented by the power distribution apparatus 102 for controlling the power distribution between the first load 106 and the second load 108 will now be described with reference to FIG. 8. In this process 800, the control module 112 may operate with the goal of ensuring that the amount of energy required by the first load 106 is provided by the solar array 104 at any one time. At step 802, the power at the first input node is measured using the first power meter 114. The first power meter 114 may measure the voltage and / or current at the first input node 111. The measured power (voltage and / or current) at the first input node 111 may be provided to the control module 112 in any suitable manner. At approximately the same time, at step 804, the power demand or power consumption of the first load 106 may be determined. For example, the second power meter 116 may measure the total power consumption of the first load 106. If the first load 106 is also connected to the second load 108, the total power consumption may be the sum of the power provided to the first input node 111 and the power provided to / from the third node 115. Additionally or alternatively, the fourth power meter 120 may measure the power provided to the third node 115 to determine the power consumption of the first load 106. The second power meter 116 and / or the fourth power meter 120 may measure the voltage and / or current demand of the first load 106, and such information may be provided to the control module 112 in any suitable manner. At step 806, the control module 112 may then use the power data received from the first power meter 114 and one or more of the second power meter 116 and the fourth power meter 120 to control the switch bank 110 to distribute power between the first load 106 and the second load 108.
[0051] FIG. 9 illustrates an example process 900 of the control step 806 of the process 800, according to an embodiment of the present disclosure. In an optional configuration step 902, the control module 112 may switch the switches 124 of the switch bank 110 such that the first N of the solar panels 104a-104n of the solar array are switches to the first input node 111. For example, if the solar array includes an even number of solar panels 104a-104n, an equal number of switches 124 may be connected to the first input node 111 and the second input node 113. If the number n of the solar panels 104a-104n is odd, the number N of switches 124 connected to the first input node 111 may be equal to the number n of switches divided by 2 and rounded to the nearest integer, i.e., N=“n / 2”. Of course, this step 902 may be omitted.
[0052] At step 904, the control module 112 may receive a power value P1 measured at the first input node 111 by the first power meter 114. At step 906, the control module 112 may receive a power value P2 measured by the second power meter 116, which represents the total power demand or power consumption of the first load 106.
[0053] In step 908, the control module 112 may determine whether the power P1 provided to the first load 106 is within a threshold T of the power consumption P2 of the first load 106 so that the power provided to the first input node 111 is substantially sufficient to use the first load 106. In some embodiments, the threshold T may be zero. In another embodiment, the threshold T may be a positive value when the second load 108 cannot be powered through the third node 115, and a buffer is provided so that more energy is not provided through the first input node 111 than the first load 106 requires. This buffer may be necessary when the energy delivery from the first load to the second load 108 is prohibited by the energy regulator. The threshold T may also be provided to provide a buffer to reduce the frequency of switching and thus reduce wear on the switch gear.
[0054] If the conditions of step 908 are met, the process 900 returns to step 904 .
[0055] If such a condition is not met, the process 900 proceeds to step 910, where the control module 112 determines whether the power P1 provided to the first input node 111 is greater than a threshold T that is less than the power consumption P2 of the first load 106. If this condition is met, then in step 912, the control module 112 determines whether all solar panels 104a-104n have been switched to the first load 106. If not, then in step 914, the control module 112 may switch one of the switches 124 of the switch bank 110 to increase the number of solar panels 104a-104n switched to the first input node 111. The process then returns to step 908.
[0056] If, at step 912, it is determined that all of the switches 124 are switched to the first input node 111, then, at step 916, the control module 112 may provide an output indicating that a power shortage exists between the power provided by the solar array 104 and the power consumption P2 of the first load 106. If the first load 106 is also connected to the second load 108 via the third node 115, the control module 112 may similarly indicate that a power shortage exists due to the power provided from the second load 108 to the first load 106 via the third node 115. The process 900 may then return to step 904.
[0057] Returning to step 910, if it is determined that the power at the first input node 111 is equal to or less than the threshold T, which is less than the power consumption of the first load 106, the power P1 provided to the first input node 111 is greater than the power consumption of the first load 106, which means that the power provided by the solar array 104 to the first load 106 is greater than the power required by the first load 106. Next, in step 918, the control module 112 first checks whether all the switches 124 are switched to the second input node 113 (i.e., whether N=0), and then in step 920, reduces the number of switches 124 switched to the first input node 111 to reduce the power provided by the solar array 104 to the first load 106.
[0058] In an embodiment of the present disclosure, the power distribution apparatus 102 is shown switching solar panels (or batteries) or solar arrays. However, it will be understood that the power distribution apparatus described herein is not limited to switching solar generators, but may also be used to switch other power sources, such as power storage devices (e.g., batteries, capacitors, etc.), or wind turbines.
[0059] It will be appreciated by those skilled in the art, particularly having the benefit of this disclosure, that the various operations described herein, particularly those described in connection with the figures, may be implemented in other circuits or other hardware components. The order in which the operations of a given method are performed may be changed, and various elements of the systems illustrated herein may be added, rearranged, combined, omitted, modified, etc. The present disclosure is intended to encompass all such modifications and alterations, and therefore the above description should be considered in an illustrative and not a limiting sense.
[0060] Similarly, while the present disclosure refers to particular embodiments, certain modifications and variations can be made to those embodiments without departing from the scope and subject matter of the present disclosure. Moreover, any benefits, advantages, or solutions to problems described herein with respect to particular embodiments are not intended to be construed as critical, required, or essential features or elements.
[0061] Further embodiments and implementations that would similarly benefit from the present disclosure will be apparent to those skilled in the art, and such embodiments should be considered as included herein. Moreover, those skilled in the art will recognize that various equivalent techniques may be applied in place of or in combination with the embodiments discussed, and all such equivalents should be considered as included in the present disclosure.
[0062] Those skilled in the art will recognize that some aspects of the above described apparatus and methods, such as the discovery and configuration methods, may be embodied as processor controlled code on a non-volatile carrier medium, such as a disk, CD-ROM, or DVD-ROM, a program memory, such as a read-only memory (firmware), or a data carrier, such as an optical or electrical signal carrier. For many applications, embodiments of the invention are implemented on a DSP (digital signal processor), an ASIC (application specific integrated circuit), or an FPGA (field programmable gate array). Thus, the code may include conventional program code or microcode, or code for setting up or controlling, for example, an ASIC or FPGA. The code may also include code for dynamically configuring a reconfigurable device, such as a reprogrammable logic gate array. Similarly, the code may include code in a hardware description language, such as Verilog TM or VHDL (Very High Speed Integrated Circuit Hardware Description Language). As will be appreciated by those skilled in the art, the code may be distributed among multiple connected components that communicate with each other. If desired, embodiments may also be implemented using code running on a field (re)programmable analog array or similar device to configure analog hardware.
[0063] It should be noted that the term module as used herein is used to refer to a functional unit or block that may be at least partially implemented by dedicated hardware components, such as custom defined circuits, and / or by one or more software processors or suitable code running on a suitable general purpose processor or the like. A module may itself contain other modules or functional units. A module may be provided by multiple components or sub-modules, which need not be co-located, but may be provided on different integrated circuits and / or execute on different processors.
[0064] It should be noted that the above embodiments are illustrative rather than limiting of the present invention, and that those skilled in the art can design many alternative embodiments without departing from the scope of the appended claims or embodiments. The word "comprising" does not exclude the presence of elements or steps other than those stated in a claim or embodiment, and "a" or "an" does not exclude a plurality, and a single feature or other unit may fulfill the functions of several units listed in a claim or embodiment. Any reference numbers or labels in the claims or embodiments should not be interpreted as limiting their scope.
Claims
1. a plurality of switches each operable to switch a respective one of the plurality of power sources between a first input node of a first load and a second input node of a second load; a first power meter configured to identify a first power supplied from the plurality of power sources through the plurality of switches to the first input node; a second power meter configured to determine a power consumption of the first load; a control module configured to control the switch to distribute power between the first load and the second load in response to the determined first power and the determined power consumption for the first load; A power distribution device comprising:
2. 2. The power distribution apparatus of claim 1, wherein each of the plurality of switches is configured to mechanically isolate a respective power source from one of the first load and the second load.
3. 3. The power distribution arrangement of claim 1 or 2, wherein each power source comprises one or more solar cells and / or one or more power storage devices.
4. The power distribution apparatus according to any one of claims 1 to 3, wherein the first load is a local load and the second load is a power grid.
5. The power distribution apparatus of claim 4 , wherein the first load is connected to the power grid through a third node.
6. 6. The power distribution arrangement of claim 5, further comprising: a first electricity meter connected between the third node and the electric power grid; and a second electricity meter connected between the second input node and the electric power grid.
7. The power distribution apparatus of claim 6 , wherein the first electric meter and the second electric meter are connected to the power grid via a common transformer.
8. The power distribution equipment of claim 6 , wherein the first electric meter and the second electric meter are connected to the power grid through separate transformers.
9. 6. The power distribution arrangement of claim 5, further comprising: a first electricity meter connected between the second input node and the third node; and a second electricity meter connected between the third node and the power grid.
10. The power distribution apparatus according to any one of claims 1 to 9, wherein the power consumption identified by the second power meter is a total power consumption of the first load.
11. The power distribution device according to any one of claims 5 to 9, wherein the power consumption identified by the second power meter is the power consumption of the first load from the power system measured at the third node.
12. 12. The power distribution apparatus of claim 1, wherein the control module is configured to control the plurality of switches such that the specified first power supplied to the first input node is equal to or greater than the specified power consumption of the first load.
13. 13. The power distribution apparatus of claim 1, wherein the control module is configured to control the plurality of switches such that the determined first power supplied to the first input node substantially matches the determined power consumption of the first load.
14. the power distribution apparatus further comprising a third power meter configured to measure a second power provided by the plurality of power sources through the plurality of switches to the second input node; 14. The power distribution apparatus of claim 1, wherein the control module is configured to control the switch to distribute power between the first load and the second load in response to the measured second power supplied to the second input node.
15. 15. The power distribution apparatus of claim 1, wherein the plurality of power sources are direct current (DC) power sources, the power distribution apparatus further comprising an inverter connected between each of the power sources and each of the plurality of switches to convert DC to alternating current (AC).
16. The power distribution device according to any one of claims 1 to 15, the plurality of power sources; A system comprising:
17. 1. A method of distributing power between a first load and a second load from a plurality of power sources, each of the plurality of power sources being switchable between the first load and the second load by a respective switch of a plurality of switches, the method comprising: identifying a first power delivered from the plurality of power sources to a first input node of the first load; determining a power consumption of the first load; controlling the plurality of switches to distribute power between the first load and the second load in response to the first power determination and the power consumption determination for the first load; The method comprising:
18. 20. The method of claim 17, wherein each of the plurality of switches is configured to mechanically isolate a respective power source from one of the first load and the second load.
19. 19. The method of claim 17 or 18, wherein each power source comprises one or more solar cells and / or one or more batteries.
20. 19. The method of claim 17 or 18, wherein the first load is a local load and the second load is a power grid.
21. 21. The method of claim 20, wherein the first load is connected to the power grid through a third node.
22. The method of any one of claims 17 to 21, wherein the determined power consumption of the first load comprises a total power consumption of the first load.
23. 22. The method of claim 21, wherein determining the power consumption of the first load comprises measuring power delivered to the first load through the third node.
24. The method further includes measuring a second power delivered by the multiple power sources through the multiple switches to a second input node of the second load; the switch is controlled in response to the measured second power provided to the second input node. The method according to any one of claims 17 to 23.
25. 25. The method according to claim 17, wherein the plurality of switches are controlled such that the specified first power supplied to the first input node is equal to or greater than the specified power consumption of the first load.
26. 26. The method of claim 25, wherein the plurality of switches are controlled such that the specified first power delivered to the first input node substantially matches the specified power consumption of the first load.
Citation Information
Patent Citations
Building power supply system
JP2012235606A
Power control unit and electric power system
JP2013183549A
Natural energy power generation system, and distribution method
JP2014135855A
Power system
JP2016116379A
Power transmission regulating system
JP2016174437A