Power management system, power supply and demand management device, and power supply and demand management method
The power management system addresses the challenge of tracking environmental value in electricity consumption by issuing certificates for simultaneous power consumption, ensuring accurate accounting and promoting renewable energy use.
Patent Information
- Application Number
- JP2020193608
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-20
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-11-20
AI Technical Summary
Existing systems struggle to accurately account for environmental value when consumers consume electricity generated using methods different from renewable energy, and when charging and discharging devices, making it difficult to track the consumption of electricity with environmental value accurately.
A power management system that manages the trading of power generated by renewable energy, issuing certificates based on the consumption of power at the same time, using a power supply and demand management device to ensure that power is consumed simultaneously and accounting for environmental value through a distributed ledger system.
Enables accurate accounting of environmental value and encourages the consumption of renewable energy at the same time, promoting the use of renewable energy and reducing reliance on fossil fuels.
Smart Images

Figure 0007569668000001 
Figure 0007569668000002 
Figure 0007569668000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an electricity management system, an electricity supply and demand management device, and an electricity supply and demand management method for trading electricity generated by renewable energy (hereinafter referred to as RE) such as solar power generation. [Background technology]
[0002] In recent years, the use of RE has been increasing. In addition, by purchasing a certificate indicating the generation of electricity by RE (hereinafter referred to as RE certificate), it is possible to earn a certain amount of electricity generated by RE (hereinafter referred to as RE certificate) for the electricity consumed. reproduction It is now possible to position it as a form of energy (called electricity).
[0003] In addition, an environmental value trading system, an environmental value trading method, and an environmental value trading program are known (for example, Patent Document 1) that can promote the effective use of unused energy generated in factories without going through a commercial power grid, and can also stimulate trading of the obtained environmental value. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-67250 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, in the technology described in Patent Document 1, an environmental value is assigned to the amount of electricity generated using waste heat from a factory, but consumers purchase some or all of the electricity, and also consume the electricity generated by a method other than using the waste heat.
[0006] In this way, when a consumer consumes electricity generated by an energy source to which an environmental value cannot be assigned in addition to the electricity generated by the energy source to which an environmental value can be assigned, it becomes difficult to accurately record the amount of electricity used. Similarly, when a consumer charges a charging / discharging device with electricity and then supplies a part of the charged electricity to another device for consumption, there is also a problem that it is difficult to accurately record the environmental value.
[0007] The present invention has been made in consideration of the above-mentioned problems, and its object is to provide a method for manufacturing a semiconductor device using the same. reproduction Electricity is directly consumed at the same time (hereinafter, reproduction Electricity is called. reproduction To provide a power management system capable of counting environmental value in order to encourage consumption of power substantially at the same time by supplying power to another device while charging and discharging the power. [Means for solving the problem]
[0008] The present invention, which solves the above problems, is an electricity management system that manages the trading of electricity generated from renewable energy, and includes an electricity supply system capable of supplying electricity generated based on renewable energy to an electricity demand system, and an electricity supply and demand management device that manages electricity demand and supply, wherein the electricity supply and demand management device requests the electricity supply system to supply electricity to the electricity demand system during electricity generation times, and issues proof to the electricity demand system that the amount of electricity supplied has been consumed in accordance with the generation of electricity. Effect of the Invention
[0009] According to the present invention, it is possible to provide a power management system that calculates an environmental value for power generated by RE and encourages consumption of the power at the same time. [Brief description of the drawings]
[0010] [Figure 1A] 1 is a functional block diagram illustrating a configuration of a power management system according to a first embodiment. [Figure 1B] This is a table showing the power supply status, supplementing the power management system in FIG. 1, showing the amount of power supply and the trading prices of normal power and renewable power. [Diagram 2] 2 is a table illustrating power supply capacity application data in the power management system of FIG. 1. [Diagram 3] 2 is a table illustrating supply power price data in the power management system of FIG. 1. [Figure 4A] 2 is an example of a service provision screen during a RE power generation time period in the power management system of FIG. 1. [Figure 4B] 2 is an example of a service provision screen during a time period when RE power generation is unavailable in the power management system of FIG. 1. [Diagram 5] 2 is a table illustrating an example of power purchase application data in the power management system of FIG. 1. [Figure 6] 1. FIG. 4 is a diagram illustrating an example of a display screen of RE certificate data in the power management system of FIG. [Figure 7] 1. FIG. 4 is a diagram illustrating an example of a display screen of simultaneous RE certificate data in the power management system of FIG. [Figure 8] 2 is a sequence diagram illustrating normal power consumption during renewable power generation in the power management system of FIG. 1. [Figure 9] 2 is a sequence diagram illustrating the consumption of renewable power during renewable power generation in the power management system of FIG. 1. [Figure 10] 2 is a sequence diagram illustrating simultaneous renewable power consumption during renewable power generation in the power management system of FIG. 1. [Figure 11] 2 is a sequence diagram illustrating normal power consumption when no renewable power is generated in the power management system of FIG. 1. [Figure 12] 2 is a sequence diagram illustrating renewable power consumption when renewable power is not being generated in the power management system of FIG. 1. [Figure 13] 2 is a functional block diagram illustrating a configuration of a power supply and demand management device in the power management system of FIG. 1. [Figure 14]2 is an explanatory diagram illustrating an example of data stored in a memory in the power supply and demand management device in the power management system of FIG. 1. [Figure 15] 2 is a flowchart illustrating an example of a procedure for initial setting of a power supply and demand management device in the power management system of FIG. 1; [Figure 16] 2 is a flowchart illustrating a procedure of supply and demand management by a power supply and demand management device in the power management system of FIG. 1. [Figure 17A] FIG. 11 is a functional block diagram illustrating a configuration of a power management system according to a second embodiment. [Figure 17B] 17B is a table showing the amount of power supply and the trading unit prices of normal power and renewable power as a power supply status supplementing the power management system of FIG. 17A. [Figure 18] 18 is a table illustrating example charge / discharge capacity application data in the power management system of FIG. 17. [Figure 19] 18 is a table illustrating charging control and power purchase application data in the power management system of FIG. 17. [Figure 20] 18 is a sequence diagram illustrating charging with renewable power during renewable power generation in the power management system of FIG. 17. [Figure 21] 18 is a sequence diagram illustrating simultaneous regenerative power consumption when regenerative power is not generated in the power management system of FIG. 17. [Figure 22] 18 is a flowchart illustrating an example of a procedure for initial setting of a power supply and demand management device in the power management system of FIG. 17. [Figure 23A] 18 is a flowchart illustrating a procedure of supply and demand management by a power supply and demand management device in the power management system of FIG. 17. [Figure 23B] 18 is a flowchart illustrating a procedure of power supply control of a power supply and demand management device in the power management system of FIG. 17. [Figure 24] FIG. 11 is a sequence diagram illustrating renewable power charging during renewable power generation and issuance of simultaneous RE certificates that can be issued in installments in the power supply and demand management device according to the third embodiment. [Diagram 25]FIG. 11 is a sequence diagram illustrating a simultaneous regenerative power supply and a simultaneous RE certificate update and issuance in the power supply and demand management device according to the third embodiment. [Figure 26A] 11 is a flowchart illustrating a procedure of supply and demand management in a power supply and demand management device according to a third embodiment. [Figure 26B] 13 is a flowchart illustrating a procedure of power supply control in a power supply and demand management device according to a third embodiment. [Figure 27A] FIG. 13 is a diagram illustrating a display screen of simultaneous RE certificate data before division in the power supply and demand management device according to the third embodiment. [Figure 27B] FIG. 13 is a diagram illustrating a display screen of divided simultaneous RE certificate data in the power supply and demand management device according to the third embodiment. [Figure 27C] FIG. 13 is a diagram illustrating a display screen of divided simultaneous RE certificate data in the power supply and demand management device according to the third embodiment. [Figure 28] FIG. 11 is a functional block diagram illustrating a configuration of a power management system according to a fourth embodiment. [Figure 29] 29 is a sequence diagram illustrating a renewable power charging and simultaneous RE certificate issuance based on a request from the charge / discharge system 71 in FIG. 28. FIG. [Diagram 30] 30 is a sequence diagram illustrating the divided issuance of a simultaneous RE certificate in the energy management system of FIG. 28. [Diagram 31] FIG. 13 is a functional block diagram illustrating a distributed ledger system 60 that records transactions for multiple power supply and demand management devices according to a fifth embodiment. [Diagram 32] FIG. 13 is a diagram illustrating an example of a display screen of reproduced power consumption history data issued to a power demand system 10 by a power supply and demand management device according to a sixth embodiment. [Diagram 33] FIG. 23 is a diagram illustrating a display screen of contemporaneous regenerated power consumption history data by the power supply and demand management device according to the sixth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] The embodiments will be described in detail with reference to the drawings. However, the present invention should not be interpreted as being limited to the description of the embodiments shown below. It will be easily understood by those skilled in the art that the specific configuration can be changed without departing from the concept or purpose of the present invention.
[0012] In order to facilitate understanding of the invention, the position, size, shape, range, etc. of each component shown in the drawings may not represent the actual position, size, shape, range, etc. Therefore, the present invention is not necessarily limited to the position, size, shape, range, etc. disclosed in the drawings, etc. Below, each embodiment of the present invention will be described with reference to Figs. 1 to 33.
[0013] Example 1 will be described using Figures 1A to 16. Example 2 will be described using Figures 17A to 23B. Example 3 will be described using Figures 24 and 25. Example 4 will be described using Figures 28 to 30. Example 5 will be described using Figure 31. Example 6 will be described using Figures 32 and 33. EXAMPLES
[0014] In the first embodiment, the power generated by RE is managed by distinguishing between cases where the power is consumed in the same time zone and cases where the power is consumed in different time zones, and different levels of reproduction Electricity supply and RE certificates are provided. In this Example 1, reproduction During the time when electricity can be generated, the generated electricity reproduction When electricity is requested and consumed, the generated electricity is reproduction The operation of issuing a simultaneous RE certificate together with the supply of power will be described below. Hereinafter, the operation of managing the supply and demand of power in the power management system of FIG.
[0015] FIG. 1 is a functional block diagram illustrating a configuration of a power management system according to a first embodiment. As shown in FIG. 1, the power management system of the first embodiment includes a power demand system 10, a power service system 20, a power supply and demand management device 30, a normal power supply system 40, reproductionThe system includes an electricity supply system 50, a distributed ledger system 60 that records electricity transactions, a communication network 110, and an electricity network 120. Each of the components referred to as the "system" includes a controller that includes a computer, which will be described later with reference to FIG.
[0016] The power demand system 10 is a consumer that recognizes controllable load fluctuations, consumes power, and is capable of expressing its intention to at least satisfy demand, or its proxy function. The power service system 20 is a mechanism that provides power supply services in response to requests from the power demand system 10, and is a conventional power company and power seller, or a proxy function for them. The power supply and demand management device 30 is a control function that manages the demand and supply of power, and makes up for shortages and minimizes surpluses to save power. The normal power supply system 40 is a function that supplies power generated without using RE, and is mainly a thermal power plant or a nuclear power plant that uses fossil fuels.
[0017] reproduction The power supply system 50 is a function that supplies electricity generated by RE, and is a power generation function that mainly uses hydroelectric power plants as well as solar and wind power. The distributed ledger system 60 is a blockchain that records electricity transactions. A blockchain is a mechanism that distributes and holds the same data among many participants, allowing correct transactions to be carried out even if there is a participant who commits fraud or does not operate normally, making it extremely difficult to tamper with and not stopping.
[0018] The communication network 110 includes an electric power demand system 10, an electric power service system 20, an electric power supply and demand management device 30, a normal electric power supply system 40, reproduction The power supply system 50 and the distributed ledger system 60 are connected to each other to exchange information. The power network 120 is a grid-connected power transmission network (power transmission and distribution network), and includes a power demand system 10, a power service system 20, a normal power supply system 40, reproduction Connect to the power supply system 50.
[0019] The power management system shown in Fig. 1 is based on the concept and equipment of a smart grid, in which power meters with communication functions (not shown) are installed everywhere and real-time information obtained from them is used to effectively control the flow of power. A smart grid is a power transmission network that can control and optimize the flow of power from both the demand and supply sides. In Japan, it is also called a next-generation power transmission network or a smart community.
[0020] In order to obtain the required power, the power demand system 10 notifies the power service system 20 of the type of power required, the required day, the required time, and the power (kW) via the communication network 110. Here, the power demand system 10 provides normal power, reproduction Simultaneous consumption of electricity and renewable energy generated at the same time reproduction The power consumption can be selected from the following:
[0021] The power service system 20 notifies the power supply and demand management device 30 of the power request made from the power demand system via the communication network 110. Based on the power request from the power service system 20, the power supply and demand management device 30 notifies the normal power supply system 40 or reproduction The power supply system 50 may be supplied with normal power or reproduction The power supply is controlled.
[0022] The normal power supply system 40 supplies normal power to the power demand system via the power network 120 and the power service system 20 in response to a request from the power supply and demand management device 30 . reproduction The power supply system 50, in response to a request from the power supply and demand management device 30, performs the following via the power network 120 and the power service system 20: reproduction The power is supplied to a power demand system 10 .
[0023] The power supply and demand management device 30 determines whether the requested power is reproductionIn the case of electricity, the RE certificate is provided to the electricity demand system 10 that is the request source of the electricity via the communication network 110. In addition, the electricity supply and demand management device 30 determines whether the requested electricity is available at the same time. reproduction In the case of electricity, a simultaneous RE certificate is provided via a communication network 110 to the electricity demand system 10 that is the requestor of the electricity.
[0024] Furthermore, the power supply and demand management device 30 records transactions of power demand and supply in a distributed ledger system 60 via a communication network 110. Although not shown in the figure, the distributed ledger system 60 is composed of multiple data recording nodes, each of which records and holds the same power trading data. This distributed ledger system is constructed using, for example, block chain technology.
[0025] FIG. 1B shows the power supply status, including the power supply amount, normal power, and reproduction This is a table showing the trading unit prices for each type of electricity. Figure 2 is a table showing an example of power supply capacity application data in the power management system of Figure 1. Power supply capacity application data 210 is made up of fields: management ID (Identifier) 201 for identifying each application, system ID 202 for identifying the system that sent the application, power type 203 indicating the power that can be provided, supply date 204 indicating the day on which power can be provided, supply time 205 indicating the time during which power can be provided, supplyable power 206, and supplyable amount of power 207.
[0026] Application R1 shown in row 211 indicates that normal power can be provided from the system with system ID 40, and that up to 500 kW of power and up to 12,000 kWh of power can be supplied from 00:00 to 23:59 on April 1, 2020. Application R2 shown in row 212 indicates that normal power can be provided from the system with system ID 50, and that up to 500 kW of power and up to 12,000 kWh of power can be supplied from the system with system ID 50. reproduction The application indicates that the supply of electricity is possible and that the supply of up to 100kW of electricity and up to 500kWh of electricity is possible on April 1, 2020, from 10:00 to 14:59.
[0027] In the first embodiment, the application for power supply is described by specifying the supply date, but the supply period may be specified. Also, the supply time is described in minutes, but it may be specified in hours, seconds, or other units.
[0028] Fig. 3 is a table illustrating supply power price data in the power management system of Fig. 1. Supply power price data 310 is composed of fields: management ID 301 that identifies the price for each power type, supplied power 302 that indicates the type of power to be provided, price 303 that indicates the price of the supplied power, and supply time 304 during which the power can be supplied.
[0029] The first price data P1 shown in row 311 indicates that the type of electricity provided is normal electricity, the price is 15 yen / kWh, and the time of provision is from 00:00 to 23:59. The second price data P2 shown in row 312 indicates that the type of electricity provided is normal electricity, the price is 15 yen / kWh, and the time of provision is from 00:00 to 23:59. reproduction It shows that the electricity is available, the price is 18 yen / kWh, and the service time is from 00:00 to 23:59.
[0030] In addition, in the third price data P3 shown in row 313, the type of power provided is reproduction It shows that the electricity is electricity, the price is 20 yen / kWh, and the supply time is from 10:00 to 14:59. Note that in the first embodiment, the price 303 is explained as a unit price per 1 kWh, but other price specifications such as a unit price per 1 Wh may be used. Also, the supply time is explained as being in minutes, but it may be specified in other units such as hours.
[0031] 4A is an example of a service provision screen in a time period during which RE power generation is possible in the power management system of FIG. 1. The service provision screen shown in FIG. 4A shows a screen that the power service system 20 presents to the power demand system 10 in a time period during which RE power generation is possible (e.g., April 1, 2020, 10:25). In the first embodiment, in the time period during which RE power generation is possible, normal power (15 yen / kWh), reproduction Electricity (18 yen / kWh) and same time reproduction This shows that three types of electricity provision services are available:
[0032] 4B is an example of a service provision screen in a time period when RE power generation is not possible in the power management system of FIG. 1. The service provision screen shown in FIG. 4B shows a screen that the power service system 20 presents to the power demand system 10 in a time period when RE power generation is not possible (e.g., April 1, 2020, 15:40). In the first embodiment, in a time period when RE power generation is not possible, normal power (15 yen / kWh) and reproduction This shows that two types of electricity provision services are available:
[0033] Fig. 5 is a table illustrating power purchase application data in the power management system of Fig. 1. Power purchase application data 510 is made up of fields: management ID 501 for identifying each application, system ID 502 for identifying the system that sent the application, power type 503 indicating the power desired to be purchased, requested date 504 indicating the date when power is required, requested time 505 indicating the time when power is required, and required power 506.
[0034] Application D1 shown in row 511 indicates an application in which an electricity demand system with a system ID of 10 wishes to purchase 60 kW of regular electricity from 10:25 on April 1, 2020. Application D2 shown in row 512 indicates an application in which an electricity demand system with a system ID of 10 wishes to purchase 60 kW of regular electricity from 11:15 on April 1, 2020. reproductionIn addition, in the application D3 shown in row 513, a power demand system with a system ID of 10 is requesting a 60 kW power purchase at the same time from 12:45 on April 1, 2020. reproduction It shows an application for the purchase of electricity.
[0035] 6 is a diagram illustrating an example of a display screen of RE certificate data in the power management system of FIG. 1. The RE certificate 600 includes a date and time 601 when the RE certificate was issued, an RE certificate ID 602 for identifying an individual certificate, reproduction A system ID 603 for identifying the system that consumed the power; reproduction A system ID 604 that identifies the system that supplied the power; reproduction A supply date 605 indicating the date on which the power was supplied, and reproduction Indicates the amount of power reproduction 606, and power amount.
[0036] In the first embodiment, the RE certificate was issued on April 1, 2020 at 11:55. The RE certificate ID is X01. reproduction The system that consumed the power has a system ID of 10. reproduction The system ID of the system that supplied the power is 50, reproduction The date of power supply was April 1, 2020, and the date of supply was reproduction It shows that the amount of power is 40 kWh. In Example 1, reproduction Although the date of power supply is specified, a period may be indicated.
[0037] Fig. 7 is a diagram illustrating a display screen of simultaneous RE certificate data in the power management system of Fig. 1. A simultaneous RE certificate 700 (hereinafter, the reference number may be omitted) shown in Fig. 7 includes the date and time of issue 701, a simultaneous RE certificate ID 702 for identifying an individual certificate, a simultaneous RE certificate ID 703, and a simultaneous RE certificate ID 704. reproduction System ID 703 that identifies the system that consumed the power, and the same time reproduction System ID 704 to identify the system that supplied power, and the time reproduction The date and time 705 when the power was supplied and consumed, and the amount of the power consumed reproduction 706, and power amount 707.
[0038] In the first embodiment, it is shown that the same-time RE certificate was issued at 13:25 on April 1, 2020. In addition, the same-time RE certificate ID is Z01, and reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 50, and the same time reproduction The date and time when electricity was supplied and consumed was April 1, 2020, from 12:45 to 13:24, reproduction Simultaneous time-based analysis of electricity demand and supply reproduction This indicates that the amount of electricity is 40kWh.
[0039] FIG. 8 shows the power management system of FIG. reproduction FIG. 2 is a sequence diagram illustrating normal power consumption during power generation in the power management system of FIG. reproduction 2 is an example of a sequence diagram of normal power consumption during power generation. First, the normal power supply system 40 notifies the power supply and demand management device 30 of the normal power that can be supplied (step S810). For example, the system ID, power type, supply date, supply time, power, and power amount shown in row 211 of FIG. 2 are notified.
[0040] reproduction The power supply system 50 can supply reproduction The power supply and demand management device 30 is notified of the power (step S811). For example, the system ID, power type, supply date, supply time, power, and power amount shown in row 212 of Fig. 2 are notified. The power supply and demand management device 30 notifies the power service system 20 of the type of power that can be supplied, the price, and the time during which power can be supplied (step S812). For example, the supplied power price data shown in Fig. 3 is notified.
[0041] The power service system 20 presents the services that can be provided to the power demand system 10 (step S813). For example, the screen shown in FIG. 4A or FIG. 4B is presented. After the above initial settings are completed, the power demand system 10 requests the required power (normal power) from the power service system 20 (step S820). For example, the power demand system 10 requests normal power using the power purchase application data shown in row 511 of FIG. 5. The power service system 20 notifies the power supply and demand management device 30 of the received purchase application for normal power (step S821).
[0042] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction After confirming that it is a time when power can be supplied, reproduction For power supply system 50 reproduction The power supply control is executed (step S822). reproduction The power supply system 50, according to the received power supply request, reproduction A power supply start process is executed (step S823). For example, reproduction It controls the supply of power to the power network and records the start time of power supply.
[0043] Also, reproduction The power supply system 50 notifies the power service system 20 in accordance with the received power supply request. reproduction The power supply is started (step S824). reproduction The power demand system 10 supplies the power as normal power to the power demand system 10 (step S825). Next, when the power demand system 10 purchases the necessary normal power, it notifies the power service system 20 of the end of the purchase (step S826). The power service system 20 notifies the power supply and demand management device 30 of the received purchase end information (step S827).
[0044] Based on the received purchase completion information, the power supply and demand management device 30 reproduction The power supply system 50 is controlled to stop supplying power (step S828). reproductionThe power supply system 50 includes: reproduction The power supply is controlled to be stopped, and the time during which the power supply was stopped and the amount of power supplied are calculated (step S829). reproduction The power supply system 50 includes: reproduction The power supply start time, end time, and amount of power supplied are notified to the power supply and demand management device 30 (step S830). The power supply and demand management device 30 notifies the power service system 20 of the amount of power supplied (step S831).
[0045] In addition, the power supply and demand management device 30 issues and holds an RE certificate with an undetermined system ID that consumed the power of the RE certificate described in FIG. 6 for the amount of power supplied (step S832). Note that the RE certificate with an undetermined system ID that consumed this power is supplied together with normal power, so that in a situation where RE power is not being generated, reproduction It is used to supply normal power.
[0046] The power service system 20 executes settlement processing for the normal power supplied to the power demand system 10 (step S833). The power service system 20 also notifies the power supply and demand management device 30 that settlement processing for the normal power supplied to the power demand system 10 has been completed (step S834). The power supply and demand management device 30 notifies the distributed ledger of the details of the supply transaction for the normal power (step S835).
[0047] The distributed ledger system 60 records the received transaction details (step S836). For example, the recorded details include that 40 kWh of regular electricity was supplied to an electricity demand system with a system ID of 10 from 10:25 to 11:04 on April 1, 2020, at a price of 600 yen.
[0048] FIG. 9 shows the power management system of FIG. reproduction During power generation reproduction FIG. 1 is a sequence diagram illustrating an example of power consumption. The power demand system 10 requests the power service system 20 to consume the required power ( reproductionFor example, the power purchase request data shown in row 512 of FIG. reproduction The power service system 20 transmits the received power to the power supply and demand management device 30. reproduction An application for purchasing electricity is notified (step S911).
[0049] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction After confirming that it is a time when power can be supplied, reproduction For power supply system 50 reproduction The power supply is controlled (step S912). reproduction The power supply system 50, according to the received power supply request, reproduction A power supply start process is executed (step S913). For example, reproduction It controls the supply of electricity to the power network, and reproduction Record the time when power was turned on.
[0050] Also, reproduction The power supply system 50 receives reproduction According to the request for power supply, the power service system 20 reproduction The supply of power is started (step S914). reproduction The power demand system 10 then supplies the necessary power (step S915). reproduction When the power is purchased, the completion of the purchase is notified to the power service system 20 (step S916). The power service system 20 notifies the received purchase completion information to the power supply and demand management device 30 (step S917).
[0051] Based on the received purchase completion information, the power supply and demand management device 30 reproduction For the power supply system 50, reproduction Control is then performed to stop the power supply (step S918). reproduction The power supply system 50 includes: reproductionThe power supply is controlled to be stopped, and the time during which the power supply was stopped and the amount of power supplied are calculated (step S919).
[0052] Next, reproduction The power supply system 50 includes: reproduction The power supply start time, end time, and amount of power supplied are notified to the power supply and demand management device 30 (step S920). reproduction An RE certificate corresponding to the amount of power is issued (step S921), and the RE certificate data is notified to the power service system 20 (step S922).
[0053] The power service system 20 notifies the power demand system 10 of the received RE certificate data (step S923). reproduction The power service system 20 notifies the power demand system 10 of the amount of power supplied (step S924). reproduction The settlement process for the electricity is executed (step S925).
[0054] In addition, the power service system 20 supplies the power to the power demand system 10. reproduction The power supply and demand management device 30 is notified that the settlement process for the power has been completed (step S926). reproduction The electricity supply transaction details are notified to the distributed ledger (step S927). The distributed ledger system 60 records the received transaction details (step S928). For example, the recorded details may be, for an electricity demand system with a system ID of 10, from 11:15 to 11:54 on April 1, 2020. reproduction It is recorded that 40 kWh of electricity was supplied, the price was 720 yen, and an RE certificate was issued.
[0055] FIG. 10 shows the power management system of FIG. reproduction At the same time when electricity is generated reproduction FIG. 1 is a sequence diagram illustrating an example of power consumption. The power demand system 10 requests the power service system 20 to consume the required power (at the same time). reproduction For example, the power purchase request data shown in row 513 of FIG. reproduction The power service system 20 transmits the received power to the power supply and demand management device 30 at the same time. reproduction A power purchase application is notified (step S1011).
[0056] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction After confirming that it is a time when power can be supplied, reproduction For power supply system 50 reproduction The power supply is controlled (step S1012). reproduction The power supply system 50, according to the received power supply request, reproduction A power supply start process is executed (step S1013). For example, reproduction It controls the supply of electricity to the power network, and reproduction Record the time when power was turned on.
[0057] Also, reproduction The power supply system 50 receives reproduction According to the request for power supply, the power service system 20 reproduction The power supply is started (step S1014). reproduction Power, at the same time reproduction The power demand system 10 then supplies the power to the power demand system 10 (step S1015). reproduction When the power is purchased, the completion of the purchase is notified to the power service system 20 (step S1016).
[0058] The power service system 20 notifies the received purchase end information to the power supply and demand management device 30 (step S1017). Based on the received purchase end information, the power supply and demand management device 30 reproduction For the power supply system 50, reproduction The power supply is stopped (step S1018). reproduction The power supply system 50 includes: reproduction Control is performed to stop the supply of power, and the time during which the supply was stopped and the amount of power supplied are calculated (step S1019).
[0059] Next, reproduction The power supply system 50 includes: reproduction The power supply start time, end time, and amount of power supplied are notified to the power supply and demand management device 30 (step S1020). reproduction A simultaneous RE certificate (see FIG. 7) corresponding to the amount of power is issued (step S1021), and the simultaneous RE certificate data is notified to the power service system 20 (step S1022).
[0060] The power service system 20 notifies the power demand system 10 of the received simultaneous RE certificate data (step S1023). reproduction The power service system 20 notifies the power amount to the power demand system 10 (step S1024). reproduction The settlement process for the electricity is executed (step S1025).
[0061] In addition, the power service system 20 supplies the power to the power demand system 10 at the same time. reproduction The power supply and demand management device 30 is notified of the completion of the settlement process for the power (step S1026). reproduction The details of the electricity supply transaction are notified to the distributed ledger (step S1027).
[0062] The distributed ledger system 60 records the received transaction details (step S1028). For example, the details to be recorded include the fact that the provided electricity was reproduction power, same time reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 50, and the same time reproduction The date and time of the power supply was from 12:45 to 13:24 on April 1, 2020. reproductionThe amount of electricity is recorded as 40 kWh, the price as 800 yen, and the RE certificate is issued at the same time.
[0063] FIG. 11 shows the power management system of FIG. reproduction 11 is a sequence diagram illustrating normal power consumption when power is not being generated. The power demand system 10 requests the power service system 20 for the power it requires (normal power) (step S1110). The power service system 20 notifies the power supply and demand management device 30 of the received purchase application for normal power (step S1111).
[0064] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction If it is confirmed that it is a time period during which power supply is not possible, control of normal power supply system 40 is executed to supply normal power (step S1112).
[0065] The normal power supply system 40 executes a process to start supplying normal power in accordance with the received request for power supply (step S1113). For example, the normal power supply system 40 controls the supply of normal power to the power network and records the power supply start time. The normal power supply system 40 also starts supplying normal power to the power service system 20 in accordance with the received request for power supply (step S1114).
[0066] The power service system 20 supplies the received normal power to the power demand system 10 (step S1115). Next, when the power demand system 10 purchases the required normal power, it notifies the power service system 20 of the end of the purchase (step S1116). The power service system 20 notifies the power supply and demand management device 30 of the received purchase end information (step S1117).
[0067] Based on the received purchase end information, the power supply and demand management device 30 executes control to stop power supply to the normal power supply system 40 (step S1118). The normal power supply system 40 controls to stop the supply of normal power, and calculates the time for which the supply was stopped and the amount of power supplied (step S1119).
[0068] Next, the normal electricity supply system 40 notifies the electricity supply and demand management device 30 of the start time, end time, and amount of electricity supplied of the normal electricity (step S1120). The electricity supply and demand management device 30 notifies the electricity service system 20 of the amount of electricity supplied (step S1121). The electricity service system 20 executes settlement processing for the supplied normal electricity to the electricity demand system 10 (step S1122).
[0069] The power service system 20 also notifies the power supply and demand management device 30 that the settlement process for the normal power supplied to the power demand system 10 has been completed (step S1123). The power supply and demand management device 30 notifies the distributed ledger of the details of the normal power supply transaction (step S1124). The distributed ledger system 60 records the received transaction details (step S11025). For example, the recorded details may include that 40 kWh of normal power was supplied to the power demand system with system ID 10 from 10:25 to 11:04 on April 1, 2020, at a price of 600 yen.
[0070] FIG. 12 shows the power management system of FIG. reproduction When electricity is not being generated reproduction FIG. 1 is a sequence diagram illustrating an example of power consumption. The power demand system 10 requests the power service system 20 to consume the required power ( reproduction The power service system 20 transmits the received power (electricity) to the power supply and demand management device 30 (step S1210). reproduction A power purchase application is notified (step S1211).
[0071] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction If it is confirmed that it is a time period during which power supply is not possible, control is exercised over the normal power supply system 40 to supply normal power (step S1212).
[0072] The normal power supply system 40 executes normal power supply start processing in accordance with the received power supply request (step S1213). For example, the normal power supply system 40 controls the supply of normal power to the power network and records the start time of the normal power supply.
[0073] In addition, the normal power supply system 40 starts supplying normal power to the power service system 20 in response to the received request for normal power supply (step S1214). The power service system 20 then converts the supplied normal power into reproduction The generated power is supplied as electric power to electric power demand system 10 (step S1215).
[0074] Next, the power demand system 10 reproduction When the power is purchased, the completion of the purchase is notified to the power service system 20 (step S1216). The power service system 20 notifies the received purchase completion information to the power supply and demand management device 30 (step S1217).
[0075] Based on the received purchase end information, the power supply and demand management device 30 controls the normal power supply system 40 to stop the supply of normal power (step S1218). The normal power supply system 40 controls to stop the supply of normal power, and calculates the time for which the supply was stopped and the amount of power supplied (step S1219).
[0076] Next, the normal power supply system 40 notifies the power supply and demand management device 30 of the start time, end time, and amount of power supplied of the normal power (step S1220). The power supply and demand management device 30 issues an RE certificate that it holds, recording the system ID of the system that consumed the power corresponding to the amount of normal power supplied (step S1221), and notifies the power service system 20 of the RE certificate data (step S1222).
[0077] The power service system 20 notifies the power demand system 10 of the received RE certificate data (step S1223). reproduction The power service system 20 notifies the power demand system 10 of the amount of power supplied (step S1224). reproduction The settlement process for the electricity is executed (step S1225).
[0078] In addition, the power service system 20 supplies the power to the power demand system 10. reproduction The power supply and demand management device 30 is notified that the settlement process for the power has been completed (step S1226). reproduction The details of the electricity supply transaction are notified to the distributed ledger (step S1227).
[0079] The distributed ledger system 60 records the received transaction details (step S1228). For example, the recorded details are: April 1, 2020, 11:15 to 11:54, for an electricity demand system with a system ID of 10. reproduction It is recorded that 40 kWh of electricity was supplied, the price was 720 yen, and an RE certificate was issued.
[0080] Fig. 13 is a functional block diagram illustrating the configuration of the power supply and demand management device 30 in the power management system of Fig. 1. In the power supply and demand management device 30, a controller is configured by a computer including a CPU 1301 which is a processor (processing device), a main memory 1302 which is a storage device, a storage 1303, and an input / output interface 1304 which transmits and receives data via the communication network (31). Each component of the controller is connected to each other via a bus 1305. The controller may further include input / output devices not shown, such as a keyboard and an image display device. Note that, not limited to the power supply and demand management device 30, each component referred to as a "system" is provided with a computer in its controller.
[0081] The CPU 1301 controls each unit of the power supply and demand management device 30, and also loads programs stored in the storage 1303 into the main memory 1302 and executes the programs to execute various functions of the power supply and demand management device 30. The main memory 1302 stores a power supply and demand initial setting program and a power supply and demand management program executed by the CPU 1301, as well as work data required for executing the programs (power supply list data, power price list data, RE certificate holding list data, and power trading history data). The storage 1303 is a large-capacity storage device such as an SSD (Solid State Drive) or HDD (Hard Disk Drive).
[0082] Fig. 14 is an explanatory diagram illustrating an example of data stored in the memory in the power supply and demand management device 30 in the power management system of Fig. 1. A power supply and demand management initial setting program 1401 and a power supply and demand management program 1402 are loaded into the main memory 1302 and executed. Also stored are power supply list data 1411, power price list data 1412, RE certificate holding list data 1413, and power trading history data 1414, which are necessary for executing the programs. The power supply list data 1411 is data based on Fig. 2, and is list data of systems that can supply power.
[0083] The electricity price list data 1412 is based on Fig. 3 and is list data indicating the price for each type of electricity that can be provided. The RE certificate holding list data 1413 is based on Fig. 6, but is list data of RE certificates for which the ID of the system that consumes electricity has not been determined. The electricity trading history data 1414 is history data on electricity trading described in Figs. 8 to 12.
[0084] Fig. 15 is a flowchart illustrating an example of an initial setting procedure of the power supply and demand management device 30 in the power management system of Fig. 1. The CPU 1301 of the power supply and demand management device 30 loads the power supply and demand initial setting program 1401 stored in the storage 1303 into the main memory 1302, and starts the initial setting (step S1510).
[0085] The power supply and demand management device 30 determines whether or not a power supply capacity application has been received (step S1511). If it is determined in step S1511 that a power supply capacity application has not been received, the process of step S1511 is continued. If it is determined in step S1511 that a power supply capacity application has been received, the received power supply capacity application is registered (step S1512). Next, the power supply and demand management device 30 determines whether or not a power supply capacity application has been received from all systems that supply power (step S1513).
[0086] If it is determined in step S1513 that power supply capacity applications have not been received from all of the systems that supply power, the process returns to step S1511 and continues. If it is determined in step S1513 that power supply capacity applications have been received from all of the systems that supply power, the initial power demand and supply setting is terminated (step S1514).
[0087] Fig. 16 is a flowchart illustrating a procedure of supply and demand management by the power supply and demand management device 30 in the power management system of Fig. 1. The CPU 1301 of the power supply and demand management device 30 loads the power supply and demand management program 1402 stored in the storage 1303 into the main memory 1302, and starts power supply and demand management (step S1610).
[0088] The power supply and demand management device 30 judges whether or not a power supply request has been received (step S1611). If it is judged in step S1611 that a power supply request has not been received, the process of step S1611 is continued. If it is judged in step S1611 that a power supply request has been received, the time during which power is required is then calculated as follows: reproduction It is determined whether or not it is a power generation time period (step S1612). reproduction If it is determined that it is a power generation time period, then: reproduction It is determined whether power is requested (step S1613).
[0089] In the determination of step S1613, reproduction If it determines that power is required, reproduction From power supply system 50 reproduction Implements control to supply power and also supplies reproduction An RE certificate is issued for the electricity and the electricity is supplied to the electricity demand system 10 that consumes the electricity via the electricity service system 20, and a request is made to record the details of the processed electricity transaction in the distributed ledger system 60 (step S1614).
[0090] In the determination of step S1613, reproduction If it is determined that power is not required, then reproduction It is determined whether power is requested (step S1615). reproduction If it determines that power is required, reproduction Power supply system 50 at the same time reproduction The power supply is controlled so that the reproduction A contemporaneous RE certificate is issued for the electricity and the electricity is supplied to the electricity demand system 10 that consumes the electricity via the electricity service system 20, and a request is made to record the details of the processed electricity transaction in the distributed ledger system 60 (step S1616).
[0091] In the determination of step S1615, reproduction If it is determined that no power is requested, then it is assumed that normal power is requested. reproduction To increase power consumption, reproduction The power supply system 50 supplies the power as normal electricity, while issuing and retaining an RE certificate for the amount of electricity supplied that does not include the system ID of the system that consumed the electricity, and requests that the details of the electricity transaction that was processed be recorded in the distributed ledger system 60 (step S1617).
[0092] In the determination of step S1612, reproduction If it is determined that it is not a power generation time period, then: reproductionIt is determined whether power is requested (step S1618). In the determination of step S1618, reproduction When it is determined that electric power is requested, control is executed to supply normal electric power from the normal electric power supply system 40. Also, in correspondence with the amount of normal electric power supplied, an RE certificate is issued by recording the system ID of the system that consumed the electric power in the RE certificate held, and the electric power is supplied to the electric power demand system 10 that consumes the electric power via the electric power service system 20.
[0093] Furthermore, the content of the processed energy transaction is requested to be recorded in the distributed ledger system 60 (step S1619). reproduction If it is determined that power is not required, then reproduction It is determined whether power is requested (step S1620). reproduction If it is determined that power is required, reproduction The fact that the supply of power is not possible is notified to the power demand system 10 via the power service system 20 (step S1621). reproduction If it is determined that no power is being requested, then it is assumed that normal power is being requested.
[0094] In response to the request, normal power is supplied from the normal power supply system 40, and a request is made to record the details of the processed power transaction in the distributed ledger system 60 (step S1622). After executing the processes of steps S1614, S1616, S1617, S1619, S1621, and S1622, the power supply and demand management process is terminated (step S1623). Note that in the first embodiment, the power demand system 10, the normal power supply system 40, reproduction Although the case where there is a single power supply system 50 has been described, there may be a plurality of each of them, and control may be executed by selecting one of them.
[0095] In this manner, the power management system according to the first embodiment receives simultaneous data from the power demand system 10. reproduction Based on the demand for electricity, the electricity supply and demand management device 30 reproduction The power supply and demand management device 30 requests power. reproduction During the power generation time period, reproduction To Power Supply System 50 reproduction demanding that electricity be provided, reproduction From power supply system 50 reproduction In addition to supplying electricity, reproduction A simultaneous RE certificate 700 corresponding to the amount of power is issued and provided to the power demand system 10.
[0096] As described above, in the power management system according to the first embodiment, when power generated by the RE is consumed in the same time zone (when reproduction electricity consumption) and consumption at different times ( reproduction Differentiate and manage different levels of power consumption reproduction In addition, in the power management system according to the first embodiment, normal power, reproduction Power and time reproduction It is now possible to select the electricity to be used each time.
[0097] Then, when normal electricity is required during the time when RE generation is taking place, the generated electricity is reproduction Electricity is used preferentially, and reproduction By dividing and managing electricity into regular electricity and RE certificates, and supplying regular electricity while holding RE certificates, reproduction This will promote the use of electricity. In addition, during times when RE power generation is not taking place, reproduction When electricity is requested, the company will supply the generated normal electricity and will also supply RE certificates that it holds for the amount of electricity supplied. reproduction This allows selective use of electricity. Furthermore, by recording the electricity transactions that have been carried out on a distributed ledger, it is possible to improve the traceability of electricity transactions. EXAMPLES
[0098] In the second embodiment, a charging / discharging system is further provided in addition to the first embodiment. reproduction By charging and discharging electricity, reproduction The operation of supplying power will be described below. The operation of managing power demand and supply in the power management system according to the second embodiment will be described below with reference to Figs.
[0099] Fig. 17 is a functional block diagram illustrating a configuration of a power management system according to Example 2. The power management system illustrated in Fig. 17A is different from the power system illustrated in Fig. 1 in that it further includes a charge / discharge system 70 connected to the communication network 110 and the power network 120.
[0100] This charging and discharging system 70 reproduction When power is temporarily charged and RE is not being generated, reproduction When power is required, the reproduction By discharging the power, reproduction Supply power.
[0101] At this time, the power supply and demand management device 30 also issues a simultaneous RE certificate. reproduction At the same time, the power demand system 10 that requested the power reproduction Supply power.
[0102] FIG. 17B shows the power supply status, including the power supply amount, normal power, and reproduction 18 is a table showing the trading unit prices for each type of electricity. Fig. 18 is a table showing an example of charging / discharging capacity application data in the electricity management system of Fig. 17. The charging / discharging capacity application data has the same structure as the electricity supply capacity application data explained in Fig. 2. However, in order to charge and discharge the generated electricity, the charging / discharging capacity application data is configured to apply for capacity related to charging and discharging.
[0103] Specifically, an application is made for a management ID 201 for identifying each application, a system ID 202 of a system that performs charging / discharging, a power type 203 for charging, an allowable power 206 for charging / discharging, and an allowable amount of power 207. Note that, among the numbers given in Fig. 18, the same numbers are given to the contents that are the same as those in Fig. 2.
[0104] In application R3 shown in row 213, the charging / discharging system with system ID 70 is reproduction The application indicates that the battery can be charged and discharged within a range of 100kW of electricity and with a capacity of up to 1000kWh.
[0105] Fig. 19 is a table illustrating charging control and power purchase application data in the power management system of Fig. 17. The charging control and power purchase application data in the second embodiment have the same configuration as the power purchase application data described in Fig. 5. In Fig. 19, the same numbers are used for the same contents as in Fig. 5.
[0106] The request D4 shown in row 521 is the content of the request made by the power supply and demand management device 30, and is for the charging and discharging system with the system ID of 70 at the same time. reproduction The application shows an application to receive 100kW of electricity for one hour from 13:00 on April 1, 2020.
[0107] The application D5 shown in row 522 is the content applied for by the power demand system 10, and the system ID is 10 and the power demand system reproduction The application shows an application to carry out electricity consumption at 60 kW from 16:00 on 1 April 2020.
[0108] FIG. 20 shows the power management system of FIG. reproduction During power generation reproduction2 is a sequence diagram illustrating power charging. First, the normal power supply system 40 notifies the power supply and demand management device 30 of the normal power that can be supplied (step S2010). For example, the system ID, power type, supply date, supply time, power, and power amount shown in row 211 of FIG. 2 are notified.
[0109] reproduction The power supply system 50 can supply reproduction The power supply and demand management device 30 is notified of the power (step S2011). For example, the system ID, power type, supply date, supply time, power, and power amount shown in row 212 of FIG.
[0110] The charging / discharging system 70 is a reproduction The power supply and demand management device 30 is notified of the power (step S2012). For example, the system ID, power type, power, and power amount shown in row 213 of FIG.
[0111] The power supply and demand management device 30 notifies the power service system 20 of the type of power that can be supplied, the price, and the time when power can be supplied (step S2013). The power service system 20 presents the power services that can be provided to the power demand system 10 (step S2014).
[0112] After the above initial settings are completed, the power supply and demand management device 30 reproduction It is determined whether or not charging of power is necessary. For example, in the charging / discharging system 70, when the charge amount is less than 50%, reproduction It is determined that power charging is required (step S2020).
[0113] In addition, the power supply and demand management device 30 is configured to reproduction If it is determined that charging is necessary, reproduction For the power supply system 50, reproduction Power supply control is carried out (step S2021).
[0114] reproductionThe power supply system 50 includes: reproduction According to power requirements, reproduction A process to start supplying power is executed (step S2022). For example, reproduction It controls the supply of power to the power network and records the start time of power supply. reproduction The power supply system 50 is connected to the charge / discharge system 70. reproduction The charging / discharging system 70 supplies the necessary power (step S2023). reproduction When the power charging is completed, the power supply and demand management device 30 is notified of the end of charging (step S2024).
[0115] When the power supply and demand management device 30 receives a charging end notification from the charging and discharging system 70, reproduction For the power supply system 50, reproduction Control to stop the power supply is executed (step S2025). reproduction The power supply system 50 includes: reproduction The power supply is controlled to be stopped, and the time when the power supply is stopped and the time when the power supply is stopped are recorded. reproduction The amount of power is calculated (step S2026).
[0116] Also, reproduction The power supply system 50 includes: reproduction The start and end times of power supply, and reproduction The amount of power is notified to the power supply and demand management device 30 (step S2027). reproduction The details of the power charging are notified to the distributed ledger (step S2028).
[0117] The distributed ledger system 60 records the received charging details (step S2029). For example, the recorded details include the system ID of 50. reproduction The power supply system will report to the charging / discharging system with system ID 70 from 13:00 to 13:59 on April 1, 2020. reproduction It supplies 100kWh of power and records that charging has occurred.
[0118] FIG. 21 shows the power management system of FIG. reproductionAt the same time when electricity is not being generated reproduction FIG. 1 is a sequence diagram illustrating an example of power consumption. The power demand system 10 requests the power service system 20 to consume the required power (at the same time). reproduction The power service system 20 transmits the received power (power) to the power supply and demand management device 30 at the same time (step S2110). reproduction A power purchase application is notified (step S2111).
[0119] The power supply and demand management device 30 includes: reproduction During the time period when no power is being generated, reproduction Confirm that power supply is possible and charge / discharge system 70 reproduction The power supply is controlled (step S2112).
[0120] The charging / discharging system 70 receives reproduction According to the power supply requirements, reproduction A power supply start process is executed (step S2113). For example, reproduction It controls the supply of electricity to the power network, and reproduction The charging / discharging system 70 records the time when the power supply started. reproduction According to the request for power supply, the power service system 20 reproduction The power supply is started (step S2114). reproduction Power, at the same time reproduction The generated power is supplied as electric power to electric power demand system 10 (step S2115).
[0121] Next, the power demand system 10 receives the necessary simultaneous reproduction When the power is purchased, the power service system 20 is notified of the purchase completion (step S2116). The power service system 20 notifies the received purchase completion information to the power supply and demand management device 30 (step S2117). Based on the received purchase completion information, the power supply and demand management device 30 notifies the charging and discharging system 70 of the following: reproduction The power supply stop control is executed (step S2118). reproductionThe power supply is controlled to be stopped, and the time when the power supply is stopped and the time when the power supply is stopped are recorded. reproduction The amount of power is calculated (step S2119).
[0122] Next, the charging / discharging system 70 reproduction The start and end times of power supply, and reproduction The amount of power is notified to the power supply and demand management device 30 (step S2120). reproduction A simultaneous RE certificate corresponding to the amount of power is issued (step S2121), and the simultaneous RE certificate data is notified to the power service system 20 (step S2122).
[0123] The power service system 20 notifies the power demand system 10 of the received simultaneous RE certificate data (step S2123). reproduction The power service system 20 notifies the power amount to the power demand system 10 (step S2124). reproduction The settlement process for the electricity is executed (step S2125).
[0124] In addition, the power service system 20 transmits the same time reproduction The power supply and demand management device 30 is notified of the completion of the settlement process for the power (step S2126). reproduction The details of the electricity supply transaction are notified to the distributed ledger (step S2127).
[0125] The distributed ledger system 60 records the received transaction details (step S2128). For example, the details to be recorded include the fact that the provided electricity was reproduction power, same time reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 70, and reproduction The date and time of the power supply was April 1, 2020, from 16:00 to 16:39, and the same time of the power supply reproductionThe amount of electricity is recorded as 40 kWh, the price as 800 yen, and the RE certificate is issued at the same time.
[0126] Fig. 22 is a flow chart illustrating an example of an initial setting procedure of the power supply and demand management device 30 in the power management system of Fig. 17. The CPU 1301 of the power supply and demand management device 30 loads the power supply and demand initial setting program 1401 stored in the storage 1303 into the main memory 1302 to start the initial setting (step S2210). The power supply and demand management device 30 determines whether or not a power supply capacity application has been received (step S2211). If it is determined in the determination in step S2211 that a power supply capacity application has been received, the received power supply capacity application is registered (step S2212).
[0127] Next, the power supply and demand management device 30 determines whether or not it has received power supply capacity applications from all systems that supply power and whether or not it has received charge / discharge capacity applications from all systems that charge / discharge power (step S2215). If it is determined in step S2215 that it has not received power supply capacity applications from all systems that supply power and whether or not it has received charge / discharge capacity applications from all systems that charge / discharge power, it returns to and executes the process of step S2211.
[0128] On the other hand, if it is determined in step S2211 that a power supply capacity application has not been received, it is then determined whether or not a charging / discharging capacity application has been received (step S2213). If it is determined in step S2213 that a charging / discharging capacity application has not been received, the process returns to step S2211. If it is determined in step S2213 that a charging / discharging capacity application has been received, the received charging / discharging capacity is registered (step S2214), and step S2215 is then executed.
[0129] If it is determined in step S2215 that power supply capacity applications have been received from all systems that supply power and that charging / discharging capacity applications have been received from all systems that charge / discharge power, the initial setting of power supply and demand is terminated (step S2216).
[0130] Fig. 23A is a flow chart illustrating a procedure of supply and demand management of the power supply and demand management device 30 in the power management system of Fig. 17. The CPU 1301 of the power supply and demand management device 30 loads the power supply and demand management program 1402 stored in the storage 1303 into the main memory 1302, and starts power supply and demand management (step S2310). reproduction It is determined whether charging of power is necessary (step S2311).
[0131] In the determination of step S2311, reproduction If it is determined that charging is necessary, reproduction From power supply system 50 reproduction The system supplies power, controls charging to the charging / discharging system, and notifies the distributed ledger system of the details of the charging process and requests that it be recorded (step S2312). reproduction The power supply system will report to the charging / discharging system with system ID 70 from 13:00 to 13:59 on April 1, 2020. reproduction It supplies 100kWh of power and records that charging has occurred.
[0132] In addition, reproduction Regarding the necessity of charging the electric power, for example, in the charging / discharging system 70, when the charge amount is less than 50%, reproduction It is determined that power charging is required. reproduction If it is determined that charging of power is not necessary, it is then determined whether or not a power supply request has been received (step S2313). If it is determined in step S2313 that a power supply request has been received, a power supply process (process A) is executed (step S2314).
[0133] After executing steps S2312 and S2314, or if it is determined in step S2313 that a request for power supply has not been received, the power supply and demand management device 30 ends the power supply and demand management (step S2315).
[0134] Fig. 23B is a flowchart illustrating the procedure of power supply control by the power supply and demand management device 30 in the power management system of Fig. 17. In this power supply control flowchart, the same processes as those in the supply and demand management flowchart of Fig. 16 are given the same reference numerals. That is, steps S1612 to S1620 and step S1622 are the same as those in the supply and demand management flowchart of Fig. 16. Therefore, processes that differ from those in the supply and demand management flowchart of Fig. 16 will be described.
[0135] In the determination of step S1620, the power supply and demand management device 30 reproduction If it is determined that a power request has been received, based on the determination in step S1612, reproduction Because it is not a power generation time, the charge / discharge system 70 reproduction Discharge and supply power, and supply power reproduction A contemporaneous RE certificate is issued and supplied in accordance with the amount of electricity, and the details of the processed electricity transaction are notified to the distributed ledger system 60 and requested to be recorded (step S2320).
[0136] The contents to be recorded include, for example, the electricity provided at the same time reproduction power, same time reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 70, and reproduction The date and time of demand and supply for electricity is from 16:00 to 16:39 on April 1, 2020, and the demand and supply are simultaneous. reproduction The amount of power is recorded as 40 kWh, the price as 800 yen, and the fact that a RE certificate was issued at the same time. Next, the power supply and demand management device 30 ends the power supply and demand management process (step S2315).
[0137] As described above, in the second embodiment, the generated electricity reproduction By charging the electricity to the charging and discharging system and discharging it when necessary, the system can be used at the same time even during periods when RE is not being generated. reproductionIn this way, by using a charging and discharging system 70 that can time-shift the supply and demand, 100% of the demand can be met even in bad weather. reproduction Since it can be powered by electricity, reproduction This will enable the issuance of electricity certificates, helping to create a society that reduces fossil fuel consumption. EXAMPLES
[0138] In Example 3, compared to Example 2, the generated electricity reproduction When electricity is charged into the charging / discharging system, a RE certificate is issued at the same time, and the reproduction When electricity was supplied, the same-time RE certificate was divided and supplied. reproduction An operation of issuing and supplying a simultaneous RE certificate corresponding to an amount of power will be described below. Hereinafter, the power supply and demand management operation of the power supply and demand management device according to the third embodiment will be described with reference to Figs.
[0139] FIG. 24 is a diagram illustrating a power supply and demand management device 30 according to the third embodiment. reproduction During power generation reproduction FIG. 1 is a sequence diagram illustrating an example of power charging and issuing a simultaneous RE certificate that can be issued in parts. reproduction It is determined whether or not charging of power is necessary. For example, in the charging / discharging system 70, when the charge amount is less than 50%, reproduction It is determined that power charging is required (step S2410).
[0140] In addition, the power supply and demand management device 30 is configured to reproduction If it is determined that charging is necessary, reproduction For the power supply system 50, reproduction Power supply control is carried out (step S2411).
[0141] reproduction The power supply system 50 includes: reproduction According to power requirements, reproduction A process to start supplying power is executed (step S2412). For example, reproductionIt controls the supply of power to the power network and records the start time of power supply. reproduction The power supply system 50 is connected to the charge / discharge system 70. reproduction The charging / discharging system 70 supplies the necessary power (step S2413). reproduction When the power charging is completed, the power supply and demand management device 30 is notified of the end of charging (step S2414).
[0142] When the power supply and demand management device 30 receives a charging end notification from the charging and discharging system 70, reproduction For the power supply system 50, reproduction Control is then performed to stop the power supply (step S2415). reproduction The power supply system 50 includes: reproduction The power supply is controlled to be stopped, and the time when the power supply is stopped and the time when the power supply is stopped are recorded. reproduction The amount of power is calculated (step S2416).
[0143] Also, reproduction The power supply system 50 includes: reproduction The start and end times of power supply, and reproduction The amount of power is notified to the power supply and demand management device 30 (step S2417). reproduction A simultaneous RE certificate is issued and held for the power (step S2418). The simultaneous RE certificate to be issued will be described later with reference to FIG. 27A.
[0144] In addition, the power supply and demand management device 30 reproduction The charging of the power and the issuance of the simultaneous RE certificate are notified to the distributed ledger (step S2419). The distributed ledger system 60 records the received charging details and the issued simultaneous RE certificate (step S2420). The recorded details are, for example, reproduction The power supply system will report to the charging / discharging system with system ID 70 from 13:00 to 13:59 on April 1, 2020. reproduction The supply of 100 kWh of electricity and the issuance of an RE certificate to the charge / discharge system 70 at the same time are recorded.
[0145] FIG. 25 is a graph showing the simultaneous time of the power supply and demand management device 30 according to the third embodiment. reproduction FIG. 1 is a sequence diagram illustrating an example of power supply and updating / issuing a simultaneous RE certificate. reproduction The power service system 20 transmits the received power (power) to the power supply and demand management device 30 at the same time (step S2510). reproduction A power purchase application is notified (step S2511).
[0146] The power supply and demand management device 30 includes: reproduction Check whether power supply is available or not, reproduction During the time when power supply is not possible, reproduction When it is confirmed that power supply is possible, the charge / discharge system 70 reproduction The power supply is controlled (step S2512).
[0147] The charging / discharging system 70 receives reproduction According to the power supply requirements, reproduction A power supply start process is executed (step S2513). For example, reproduction It controls the supply of electricity to the power network, and reproduction The charging / discharging system 70 records the time when the power supply started. reproduction According to the request for power supply, the power service system 20 reproduction The supply of power is started (step S2514).
[0148] The power service system 20 is provided reproduction Power, at the same time reproduction The power demand system 10 then supplies the power to the power demand system 10 (step S2515). reproduction When the power is purchased, the completion of the purchase is notified to the power service system 20 (step S2516). The power service system 20 notifies the received purchase completion information to the power supply and demand management device 30 (step S2517).
[0149] Based on the received purchase completion information, the power supply and demand management device 30 notifies the charging and discharging system 70 of reproduction The power supply stop control is executed (step S2518). reproduction The power supply is controlled to be stopped, and the time during which the power supply was stopped and the amount of power supplied are calculated (step S2519).
[0150] Next, the charging / discharging system 70 reproduction The power supply and demand management device 30 is notified of the power supply start time, end time, and amount of power supplied (step S2520). The power supply and demand management device 30 divides the issued simultaneous RE certificate (described later with reference to FIG. 27A) and outputs the simultaneous RE certificate of the supplied power. reproduction The same-time RE certificate corresponding to the amount of power (described later using FIG. 27B) and the remaining amount of power in the charging / discharging system reproduction A simultaneous RE certificate (described later with reference to FIG. 27C) for the amount of power supplied is issued (step S2521). reproduction The simultaneous RE certificate data for the amount of power is notified to the power service system 20 (step S2522).
[0151] The power service system 20 notifies the power demand system 10 of the received simultaneous RE certificate data (step S2523). reproduction The power service system 20 notifies the power amount to the power demand system 10 (step S2524). reproduction The settlement process for the electricity is executed (step S2525).
[0152] In addition, the power service system 20 supplies the power to the power demand system 10 at the same time. reproduction The power supply and demand management device 30 is notified of the completion of the settlement process for the power (step S2526). reproduction The details of the electricity supply transaction are notified to the distributed ledger (step S2527).
[0153] The distributed ledger system 60 records the received transaction details (step S2528). For example, the details to be recorded include the fact that the provided electricity was reproduction power, same time reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 70, and reproduction The date and time of the power supply was April 1, 2020, from 16:00 to 16:39, and the same time of the power supply reproduction The amount of electricity is 40 kWh, the price is 800 yen, and the amount of electricity supplied per unit time is reproduction Record that a contemporaneous RE certificate indicating the amount of electricity was issued.
[0154] 26A is a flowchart illustrating a procedure of supply and demand management in the power supply and demand management device 30 according to the third embodiment. The CPU 1301 of the power supply and demand management device 30 loads the power supply and demand management program 1402 stored in the storage 1303 into the main memory 1302, and starts power supply and demand management (step S2610). reproduction It is determined whether charging of power is necessary (step S2611).
[0155] In the determination of step S2611, reproduction If it is determined that charging is necessary, reproduction From power supply system 50 reproduction It supplies power and controls the power received by the charging and discharging system. It also controls the charging and discharging system. reproduction A simultaneous RE certificate for the amount of electricity is issued and stored. Furthermore, the charging and simultaneous RE certificate issuance processes are notified to the distributed ledger system and a request is made for recording (step S2612).
[0156] For example, the contents to be recorded are reproduction The power supply system will report to the charging / discharging system with system ID 70 from 13:00 to 13:59 on April 1, 2020. reproductionIt is recorded that 100 kWh of electricity was supplied and charged, and that a RE certificate was issued at the same time for the 100 kWh charged. reproduction Regarding the necessity of charging the electric power, for example, in the charging / discharging system 70, when the charge amount is less than 50%, reproduction It is determined that power charging is required.
[0157] In the determination of step S2611, reproduction If it is determined that charging of power is not necessary, it is then determined whether or not a power supply request has been received (step S2613). If it is determined in step S2613 that a power supply request has been received, a power supply process (process B) is executed (step S2614). After executing steps S2612 and S2614, or if it is determined in step S2613 that a power supply request has not been received, the power supply and demand management device 30 ends power supply and demand management (step S2615).
[0158] Fig. 26B is a flowchart illustrating the procedure of power supply control in the power supply and demand management device 30 according to the third embodiment. In this power supply control flowchart, the same processes as those in the supply and demand management flowchart in Fig. 16 are given the same reference numerals. That is, steps S1612 to S1620 and step S1622 are the same as those in the supply and demand management flowchart in Fig. 16. Therefore, processes different from those in the supply and demand management flowchart in Fig. 16 will be described.
[0159] In the determination of step S1620, the power supply and demand management device 30 reproduction If it is determined that a power request has been received, based on the determination in step S1612, reproduction Because it is not a power generation time, the charge / discharge system 70 reproduction In addition, the issued simultaneous RE certificate (described later with reference to FIG. 27A) is divided and the simultaneous RE certificate is supplied. reproduction The same-time RE certificate (described later with reference to FIG. 27B) corresponding to the amount of electric power remaining in the charging / discharging system 70 reproductionA simultaneous RE certificate (described later with reference to FIG. 27C) for the amount of electricity will be issued.
[0160] And supplied reproduction The concurrent RE certificate data for the amount of power is notified to the power service system 20. Furthermore, the content of the processed power transaction and the issued concurrent RE certificate are notified to the distributed ledger system 60, and a request is made for recording (step S2620).
[0161] The contents to be recorded include, for example, the electricity provided at the same time reproduction power, same time reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 70, and reproduction The date and time when electricity was supplied according to demand was from 16:00 to 16:39 on April 1, 2020. reproduction The amount of electricity is 40 kWh, the price is 800 yen, and the amount of electricity supplied per unit time is reproduction The fact that the contemporaneous RE certificate describing the amount of power has been issued is recorded. Next, the power supply and demand management device 30 ends the power supply and demand management process (step S2615).
[0162] 27A is a diagram illustrating a display screen of simultaneous RE certificate data before division in the power supply and demand management device 30 according to the third embodiment. A simultaneous RE certificate 2710 in the third embodiment further includes an indicator 2750 indicating whether or not the simultaneous RE certificate 700 shown in FIG. 7 can be divided, and the time and date of supply. reproduction It includes a list 2711 that describes the amount of power. The same contents (701 to 706) as those in the simultaneous RE certificate 700 in FIG.
[0163] In the third embodiment, the same-time RE certificate was issued at 14:00 on April 1, 2020. The same-time RE certificate ID is Z02. reproduction The system ID of the system that consumed power is 70, and reproduction The system ID of the system that supplied power was 50, and the same time reproductionThe date and time of supply and demand when electricity was consumed was April 1, 2020, from 13:00 to 13:59, and the same time when electricity was supplied according to demand. reproduction This indicates that the amount of electricity is 100kWh.
[0164] In addition, since this simultaneous RE certificate was issued to the charging / discharging system 70, the indicator indicating whether or not it is divisible is "Yes", which indicates that this simultaneous RE certificate can be divided. On the other hand, when electricity is directly consumed, the simultaneous RE certificate is set to be divisible. Furthermore, reproduction As a list 2711 of the amount of electricity, from 13:00 to 13:59, reproduction This shows that 100 kWh of electricity was charged. reproduction Not to supply power, but to the charging / discharging system 70 reproduction To charge the battery, the battery was charged at one-hour intervals. reproduction The amount of electricity is listed, but it may also be listed at 5-minute intervals, etc.
[0165] Fig. 27B is a diagram illustrating a display screen of the divided simultaneous RE certificate data in the power supply and demand management device 30 according to the third embodiment. The simultaneous RE certificate 2720 in the third embodiment has the same configuration as the simultaneous RE certificate 2710 shown in Fig. 27A. The same reference numerals are given to the same contents (701 to 706, 2750) as those in the simultaneous RE certificate 2710 in Fig. 27A.
[0166] In Example 3, it is shown that the simultaneous RE certificate was issued at 16:40 on April 1, 2020. The simultaneous RE certificate ID is Z02-01, which indicates a division of the simultaneous RE certificate (ID is Z02) shown in FIG. 27A. reproduction The system ID of the system that consumed power is 10, and the same time reproduction The system ID of the system that supplied power was 70, and reproduction The date and time of supply and demand for electricity consumption is April 1, 2020, from 16:00 to 16:39, and the same time of consumption. reproductionThis indicates that the amount of electricity is 40kWh.
[0167] Furthermore, this same-time RE certificate, reproduction Since this certificate was issued to the electricity demand system 10 that directly consumes electricity, the indicator for whether or not it can be divided is set to "No", which indicates that this simultaneous RE certificate cannot be divided. reproduction The amount of electricity is 5kWh each. reproduction The system that consumed the power was power demand system 10, which consumed the power at 5-minute intervals. reproduction Although the amount of power is indicated, it may be indicated at other intervals.
[0168] Fig. 27C is a diagram illustrating a display screen of the divided simultaneous RE certificate data in the power supply and demand management device 30 according to the third embodiment. The simultaneous RE certificate (2730) in the third embodiment has the same configuration as the simultaneous RE certificate 2710 shown in Fig. 27A. The same reference numerals are given to the same contents (701 to 706, 2750) as those in the simultaneous RE certificate 2710 in Fig. 27A.
[0169] In Example 3, it is shown that the simultaneous RE certificate was issued at 16:40 on April 1, 2020. The simultaneous RE certificate ID is Z02-02, which indicates a division of the simultaneous RE certificate (ID is Z02) shown in FIG. 27A. reproduction The system ID of the system that consumed power is 70, and reproduction The system ID of the system that supplied power was 50, and the same time reproduction The date and time when electricity was consumed was from 13:00 to 13:59 on April 1, 2020, and the same time when electricity was supplied according to demand. reproduction This indicates that the amount of electricity is 60kWh.
[0170] In addition, since this simultaneous RE certificate was issued to the charge / discharge system 70, the indicator indicating whether or not it can be divided is set to "Yes", which indicates that this simultaneous RE certificate can be divided. reproduction List 2731, which lists the amount of electricity, is from 13:00 to 13:59 at the same time. reproduction This shows that 60 kWh of electricity was charged. reproduction To charge the battery, the battery was charged at one-hour intervals. reproduction Although the amount of power is indicated, it may be indicated at other intervals.
[0171] As explained above, the generated electricity reproduction When the power is charged to the charging / discharging system 70, a RE certificate is issued at the same time, and the power is discharged from the charging / discharging system 70. reproduction When electricity was supplied, the same-time RE certificate was divided and supplied. reproduction By issuing and supplying a Concurrent RE Certificate corresponding to the amount of electricity, it becomes possible to issue the Concurrent RE Certificate in parts. To achieve this function, information on whether the certificate can be divided, which was not included in conventional certificates, is incorporated into the certificate and managed separately for when electricity is charged (divisible) and when it is consumed (not divisible), and by recording the division process in the distributed ledger, it has become technically possible to divide and use the Concurrent RE Certificate. EXAMPLES
[0172] In the fourth embodiment, in contrast to the first embodiment, the charging / discharging system 71 is connected to the power service system 20. reproduction The operation of purchasing electricity and issuing a simultaneous RE certificate will be described. reproduction An operation of supplying power and issuing simultaneous RE certificates in installments will be described below. Hereinafter, the power demand and supply management operation according to the fourth embodiment will be described with reference to Figs.
[0173] FIG. 28 is a functional block diagram illustrating a configuration of a power management system according to a fourth embodiment. The power management system illustrated in FIG. 28 is different from the power system illustrated in FIG. 1 in that it further includes a charge / discharge system 71 and a power demand system that are connected to a communication network 110 and a power network 120. The charge / discharge system 71 is a regeneration Electricity is temporarily charged and is sent simultaneously from the electricity demand system 11 regeneration When power is required, the same time it is charged regeneration By discharging power, regeneration Supply power.
[0174] At this time, the power supply and demand management device 30 also issues a simultaneous RE certificate. regeneration At the same time, the charging / discharging system 71 that requested the power regeneration Furthermore, the charging / discharging system 71 simultaneously supplies the electric power to the electric power demand system 11. regeneration When power is supplied, the power supply and demand management device 30 records the time when the power was supplied. regeneration The power supply and demand management device 30 requests the distributed ledger system 60 to record the issued concurrent RE certificates.
[0175] FIG. 29 shows a flow chart based on the request from the charge / discharge system 71 shown in FIG. regeneration FIG. 1 is a sequence diagram illustrating an example of power charging and issuing a simultaneous RE certificate. regeneration The power service system 20 transmits the received power to the power supply and demand management device 30 at the same time (step S2910). regeneration A power purchase application is notified (step S2911).
[0176] The power supply and demand management device 30 includes: regeneration During the hours when electricity is available, regeneration For power supply system 50 regeneration The power supply is controlled (step S2912). regeneration The power supply system 50 receives regeneration According to the power supply requirements, regeneration A power supply start process is executed (step S2913). For example, regeneration Controlling the supply of power to the power network 120; regeneration Record the time when power was turned on.
[0177] Also, regeneration The power supply system 50 receives regeneration According to the request for power supply, the power service system 20 regeneration The supply of power is started (step S2914). regeneration Power, at the same time regeneration The charge / discharge system 71 then supplies the power to the charge / discharge system 71 (step S2915). regeneration Once the power has been purchased, the completion of the purchase is notified to the power service system 20 (step S2916).
[0178] The power service system 20 notifies the received purchase end information to the power supply and demand management device 30 (step S2917). Based on the received purchase end information, the power supply and demand management device 30 regeneration For the power supply system 50, regeneration Control is then performed to stop the power supply (step S2918). regeneration The power supply system 50 includes: regeneration The power supply is controlled to be stopped, and the time during which the power supply was stopped and the amount of power supplied are calculated (step S2919).
[0179] Next, regeneration The power supply system 50 includes: regeneration The start and end times of power supply, and regeneration The amount of power is notified to the power supply and demand management device 30 (step S2920). regeneration A simultaneous RE certificate corresponding to the amount of power is issued (step S2921), and the simultaneous RE certificate data is notified to the power service system 20 (step S2922).
[0180] The power service system 20 notifies the charge / discharge system 71 of the received simultaneous RE certificate data (step S2923). regeneration The power service system 20 notifies the amount of power supplied to the charging / discharging system 71 at the same time (step S2924). regeneration The settlement process for the electricity is executed (step S2925).
[0181] In addition, the power service system 20 supplies the same time regeneration The power supply and demand management device 30 is notified of the completion of the settlement process for the power (step S2926). regeneration The details of the electricity supply transaction are notified to the distributed ledger (step S2927).
[0182] The distributed ledger system 60 records the received transaction details (step S2928). For example, the recorded details include the fact that the concurrent RE certificate ID is Z03 and the concurrent regeneration The system ID of the system that requested power was 71, and regeneration The system ID of the system that supplied power was 50, and the same time regeneration The date and time of the power supply was April 1, 2020, from 14:00 to 14:39, and the same time of the power supply regeneration It is recorded that the amount of electricity is 40 kWh, the indicator showing whether or not it can be divided is "Yes", the price is 800 yen, and at the same time, the RE certificate was issued.
[0183] Fig. 30 is a sequence diagram illustrating the divisional issuance of a simultaneous RE certificate in the power management system of Fig. 28. The power demand system 11 issues a simultaneous RE certificate to the charge / discharge system 71. regeneration The charge / discharge system 71 requests the supply of power at the same time (step S3010). regeneration When power is being charged, regeneration A process to start supplying electric power is executed (step S3011). regeneration The power demand system 11 is controlled to supply power to the power demand system 11. regeneration Record the time when power was turned on.
[0184] In addition, the charging / discharging system 71 receives the same time regeneration According to the request for power supply, the power demand system 11 is notified at the same time. regeneration The supply of power is started (step S3012). Next, the power demand system 11 performs the necessary simultaneous regeneration When the power is consumed, the charging / discharging system 71 is notified of the end of the demand (step S3013). The charging / discharging system 71 notifies the power demand system 11 of the end of the demand at the same time based on the received demand end information. regeneration The power supply stop control, the time when the power supply was stopped, and the amount of power supplied are calculated (step S3014).
[0185] The charging / discharging system 71 transmits information on the simultaneous RE certificate (ID: Z03) that it holds, and the simultaneous RE certificate (ID: Z04) of 20 kWh from 15:40 to 15:59 on April 1, 2020 to the demand system 11. regeneration The power supply and demand management device 30 is notified of the supply of power, and an application is made for division of the simultaneous RE certificate (step S3015).
[0186] The power supply and demand management device 30 divides the simultaneous RE certificate (ID: Z03) based on the received simultaneous RE certificate division application, and divides the simultaneous RE certificate (ID: X03-01, division possibility: no) for the power demand system 11 and the simultaneous RE certificate remaining in the charge / discharge system 71. regeneration A simultaneous RE certificate for electricity (ID: X03-02, divisibility: yes) is issued (step S3016), and notified to the charging / discharging system 71 (step S3017).
[0187] The charging / discharging system 71 holds a simultaneous RE certificate (ID: X03-02, divisibility: yes), and supplies a simultaneous RE certificate (ID: X03-01, divisibility: no) to the power demand system 11 (step S3018).
[0188] The power supply and demand management device 30 notifies the distributed ledger system 60 that the same-time RE certificate (ID: 03) has been invalidated and that a new same-time RE certificate (ID: X03-01, divisibility: no) and a new same-time RE certificate (ID: X03-02, divisibility: yes) have been issued, and requests that this be recorded (step S3019).
[0189] The distributed ledger system 60 records that the concurrent RE certificate (ID: 03) has been invalidated and that a new concurrent RE certificate (ID: X03-01, divisibility: no) and a new concurrent RE certificate (ID: X03-02, divisibility: yes) have been issued (step S3020).
[0190] In the above description, it is assumed that the charge / discharge system 71 and the power demand system 11 are owned by the same person, and the divided simultaneous RE certificates are not traded. On the other hand, when the charge / discharge system 71 and the power demand system 11 are owned by different people, regeneration RE certificates may be bought and sold at the same time as electricity.
[0191] As described above, the charging / discharging system 71 is connected to the power service system 20, and regeneration The electric power is temporarily stored in the charge / discharge system 71, and then discharged from the charge / discharge system 71. regeneration In addition, the charging and discharging system 71 can supply electric power at the same time. regeneration When the power is charged, a RE certificate is issued at the same time, and when the power is discharged from the charging / discharging system 71, a RE certificate is issued at the same time. regeneration When the electricity demand system 11 consumes the electricity, the first simultaneous RE certificate is divided and the simultaneous RE certificate is used to calculate the electricity consumption by the electricity demand system 11. regeneration It will be possible to issue new simultaneous RE certificates for electricity.
[0192] In order to enable the issuance of the simultaneous time certificate in parts, the charge / discharge system 71 transmits the simultaneous time certificate to the power demand system 11. regenerationWhen electricity is supplied, a request is made to the power supply and demand management device 30 to issue a simultaneous RE certificate in parts. The power supply and demand management device 30 checks the record of the simultaneous RE certificate for which partial issuance has been requested in the distributed ledger system 60, and if partial issuance is verified to be possible, it executes partial issuance, making it technically possible to issue the simultaneous RE certificate in parts. Note that the RE certificate can also be used in parts by processing it based on a method that allows partial issuance of the simultaneous RE certificate. EXAMPLES
[0193] In the fifth embodiment, the operation of the distributed ledger system for recording energy transactions managed by multiple energy supply and demand management devices will be described with reference to Fig. 31. Fig. 31 is a functional block diagram illustrating a distributed ledger system 60 for recording transactions for multiple energy supply and demand management devices (30-1 to 30-3) according to the fifth embodiment. The distributed ledger system 60 is connected to the multiple energy supply and demand management devices (30-1 to 30-3) via a communication network.
[0194] As described in the first embodiment, each of the power supply and demand management devices (30-1 to 30-3) manages transactions for power demand and supply, and records the transactions in the distributed ledger system 60. In the fifth embodiment, each of the power supply and demand management devices (30-1 to 30-3) connects to the distributed ledger system 60 and requests that the managed power transactions be recorded.
[0195] The distributed ledger system 60 records all details of electricity transactions requested by multiple electricity supply and demand management devices (30-1 to 30-3). Although three electricity supply and demand management devices are shown in the figure, any other number (N) of devices may be used. As described above, the distributed ledger system 60 is capable of recording and holding details related to electricity transactions managed by multiple electricity supply and demand management devices (30-1 to 30-3). EXAMPLES
[0196] In the sixth embodiment, the power supply and demand management measure 30 is regenerationPower consumption history and time regeneration An operation of issuing the history of power consumption to the power demand system 10 will be described. FIG. 32 is a flow chart of the operation of issuing the history of power consumption to the power demand system 10 by the power supply and demand management device 30 according to the sixth embodiment. regeneration FIG. 1 is a diagram illustrating an example of a display screen of power consumption history data. In the first embodiment, the power demand system 10, for example, regeneration Each time electricity is consumed, the details of the electricity transaction are managed by the electricity supply and demand management system 30 and the distributed ledger system 60.
[0197] In Example 6, the monthly regeneration Data showing the history and cumulative total of power consumption is issued every month to the power demand system 10 by the power supply and demand management device 30. regeneration The power consumption history data 3200 is regeneration Electricity consumed year 3210, consumed regeneration Cumulative total of electricity 3211, each month regeneration Electricity consumption history (3212), and regeneration It consists of a detailed history 3213 of power consumption.
[0198] In Example 6, up to October 2019 regeneration It shows that the power consumption is 370kWh. When you check the details of history 3213, regeneration It is possible to check the detailed history of each electricity transaction. regeneration The confirmation of the power consumption history has been described above. The power demand system 10: regeneration When both normal and regular power are selected and both types of power are consumed, the amount of power consumed is displayed in a different color so that it is easy to tell. Information is also provided about the percentage of each type of power consumed in relation to the total power consumption.
[0199] FIG. 33 is a graph showing the simultaneous time by the power supply and demand management device 30 according to the sixth embodiment. regeneration FIG. 10 is a diagram illustrating an example of a display screen of power consumption history data. regenerationEach time electricity is consumed, the details of the electricity transaction are managed by the electricity supply and demand management system 30 and the distributed ledger system 60. regeneration Data indicating the history and cumulative total of power consumption is issued by the power supply and demand management device 30 to the power demand system 10 every month.
[0200] The same time shown in the figure regeneration The power consumption history data 3300 is regeneration Electricity consumption year 3310, consumed regeneration Cumulative total of electricity 3311, same time in each month regeneration Electricity consumption history 3312 and the same time regeneration In the sixth embodiment, the detailed power consumption history 3313 is configured. regeneration It shows that the power consumption is 415kWh. When checking the contents of the history detail 3313, regeneration It is possible to check the detailed history of each electricity transaction.
[0201] In the above, at the same time regeneration We have explained how to check the power consumption history, but the power demand system regeneration When multiple types of power are consumed, for example, by selecting between normal power and other types of power, the amount of each type of power consumed is displayed in a different color so that the amount of each type of power consumed can be seen. Information is also provided about the percentage of each type of power consumed relative to the total power consumption. As described above, the power demand system 10 can display the consumed amount of power. regeneration power, same time regeneration It is possible to manage the history and cumulative totals of power consumption for power, normal power, and a mixture of these.
[0202] [1] The power management system according to the embodiment of the present invention is a system that uses renewable energy (RE) generated electricity. regeneration It is an electricity management system that manages electricity trading, and can be summarized as follows. The electricity management system is a system that manages electricity generated based on renewable energy RE. regeneration A power supply system capable of supplying power to a power demand system 10 regenerationThe system is configured to include a power supply system 50 and a power supply and demand management device 30 that manages the demand and supply of power. The power supply and demand management device 30 manages the following during a power generation time period: regeneration The power supply system 50 is requested to supply power to the power demand system 10, and the amount of power supplied is regeneration A certificate is issued to the electricity demand system 10 that electricity has been consumed in accordance with its generation.
[0203] First of all, there is no charge / discharge function. regeneration A basic form is defined in which a simultaneous RE certificate 700 is issued when power is consumed in real time. The power demand system 10 consumes power. The power supply and demand management device 30 regeneration During the power generation time period, regeneration If there is a demand for electricity, regeneration Power Supply System 50 regeneration At this time, the power supply and demand management device 30 regeneration Power Supply System 50 regeneration Power is supplied and regeneration A simultaneous RE certificate 700 corresponding to the amount of power is issued and provided to the power demand system 10.
[0204] As a result, the consumers constituting the electricity demand system 10 or their representative organizations benefit by receiving the simultaneous RE certificate 700, which serves as proof of their contribution to society. The simultaneous RE certificate 700, which comes with benefits, can also be used as a trading material. Thus, the electricity supply and demand management device can contribute to society by recording the environmental value of electricity generated by RE and encouraging consumption at the same time.
[0205] [2] In contrast to the basic form described above [1], the power management system is regeneration It is preferable that the system further includes a power supply system 50, a power supply and demand management device 30, a power service system 20, a power demand system 10, a power network 120, and a communication network 120.
[0206] regenerationThe power supply system 50 generates electricity using RE. regeneration The power demand and supply management device 30 manages the demand and supply of power. The power service system 20 manages the power supply service. The power demand system 10 consumes power. The power network 120 regeneration The communication network 120 transmits power between the power supply system 50, the power service system 20, and the power demand system 10. regeneration It provides communication between the power supply system 50, the power supply and demand management device 30, the power service system 20, and the power demand system 10.
[0207] The power service system 20 includes: regeneration At the same time as electricity is generated regeneration The power service system 20 can issue a simultaneous RE certificate 700 that proves that the power has been consumed. regeneration Based on the demand for electricity, the power supply and demand management device 30 regeneration In response to this, the power supply and demand management device 30 regeneration During the power generation time period, regeneration To Power Supply System 50 regeneration Demand that power be provided.
[0208] The information related to the various requests described above is instantly transmitted by the communication network 120 between the power supply and demand management device 30, the power service system 20, and the power demand system 10 through the communication function. With its rich functions, the power management system of this type [2] can: regeneration The power supply system 50 regeneration At the same time that electricity is generated, the electricity demand system 10 regeneration It can be induced to consume electricity without delay.
[0209] [3] In contrast to the basic configuration [2] described above, it is also desirable to take into account the case where normal power is requested even though RE generation is possible. Such a power management system [3] can regeneration The power supply and demand management device 30 may supply power to the consumer, and in conjunction with this, issue a corresponding RE certificate 600, which may be retained by the issuer without being handed over to the consumer. regeneration It is also possible to issue the RE certificate 600 for the electricity. In this way, the electricity management system of the third aspect is as follows: regeneration If a request for regular power supply is made during power generation hours, regeneration From power supply system 50 regeneration The RE certificate 600 corresponding to the amount of electricity supplied is issued, but is not put into circulation and is kept by the issuer. regeneration Even if we aim to utilize electricity, it is realistic to use electricity derived from fossil fuels to make up for shortages due to bad weather. In such cases, the scope of application of the present invention can be expanded, and the electricity can be supplied at the same time according to the selection of the electricity consumer. regeneration Electricity certificates can be issued.
[0210] [4] In contrast to the above-mentioned configuration [3], in a state where RE power generation is not possible, regeneration When an electric power request is made, the electric power management system of this embodiment [4] may supply normal electric power and the RE certificate 600 stored therein. The electric power management system of this embodiment [4] further includes a normal electric power supply system 40 connected to the electric power network 120 and the communication network 110. The electric power supply and demand management device 30 of this embodiment [4] includes: regeneration Even though it is a time when electricity generation is not possible, regeneration When a supply of electricity is requested, the normal electricity supply system 40 is controlled to supply normal electricity, and the RE certificate 600, which is held like savings, is provided to the electricity demand system 10 in accordance with the amount of electricity already supplied.
[0211] [5] In contrast to the basic form [2] described above, regeneration It is preferable that the power management system of this embodiment [5] further includes a charging / discharging system 70 connected to the power network 120 and the communication network 110. The power supply and demand management device 30 of this embodiment [4] includes: regeneration During power generation hours regeneration Supplied from the power supply system 50 regeneration If it is determined that there is enough power to charge, the supplied regeneration The electric power is used to charge the charging / discharging system 70. This type of power management system [5] can contribute to peak shaving and can also save on the amount of new normal power generation.
[0212] [6] In contrast to the basic form [5] described above, when RE generation is not possible and RE is requested at the same time, the charged power may be discharged and the RE certificate 700 may be provided at the same time. The power supply and demand management device 30 in this form [6] may: regeneration At the same time, even though it was a time when electricity generation was not possible, regeneration When a power supply is requested, the charge / discharge system 70 regeneration Discharge the power regeneration The power management system supplies power and provides a contemporaneous RE certificate 700 corresponding to the supplied power to the power demand system 10. The power management system of this type [6] can certify by the contemporaneous RE certificate 700 that the amount of new normal power generation has been saved.
[0213] [7] The power supply and demand management device 30 realizing the above-mentioned form [6] may issue the simultaneous RE certificate 700. The simultaneous RE certificate 700 of such form [7] is a certificate of the time period during which the power was supplied and the time period during which the power was supplied. regeneration It may consist of a list of one or more combinations of power amounts.
[0214] [8] The simultaneous RE certificate 700 that realizes the above-mentioned embodiment [7] may be issued in parts. regeneration Since the amount of charging and discharging electricity do not correspond to a single unit, certificates are issued for separate units.
[0215] [9] The energy management system realizing the above-mentioned embodiment [7] preferably further includes a distributed ledger system 60 connected to the communication network 110. The energy supply and demand management device 30 in such embodiment [9] only needs to record the details of the energy transactions in the distributed ledger system 60.
[0216]
[10] In the power management system realizing the above-mentioned embodiment [9], the power supply and demand management device 30 controls the power demand system 10 as follows: regeneration Same time as power regeneration It is sufficient to provide either historical or cumulative information, or both, regarding the consumption of either or both of the electricity. This type of power management system
[10] can regeneration Power is consumed preferentially and, if possible, at the same time. regeneration Consumption of electricity is encouraged.
[0217]
[11] The basic power supply and demand management device 30 that issues the simultaneous RE certificate 700 is a device that manages the demand and supply of power using a controller equipped with a CPU 1301 and a storage 1303. When RE is being generated, regeneration When electricity is required, it is generated regeneration Provided and provided power regeneration A simultaneous RE certificate 700 is issued for the amount of electricity. regeneration Consumption of electricity is encouraged.
[0218]
[12] The power supply and demand management device 30 that realizes the above-mentioned embodiment
[11] is regeneration If there is power, it is discharged and supplied, and a corresponding simultaneous RE certificate 700 is issued. regeneration When power is required, it is charged regeneration Discharge the power, regeneration Provided and provided power regeneration For the amount of electricity, a contemporaneous RE certificate 700 is issued. This type of power management system
[12] can certify with the contemporaneous RE certificate 700 that the amount of new normal electricity generation has been saved, even if no RE is being generated.
[0219]
[13] It is preferable that the power supply and demand management device 30 realizing the above-mentioned configuration
[12] records the power trade. The power supply and demand management device 30 of such a configuration
[13] includes: regeneration Information on the source of electricity generation, regeneration Information on where electricity is consumed, regeneration The amount of power consumed regeneration The information of the simultaneous RE certificate 700 issued for the amount of power is recorded. regeneration By encouraging electricity consumption, we can contribute to society.
[0220]
[14] The basic method of managing electricity supply and demand to issue the Concurrent RE Certificate 700 is to regeneration When electricity is required, it is generated regeneration Provided and provided power regeneration This is a method for managing the demand and supply of electricity by a controller equipped with a CPU 1301 and a storage 1303, with a procedure for issuing a simultaneous RE certificate 700 for the amount of electricity. regeneration By encouraging electricity consumption, we can contribute to society.
[0221]
[15] In the power supply and demand management method realizing the above-mentioned form
[14] , it is preferable to record the power trade. In the power supply and demand management method of this form
[15] , when RE is not being generated, regeneration When power is required, it is charged regeneration Discharge the power, regeneration Provided and provided power regeneration It is advisable to execute the procedure of issuing the simultaneous RE certificate 700 for the amount of power. regeneration By encouraging electricity consumption, we can contribute to society. [Explanation of symbols]
[0222] 10, 11 Electric power demand system, 20 Electric power service system, 30 Electric power supply and demand management device, 40 Normal electric power supply system, 50 regeneration Power supply system, 60 Distributed ledger system, 70, 71 Charging and discharging system, 110 Communication network, 120 Power network, 600 RE certificate, 700 Simultaneous RE certificate
Claims
1. A power management system that manages trading of power generated by renewable energy, A renewable power supply system capable of supplying power generated based on the renewable energy to a power demand system; An electric power supply and demand management device that manages the demand and supply of the electric power; an electric power service system that manages an electric power supply service; an electric power network that transmits electric power between the electric power service system, a renewable electric power supply system capable of supplying renewable electric power generated by RE representing the renewable energy, and the electric power demand system; a communication network that provides communication between the renewable power supply system, the power supply and demand management device, the power service system, and the power demand system; Equipped with The power supply and demand management device includes: requesting the renewable power supply system to supply the power to the power demand system during a power generation time period; issuing to the electricity demand system a certificate that the amount of electricity supplied was consumed in accordance with the generation of the electricity; The power service system includes: It is possible to issue a simultaneous RE certificate showing that renewable electricity was consumed at the same time as it was generated. a request for simultaneous regenerated power to the power supply and demand management device based on a demand request for simultaneous regenerated power from the power demand system; Power management system.
2. The power supply and demand management device is capable of issuing a RE certificate indicating that the power is renewable, When a supply of normal power is requested during a renewable power generation time period, the renewable power supply system supplies power and issues and holds the RE certificate corresponding to the amount of power supplied. The power management system of claim 1 .
3. a normal power supply system connected to the power network and the communication network; When a supply of renewable power is requested during a time period when renewable power generation is not possible, the power supply and demand management device controls the normal power supply system to supply power, and provides the power demand system with a RE certificate that is held in accordance with the amount of power already supplied. The power management system according to claim 2 .
4. A charging / discharging system connected to the power network and the communication network, When the power supply and demand management device determines that there is a margin for charging the renewable power supplied from the renewable power supply system during the renewable power generation time period, Charging the charging / discharging system with the supplied regenerative power; The power management system of claim 1 .
5. When the supply of renewable power is requested at the same time even though it is a time period during which renewable power generation is not possible, the power supply and demand management device Discharging the renewable power stored in the charging / discharging system to supply the renewable power, and providing a simultaneous RE certificate corresponding to the supplied power to an electricity demand system. The power management system according to claim 4 .
6. The power supply and demand management device is also capable of issuing the simultaneous RE certificate, The same-time RE certificate is composed of one or more lists of combinations of the time period during which electricity was supplied and the amount of renewable electricity supplied. The power management system according to claim 5 .
7. The simultaneous RE certificate can be issued in parts, The power management system according to claim 6.
8. The power supply and demand management device further includes a distributed ledger system connected to the communication network, and the power supply and demand management device records details of the power transaction in the distributed ledger system. The power management system of claim 7.
9. The power supply and demand management device provides the power demand system with either history or cumulative information, or both, regarding consumption of either or both of the renewable power and the simultaneous renewable power; The power management system of claim 8.
10. This is an electric power supply and demand management device that manages the demand and supply of electric power using a controller equipped with a CPU and storage, and when simultaneous regenerated electric power is requested while RE is being generated, supplies the generated regenerated electric power and issues a simultaneous RE certificate for the amount of regenerated electric power supplied.
11. When the RE is not generating power and simultaneous regenerative power is requested, the regenerative power stored in the storage unit is discharged to supply the regenerative power, and the simultaneous RE certificate is issued for the amount of regenerative power supplied. The power supply and demand management device according to claim 10.
12. Recording information on a generator of the renewable power, information on a consumer of the renewable power, the amount of the consumed renewable power, and information on the simultaneous RE certificate issued for the amount of the consumed renewable power; The power supply and demand management device according to claim 11.
13. This is an electricity supply and demand management method that manages electricity demand and supply using a controller equipped with a CPU and storage, and when simultaneous regenerative electricity is requested while RE is being generated, the generated regenerative electricity is supplied and a simultaneous RE certificate is issued for the amount of regenerative electricity supplied.
14. When the RE is not generating power and simultaneous regenerative power is requested, the regenerative power stored in the storage unit is discharged to supply the regenerative power, and the simultaneous RE certificate is issued for the amount of regenerative power supplied. The power supply and demand management method according to claim 13.
Citation Information
Patent Citations
System for evaluating value-added of power generation by renewable energy
JP2001306755A
Electric-power distribution management device, method, and program
JP2016177734A
Environmental value transaction system, environmental value transaction method and environmental value transaction program
JP2019067250A
Electric power transaction platform
JP2020009334A
Co2-free valued electric power purchase intermediation system and co2-free valued electric power purchase intermediation method
JP2020166666A
