Attendance management system and attendance management program
The attendance status management system addresses the inefficiencies of conventional systems by using a point conversion table to calculate and notify employees and managers of excessive workloads, effectively reducing overtime and improving work management.
Patent Information
- Application Number
- JP2021168736
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-10-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-10-14
AI Technical Summary
Conventional attendance management systems fail to effectively manage and guide employee workloads, leading to excessive overtime and undermanaged work, without providing sufficient guidance due to the lack of indices for determining work management sufficiency.
An attendance status management system that integrates a point conversion table associating overtime work applications with points, calculates cumulative warning values, and generates warning information for users and managers through a warning point calculation system and generation unit.
Enables accurate workload assessment and guidance by visualizing work management, reducing overtime and improving work distribution through cumulative warning point calculations and notifications.
Smart Images

Figure 0007569776000001 
Figure 0007569776000002 
Figure 0007569776000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an attendance status management system and an attendance status management program. [Background technology]
[0002] There is a known attendance status management system that manages the attendance status of employees of a company, etc. Conventional attendance status management systems manage the arrival time and departure time of each employee, but do not function effectively in controlling and guiding the work management of each employee.
[0003] For example, an employee may be able to apply for overtime or holiday work in advance for the amount of time required (both of which are referred to as "overtime work applications") and be able to fully control his or her own work, while another employee may be forced to make sudden overtime or holiday work applications frequently due to an excessive workload, sudden occurrence of work, or insufficient work management. Reducing such sudden overtime and holiday work is required in terms of labor management. In addition, it is necessary to "visualize" employees with heavy workloads and employees with insufficient work management. If "visualization" can be achieved, it will be possible to identify employees with too much workload or employees who do not properly manage their work, and redistribute work and provide guidance to employees more appropriately.
[0004] However, the current attendance status management system is not able to fully support such a management function. Conventional attendance status management systems have no indicators for judging whether each person's work management is sufficient or not, so there is a problem that guidance cannot be given sufficiently and accurately. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2019-61476 A Summary of the Invention [Problem to be solved by the invention]
[0006] The present invention provides an attendance status management system and attendance status management program that enable understanding of employee workload and work management status, and provide accurate guidance to employees on work management. [Means for solving the problem]
[0007] In order to solve the above problems, the attendance status management system of the present invention is characterized by comprising a memory unit that stores a point conversion table that associates items related to overtime work applications with point numbers, a calculation unit that accumulates the point numbers according to information related to the overtime work application input from a user terminal used by the user and outputs the accumulated value, and a warning information generation unit that generates warning information indicating a warning to the user according to the accumulated value, and presents it to the user terminal and a managerial terminal used by a manager who manages the users. Effect of the Invention
[0008] According to the attendance status management system of the present invention, it is possible to provide an attendance status management system and attendance status management program that enable understanding of an employee's workload and work management status, and provide accurate guidance to employees on work management. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram illustrating an overall configuration of an attendance status management system according to a first embodiment. [Diagram 2] 4 is an example of an index point conversion table stored in an index point conversion table database 430. [Diagram 3] 13 shows a method for calculating an integrated value of warning points for one employee in the warning point calculation system 120. [Figure 4]5 is a flowchart illustrating a procedure for calculating warning points and sending warning information in the attendance status management system according to the first embodiment. [Diagram 5] This is an example in which the cumulative warning points for a given month for multiple (eg, four) employees (users A to D) supervised by one manager who is the operator of a manager terminal 300 are displayed in the form of a bar graph. [Figure 6] 13 is an example of a bar graph showing monthly changes in the integrated value of warning points for one user. [Figure 7] FIG. 11 is a schematic diagram illustrating an attendance status management system according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, the present embodiment will be described with reference to the accompanying drawings. In the accompanying drawings, functionally identical elements may be indicated by the same numbers. Note that the accompanying drawings show embodiments and implementation examples according to the principles of the present disclosure, but these are for understanding the present disclosure and are not to be used to interpret the present disclosure in a limiting manner. The description in this specification is merely a typical example and does not limit the scope or application of the present disclosure in any sense.
[0011] In the present embodiment, the description is given in sufficient detail for a person skilled in the art to implement the present disclosure, but it should be understood that other implementations and forms are possible, and that changes in configuration and structure and substitutions of various elements are possible without departing from the scope and spirit of the technical ideas of the present disclosure. Therefore, the following description should not be interpreted as being limited thereto.
[0012] [First embodiment] The overall configuration of the attendance status management system according to the first embodiment will be described with reference to Fig. 1. This attendance status management system is configured by connecting an attendance status management server (hereinafter simply referred to as the management server) 100, a user terminal 200, a manager's terminal 300, and a database 400 via a network (LAN, WAN, Internet, etc.). The user terminal 200 is a terminal operated by an employee (user) of a company or the like that is a user of this system, and may be configured by a general-purpose personal computer, tablet, etc.
[0013] The managerial terminal 300 is a terminal operated by a manager who manages employees. The managerial terminal 300 differs from the user terminal 200 in that it is provided with a function for performing approval tasks related to various applications input from the user terminal 200, but otherwise has the same functions and configuration as the user terminal 200. When the manager who operates the managerial terminal 300 is an employee, the managerial terminal 300 itself may function as the user terminal 200.
[0014] Although only one user terminal 200 and one managerial terminal 300 are shown in FIG. 1, multiple user terminals 200 and multiple managerial terminals 300 can be provided in one system depending on the number of users and managers.
[0015] The management server 100 has the function of inputting and outputting data between the user terminal 200 and the manager terminal 300, managing the work status of users, and presenting a work information confirmation screen for confirming the work status to the user terminal 200 and the manager terminal 300. The management server 100 is also provided with a function for controlling the automatic shutdown of the user terminal 200.
[0016] The management server 100 may be a general server computer, and is configured, for example, with a CPU 101, a ROM 102, a RAM 103, a hard disk drive 104, an input / output unit 105, a display 106, and the like.
[0017] Various applications for executing the functions of the management server 100 are stored as a Web container 110 in a storage unit such as the hard disk drive 104. The Web container 110 may include, for example, a work status confirmation screen control application 111 that controls a work information confirmation screen for confirming the work status of employees, a workflow system application 112 that is responsible for input / output, transfer, and data processing of various data related to the business (clock in, clock out, various applications, approvals, etc.) of the company in which this system is introduced, and an automatic shutdown application 113 that executes automatic shutdown of the user terminal 200.
[0018] The automatic shutdown application 113 is an application that starts a countdown to shutdown when a specified work end time or the end time of overtime applied for approaches, and forcibly shuts down the user terminal 200 when the end time arrives.
[0019] In addition, the management server 100 includes a warning point calculation system 120 (calculation unit) and a warning information generation unit 130. The warning point calculation system 120 is configured to calculate warning points for each employee according to an index point conversion table described below, an application from the user terminal 200, and the status of automatic shutdown. The warning information generation unit 130 has a function of generating warning information when the warning point of an employee calculated by the warning point calculation system 120 exceeds a threshold value. The generated warning information is presented to the user terminal 200 and the manager's terminal 300 by the workflow system application 112. The warning point calculation system 120 and the warning information generation unit 130 can also be installed as applications in the Web container 110.
[0020] The management server 100 is connected to a database 400. The database 400 is a storage device that stores various data necessary for the performance of business in a company or the like in which the present system is introduced, and includes, as examples, an attendance information database 410, a shutdown information database 420, an index point conversion table database 430, and a warning point database 440. The attendance information database 410 manages employee attendance information according to information such as employee arrival times and departure times, overtime applications, and holiday work applications input from the user terminal 200 or other terminals.
[0021] The shutdown information database 420 manages the automatic shutdown operation status provided by the automatic shutdown application 113 on an employee basis. The index point conversion table database 430 is a database that manages an index point conversion table, which will be described later. The warning point database 440 is a database that manages the accumulated value of warning points calculated for each employee. The accumulated value of warning points is calculated by the warning information generation unit 130, and the result of the calculation is transferred to the warning point database 440 and stored therein.
[0022] As described above, the user terminal 200 is a terminal (computer) used by employees to perform their work, and is configured, for example, with a CPU 201, ROM 202, RAM 203, a hard disk drive 204, an input / output unit 205, a display 206, etc. The user terminal 200 is provided with a workflow system application 212 corresponding to the workflow system application 112 via the network, and is capable of inputting various applications from the input / output unit 205 using this workflow system application 212.
[0023] As described above, managerial terminal 300 is a terminal (computer) used by managers who manage employees to carry out their own work and to manage employees, and is configured, for example, with CPU 301, ROM 302, RAM 303, hard disk drive 304, input / output unit 305, display 306, etc. Similarly, managerial terminal 300 is provided with workflow system application 312 corresponding to workflow system application 112 via the network. This workflow system application 312 can be used to execute approval operations for various applications from employees.
[0024] An example of an index point conversion table stored in the index point conversion table database 430 will be described with reference to Fig. 2. The index point conversion table is a table that associates an index with a warning point that is allocated when an event indicated by the index occurs, using indicators such as shutdown of the user terminal 200, the presence or absence of an overtime application and the timing of the application, and the occurrence of working on a holiday. An item number is also assigned to each indicator.
[0025] The indicator point conversion table associates an indicator with a warning point that is given each time the event indicated by that indicator occurs. The warning point given to each indicator is a different numerical value, and the more the occurrence of the event indicated by the indicator should be avoided (for example, the greater the workload), the larger the warning point that is given.
[0026] For example, in the case of shutdown, if the user terminal 200 is manually shut down by the user himself (item number 1), the warning point is 0. When a manual shutdown is performed, it can be assumed that the user is able to properly manage his / her own work, so the warning point is set to 0.
[0027] On the other hand, when the user terminal 200 is shut down by automatic shutdown executed by the automatic shutdown application 113 without the user's operation (item number 2), the warning point is a large value of +30. This is because when automatic shutdown is executed, it can be presumed that the user is not managing his / her work properly, or that the user is so busy that he / she has forgotten to apply for overtime, or has applied for overtime but forgotten the end time of the applied time.
[0028] Regarding overtime requests, different warning points are assigned depending on whether the overtime request was made from the user terminal 200 and also on the timing of the overtime request. In principle, large warning points are assigned to indicators that are estimated to indicate insufficient user time management.
[0029] For example, if no overtime application is made (item 3), the warning points are ±0. On the other hand, if an overtime application is made from the user terminal 200 more than 30 minutes before the stop time of the user terminal 200 (the time when the countdown to the start of shutdown begins) (item 4), the warning points are also 0. The reason for the 0 point is that if an overtime application is made more than 30 minutes before the stop time, it can be assumed that the user's time management and workload are appropriately understood.
[0030] On the other hand, if an overtime application is made between 30 minutes before the stop time of the user terminal 200 and the stop time (item 5), the warning points are set to +10. The reason why the warning points are set to 10 is because it is considered that time management is not being performed sufficiently as compared to item 4. Also, if an overtime application is made after the stop time (after the countdown has started) (item 6), the warning points are set to +20, which is even higher than item 5.
[0031] If overtime is requested three or more times in one day (item 7), the warning points are increased by +20, which is a larger number than item 5. This is because it can be assumed that the necessary overtime hours are not fully understood and time management is not being done properly. In this way, when an overtime request is made, different warning points are given depending on the timing of the request. If work is done on a holiday, an even larger warning point (here, +30) is given than when an overtime request is made.
[0032] The conversion table in Figure 2 is just an example, and it goes without saying that different indicators than those shown in the figure or additional indicators may be included depending on the company's policy and changes in circumstances. For example, different warning points can be given not only for holiday work, but also for the timing of the request.
[0033] Fig. 3 is a schematic diagram showing a calculation method for an accumulated value of warning points calculated for one employee in the warning point calculation system 120. The warning point calculation system 120 determines the number of occurrences of indicators shown in the indicator point conversion table according to information on overtime applications and shutdown operations of the user terminal 200 input by each employee via the workflow system application 212, and calculates warning points according to the number of occurrences. The accumulated value of the multiple points calculated in Fig. 3 becomes the warning points for that employee.
[0034] When the warning points exceed a predetermined threshold, the warning information generating unit 130 generates warning information to warn the employee and presents it to the user terminal 200 and the manager terminal 300. When events corresponding to multiple indicators occur during one day, the warning points given to the multiple indicators are all accumulated and added (integrated) to calculate an integrated value. For example, if a user applies for overtime 20 minutes before the stop time, but then an automatic shutdown is also performed, items 2 and 5 are applied redundantly, and the total integrated value for one day is 30+10=40 points. For example, if a user works on a holiday and then continues working and his / her user terminal 200 is automatically shut down, the accumulated warning points are 30+30=60 points.
[0035] Next, the procedure for calculating warning points and sending warning information in this system will be described with reference to the flowchart in Fig. 4. First, the management server 100 receives input of information related to an application for overtime work, etc. from the user terminal 200 via the workflow system application 112 (step S11). Applications related to applications for overtime work, etc. are received by the management server 100 via the workflow system application 112 as appropriate. Information related to the received application is transferred to the warning point calculation system 120 as appropriate.
[0036] Next, the warning point calculation system 120 judges the contents of the information on the received application, identifies the corresponding indicator, and counts the number of occurrences of the indicator. Then, at a predetermined timing, the accumulated value of the warning points is calculated for each employee (step S12). The calculation of the accumulated value can be performed, for example, during a period when the user terminal 200 is shut down (such as at night). The calculation result is stored in the warning point database 440 (step S13). Then, it is determined whether the calculated accumulated value of the warning points exceeds a threshold value (step S14). Here, the accumulated value can be the accumulated value of the warning points over a predetermined period, for example, one month. The accumulation period is not limited to a specific period and can be changed as appropriate. The cycle of the determination in step S14 can also be changed as appropriate and is not limited to a specific cycle.
[0037] If the determination in step S14 is affirmative (Yes), then in step S15 warning information is generated in warning information generation unit 130 and notified to user terminal 200 and manager terminal 300. The warning information is displayed as part of the work status confirmation screen on display 206 of user terminal 200 and display 306 of manager terminal 300 in work status confirmation screen control application 111. On the other hand, if the determination in step S14 is negative (No), then step S15 is omitted and the warning information is not notified to the corresponding user terminal 200 and manager terminal 300.
[0038] For example, a warning point calculation spreadsheet as shown in Fig. 3 can be displayed as the calculation result of the integrated value together with the name of the relevant employee, etc., to generate warning information, which can be displayed on the work status confirmation screen. By looking at this calculation spreadsheet, the relevant employee can learn the fact that he or she has received a warning and the cause of the warning. By transmitting the same information to the managerial terminal 300, an employee in charge of a managerial position can learn the work status of the employees (subordinates) that he or she supervises. The cause of the warning point can be learned by analyzing the calculation spreadsheet on the screen, and appropriate guidance can be given to the employee, changes in the division of roles can be made, or specific tasks can be reallocated.
[0039] The warning information generating unit 130 can generate warning information for each employee, but can also display warning information for multiple user terminals 200 related to a certain manager terminal 300 together on one screen. Fig. 5 shows an example of a bar graph displaying the cumulative warning points for a given month for multiple (e.g., four) employees (users A to D) supervised by a manager who is the operator of a certain manager terminal 300. In this example, the threshold is set to "100", and it shows that, of users A to D, only user B has exceeded the threshold and is the target of a warning.
[0040] FIG. 6 shows another display format of warning information, which shows the trend of the cumulative warning points of one user B over several months in a bar graph. In the example of FIG. 6, it is clear at a glance that user B's accumulated value (warning point) was within the threshold value in the month before last and last month, but this month the accumulated value (warning point) exceeded the threshold value and became the target of a warning. 5. The screen as shown in FIG. 6 may be converted into HTML data or the like so that it can be always viewed on the user terminal 200 and the managerial terminal 300, for example, via a web browser, or it may be in other data formats.
[0041] As described above, according to the attendance status management system of the first embodiment, the warning points are cumulatively calculated based on the index point conversion table, the contents of the overtime application that occurred, the execution status of the automatic shutdown, etc., and warning information is generated according to the accumulated value, which can be presented to users and managers. By visualizing the accumulated value of the warning points, the users themselves can easily manage their own work and can improve their awareness of reducing overtime. In addition, the managers who supervise the users can judge the degree of the work load of the users (employees) they supervise, the appropriateness of each person's work management and schedule management, etc., which can be useful for redistributing work and dividing roles. As a result, the overtime hours and holiday work of the entire department can be reduced.
[0042] 1, whether or not automatic shutdown is executed by the automatic shutdown application 113 may not be taken into consideration in calculating warning points (items related to automatic shutdown may be excluded from the index point conversion table). In other words, the types of indexes included in the index point conversion table are not limited to specific ones, and it is sufficient that indexes that enable the overall degree of user's task management to be determined are selected and appropriate warning points are distributed. Therefore, a system that does not include the automatic shutdown system itself may also be adopted.
[0043] [Second embodiment] Next, an attendance status management system according to a second embodiment will be described with reference to FIG. 7. The overall configuration of the system according to the second embodiment is substantially the same as that of the first embodiment (FIG. 1), so duplicated explanations will be omitted. In the first embodiment, the index point conversion table database 430 has one index point conversion table. On the other hand, in the second embodiment, multiple index point conversion tables are prepared according to the attributes of the employees, which is different from the first embodiment.
[0044] For example, different index point conversion tables can be prepared depending on the job title and work content of the user (employee), as shown in the upper part of Figure 7. A first index point conversion table can be applied to users who are general employees or temporary workers, while a second index point conversion table can be prepared for users with a job title of supervisor or higher.
[0045] Furthermore, a third index point conversion table can be prepared for users who belong to a specific department (such as a system management department) that is assigned specific work content. Once a suitable one is selected from multiple index point conversion tables, the subsequent operations are the same as in the first embodiment. By preparing an index point conversion table suitable for each job title and work content, it becomes possible to more appropriately manage the working status of users (employees). Which index point conversion table is applied can be determined based on the IP address of the user terminal 200, the employee number of the user of the user terminal 200, etc.
[0046] Depending on the position or work content, unexpected work, trouble, accidents, etc. may occur, and it may be necessary to deal with them, and there may be cases where it is unavoidable to delay the start of overtime work. In this second embodiment, in consideration of such situations, by preparing different types of index point conversion tables, it becomes possible to perform attendance management that takes into account the differences due to position and work content.
[0047] Alternatively, as shown in the lower part of Figure 7, different index point conversion tables may be applied depending on the place of work (such as the head office in Tokyo or elsewhere). Since the degree of occurrence of emergency work differs depending on the place of work, it becomes possible to implement attendance management that corresponds to such differences.
[0048] The above two examples (upper part of Figure 7, lower part of Figure 7) may be combined. In addition to these, it is also possible to apply different index point conversion tables depending on the time of year (busy season, off-season, etc.) even for the same job title, job content, and work location.
[0049] Although various embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments and includes various modified examples. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those having all of the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]
[0050] 100... management server, 110... web container, 111... work status confirmation screen control application, 112... workflow system application, 113... automatic shutdown application, 120... warning point calculation system, 200... user terminal, 300... managerial terminal, 400... database, 410... attendance information database, 420... shutdown information database, 430... index point conversion table database, 440... warning point database.
Claims
1. a storage unit that stores a point conversion table that associates items related to overtime work applications with points; a calculation unit that accumulates the number of points according to information regarding the overtime work application input from a user terminal used by the user, and outputs the accumulated value; a warning information generating unit that generates warning information indicating a warning to the user according to the integrated value and presents the warning information to the user terminal and a manager terminal used by a manager who manages the user; An attendance management system equipped with
2. An automatic shutdown system for automatically shutting down the user terminal is further provided, The storage unit stores the occurrence of an automatic shutdown in association with the number of points, The calculation unit accumulates the number of points in response to the occurrence of the automatic shutdown in addition to the information regarding the overtime work application.
2. The attendance status management system according to claim 1.
3. The attendance status management system according to claim 1 , wherein the storage unit stores different types of point conversion tables according to attributes of the users.
4. Receive information regarding an application for overtime work from the user terminal used by the user, accumulating the points according to a points conversion table that associates items related to overtime work applications with points and information related to the received overtime work application, and outputting the accumulated value; According to the integrated value, warning information indicating a warning to the user is generated and presented to the user terminal and a manager terminal used by a manager who manages the user. The attendance management program is configured to cause a computer to execute the above steps.
5. the point conversion table associates the occurrence of an automatic shutdown by an automatic shutdown system that automatically shuts down the user terminal with the number of points; In addition to the information regarding the overtime work application, the points are accumulated in response to the occurrence of the automatic shutdown.
5. The attendance status management program according to claim 4.
6. 6. The attendance status management program according to claim 4, wherein different types of point conversion tables are stored according to attributes of the users.
Citation Information
Patent Citations
Risk analysis device, risk analysis system and risk analysis program
JP2009146257A
Duty management support system, duty management support device and duty management support method
JP2014191716A
Information processing device, program, and estimation method
JP2016200955A
Management system, management method and management program and information processing device
JP2019061476A
Management system, management method, and management program
JP2019169035A